9
PROJECT: OWNER: LOCATION: ITEM ACTIVITIES Wt. % 60 CALENDAR DAYS A CONSTRUCTI ON OF SILO STRUCTURAL a.1 EARTH WORKS a.1.1 Site preparation a.1.2 Lay o!t a.1." E#$a%ation &or &o!n'ati on a.1.( Preparation o& &or )* a.1.+ In*ta, ,ation o& &or)* a.2 CONCRETE WORKS a.2.1 Po!ri n- o& $on$rete )i#e' &or &o!n'ation a.2.2 Po!ri n- o& $on$rete )i#e' &or pe'e*ta, a.2." a$/&i ,, a.3 FABRICA TION WORKS a.".1 ari $ation o& $oni$a, ott o) o& *i,o a.".2 ari $ation o& *tee, *tr!$t!re a."." ari $ation o& *po!t a.".( ari $ation o& *po!t 'i%er ter SJECT: GANTT CHART    '   e   $  .    2    3    '   e   $  .    2    4    '   e   $  .    "    0    '   e   $  .    "    1    5   a   n  .    1    5   a   n  .    2    5   a   n  .    "    5   a   n  .    (    5   a   n  .    +    5   a   n  .    6    5   a   n  .        5   a   n  .    3    5   a   n  .    4    5   a   n  .    1    0    5   a   n  .    1    1    5   a   n  .    1    2    5   a   n  .    1    "    5   a   n  .    1    (    5   a   n  .    1    +    5   a   n  .    1    6    5   a   n  .    1        5   a   n  .    1    3    5   a   n  .    1    4   a   n  .    5   a   n  .    2    1    5   a   n  .    2    2    5   a   n  .    2    "    5   a   n  .    2    (    5   a   n  .    2    +    5   a   n  .    2    6    5   a   n  .    2        5   a   n  .    2    3    5   a   n  .    2    4    5   a   n  .    "    0    5   a   n  .    "    1    &   e      .    1    &   e      .    2   e  .    &   e      .    (    &   e      .    +    &   e      .    6    &   e      .        &   e      .    3    &   e      .    4    &   e      .    1    0    &   e      .    1    1    &   e      .    1    2    &   e      .    1    "    &   e      .    1    (   e  .    &   e      .    1    6   e  .    &   e      .    1    3    &   e      .    1    4    &   e      .    2    0    &   e      .    2    1    &   e      .    2    2   e  .

Gantt Chart, B-meg

Embed Size (px)

DESCRIPTION

b

Citation preview

Page 1: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 1/10

PROJECT:

OWNER:

LOCATION:

ITEM ACTIVITIES Wt. %

60 CALENDAR DAYS

A CONSTRUCTION OF SILO STRUCTURAL

a.1 EARTH WORKS

a.1.1 Site preparation

a.1.2 Lay o!t

a.1." E#$a%ation &or &o!n'ation

a.1.( Preparation o& &or)*

a.1.+ In*ta,,ation o& &or)*a.2 CONCRETE WORKS

a.2.1 Po!rin- o& $on$rete )i#e' &or &o!n'ation

a.2.2 Po!rin- o& $on$rete )i#e' &or pe'e*ta,

a.2." a$/&i,,

a.3 FABRICATION WORKS

a.".1 ari$ation o& $oni$a, otto) o& *i,o

a.".2 ari$ation o& *tee, *tr!$t!re

a."." ari$ation o& *po!t

a.".( ari$ation o& *po!t 'i%erter 

SJECT: GANTT CHART

   '  e  $ .

   2   3

   '  e  $ .

   2   4

   '  e  $ .

   "   0

   '  e  $ .

   "   1

   5  a  n .

   1

   5  a  n .

   2

   5  a  n .

   "

   5  a  n .

   (

   5  a  n .

   +

   5  a  n .

   6

   5  a  n .

   

   5  a  n .

   3

   5  a  n .

   4

   5  a  n .

   1   0

   5  a  n .

   1   1

   5  a  n .

   1   2

   5  a  n .

   1   "

   5  a  n .

   1   (

   5  a  n .

   1   +

   5  a  n .

   1   6

   5  a  n .

   1   

   5  a  n .

   1   3

   5  a  n .

   1   4

  a  n .

   5  a  n .

   2   1

   5  a  n .

   2   2

   5  a  n .

   2   "

   5  a  n .

   2   (

   5  a  n .

   2   +

   5  a  n .

   2   6

   5  a  n .

   2   

   5  a  n .

   2   3

   5  a  n .

   2   4

   5  a  n .

   "   0

   5  a  n .

   "   1

   &  e    .

   1

   &  e    .

   2

  e

 .

   &  e    .

   (

   &  e    .

   +

   &  e    .

   6

   &  e    .

   

   &  e    .

   3

   &  e    .

   4

   &  e    .

   1   0

   &  e    .

   1   1

   &  e    .

   1   2

   &  e    .

   1   "

   &  e    .

   1   (

  e

 .

   &  e    .

   1   6

  e

 .

   &  e    .

   1   3

   &  e    .

   1   4

   &  e    .

   2   0

   &  e    .

   2   1

   &  e    .

   2   2

  e

 .

Page 2: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 2/10

a.4 INSTALLATION WORKS

a.(.1 Ere$tion o& *tee, *tr!$t!re

a.(.2 Ere$tion o& *i,o

a.(." In*ta,,ation o& *po!t

a.(.( In*ta,,ation o& *po!t 'i%erter 

B FABRICATION OF EQUIPMENT

b.1 FLATBELT CONVEOR 1! ".1.1 ari$ation o& )ain &ra)e

.1.2 ari$ation o& ro,,er 

.1." ari$ation o& 'ri%e p!,,ey

.1.( ari$ation o& 'ri%en p!,,y

.1.+ In*ta,,ation o& &,ate,t

.1.6 Ere$tion o& &,ate,t $on%eyor a**e),y

b.2 SCREW CONVEOR 12 "# 3$$ "" .2.1 ari$ation o& $on%eyor $a*in-

.2.2 ari$ation o& *$re7

.2." Ere$tion o& *$re7 $on%eyor a**e),y

b.3 1 UNIT BUCKET ELEVATOR 2&$ ' 2&$ ' 14 "

.".1 ari$ation o& e,e%ator a*e

.".2 ari$ation o& e,e%ator 8ea'

."." ari$ation o& 'ri%e p!,,ey

Page 3: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 3/10

.".( ari$ation o& 'ri%en p!,,y

.".+ ari$ation o& e,e%ator o#

.".6 In*ta,,ation o& e,e%ator e,t 79 !$/et

.". In*ta,,ation o& !$/et e,e%ator a**e),y

b.4 SCREW CONVEOR STRUCTURAL

.(.1 ari$ation o& )ain &ra)e an' $at7a,/

.(.2 Ere$tion o& )ain &ra)e an' $at7a,/

Page 4: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 4/10

   &  e    .

   2   (

   &  e    .

   2   +

Page 5: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 5/10

Page 6: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 6/10

Page 7: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 7/10

PROJECT:

OWNER:

LOCATION:

ITEM ACTIVITIES

  CONSTRUCTION OF SILO STRUCTURAL

a.1 EARTH WORKS

a.1.1 Site preparation

a.1.2 Lay o!t

a.1." E#$a%ation &or &o!n'ation

a.1.( Preparation o& &or)*a.1.+ In*ta,,ation o& &or)*

a.2 CONCRETE WORKS

a.2.1 Po!rin- o& $on$rete )i#e' &or &o!n'ation

a.2.2 Po!rin- o& $on$rete )i#e' &or pe'e*ta,

a.2." a$/&i,,

a.3 FABRICATION WORKS

a.".1 ari$ation o& $oni$a, otto) o& *i,o

a.".2 ari$ation o& *tee, *tr!$t!rea."." ari$ation o& *po!t

a.".( ari$ation o& *po!t 'i%erter 

a.4 INSTALLATION WORKS

a.(.1 Ere$tion o& *tee, *tr!$t!re

a.(.2 Ere$tion o& *i,o

a.(." In*ta,,ation o& *po!t

a.(.( In*ta,,ation o& *po!t 'i%erter 

B FABRICATION OF EQUIPMENT

b.1 FLATBELT CONVEOR 1! ".1.1 ari$ation o& )ain &ra)e

.1.2 ari$ation o& ro,,er 

.1." ari$ation o& 'ri%e p!,,ey

.1.( ari$ation o& 'ri%en p!,,y

.1.+ In*ta,,ation o& &,ate,t

.1.6 Ere$tion o& &,ate,t $on%eyor a**e),y

b.2 SCREW CONVEOR 12 "# 3$$ ""

.2.1 ari$ation o& $on%eyor $a*in-.2.2 ari$ation o& *$re7

.2." Ere$tion o& *$re7 $on%eyor a**e),y

b.3 1 UNIT BUCKET ELEVATOR 2&$ ' 2&$ ' 14 "

.".1 ari$ation o& e,e%ator a*e

.".2 ari$ation o& e,e%ator 8ea'

."." ari$ation o& 'ri%e p!,,ey

.".( ari$ation o& 'ri%en p!,,y

.".+ ari$ation o& e,e%ator o#

.".6 In*ta,,ation o& e,e%ator e,t 79 !$/et

SJECT: GANTT CHART

Page 8: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 8/10

PROJECT:

OWNER:

LOCATION:

ITEM ACTIVITIES Wt. %

60 CALENDAR DAYS

A CONSTRUCTION OF SILO STRUCTURAL

a.1 EARTH WORKS

a.1.1 Site preparation

a.1.2 Lay o!t

a.1." E#$a%ation &or &o!n'ation

a.1.( Preparation o& &or)*

a.1.+ In*ta,,ation o& &or)*

a.2 CONCRETE WORKS

a.2.1 Po!rin- o& $on$rete )i#e' &or &o!n'ation

a.2.2 a$/&i,,

a.3 FABRICATION WORKS

a.".1 ari$ation o& $oni$a, otto) o& *i,o

a.".2 ari$ation o& *tee, *tr!$t!re

a."." ari$ation o& *po!t

a.".( ari$ation o& *po!t 'i%erter 

a.4 INSTALLATION WORKS

a.(.1 Ere$tion o& *tee, *tr!$t!re

a.(.2 Ere$tion o& *i,o

a.(." In*ta,,ation o& *po!t

a.(.( In*ta,,ation o& *po!t 'i%erter 

 

SJECT: GANTT CHART

   '  e  $ .

   2   3

   '  e  $ .

   2   4

   '  e  $ .

   "   0

   '  e  $ .

   "   1

   5  a  n .

   1

   5  a  n .

   2

   5  a  n .

   "

   5  a  n .

   (

   5  a  n .

   +

   5  a  n .

   6

   5  a  n .

   

   5  a  n .

   3

   5  a  n .

   4

   5  a  n .

   1   0

   5  a  n .

   1   1

   5  a  n .

   1   2

   5  a  n .

   1   "

   5  a  n .

   1   (

   5  a  n .

   1   +

   5  a  n .

   1   6

   5  a  n .

   1   

   5  a  n .

   1   3

   5  a  n .

   1   4

   5  a  n .

   2   0

   5  a  n .

   2   1

   5  a  n .

   2   2

   5  a  n .

   2   "

   5  a  n .

   2   (

   5  a  n .

   2   +

   5  a  n .

   2   6

   5  a  n .

   2   

   5  a  n .

   2   3

   5  a  n .

   2   4

   5  a  n .

   "   0

   5  a  n .

   "   1

   &  e    .

   1

   &  e    .

   2

   &  e    .

   "

   &  e    .

   (

   &  e    .

   +

   &  e    .

   6

   &  e    .

   

   &  e    .

   3

   &  e    .

   4

   &  e    .

   1   0

   &  e    .

   1   1

   &  e    .

   1   2

   &  e    .

   1   "

   &  e    .

   1   (

   &  e    .

   1   +

   &  e    .

   1   6

   &  e    .

   1   

   &  e    .

   1   3

   &  e    .

   1   4

   &  e    .

   2   0

   &  e    .

   2   1

   &  e    .

   2   2

   &  e    .

   2   "

   &  e    .

   2   (

   &  e    .

   2   +

Page 9: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 9/10

 

b.1 FLATBELT CONVEOR 1! "

.1.1 ari$ation o& )ain &ra)e

.1.2 ari$ation o& ro,,er 

.1." ari$ation o& 'ri%e p!,,ey

.1.( ari$ation o& 'ri%en p!,,y

.1.+ In*ta,,ation o& &,ate,t

.1.6 Ere$tion o& &,ate,t $on%eyor a**e),y

b.2 SCREW CONVEOR 12 "# 3$$ ""

.2.1 ari$ation o& $on%eyor $a*in-

.2.2 ari$ation o& *$re7

.2." Ere$tion o& *$re7 $on%eyor a**e),y

b.3 1 UNIT BUCKET ELEVATOR 2&$ ' 2&$ ' 14 "

.".1 ari$ation o& e,e%ator a*e

.".2 ari$ation o& e,e%ator 8ea'

."." ari$ation o& 'ri%e p!,,ey

.".( ari$ation o& 'ri%en p!,,y

.".+ ari$ation o& e,e%ator o#.".6 In*ta,,ation o& e,e%ator e,t 79 !$/et

.". In*ta,,ation o& !$/et e,e%ator a**e),y

b.4 SCREW CONVEOR STRUCTURAL

.(.1 ari$ation o& )ain &ra)e an' $at7a,/

.(.2 Ere$tion o& )ain &ra)e an' $at7a,/

Page 10: Gantt Chart, B-meg

7/17/2019 Gantt Chart, B-meg

http://slidepdf.com/reader/full/gantt-chart-b-meg 10/10

ITEM ACTIVITIES AMOUNT

60 CALENDAR DAYS

A CONSTRUCTION OF SILO STRUCTURE 4(4#1!).$$ (2.2 . .

b.1 FLATBELT CONVEOR 1! " 2(2#(42.$$ 2".33 "." 3.4 6.

b.2 SCREW CONVEOR 12 "# 3$$ "" 134#!*).$$ 12.26 . .

b.3 1 UNIT BUCKET ELEVATOR 2&$ ' 2&$ ' 14 " 213#))$.$$ 14.(+ (. 3.0

b.4 SCREW CONVEOR STRUCTURAL 24#3$$.$$ 2.204

  TOTAL 1#1$$#$$$.$$ 1$$

ACCOMPLISHMENT "2.0 "1.3 21. 0

CUMULATIVE ACCOMPLISHMENT "2.0 6".3 3+.+ !&.&

CASH FLOW   "+16"".11 "(4466.10 2"3416.(

CUMULATIVE CASH FLOW   "+16"".11 01+44.21 4(0+1+.4+ )4$#&

P+,-a+, b/0

GOAL ENGINEERING WORKS

PROJECT: CONSTRUCTION OF SILO STRUCTURE AN CONVEING SSTEM

SJECT: CASH FLOW

Wt. %

   '  e

  $ .

   2   3

   '  e

  $ .

   2   4

   '  e

  $ .

   "   0

   '  e

  $ .

   "   1

   5  a  n

 .   1

   5  a  n

 .   2

   5  a  n

 .   "

   5  a  n

 .   (

   5  a  n

 .   +

   5  a  n

 .   6

   5  a  n

 .   

   5  a  n

 .   3

   5  a  n

 .   4

   5  a  n

 .   1   0

   5  a  n

 .   1   1

   5  a  n

 .   1   2

   5  a  n

 .   1   "

   5  a  n

 .   1   (

   5  a  n

 .   1   +

   5  a  n

 .   1   6

   5  a  n

 .   1   

   5  a  n

 .   1   3

   5  a  n

 .   1   4

   5  a  n

 .   2   0

   5  a  n

 .   2   1

   5  a  n

 .   2   2

   5  a  n

 .   2   "

   5  a  n

 .   2   (

   5  a  n

 .   2   +

   5  a  n

 .   2   6

   5  a  n

 .   2   

   5  a  n

 .   2   3

   5  a  n

 .   2   4

   5  a  n

 .   "   0

   5  a  n

 .   "   1

   &  e    .

   1

   &  e    .

   2

   &  e    .

   "

   &  e    .

   (

   &  e    .

   +

   &  e    .

   6

   &  e    .

   

   &  e    .

   3

   &  e    .

   4

   &  e    .

   1   0

   &  e    .

   1   1

   &  e    .

   1   2

   &  e    .

   1   "

   &  e    .

   1   (

   &  e    .

   1   +

   &  e    .

   1   6

   &  e    .

   1   

   &  e    .

   1   3

   &  e    .

   1   4

   &  e    .

   2   0

   &  e    .

   2   1

   &  e    .

   2   2

   &  e  

   2   "