8
FOR SALE: USED STEAM TURBINE & GAS TURBINE

FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

  • Upload
    dolien

  • View
    221

  • Download
    3

Embed Size (px)

Citation preview

Page 1: FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

FOR SALE: USED STEAM TURBINE & GAS TURBINE

Page 2: FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

FOR SALE STEAM & GAS TURBINE 02

Recently DDM became owner of the Hem-weg 7 power plant which is out of operation since December 2012.

Since that moment precautions are taken to ensure that the equipment of the power plant stays in its perfect condition.

The plant consists of one direct fired boiler installation, heavy fuel oil (HFO) and gas, and a steam turbine in combination with a gas turbine.

The gas turbine, the boiler and steam turbine can be operated separately and/or in combination.

The boiler and steam turbine were com-missioned in 1978. In 1988 the GT13E gas turbine has been taken into operation.

The new EV burner unit has been installed in 1996.

A new and modern digital control system is installed several years ago.

Page 3: FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

FOR SALE STEAM & GAS TURBINE 03

The steamturbine consits of a high pressure, medium pressure and two low pressure turbines.

Page 4: FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

FOR SALE STEAM & GAS TURBINE 04

Gas Turbine:

Manufacturer: Alstom/ABB, Model GT13ECapacity: 150,000 kW (150MWE/18,5 MVA, cos phi 0,8)Frequency: 50 HzYear: 1988Speed: 3000 RPMFuel: GasLast C-inspection: 2004Hours: OH 66.200 EOH 95.644 Starts 1.456 Trips 296Emission: NOx 75 mg/Nm3Efficiency: 34.56%

Additional equipment Kawasaki Ammonia De-Oxidation Method, DLN Combustor Technology, EV Type Burners. Misc. spare parts.

Note: New EV burner unit has been installed in 1996.

Boiler at 100% load:

Make/type: Schelde / C-E steam boiler with forced circulation, single reheat, and overpressure furnace.Live steam: 188 bar / 540 °CCapacity: 1610 mt/hrFuel: Gas / HFOBurnertype: Dual fuel: Tangential arrangement Emission: NOx 90 mg/Nm3Efficiency: Solo steam turbine operation 40%. In combination with gas turbine 43%Eco inlet: 263 °C

Steam turbine:

Manufacturer: Alstom/ABB Licensee: RDMManufacture year: 1978Hours: 146.935 OH; Starts 1.125; Trips 99Type: Axial Excess PressureExecution: Condensation TurbineConstruction Type: Multi-PartOutput, net: approx. 511 MWOutput, gross: approx. 527 MWSpeed (nominal): 3300 RPM (10%)Speed: 3300 RPM (10%) / 3360 RPM (12%)Number of taps: 7Make: BBC (HP-MP-LP)Type: D4 Y 456 AExtractions: 0,23 / 0,72 / 1,51 / 4,9 / 11 / 22,5 bara at 62,9 / 90,2 / 130,2 / 242 / 437 °C.Efficiency: 99,8%Generator: 500MWE/625MVA/cos phi 0,8Voltage: 21 KVMaintenance: last retrofits: LP2005, MP2004, HP2002Condenser: water cooled with vacuum 96,4 %

Transformers:

GT trafo: 21KV -> 163KVEB trafo: 10KV/ 3KV/ 400V en 35 MVAOperating hours: 148.886 for boiler & steam turbine

Fuel consumption: - GT 46.000Nm3/hr,- Boiler solo 86.000Nm3/hr /109 mt HFO (at 40,74 MJ/kg) Combi 132.000 Nm3/hr,- HFO specification:HFO sec.6500 RI/37 grdC / max S 2%.

Turbo generator

Manufacturer: ABB, Model: WTAL 534Serial nr.: GM 204791Capacity: 187.500 KVASpeed: 3000 RPMVolt: 15.000 VFrequency: 50 Hz

Page 5: FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

ConfigurationUnit: GT Conventional BSTNet: BST = NHN 150 kV, GT = A 50 kVFVR: YesFuel: LC gas, HC gas, LC gas-oil, HC gas-oilPermit Power: 599 MW

CharacteristicsPower output depends on air and cooling water temperature. Therefore temperature curves are set for plan-ning purposes.

PropertiesThe calling time is the time needed for a Powerplant to come standby and is downtime dependable.The start time is the time needed to come from standby to parallel and is also downtime dependable.

Control Restrictions (Regelrestricties or Ramping)Per specified call time control restrictions are given. Once a unit delivers power, for all start types maximum control restrictions apply. The maximum control restrictions are noted points in time and net power output. The maximum control restrictions are valid if the unit is ramped up to its maximum. In the ranges between the dictated points, more points can be described.

Shutdown RestrictionsShutdown a unit regularly can be done in respect to two aims, i.e. being available for production as fast as possible or being available for maintenance as fast as possible. We distinguish therefor two types of shut-down: Shutdown Warm, Shutdown Cold

The stop procedures describe from a specific amount of power output which special restrictions occur. The format equals the format of the control restrictions.

Sliding Heat Curve (GWK) per 1-1-2003

P = netto opwek in [Mwe]Q = warmtelevering (5min waarde) [MWth]Tkw = Koelwatertemperatuur inlaat KKTbl = BuitenluchttemperatuurWvB = WarmteverbruiksWvB = Specifiek warmteverbruik

NOx Emission

FOR SALE STEAM & GAS TURBINE 05

Page 6: FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

FOR SALE STEAM & GAS TURBINE 06

Page 7: FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

FOR SALE STEAM & GAS TURBINE 07

Page 8: FOR SALE: USED STEAM TURBINE & GAS · PDF fileFOR SALE STEAM & GAS TURBINE 02 ... Therefore temperature curves are set for plan- ... The start time is the time needed to come from

For any questions please contact

Menno Boot on phone number +31 (0)30 666 97 80 or cell phone +31 (0)614 671 [email protected] DDM Demontage B.V. Veldzigt 62, 3454 PW PO Box 253, 3454 ZM De Meern, the Netherlands

Or

Robert Boulandon phone number +31 (0)20 470 09 89or cell phone +31 (0)6 51 74 13 [email protected] industrial asset management Oranje Nassaulaan 691075 AL AmsterdamThe Netherlands