FULL-DAY KINDERGARTEN
IN THE
PLYMOUTH PUBLIC SCHOOLS
Fiscal Review and Recommendations
Presentation to School Committee
November 30, 2015
Feasibility Study: Interest
Driven by the commitment of the School Committee, administration, building
principals, and professional staff
Expand the quality of service provided to children in the Plymouth Public
Schools
Extend the opportunity to develop social skills and readiness for first grade
Further promote district's efforts to maximize early literacy
Massachusetts and
Full-Day Kindergarten (as of 2014)
Full-Day Kindergarten*
Percent of public school kindergarten students in full-day kindergarten classes
88%
Percent of school districts offering full-day kindergarten that charge tuition (range: $995 - $4,872)
24%
*69,585 children enrolled in public school kindergarten. Massachusetts Department of Education, SIMS data from 2013-2014 school year.
Summary of Findings
Approximately 88% of public school kindergarten students participate in full-
day kindergarten classes.
Only 24% of school districts offering full-day kindergarten charge tuition.
A majority (77.8%) of parents surveyed prefer a full-day kindergarten
program.
10 full-day kindergarten students from Plymouth participate in school choice in
Carver and Bourne.
Current obstacles and supports for transitioning to a full-day kindergarten that
have been identified are:
Space – Buildings not capable of meeting FDK needs with current room
configurations
Financial – Funding required for additional teacher and student resources
Staffing support – Additional funding required
Geographical area of town – Over 100 square miles
Specialist support services – Art, music, and physical education
RecapFebruary–March
Analyzed enrollment information and staffing data
Conducted study of existing classroom space within the district
Initiated community-wide kindergarten needs assessment (surveys)
Local Preschools
Plymouth Family Network
Plymouth Public Schools Parents
Head Start March
April Developed operational estimates (professional development, curriculum materials,
furniture, staffing, classroom supplies and equipment, etc.)
May Integrated survey data, needs assessment information and operational needs estimates
into preliminary report
June Presented draft report to Superintendent for submission to School Committee
Motion by School Committee to continue fiscal study of FDK
Options for Consideration
The exploration of portable classrooms at elementary schools (not an option at
certain elementary schools).
Extraordinary costs
Logistics
Inability to accommodate 100% of schools
Redistricting exercise (K-8) to explore various grade level reconfigurations.
Disruption to majority of schools
The use of one PCIS “house” as a possible kindergarten center.
Transportation and capital expense
Additional administrative oversight
Less desirable for families
Planning Sessions with Principals Several meetings to assess:
Staffing
Class size expectations
Facilities (inventory of
space)
Furniture and equipment
needs
Conclusions:
7 of the 8 elementary
schools can accommodate
full-day kindergarten
Exception: Hedge (one
section)
Preschool programs
(West/South Elem) co-
exist with PFN at PCIS No budget implications
Follow-up meetings to
determine the future
needs of preschool
Full-Day Kindergarten Costs FY17 Budget
Expense Total Costs ($)
Instructional Staff $1,286,183
Support Staff $320,451
Transportation * -$162,071
Building Modifications $0
Savings and Revenue * -$820,443
FY 17 Budget Increase $1,444,563
FY 18 Anticipated Budget Impact $801,357
* The total FDK expenses would be reduced in FY18 by approximately $845,443
(CH70 aid and transportation)
Teaching Staff Required FY 16 FY 17
School Budget
FTE
Existing
Staff Paid by
Budget
Revolving
FTE
Revolving $ Additional
New FTE
Additional New
$
Total
FTE
Total $
(Revolving
and New)
CSES 1.0 $51,870 0.5 $28,263 0.5 $23,607 2.0 $51,870
FFES 1.5 $89,955 0.5 $30,842 1.0 $46,774 3.0 $77,616
HES 1.0 $48,003 0.0 - 0.0 - 1.0 -
IBES 2.5 $217,416 0.5 $48,835 1.0 $46,774 4.0 $90,609
MES 1.0 $57,508 0.5 $33,507 1.5 $70,161 3.0 $103,668
NMES 2.0 $140,623 1.0 $78,940 1.0 $46,774 4.0 $125,714
SES 2.5 $147,184 1.0 $65,353 1.5 $70,161 5.0 $135,514
West 1.5 $84,786 0.5 $32,325 2.0 $93,548 4.0 $125,873
TOTAL 13.0 $837,344 4.5 $313,064 8.5 $397,799 26.0 $710,863
Paraeducator Staff Required FY 16 FY 17
School Budget
FTE
Existing
Staff Paid by
Budget
Revolving
FTE
Revolving $ Additional
New FTE
Additional
New $
Total
FTE
Total $
(Revolving
and New)
CSES 0.0 $0 .6 $12,684 .6 $11,769 1.2 $24,453
FFES 0.0 $0 .6 $ 10,295 1.2 $ 23,538 1.8 $ 33,833
HES 0.0 $0 0.0 $0 .75 $14,711 .75 $14,711
IBES 0.0 $0 .6 $ 13,226 1.8 $ 35,307 2.4 $ 48,533
MES 0.0 $0 .6 $ 14,376 1.2 $ 23,538 1.8 $ 37,914
NMES 0.0 $0 1.2 $ 26,702 1.2 $ 23,538 2.4 $ 50,240
SES 0.0 $0 1.2 $ 27,002 1.8 $ 35,307 3.0 $ 62,309
West 0.0 $0 .6 $ 13,151 1.8 $ 35,307 2.4 $ 48,458
TOTAL 0.0 $0 5.4 $ 117,436 10.35 $ 203,015 15.75 $ 320,451
Additional Specialists
Art PE Music Library/
Media
Tech SPED Speech O.T. P.T. Total
FTE
CSES 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.9
FFES 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.1
HES 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.9
IBES 0.2 0.2 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.8
MES 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.3
NMES 0.2 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.8
SES 0.2 0.2 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.8
West 0.2 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.7
Unassigned 3.0 2.0 1.0 1.0 7.0
TOTAL 1.5 1.5 1.5 0.7 0.1 3.0 2.0 1.0 1.0 12.3
TOTAL $ $575,320
Important to Understand
Hedge classroom will be housed at West Elementary
for one year only.
Specialist classrooms will not be displaced.
Instructional spaces for FDK are all appropriate and
comparable to other educational spaces within each
school.