50
AVL SET GmbH Confidential INVERTER TESTING Tackling the challenges of the new power processor in electric drives

From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

AVL SET GmbH

Confidential

INVERTER TESTINGTackling the challenges of the new power processor in electric drives

Page 2: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

| | PDIM Gothenburg, 29 November 2019 | 2Confidential

The Inverter plays a key role

Fuel Tank

CombustionEngine & Control

WheelGear-box

m e c h .

r o t a t i o n

m e c h .

r o t a t i o n

Energy, s to red in the fue l tank is t rans fer red in to ro tat ing k inet ic energy by the combust ion engine which ac ts as

the “power processor” . The gear box matches the rotat ion speed and torque to the wheels .

HV Battery

InverterE-

Motorr o t o r pos .

e l e c t r . r o t a t i on

WheelGear-box

m e c h .

r o t a t i onm e c h .

r o t a t i on

Energy, s to red in the HV Bat te ry is t rans ferred in to ro ta t ing elect r ica l energy by the inverte r, wh ich ac ts as the

“power processor” . The elec t r ica l motor ac ts as an ac tuator and is part o f the inver te rs c losed loop cont ro l

scheme. A gearbox is not a lways requi red .

Page 3: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

3Confidential | | PDIM Gothenburg, 29 November 2019 |

THE BASIC LAW FOR FAST PROGRESS & CONSISTENT RESULTS…

ISOLATED COMPONENT TESTING

Page 4: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

4Confidential | | PDIM Gothenburg, 29 November 2019 |

Inverter Test / E-Motor Test – Different Testbeds

INVERTERE-

MOTOR

E-MOTORDATA

E-MOTORIDENTIFICATION

DRIVE TEST

INVERTERCALIBRATION

➢ Does real e-motor match with

the design target?

➢ Is given e-motor data correct?

- data quality

- temperature correlation

➢ Inverter control laws approved?

Typical issue today:

Inverter test and e-motor test are not clearly isolated…Triangle of uncertainties…

?Motor issues can be seen as

inverter problems and versus

vice…

Isolated component testing is a key factor for successful system design

Page 5: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

5Confidential | | PDIM Gothenburg, 29 November 2019 |

Inverter Test / E-Motor Test – Different Testbeds

INVERTERSUPPLIER 1

MOTORSUPPLIER

1

MOTORDATA

SUPPLIER 1

Multiple dependencies and uncertainties do not allow efficient performance test and comparison

INVERTERSUPPLIER 2

MOTORSUPPLIER

2

MOTORDATA

SUPPLIER 2

INVERTERSUPPLIER X

MOTORSUPPLIER

X

MOTORDATA

SUPPLIER X

Page 6: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

6Confidential | | PDIM Gothenburg, 29 November 2019 |

Inverter Test / E-Motor Test – Different Testbeds

Breaking the triangle of uncertainties and dependencies: …. inverter test without a real motor!

E-MOTOREMULATOR

➢ Test of inverter and motor are

fully independent (decoupled)

➢ No variation between calibration

data and the virtual motor for the

drive test

➢ Real motor not required for

inverter test

➢ No influences from the

mechanical load system

➢ Testing with a motor library

➢ Easy fault injection testing

Benefits at a glance:

DIGITALE-MOTOR

COPY

INVERTER

E-MOTORDATA

DRIVE TEST

INVERTERCALIBRATION

Page 7: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

7Confidential | | PDIM Gothenburg, 29 November 2019 |

Inverter Test / E-Motor Test – Different Testbeds

INVERTER

Removing complexity: … by independent component test with different testbeds

MOTOR

Electrical World Mechanical World

Integrated World

MOTORINVERTER

PR

OC

ES

S F

LO

W

Page 8: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

8Confidential | | PDIM Gothenburg, 29 November 2019 |

E-Motor Emulator

E-Motor Emulator

Drivetrain Integration Process

INVERTER

Removing complexity: … by separation of integration layers

E-Integration Testbed

E-MOTORINVERTER

E-Motor Emulator

DynometerBATTERY

EMULATOR

EM-Integration Testbed

Drive CycleSimulation

“M-World”“E-World”alternatively

real battery

BATTERYEMULATOR LOAD

TORQUE/SPEED

Page 9: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

9Confidential | | PDIM Gothenburg, 29 November 2019 |

TEST COVERAGE vs. TEST EFFORT

… IS THE KEY FIGURE OF TESTING COSTS

Page 10: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

10Confidential | | PDIM Gothenburg, 29 November 2019 |

How to test the inverter?

Signal-

HiL

Which test concept gives us the best test coverage vs. effort?

E-Motor

& DynoInductive loads

Power

HiL

Vehicle

Page 11: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

11Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test Requirements

not important

Very important

Test

Req

uir

em

en

t Excellent

Average

Poor

Very Poor

Page 12: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

12Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test RequirementsStatic

Performance

Static Performance Test: measurethe capablity of the unit under testto set and mantain a staticoperating point with high accuracyand stability.

not important

Very important

Excellent

Average

Poor

Very Poor

Page 13: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

13Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test RequirementsStatic

Performance

DynamicPerformance

Dynamic Performance Test: measure the capablity of the unitunder test to follow fast-changingtransients

not important

Very important

Excellent

Average

Poor

Very Poor

Page 14: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

14Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test RequirementsStatic

Performance

DynamicPerformance

ControlPerformance

Control Performance Test: measure the stability and accuracyof the unit under test‘s controlsystem

not important

Very important

Excellent

Average

Poor

Very Poor

Page 15: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

15Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test RequirementsStatic

Performance

DynamicPerformance

ControlPerformance

Deratingand

overload

Derating and Overload Tests: verifies the behavior of the unitunder test in case of overload orperformance derating

not important

Very important

Excellent

Average

Poor

Very Poor

Page 16: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

16Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test RequirementsStatic

Performance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Calibration Tests: perform theunit under test‘s calibration and/ormeasure the performances withdifferent calibration sets.

not important

Very important

Excellent

Average

Poor

Very Poor

Page 17: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

17Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test RequirementsStatic

Performance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Safety Functionse.g. Active Short Circuit

Safety Functions Tests: test thefunctionality and behavior of theunit under test‘s safety functions

Alarm OFF

Alarm ON

not important

Very important

Excellent

Average

Poor

Very Poor

Page 18: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

18Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test RequirementsStatic

Performance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Safety Functionse.g. Active Short Circuit

Fault Injection Tests: inject a fault in the system and observethe unit under test‘s behavior

Fault Injection

Fault: Phase V to GND

not important

Very important

Excellent

Average

Poor

Very Poor

Page 19: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

19Confidential | | PDIM Gothenburg, 29 November 2019 |

R&D Inverter Test RequirementsStatic

Performance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Safety Functionse.g. Active Short Circuit

Fault Injection

Motor ToleranceHandling

Motor Tolerance Handling Tests: observe the unit under test‘sbehavior when testing with e-motors at the extreme limits oftolerance ranges

Good

Acceptable

Critical

not important

Very important

Excellent

Average

Poor

Very Poor

Page 20: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

21Confidential | | PDIM Gothenburg, 29 November 2019 |

Inverter test with e-motor & dynamometerStatic

Performance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Safety Functionse.g. Active Short Circuit

Fault Injection

Motor ToleranceHandling

not important

Very important

Excellent

Average

Poor

Very Poor

Page 21: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

22Confidential | | PDIM Gothenburg, 29 November 2019 |

StaticPerformance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Safety Functionse.g. Active Short Circuit

Fault Injection

Motor ToleranceHandling

not important

Very important

Excellent

Average

Poor

Very Poor

Passive loads test coverage

Page 22: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

24Confidential | | PDIM Gothenburg, 29 November 2019 |

Vehicle Road Test CoverageStatic

Performance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Safety Functionse.g. Active Short Circuit

Fault Injection

Motor ToleranceHandling

not important

Very important

Excellent

Average

Poor

Very Poor

Page 23: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

25Confidential | | PDIM Gothenburg, 29 November 2019 |

AVL Inverter Testbed CapabilitiesStatic

Performance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Safety Functionse.g. Active Short Circuit

Fault Injection

Motor ToleranceHandling

not important

Very important

Excellent

Average

Poor

Very Poor

Page 24: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

26Confidential | | PDIM Gothenburg, 29 November 2019 |

StaticPerformance

DynamicPerformance

ControlPerformance

Calibration

Deratingand

overload

Safety Functionse.g. Active Short Circuit

Fault Injection

Motor ToleranceHandling

AVL Inverter

Test System

E-Motor Based

Test System

→Very hightest coverage→min. 10x faster→ „zero“ costs/delay for motor/adaption/etc.

Inverter test coverage comparison

Page 25: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

27Confidential | | PDIM Gothenburg, 29 November 2019 |

HIGH PERFORMANCE VS.LOW PERFORMANCEE-MOTOR EMULATOR

Page 26: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

28Confidential | | PDIM Gothenburg, 29 November 2019 |

Poor Performance SystemE-Motor Emulator with Low Switch Frequency

Inverter Switch Period

InverterDuty Cycle

Inverter Switch Control

Inverter Current

Inverter Average Output Current

Inverter Average Output Current

Inverter CurrentEmulator Current

Emulator Average Output Current

Emulator Duty Cycle

EmulatorDuty Cycle

Time

Time

Am

pli

tud

eA

mp

litu

de

Inverter Behavior

E-Motor EmulatorBehavior

Page 27: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

29Confidential | | PDIM Gothenburg, 29 November 2019 |

High Performance SystemE-Motor Emulator with High Switch Frequency

Inverter Switch Period

InverterDuty Cycle

Inverter Switch Control

Inverter Current

Inverter Average Output Current

Inverter Average Output Current

Inverter CurrentEmulator Current

Emulator Average Output Current

Emulator Duty Cycle Emulator Duty Cycle

EmulatorSwitch Period Emulator

Switch Period

Am

plit

ud

e

Time

Am

plit

ud

e

Time

Inverter Behavior

E-Motor EmulatorBehavior

Page 28: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

30Confidential | | PDIM Gothenburg, 29 November 2019 |

Low-High Switch Frequency ComparisonTime Domain

Inverter Current

Low Frequency Emulator Current

High Frequency Emulator CurrentA

mp

litu

de

Time

Good Accuracy

Poor Accuracy

Page 29: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

31Confidential | | PDIM Gothenburg, 29 November 2019 |

Low-High Switch Frequency ComparisonFrequency Domain

Inverter Harmonics

(real) Low Frequency Emulator

Harmonics(artifacts)

Inverter Harmonics

(real)

High Frequency Emulator

Harmonics(artifacts)

FrequencyFrequency

Am

plit

ud

e

Am

plit

ud

e

When using a low frequency emulator to develop and calibrate the control strategy, we risk to waste efforts to compensate for harmonic behavior that has been introduced by the emulator switch frequency and is therefore not real

Inverter Current

Low Frequency Emulator Current

High Frequency Emulator CurrentA

mp

litu

de

Time

Good Accuracy

Poor Accuracy

Page 30: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

32Confidential | | PDIM Gothenburg, 29 November 2019 |

The heart of an inverter test system

E-Motor Emulator … see how itfunctions

Page 31: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

33Confidential | | PDIM Gothenburg, 29 November 2019 |

E-Motor Emulator … basic operation principle

E-Motor replaced with a power electronic device

Page 32: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

34Confidential | | PDIM Gothenburg, 29 November 2019 |

E-Motor Emulator … testbed integration

Battery Emulator E-Motor Emulator

✓ HV Batterie Replacement

(Virtual Battery with

Correct Characteristics)

✓ Standard Unit Today

Inverter

under Test

✓ E-Motor Replacement

(Virtual E-Motor with

Correct Characteristics)

✓ Dyno Replacement

(No Mechanics)

The e-motor emulator replaces both, e-motor and dynamometer

E-Motor Data

✓ Control of rotor position

✓ Control of torque

✓ Control of speed

Page 33: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

35Confidential | | PDIM Gothenburg, 29 November 2019 |

E-Motor Emulator … making it happen

Is your inverter test concept- efficient ?- realistic ?- fast ?

Page 34: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

36Confidential | | PDIM Gothenburg, 29 November 2019 |

Calling the inverter test system intoexistence …

A modular test bed architecture

Page 35: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

37Confidential | | PDIM Gothenburg, 29 November 2019 |

Basic inverter test system layout withe-motor emulator

Page 36: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

38Confidential | | PDIM Gothenburg, 29 November 2019 |

AVL Inverter test system – modular & scalable

UUT

AC Power Cycle Topology DC Power Cycle Topology

+ Allows integration of a real battery

- Weight and physical dimensions

+ Compact

- Later integration of a real battery not possible

E-Motor

Emulator

DC-

Power

Supply

Battery

Emulator

Inverter Table

(alt. Climatic

Chamber)

++ - -

Grid

UUTE-Motor

Emulator

Testbed

Supply

Inverter Table

(alt. Climatic

Chamber)

++ - -

Grid

Page 37: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

39Confidential | | PDIM Gothenburg, 29 November 2019 |

AVL Inverter test system – modular & scalable

UUT

E-Motor Emulator Phase Current Scalability

E-Motor

Emulator

DC-

Power

Supply

Battery

Emulator

Inverter Table

(alt. Climatic

Chamber)

+

+ -

-

Grid

The E-Motor

Emulator phase

current capability

can be selected in

400ARMS steps:

• 400ARMS

• 800ARMS

• 1,200ARMS

Page 38: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

40Confidential | | PDIM Gothenburg, 29 November 2019 |

AVL Inverter test system – modular & scalable

UUT

E-Motor Emulator Phase Fault Injection

E-Motor

Emulator

DC-

Power

Supply

Battery

Emulator

Inverter Table

(alt. Climatic

Chamber)

+

+ -

-

Grid

A fault injection matrix

simulates phase faults

with high current /

voltage ratings:

• Phase break

• Phase-to-phase short

• Phase short to battery +

Fault

Injection

Matrix

• Phase short to battery -

• Phase short to chassis

Page 39: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

41Confidential | | PDIM Gothenburg, 29 November 2019 |

AVL Inverter test system – modular & scalable

UUT

Extension to Emulate 6-Phase E-Motors

E-Motor

Emulator

DC-

Power

Supply

Battery

Emulator

Inverter Table

(alt. Climatic

Chamber)

+

+ -

-

Grid

Implementation of a second E-

Motor Emulator provides several

testbed variants:

• Test of two channel inverters

+ -

E-Motor

Emulator

DC-

Power

Supply

• Test of 6-phase inverters

• Doubling the phase current

• Parallel test of two 3-phase

inverters (requires another

battery emulator)

Other options are:

• 6-phase fault injection testing

• Emulation of Externally

Excited Motors

Page 40: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

42Confidential | | PDIM Gothenburg, 29 November 2019 |

INVERTER TESTING …

PICK THE RIGHT TEST EQUIPMENT!

Page 41: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

43Confidential | | PDIM Gothenburg, 29 November 2019 |

AVL Inverter test system – market position

Why is the AVL inverter test system unique in the market?

The e-motor is precisely emulated according to the real physics via:

➢ 320ns model iteration➢ 800kHz switching frequency➢ Power amplifiers THD 0.09%➢ Use of real motor data

Modular and scalable:

➢ Up to 1,000V➢ Up to 2,400Arms in 400A steps➢ Power from 160kW to >1MW➢ Any rotor sensor on the market➢ 3-phase / 6-phase motors / dual

Fault injection on power level with correct e-motor characteristics:

➢ Phase shorts➢ Phase breaks➢ Active short

All e-motor models relevant for the automotive industry are available & approved:

➢ PMSM 3-phase, 6-phase➢ IM 3-phase, 6-phase➢ EESM 3-phase, 6-phase

All required functionality available:

➢ Tool chain for motor-copy functionality

➢ Synthetic motor data➢ Inverter protection➢ Exciter coil emulation➢ Rotor sensor fault

injection➢ Built-in scope➢ Automation system➢ ….

Page 42: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

44Confidential | | PDIM Gothenburg, 29 November 2019 |

INVERTER TESTING WITH EME …A GAME CHANGER – GLOBALLY!

Page 43: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

45Confidential | | PDIM Gothenburg, 29 November 2019 |

Customer testimonials

Daimler: Full road-to-lab for complex inverter controls testing

Further information: ATZelectronic 2013-031 E-motor emulator is partof the „virtual car“

Inverter control loop test forsmooth traction …

in office area @ full power!

Page 44: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

46Confidential | | PDIM Gothenburg, 29 November 2019 |

„This approach also opens up new possibilities. Engineers working in the field of drive inverterdevelopment now have the possibility of runningsystem tests in a laboratory environment, reproducibly and under power, thus enabling themto systematically optimise control algorithms. […]

The number of vehicle tests required have beendrastically reduced, which reduces costs anddevelopment times“

Customer testimonials

Page 45: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

47Confidential | | PDIM Gothenburg, 29 November 2019 |

LuK Schaeffler: Torque Vectoring Inverter Test (ASIL-D)

Further information: ATZelectronic 2015-06 … active short circuit test …short circuit shutdown

correct dynamics…!… phase short injection

Customer testimonials

Page 46: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

48Confidential | | PDIM Gothenburg, 29 November 2019 |

„The AVL Inverter Testsystem has

proven itself as an ideal test tool.

Within two weeks we could run a

testprogram which used to take

half a year! “

Customer testimonials

Page 47: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

49Confidential | | PDIM Gothenburg, 29 November 2019 |

How Mercedes India challenges Silicon Valley

AVL Inverter Testsystem

https://www.welt.de/motor/article159733767/Wie-Indien-dem-Silicon-Valley-den-Rang-ablaeuft.html (27.11.2016)

"We make sure that new cars drive longer andlonger in the virtual world, before we need actualprototypes. That increases the flexibility in development, accelerates the processes andreduces costs on top of that.“ (Manu Saale, Die Welt,

27.11.2016)

"Not for nothing have we set up a testbed in thecellar, which can simulate any electric motor[AVL‘s Inverter Testsystem], long before it isavailable at all as a prototype.“ (Thomas Weber, Die Welt,

27.11.2016)

Customer testimonials

Page 48: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

50Confidential | | PDIM Gothenburg, 29 November 2019 |

Customer testimonials

Global & shared testing with same data base

Virtual E-Motor shared worldwide via Email allows…

→ sharing test resources→ concurrent engineering→ testing free from tolerance issues and mechanics (no real motor)→ easy test result comparison between different locations due to

numerically correct results

Page 49: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

51Confidential | | PDIM Gothenburg, 29 November 2019 |

Customer which know us…

2018

Asia▪ CRRC (CN)▪ FAW (CN)▪ SAIC (CN)▪ ITRI (TW)▪ Mercedes (IN)▪ Catarc (CN)▪ Delphi (CN)▪ Honda (JP)▪ Denso (JP)▪ Hitachi (JP)▪ ADD (KR)▪ GNTP (KR)

Europe▪ Honda▪ DYNEX▪ APRL▪ JLR▪ Dyson▪ Valeo / Siemens▪ BMW AG▪ Daimler AG▪ VW ▪ ZF▪ Bosch▪ Continental▪ LuK-Schaeffler▪ MAGNA▪ MAHLE▪ MAN▪ KST

USA▪ Mercedes R&D▪ Cummins▪ Delphi▪ Ford

2019

Page 50: From Inverter Testing to Power Electronics based Test Systems2019... · Multiple dependencies and uncertainties do not allow efficient performance test and comparison INVERTER SUPPLIER

www.avl.com

Thank You