FORM-1 AND PRE-FEASIBILITY REPORTs
“Development of Integrated Facilities (stage-II) within the Existing Kandla Port Trust Limit at Kutch District of Gujarat:
1. Setting up of Barge Port at Veera; 2. Setting up of Barge Jetty at Jafarwadi; 3. Setting up of Oil Jetty No.-7; 4. Construction of Administrative Building at Tuna; 5. Construction of Road connecting Veera jetty”
APPLICANT
M/ KANDLA PORT TRUST
Administrative Office Building Annex Building, First floor,
Post Box no. 50 Gandhidham – 370201 Kutch District (Gujarat)
Prepared By MANTEC CONSULTANTS PVT. LTD.
(QCI Accredited consultant at S. No. 99 as per List of Accredited Consultant Organizations/ Rev. 28/March 05, 2015)
ENVIRONMENT DIVISION: D-36, SECTOR-6, NOIDA, U.P.-201301
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
1
MANTEC CONSULTANTS PVT. LTD., NOIDA
PRE-FEASIBILITY REPORT
SETTING UP OF BARGE JETTY AT VEERA
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
2
MANTEC CONSULTANTS PVT. LTD., NOIDA
Table of Contents
LIST OF ABBREVIATIONS ...................................................................................... 3
1. EXECUTIVE SUMMARY .................................................................................... 4
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION .............. 5
3. PROJECT DESCRIPTION .................................................................................. 7
4. SITE ANALYSIS .............................................................................................. 10
5. PLANNING (BRIEF): ...................................................................................... 14
6. PROPOSED INFRASTRUCTURE ..................................................................... 15
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN ................................ 16
8. PROJECT SCHEDULE AND COST ESTIMATES ................................................ 16
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) ............................. 17
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
3
MANTEC CONSULTANTS PVT. LTD., NOIDA
LIST OF ABBREVIATIONS
BOT Build, Operate and Transfer
CAGR Compounded Annual Growth Rate
DSCR Debt Service Coverage Ratio
DWT Dead Weight Tonnage
GRT Gross Registered Tonnage
IRR Internal Rate of Return
KPT Kandla Port Trust
MMTPA Million Metric Tonnes per Annum
MT Metric Tonne
NPV Net Present Value
POL Petrol Oil Lubricant
PPP Public Private Partnership
SEZ Special Economic Zone
TAMP Tariff Authority for Major Ports
MAT Minimum Alternate Tax
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
4
MANTEC CONSULTANTS PVT. LTD., NOIDA
1. EXECUTIVE SUMMARY
Kandla Port is one of the busiest Ports of India. Kandla Port has been achieving first position
among all the Major Ports of India in the terms of cargo handling for the most of the years in
last decade. Thus, Kandla Port Trust has been contributing the most for the development of
port capacity and handling seaborne trade of the country.
Presently, Kandla Port is handling its cargo at its 12 nos. Jetties. These jetties collectively
have a capacity of 27.37 MMTPA. However, there are certain factors which are not allowing
the operations to be efficient enough to achieve the throughput equal to the said capacity.
Time loss due to berthing, un-berthing, custom checks, custom boarding, cargo
sampling, etc.
Time loss due to tidal restriction which may not allow ships to sail out even if the
handling operations are over, keeping them waiting for next high tide.
Since the existing jetties are quite old structures, it calls for relatively higher time
for maintenance.
Owing to the above stated reasons and considering the ideal berth occupancy, ideally
utilizable capacity of the existing jetties is relatively less at 9.75 MMTPA. Presently, at KPT,
waiting for berthing at Oil Jetties is being observed.
Total of 87.01 MMTPA of cargo was handled at Kandla Port in the year 2013-14. In order to
ease pressure / avoid the waiting of the vessels for the existing oil terminals and to cater
additional cargo, KPT has taken measures to develop a cargo handling facility at Veera. The
proposed facility will be able to cater vessels of higher DWT. Commissioning of the proposed
facility shall augment the cargo handling capacity of Kandla Port by 6.29 MMTPA.
Traffic Forecast
Traffic forecast for the proposal Veera Jetty with products to be handled 6.29 MMTPA (Dry Cargo)
Project Viability
Analysis of economic viability of the project FIRR 12.42% and EIRR 13.96%
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
5
MANTEC CONSULTANTS PVT. LTD., NOIDA
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
i. Identification of project and project proponent.
Kandla Port is one of the busiest Ports of India. Kandla Port has been achieving first position among all the Major Ports of India in the terms of cargo handling for the most of the years in last decade. Thus, Kandla Port Trust has been contributing the most for the development of port capacity and handling seaborne trade of the country.
Especially northern India is heavily dependent on Kandla Port Trust for its trade requirements due to its peculiar land locked location compared to many other regions of India which are comparatively quite nearer to the sea shore. Some states of central India like Madhya Pradesh are also dependent for its specific trade requirement on Kandla Port Trust.
Hence, considering the vast hinterland that is dependent on KPT for seaborne trade and currently prevailing traffic congestion at existing facilities of KPT, capacity additions are of utmost importance at KPT for serving the economy of the influence region and in turn, the economy of the whole country in the best possible manner. Presently, Kandla Port is handling its 12 cargo berths under the direct operation at port,
These jetties collectively have a capacity of 59.01 MMTPA. However, there are certain
factors which are not allowing the operations to be efficient enough to achieve the
throughput equal to the said capacity.
Time loss due to berthing, un-berthing, custom checks, custom boarding, cargo sampling, etc.
Time loss due to tidal restriction which may not allow ships to sail out even if the handling operations are over, keeping them waiting for next high tide.
Since the existing jetties are quite old structures, it calls for relatively higher time for maintenance.
1. The main components of the Veera jetty which shall be constructed by the BOT
operator will be: a). A jetty of length 160 m x 60 m.
2. The total estimated cost of the projects will be Rs.16000lakh.
3. Capital and Maintenance dredging in front of the jetty is also proposed to be
undertaken by the BOT operator.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
6
MANTEC CONSULTANTS PVT. LTD., NOIDA
ii. Brief description of nature of the project
The cargo handling capacity of Veera by 6.29Million MTs.
The proposed facility shall be used for handling cargo.
Name of Project SETTING UP OF BARGE JETTY AT VEERA
Length of the wharf 160m
Width of the wharf 60m
Total Back up area 20Ha
Capital Cost Rs. 16000lakhs.
Project time Schedule 18 months from the Date of Award of Concession
iii. Need of the project and its importance to the country and or region.
The need of the project can be understood from the demand at the Kandla port.
Presently, 12 numbers barge jetties are handling cargo at Old Kandla Port. In future,
proposed one number barge jetty shall be commissioned for handling cargo at Veera.
Existing Cargo Handling Capacity
No nearby existing cargo handling capacity in Veera.
Trends in the past liquid cargo traffic
Kandla’s liquid throughput for fiscal 2011-12 stood at 96.61 lakh MTs. In case of
liquids at Kandla, during fiscal 2011-12 as compared to fiscal 2010-11, there was an
increase in Phos Acid by by 07% to 13.82 from 12.86 lakh MTs, and other Chemicals
from 39.05 lakh MTs to 42.88 lakh MTs registering a increase in 10%.
Demand and Supply with future projections
The demand and Supply gap is increasing day by day and this Jetty with capacity of 6.29
MMTPA will help to fill up this gap.
iv. Imports vs. indigenous production
The proposed jetty planned to be developed for handling of oil for both import as well as export.
v. Export possibility
The proposed jetty would be suitable for export of materials/products produced in its
hinter land.
vi. Domestic/export markets
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
7
MANTEC CONSULTANTS PVT. LTD., NOIDA
There is existing demand from existing /proposed industries for import of materials for
domestic use as well as export materials/products.
vii. Employment generation (Direct & Indirect) due to the project.
Based on the preliminary estimates, the direct employment due to proposed project will be during the construction phase and indirectly during the operation phase.
3. PROJECT DESCRIPTION
(i) Type of project including interlinked and interdependent project, if any.
As mentioned earlier, construction of Barge Jetty at Veera is proposed to ease the pressure on the existing Barge jetties. It is anticipated that the even after the commissioning of the aforementioned facility, the capacity shall be inadequate to handle the likely Barge traffic in future. Commissioning of the proposed facility shall augment the Barge handling capacity of Kandla Port by 6.29MTs.
Road connecting to Veera Barge jetty to tuna gate proposed as an interlinked project.
(ii) Location (map showing general location, specific location, and project boundary and project site layout) with coordinates.
The proposed project site is situated in Veera village having latitude 22°54'26.3" N & longitude 70°01'21.8" E. The site for the proposed jetty is 24.3Kms from the Gandhidham railway station towards west and 27.1Kms from the Kandla Airport towards North. The site is about 148 Kms away from the NH 8A as per drawing enclosed at Annexure A.
(iii) Details of alternate sites considered and the basis of selecting the proposed site. Particularly the environmental consideration gone into should be highlighted.
As the jetty is proposed within the limits of Kandla Port Trust, no alternative site has
been examined.
(iv) Size or magnitude of operation.
The proposed jetty is planned to handle dry cargo of about 6.29 MMT per year in the
initial years. Further expansion with additional demand will be considered in future
when such needs arise.
(v) Project description with process details (a schematic diagram / flow chart showing the project layout, components of the project etc. should be given).
The project includes loading-unloading of cargo as it does not include any process.
(vi) Raw material required along with estimated quantity, likely resource, marketing area of final product/s, mode of transport of raw material and finished products.
Cement - 8330 MT
Steel- 5680 MT
Structural steel- 905 MT
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
8
MANTEC CONSULTANTS PVT. LTD., NOIDA
Trap stone- 100810M3
Crushed metal - 72744 m3
Sand- 9689 m3
Quarry spall- 830322 m3
Asphalt VG-30- 588 MT
Bitumen Emulsion- 200 MT
(vii) Resource optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined.
The proposed project is development of a jetty and its operation. Therefore, resource optimization will be mainly in the form of effective use of infrastructure created and optimization of berth occupancy and utilities and services.
(viii) Availability of water its sources, energy / power requirement and sources should be given.
Water:
The required water will be arranged by Contractor.
The water requirement has been envisaged based on the total area of the Project
considering the jetty area. Water requirement for the project is approximately 10000KL
for the Project.
The quantity of effluent generation during construction and operation is Nil.
Power:
DG set of approx. 50 KV will be required for the construction work.
(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their management / disposal.
Prima facie, waste generated by BOT operator during any operations, is responsibility
of the same and he would have to make arrangements to deal with management of
disposal (both solid and liquid. Details of waste (both solid and liquid) generated and
its management would be ascertained at later stages.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
9
MANTEC CONSULTANTS PVT. LTD., NOIDA
(x) Schematic representation of the feasibility drawing which give information of EIA purpose.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
10
MANTEC CONSULTANTS PVT. LTD., NOIDA
4. SITE ANALYSIS
(i) Connectivity.
Airway The national airlines operate daily flights through the district headquarters at
Bhuj as well as Gandhidham which lies 71.3 Km (N) & 24.5 Km (N) respectively from Kandla Port. Gandhidham airport is also operational and there is a daily flight to Mumbai from this Airport.
Railway
Broad gauge(BG) tracks directly connect the Port at New Kandla with the
principal cities of Mumbai, Ahmadabad, Surat, Baroda, etc., and also Delhi,
Punjab and Haryana through the route Ahmadabad-Ratlam- Kota - Mathura to
Delhi. The second route is via Palanpur - Ajmer to Delhi.
The nearest railway station is Gandhidham railway station is 24.3 Kms.
Road Kandla is connected to the National Highway grid system through NH 8A coming
from Mumbai via Ahmedabad and Morbi and terminates at the Port. The distance
from Veera to NH 8A about 148 Kms(S) from the Port. The port enjoys fully
developed road network, both in and around the Port area to facilitate faster
movement of cargo.
(ii) Land form/ land use / land ownership.
Land is largely flat with scanty vegetation. Land currently is lying as barren land and is under ownership of Kandla Port.
(iii) Topography (along with map).
Topography at the site location is generally flat with average ground level of about 2m above MSL. Topsoil appears marshy. The Master plan for Kandla Port trust is attached.
(iv) Existing land use pattern (agriculture, non-agricultural, forest, water bodies [including area under CRZ]), shortest distance from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given.
Existing land use pattern of the proposed site is barren land, without and cultivation and is covered under coastal regulation.
(v) Existing infrastructure
The proposed Barge jetty is a green field project and nothing exists on the site as of now. The backup area earmarked for the jetty is almost barren and flat. It is proposed to construct and operate a wharf of length 160 m X 60 m on PPP basis. The jetty shall be used for
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
11
MANTEC CONSULTANTS PVT. LTD., NOIDA
handling of dry cargos products. The BOT operator shall undertake the following development activities at the proposed project.
c. Soil Classification
Sub-soil profile (Tentative profile taken from nearby area)
The sub-soil profile is shown in the diagram below:
Depth (m) Dia of Bore
Hole Log Strata Description
0.70
150 mm Grey Soft to Firm Silty Clay
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
10.00 10.70 11.00
150 mm Reddish Brown Hard Silty Clay
12.00 13.00 14.00 15.00 16.00 17.00 18.00 18.70
19.00 150 mm
Reddish Brown Hard Silty Clay with Gypsum 20.00
21.00
150 mm Reddish Brown Hard Silty Clay with
Gypsum
22.00 23.00 24.00 25.00 26.00 26.90 27.00
150 mm Yellowish Brown Dense to Very
Dense Silty Sand
28.00 29.00 30.00 30.07 31.00
150 mm Yellowish Brown Dense to Very
Dense Sitly Sand
32.00
33.00
34.00
35.00
36.00
37.00
37.52
As could be seen, the sub-soil profile consists of grey soft to firm silty clay up to -10.70
m, reddish brown hard silty clay is found up to -18.70 m. A reddish brown hard silty clay
with gypsum is met below -19.00 m up to -26.90 m. Very dense yellowish brown silty
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
12
MANTEC CONSULTANTS PVT. LTD., NOIDA
sand is found up to -36.00 m. Between -35.7 to -39.7 hard greyish brown clay is found.
Very dense yellowish silty sand is found below -36.00 m and the bore hole is terminated
at -36.00 m with the same composition being observed.
d. Climatic Data from secondary Sources
Tidal Conditions
Tides at Kandla are semi-diurnal in character. The tidal heights with respect to port
Chart Datum, with local Mean Sea level as + 3.884 is presented in the table below:
Highest High Water + 7.59 m
Mean High Water Spring + 6.66 m
Mean High Water + 6.185 m
Mean High Water Neaps + 5.71 m
Local Mean sea Level +3.88 m
Mean Low Water Neaps + 1.80 m
Mean Low Water + 1.30 m
Mean Low Water Spring +0.80 m
Lowest Low Water + 0.4 m
Average Spring Range 5.86 m
Average Neap Range 3.91 m
Mean Range 4.885 m
Waves
Kandla Creek is protected from wave disturbances by a number of shoals at its outfall
into the gulf. This provides the setting for a basin with absolute tranquility. The creek
provides calm waters round the year for easy movement of shipping. Thus, Kandla has
become an all-weather Port of repute. The high amplitude tides coupled with a large
storage area has resulted in high flushing velocities inside. This has helped in cleansing
of the navigational channels, thus providing minimum siltation. Outside in the gulf, the
complex flow phenomenon has given rise to a number of shoals, which are dynamic in
nature. The Port of Kandla is approached through the channel starting from the Outer
Tuna Buoy. The shallow depths at the turning point of the channel are over passed
during high tides by vessels approaching the harbour. Ship movements are normally
confined to the high tides. Siltation in the channel is confined to a reach of hardly 3 km
only. The Port region is free from any significant wave disturbances.
Silt and Salinity
Silt charge and salinity observations were carried out during dry and monsoon months
in April and September 1983 at locations east and west of Kandla Creek and at two
stations in the Gulf of Kutch. The waters of the Creek are heavily silt charged, the range
being 1 to 3 ppt. The Creek waters have a salinity ranging from 23 to 25 ppt.
Temperature and Humidity
The climate of Kandla Port is generally tropical and dry. The air temperature varies from
less than 100 C in winter to about 440 C in summer. The mean, maximum and minimum
temperature observed in the different months at Kandla is presented in the table below:
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
13
MANTEC CONSULTANTS PVT. LTD., NOIDA
Months Mean of Max. Temp. Mean of Min. Temp.
January 25.2 13.0
February 27.5 15.5
March 32.0 20.2
April 34.6 23.5
May 35.9 25.7
June 35.0 27.7
July 32.4 27.2
August 30.7 25.4
September 33.3 24.5
October 34.2 23.1
November 32.4 20.2
December 25.6 13.5
Kandla region is fairly dry and only July, August and September is humid months. The
range of maximum relative humidity varies from 0% to 100%, whereas minimum values
vary between 0 and 30%, except during July, August and September, when minimum
values vary between 25% and 50%.
Rainfall
Rainfall in Kandla is very low. Between January and April, there is normally no rainfall.
Rainfall generally remains confined between June end and mid September. During the
remaining months, the rainfall is scanty. The annual average rainfall is around 200mm
only.
Wind Conditions
From long term observation of wind velocities and directions, following inferences can
be made:
January The predominant direction is between NNE and NNW with speed range normally
between 12 and 19 Km/hr. which may exceed for about 10 % of the time.
February
The direction changes from NNE and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
March The direction lies between NNW and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
April to
June
The direction for wind is between WSW and SSW. The wind speed reaches a
maximum of 39 km/ hr. except in July, when the speed may exceed the range.
October The direction of wind changes from SSW to NNW. Wind speed ranges between 12
and 19 km/ hr. but the limit may exceed for 10 % of the time.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
14
MANTEC CONSULTANTS PVT. LTD., NOIDA
Nov. & Dec. The predominant direction is between NNE and NNW and the speed is between
12 and 19 km/hr.
Storms and Cyclones
Kandla port is not generally affected by cyclonic storms. During June 1998, a severe
cyclonic storm, which passed over Kandla Port with a wind speed of 150 km/hr.,
resulting in high tidal waves of 10.5 m with strong current, caused extensive damages to
the Port installations, crafts and human lives.
5. PLANNING (BRIEF):
(i) Planning concept (type of industries, facilities, transportation, etc.) town and country planning/development authority classification.
The site for the proposed project is situated at Veera as per drawing enclosed at
Annexure A. Commissioning of the proposed facility shall augment the cargo handling
capacity of Kandla Port by 6.29 Million MTs.
It is proposed to construct and operate a wharf of length 160 m X 60 m on PPP basis.
The BOT operator shall undertake the following development activities at the proposed
project.
(ii) Population projection
The population projection for the proposed project is only related to direct and
indirect employment generation. In construction stage, the temporary population will
be about 600 and in the initial stage of population direct and indirect population will
be 150 and 350 respectively.
(iii) Land use planning (breakup along with green belt, etc.)
It is planned to develop backup area of 20 hectare approx for bunkering facilities.
(iv) Assessment of infrastructure demand (physical and social).
The BOT operator shall undertake the following development activities.
Construction of wharf of 160 mts. x 60 mts. on pile foundation
Construction of other civil structures on pile foundation such as approach
bridge, connecting platform between jetty and approach bridge, crew office, high
mast lighting tower, fire pump house,
Providing Temporary Custom fencing wall,
Providing Fire fighting line
Electrification works
Gate office and security check
Development of back up area
o Construction of permanent boundary wall
o Product laboratory
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
15
MANTEC CONSULTANTS PVT. LTD., NOIDA
o Providing fire fighting system
o Electrification works
o Construction of office building and security cabin
Capital dredging and Maintenance dredging alongside the jetty
(v) Amenities / facilities
The Amenities/facilities proposed are in relation to the infrastructure
proposed to be developed in phases.
6. PROPOSED INFRASTRUCTURE
i. Industrial Area (Processing Area)
The Capacity of the Terminal has been calculated based upon the guidelines published
by TAMP.
1. Draft available at the proposed Jetty - 4 .00 meters (below CD)
2. Dimensions of the jetty - 160 m x 60 m (proposed)
ii. Residential area (non processing area).
There is no proposed residential area as part of this project.
iii. Green belt.
Green belt will be provided as per specified norms.
iv. Social infrastructure.
There is no proposed social infrastructure as part of this project.
v. Connectivity (traffic and transportation road / rail / metro / water ways
etc).
Currently there is no road/ rail/ metro/ water ways to connect the proposed site for jetty. The proposed jetty will be connected by a proposed road of 15.5km.
vi. Drinking water management (source and supply of water).
The drinking water shall be taken from Gujarat Water Supply and Sewerage Board.
vii. Sewerage system
For sewage treatment, septic tank and soak pit will be constructed within the
plot area.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
16
MANTEC CONSULTANTS PVT. LTD., NOIDA
viii. Industrial waste management:
There is no industrial waste except waste water and solid waste generated from this project. The waste water shall be treated in sewerage treatment plant (STP)
ix. Solid waste management:
Solid waste generated from this facility can be broadly categories in three types:
1. Domestic waste: - sweeping, cleaning, fuel burning, gardening waste, waste wood etc.
2. Construction and maintenance debris: - This waste of construction material will be dealt with separately.
3. Other waste: - packing material, plastics, metal items etc.
It is assumed that above collected waste would consist of Bio-degradable material (75%), Inorganic material (20%) and inert material as 5%. Bio waste will be treated to form the manure and can be handled on-site through a land fill or waste pit technique. Non-bio waste which can be recycled (ferrous materials, plastic etc) shall be sold /given to waste plastic vendors for recycling purposes. Construction material can be used for site filling purposes.
x. Power requirement and supply / source:
DG set of approx. 50 KV will be required for the construction work.
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN
i. Policy to be adopted (central / state) in respect of the project affected persons including home outsees, land outsees and landless labours (a brief outline to be given).
Not applicable for this project, as land is under ownership of Port Authorities and
free from all encumbrance.
8. PROJECT SCHEDULE AND COST ESTIMATES
i. Likely date of start of construction and likely date of completion (time schedule for the project to be given).
The Project is envisaged to be completed and brought into operation, by approximately 18 Months from the date of award of concession agreement.
ii. Estimated project cost along with analysis in terms of economic viability of the project.
Approx. Estimated Project cost is 16000 lakhs.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
17
MANTEC CONSULTANTS PVT. LTD., NOIDA
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.
Financial Benefits of project I. To Kandla Port Trust
1. Increased cargo handling capacity 2. Earnings in the form of revenue share from the BOT operator. 3. Increase in revenue operations of port due to additional traffic handling. 4. Reducing congestion at other jetties at Kandla port. 5. Reduction in the cost of handling, thereby making Kandla Port more competitive.
II. To Local community 1. Indirect economic activity for nearby areas. 2. More employment opportunities for local people.
Social Benefits of project To Local community
A. Public image of Kandla port as World class facility with most modern infrastructure.
B. With modernisation and expansion of Kandla port, more economic opportunities would be created (both in formal and informal sector) for Local community.
C. Increase in business activity will bring in prosperity in hinterland, which consequently would bring better access to social and physical infrastructure.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT VEERA
18
MANTEC CONSULTANTS PVT. LTD., NOIDA
ANNEXURE A
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
PRE-FEASIBILITY REPORT
SETTING UP OF BARGE JETTY AT JAFARWADI
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
Table of Contents
LIST OF ABBREVIATIONS ........................................................................................................3
1. EXECUTIVE SUMMARY .....................................................................................................4
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION ..................5
3. PROJECT DESCRIPTION ...................................................................................................7
4. SITE ANALYSIS ................................................................................................................. 10
5. PLANNING (BRIEF): ........................................................................................................ 14
6. PROPOSED INFRASTRUCTURE ................................................................................... 15
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN ....................................... 16
8. PROJECT SCHEDULE AND COST ESTIMATES ......................................................... 16
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) .................................. 16
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
LIST OF ABBREVIATIONS
BOT Build, Operate and Transfer
CAGR Compounded Annual Growth Rate
DSCR Debt Service Coverage Ratio
DWT Dead Weight Tonnage
GRT Gross Registered Tonnage
IRR Internal Rate of Return
KPT Kandla Port Trust
MMTPA Million Metric Tonnes per Annum
MT Metric Tonne
NPV Net Present Value
POL Petrol Oil Lubricant
PPP Public Private Partnership
SEZ Special Economic Zone
TAMP Tariff Authority for Major Ports
MAT Minimum Alternate Tax
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
1. EXECUTIVE SUMMARY
Kandla Port is one of the busiest Ports of India. Kandla Port has been achieving first position
among all the Major Ports of India in the terms of cargo handling for the most of the years in
last decade. Thus, Kandla Port Trust has been contributing the most for the development of
port capacity and handling seaborne trade of the country.
Presently, Kandla Port is handling its cargo at its 12 nos. of Jetties. These jetties collectively
have a capacity of 27.37 MMTPA. However, there are certain factors which are not allowing
the operations to be efficient enough to achieve the throughput equal to the said capacity.
Time loss due to berthing, un-berthing, custom checks, custom boarding, cargo
sampling, etc.
Time loss due to tidal restriction which may not allow ships to sail out even if the
handling operations are over, keeping them waiting for next high tide.
Since the existing jetties are quite old structures, it calls for relatively higher time
for maintenance.
Owing to the above stated reasons and considering the ideal berth occupancy, ideally
utilizable capacity of the existing jetties is relatively less at 9.75 MMTPA. Presently, at KPT,
waiting for berthing at Jetties is being observed.
Total of 87.01 MMTPA of cargo was handled at Kandla Port in the year 2013-14. In order to
ease pressure / avoid the waiting of the vessels for the existing terminals and to cater
additional cargo, KPT has taken measures to develop a cargo handling facility at Jafarwadi.
The proposed facility will be able to cater vessels of higher DWT. Commissioning of the
proposed facility shall augment the cargo handling capacity of Kandla Port by 1.84 MMTPA.
Traffic Forecast
Traffic forecast for proposal Jafarwadi Jetty is 3.00 MMTPA
Project Viability
Details of cost of the Project yet to be worked out hence, FIRR will be worked out later.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
.
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
i. Identification of project and project proponent.
Kandla Port is one of the busiest Ports of India. Kandla Port has been achieving first position among all the Major Ports of India in the terms of cargo handling for the most of the years in last decade. Thus, Kandla Port Trust has been contributing the most for the development of port capacity and handling seaborne trade of the country.
Especially northern India is heavily dependent on Kandla Port Trust for its trade requirements due to its peculiar land locked location compared to many other regions of India which are comparatively quite nearer to the sea shore. Some states of central India like Madhya Pradesh are also dependent for its specific trade requirement on Kandla Port Trust.
Hence, considering the vast hinterland that is dependent on KPT for seaborne trade and currently prevailing traffic congestion at existing facilities of KPT, capacity additions are of utmost importance at KPT for serving the economy of the influence region and in turn, the economy of the whole country in the best possible manner. Presently, Kandla Port is handling its 12 dry cargo. These jetties collectively have a capacity
of 59.01 MMTPA. However, there are certain factors which are not allowing the operations
to be efficient enough to achieve the throughput equal to the said capacity.
Time loss due to berthing, un-berthing, custom checks, custom boarding, cargo sampling, etc.
Time loss due to tidal restriction which may not allow ships to sail out even if the handling operations are over, keeping them waiting for next high tide.
Since the existing jetties are quite old structures, it calls for relatively higher time for maintenance.
1. The main components of the Jafarwadi jetty which shall be constructed by the BOT
operator will be: a). A jetty of length 180 m x 20 m.
2. The total estimated cost of the projects will be Rs.10500lakh.
3. Capital and Maintenance dredging in front of the jetty is also proposed to be
undertaken by the BOT operator.
ii. Brief description of nature of the project
The cargo handling capacity of Jafarwadi by 3.00Million MTs
The proposed facility shall be used for handling cargo.
Name of Project SETTING UP OF BARGE JETTY AT JAFARWADI
Length of the wharf 180m
Width of the wharf 20m
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
Total Back up area 20Ha
Capital Cost Rs. 10500lakhs.
Project time Schedule 18 months from the Date of Award of Concession
iii. Need of the project and its importance to the country and or region.
Kandla Port is having capacity of 28.76 MMTPA for handling non-containerized dry
cargo. In the last three years Kandla Port has handled non containerized cargo, 26.01
MMTPA in the year 2011-12; 31.76 MMTPA in the year 2012-13; and 27.37 MMTPA in
the year 2013-14. From the above figure it is clear that these facilities are being utilized
at 90%. As per international standard berth occupancy should not be utilized more than
70% then only designed period of life can be achieved.
Further it is also to state that Kandla Port has already commissioned four floating cranes
at OTB for lighterage operations. Recently Kandla Port handled panamax/ post panamax
vessels at OTB with floating cranes. This operation needs Barge Jetty so that loading and
unloading can also be achieved. At present Kandla Port is having Barge facilities at
Bunder Basin Kandla and at Tuna.
Four floating cranes are commissioned and LOS for three more floating cranes has been
issued. It is very much essential for Kandla Port to utilize this floating crane facility by
creating more number of Barge facilities at Jafarwadi at appropriate locations where it is
technically and financially feasible
Existing Cargo Handling Capacity
No nearby existing cargo handling capacity at Jafarwadi.
Trends in the past cargo traffic at Kandla
Cargo traffic rose by 5.04 per cent to 433.86 million tonnes (MT) at 12 major ports during April-December 2014 as compared to the same period of previous year.
These Centre-run ports had handled 413.06 MT of cargo during April-December 2013.
According to the latest data, Kandla Port handled the maximum 70.85 MT of cargo during the period, which was up 7.22 per cent against 66.08 MT during April-December 2013.
Demand and Supply with future projections
The demand and Supply gap is increasing day by day and this Jetty with capacity of 3.00
MMTPA will help to fill up this gap.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
iv. Imports vs. indigenous production
The proposed jetty planned to be developed for handling of cargo for both import as well as export.
v. Export possibility
The proposed jetty would be suitable for export of materials/products produced in its
hinter land.
vi. Domestic/export markets
There is existing demand from existing /proposed industries for import of materials for
domestic use as well as export materials/products.
vii. Employment generation (Direct & Indirect) due to the project.
Based on the preliminary estimates, the direct employment due to proposed project will be during the construction phase and indirectly during the operation phase.
3. PROJECT DESCRIPTION
(i) Type of project including interlinked and interdependent project, if any.
The proposal is for establishment of barge jetty in Jafarwadi to ease the load of Kandla Port Trust. There is no interlinked project with barge jetty.
(ii) Location (map showing general location, specific location, and project boundary and project site layout) with coordinates.
The proposed site for the construction of Barge jetty at Jafarwadi with latitude 23° 04'
33.6" N & longitude 70° 12' 36.4" E. The site for the proposed jetty is 7.6Kms from the Gandhidham railway station towards west and 11.85Kms from the Kandla Airport towards North. The site is about 127 Kms away from the NH 8A as per drawing enclosed at Annexure A.
(iii) Details of alternate sites considered and the basis of selecting the proposed site. Particularly the environmental consideration gone into should be highlighted.
No alternative site has been considered as the project is proposed within the limit of
Kandla port trust.
(iv) Size or magnitude of operation.
The proposed jetty is planned to handle dry cargo of about 3.00 MMT per year in the
initial years. Further expansion with additional demand will be considered in future
when such needs arise.
(v) Project description with process details (a schematic diagram / flow chart showing the project layout, components of the project etc. should be given).
The project includes loading-unloading of cargo as it does not include any process.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
(vi) Raw material required along with estimated quantity, likely resource, marketing area of final product/s, mode of transport of raw material and finished products.
Cement 5545 MT
Steel 3900 MT
Structural steel 1892 MT
Crushed metal 67948 m3
Sand 5900 m3
Quarry spall 721700m3
Asphalt VG-30 1573MT
Bitumen Emulsion- 191MT
(vii) Resource optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined.
The proposed project is development of a jetty and its operation. Therefore, resource optimization will be mainly in the form of effective use of infrastructure created and optimization of berth occupancy and utilities and services.
(viii) Availability of water its sources, energy / power requirement and sources should be given.
Water:
The required water will be arranged by Contractor.
The water requirement has been envisaged based on the total area of the Project
considering the jetty area, area of approach. Water requirement for the project is
approximately 10000KL the Project.
The quantity of effluent generation during construction and operation is Nil.
Power:
DG set of approx. 50 KV will be required for the construction work.
(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their management / disposal.
Prima facie, waste generated by BOT operator during any operations, is responsibility
of the same and he would have to make arrangements to deal with management of
disposal (both solid and liquid. Details of waste (both solid and liquid) generated and
its management would be ascertained at later stages.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
(x) Schematic representation of the feasibility drawing which give information of EIA purpose.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
4. SITE ANALYSIS
(i) Connectivity.
Airway The national airlines operate daily flights through the district headquarters at
Bhuj as well as Gandhidham which lies 62.9Km. (N) & 11.8 Km. (N) respectively
from Kandla Port. Gandhidham airport is also operational and there is a daily
flight to Mumbai from this Airport.
Railway
Broad gauge(BG) tracks directly connect the Port at New Kandla with the
principal cities of Mumbai, Ahmadabad, Surat, Baroda, etc., and also Delhi,
Punjab and Haryana through the route Ahmadabad-Ratlam- Kota - Mathura to
Delhi. The second route is via Palanpur - Ajmer to Delhi.
The nearest railway station is Gandhidham railway station is 7.6 Kms.
Road Kandla is connected to the National Highway grid system through NH 8A coming
from Mumbai via Ahmedabad and Morbi and terminates at the Port. The city of
Gandhidham where the Port Administrative Office and the main staff colony are
located, also lies on NH 8A about 127 Km. from the Port. The port enjoys fully
developed road network, both in and around the Port area to facilitate faster
movement of cargo.
(ii) Land form/ land use / land ownership.
Land is largely flat with scanty vegetation. Land currently is lying as barren land and is under ownership of Kandla Port.
(iii) Topography (along with map).
Topography at the site location is generally flat with average ground level of about 2m above MSL. Topsoil appears marshy. The Master plan for Kandla Port trust is attached.
(iv) Existing land use pattern (agriculture, non-agricultural, forest, water bodies [including area under CRZ]), shortest distance from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given.
Existing land use pattern of the proposed site is barren land, without and cultivation and is covered under coastal regulation.
(v) Existing infrastructure:
There is no any existing Infrastructure at Jafarwadi.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
c. Soil Classification
Sub-soil profile (Tentative profile taken from nearby area)
The sub-soil profile is shown in the diagram below:
Depth (m) Dia of Bore
Hole Log Strata Description
0.70
150 mm Grey Soft to Firm Silty Clay
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
10.00 10.70 11.00
150 mm Reddish Brown Hard Silty Clay
12.00 13.00 14.00 15.00 16.00 17.00 18.00 18.70
19.00 150 mm
Reddish Brown Hard Silty Clay with Gypsum 20.00
21.00
150 mm Reddish Brown Hard Silty Clay with
Gypsum
22.00 23.00 24.00 25.00 26.00 26.90 27.00
150 mm Yellowish Brown Dense to Very Dense
Silty Sand
28.00 29.00 30.00 30.07 31.00
150 mm Yellowish Brown Dense to Very Dense
Sitly Sand
32.00
33.00
34.00
35.00
36.00
37.00
37.52
As could be seen, the sub-soil profile consists of grey soft to firm silty clay up to -10.70
m, reddish brown hard silty clay is found up to -18.70 m. A reddish brown hard silty clay
with gypsum is met below -19.00 m up to -26.90 m. Very dense yellowish brown silty
sand is found up to -36.00 m. Between -35.7 to -39.7 hard greyish brown clay is found.
Very dense yellowish silty sand is found below -36.00 m and the bore hole is terminated
at -36.00 m with the same composition being observed.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
d. Climatic Data from secondary Sources
Tidal Conditions
Tides at Kandla are semi-diurnal in character. The tidal heights with respect to port
Chart Datum, with local Mean Sea level as + 3.884 is presented in the table below:
Highest High Water + 7.59 m
Mean High Water Spring + 6.66 m
Mean High Water + 6.185 m
Mean High Water Neaps + 5.71 m
Local Mean sea Level +3.88 m
Mean Low Water Neaps + 1.80 m
Mean Low Water + 1.30 m
Mean Low Water Spring +0.80 m
Lowest Low Water + 0.4 m
Average Spring Range 5.86 m
Average Neap Range 3.91 m
Mean Range 4.885 m
Waves
Kandla Creek is protected from wave disturbances by a number of shoals at its outfall
into the gulf. This provides the setting for a basin with absolute tranquility. The creek
provides calm waters round the year for easy movement of shipping. Thus, Kandla has
become an all-weather Port of repute. The high amplitude tides coupled with a large
storage area has resulted in high flushing velocities inside. This has helped in cleansing
of the navigational channels, thus providing minimum siltation. Outside in the gulf, the
complex flow phenomenon has given rise to a number of shoals, which are dynamic in
nature. The Port of Kandla is approached through the channel starting from the Outer
Tuna Buoy. The shallow depths at the turning point of the channel are over passed
during high tides by vessels approaching the harbour. Ship movements are normally
confined to the high tides. Siltation in the channel is confined to a reach of hardly 3 km
only. The Port region is free from any significant wave disturbances.
Silt and Salinity
Silt charge and salinity observations were carried out during dry and monsoon months
in April and September 1983 at locations east and west of Kandla Creek and at two
stations in the Gulf of Kutch. The waters of the Creek are heavily silt charged, the range
being 1 to 3 ppt. The Creek waters have a salinity ranging from 23 to 25 ppt.
Temperature and Humidity
The climate of Kandla Port is generally tropical and dry. The air temperature varies from
less than 100 C in winter to about 440 C in summer. The mean, maximum and minimum
temperature observed in the different months at Kandla is presented in the table below:
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
Months Mean of Max. Temp. Mean of Min. Temp.
January 25.2 13.0
February 27.5 15.5
March 32.0 20.2
April 34.6 23.5
May 35.9 25.7
June 35.0 27.7
July 32.4 27.2
August 30.7 25.4
September 33.3 24.5
October 34.2 23.1
November 32.4 20.2
December 25.6 13.5
Kandla region is fairly dry and only July, August and September is humid months. The
range of maximum relative humidity varies from 0% to 100%, whereas minimum values
vary between 0 and 30%, except during July, August and September, when minimum
values vary between 25% and 50%.
Rainfall
Rainfall in Kandla is very low. Between January and April, there is normally no rainfall.
Rainfall generally remains confined between June end and mid September. During the
remaining months, the rainfall is scanty. The annual average rainfall is around 200mm
only.
Wind Conditions
From long term observation of wind velocities and directions, following inferences can
be made:
January The predominant direction is between NNE and NNW with speed range normally
between 12 and 19 Km/hr. which may exceed for about 10 % of the time.
February
The direction changes from NNE and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
March The direction lies between NNW and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
April to
June
The direction for wind is between WSW and SSW. The wind speed reaches a
maximum of 39 km/ hr. except in July, when the speed may exceed the range.
October The direction of wind changes from SSW to NNW. Wind speed ranges between 12
and 19 km/ hr. but the limit may exceed for 10 % of the time.
Nov. & Dec. The predominant direction is between NNE and NNW and the speed is between
12 and 19 km/hr.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
Storms and Cyclones
Kandla port is not generally affected by cyclonic storms. During June 1998, a severe
cyclonic storm, which passed over Kandla Port with a wind speed of 150 km/hr.,
resulting in high tidal waves of 10.5 m with strong current, caused extensive damages to
the Port installations, crafts and human lives.
5. PLANNING (BRIEF):
(i) Planning concept (type of industries, facilities, transportation, etc.) town and country planning/development authority classification.
The site for the proposed project is situated at Jafarwadi as per drawing enclosed at
Annexure A. Commissioning of the proposed facility shall augment the cargo handling
capacity of Kandla Port by 3.00 Million MTs.
It is proposed to construct and operate a wharf of length 180 m X 20 m on PPP basis.
The BOT operator shall undertake the following development activities at the proposed
project.
(ii) Population projection
The population projection for the proposed project is only related to direct and
indirect employment generation. In construction stage, the temporary population will
be about 600 and in the initial stage of population direct and indirect population will
be 150 and 350 respectively.
(iii) Land use planning (breakup along with green belt, etc.)
It is planned to develop backup area of 20.0 hectare approx for bunkering facilities.
(iv) Assessment of infrastructure demand (physical and social).
The BOT operator shall undertake the following development activities.
Construction of wharf of 180 mts. x 20 mts. on pile foundation
Construction of other civil structures on pile foundation such as approach
bridge, connecting platform between jetty and approach bridge, crew office, high
mast lighting tower, fire pump house,
Providing Temporary Custom fencing wall,
Providing Fire fighting line
Electrification works
Gate office and security check
Development of back up area
o Construction of permanent boundary wall
o Product laboratory
o Providing fire fighting system
o Electrification works
o Construction of office building and security cabin
Capital dredging and Maintenance dredging alongside the jetty
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
(v) Amenities / facilities
The Amenities/facilities proposed are in relation to the infrastructure
proposed to be developed in phases.
6. PROPOSED INFRASTRUCTURE
i. Industrial Area (Processing Area)
The Capacity of the Terminal has been calculated based upon the guidelines published
by TAMP.
1. Draft available at the proposed Jetty – 4 meters (proposed) with tidal window 13
meters.
2. Dimensions of the jetty - 180 m x 20 m (proposed)
ii. Residential area (non processing area).
There is no proposed residential area as part of this project.
iii. Green belt.
Green belt will be provided as per specified norms.
iv. Social infrastructure.
There is no proposed social infrastructure as part of this project.
v. Connectivity (traffic and transportation road / rail / metro / water ways
etc).
Currently there is no road/ rail/ metro/ water ways to connect the proposed site for jetty.
vi. Drinking water management (source and supply of water).
The drinking water shall be taken from Gujarat Water Supply and Sewerage Board.
vii. Sewerage system.
For sewage treatment, septic tank and soak pit will be constructed within the
plot area.
viii. Industrial waste management:
There is no industrial waste except waste water and solid waste generated from this project. The waste water shall be treated in sewerage treatment plant (STP)
ix. Solid waste management:
Solid waste generated from this facility can be broadly categories in three types:
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
1. Domestic waste: - sweeping, cleaning, fuel burning, gardening waste, waste wood etc.
2. Construction and maintenance debris: - This waste of construction material will be dealt with separately.
3. Other waste: - packing material, plastics, metal items etc.
It is assumed that above collected waste would consist of Bio-degradable material (75%), Inorganic material (20%) and inert material as 5%. Bio waste will be treated to form the manure and can be handled on-site through a land fill or waste pit technique. Non-bio waste which can be recycled (ferrous materials, plastic etc) shall be sold /given to waste plastic vendors for recycling purposes. Construction material can be used for site filling purposes.
x. Power requirement and supply / source:
DG set of approx. 50 KV will be required for the construction work.
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN
i. Policy to be adopted (central / state) in respect of the project affected persons including home outsees, land outsees and landless labours (a brief outline to be given).
Not applicable for this project, as land is under ownership of Port Authorities and
free from all encumbrance.
8. PROJECT SCHEDULE AND COST ESTIMATES
i. Likely date of start of construction and likely date of completion (time schedule for the project to be given).
The Project is envisaged to be completed and brought into operation, by approximately 18 Months from the date of award of concession agreement.
ii. Estimated project cost along with analysis in terms of economic viability of the project.
Approx. Estimated Project cost is 10500 lakhs.
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.
Financial Benefits of project I. To Kandla Port Trust
1. Increased cargo handling capacity 2. Earnings in the form of revenue share from the BOT operator. 3. Increase in revenue operations of port due to additional traffic handling.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
4. Reducing congestion at other jetties at Kandla port. 5. Reduction in the cost of handling, thereby making Kandla Port more competitive.
II. To Local community 1. Indirect economic activity for nearby areas. 2. More employment opportunities for local people.
Social Benefits of project To Local community
A. Public image of Kandla port as World class facility with most modern infrastructure.
B. With modernisation and expansion of Kandla port, more economic opportunities would be created (both in formal and informal sector) for Local community.
C. Increase in business activity will bring in prosperity in hinterland, which consequently would bring better access to social and physical infrastructure.
PRE-FEASIBILITY REPORT - SETTING UP OF BARGE JETTY AT JAFARWADI
MANTEC CONSULTANTS PVT LTD., NOIDA
ANNEXURE A
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 1
Table of Contents
LIST OF ABBREVIATIONS ........................................................................................................2
1. EXECUTIVE SUMMARY .....................................................................................................3
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION ..................5
3. PROJECT DESCRIPTION ...................................................................................................7
4. SITE ANALYSIS ................................................................................................................. 11
b). Container Cargo ................................................................................................................................. 12
5. PLANNING (BRIEF): ........................................................................................................ 22
6. PROPOSED INFRASTRUCTURE ................................................................................... 23
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN ....................................... 25
8. PROJECT SCHEDULE AND COST ESTIMATES ......................................................... 26
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) .................................. 31
Annexure – A: Project Site .................................................................................................................... 32
Annexure - B Back up Area Layout ................................................................................................... 33
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 2
LIST OF ABBREVIATIONS
BOT Build, Operate and Transfer
CAGR Compounded Annual Growth Rate
DSCR Debt Service Coverage Ratio
DWT Dead Weight Tonnage
GRT Gross Registered Tonnage
IRR Internal Rate of Return
KPT Kandla Port Trust
MMTPA Million Metric Tonnes per Annum
MT Metric Tonne
NPV Net Present Value
POL Petrol Oil Lubricant
PPP Public Private Partnership
SEZ Special Economic Zone
TAMP Tariff Authority for Major Ports
MAT Minimum Alternate Tax
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 3
1. EXECUTIVE SUMMARY
Kandla Port is one of the busiest Ports of India. Kandla Port has been achieving first position
among all the Major Ports of India in the terms of cargo handling for the most of the years in
last decade. Thus, Kandla Port Trust has been contributing the most for the development of
port capacity and handling seaborne trade of the country. Presently, Kandla Port is handling
its liquid cargo at its 6 nos. Oil Jetties. These jetties collectively have a capacity of 13.00
MMTPA. However, there are certain factors which are not allowing the operations to be
efficient enough to achieve the throughput equal to the said capacity.
Time loss due to berthing, un-berthing, custom checks, custom boarding, cargo
sampling, etc.
Time loss due to tidal restriction which may not allow ships to sail out even if the
handling operations are over, keeping them waiting for next high tide.
Since the existing oil jetties are quite old structures, it calls for relatively higher
time for maintenance.
Recently on-going strengthening of Oil Jetty No. 1 and 2 has also affected the
availability of the utilizable capacity to some extent.
Owing to the above stated reasons and considering the ideal berth occupancy, ideally
utilizable capacity of the existing jetties is relatively less at 9.75 MMTPA. Presently, at KPT,
waiting for berthing at Oil Jetties is being observed.
Total of 8.51 MMTPA of liquid cargo was handled at Kandla Port in the year 2013-14. In
order to ease pressure / avoid the waiting of the vessels for the existing oil terminals and to
cater additional liquid cargo, KPT has taken measures to develop a liquid cargo handling
facility next to the existing oil jetty no. 6 at Old Kandla. The proposed facility will be able to
cater vessels of higher DWT. Commissioning of the proposed facility shall augment the
liquid cargo handling capacity of Kandla Port by 1.84 MMTPA.
The proposed facility shall be used for handling all kinds of liquid cargo i.e. POL, vegetable
oils/edible oils, others etc. which are permitted. However, Concessionaire shall handle and
store the chemicals and liquids as per the applicable CRZ notifications.
Traffic Forecast
Projected traffic has been allocated for the ideally utilizable capacity of existing Oil Jetties
and expected utilization of upcoming new Oil jetty and Ship Bunkering Terminal on BOT.
Following table shows the traffic projections for the proposed Project.
Traffic Projections for Liquid Cargo excluding POL
FY 2014
FY 2015
FY 2016
FY 2017
FY 2018
FY 2019
FY 2020
FY 2021
FY 2022
FY 2025
FY 2030
Liquid Cargo excluding POL
- 6% 6% 6% 6% 6% 6% 6% 6% 6% 6%
Liquid Cargo 6.50 6.89 7.30 7.74 8.20 8.69 9.22 9.77 10.35 12.33 16.50
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 4
excluding POL
Total Traffic 6.50 6.89 7.30 7.74 8.20 8.69 9.22 9.77 10.35 12.33 16.50
Handling by Existing & Upcoming facilities
Existing Liquid Jetties at KPT*
7.06 7.06 7.06 7.06 7.06 7.06 7.06 7.06 7.06 7.06 7.06
Oil Jetty and Ship Bunkering Terminal on BOT
1.30 1.36 1.43 1.50 1.74 2.17
Total Allocation 7.06 7.06 7.06 7.06 7.06 8.36 8.43 8.50 8.57 8.80 9.23
Net Traffic Projection for Proposed Jetty
-0.57 -0.18 0.24 0.67 1.14 0.33 0.79 1.27 1.79 3.53 7.28
Note: *Ideally utilizable capacity for Liquid Cargo excluding POL has been considered as Total Ideally
Utilizable Capacity of Oil Jetties x Share of Liquid Cargo other than POL = 9.75 MMTPA * 72.44% i.e. share
of liquid cargo at Kandla excluding POL for past five years.
As it can be seen from the above traffic analysis and projections, liquid cargo traffic has been
projected at 6% CAGR. From the projected traffic, allocation to existing oil jetties has been
envisaged to be equal to ideally utilizable capacity of 7.06 MMTPA. Further, the utilization
expected in case of the Project of Oil Jetty and Ship Bunkering Terminal on BOT Basis has been
envisaged as per the Feasibility Report of that Project for Liquid Cargo excluding POL. Thus,
total allocation has been subtracted from projected traffic. Hence, the same has been
considered as the gap of traffic to be bridged by the proposed Oil Jetty No. 7. Though the said
gap / projection reaches around 1.79 MMTPA by FY 2023 which is almost equivalent to
proposed capacity, it is understood that the Project may take some time to ramp up the
utilization. Hence, the following utilization levels have been considered for revenue calculations
for the financial viability assessment.
Particulars FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
Optimal Capacity 1.84 1.84 1.84 1.84 1.84 1.84 1.84
Capacity Utilization 40% 50% 60% 70% 80% 90% 100%
Project Viability
The financial viability of the Project has been evaluated based on the tariffs already
approved for Oil Jetty and Ship Bunkering Terminal at Old Kandla on BOT Basis.
Followings are the Project Viability Indicators.
S.No. Indicator Value
1. Project IRR - Pre Tax 18.71%
2. Project NPV in Rs. Crores 156.24
3. Economic IRR 19.18%
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 5
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
i. Identification of project and project proponent.
Kandla Port is one of the busiest Ports of India. Kandla Port has been achieving first position among all the Major Ports of India in the terms of cargo handling for the most of the years in last decade. Thus, Kandla Port Trust has been contributing the most for the development of port capacity and handling seaborne trade of the country.
Especially northern India is heavily dependent on Kandla Port Trust for its trade requirements due to its peculiar land locked location compared to many other regions of India which are comparatively quite nearer to the sea shore. Some states of central India like Madhya Pradesh are also dependent for its specific trade requirement on Kandla Port Trust.
Hence, considering the vast hinterland that is dependent on KPT for seaborne trade and currently prevailing traffic congestion at existing facilities of KPT, capacity additions are of utmost importance at KPT for serving the economy of the influence region and in turn, the economy of the whole country in the best possible manner. India is a heavily oil deficit country which is largely fed by imports at Major Ports. Among major ports, Kandla is the leader due to its sustained growth of traffic in various commodities including liquid cargo.
Presently, Kandla Port is handling its liquid cargo at its 6 nos. Oil Jetties. These jetties
collectively have a capacity of 13.00 MMTPA. However, there are certain factors which are
not allowing the operations to be efficient enough to achieve the throughput equal to the
said capacity.
Time loss due to berthing, un-berthing, custom checks, custom boarding, cargo sampling, etc.
Time loss due to tidal restriction which may not allow ships to sail out even if the handling operations are over, keeping them waiting for next high tide.
Since the existing oil jetties are quite old structures, it calls for relatively higher time for maintenance.
Recently on-going strengthening of Oil Jetty No. 1 and 2 has also affected the availability of the utilizable capacity to some extent.
Owing to the above stated reasons and considering the ideal berth occupancy, ideally
utilizable capacity of the existing jetties is relatively less at 9.75 MMTPA. Presently, at KPT,
waiting for berthing at Oil Jetties is being observed.
Total of 8.51 MMTPA of liquid cargo was handled at Kandla Port in the year 2013-14. In
order to ease pressure / avoid the waiting of the vessels for the existing oil terminals and to
cater additional liquid cargo, KPT has taken measures to develop a liquid cargo handling
facility next to the existing oil jetty no. 6 at Old Kandla. The proposed facility will be able to
cater vessels of higher DWT. Commissioning of the proposed facility shall augment the
liquid cargo handling capacity of Kandla Port by 1.84 MMTPA.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 6
The proposed facility shall be used for handling all kinds of liquid cargo i.e. POL, vegetable
oils/edible oils, others etc. which are permitted. However, Concessionaire shall handle and
store the chemicals and liquids as per the applicable CRZ notifications.
1. The main components of the oil jetty no. 07 which shall be constructed by the BOT
operator will be: a). A jetty of length 300 m x 15 m with approach of 210 meter &
b). Tank terminal for storage of liquid cargo of capacity 176842 KL.
2. The total estimated cost of the projects will be Rs.219.64 crore.
3. Storage tank farm with an aggregate storage capacity of 176842KL having pipeline
connectivity for receiving as well as supplying the fuels
4. The storage tank farm shall have fire fighting facilities, water sprinkler system,
concrete payment, lab testing facility, etc.
5. Capital and Maintenance dredging in front of the jetty is also proposed to be
undertaken by the BOT operator.
ii. Brief description of nature of the project
In order to ease pressure on the existing liquid cargo berths, KPT has taken a slew of
measures that include development of Oil jetties at old Kandla. In light of the same it is
proposed to develop and setting up of oil jetty no. 7 at old Kandla adjoining to the
existing oil jetty no. 6 (IOC jetty) at Old Kandla. Commissioning of the proposed facility
shall augment the liquid cargo handling capacity of Kandla Port by 3.02 Million MTs.
The proposed facility shall be used for handling liquid cargo.
Name of Project Construction of Oil Jetty No. 7 to Handle Liquid Cargo at Old Kandla under PPP mode
Length of the wharf 300 meters
Width of the wharf 15 meters Approach to Jetty 210 m Back Up area for Tank Farm Development 7 Ha Maximum Vessel Size Up to 65000 DWT Optimal Capacity of Oil Terminal 1.84 MMTPA Tank Farm Capacity 176842 KL Design load for wharf 5 MT/m2 Draught in front of Jetty and Approach 13 m Type of Cargo All types of liquid cargo Capital Cost Rs. 219.64 Crores Source of funds Debt: Equity in 70:30 ratio Project time Schedule 24 months from the Date of Award of
Concession
Capital and Maintenance Dredging will be carried out by the Concessionaire
Expected Commissioning by End of - FY 2018-19 Viability Indicators Project IRR - Pre Tax 18.71% Project NPV in Rs. Crores 156.24 Economic IRR 19.18%
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 7
iii. Need of the project and its importance to the country and or region.
The need of the project can be understood from the demand and supply mismatch at the
Kandla Port in terms of the liquid cargo being handled by the existing 6 Nos. of Jetties.
iv. Imports vs. indigenous production
The proposed jetty planned to be developed for handling of oil for both import as well as export.
v. Export possibility
The proposed jetty would be suitable for export of materials/products produced in its
hinter land.
vi. Domestic/export markets
There is existing demand from existing /proposed industries for import of materials for
domestic use as well as export materials/products.
vii. Employment generation (Direct & Indirect) due to the project.
Based on the preliminary estimates, the direct employment due to proposed project will be during the construction phase and indirectly during the operation phase.
3. PROJECT DESCRIPTION
(i) Type of project including interlinked and interdependent project, if any.
As mentioned earlier, construction of Oil Jetty at Old Kandla is proposed to ease the pressure on the existing Oil jetties. It is anticipated that the even after the commissioning of the aforementioned facility, the capacity shall be inadequate to handle the likely liquid cargo traffic in future. Commissioning of the proposed facility shall augment the liquid cargo handling capacity of Kandla Port by 13 Million MTs. To 14.84 Million MTs. Hence this project should be seen as part of larger Kandla Port complex with interlinked operations.
(ii) Location (map showing general location, specific location, and project boundary and project site layout) with coordinates.
The proposed project site is situated at Kandla creek at Kandla near IOC Jetty (Oil Jetty
no. 6) having latitude 23°02'22.21" N & longitude 70°13'14.09" as per location map
enclosed at Annexure B.
(iii) Details of alternate sites considered and the basis of selecting the proposed site. Particularly the environmental consideration gone into should be highlighted.
The proposed Oil jetty site is located adjacent to the existing operational Oil jetties of
Kandla Port and is considered to be the most suitable site. No alternative site has been
considered.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 8
(iv) Size or magnitude of operation.
The proposed jetty is planned to handle oil cargo of about 1.84 MMT per year in the
initial years. Further expansion with additional demand will be considered in future
when such needs arise.
(v) Project description with process details (a schematic diagram / flow chart showing the project layout, components of the project etc. should be given).
The project includes loading-unloading of oil as it does not include any process.
(vi) Raw material required along with estimated quantity, likely resource, marketing area of final product/s, mode of transport of raw material and finished products.
The raw materials are required only for jetty development and will be mainly in
the form of construction materials given below:
Cement - 4286.09 MT
Steel- 4571 MT
Crushed metal - 20426 MT
Sand- 14901.57 m3
Quarry spall- 140000 m3
Bitumen Emulsion- 37 MT
(vii) Resource optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined.
The proposed project is development of a jetty and its operation. Therefore, resource optimization will be mainly in the form of effective use of infrastructure created and optimization of berth occupancy and utilities and services.
(viii) Availability of water its sources, energy / power requirement and sources should be given.
Water:
The Gujarat Water Supply and Sewerage Board are responsible for developing and
managing various sources of water in the region. The important source of water is the
14.5 Million m3 capacity reservoir of Tapar Dam, besides a number of deep tube wells.
Water is distributed to Kandla area from high service reservoir near Bhachau through
18” dia. CI mains, after chlorination. The capacities of the elevated water towers and
underground reservoirs at Kandla are 1500 kl. and 14000 kl., respectively. The average
daily consumption of water at Kandla area is estimated at around 2000 kl. The position
is improved to a great extent by tapping the source of water from Sardar Sarovour
Narmada Nigam Limited.
The water requirement has been envisaged based on the total area of the Project
considering the jetty area, area of approach and the Pipeline area. Water requirement
for the project is approximately 450 m3/day for the total area of 8.8 ha for the Project.
The quantity of effluent generation is assumed at 80% of water consumption which is
approximately 360 m3 /day.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 9
Power: The port receives Bulk power supply from PGVCL through its 66 kVA sub
stations and has 11 KV substation giving power supply to the various other cranes and
installations. Besides, the port has two diesel generating sets to meet with emergency
needs. Kandla Port Trust is a distribution Licensee for power and distributes power to
the various users of Kandla.
Uninterrupted good quality estimated power requirement of 900MW is expected to be
supplied in the SEZ area by the Gujarat Government. However, master plan caters for
setting up a dedicated power back up from an independent power producer (IPP) at a
later stage, if required.
(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their management / disposal.
Prima facie, waste generated by BOT operator during any operations, is responsibility
of the same and he would have to make arrangements to deal with management of
disposal (both solid and liquid. Details of waste (both solid and liquid) generated and
its management would be ascertained at later stages.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 10
(x) Schematic representation of the feasibility drawing which give information of EIA purpose.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 11
4. SITE ANALYSIS
(i) Connectivity.
Airway The national airlines operate daily flights through the district headquarters at Bhuj as well
as Gandhidham which lies 67 Km. & 20 Km. respectively from Kandla Port.
Gandhidham airport is also operational and there is a daily flight to Mumbai from
this Airport.
Railway Broad gauge(BG) tracks directly connect the Port at New Kandla with the principal cities
of Mumbai, Ahmadabad, Surat, Baroda, etc., and also Delhi, Punjab and Haryana
through the route Ahmadabad-Ratlam- Kota - Mathura to Delhi. The second route is
via Palanpur - Ajmer to Delhi.
Apart from this, the existing meter gauge line from Bhildi to Samdari has been converted
to BG, which provides direct link to Jodhpur in Rajasthan & Bhatinda in Punjab and
reduces the reach to Hinterland by 118 Km.
Road Kandla is connected to the National Highway grid system through NH 8A coming from
Mumbai via Ahmedabad and Morbi and terminates at the Port. All main gates of
cargo jetty complex as well as oil jetty complex are directly connected to N. H. 8 A by
four lane wide roads. The city of Gandhidham where the Port Administrative Office
and the main staff colony are located, also lies on NH 8A about 13 Km. from the Port.
The port enjoys fully developed road network, both in and around the Port area to
facilitate faster movement of cargo.
(ii) Land form/ land use / land ownership.
Land is largely flat with scanty vegetation. Land currently is lying as barren land and is under ownership of Kandla Port.
(iii) Topography (along with map).
Topography at the site location is generally flat with average ground level of about 2m above MSL. Topsoil appears marshy. The master plan for Kandla Port Trust is attached.
(iv) Existing land use pattern (agriculture, non-agricultural, forest, water bodies [including area under CRZ]), shortest distance from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given.
Existing land use pattern of the proposed site is barren land, without and cultivation and is covered under coastal regulation.
(v) Existing infrastructure
The proposed Oil jetty is a green field project and nothing exists on the site as of
now. The backup area earmarked for the jetty is almost barren and flat. It is
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 12
proposed to construct and operate a wharf of length 300 m X 15 m on PPP basis. The
jetty shall be used for handling of liquid cargos like Chemicals, Edible oil and POL
products. The BOT operator shall undertake the following development activities at
the proposed project.
a. Port Infrastructure
The Port handles cargo at two locations, viz. Kandla and Vadinar (near Jamnagar).
Presently, Vadinar has three Single Buoy Moorings (SBMs), two installed by the
Indian Oil Corporation (IOC) & one installed by Vadinar Oil Terminal Ltd. (VOTL) for
handling of crude oil for its refineries. These SBMs can accommodate vessels up to 3
Lakhs DWT size and have a capacity to handle around 28.50 Million tons of crude
traffic per annum. Kandla has, at present, 12 dry cargo berths along with 2 container
handling berths and six oil jetties. The existing Fourteen general cargo berths have a
quay length measuring 3132.00 m. The custom fencing is 253 hectares. Also, Kandla
Port has 240.00 meter long barge handling jetty at Tuna. The permissible draught
and sizes of vessels that can be docked along the 14 berth at Kandla Port are given
below:
Berth No. Dead Weight Tonnage
(DWT)
Draught (in
metres)
I 45000 9.8
II 45000 9.8
III 45000 9.8
IV 45000 9.8
V 35000 9.1
VI 35000 9.1
VII 55000 12.0
VIII 55000 12.0
IX 55000 12.0
X 55000 12.0
XI 65000 13.0
XII 65000 13.0
XIII 75000 13.0
XV 75000 13.0
b). Container Cargo
Presently, there are two container berths i.e. 11th and 12th Cargo berth to handle
container cargo like manufactured items, wood, tiles, foodstuffs, textile, apparel, glass
and building materials, etc. Maximum DWT of the vessels and the permissible draft at
these jetties is shown in the table below:
Container Cargo Berth DWT Draught (M)
XI 65000 13
XII 75000 13
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 13
c. Liquid Cargo facility:
Existing Liquid Cargo Handling Capacity
Presently, six numbers oil jetties are handling liquid cargo at Old Kandla Port. In future,
proposed one number oil jetty shall be commissioned for handling liquid cargo at Old
Kandla Port. The combined capacity of all facilities at Kandla Port for handling liquid
cargo (excluding containers) is designated as 13 MMTPA. Further KPT has recently
signed concession agreement with Kandla Oil Terminal Private Limited for
“Development of Oil Jetty to Handle Liquid and Ship Bunkering Terminal at Old Kandla
on BOT Basis”. The same is to add the capacity of 3.39 MMTPA. Hence, total designated
capacity would be 16.39 MMTPA at Kandla Port. However, the designated capacity may
not be considered correct figure for analyzing the demand supply gap for the new port
facility to be developed. There are some practical operational factors as mentioned
following are responsible this:
Time loss due to berthing, un-berthing, custom checks, custom boarding, cargo
sampling, etc.
Time loss due to tidal restriction which may not allow ships to sail out even if the
handling operations are over, keeping them waiting for next high tide.
Since the existing oil jetties are quite old structures, it calls for relatively higher
time for maintenance.
Recently on-going strengthening of Oil Jetty No. 1 and 2 has also affected the
availability of the utilizable capacity to some extent.
Owing to the above factors, presently, there is waiting for getting the berthing for Liquid
tankers at Oil Jetty Complex of Kandla Port. Considering this phenomena, actual
utilizable capacity of the Oil Jetty Complex has to be considered with ideal berth
occupancy.
In view of the above, the existing capacity of the Oil Jetties No. 1 to 6 has been envisaged
as follows:
Particulars Values
Existing Capacity of Oil Jetties 1 to 6 13 MMTPA
Average Berth Occupancy of 1 to 6 75% (at this occupancy figure, waiting
is being observed for berthing)
Ideal Utilizable Capacity 9.75 MMTPA
Traffic handled by Oil Jetties 1 to 6 in the past may also be more than 9.75 MMTPA.
However, it would be with very high berth occupancy which is not advisable from the
asset maintenance point of view.
Historical Liquid Cargo Traffic at Kandla
The liquid cargo handled at Kandla Port has been studied. Growth and commodity share
analysis has also been undertaken keeping in mind the proposed facilities.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 14
Liquid Traffic Scenario based on Past Five Years from 2009-10 to 2013-14
Liquid Bulk Traffic 2009-10 2010-11 2011-12 2012-13 2013-14 5 year 10 Year
Imports CAGR CAGR
POL 1366735 1884770 1640572 1203101 702140 -4.51% -7.81%
EDIBLE/VEG.OIL 666718 628992 351519 576946 2489880 30.03% 22.08%
PHOS ACID 1502180 1286098 1381763 1349284 990587 1.90% -4.79%
AMMONIA 311380 293120 296236 246270 239758 0.81% -1.62%
OTHER LIQUIDS 4245332 3904618 4288003 4938034 2455501 -4.50% 3.55%
Total Imports 8092345 7997598 7958093
8313635
6877866
3.55% 2.16%
Exports
POL 1699300 1404835 1247350 1097727 1318015 -4.63% 14.51%
EDIBLE/CASTOR OIL 157124 144309 169872 166143 165859 -2.59% -3.63%
MOLASSES 0 5000 0 0 0
OTHER LIQUIDS 822042 653813 285440 217751 154943 -17.14%
0.63%
Total Exports 2678466 2207957 1702662
1481621
1638817
-6.20% 8.49%
Total Liquid Bulk Traffic
10770811
10205555
9660755
9795256
8516683
1.17% 3.09%
Based on the above analysis, following findings can be ascertained:
POL traffic has been constantly decreasing for the past five years. Further, the
analysis was carried out for past 10 years also. In that case also, the traffic was
found as decreasing. As per the industry players’ view, the POL traffic is affected
for long due to the reason that the domestic refineries have increased their
capacity and users of POL products are now sourcing the material locally and
India is on its way of turning the net exporter of Petroleum and petrochemical
products. Hence, the imports of POL traffic have been reducing.
Though POL traffic exports have reduced in case of past five years performance,
the same has increased considering the past 10 years data. This was also
discussed with industry players who opined that the India’s increasing capacity
of refineries could be the sole reason for increased exports of POL products.
Moreover, decrease at Kandla could be attributable to competition of state ports
like Mundra, Hazira, Pipavav, etc.
Overall subdued growth scenario for liquids handled at Kandla.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 15
Another input from the industry players is that it is difficult to understand the
traffic trend of chemicals and liquid products which has very significant impact
from the pricing scenario at domestic as well as international markets.
POL viz-a-viz Edible Oils, Chemicals and Other Liquids put together has been
studied and analysed.
Cargo Type 2009-
10 2010-
11 2011-
12 2012-
13 2013-
14 5 Yr
CAGR 10 Yr CAGR
Share of POL 3.07 3.29 2.89 2.30 2.02 -4.59% 0.49%
Other Liquids 7.70 6.92 6.77 7.49 6.50
3.47% 4.08%
Total 10.77 10.21 9.66 9.80 8.52 1.17% 3.09%
In terms of share of Cargo Type i.e. POL and Other Liquids, following is the
analysis of Liquid Cargo Handled at Kandla for past five years.
Cargo Type 2009-10 2010-11 2011-12 2012-13 2013-14 5 year 10 Year
Share of POL 28.47% 32.23% 29.89% 23.49% 23.72% 27.56% 32.79%
Other Liquids 71.53% 67.77% 70.11% 76.51% 76.28% 72.44% 67.21%
Share of POL has reduced from 32.23% in 2010-11 to 23.72% in 2013-14. In general, considering the above available data and views of some of the
industry players, it can be stated that the POL traffic may continue to reduce.
However, traffic of Edible Oils, Chemicals and Other Liquids may be expected to
increase. Further, if the facilities are strengthened, improved and expanded with
better infrastructure, the better growth may be expected.
Traffic Projections for Proposed Project
Oil jetties at Kandla have been observing the berth occupancy in excess of 75%.
Moreover, if the private captive jetties of IOC and IFFCO are excluded, the berth
occupancy exceeds 90% for last few years for Oil jetties No. 1 to 4.
However, traffic growth of liquid bulk at Kandla has been subdued due to: Lack of deep draft jetties Old infrastructure Competition from state ports where above two difficulties are not being faced.
Addressing the both the lacunas, proposed Oil Jetty No. 7 has been proposed comprising
Jetty with higher draft and modern infrastructure including storage tank farm with
required allied facilities.
Traffic projections have been prepared envisaging the handling of liquid cargo traffic
excluding POL since POL traffic has been found to be decreasing only. Hence, in the
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 16
proposed capacity formulation, handling of POL has not been considered. However, if the
Concessionaire wants to handle POL, it may be allowed to do so.
Past five years traffic of liquid cargo excluding POL has been growing at CAGR of around 4%.
However, traffic projections have been estimated based on 6% CAGR. Higher CAGR has been
considered due to improved infrastructure and deep draft Jetty and expected overall economic
growth recovery leading to growth in trade and traffic.
Projected traffic has been allocated for the ideally utilizable capacity of existing Oil Jetties and
expected utilization of upcoming new Oil jetty and Ship Bunkering Terminal on BOT. Following
table shows the traffic projections for the proposed Project.
Traffic Projections for Liquid Cargo excluding POL
FY 2014
FY 2015
FY 2016
FY 2017
FY 2018
FY 2019
FY 2020
FY 2021
FY 2022
FY 2025
FY 2030
Liquid Cargo excluding POL
6% 6% 6% 6% 6% 6% 6% 6% 6% 6%
Liquid Cargo excluding POL
6.50 6.89 7.30 7.74 8.20 8.69 9.22 9.77 10.35 12.33 16.50
Total Traffic 6.50 6.89 7.30 7.74 8.20 8.69 9.22 9.77 10.35 12.33 16.50
Handling by Existing & Upcoming facilities
Existing Liquid Jetties at KPT*
7.06 7.06 7.06 7.06 7.06 7.06 7.06 7.06 7.06 7.06 7.06
Oil Jetty and Ship Bunkering Terminal on BOT
1.30 1.36 1.43 1.50 1.74 2.17
Total Allocation 7.06 7.06 7.06 7.06 7.06 8.36 8.43 8.50 8.57 8.80 9.23
Net Traffic Projection for Proposed Jetty
-0.57 -0.18 0.24 0.67 1.14 0.33 0.79 1.27 1.79 3.53 7.28
Note: *Ideally utilizable capacity for Liquid Cargo excluding POL has been considered as Total Ideally
Utilizable Capacity of Oil Jetties x Share of Liquid Cargo other than POL = 9.75 MMTPA * 72.44% i.e. share
of liquid cargo at Kandla excluding POL for past five years.
As it can be seen from the above traffic analysis and projections, liquid cargo traffic has been
projected at 6% CAGR. From the projected traffic, allocation to existing oil jetties has been
envisaged to be equal to ideally utilizable capacity of 7.06 MMTPA. Further, the utilization
expected in case of the Project of Oil Jetty and Ship Bunkering Terminal on BOT Basis has been
envisaged as per the Feasibility Report of that Project for Liquid Cargo excluding POL. Thus,
total allocation has been subtracted from projected traffic. Hence, the same has been
considered as the gap of traffic to be bridged by the proposed Oil Jetty No. 7. Though the said
gap / projection reaches around 1.79 MMTPA by FY 2023 which is almost equivalent to
proposed capacity, it is understood that the Project may take some time to ramp up the
utilization. Hence, the following utilization levels have been considered for revenue calculations
for the financial viability assessment.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 17
Particulars FY 2018
FY 2019
FY 2020
FY 2021
FY 2022
FY 2023
FY 2024
FY 2025
FY 2026
FY 2030
FY 2040
FY 2047
Optimal Capacity 1.84 1.84 1.84 1.84 1.84 1.84 1.84 1.84 1.84 1.84
Capacity Utilization
40% 50% 60% 70% 80% 90% 100% 100% 100% 100%
Cargo Handled 0.74 0.92 1.10 1.29 1.47 1.66 1.84 1.84 1.84 1.84
d. Mooring Facilities:
Kandla Port Trust has many offshore mooring facilities also for carrying out mid stream
cargo handling by carrying out lighter age of cargo from mother vessel to daughter vessels
i.e. Barges. The details of the moorings available together with their occupancy are given
below:-
e. Storage Capacity:
Liquid Storage Capacity
The tank farms at Kandla for liquid bulk cargo (chemicals, edible oils, POL products, acids, etc.)
storage have a total combined capacity of nearly 23.75 Lakh kilo-litres. The tank farms are
connected to the oil jetties through a number of pipelines facilitating easy and faster handling of
liquid cargo ships. All tank farms are situated behind the port jetties.
Sr. No.
Nature of Storage No. of Tanks / Area Capacity
1
Oil & Liquid
PSU - 101 Nos.
Private Installation 555 Nos.
11.22 Lakh KLs
12.53 Lakh KLs
Dry Storage Capacity (Covered & Open)
The Port has developed storage capacity for dry cargo inside the custom bounded area for
storage of import and export cargo. RCC ramps have been constructed for all godowns, so that
cargo can be loaded/unloaded directly from the godowns which reduce the loading/unloading
time. The open storage and godown capacity is shown in the following table:
Nos. Area (Sq. mtrs.) Capacity (Lakh MT)
Port Owned
Godowns 35 2.03 lakhs 6.47
Open storage 16.63 lakhs 36
Private and CWC owned
Godowns 38 74000 4.5
Moorings Maximum Length overall (in
m)
Draught (in m)
I & II 167.5 7.9
III 183.93 8.2
DDM 255.55 12
Salt Mooring 160.00 8.5
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 18
f. Other infrastructural facilities
Other infrastructural facilities at Kandla Port Trust include:
Uninterrupted power supply from the national grid supplemented by diesel power,
generator of 2000 KVA capacity.
Barge handling facilities at Kandla.
Storage facility for LPG to the tune of 30,000 m3.
Two jetties for berthing Port Craft.
One berthing jetty for Port Tugs.
A floating steel dry dock for port craft. The floating dry dock can accommodate
vessels having displacement upto 2,700 DWT and a maximum length of 95 meters,
beam of 15 meters and draft of 4.5 meters. The floating dry dock is equipped with a
5 ton capacity of Leibherr crane.
State of art Container Freight Station (CFS).
26 Nos of Flotilas including 6 Nos. of shipping tugs.
5 Nos. of shipping tugs on contract with Pvt. Parties.
Online computerization of entire port operation and established connectivity with
various business partners viz banks, custom, custom house agent, etc.
There are twelve weighbridges at the port (including three private weighbridges)
which are summarized as below:-
o Two weighbridge of 60 MT capacity
o Two weighbridges of 80 MT capacity
o Three weighbridges of 100 MT capacity owned by Private Parties.
o Five weighbridges of 100 MT capacities by the Port are on anvil.
Cargo handling Equipment
The port is equipped with a range of cargo handling equipment to handle different types
of cargo passing through the port. There are nine number of high capacity Electrical
Level Luffing cranes working on the present cargo berths. The mobile cargo handling
equipment includes cranes, forklift trucks, trailers etc. Details of the Cranes presently,
held by the port are given as below: There are twelve cranes:
o 2 of 16 Tons.
o 3 of 25 Tons.
o 3 of 25 Tons.
o 2 of 12 Tons.
o 2 of 16 Tons.
The Port has eight shipping tugs and two harbour tugs, 15 launches and one fire float,
two pilot & oil cum Debris recovery vessel, one each at Kandla & Vadinar. Ships are
berthed / sailed round the clock. The Pilot embarks / disembarks inward and
outward vessels at fair-weather Buoy located about 23 Kms from Kandla.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 19
g. Soil Classification
Sub-soil profile (Tentative profile taken from nearby area)
The sub-soil profile is shown in the diagram below:
Depth (m) Dia of Bore
Hole Log Strata Description
0.70
150 mm Grey Soft to Firm Silty Clay
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
10.00 10.70 11.00
150 mm Reddish Brown Hard Silty Clay
12.00 13.00 14.00 15.00 16.00 17.00 18.00 18.70
19.00 150 mm
Reddish Brown Hard Silty Clay with Gypsum 20.00
21.00
150 mm Reddish Brown Hard Silty Clay with
Gypsum
22.00 23.00 24.00 25.00 26.00 26.90 27.00
150 mm Yellowish Brown Dense to Very Dense
Silty Sand
28.00 29.00 30.00 30.07 31.00
150 mm Yellowish Brown Dense to Very Dense
Sitly Sand
32.00
33.00
34.00
35.00
36.00
37.00
37.52
As could be seen, the sub-soil profile consists of grey soft to firm silty clay up to -10.70
m, reddish brown hard silty clay is found up to -18.70 m. A reddish brown hard silty clay
with gypsum is met below -19.00 m up to -26.90 m. Very dense yellowish brown silty
sand is found up to -36.00 m. Between -35.7 to -39.7 hard greyish brown clay is found.
Very dense yellowish silty sand is found below -36.00 m and the bore hole is terminated
at -36.00 m with the same composition being observed.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 20
h. Climatic Data from secondary Sources
Tidal Conditions
Tides at Kandla are semi-diurnal in character. The tidal heights with respect to port
Chart Datum, with local Mean Sea level as + 3.884 is presented in the table below:
Highest High Water + 7.59 m
Mean High Water Spring + 6.66 m
Mean High Water + 6.185 m
Mean High Water Neaps + 5.71 m
Local Mean sea Level +3.88 m
Mean Low Water Neaps + 1.80 m
Mean Low Water + 1.30 m
Mean Low Water Spring +0.80 m
Lowest Low Water + 0.4 m
Average Spring Range 5.86 m
Average Neap Range 3.91 m
Mean Range 4.885 m
Waves
Kandla Creek is protected from wave disturbances by a number of shoals at its outfall
into the gulf. This provides the setting for a basin with absolute tranquility. The creek
provides calm waters round the year for easy movement of shipping. Thus, Kandla has
become an all-weather Port of repute. The high amplitude tides coupled with a large
storage area has resulted in high flushing velocities inside. This has helped in cleansing
of the navigational channels, thus providing minimum siltation. Outside in the gulf, the
complex flow phenomenon has given rise to a number of shoals, which are dynamic in
nature. The Port of Kandla is approached through the channel starting from the Outer
Tuna Buoy. The shallow depths at the turning point of the channel are over passed
during high tides by vessels approaching the harbour. Ship movements are normally
confined to the high tides. Siltation in the channel is confined to a reach of hardly 3 km
only. The Port region is free from any significant wave disturbances.
Silt and Salinity
Silt charge and salinity observations were carried out during dry and monsoon months
in April and September 1983 at locations east and west of Kandla Creek and at two
stations in the Gulf of Kutch. The waters of the Creek are heavily silt charged, the range
being 1 to 3 ppt. The Creek waters have a salinity ranging from 23 to 25 ppt.
Temperature and Humidity
The climate of Kandla Port is generally tropical and dry. The air temperature varies from
less than 100 C in winter to about 440 C in summer. The mean, maximum and minimum
temperature observed in the different months at Kandla is presented in the table below:
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 21
Months Mean of Max. Temp. Mean of Min. Temp.
January 25.2 13.0
February 27.5 15.5
March 32.0 20.2
April 34.6 23.5
May 35.9 25.7
June 35.0 27.7
July 32.4 27.2
August 30.7 25.4
September 33.3 24.5
October 34.2 23.1
November 32.4 20.2
December 25.6 13.5
Kandla region is fairly dry and only July, August and September is humid months. The
range of maximum relative humidity varies from 0% to 100%, whereas minimum values
vary between 0 and 30%, except during July, August and September, when minimum
values vary between 25% and 50%.
Rainfall
Rainfall in Kandla is very low. Between January and April, there is normally no rainfall.
Rainfall generally remains confined between June end and mid September. During the
remaining months, the rainfall is scanty. The annual average rainfall is around 200mm
only.
Wind Conditions
From long term observation of wind velocities and directions, following inferences can
be made:
January The predominant direction is between NNE and NNW with speed range normally
between 12 and 19 Km/hr. which may exceed for about 10 % of the time.
February
The direction changes from NNE and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
March The direction lies between NNW and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
April to
June
The direction for wind is between WSW and SSW. The wind speed reaches a
maximum of 39 km/ hr. except in July, when the speed may exceed the range.
October The direction of wind changes from SSW to NNW. Wind speed ranges between 12
and 19 km/ hr. but the limit may exceed for 10 % of the time.
Nov. & Dec. The predominant direction is between NNE and NNW and the speed is between
12 and 19 km/hr.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 22
Storms and Cyclones
Kandla port is not generally affected by cyclonic storms. During June 1998, a severe
cyclonic storm, which passed over Kandla Port with a wind speed of 150 km/hr.,
resulting in high tidal waves of 10.5 m with strong current, caused extensive damages to
the Port installations, crafts and human lives.
5. PLANNING (BRIEF):
(i) Planning concept (type of industries, facilities, transportation, etc.) town and country planning/development authority classification.
The site for the proposed project is situated at Old Kandla Port as per drawing enclosed
at Annexure B. it is proposed to develop the facility at Old Kandla Port to handle liquid
cargo in future. Commissioning of the proposed facility shall augment the liquid cargo
handling capacity of Kandla Port by 3.02 Million MTs.
It is proposed to construct and operate a wharf of length 300 m X 15 m on PPP basis.
The jetty shall be used for unloading/loading of liquid cargo from Tankers. The BOT
operator shall undertake the following development activities at the proposed project.
(ii) Population projection
The population projection for the proposed project is only related to direct and
indirect employment generation. In construction stage, the temporary population will
be about 600 and in the initial stage of population direct and indirect population will
be 150 and 350 respectively.
(iii) Land use planning (breakup along with green belt, etc.)
It is planned to develop backup area of 7.0 hectare approx for tank farms and
bunkering facilities.
(iv) Assessment of infrastructure demand (physical and social).
The BOT operator shall undertake the following development activities at the
Tuna Port.
Construction of wharf of 300 mts. x 15 mts. on pile foundation
Construction of other civil structures on pile foundation such as approach
bridge, connecting platform between jetty and approach bridge, crew office, high
mast lighting tower, fire pump house,
Providing Temporary Custom fencing wall,
Providing Fire fighting line
Asphalting paving behind approach till liquid storage tank farm
Electrification works
Gate office and security check
Development of back up area
o Development of Tanks for storage of Liquid cargo
o Construction of permanent boundary wall
o Supply pipelines from the Oil Jetty to the tank farm
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 23
o Piping network within the tank farm
o Tank trucks loading racks and pumping
o Product laboratory
o Providing fire fighting system
o Electrification works
o Construction of office building and security cabin
o High capacity new weigh bridges
Capital dredging and Maintenance dredging alongside the jetty
Apart from undertaking the above activities, BOT operator shall provide Marine
Loading / Unloading Arm for executing liquid cargo handling operations at the
jetty terminal
(v) Amenities / facilities
The Amenities/facilities proposed are in relation to the infrastructure
proposed to be developed in phases.
6. PROPOSED INFRASTRUCTURE
i. Industrial Area (Processing Area)
The Capacity of the Terminal has been calculated based upon the guidelines published
by TAMP.
1. Depth to be made available at the proposed Oil Jetty and in approach to
Navigational Channel: 14.1 m below CD
2. Dimensions of the jetty - 300 m x 15 m (proposed)
3. Maximum size of vessel which can be accommodated – up to 65000 DWT
Optimal Capacity of Oil Jetty No. 7 for handling of Liquid Cargo excluding POL
Particulars Values Units
Handling Rate of Other Liquids excluding POL 300
Hours in a Day 24
Days in a Year 365
Optimization Factor / Berth Occupancy 70%
Optimal Capacity 1.84 MMTPA
Optimal capacity of the terminal = 1.84 Million Metric Tons.
Oil Jetty No. 7 is proposed to get connected with a Liquid Storage Tank Farm with Capacity
of 176842 KL by required nos. of pipelines with length of 4.5 Kms. Jetty and Tank Farm would be
supported by various allied utilities/facilities.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 24
ii. Residential area (non processing area).
There is no proposed residential area as part of this project.
iii. Green belt.
Green belt will be provided as per specified norms.
iv. Social infrastructure.
There is no proposed social infrastructure as part of this project.
v. Connectivity (traffic and transportation road / rail / metro / water ways
etc).
Site is well connected by an access road of width 7.5 mts from north eastern side to the proposed site.
vi. Drinking water management (source and supply of water).
The drinking water shall be taken from Gujarat Water Supply and Sewerage Board.
vii. Sewerage system.
As per preliminary estimates, it is estimated that 75% of water supply (750 kl/day) would be generated as domestic sewerage from Office building and other backup areas. However, it would not be viable to setup a treatment plant in this case and sewerage shall be transferred to nearest STP. In later stages this can be integrated with STP of Proposed Multi Product SEZ at Kandla. Further details shall be ascertained in later stages.
viii. Industrial waste management:
There is no industrial waste except waste water and solid waste generated from this project. The waste water shall be treated in sewerage treatment plant (STP).
ix. Solid waste management:
Solid waste generated from this facility can be broadly categories in three types:
1. Domestic waste: - sweeping, cleaning, fuel burning, gardening waste, waste wood etc.
2. Construction and maintenance debris: - This waste of construction material will be dealt with separately.
3. Other waste: - packing material, plastics, metal items etc.
It is assumed that above collected waste would consist of Bio-degradable material (75%), Inorganic material (20%) and inert material as 5%. Bio waste will be treated to form the manure and can be handled on-site through a land fill or waste pit technique. Non-bio waste which can be recycled (ferrous materials, plastic etc) shall be sold /given to waste plastic vendors for recycling purposes. Construction material can be used for site filling purposes.
x. Power requirement and supply / source:
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 25
The port receives Bulk power supply from PGVCL through seven 11 KV sub stations. Besides, the port has two diesel generating sets to meet with emergency needs. A scheme is presently under implementation to augment the power supply to 66 KV and to provide necessary infrastructure for receiving Bulk supply, stepping down and distribution. The BOT operator shall be required to install a 11 KV transformer yard for transmission and power distribution for the said project.
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN
i. Policy to be adopted (central / state) in respect of the project affected persons including home outsees, land outsees and landless labours (a brief outline to be given).
Not applicable for this project, as land is under ownership of Port Authorities and
free from all encumbrance.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 26
8. PROJECT SCHEDULE AND COST ESTIMATES
i. Likely date of start of construction and likely date of completion (time schedule for the project to be given).
The Project is envisaged to be completed and brought into operation, by approximately 24 Months from the date of award of concession agreement. The estimated Bar-Chart for developing the facility is presented below.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 27
ii. Estimated project cost along with analysis in terms of economic viability of the project.
Assumptions in the evaluation of Financial Viability
The table below summarizes the major assumptions made with regard to traffic
composition, construction phasing and financing in order to evaluate financial
viability.
Financial viability analysis has been carried out by assessing the viability indicators
like IRR, NPV, etc. These indicators have been assessed by investments and net
Cashflow estimates. Investment and net Cashflow estimates have been arrived at by
considering the capital cost estimates, operating cost estimates, financial cum
revenue assumptions for the Project.
Capital and operating cost estimates have been discussed in earlier sections.
Following are the revenue and other assumptions used for the analysis.
Particulars Values Units
Days in a Year 365 Days
Total Hours in a Year 8760 Hours
Optimization Factor 70%
Optimal Hours for Berth Hire 6132 Hours
Design Vessel
DWT 65000
LOA 240 m
Beam 34 m
Fully Laden Draught 13 m
Operational Assumptions
Capacity Utilization - 1st Year 40%
Yearly Increase in Capacity Utilization 10%
Revenue Assumptions with Escl. Reference Tariffs based on Oil Jetty and Ship Bunkering Terminal
as of Jan 14 8.59%
Particulars Foreign Coastal Foreign Coastal
Cargo Handling Charges (Rs./MT)
POL 31.29 31.29 33.98 33.98
Other Liquids 108.64 65.18 117.97 70.78
Storage Charges (Rs./MT/Day) 6.21 6.74
Miscellaneous Charges (Rs./MT) 4.11 4.46
Berth Hire Charges (Rs./GRThr) 0.57 0.34 0.62 0.37
Average Ratio of GRT to DWT 63.32% of DWT
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 28
Average DWT - 25000 DWT to 65000 DWT 45000
Avg of Proposed DWT and Avg DWT at Existing Jetties
Average GRT 28494
Optimal GRT Hrs 174725208
Foreign 142967234
Coastal 16981490
Operating Expenses
Power & Fuels
Power 240000 Kwh/Ha
Repairs and Maintenance
Civil Assets 1% of Cost
Mechanical, Electrical & Utilities 5% of Cost
Pipelines 5% of Cost
Insurance 1% of Gross
FA
Depreciation SLM WDV Asset Life
Civil Assets 3.34% 10% 30.00
Mechanical, Electrical & Utilities 4.00% 15.00% 25.00
Pipelines 4.00% 13.91% 25.00
Other Expenses 5% of Gross
FA
Land Area for License Fees L B Sqm
Back Up Area 70000
Berth Structure 300 15 4500
Approach 210 10 2100
Pipeline Area on Way Leave Charges
300 mm dia-for edible oil/ veg 8600 0.3 2580 250 mm dia - for other liquids 17200 0.25 4300 200 mm dia - for other liquids 17200 0.2 3440 80 mm dia- Air pigging line 4300 0.08 344 Total 10664 Water Area for License Fees
Front Side 300 39.10 11730
License Fees Rates as per KPT SOR L B Sqm
License Fees – Land 923.27
License Fees - Waterfront 461.64
Ratio of Foreign Coastal Foreign Coastal
Cargo Share 63.00% 37.00%
For liquids except POL
Vessel Share 90.28% 9.72%
For Liquid cargo tankers
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 29
Escalations
Long Term Average WPI 5% Tariffs as per TAMP Guidelines of Ref Tariffs 3%
Operating Expenses WPI 5%
License Fee Escalation as per Land Policy 2%
Financing Ratio
Equity 30%
Debt 70%
Total 100%
Investment Phasing FY2015 FY2016 Total
Equity 50% 50% 100%
Debt 50% 50% 100%
Taxation Rate
MAT 20.48%
Corporate Tax 33.22%
Economic IRR
Contractor' Profit in Civil Cost 15%
Labour Cost in Civil Cost 30%
Tax Element in Material cost 15%
Misc. Cost in Project Cost as per TAMP 5%
Financing Assumptions have been considered as follows:
Terms of Debt Interest Rate 13%
Total Tenure 10 Years
Moratorium 2 Years Repayment
Period 8 Years
Investment Phasing has been considered as shown below over the construction period.
Investment Phasing FY
2018 FY
2019
Equity Rs. Crs. 32.95 32.95
Debt Rs. Crs. 76.87 76.87
Total 109.82 109.82
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 30
A. Viability Analysis
The financial and economic viability analysis of the project has been carried out for a 30
year concession period including a construction period of 24 months. The Project
profitability has been assessed whereby the Cashflow analysis has been carried out for the
Project life. On the basis of the same, the IRR and NPV for the Project have been calculated.
Net Project Cash flows have been shown below in tabular and graphical format.
Project Cash flows
The initial drop in the cash flows indicates the cash outflow for capital expenditure.
Detailed worksheets for profit and loss, cash flows, tax and depreciation are presented as
annexure to this report.
Year of Operation
Annual Revenue
in Rs Crore
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 31
B. Sensitivity Analysis
Sensitivity analysis has been worked out to ascertain the impact of critical factors affecting the
viability of the project viz. revenues, operating expenses, traffic projections and the estimated
Project cost. The impact of variation in these factors has been assessed on Project IRR and
Project NPV.
Scenario Base Case 5% Lower Traffic /
Revenues
5% Higher
Opex
5% Higher
Capex
Project IRR 18.71% 16.67% 18.36% 17.94% NPV in Rs. Crores 156.24 108.45 147.35 142.55 Economic IRR 19.18% 17.09% 18.82% 18.37%
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.
Financial Benefits of project I. To Kandla Port Trust
1. Increased liquid cargo handling capacity 2. Earnings in the form of revenue share from the BOT operator. 3. Increase in revenue operations of port due to additional traffic handling. 4. Reducing congestion at other Oil jetties at Kandla port. 5. Reduction in the cost of handling, thereby making Kandla Port more competitive.
II. To Local community 1. Indirect economic activity for nearby areas. 2. More employment opportunities for local people.
Social Benefits of project To Local community
A. Public image of Kandla port as World class facility with most modern infrastructure.
B. With modernisation and expansion of Kandla port, more economic opportunities would be created (both in formal and informal sector) for Local community.
C. Increase in business activity will bring in prosperity in hinterland, which consequently would bring better access to social and physical infrastructure.
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 32
Annexure – A: Project Site
PRE-FEASIBILITY REPORT-Setting up of Oil Jetty No.7
MANTEC CONSULTANTS PVT LTD., NOIDA 33
Annexure - B Back up Area Layout
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
1 MANTEC CONSULTANTS PVT. LTD., NOIDA
PRE-FEASIBILITY REPORT
Administrative Office Building at Tuna Tekra
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
2 MANTEC CONSULTANTS PVT. LTD., NOIDA
Table of Contents
1. EXECUTIVE SUMMARY .................................................................................... 3
3. PROJECT DESCRIPTION .................................................................................. 5
4. SITE ANALYSIS ................................................................................................ 8
5. PLANNING (BRIEF): ...................................................................................... 12
6. PROPOSED INFRASTRUCTURE ..................................................................... 12
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN ................................ 13
8. PROJECT SCHEDULE AND COST ESTIMATES ................................................ 13
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) ............................. 13
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
3 MANTEC CONSULTANTS PVT. LTD., NOIDA
1. EXECUTIVE SUMMARY
Kandla Port is one of the busiest Ports of India. Kandla Port has been achieving first position
among all the Major Ports of India in the terms of cargo handling for the most of the years in
last decade. Thus, Kandla Port Trust has been contributing the most for the development of
port capacity and handling seaborne trade of the country.
The proposed project i.e., Administrative Office Building at Tuna Tekra
It has been suggested to provide infrastructure facilities. Administrative Office and amenities are required to be constructed for various departments of Kandla Port Trust
The facilities proposed to be developed area given under:
i- Construction of office building containing 12 rooms including conference room, canteen and toilet etc
ii- Compound wall, gate and security cabin.
iii- Electrification and approach road leading from Tuna Tekra backup area
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
4 MANTEC CONSULTANTS PVT. LTD., NOIDA
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
i. Identification of project and project proponent.
The proposed project is for the construction of Administrative office building at Tuna Tekra which is proposed by Kandla Port Trust. To provide infrastructure facilities and control over the various activities the Administrative building is proposed.
ii. Brief description of nature of the project
Name of Project Administrative building at Tuna Tekra
Area of Plot 100m x 150m=15000m2
Area of Building 40m x 40m=1600m2
Height of Building 3.6m
Area of Parking 40m x 8m
Capital Cost Rs. 16000 lakhs.
Project time Schedule 18 months from the Date of Award of Concession
iii. Need of the project and its importance to the country and or region.
To improve the infrastructure of the port, Administrative Office building is to be
constructed.
iv. Imports vs. indigenous production
Not applicable.
v. Export possibility
Not applicable.
vi. Domestic/export markets
Not applicable.
vii. Employment generation (Direct & Indirect) due to the project.
During construction of building employment will be generated.
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
5 MANTEC CONSULTANTS PVT. LTD., NOIDA
3. PROJECT DESCRIPTION
(i) Type of project including interlinked and interdependent project, if any.
This project provides infrastructure facilities to the Port.
(ii) Location (map showing general location, specific location, and project boundary and project site layout) with coordinates.
The proposed project site is situated at Tuna Tekra Latitude: 700 06’ 00’’ E Longitude: 220 56’ 02’’ N
The integrated map showing locations of all projects including the AO building is
attached.
(iii) Details of alternate sites
Project is proposed within Kandla Port trust limit, no alternative site has been
considered.
(iv) Size or magnitude of operation
The proposed building is proposed in approx. 1600m2 area.
(v) Project description with process details (a schematic diagram / flow chart showing the project layout, components of the project etc. should be given).
It’s an Administrative office building project.
(vi) Raw material required along with estimated quantity, likely resource, marketing area of final product/s, mode of transport of raw material and finished products.
Cement - 1000 MT
Steel- 550 MT
Trap stone/Crushed metal - 3852 m3
Sand- 1812 m3
Block- 770nos.
Bricks- 1,50,000nos.
Asphalt VG-30- 31 MT
Bitumen Emulsion- 3 MT
(vii) Resource optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined.
Not applicable.
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
6 MANTEC CONSULTANTS PVT. LTD., NOIDA
(viii) Availability of water its sources, energy / power requirement and sources should be given.
Water:
Water requirement during construction period will be 5,500 KL. The required
water will be arranged by Contractor.
Power:
DG set of approx. 50 KV will be required for the construction work.
(ix) Quantity of wastes to be generated
The excavated material as well as solid waste i.e., piece of bricks /blocks will
be refilled for reclaiming the area.
Empty cement bags will be disposed away to the scrape vendor by the
contractor.
Waste bars of steel will be disposed away to the scrape vendor by the
contractor.
For sewage treatment, septic tank and soak pit will be constructed within
the plot area.
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
7 MANTEC CONSULTANTS PVT. LTD., NOIDA
(x) Schematic representation of the feasibility drawing which give information of EIA purpose.
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
8 MANTEC CONSULTANTS PVT. LTD., NOIDA
4. SITE ANALYSIS
(i) Connectivity.
Airway: Kandla Airport 26.50 Km (N) Railway: Gandhidham Railway Station 23.0 Km (N)
(ii) Land form/ land use / land ownership
Land is largely flat with scanty vegetation. Land currently is lying as barren land and is under ownership of Kandla Port.
(iii) Topography (along with map)
Topography at the site location is generally flat with average ground level of about 2m above MSL. Topsoil appears marshy. The Master plan for Kandla Port trust is attached.
(iv) Existing land use pattern (agriculture, non-agricultural, forest, water bodies [including area under CRZ]), shortest distance from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given.
Existing land use pattern of the proposed site is barren land, without and cultivation and is covered under coastal regulation.
c. Soil Classification
Sub-soil profile (Tentative profile taken from nearby area)
The sub-soil profile is shown in the diagram below:
Depth (m) Dia of Bore
Hole Log Strata Description
0.70
150 mm Grey Soft to Firm Silty Clay
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
10.00 10.70 11.00
150 mm Reddish Brown Hard Silty Clay
12.00 13.00 14.00 15.00 16.00 17.00
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
9 MANTEC CONSULTANTS PVT. LTD., NOIDA
18.00 18.70
19.00 150 mm
Reddish Brown Hard Silty Clay with Gypsum 20.00
21.00
150 mm Reddish Brown Hard Silty Clay with
Gypsum
22.00 23.00 24.00 25.00 26.00 26.90 27.00
150 mm Yellowish Brown Dense to Very Dense
Silty Sand
28.00 29.00 30.00 30.07 31.00
150 mm Yellowish Brown Dense to Very Dense
Sitly Sand
32.00
33.00
34.00
35.00
36.00
37.00
37.52
As could be seen, the sub-soil profile consists of grey soft to firm silty clay up to -
10.70 m, reddish brown hard silty clay is found up to -18.70 m. A reddish brown
hard silty clay with gypsum is met below -19.00 m up to -26.90 m. Very dense
yellowish brown silty sand is found up to -36.00 m. Between -35.7 to -39.7 hard
greyish brown clay is found. Very dense yellowish silty sand is found below -
36.00 m and the bore hole is terminated at -36.00 m with the same composition
being observed.
d. Climatic Data from secondary Sources
Tidal Conditions
Tides at Kandla are semi-diurnal in character. The tidal heights with respect to
port Chart Datum, with local Mean Sea level as + 3.884 is presented in the table
below: Highest High Water + 7.59 m
Mean High Water Spring + 6.66 m
Mean High Water + 6.185 m
Mean High Water Neaps + 5.71 m
Local Mean sea Level +3.88 m
Mean Low Water Neaps + 1.80 m
Mean Low Water + 1.30 m
Mean Low Water Spring +0.80 m
Lowest Low Water + 0.4 m
Average Spring Range 5.86 m
Average Neap Range 3.91 m
Mean Range 4.885 m
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
10 MANTEC CONSULTANTS PVT. LTD., NOIDA
Waves
Kandla Creek is protected from wave disturbances by a number of shoals at its
outfall into the gulf. This provides the setting for a basin with absolute
tranquility. The creek provides calm waters round the year for easy movement of
shipping. Thus, Kandla has become an all-weather Port of repute. The high
amplitude tides coupled with a large storage area has resulted in high flushing
velocities inside. This has helped in cleansing of the navigational channels, thus
providing minimum siltation. Outside in the gulf, the complex flow phenomenon
has given rise to a number of shoals, which are dynamic in nature. The Port of
Kandla is approached through the channel starting from the Outer Tuna Buoy.
The shallow depths at the turning point of the channel are over passed during
high tides by vessels approaching the harbour. Ship movements are normally
confined to the high tides. Siltation in the channel is confined to a reach of hardly
3 km only. The Port region is free from any significant wave disturbances.
Silt and Salinity
Silt charge and salinity observations were carried out during dry and monsoon
months in April and September 1983 at locations east and west of Kandla Creek
and at two stations in the Gulf of Kutch. The waters of the Creek are heavily silt
charged, the range being 1 to 3 ppt. The Creek waters have a salinity ranging
from 23 to 25 ppt.
Temperature and Humidity
The climate of Kandla Port is generally tropical and dry. The air temperature
varies from less than 100 C in winter to about 440 C in summer. The mean,
maximum and minimum temperature observed in the different months at Kandla
is presented in the table below:
Months Mean of Max. Temp. Mean of Min. Temp.
January 25.2 13.0
February 27.5 15.5
March 32.0 20.2
April 34.6 23.5
May 35.9 25.7
June 35.0 27.7
July 32.4 27.2
August 30.7 25.4
September 33.3 24.5
October 34.2 23.1
November 32.4 20.2
December 25.6 13.5
Kandla region is fairly dry and only July, August and September is humid months.
The range of maximum relative humidity varies from 0% to 100%, whereas
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
11 MANTEC CONSULTANTS PVT. LTD., NOIDA
minimum values vary between 0 and 30%, except during July, August and
September, when minimum values vary between 25% and 50%.
Rainfall
Rainfall in Kandla is very low. Between January and April, there is normally no
rainfall. Rainfall generally remains confined between June end and mid
September. During the remaining months, the rainfall is scanty. The annual
average rainfall is around 200mm only.
Wind Conditions
From long term observation of wind velocities and directions, following
inferences can be made:
January The predominant direction is between NNE and NNW with speed range normally
between 12 and 19 Km/hr. which may exceed for about 10 % of the time.
February
The direction changes from NNE and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
March The direction lies between NNW and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
April to
June
The direction for wind is between WSW and SSW. The wind speed reaches a
maximum of 39 km/ hr. except in July, when the speed may exceed the range.
October The direction of wind changes from SSW to NNW. Wind speed ranges between 12
and 19 km/ hr. but the limit may exceed for 10 % of the time.
Nov. & Dec. The predominant direction is between NNE and NNW and the speed is between
12 and 19 km/hr.
Storms and Cyclones
Kandla port is not generally affected by cyclonic storms. During June 1998, a
severe cyclonic storm, which passed over Kandla Port with a wind speed of 150
km/hr., resulting in high tidal waves of 10.5 m with strong current, caused
extensive damages to the Port installations, crafts and human lives.
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
12 MANTEC CONSULTANTS PVT. LTD., NOIDA
5. PLANNING (BRIEF):
(i) Planning concept (type of industries, facilities, transportation, etc.) town and country planning/development authority classification.
The site for the proposed project is situated at Tuna Tekra.
(ii) Land use planning (breakup along with green belt, etc.)
Reclamation of Area 15000m2
(iii) Assessment of infrastructure demand (physical and social).
Administrative Office and amenities are required to be constructed for various departments of Kandla Port Trust
(iv) Amenities / facilities
Construction of office building containing 12 rooms including conference room, canteen and toilet etc
Compound wall, gate and security cabin.
Electrification and approach road leading from Tuna Tekra backup area
6. PROPOSED INFRASTRUCTURE
i. Residential area (non processing area)
There is no proposed residential area as part of this project.
ii. Green belt.
Green belt will be provided as per specified norms.
iii. Social infrastructure.
There is no proposed social infrastructure as part of this project.
iv. Connectivity (traffic and transportation road / rail / metro / water ways
etc).
Airway: Kandla Airport 26.50 Km (N) Railway: Gandhidham Railway Station 23.0 Km (N)
Road: NA
v. Drinking water management (source and supply of water).
The drinking water shall be taken from Gujarat Water Supply and Sewerage Board.
vi. Sewerage system.
For sewage treatment, septic tank and soak pit will be constructed within the
plot area.
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
13 MANTEC CONSULTANTS PVT. LTD., NOIDA
vii. Industrial waste management:
There is no industrial waste except waste water and solid waste generated from this project. The waste water shall be treated in sewerage treatment plant (STP).
viii. Solid waste management:
Solid waste generated from this facility can be broadly categories in three types:
1. Domestic waste: - sweeping, cleaning, fuel burning, gardening waste, waste wood etc.
2. Construction and maintenance debris: - This waste of construction material will be dealt with separately.
3. Other waste: - The excavated material as well as solid waste i.e., piece of bricks
/blocks will be refilled for reclaiming the area.
Empty cement bags will be disposed away to the scrape vendor by the contractor.
Waste bars of steel will be disposed away to the scrape vendor by the contractor.
ix. Power requirement and supply / source:
DG set of approx. 50 KV will be required for the construction work.
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN
i. Policy to be adopted (central / state) in respect of the project affected persons including home outsees, land outsees and landless labours (a brief outline to be given).
Not applicable for this project, as land is under ownership of Port Authorities and
free from all encumbrance.
8. PROJECT SCHEDULE AND COST ESTIMATES
i. Likely date of start of construction and likely date of completion (time schedule for the project to be given).
The Project is envisaged to be completed and brought into operation, by approximately 18 Months from the date of award of concession agreement.
ii. Estimated project cost along with analysis in terms of economic viability of the project.
The estimate cost of the project is 1000 lakhs. It’s an Infrastructural Project.
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.
This will improve the infrastructure facility of the Port.
PRE-FEASIBILITY REPORT-Administrative Office Building at Tuna Tekra
14 MANTEC CONSULTANTS PVT. LTD., NOIDA
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
1 MANTEC CONSULTANTS PVT. LTD., NOIDA
PRE-FEASIBILITY REPORT
Road connecting from Veera Barge Jetty to Tuna Gate
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
2 MANTEC CONSULTANTS PVT. LTD., NOIDA
Table of Contents
1. EXECUTIVE SUMMARY .................................................................................... 3
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION .............. 3
3. PROJECT DESCRIPTION .................................................................................. 4
4. SITE ANALYSIS ................................................................................................ 7
5. PLANNING (BRIEF): ...................................................................................... 10
6. PROPOSED INFRASTRUCTURE ..................................................................... 11
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN ................................ 11
8. PROJECT SCHEDULE AND COST ESTIMATES ................................................ 12
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) ............................. 12
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
3 MANTEC CONSULTANTS PVT. LTD., NOIDA
1. EXECUTIVE SUMMARY
Kandla Port is one of the busiest Ports of India. Kandla Port has been achieving first position
among all the Major Ports of India in the terms of cargo handling for the most of the years in
last decade. Thus, Kandla Port Trust has been contributing the most for the development of
port capacity and handling seaborne trade of the country.
The proposed project i.e., Road connecting from Veera Barge jetty to Tuna Gate. The road
proposed by the Kandla Port Trust which eases to approach the Jetty.
The proposed road is 15.5 Km which is connected to the proposed barge jetty at Veera & NH-
141 for faster evacuation of the cargo from the proposed barge Jetty.
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
i. Identification of project and project proponent.
The proposed project i.e., Road connecting from Veera Barge jetty to Tuna Gate. The road
proposed by the Kandla Port Trust which eases to approach the Jetty.
The proposed road is 15.5 Km which is connected to the proposed barge jetty at Veera and
NH-141 for faster evacuation of the cargo from the proposed barge Jetty.
ii. Brief description of nature of the project
Name of Project Road connecting from Veera Barge Jetty to Tuna Gate
Length of road 15500m
Width of the road 7.30m with both side 1.50m shoulders
Project Cost Rs.4882 lacs.
Time period for completion of project
12 Months
iii. Need of the project and its importance to the country and or region.
The proposed road which is connected to the NH-141 which faster the evacuation of the
cargo and fulfill the need of the country and region.
iv. Imports vs. indigenous production
N/A.
v. Export possibility
N/A.
vi. Domestic/export markets
N/A.
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
4 MANTEC CONSULTANTS PVT. LTD., NOIDA
vii. Employment generation (Direct & Indirect) due to the project.
During construction of road employment will be generated.
3. PROJECT DESCRIPTION
(i) Type of project including interlinked and interdependent project, if any.
It is an interlinked project with the establishment of Barge jetty in Veera for the faster evacuation of the cargo from.
(ii) Location with coordinates.
The proposed project site is situated in Veera village having stat point of latitude 22°54'26.3" N & longitude 70° 01'21.8" E and end point of latitude 22°58'22" N & longitude 70° 05'35" E.
(iii) Details of alternate sites considered and the basis of selecting the proposed site. Particularly the environmental consideration gone into should be highlighted.
No alternative site has been considered.
(iv) Size or magnitude of operation.
The proposed road 15.500Km in length and 7.30 m in width with both side 1.50 m shoulders.
(v) Project description with process details (a schematic diagram / flow chart showing the project layout, components of the project etc. should be given).
The project includes only transportation of cargo.
(vi) Raw material required along with estimated quantity, likely resource, marketing area of final product/s, mode of transport of raw material and finished products.
Cement - 2500 MT
Steel Reinforcement - 1100 MT
Steel Plates - 300 MT
Trap stone/ crushed metal - 8000 m3
Sand- 3000 m3
Quarry spall- 3500 m3
Asphalt VG-30- 35 MT
Bitumen Emulsion- 12 MT
(vii) Resource optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined.
Not applicable.
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
5 MANTEC CONSULTANTS PVT. LTD., NOIDA
(viii) Availability of water its sources, energy / power requirement and sources should be given.
Water:
Water requirement during construction period will be 5000 KL. The required water will
be arranged by Contractor.
Power:
Power requirement during construction period approx. 100 KVA. The required electric
power will be fetched from existing electric substation of Gujarat Electricity Board
located nearer to site.
Quantity of wastes to be generated (liquid and solid) and scheme for their
management / disposal.
The excavated material as well as solid waste i.e., piece of bricks /blocks will be
refilled for reclaiming the area.
Empty cement bags will be disposed away to the scrape vendor by the
contractor.
Waste bars of steel will be disposed away to the scrape vendor by the contractor.
For sewage treatment, septic tank and soak pit will be constructed within the
plot area.
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
6 MANTEC CONSULTANTS PVT. LTD., NOIDA
(ix) Schematic representation of the feasibility drawing which give information of EIA purpose.
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
7 MANTEC CONSULTANTS PVT. LTD., NOIDA
4. SITE ANALYSIS
(i) Connectivity.
The proposed road is connected to the NH-141.
(ii) Land form/ land use / land ownership.
Land is largely flat with scanty vegetation. Land currently is lying as barren land and is under ownership of Kandla Port.
(iii) Topography (along with map).
Topography at the site location is generally flat with average ground level of about 2m above MSL. Topsoil appears marshy. The Master plan for Kandla Port trust is attached.
(iv) Existing land use pattern (agriculture, non-agricultural, forest, water bodies [including area under CRZ]), shortest distance from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given.
Existing land use pattern of the proposed site is barren land, without and cultivation and is covered under coastal regulation.
c. Soil Classification
Sub-soil profile (Tentative profile taken from nearby area)
The sub-soil profile is shown in the diagram below:
Depth (m) Dia of Bore
Hole Log Strata Description
0.70
150 mm Grey Soft to Firm Silty Clay
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
10.00 10.70 11.00
150 mm Reddish Brown Hard Silty Clay
12.00 13.00 14.00 15.00 16.00 17.00 18.00 18.70
19.00 150 mm
Reddish Brown Hard Silty Clay with Gypsum 20.00
21.00 150 mm
Reddish Brown Hard Silty Clay with Gypsum 22.00
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
8 MANTEC CONSULTANTS PVT. LTD., NOIDA
23.00 24.00 25.00 26.00 26.90 27.00
150 mm Yellowish Brown Dense to Very Dense
Silty Sand
28.00 29.00 30.00 30.07 31.00
150 mm Yellowish Brown Dense to Very Dense
Sitly Sand
32.00
33.00
34.00
35.00
36.00
37.00
37.52
As could be seen, the sub-soil profile consists of grey soft to firm silty clay up to -10.70
m, reddish brown hard silty clay is found up to -18.70 m. A reddish brown hard silty clay
with gypsum is met below -19.00 m up to -26.90 m. Very dense yellowish brown silty
sand is found up to -36.00 m. Between -35.7 to -39.7 hard greyish brown clay is found.
Very dense yellowish silty sand is found below -36.00 m and the bore hole is terminated
at -36.00 m with the same composition being observed.
d. Climatic Data from secondary Sources
Tidal Conditions
Tides at Kandla are semi-diurnal in character. The tidal heights with respect to port
Chart Datum, with local Mean Sea level as + 3.884 is presented in the table below:
Highest High Water + 7.59 m
Mean High Water Spring + 6.66 m
Mean High Water + 6.185 m
Mean High Water Neaps + 5.71 m
Local Mean sea Level +3.88 m
Mean Low Water Neaps + 1.80 m
Mean Low Water + 1.30 m
Mean Low Water Spring +0.80 m
Lowest Low Water + 0.4 m
Average Spring Range 5.86 m
Average Neap Range 3.91 m
Mean Range 4.885 m
Waves
Kandla Creek is protected from wave disturbances by a number of shoals at its outfall
into the gulf. This provides the setting for a basin with absolute tranquility. The creek
provides calm waters round the year for easy movement of shipping. Thus, Kandla has
become an all-weather Port of repute. The high amplitude tides coupled with a large
storage area has resulted in high flushing velocities inside. This has helped in cleansing
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
9 MANTEC CONSULTANTS PVT. LTD., NOIDA
of the navigational channels, thus providing minimum siltation. Outside in the gulf, the
complex flow phenomenon has given rise to a number of shoals, which are dynamic in
nature. The Port of Kandla is approached through the channel starting from the Outer
Tuna Buoy. The shallow depths at the turning point of the channel are over passed
during high tides by vessels approaching the harbour. Ship movements are normally
confined to the high tides. Siltation in the channel is confined to a reach of hardly 3 km
only. The Port region is free from any significant wave disturbances.
Silt and Salinity
Silt charge and salinity observations were carried out during dry and monsoon months
in April and September 1983 at locations east and west of Kandla Creek and at two
stations in the Gulf of Kutch. The waters of the Creek are heavily silt charged, the range
being 1 to 3 ppt. The Creek waters have a salinity ranging from 23 to 25 ppt.
Temperature and Humidity
The climate of Kandla Port is generally tropical and dry. The air temperature varies from
less than 100 C in winter to about 440 C in summer. The mean, maximum and minimum
temperature observed in the different months at Kandla is presented in the table below:
Months Mean of Max. Temp. Mean of Min. Temp.
January 25.2 13.0
February 27.5 15.5
March 32.0 20.2
April 34.6 23.5
May 35.9 25.7
June 35.0 27.7
July 32.4 27.2
August 30.7 25.4
September 33.3 24.5
October 34.2 23.1
November 32.4 20.2
December 25.6 13.5
Kandla region is fairly dry and only July, August and September is humid months. The
range of maximum relative humidity varies from 0% to 100%, whereas minimum values
vary between 0 and 30%, except during July, August and September, when minimum
values vary between 25% and 50%.
Rainfall
Rainfall in Kandla is very low. Between January and April, there is normally no rainfall.
Rainfall generally remains confined between June end and mid September. During the
remaining months, the rainfall is scanty. The annual average rainfall is around 200mm
only.
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
10 MANTEC CONSULTANTS PVT. LTD., NOIDA
Wind Conditions
From long term observation of wind velocities and directions, following inferences can
be made:
January The predominant direction is between NNE and NNW with speed range normally
between 12 and 19 Km/hr. which may exceed for about 10 % of the time.
February
The direction changes from NNE and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
March The direction lies between NNW and SSW, but predominantly between WSW and
SSW. The wind speed from SSW varies between 12 and 39 km/ hr. for 15 % of the
time and for rest of the time it generally varies between 12 and 19 Km/ hr.
April to
June
The direction for wind is between WSW and SSW. The wind speed reaches a
maximum of 39 km/ hr. except in July, when the speed may exceed the range.
October The direction of wind changes from SSW to NNW. Wind speed ranges between 12
and 19 km/ hr. but the limit may exceed for 10 % of the time.
Nov. & Dec. The predominant direction is between NNE and NNW and the speed is between
12 and 19 km/hr.
Storms and Cyclones
Kandla port is not generally affected by cyclonic storms. During June 1998, a severe
cyclonic storm, which passed over Kandla Port with a wind speed of 150 km/hr.,
resulting in high tidal waves of 10.5 m with strong current, caused extensive damages to
the Port installations, crafts and human lives.
5. PLANNING (BRIEF):
(i) Planning concept
The proposed road shall be constructed by providing 1100 mm quarry spall in layers of 300 mm each with truck rolling. Above quarry spall 600 mm Granular Sub Base in layers of 200 mm each including compacting at OMC & WMM 250 mm shall be provided. Top surface shall be finished with MSS.
The 3 nos. Bridges (1 no. 120 long & 2 nos. 30m. Long) across major creeks shall be constructed on 1000 mm RCC bored cast-in-situ pile with necessary abundant/ pier, deck beam & slab.
The 20 nos. RCC Box (2 nos. 12m, 1 no. 9 mm, 2 nos. 6m, & 15 nos. 3m)
Shall be constructed across minor creeks.
(ii) Population projection- not applicable
(iii) Land use planning (breakup along with green belt, etc.)- There will be no change in existing land use.
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
11 MANTEC CONSULTANTS PVT. LTD., NOIDA
(iv) Amenities / facilities- not applicable
6. PROPOSED INFRASTRUCTURE
i. Residential area (non processing area).
Not applicable.
ii. Green belt.
Green belt will be provided as per specified norms.
iii. Social infrastructure.
There is no proposed social infrastructure as part of this project.
iv. Connectivity
The proposed project is a transportation road for the cargo.
v. Drinking water management (source and supply of water).
The drinking water shall be taken from Gujarat Water Supply and Sewerage Board.
vi. Sewerage system.
vii. Industrial waste management:
There is no industrial waste except waste water and solid waste generated from this project.
viii. Solid waste management:
Solid waste generated from this facility can be broadly categories in three types:
1. Domestic waste: - sweeping, cleaning, fuel burning, gardening waste, waste wood etc.
2. Construction and maintenance debris: - This waste of construction material will be refilled in embankment..
3. Other waste: - Empty cement bags & steel scrape will be deposited away t the scrape vendor.
ix. Power requirement and supply / source:
N/A
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN
i. Policy to be adopted (central / state) in respect of the project affected persons including home outsees, land outsees and landless labours (a brief outline to be given).
Not applicable for this project, as land is under ownership of Port Authorities and
free from all encumbrance.
PRE-FEASIBILITY REPORT- Road connecting from Veera Barge Jetty to Tuna Gate
12 MANTEC CONSULTANTS PVT. LTD., NOIDA
8. PROJECT SCHEDULE AND COST ESTIMATES
i. Likely date of start of construction and likely date of completion (time schedule for the project to be given).
The Project is envisaged to be completed and brought into operation, by approximately 12 Months from the date of award of concession agreement.
ii. Estimated project cost along with analysis in terms of economic viability of the project.
The estimated cost is approx. Rs. 4882 lacs.
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.
The Proposed project is interlinked to the Veera jetty which will help for transportation of the cargo via this road.