Dynamic Infrastructure: Helping build a smarter planet
From Space this Planet is a special place
IBM
4 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
Everyone, Everything, Everywhere becoming connected in a joined up technological world
At 100,000 feet the view is…a Smarter Planet
5 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planetAt 60,000 feet the Dynamic infrastructure becomes apparent…5
…with interrelated initiatives providing the DNA to thrive in a smarter planet.
6 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
At 20,000 feet Dynamic infrastructure gives way to Information Infrastructure…
…[]
6
7 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
And at 2,000 feet we can see the parts of an Information Infrastructure
…Compliance, Availability, Retention and Security
7
9 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
10 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
Data created and copied expected to grow at 57% CAGR through 2010
PB shipped
2005 2006 2007 2008 2009 2010
Hyper Data Growth
11 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
Only 20% of data is structured, with unstructured content coming in the form of email, other documents, images, and video
Structured
Unstructured
© 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
15 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
16 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
17 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
18 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
19 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
22 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
What is the IBM SPACE Programme?
23 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
The Consultancy Process
�������������������� ������
24 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
The SPACE Consultancy Process
�������������������� ������
SPACE DeltaSPACE Delta
������������������������������������ �
��!"���!�#��������$�%������&��'��� �
�%����%$�%������#��� �������$�%�
���()(���*��%��+��� �
,�!�#*������!������$�-��� �
�����.�������!�����)������
-��� ��/���!�%��
�����������������!���� �0�,#��%������������� �
�**��!����%���**�%.
��1�2�)����'��� ������**��
26 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
When you mix the ingredients wellII supports the New Enterprise Data Center Imperatives
� Provision new applications resources in minutes
� Triple asset utilization without most upgrades
� Shrink physical disk storage up to 50%
� Begin savings in year 1, full payback in 2
� System outages down 58%
� Reduce floor space by 80%
� Power & cooling reduced by 60%
27 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
SPACE trends
Through consulting with customers IBM have found….
82% have 21-29% utilization (consumption vs. allocation)
93% have data duplication rates @ 66% or more
74% have “sleepy” T1 & T2 data access traffic
73% have unreadable Service Catalogues definitions
67% have 17-20% freespace for a decade
100% are growing @ > 37% annuallySource: IBM SPACE Programme
28 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
So what does that look like really?
Known Purchased Storage Capacity
unknown Purchased
Logically Configured
Storage Capacity
Allocated Storage
Capacity to File System
Available Storage Capacity to Users
Total Consumed Storage Capacity
25% -47%
Unique Data Stored
PhysicalPhysical LogicalLogical AllocatedAllocated AvailableAvailable ClaimedClaimed UsedUsed
Waste Waterfall Chart
Averaging64% waste
UntappedResource/
Opportunity
So what does that really mean?
29 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
‘Top 5 Bank’ POC Findings (Major customer attention – active debate)
The original proof of concept findings conducted within ‘Top 5 Bank’ confirmed utilization ~9%
30 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
‘Top 3 Bank’ POC Findings (Major customer attention - active debate)
The original proof of concept findings conducted for ‘Top 3 Bank’ found significant volumes of orphaned storage available for rapid reclamation
31 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
How do I participate in the IBM SPACE Programme?
32 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
Example Reclamation Method & Capacity Released
Storage Targets and complexity to recover
10.0%
10.8%
16.4%
3.1%17.2%
30.0%
12.7%
Orphaned GT50
Orphaned LT50
Orphaned UI
Reclaimable GT50
Reclaimable LT50
Mapped
Low Util Reclaim
Method Recoverable TB ComplexityOrph GT50 39 2Orph LT50 42 3Orph UI 64 6Reclm GT50 12 2Reclm LT50 67 3Mapped 117 2Low Utilization Reclaim 65 8
33 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
Storage TB Recovery - 12 month plan for ‘Top 3 Bank’
0
50
100
150
200
250
300
350
400
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10
Total ReclaimedMonthly Reclaimed TB
The graph below illustrates the projected storage recovery over time as part of the Capacity Management Change Plan
Activity defined in this proposal will end at this point with ‘T3B’. Additional recovery beyond this point will either be as part of another engagement or be delivered internally by ‘T3B’
Approximate value of storage recovery at this point is $4.75m
STG Objectives
M1 – Leverage Utilisation discussions to secure XIV workshop and right to undertake short TCO
M2 – Follow on sponsorship for POC and establish safe use case
M3 – Define requirement for fat to thin legacy migration to drive up utilisation further and submit proposal
M3-6 – XIV deployment in controlled environment (circa $500k)
2H – Review readiness and build operational case for Prime Time Production ($$$$$$$$$)
35 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
Proven Transformation Customer References
Below are real life illustrations of returns achieved through IBM Tools based transformation programmes.
�#���$�� ���#���% ���� ���#�%
Fortune 5 Global Bank Global remediation of SRM and deployment of SERP led to $120M in capital avoidance through better utilization tracking and correlation of assets.
345�$ 3���$
Top Ten Investment Bank Deployment of SERP resulted in 12 month spending Freeze for Tier One and 20% increase in host level utilsation.
3�5'$ 3��$
Leading Global Investment Firm
Strategy and organizational assessment, future state roadmap, discovery of underutilised storage (over 200TB)
3�5�$ 3+56$
38 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
������������������ �� �� ������� �����
1901
2 Blade Razor
1971
3 Blade Razor
www.gilette.com
1998Five blades!2007
39 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
����������� �� ������� �����
40 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
Introducing the: Gillette Fusion Power Phantom
������������������������� �������
�����
41 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
From Silos … … to Services
Current events mean a change in IT Prioritization And the leaders are already planning…
IT delivers services designed to meet business goalsIT maintains IT resources that support the business
New ThinkingOld Thinking
42 © 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
IBM invites you to adopt a dynamic infrastructureStart customising at ibm.com/doing/uk
PROVIDING STORAGE ON DEMAND
PROVIDING INFORMATION ON DEMANDIBM invites you to adopt a dynamic infrastructureStart customising at ibm.com/doing/ukIBM invites you to adopt a dynamic infrastructureStart customising at ibm.com/doing/uk
PROVIDING STORAGE ON DEMAND
PROVIDING INFORMATION ON DEMAND
© 2009 IBM Corporation
Dynamic Infrastructure: Helping build a smarter planet
QUESTIONS?