22
1 ANNUAL OPERATING PLAN FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 AND 7 PN5_PN7_2015-16 SUBMITTED: 5 NOVEMBER 2015 SUBMISSION NUMBER: 1

FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 2: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

2

CONTENTS OVERVIEW .................................................................................................................................................... 3

INCIDENTAL DECIDUOUS VOLUME .............................................................................................................. 3

OPERATING SCHEDULE AND TIMBER PRODUCTION ................................................................................... 3

REFORESTATION PROGRAM ......................................................................................................................... 8

FIRE CONTROL PLAN ..................................................................................................................................... 9

ROAD PLAN ................................................................................................................................................... 9

WATERCOURSE CROSSINGS ........................................................................................................................ 17

SENSITIVE SPECIES CONCERNS ................................................................................................................... 21

SCALING METHODOLOGY........................................................................................................................... 21

UTILIZATION STANDARDS ........................................................................................................................... 21

WEED MANAGEMENT ................................................................................................................................ 22

2015-2016 LINE CLEARING ......................................................................................................................... 22

VALIDATION BY REGISTERED FOREST PRACTITIONER ............................................................................... 22

Page 3: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

3

OVERVIEW This plan contains harvesting areas for La Crete Sawmills Ltd. / Tolko Industries Ltd. / Norbord Inc. (the Companies) and is in reference 2015-2020 Ponton 5 and Ponton 7 Forest Harvest Plan’s submitted/approved by GoA. Coniferous timber will be manufactured at the Tolko mill located in High Level. The effective date is for November 1, 2015 – April 30th, 2016. All conifer volume produced from this plan will be charged to Tolko Industries Ltd.

INCIDENTAL DECIDUOUS VOLUME Norbord Incorporated has the rights to the deciduous incidental volume within these operating areas. Utilization is dependent on the acceptance of deciduous timber by the deciduous operator. Should the deciduous operator be unable to accept incidental volume, the companies will implement avoidance strategies wherever possible to leave deciduous trees standing. All incidental deciduous volume produced will be charged to the respective company receiving the volume. Incidental deciduous left standing will be charged via the established protocols on the FMA.

OPERATING SCHEDULE AND TIMBER PRODUCTION Ponton 5

Compartment Opening Number

Block Number

Area (ha)

Field Estimated Deciduous

Volume (m³)

Field Estimated Coniferous

Volume (m³)

Total Volume

(m³)

Estimated Harvest Month

Ponton 5 5191140175 175 6.2 0 936 936 Feb to Mar 2016 Ponton 5 5191130188 188 13.95 0 1,512 1,512 Feb to Mar 2016 Ponton 5 5181130211 211 1.92 0 399 399 Feb to Mar 2016 Ponton 5 5171130276 276 16.47 443 2,017 2,460 Jan to Feb 2016 Ponton 5 5181130312 312 12.57 700 2,138 2,838 Feb to Mar 2016 Ponton 5 5171130321 321 7.01 0 1,190 1,190 Jan to Feb 2016 Ponton 5 5181130356 356 7.89 445 1,014 1,459 Feb to Mar 2016 Ponton 5 5171130359 359 16.73 701 2,589 3,290 Feb to Mar 2016 Ponton 5 5171130383 383 15.11 1,616 1,268 2,884 Jan to Feb 2016 Ponton 5 5181130415 415 9.12 282 1,392 1,674 Feb to Mar 2016 Ponton 5 5181140446 446 15.56 0 2,703 2,703 Feb to Mar 2016 Ponton 5 5181130488 488 59.35 3,795 10,852 14,647 Feb to Mar 2016 Ponton 5 5181130531 531 8.91 0 783 783 Feb to Mar 2016 Ponton 5 5181140553 553 23.61 2,572 3,611 6,183 Feb to Mar 2016 Ponton 5 5181140556 556 64.68 3,359 12,016 15,375 Feb to Mar 2016 Ponton 5 5161130591 591 3.94 148 846 994 Jan to Feb 2016 Ponton 5 5161130592 592 7.83 406 1,443 1,849 Jan to Feb 2016

Page 4: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

4

Compartment Opening Number

Block Number

Area (ha)

Field Estimated Deciduous

Volume (m³)

Field Estimated Coniferous

Volume (m³)

Total Volume

(m³)

Estimated Harvest Month

Ponton 5 5171130732 732 3.24 182 656 838 Jan to Feb 2016 Ponton 5 5161130762 762 12.2 647 1,806 2,453 Jan to Feb 2016 Ponton 5 5161130770 770 11.35 1,006 1,480 2,486 Jan to Feb 2016 Ponton 5 5161130790 790 12.46 0 3,038 3,038 Jan to Feb 2016 Ponton 5 5181130878 878 186.18 16,377 32,754 49,131 Feb to Mar 2016 Ponton 5 5171130883 883 35.92 2,441 6,318 8,759 Jan to Feb 2016 Ponton 5 5181140892 892 14.95 0 2,403 2,403 Feb to Mar 2016 Ponton 5 5171130922 922 7.38 606 1,256 1,862 Feb to Mar 2016 Ponton 5 5181130954 954 41.42 2,318 6,624 8,942 Feb to Mar 2016 Ponton 5 5171130972 972 54.39 1,358 7,711 9,069 Jan to Feb 2016 Ponton 5 5181130992 992 21.61 1,728 3,672 5,400 Feb to Mar 2016 Ponton 5 5171131155 1155 4.7 291 353 644 Jan to Feb 2016 Ponton 5 5171131243 1243 5.8 174 261 435 Jan to Feb 2016 Ponton 5 5171131281 1281 7.6 116 901 1,017 Jan to Feb 2016 Ponton 5 5181121368 1368 3.63 47 486 533 Feb to Mar 2016 Ponton 5 5191141369 1369 5.84 0 1,121 1,121 Feb to Mar 2016 Ponton 5 5191141392 1392 5.74 0 855 855 Feb to Mar 2016 Ponton 5 5181141533 1533 47.42 0 7,110 7,110 Feb to Mar 2016 Ponton 5 5181131644 1644 30.96 2,163 5,562 7,725 Feb to Mar 2016 Ponton 5 5171131684 1684 2.75 27 257 284 Jan to Feb 2016 Ponton 5 5171131796 1796 3.35 0 683 683 Jan to Feb 2016 Ponton 5 5171131834 1834 40.31 3,305 6,690 9,995 Jan to Feb 2016 Ponton 5 5181131879 1879 7.26 0 1,102 1,102 Feb to Mar 2016 Ponton 5 5171131883 1883 17.84 1,744 2,634 4,378 Jan to Feb 2016 Ponton 5 5171121918 1918 16.01 864 2,624 3,488 Feb to Mar 2016 Ponton 5 5171122036 2036 16.39 994 1,760 2,754 Jan to Feb 2016 Ponton 5 5181132046 2046 58.69 1,758 14,064 15,822 Feb to Mar 2016 Ponton 5 5181132062 2071 13.01 533 1,833 2,366 Feb to Mar 2016 Ponton 5 5171122098 2098 31.52 2,741 3,843 6,584 Jan to Feb 2016 Ponton 5 5181132104 2104 34.04 1,870 4,726 6,596 Feb to Mar 2016 Ponton 5 5181132161 2161 19.08 0 3,097 3,097 Feb to Mar 2016 Ponton 5 5181132429 2429 18.03 2,034 1,800 3,834 Feb to Mar 2016 Ponton 5 5181122485 2485 26.03 832 3,744 4,576 Feb to Mar 2016 Ponton 5 5191132497 2497 2 0 152 152 Feb to Mar 2016 Ponton 5 5181122501 2501 47.24 3,398 7,033 10,431 Feb to Mar 2016 Ponton 5 5171122517 2517 16.34 440 2,478 2,918 Jan to Feb 2016 Ponton 5 5171122524 2524 13.29 383 1,663 2,046 Jan to Feb 2016

Page 5: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

5

Compartment Opening Number

Block Number

Area (ha)

Field Estimated Deciduous

Volume (m³)

Field Estimated Coniferous

Volume (m³)

Total Volume

(m³)

Estimated Harvest Month

Ponton 5 5181122542 2542 8.1 0 1,384 1,384 Feb to Mar 2016 Ponton 5 5191132576 2576 4.3 0 770 770 Feb to Mar 2016 Ponton 5 5191122583 2583 12.33 62 1,079 1,141 Feb to Mar 2016 Ponton 5 5181122673 2673 34.02 1,972 7,650 9,622 Feb to Mar 2016 Ponton 5 5171122685 2685 29.58 236 3,570 3,806 Jan to Feb 2016 Ponton 5 5171122698 2698 56.82 966 7,441 8,407 Jan to Feb 2016 Ponton 5 5181132720 2720 13.05 780 2,405 3,185 Feb to Mar 2016 Ponton 5 5171122726 2726 12.94 439 2,064 2,503 Jan to Feb 2016 Ponton 5 5181132771 2771 24.34 851 4,374 5,225 Feb to Mar 2016 Ponton 5 5181132780 2780 4.7 0 494 494 Feb to Mar 2016 Ponton 5 5171122831 2831 32.52 1,008 4,583 5,591 Jan to Feb 2016 Ponton 5 5181132864 2864 46.46 278 7,331 7,609 Feb to Mar 2016 Ponton 5 5181122865 2865 4.19 0 615 615 Feb to Mar 2016 Ponton 5 5171122890 2890 61.21 2,815 7,711 10,526 Jan to Feb 2016 Ponton 5 5181132966 2966 21.58 0 4,085 4,085 Feb to Mar 2016 Ponton 5 5171122987 2987 8.08 504 744 1,248 Feb to Mar 2016 Ponton 5 5181133014 3014 12.47 0 2,480 2,480 Feb to Mar 2016 Ponton 5 5181133037 3037 40.95 2,454 6,789 9,243 Feb to Mar 2016 Ponton 5 5181133070 3070 60.17 3,010 11,438 14,448 Feb to Mar 2016 Ponton 5 5181133126 3126 3.52 0 532 532 Feb to Mar 2016 Ponton 5 5161123140 3140 26.49 1,610 4,198 5,808 Jan to Feb 2016 Ponton 5 5161123147 3147 8.79 757 931 1,688 Jan to Feb 2016 Ponton 5 5181123194 3194 14.68 0 1,066 1,066 Feb to Mar 2016 Ponton 5 5171123226 3226 9.42 1,322 1,369 2,691 Jan to Feb 2016 Ponton 5 5181123332 3332 6.7 0 804 804 Feb to Mar 2016 Ponton 5 5171123369 3369 3.24 0 768 768 Jan to Feb 2016 Ponton 5 5181123386 3386 9.67 576 1,123 1,699 Feb to Mar 2016 Ponton 5 5171123413 3413 20.99 941 3,323 4,264 Jan to Feb 2016 Ponton 5 5171123464 3464 7.99 395 790 1,185 Jan to Feb 2016 Ponton 5 5181123498 3498 4.48 119 660 779 Feb to Mar 2016 Ponton 5 5181123511 3511 102.35 4,297 20,153 24,450 Feb to Mar 2016 Ponton 5 5181123556 3556 46.6 1,023 10,509 11,532 Feb to Mar 2016 Ponton 5 5181123593 3593 20.73 704 2,691 3,395 Feb to Mar 2016 Ponton 5 5171123619 3619 9.22 589 1,214 1,803 Jan to Feb 2016 Ponton 5 5191123679 3679 12.79 0 635 635 Feb to Mar 2016 Ponton 5 5191123691 3691 17.34 0 1,228 1,228 Feb to Mar 2016

Totals: 1934.8 91,688 316,615 408,303 Jan to Mar 2016

Page 6: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

6

* All blocks are planned for scarification. Scarification will occur outside all watercourse buffers (as outlined in the FHP) and occur outside of the CPA timing restriction unless otherwise approved by GoA. *Blocks in Caribou Zones *Indicates contingency blocks that will be harvested if volume targets cannot be met

Ponton 7

Compartment Opening Number

Block Number

Area (ha)

Field Estimated Deciduous

Volume (m³)

Field Estimated Coniferous

Volume (m³)

Total Volume

(m³)

Estimated Harvest Month

Ponton 7 5181121044 1044 14.96 1,087.7 1,981.7 3,069.4 Dec to Jan 2016 Ponton 7 5171121075 1075 15.84 537.2 2,701.8 3,239.0 Dec to Jan 2016 Ponton 7 5171110112 112 7.39 226.3 1,007.4 1,233.7 Nov to Dec 2015 Ponton 7 5171111134 1134 6.06 390.0 1,470.0 1,860.0 Nov to Dec 2015 Ponton 7 5181111152 1152 11.16 654.9 1,076.7 1,731.6 Jan to Feb 2016 Ponton 7 5181121185 1185 7.14 248.5 1,228.3 1,476.8 Dec to Jan 2016 Ponton 7 5181111256 1256 3.48 384.2 248.2 632.4 Jan to Feb 2016 Ponton 7 5171111270 1270 5.60 196.0 935.2 1,131.2 Nov to Dec 2015 Ponton 7 5181121280 1280 15.58 967.2 2,106.0 3,073.2 Dec to Jan 2016 Ponton 7 5181111299 1299 5.23 468.0 514.8 982.8 Jan to Feb 2016 Ponton 7 5181121351 1351 5.34 79.5 689.0 768.5 Dec to Jan 2016 Ponton 7 5181121362 1362 33.41 2,605.2 5,377.4 7,982.6 Dec to Jan 2016 Ponton 7 5171121381 1381 5.96 210.9 712.5 923.4 Feb to Mar 2016 Ponton 7 5171121431 1431 4.03 80.0 560.0 640.0 Feb to Mar 2016 Ponton 7 5181111447 1447 13.16 950.4 1,650.0 2,600.4 Jan to Feb 2016 Ponton 7 5171110145 145 6.23 80.6 787.4 868.0 Nov to Dec 2015 Ponton 7 5171121455 1455 4.17 217.3 438.7 656.0 Jan to Feb 2016 Ponton 7 5171121459 1459 7.03 273.0 973.0 1,246.0 Feb to Mar 2016 Ponton 7 5171121482 1482 5.41 324.0 810.0 1,134.0 Feb to Mar 2016 Ponton 7 5181111489 1489 23.43 2,293.2 3,510.0 5,803.2 Jan to Feb 2016 Ponton 7 5171121498 1498 21.28 2,172.6 3,109.8 5,282.4 Feb to Mar 2016 Ponton 7 5161111563 1563 4.27 273.0 831.6 1,104.6 Nov to Dec 2015 Ponton 7 5181111565 1565 34.13 2,011.9 4,398.9 6,410.8 Jan to Feb 2016 Ponton 7 5161111576 1576 3.41 180.2 629.0 809.2 Nov to Dec 2015 Ponton 7 5171111677 1677 15.74 157.0 2,386.4 2,543.4 Jan to Feb 2016 Ponton 7 5161121702 1702 9.16 - 1,638.0 1,638 Feb to Mar 2016 Ponton 7 5161121707 1707 3.33 - 324.0 324.0 Feb to Mar 2016 Ponton 7 5171121754 1754 25.10 2,334.3 1,907.6 4,241.9 Dec to Jan 2016 Ponton 7 5161121758 1758 5.85 - 986.0 986.0 Feb to Mar 2016 Ponton 7 5181120177 177 32.01 5,152.0 4,672.0 9,824.0 Dec to Jan 2016 Ponton 7 5171111804 1804 34.43 2,182.4 5,728.8 7,911.2 Jan to Feb 2016 Ponton 7 5171121811 1811 22.22 1,332.0 3,330.0 4,662.0 Dec to Jan 2016 Ponton 7 5171111848 1848 14.49 446.4 1,785.6 2,232.0 Jan to Feb 2016 Ponton 7 5171121854 1854 14.40 1,008.0 2,188.8 3,196.8 Dec to Jan 2016

Page 7: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

7

Compartment Opening Number

Block Number

Area (ha)

Field Estimated Deciduous

Volume (m³)

Field Estimated Coniferous

Volume (m³)

Total Volume

(m³)

Estimated Harvest Month

Ponton 7 5171121877 1877 66.00 6,676.1 10,113.0 16,789.4 Dec to Jan 2016 Ponton 7 5161121946 1946 9.98 - 1,395.9 1,395.9 Feb to Mar 2016 Ponton 7 5171110195 195 4.67 274.4 578.2 852.6 Nov to Dec 2015 Ponton 7 5171111991 1991 3.86 140.6 387.6 528.2 Jan to Feb 2016 Ponton 7 5171112048 2048 3.05 396.8 303.8 700.6 Jan to Feb 2016 Ponton 7 5171112058 2058 3.21 825.6 - 825.6 Jan to Feb 2016 Ponton 7 5171112168 2168 6.79 234.6 931.5 1,166.1 Jan to Feb 2016 Ponton 7 5171112206 2206 28.74 4,466.0 3,480.4 7,946.4 Jan to Feb 2016 Ponton 7 5171122246 2246 2.40 317.4 280.6 598.0 Dec to Jan 2016 Ponton 7 5171112257 2257 11.26 728.0 1,232.0 1,960.0 Jan to Feb 2016 Ponton 7 5171122263 2263 6.80 - 1,455.2 1,455.2 Nov to Dec 2015 Ponton 7 5161112266 2266 14.64 803.0 1,795.8 2,598.8 Nov to Dec 2015 Ponton 7 5171112348 2348 3.68 48.1 395.9 444.0 Jan to Feb 2016 Ponton 7 5171122368 2368 3.25 342.4 883.2 1,225.6 Feb to Mar 2016 Ponton 7 5181120240 240 16.26 1,474.2 2,721.6 4,195.8 Dec to Jan 2016 Ponton 7 5171122499 2499 9.30 - 2,575.3 2,575.3 Feb to Mar 2016 Ponton 7 5181112605 2605 9.32 725.4 864.9 1,590.3 Dec to Jan 2016 Ponton 7 5171112645 2645 6.74 983.4 759.0 1,742.4 Jan to Feb 2016 Ponton 7 5181110265 265 1.47 - 204.4 204.4 Jan to Feb 2016 Ponton 7 5161112712 2712 3.02 405.0 186.0 591.0 Nov to Dec 2015 Ponton 7 5181112730 2730 23.15 1,547.7 1,570.8 3,118.5 Dec to Jan 2016 Ponton 7 5171112760 2760 9.54 1,282.5 1,073.5 2,356 Jan to Feb 2016 Ponton 7 5181112767 2767 13.47 1,390.0 1,251.0 2,641.0 Dec to Jan 2016 Ponton 7 5161112858 2858 22.08 - 1,645.8 1,645.75 Nov to Dec 2015 Ponton 7 5161112879 2879 2.09 - 147.0 147.0 Nov to Dec 2015 Ponton 7 5171110291 291 2.15 113.4 186.9 300.3 Nov to Dec 2015 Ponton 7 5171112955 2955 173.56 15,606.0 30,345.0 45,951.0 Dec to Jan 2016 Ponton 7 5161112975 2975 6.76 - 828.0 828.0 Nov to Dec 2015 Ponton 7 5171112980 2980 7.77 592.8 600.6 1,193.4 Jan to Feb 2016 Ponton 7 5171113044 3044 6.61 990.0 792.0 1,782.0 Jan to Feb 2016 Ponton 7 5171113071 3071 10.28 1,184.5 1,133.0 2,317.5 Jan to Feb 2016 Ponton 7 5171113106 3106 13.16 1,388.6 2,227.0 3,615.6 Dec to Jan 2016 Ponton 7 5171113112 3112 8.09 1,514.7 1,182.6 2,697.3 Dec to Jan 2016 Ponton 7 5171113122 3122 10.34 714.0 1,999.2 2,713.2 Jan to Feb 2016 Ponton 7 5171113195 3195 50.57 5,616.6 9,361.0 14,977.6 Dec to Jan 2016 Ponton 7 5171120320 320 6.18 - 1,134.0 1,134.0 Dec to Jan 2016 Ponton 7 5171113276 3276 96.42 13,978.0 13,978.0 27,956.0 Dec to Jan 2016 Ponton 7 5171113353 3353 43.22 3,369.6 7,387.2 10,756.8 Dec to Jan 2016 Ponton 7 5181113372 3372 37.42 6,324.0 4,836.0 11,160.0 Dec to Jan 2016 Ponton 7 5161113383 3383 9.53 - 987.0 987.0 Nov to Dec 2015 Ponton 7 5181113452 3452 17.95 1,915.3 1,449.9 3,365.2 Dec to Jan 2016

Page 8: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

8

Compartment Opening Number

Block Number

Area (ha)

Field Estimated Deciduous

Volume (m³)

Field Estimated Coniferous

Volume (m³)

Total Volume

(m³)

Estimated Harvest Month

Ponton 7 5171113457 3457 59.44 4,144.0 8,880.0 13,024.0 Dec to Jan 2016 Ponton 7 5161120355 355 18.52 - 2,833.6 2,833.6 Nov to Dec 2015 Ponton 7 5181113589 3589 7.65 296.4 1,071.6 1,368.0 Dec to Jan 2016 Ponton 7 5171113654 3654 2.06 - 493.5 493.5 Jan to Feb 2016 Ponton 7 5181113694 3694 9.45 880.0 510.4 1,390.4 Dec to Jan 2016 Ponton 7 5171120425 425 52.51 2,355.6 6,946.0 9,301.6 Dec to Jan 2016 Ponton 7 5171120467 467 18.52 - 2,387.6 2,387.6 Dec to Jan 2016 Ponton 7 5181110487 487 53.27 3,670.8 7,341.6 11,012.4 Jan to Feb 2016 Ponton 7 5161110495 495 18.48 - 2,888.8 2,888.8 Nov to Dec 2015 Ponton 7 5171120506 506 9.20 920.0 1,288.0 2,208.0 Dec to Jan 2016 Ponton 7 5171120594 594 27.99 1,339.2 4,770.9 6,110.1 Dec to Jan 2016 Ponton 7 5171120587 587 24.69 2,771.5 3,060.7 5,832.2 Dec to Jan 2016 Ponton 7 5171120640 640 25.34 2,091.6 3,704.4 5,796.0 Dec to Jan 2016 Ponton 7 5161120646 646 2.43 187.2 446.4 633.6 Jan to Feb 2016 Ponton 7 5161110710 710 29.51 708.0 4,690.5 5,398.5 Nov to Dec 2015 Ponton 7 5161120719 719 3.52 409.5 609.0 1,018.5 Feb to Mar 2016 Ponton 7 5171110754 754 5.14 132.6 397.8 530.4 Jan to Feb 2016 Ponton 7 5161110755 755 9.63 489.6 1,411.2 1,900.8 Dec to Jan 2016 Ponton 7 5171120765 765 15.53 1,085.0 2,015.0 3,100.0 Jan to Feb 2016 Ponton 7 5171120821 821 109.59 12,045.0 10,950.0 22,995.0 Dec to Jan 2016 Ponton 7 5171120826 826 9.53 988.0 1,178.0 2,166.0 Dec to Jan 2016 Ponton 7 5161120848 848 6.93 - 1,104.0 1,104.0 Feb to Mar 2016 Ponton 7 5161120914 914 2.50 187.5 425.0 612.5 Feb to Mar 2016 Ponton 7 5171120923 923 25.25 1,764.0 2,646.0 4,410.0 Dec to Jan 2016 Ponton 7 5171120935 935 22.91 - 3,893.0 3,893.0 Dec to Jan 2016 Ponton 7 5171120939 939 10.86 1,004.4 2,192.4 3,196.8 Nov to Dec 2015

Total: 1775.5 141,345 176,001 392,383 Dec to Mar 2016 * All blocks are planned for scarification. Scarification will occur outside all watercourse buffers (as outlined in the FHP) and occur outside of the CPA timing restriction unless otherwise approved by GoA. *Indicates contingency blocks that will be harvested if volume targets cannot be met

REFORESTATION PROGRAM The reforestation program for Ponton 5 and Ponton 7 will follow ‘the Companies’ Annual Silviculture Plan submission for 2015-16. Items described in the plan include the silviculture prescription and silviculture treatment schedule. All blocks planned for scarification are contained in the Operating Schedule and Timber Production table.

Page 9: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

9

Proposed planting operations for Ponton 5 and Ponton 7 are as follows:

License Seed zone M³ Vol/Ha Area Trees Stock Type

Ponton 5 CM 1.3(4.67) 348,500 175 1,991.4 3,026,971 410A

Ponton 7 CM1.3(2.314)'DM 1.1(.324) 155,000 230 673.9 1,024,348 410A

Total: 503,500 405 2665.3 4,051,319

The Ponton 5 and Ponton 7 compartment are planned as a 2016 spring tree planting program. Any outstanding areas needed for reforestation will have remaining tree planting commence during the 2017 spring/summer planting program. Specific sensitive species considerations for spring planting is outlined in the Companies’ 2015 Caribou Protection Area & Key Wildlife Biodiversity Zone Plan.

FIRE CONTROL PLAN Tolko’s final Fire Control Plan for FMA 0200040 was submitted May 29, 2015 and approved June 22, 2015. A Fire Control Plan will be submitted to GoA by Tolko Industries Ltd. again in March 2016 in accordance with the UHROGR’s section 7.3.5.

ROAD PLAN The Road Plan for Ponton 5 and Ponton 7 will be consistent with Appendix C – Road Design Report of the 2015-2020 Forest Harvest Plan. Only those blocks listed under this AOP will require access approval. The accompanying Overview Map gives a visual representation of what roads are being applied for under this AOP submission. An application for approval of early access for freeze in of main haul routes has been sent to GoA. Those routes are highlighted in the following table as well as identified on the Overview Map.

Ponton 5

Road Number Disposition

Number Road Class Season of Use Corridor Width

PN5M1 LOC890915 Class IV Frozen 7-20m PN5M1 DLO760786 Class IV Frozen 7-20m PN5M1 DLO770057 Class IV Frozen 7-20m PN5M2 N/A Class IV Frozen 7-20m

PN5M2A N/A Class IV Frozen 7-20m PN5M2B N/A Class IV Frozen 7-20m PN5M3 N/A Class IV Frozen 7-20m PN5M4 N/A Class IV Frozen 7-20m PN5M5 LOC033476 Class IV Frozen 7-20m

1155 N/A Class IV Frozen 7-20m 1243 N/A Class IV Frozen 7-20m 1281 N/A Class IV Frozen 7-20m

Page 10: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

10

Road Number Disposition

Number Road Class Season of Use Corridor Width

1368 N/A Class IV Frozen 7-20m 1644 N/A Class IV Frozen 7-20m

1644A N/A Class IV Frozen 7-20m 1644B N/A Class IV Frozen 7-20m 1644C N/A Class IV Frozen 7-20m 1684 N/A Class IV Frozen 7-20m 1730 DLO760786 Class IV Frozen 7-20m 175 N/A Class IV Frozen 7-20m

1796 N/A Class IV Frozen 7-20m 1834A N/A Class IV Frozen 7-20m 1834B N/A Class IV Frozen 7-20m 1879 N/A Class IV Frozen 7-20m 188 LOC030124 Class IV Frozen 7-20m

1918 N/A Class IV Frozen 7-20m 1918A N/A Class IV Frozen 7-20m 1918B N/A Class IV Frozen 7-20m 1947 N/A Class IV Frozen 7-20m 2036 N/A Class IV Frozen 7-20m 2046 N/A Class IV Frozen 7-20m

2046A N/A Class IV Frozen 7-20m 2046B N/A Class IV Frozen 7-20m 2071 N/A Class IV Frozen 7-20m

2071A N/A Class IV Frozen 7-20m 2083 N/A Class IV Frozen 7-20m 2098 N/A Class IV Frozen 7-20m

2098A N/A Class IV Frozen 7-20m 2104 N/A Class IV Frozen 7-20m

2104A N/A Class IV Frozen 7-20m 211 N/A Class IV Frozen 7-20m

2161 N/A Class IV Frozen 7-20m 2161A N/A Class IV Frozen 7-20m 2429 N/A Class IV Frozen 7-20m

2429A N/A Class IV Frozen 7-20m 2429B N/A Class IV Frozen 7-20m 2429C N/A Class IV Frozen 7-20m 2485 N/A Class IV Frozen 7-20m

2485A N/A Class IV Frozen 7-20m 2497 N/A Class IV Frozen 7-20m 2501 N/A Class IV Frozen 7-20m

Page 11: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

11

Road Number Disposition

Number Road Class Season of Use Corridor Width

2501A N/A Class IV Frozen 7-20m 2517 N/A Class IV Frozen 7-20m 2524 N/A Class IV Frozen 7-20m

2524A N/A Class IV Frozen 7-20m 2542 N/A Class IV Frozen 7-20m 2576 N/A Class IV Frozen 7-20m

2576A N/A Class IV Frozen 7-20m 2583 LOC020269 Class IV Frozen 7-20m 2673 N/A Class IV Frozen 7-20m

2673A N/A Class IV Frozen 7-20m 2685 N/A Class IV Frozen 7-20m

2685A N/A Class IV Frozen 7-20m 2698 N/A Class IV Frozen 7-20m

2698A N/A Class IV Frozen 7-20m 2698B N/A Class IV Frozen 7-20m 2698C N/A Class IV Frozen 7-20m 2698D N/A Class IV Frozen 7-20m 2698E N/A Class IV Frozen 7-20m 2720 N/A Class IV Frozen 7-20m

2720A N/A Class IV Frozen 7-20m 2726 N/A Class IV Frozen 7-20m

2726A N/A Class IV Frozen 7-20m 276 N/A Class IV Frozen 7-20m

276A N/A Class IV Frozen 7-20m 2771 N/A Class IV Frozen 7-20m

2771A N/A Class IV Frozen 7-20m 2831 N/A Class IV Frozen 7-20m

2831A N/A Class IV Frozen 7-20m 2831B N/A Class IV Frozen 7-20m 2864 N/A Class IV Frozen 7-20m

2864B N/A Class IV Frozen 7-20m 2864C N/A Class IV Frozen 7-20m 2865 N/A Class IV Frozen 7-20m 2890 N/A Class IV Frozen 7-20m

2890A N/A Class IV Frozen 7-20m 2890B N/A Class IV Frozen 7-20m 2890C N/A Class IV Frozen 7-20m 2890D N/A Class IV Frozen 7-20m 2966 N/A Class IV Frozen 7-20m

Page 12: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

12

Road Number Disposition

Number Road Class Season of Use Corridor Width

2987 N/A Class IV Frozen 7-20m 2987A N/A Class IV Frozen 7-20m 3008 N/A Class IV Frozen 7-20m

3008A N/A Class IV Frozen 7-20m 3008B N/A Class IV Frozen 7-20m 3008C N/A Class IV Frozen 7-20m 3008D N/A Class IV Frozen 7-20m 3008E N/A Class IV Frozen 7-20m 3008F N/A Class IV Frozen 7-20m 3008G N/A Class IV Frozen 7-20m 3008H N/A Class IV Frozen 7-20m 3008I N/A Class IV Frozen 7-20m 3008J N/A Class IV Frozen 7-20m 3014 N/A Class IV Frozen 7-20m

3014A N/A Class IV Frozen 7-20m 3014B N/A Class IV Frozen 7-20m

302 N/A Class IV Frozen 7-20m 302A N/A Class IV Frozen 7-20m 3037 N/A Class IV Frozen 7-20m

3037A N/A Class IV Frozen 7-20m 3037B N/A Class IV Frozen 7-20m 3037C N/A Class IV Frozen 7-20m 3070 N/A Class IV Frozen 7-20m

3070A N/A Class IV Frozen 7-20m 3070B N/A Class IV Frozen 7-20m 3070C N/A Class IV Frozen 7-20m 3126 N/A Class IV Frozen 7-20m 3140 N/A Class IV Frozen 7-20m

3140A N/A Class IV Frozen 7-20m 3140B N/A Class IV Frozen 7-20m 3147 N/A Class IV Frozen 7-20m 3194 N/A Class IV Frozen 7-20m

3194A N/A Class IV Frozen 7-20m 321 N/A Class IV Frozen 7-20m

3226 N/A Class IV Frozen 7-20m 3226A N/A Class IV Frozen 7-20m

328 N/A Class IV Frozen 7-20m 328A N/A Class IV Frozen 7-20m 3332 N/A Class IV Frozen 7-20m

Page 13: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

13

Road Number Disposition

Number Road Class Season of Use Corridor Width

3369 N/A Class IV Frozen 7-20m 3386 N/A Class IV Frozen 7-20m 3413 N/A Class IV Frozen 7-20m

3413A N/A Class IV Frozen 7-20m 3464 N/A Class IV Frozen 7-20m 3498 N/A Class IV Frozen 7-20m 3511 N/A Class IV Frozen 7-20m

3511A N/A Class IV Frozen 7-20m 3511B N/A Class IV Frozen 7-20m 3511C N/A Class IV Frozen 7-20m 3511D N/A Class IV Frozen 7-20m 3511E N/A Class IV Frozen 7-20m 3511F N/A Class IV Frozen 7-20m 3511G N/A Class IV Frozen 7-20m 3511H N/A Class IV Frozen 7-20m 3511I N/A Class IV Frozen 7-20m 3511J N/A Class IV Frozen 7-20m 3556 N/A Class IV Frozen 7-20m

3556A N/A Class IV Frozen 7-20m 3556B N/A Class IV Frozen 7-20m

356 N/A Class IV Frozen 7-20m 3593 N/A Class IV Frozen 7-20m

3593A N/A Class IV Frozen 7-20m 359A N/A Class IV Frozen 7-20m 3619 N/A Class IV Frozen 7-20m

3619A N/A Class IV Frozen 7-20m 3679 N/A Class IV Frozen 7-20m

3679A N/A Class IV Frozen 7-20m 3691 N/A Class IV Frozen 7-20m

3691A N/A Class IV Frozen 7-20m 3691B N/A Class IV Frozen 7-20m 3691C N/A Class IV Frozen 7-20m

374 N/A Class IV Frozen 7-20m 383 N/A Class IV Frozen 7-20m 415 N/A Class IV Frozen 7-20m 446 N/A Class IV Frozen 7-20m 488 N/A Class IV Frozen 7-20m

488A N/A Class IV Frozen 7-20m 488B N/A Class IV Frozen 7-20m

Page 14: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

14

Road Number Disposition

Number Road Class Season of Use Corridor Width

488C N/A Class IV Frozen 7-20m 488D N/A Class IV Frozen 7-20m 531 N/A Class IV Frozen 7-20m

531A N/A Class IV Frozen 7-20m 531B N/A Class IV Frozen 7-20m 553 N/A Class IV Frozen 7-20m

553A N/A Class IV Frozen 7-20m 553B N/A Class IV Frozen 7-20m 553C N/A Class IV Frozen 7-20m 556 N/A Class IV Frozen 7-20m

556A N/A Class IV Frozen 7-20m 556B N/A Class IV Frozen 7-20m 556C N/A Class IV Frozen 7-20m 556D N/A Class IV Frozen 7-20m 556E N/A Class IV Frozen 7-20m 591 N/A Class IV Frozen 7-20m 592 N/A Class IV Frozen 7-20m 732 N/A Class IV Frozen 7-20m 762 N/A Class IV Frozen 7-20m 770 N/A Class IV Frozen 7-20m 790 N/A Class IV Frozen 7-20m

790A N/A Class IV Frozen 7-20m 878 N/A Class IV Frozen 7-20m

878A N/A Class IV Frozen 7-20m 878B N/A Class IV Frozen 7-20m 878C N/A Class IV Frozen 7-20m 878D N/A Class IV Frozen 7-20m 878E N/A Class IV Frozen 7-20m 878F N/A Class IV Frozen 7-20m 878G N/A Class IV Frozen 7-20m 878H N/A Class IV Frozen 7-20m 878I N/A Class IV Frozen 7-20m 883 N/A Class IV Frozen 7-20m

883A N/A Class IV Frozen 7-20m 892 N/A Class IV Frozen 7-20m 893 N/A Class IV Frozen 7-20m 922 N/A Class IV Frozen 7-20m 938 N/A Class IV Frozen 7-20m

938A N/A Class IV Frozen 7-20m

Page 15: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

15

Road Number Disposition

Number Road Class Season of Use Corridor Width

954 N/A Class IV Frozen 7-20m 972 N/A Class IV Frozen 7-20m

972A N/A Class IV Frozen 7-20m 972B N/A Class IV Frozen 7-20m 972C N/A Class IV Frozen 7-20m 992 N/A Class IV Frozen 7-20m 999 N/A Class IV Frozen 7-20m

999A N/A Class IV Frozen 7-20m WT3M1 N/A Class IV Frozen 7-20m

WT3M1 (DLO) DLO4530 Class IV Frozen 7-20m WT3M1 (DLO) DLO760786 Class IV Frozen 7-20m

• Roads highlighted in yellow are being requested for approval for early freeze in access

Ponton 7

Road Number Disposition Number Road Classification Season of Use Corridor Width 112 N/A Class IV Winter 7-20m 145 N/A Class IV Winter 7-20m 177 N/A Class IV Winter 7-20m 195 N/A Class IV Winter 7-20m 240 N/A Class IV Winter 7-20m 265 N/A Class IV Winter 7-20m 291 N/A Class IV Winter 7-20m 320 N/A Class IV Winter 7-20m 355 N/A Class V Winter 7-20m 425 N/A Class IV Winter 7-20m 487 N/A Class IV Winter 7-20m 495 N/A Class IV Winter 7-20m 587 N/A Class IV Winter 7-20m 594 N/A Class V Winter 7-20m 640 N/A Class V Winter 7-20m 646 N/A Class IV Winter 7-20m 709 N/A Class IV Winter 7-20m 710 N/A Class IV Winter 7-20m 719 N/A Class IV Winter 7-20m 754 N/A Class IV Winter 7-20m 755 N/A Class IV Winter 7-20m 765 N/A Class IV Winter 7-20m 826 N/A Class IV Winter 7-20m 848 N/A Class IV Winter 7-20m 914 N/A Class IV Winter 7-20m 923 N/A Class IV Winter 7-20m 935 N/A Class IV Winter 7-20m

Page 16: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

16

939 N/A Class IV Winter 7-20m 1044 N/A Class V Winter 7-20m 1075 N/A Class IV Winter 7-20m 1134 N/A Class IV Winter 7-20m 1185 N/A Class IV Winter 7-20m 1270 N/A Class IV Winter 7-20m 1280 N/A Class IV Winter 7-20m 1299 N/A Class IV Winter 7-20m 1351 N/A Class V Winter 7-20m 1381 N/A Class IV Winter 7-20m 1431 N/A Class IV Winter 7-20m 1447 N/A Class IV Winter 7-20m 1455 N/A Class IV Winter 7-20m 1482 N/A Class IV Winter 7-20m 1498 N/A Class IV Winter 7-20m 1563 N/A Class IV Winter 7-20m 1565 N/A Class IV Winter 7-20m 1677 LOC032966 Class IV Winter 7-20m 1702 N/A Class IV Winter 7-20m 1754 N/A Class IV Winter 7-20m 1758 N/A Class IV Winter 7-20m 1804 N/A Class IV Winter 7-20m 1811 N/A Class IV Winter 7-20m 1854 N/A Class IV Winter 7-20m 1946 N/A Class V Winter 7-20m 1991 N/A Class IV Winter 7-20m 2048 N/A Class IV Winter 7-20m 2058 N/A Class IV Winter 7-20m 2168 N/A Class IV Winter 7-20m 2206 N/A Class IV Winter 7-20m 2246 N/A Class IV Winter 7-20m 2257 N/A Class IV Winter 7-20m 2263 N/A Class IV Winter 7-20m 2266 N/A Class IV Winter 7-20m 2348 N/A Class IV Winter 7-20m 2368 N/A Class IV Winter 7-20m 2499 N/A Class IV Winter 7-20m 2605 N/A Class IV Winter 7-20m 2645 N/A Class IV Winter 7-20m

Page 17: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

17

2712 N/A Class IV Winter 7-20m 2730 N/A Class IV Winter 7-20m 2760 N/A Class IV Winter 7-20m 2858 N/A Class IV Winter 7-20m 2879 N/A Class IV Winter 7-20m 2955 N/A Class IV Winter 7-20m 2975 N/A Class IV Winter 7-20m 2980 N/A Class IV Winter 7-20m 3044 N/A Class IV Winter 7-20m 3071 N/A Class IV Winter 7-20m 3106 N/A Class IV Winter 7-20m 3122 N/A Class IV Winter 7-20m 3195 N/A Class IV Winter 7-20m 3276 N/A Class IV Winter 7-20m 3353 N/A Class IV Winter 7-20m 3372 LOC032123 Class V Winter 7-20m 3383 N/A Class IV Winter 7-20m 3452 N/A Class IV Winter 7-20m 3457 N/A Class IV Winter 7-20m 3589 N/A Class IV Winter 7-20m 3654 N/A Class IV Winter 7-20m 3694 N/A Class IV Winter 7-20m

PN7M1 DLO770057 Class V Winter 7-20m PN7M2 LOC013472 Class V Winter 7-20m PN7M3 LOC032966 Class V Winter 7-20m PN7M4 N/A Class IV Winter 7-20m

• Roads highlighted in yellow are being requested for approval for early freeze in access

WATERCOURSE CROSSINGS The Watercourse Crossings for Ponton 5 and Ponton 7 will be consistent with Appendix D – Watercourse Crossings Table of the 2015-2020 Forest Harvest Plan. Only those blocks listed under this AOP will require crossings approval. The accompanying Overview Map provides a visual representation of watercourse crossings that are being applied for.

Page 18: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

18

Ponton 5

Crossing ID

Crossing Class Stream Classification Crossing Type Working

Area 12964 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 12966 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 12968 Stream Intermittent Fill: Snow/Ice/Logs PN 5 12973 Stream Intermittent Fill: Snow/Ice/Logs PN 5 12974 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 12980 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 12981 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 12991 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 12995 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 12998 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 12999 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 13000 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 13020 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 13021 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 13022 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 13025 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 13026 Stream Intermittent Fill: Snow/Ice/Logs PN 5 14118 Skid Ephemeral Fill: Snow/Ice/Logs PN 5 14121 Stream Intermittent Fill: Snow/Ice/Logs PN 5 14123 Stream Intermittent Fill: Snow/Ice/Logs PN 5 14125 Skid Ephemeral Fill: Snow/Ice/Logs PN 5 16382 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 16391 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 16400 Skid Watersource Area Fill: Snow/Ice/Logs PN 5 16404 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 16410 Stream Intermittent Fill: Snow/Ice/Logs PN 5 16413 Stream Intermittent Fill: Snow/Ice/Logs PN 5 16415 Stream Intermittent Fill: Snow/Ice/Logs PN 5 16419 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 16421 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 16436 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 16440 Stream Intermittent Fill: Snow/Ice/Logs PN 5 16796 Stream Intermittent Fill: Snow/Ice/Logs PN 5 16797 Stream Intermittent Fill: Snow/Ice/Logs PN 5 16798 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 16800 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 16801 Stream Intermittent Fill: Snow/Ice/Logs PN 5 16802 Skid Intermittent Fill: Snow/Ice/Logs PN 5 16808 Stream Intermittent Fill: Snow/Ice/Logs PN 5

Page 19: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

19

17331 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 17333 Stream Intermittent Fill: Snow/Ice/Logs PN 5 17335 Stream Intermittent Fill: Snow/Ice/Logs PN 5 17337 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 17338 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 17339 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 17341 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 17352 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18079 Skid Intermittent Fill: Snow/Ice/Logs PN 5 18082 Stream Intermittent Fill: Snow/Ice/Logs PN 5 18083 Stream Intermittent Fill: Snow/Ice/Logs PN 5 18084 Stream Intermittent Fill: Snow/Ice/Logs PN 5 18086 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 18088 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18174 Skid Intermittent Fill: Snow/Ice/Logs PN 5 18175 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18176 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18177 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18178 Skid Ephemeral Fill: Snow/Ice/Logs PN 5 18179 Skid Intermittent Fill: Snow/Ice/Logs PN 5 18180 Skid Intermittent Fill: Snow/Ice/Logs PN 5 18181 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18182 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18183 Stream Intermittent Fill: Snow/Ice/Logs PN 5 18184 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 18294 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 18295 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 18494 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 18495 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 18496 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 18497 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 18498 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 18499 Stream Small Permanent Fill: Snow/Ice/Logs PN 5 18502 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18503 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18504 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 18505 Stream Ephemeral Fill: Snow/Ice/Logs PN 5 18506 Skid Ephemeral Fill: Snow/Ice/Logs PN 5 18507 Stream Watersource Area Fill: Snow/Ice/Logs PN 5 18508 Skid Ephemeral Fill: Snow/Ice/Logs PN 5

Ponton 7

Page 20: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

20

Crossing ID

Crossing Class Stream Classification Crossing Type Working

Area 16118 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16119 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16121 Stream Intermittent Fill: Snow/Ice/Logs PN 7 16124 Stream Intermittent Fill: Snow/Ice/Logs PN 7 16126 Stream Watersource Area Fill: Snow/Ice/Logs PN 7 16127 Stream Intermittent Fill: Snow/Ice/Logs PN 7 16128 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 16136 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16137 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16143 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16150 Stream Intermittent Fill: Snow/Ice/Logs PN 7 16151 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16160 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16163 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16165 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16169 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16170 Stream Watersource Area Fill: Snow/Ice/Logs PN 7 16171 Stream Intermittent Fill: Snow/Ice/Logs PN 7 16172 Stream Intermittent Fill: Snow/Ice/Logs PN 7 16173 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16174 Stream Intermittent Fill: Snow/Ice/Logs PN 7 16175 Stream Intermittent Fill: Snow/Ice/Logs PN 7 16176 Stream Small Permanent Fill: Snow/Ice/Logs PN 7 16178 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16182 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16183 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16186 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16187 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 16981 Stream Intermittent Fill: Snow/Ice/Logs PN 7 17126 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 17127 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 17128 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17129 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17130 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17131 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17188 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17189 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17190 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 17209 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17210 Stream Intermittent Fill: Snow/Ice/Logs PN 7 17211 Stream Ephemeral Fill: Snow/Ice/Logs PN 7

Page 21: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

21

17384 Stream Intermittent Fill: Snow/Ice/Logs PN 7 17420 Skid Intermittent Fill: Snow/Ice/Logs PN 7 17421 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17422 Skid Intermittent Fill: Snow/Ice/Logs PN 7 17423 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17424 Stream Intermittent Fill: Snow/Ice/Logs PN 7 17429 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 17555 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 17556 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 17557 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 17558 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17560 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17561 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17562 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17564 Stream Watersource Area Fill: Snow/Ice/Logs PN 7 17730 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17731 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17732 Skid Ephemeral Fill: Snow/Ice/Logs PN 7 17860 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17861 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17862 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17863 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 17864 Stream Ephemeral Fill: Snow/Ice/Logs PN 7 18900 Stream Watersource Area Fill: Snow/Ice/Logs PN 7 Bushe River Stream Small Permanent Fill: Snow/Ice/Logs PN 7

SENSITIVE SPECIES CONCERNS Refer to the Caribou Protection Area & Key Wildlife Biodiversity Zone Plan submitted October 21, 2015.

SCALING METHODOLOGY Tolko Industries Ltd. abides by the scaling methodology set out by the Government of Alberta in the Alberta Scaling Manual – Smalian Scale (section 3.0).

UTILIZATION STANDARDS Ponton 5 & 7 will be cut to length operations with timber being hauled directly to the Tolko High Level mill. Utilization standards set out in the Upper Hay Regional Operating Ground Rules section 4.2.1 will be adhered to in accordance with minimum standards defined under ‘the Companies’ FMA 0200040 timber disposition.

Page 22: FMA 0200040 PONTON OPERATING AREA COMPARTMENT 5 … · 1 annual operating plan . fma 0200040 . ponton operating area . compartment 5 and 7 . pn5_ pn7_ 2015- 16 . submitted: 5 november

PN5_PN7_2015-16

22

WEED MANAGEMENT Tolko Industries Ltd., Norbord Inc. and La Crete Sawmills (‘the Companies) shall, with respect to the land contained in this timber disposition, prevent the establishment of and control all noxious and restricted weeds to which the Weed Control Act applies, in a manner acceptable to the Minister.

2015-2016 LINE CLEARING The 2016 line clearing program within Ponton 4 & 6 is planned to commence as early as frozen conditions will allow operations to begin, consultation is deemed adequate, and the line clearing AOP is approved by GoA. Tolko Industries Ltd. is striving for an ‘early in early out’ strategy for all lines planned to be cleared within Caribou Zones as well as Key Wildlife Biodiversity Zones to accommodate best practice timelines.

Ponton 4 & 6 compartments are scheduled for line clearing. Further details on the 2016 line clearing program can be referred to in the Caribou Protection Area & Key Wildlife Biodiversity Plan submitted October 21, 2015 and the 2015-2016 Line Clearing AOP.

VALIDATION BY REGISTERED FOREST PRACTITIONER

Plan prepared and submitted on behalf of Tolko Industries by:

Date: November 4, 2015

Sean Ellens, RPFT #120015

Operations Forester – Tolko Industries Ltd.