PROJECT: OWNER: LOCATION: ITEM ACTIVITIES Wt. % 60 CALENDAR DAYS A CONSTRUCTION OF SILO STRUCTURAL a.1 EARTH WORKS a.1.1 Site preparation a.1.2 Lay - out a.1.3 Excavation for foundation a.1.4 Preparation of forms a.1.5 Installation of forms a.2 CONCRETE WORKS a.2.1 Pouring of concrete mixed for foundation a.2.2 Pouring of concrete mixed for pedestal a.2.3 Backfill a.3 FABRICATION WORKS a.3.1 Fabrication of conical bottom of silo a.3.2 Fabrication of steel structure a.3.3 Fabrication of spout a.3.4 Fabrication of spout diverter SUBJECT: GANTT CHART dec. 28 dec. 29 dec. 30 dec. 31 jan. 1 jan. 2 jan. 3 jan. 4 jan. 5 jan. 6 jan. 7 jan. 8 jan. 9 jan. 10 jan. 11 jan. 12 jan. 13 jan. 14 jan. 15 jan. 16 jan. 17 jan. 18 jan. 19 jan. 20 jan. 21 jan. 22 jan. 23 jan. 24 jan. 25 jan. 26 jan. 27 jan. 28 jan. 29 jan. 30 jan. 31 feb. 1 feb. 2 feb. 3 feb. 4 feb. 5 feb. 6 feb. 7 feb. 8 feb. 9 feb. 10 feb. 11 feb. 12 feb. 13 feb. 14 feb. 15 feb. 16

Gantt Chart, B-meg

Embed Size (px)

DESCRIPTION

gantt

Citation preview

Page 1: Gantt Chart, B-meg

PROJECT:OWNER:LOCATION:

ITEM ACTIVITIES Wt. %

60 CALENDAR DAYS

A CONSTRUCTION OF SILO STRUCTURALA

a.1 EARTH WORKS

a.1.1 Site preparation

a.1.2 Lay - out

a.1.3 Excavation for foundation

a.1.4 Preparation of forms

a.1.5 Installation of forms

a.2 CONCRETE WORKS

a.2.1 Pouring of concrete mixed for foundation

a.2.2 Pouring of concrete mixed for pedestal

a.2.3 Backfill

a.3 FABRICATION WORKS

a.3.1 Fabrication of conical bottom of silo

a.3.2 Fabrication of steel structure

a.3.3 Fabrication of spout

a.3.4 Fabrication of spout diverter

SUBJECT: GANTT CHART

dec.

28

dec.

29

dec.

30

dec.

31

jan.

1ja

n. 2

jan.

3ja

n. 4

jan.

5ja

n. 6

jan.

7ja

n. 8

jan.

9ja

n. 1

0ja

n. 1

1ja

n. 1

2ja

n. 1

3ja

n. 1

4ja

n. 1

5ja

n. 1

6ja

n. 1

7ja

n. 1

8ja

n. 1

9ja

n. 2

0ja

n. 2

1ja

n. 2

2ja

n. 2

3ja

n. 2

4ja

n. 2

5ja

n. 2

6ja

n. 2

7ja

n. 2

8ja

n. 2

9ja

n. 3

0ja

n. 3

1fe

b. 1

feb.

2fe

b. 3

feb.

4fe

b. 5

feb.

6fe

b. 7

feb.

8fe

b. 9

feb.

10

feb.

11

feb.

12

feb.

13

feb.

14

feb.

15

feb.

16

feb.

17

feb.

18

feb.

19

feb.

20

feb.

21

feb.

22

feb.

23

Page 2: Gantt Chart, B-meg

a.4 INSTALLATION WORKS

a.4.1 Erection of steel structure

a.4.2 Erection of silo

a.4.3 Installation of spout

a.4.4 Installation of spout diverter

B FABRICATION OF EQUIPMENT

b.1 FLATBELT CONVEYOR 18 m

b.1.1 Fabrication of main frame

b.1.2 Fabrication of roller

b.1.3 Fabrication of drive pulley

b.1.4 Fabrication of driven pully

b.1.5 Installation of flatbelt

b.1.6 Erection of flatbelt conveyor assembly

b.2 SCREW CONVEYOR 12 m, 300 mm Ø

b.2.1 Fabrication of conveyor casing

b.2.2 Fabrication of screw

b.2.3 Erection of screw conveyor assembly

b.3 1 UNIT BUCKET ELEVATOR 250 x 250 x 14 m

b.3.1 Fabrication of elevator base

b.3.2 Fabrication of elevator head

b.3.3 Fabrication of drive pulley

Page 3: Gantt Chart, B-meg

b.3.4 Fabrication of driven pully

b.3.5 Fabrication of elevator box

b.3.6 Installation of elevator belt w/ bucket

b.3.7 Installation of bucket elevator assembly

b.4 SCREW CONVEYOR STRUCTURAL

b.4.1 Fabrication of main frame and catwalk

b.4.2 Erection of main frame and catwalk

Page 4: Gantt Chart, B-meg

60 CALENDAR DAYS

feb.

24

feb.

25

Page 5: Gantt Chart, B-meg

PROJECT:OWNER:LOCATION:

ITEM ACTIVITIES

CONSTRUCTION OF SILO STRUCTURALa.1 EARTH WORKS

a.1.1 Site preparationa.1.2 Lay - outa.1.3 Excavation for foundationa.1.4 Preparation of formsa.1.5 Installation of forms

a.2 CONCRETE WORKSa.2.1 Pouring of concrete mixed for foundationa.2.2 Pouring of concrete mixed for pedestala.2.3 Backfill

a.3 FABRICATION WORKSa.3.1 Fabrication of conical bottom of siloa.3.2 Fabrication of steel structurea.3.3 Fabrication of spouta.3.4 Fabrication of spout diverter

a.4 INSTALLATION WORKSa.4.1 Erection of steel structurea.4.2 Erection of siloa.4.3 Installation of spouta.4.4 Installation of spout diverterB FABRICATION OF EQUIPMENTb.1 FLATBELT CONVEYOR 18 m

b.1.1 Fabrication of main frameb.1.2 Fabrication of rollerb.1.3 Fabrication of drive pulleyb.1.4 Fabrication of driven pullyb.1.5 Installation of flatbeltb.1.6 Erection of flatbelt conveyor assembly

b.2 SCREW CONVEYOR 12 m, 300 mm Øb.2.1 Fabrication of conveyor casingb.2.2 Fabrication of screwb.2.3 Erection of screw conveyor assembly

b.3 1 UNIT BUCKET ELEVATOR 250 x 250 x 14 mb.3.1 Fabrication of elevator baseb.3.2 Fabrication of elevator headb.3.3 Fabrication of drive pulleyb.3.4 Fabrication of driven pullyb.3.5 Fabrication of elevator boxb.3.6 Installation of elevator belt w/ bucketb.3.7 Installation of bucket elevator assembly

b.4 SCREW CONVEYOR STRUCTURAL SUPPORTb.4.1 Fabrication of main frame and catwalkb.4.2 Erection of main frame and catwalk

SUBJECT: GANTT CHART

Page 6: Gantt Chart, B-meg

PROJECT:OWNER:LOCATION:

ITEM ACTIVITIES Wt. %

60 CALENDAR DAYS

A CONSTRUCTION OF SILO STRUCTURAL

a.1 EARTH WORKS

a.1.1 Site preparation

a.1.2 Lay - out

a.1.3 Excavation for foundation

a.1.4 Preparation of forms

a.1.5 Installation of forms

a.2 CONCRETE WORKS

a.2.1 Pouring of concrete mixed for foundation

a.2.2 Backfill

a.3 FABRICATION WORKS

a.3.1 Fabrication of conical bottom of silo

a.3.2 Fabrication of steel structure

a.3.3 Fabrication of spout

a.3.4 Fabrication of spout diverter

a.4 INSTALLATION WORKS

a.4.1 Erection of steel structure

a.4.2 Erection of silo

a.4.3 Installation of spout

a.4.4 Installation of spout diverter

B FABRICATION OF EQUIPMENT

SUBJECT: GANTT CHART

dec.

28

dec.

29

dec.

30

dec.

31

jan.

1ja

n. 2

jan.

3ja

n. 4

jan.

5ja

n. 6

jan.

7ja

n. 8

jan.

9ja

n. 1

0ja

n. 1

1ja

n. 1

2ja

n. 1

3ja

n. 1

4ja

n. 1

5ja

n. 1

6ja

n. 1

7ja

n. 1

8ja

n. 1

9ja

n. 2

0ja

n. 2

1ja

n. 2

2ja

n. 2

3ja

n. 2

4ja

n. 2

5ja

n. 2

6ja

n. 2

7ja

n. 2

8ja

n. 2

9ja

n. 3

0ja

n. 3

1fe

b. 1

feb.

2fe

b. 3

feb.

4fe

b. 5

feb.

6fe

b. 7

feb.

8fe

b. 9

feb.

10

feb.

11

feb.

12

feb.

13

feb.

14

feb.

15

feb.

16

feb.

17

feb.

18

feb.

19

feb.

20

feb.

21

feb.

22

feb.

23

feb.

24

feb.

25

Page 7: Gantt Chart, B-meg

B FABRICATION OF EQUIPMENT

b.1 FLATBELT CONVEYOR 18 m

b.1.1 Fabrication of main frame

b.1.2 Fabrication of roller

b.1.3 Fabrication of drive pulley

b.1.4 Fabrication of driven pully

b.1.5 Installation of flatbelt

b.1.6 Erection of flatbelt conveyor assembly

b.2 SCREW CONVEYOR 12 m, 300 mm Ø

b.2.1 Fabrication of conveyor casing

b.2.2 Fabrication of screw

b.2.3 Erection of screw conveyor assembly

b.3 1 UNIT BUCKET ELEVATOR 250 x 250 x 14 m

b.3.1 Fabrication of elevator base

b.3.2 Fabrication of elevator head

b.3.3 Fabrication of drive pulley

b.3.4 Fabrication of driven pully

b.3.5 Fabrication of elevator box

b.3.6 Installation of elevator belt w/ bucket

b.3.7 Installation of bucket elevator assembly

b.4 SCREW CONVEYOR STRUCTURAL

b.4.1 Fabrication of main frame and catwalk

b.4.2 Erection of main frame and catwalk

Page 8: Gantt Chart, B-meg

PROJECT:

ITEM ACTIVITIES AMOUNT

60 CALENDAR DAYS

A CONSTRUCTION OF SILO STRUCTURE 464,189.00 42.2 28.6 13.6

b.1 FLATBELT CONVEYOR 18 m 262,642.00 23.88 3.3 8.9 6.7

b.2 SCREW CONVEYOR 12 m, 300 mm Ø 134,879.00 12.26 4.7 7.0

b.3 1 UNIT BUCKET ELEVATOR 250 x 250 x 14 m 213,990.00 19.45 4.7 8.0

b.4 SCREW CONVEYOR STRUCTURAL 24,300.00 2.209

TOTAL 1,100,000.00 100

ACCOMPLISHMENT 32.0 31.8 21.7 0

CUMULATIVE ACCOMPLISHMENT 32.0 63.8 85.5 85.5

CASH FLOW 351,633.11 349,966.10 238,916.74 -

CUMULATIVE CASH FLOW 351,633.11 701,599.21 940,515.95 940,515.95

Prepared by:

SUBJECT: CASH FLOW

Wt. %

dec.

28

dec.

29

dec.

30

dec.

31

jan.

1ja

n. 2

jan.

3ja

n. 4

jan.

5ja

n. 6

jan.

7ja

n. 8

jan.

9ja

n. 1

0ja

n. 1

1ja

n. 1

2ja

n. 1

3ja

n. 1

4ja

n. 1

5ja

n. 1

6ja

n. 1

7ja

n. 1

8ja

n. 1

9ja

n. 2

0ja

n. 2

1ja

n. 2

2ja

n. 2

3ja

n. 2

4ja

n. 2

5ja

n. 2

6ja

n. 2

7ja

n. 2

8ja

n. 2

9ja

n. 3

0ja

n. 3

1fe

b. 1

feb.

2fe

b. 3

feb.

4fe

b. 5

feb.

6fe

b. 7

feb.

8fe

b. 9

feb.

10

feb.

11

feb.

12

feb.

13

feb.

14

feb.

15

feb.

16

feb.

17

feb.

18

feb.

19

feb.

20

feb.

21

feb.

22

feb.

23

feb.

24

feb.

25