FUNDING In 12-18 months, a total of approximately $9 million will have been spent in local, state and federal funds on studying the corridor, Phase I engineering, and the acquisition of approximately 50% of the needed right-of-way acquisitions for the corridor. At that time, currently available funding will be exhausted, and the need for a new funding package will be crucial to continue moving forward with implementation of the corridor. The unfunded items remaining include: Phase II engineering, further right-of-way acquisitions, construction and construction engineering. Federal funding rescissions, the approaching expiration of the National Highway Trust Fund, along with changes in programming strategies at the regional, State, and Federal levels have resulted in very limited and competitive funding for transportation. As a result, the region is exploring all available funding options. LONGMEADOW PARKWAY TASK FORCE One possible funding option is to explore County Toll Bridges, which are authorized by the Illinois Compiled Statutes in 605 ILCS 5/Article 10 Division 3 of the Highway Code (County Toll Bridges). The statute allows the County to issue revenue bonds for the purpose of constructing toll bridges. A Longmeadow Task Force was established on July 25, 2007. The charge of the Task Force is to coordinate the required activities needed for the consideration of a toll bridge. Its membership consists of 4 Kane County Board members, 2 Kane County senior staff, 2 McHenry County Board members, 2 McHenry County senior staff and the president and manager of the villages of Algonquin, Carpentersville, East Dundee and West Dundee. Task Force Objectives: Statutory authority and requirements Preliminary traffic projections Financial feasibility study of potential user fees and bonding capabilities FHWA coordination Determine Federal requirements regarding EIS and use of Federal funds Illinois Tollway coordination Determine parameters for implementation of I-PASS Bond issuance parameters Report of Findings As the Task Force considers the toll bridge funding option, a Feasibility Study is underway to estimate tolls, revenues, bond needs, and potential impacts; consider other issues; and develop conceptual facility approaches. One advantage to the toll bridge alternative, which is a user fee based system, is that the project benefits more than just Kane County residents and allows toll bridge users who reside outside of Kane County to contribute to the cost of the project. It is proposed, that the toll bridge concept remain until the initial construction bonds are fully repaid and a maintenance endowment fund to cover ongoing maintenance and future widening are established. At that time, municipalities are requesting that the tolls be removed. In addition to the Toll Bridge option, other funding alternatives will be investigated for the remaining segments of the corridor. POTENTIAL TIMETABLE WITH TOLL FUNDING One year to complete Phase I engineering (approval expected in 2009) Two years to finalize right-of-way acquisitions (which can proceed concurrently with engineering) Two years to complete Phase II engineering (to start after Phase I engineering is complete) Two construction seasons to construct the roadway, retaining walls and the new bridge over Fox River. If funding was available, it is estimated that the corridor could be open to traffic in approximately 4-5 years. The Longmeadow Parkway Bridge Corridor ultimately is a proposed four-lane Fox River Bridge crossing and four-lane minor arterial roadway with a landscaped median, approximately 5.6 miles in length, to address traffic congestion and transportation needs in northern Kane County. The proposed road passes through portions of the Villages of Algonquin, Carpentersville and Barrington Hills, as well as unincorporated areas of Kane County. The western terminus is on Huntley Road west of Randall Road, approximately 1,300 feet northwest of the Huntley/Boyer intersection. From Huntley Road to the Fox River, the corridor primarily traverses mostly undeveloped properties or new subdivisions; these subdivisions were planned and developed with a dedicated right-of-way to accommodate the proposed bridge corridor. Developments at the east end of the corridor, on the north side of Bolz Road were also planned to accommodate the Longmeadow Parkway Bridge Corridor. After crossing the river, the corridor parallels existing Bolz Road, to the eastern project terminus at Illinois Route 62. The project was earmarked $4 million in Federal funds for right-of-way acquisition and engineering in the Federal SAFETEA-LU Transportation Bill in August 2005, and has a total estimated construction cost estimate of $170 million. The County will continue right-of-way acquisition and Phase I engineering for Longmeadow Parkway until all available funds are exhausted. PROJECT DESCRIPTION INFORMATIONAL BROCHURE LONGMEADOW PARKWAY FOX RIVER BRIDGE CORRIDOR SPECIAL POINTS OF INTEREST: The construction costs for the 2-lane staged construction of the corridor are estimated at $117 million The project will include a new Fox River Bridge Crossing and a 5.6 mile, 2-lane arterial corridor Kane County and local municipalities are currently acquiring right- of-way for the project INSIDE THIS ISSUE: PROJECT DESCRIPTION 1 HISTORY 2 PURPOSE AND NEED 3 PROJECT LIMITS AND AERIAL MAP 2-3 TOLL BRIDGE TASK FORCE 4 PROJECT STATUS 3 LONGMEADOW PARKWAY PUBLIC HEARING THURSDAY, MARCH 26, 2009 Artist rendering of the proposed Longmeadow Parkway Bridge over the Fox River.

FOX RIVER BRIDGE CORRIDORkdot.countyofkane.org/Longmeadow Parkway/Public Hearing Informa… · • The project will include a new Fox River Bridge Crossing and a 5.6 mile, 2-lane

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FOX RIVER BRIDGE CORRIDORkdot.countyofkane.org/Longmeadow Parkway/Public Hearing Informa… · • The project will include a new Fox River Bridge Crossing and a 5.6 mile, 2-lane

F U N D I N G

In 12-18 months, a total of approximately $9 million will have been spent in local, state and federal funds on studying the corridor, Phase I engineering, and the acquisition of approximately 50% of the needed right-of-way acquisitions for the corridor. At that time, currently available funding will be exhausted, and the need for a new funding package will be crucial to continue moving forward with implementation of the corridor. The unfunded items remaining include: Phase II engineering, further right-of-way acquisitions, construction and construction engineering.

Federal funding rescissions, the approaching expiration of the National Highway Trust Fund, along with changes in programming strategies at the regional, State, and Federal levels have resulted in very limited and competitive funding for transportation. As a result, the region is exploring all available funding options.

L O N G M E A D O W P A R K W A Y T A S K F O R C E

One possible funding option is to explore County Toll Bridges, which are authorized by the Illinois Compiled Statutes in 605 ILCS 5/Article 10 Division 3 of the Highway Code (County Toll Bridges). The statute allows the County to issue revenue bonds for the purpose of constructing toll bridges. A Longmeadow Task Force was established on July 25, 2007. The charge of the Task Force is to coordinate the required activities needed for the consideration of a toll bridge. Its membership consists of 4 Kane County Board members, 2 Kane County senior staff, 2 McHenry County Board members, 2 McHenry County senior staff and the president and manager of the villages of Algonquin, Carpentersville, East Dundee and West Dundee.

Task Force Objectives:

■ Statutory authority and requirements ■ Preliminary traffic projections ■ Financial feasibility study of potential user fees and bonding capabilities ■ FHWA coordination

■ Determine Federal requirements regarding EIS and use of Federal funds ■ Illinois Tollway coordination

■ Determine parameters for implementation of I-PASS ■ Bond issuance parameters ■ Report of Findings

As the Task Force considers the toll bridge funding option, a Feasibility Study is underway to estimate tolls, revenues, bond needs, and potential impacts; consider other issues; and develop conceptual facility approaches. One advantage to the toll bridge alternative, which is a user fee based system, is that the project benefits more than just Kane County residents and allows toll bridge users who reside outside of Kane County to contribute to the cost of the project. It is proposed, that the toll bridge concept remain until the initial construction bonds are fully repaid and a maintenance endowment fund to cover ongoing maintenance and future widening are established. At that time, municipalities are requesting that the tolls be removed.

In addition to the Toll Bridge option, other funding alternatives will be investigated for the remaining segments of the corridor.

P O T E N T I A L T I M E T A B L E W I T H T O L L F U N D I N G

• One year to complete Phase I engineering (approval expected in 2009)

• Two years to finalize right-of-way acquisitions (which can proceed concurrently with engineering)

• Two years to complete Phase II engineering (to start after Phase I engineering is complete)

• Two construction seasons to construct the roadway, retaining walls and the new bridge over Fox River.

If funding was available, it is estimated that the corridor could be open to traffic in approximately 4-5 years.

The Longmeadow Parkway Bridge Corridor ultimately is a proposed four-lane Fox River Bridge crossing and four-lane minor arterial roadway with a landscaped median, approximately 5.6 miles in length, to address traffic congestion and transportation needs in northern Kane County. The proposed road passes through portions of the Villages of Algonquin, Carpentersville and Barrington Hills, as well as unincorporated areas of Kane County. The western terminus is on Huntley Road west of Randall Road, approximately 1,300 feet northwest of the Huntley/Boyer intersection. From Huntley Road to the Fox River, the corridor primarily traverses mostly undeveloped properties or new subdivisions; these subdivisions were planned and developed with a dedicated right-of-way to accommodate the proposed bridge corridor. Developments at the east end of the corridor, on the north side of Bolz Road were also planned to accommodate the Longmeadow Parkway Bridge Corridor. After crossing the river, the corridor parallels existing Bolz Road, to the eastern project terminus at Illinois Route 62.

The project was earmarked $4 million in Federal funds for right-of-way acquisition and engineering in the Federal SAFETEA-LU Transportation Bill in August 2005, and has a total estimated construction cost estimate of $170 million. The County will continue right-of-way acquisition and Phase I engineering for Longmeadow Parkway until all available funds are exhausted.

P R O J E C T D E S C R I P T I O N

I N F O R M A T I O N A L B R O C H U R E

L O N G M E A D O W P A R K W A Y F O X R I V E R B R I D G E C O R R I D O R

S P E C I A L P O I N T S O F I N T E R E S T :

• The construction costs for the 2-lane staged construction of the corridor are estimated at $117 million

• The project will include a new Fox River Bridge Crossing and a 5.6 mile, 2-lane arterial corridor

• Kane County and local m unic ipa l i t ies a re currently acquiring right-of-way for the project

I N S I D E T H I S I S S U E :

P R O J E C T D E S C R I P T I O N

1

H I S T O R Y 2

P U R P O S E A N D N E E D

3

P R O J E C T L I M I T S A N D A E R I A L M A P

2 - 3

T O L L B R I D G E T A S K F O R C E

4

P R O J E C T S T A T U S

3

L O N G M E A D O W P A R K W A Y P U B L I C H E A R I N G T H U R S D A Y , M A R C H 2 6 , 2 0 0 9

Artist rendering of the proposed Longmeadow Parkway Bridge over the Fox River.

Page 2: FOX RIVER BRIDGE CORRIDORkdot.countyofkane.org/Longmeadow Parkway/Public Hearing Informa… · • The project will include a new Fox River Bridge Crossing and a 5.6 mile, 2-lane

H I S T O R Y

Page 2 L O N G M E A D O W P A R K W A Y

Since the 1950’s, Kane County has experienced major development and growth in the area surrounding the historical city centers along the Fox River, which runs north-south through the County. The roadway network along the Fox River was originally developed to accommodate travel between these city centers. Recent growth in development, and the accompanying increase in traffic, has resulted in major congestion and pressure on the existing communities to accommodate the travel needs of residents. Currently, motorists wishing to cross the Fox River to get to other locations must travel a longer indirect route through city centers or I-90, a controlled-access tollway.

Representatives in Kane County recognized that the Fox River, with its limited number of crossings, represented a major impediment to travel in an area that was rapidly developing. In 1990 the Fox River Bridge Advisory Committee was formed to address these issues. The Committee included representatives from townships, municipalities and counties near the Fox River. Working with the Chicago Area Transportation Study (CATS) and considering public input, the Fox River Bridge Advisory Committee developed and evaluated a number of Fox River crossing alternatives between Illinois Route 62 in Algonquin and Illinois Route 47 in Yorkville.

The Longmeadow Parkway Fox River Bridge Corridor was evaluated for its effectiveness in addressing traffic congestion on roadways in the northern region of Kane County, and deemed potentially effective at addressing the regional traffic needs. Consequently, the Longmeadow Parkway Bridge Corridor was studied as part of the Fox River Bridge Crossings Environmental Impact Study (EIS) in the 1990s.

Ran

dall

Rd.

Huntley Rd. Longmeadow Pkwy

Huntley Rd.

Longmeadow Pkwy

P U R P O S E A N D N E E D

Page 3 I N F O R M A T I O N A L B R O C H U R E

Three Fox River Bridge Corridors (Longmeadow Parkway, Stearns Road, and IL56/Oak Street) received environmental approval from the Federal Highway Administration in May of 2002. The Purpose and Need of the Longmeadow Parkway have been defined in the Record of Decision as:

1) Enhance Kane County's transportation network by reducing congestion and providing alternate and more direct routes.

2) Serve existing land use through efficient access to central business districts; public services; and employment and commercial centers.

3) Serve proposed land use in conformance to Kane County's 2020 Land Resource Management Plan, (now updated to the 2030 Plan) which encourages compact, contiguous growth in the eastern portion of the County and preserves the rural qualities of the western portion.

Kane County is anticipated to reinitiate Phase I engineering, which will outline the right-of-way needed, roadway design requirements, preliminary design of the bridge over the Fox River, subsoil investigations, and drainage and hydraulic requirements. It is expected that the County will receive design approval for the Phase I Engineering from the Illinois Department of Transportation in 2009. The County has been acquiring right-of-way since 2004, and will continue acquiring critical parcels until the available funding is exhausted. Recognizing that funding is limited, the County has focused on critical right-of-way acquisitions between IL 31 and IL 25.

IL 2

5

Bolz Rd.

IL 62

P R O J E C T S T A T U S