Garissa District Vision and Strategy

Embed Size (px)

DESCRIPTION

garissadistrict visionmission

Citation preview

  • 5/21/2018 Garissa District Vision and Strategy

    1/35

    Garissa District Vision and

    Strategy: 2005-2015

    July 2005

  • 5/21/2018 Garissa District Vision and Strategy

    2/35

    TABLE OF CONTENTS

    Page

    1 Introduction and background 1

    1.1 Strategic planning approach 11.1.1 Format of the district consultations 2

    2 District profile 3

    2.1 Administrative profile 32.2 Topography 3

    2.3 Rainfall and Climate 3

    2.4

    Population and Settlement 4

    3 Natural resources in the district 54 Situation analysis 6

    4.1 Overview 6

    4.2 Summary Strengths, Weaknesses, Opportunities and Threats(SWOT) Analysis (SWOT) Analysis for Garissa district 6

    4.3 Resource-based analysis 74.3.1 Livestock: Strategic challenges 7

    O

  • 5/21/2018 Garissa District Vision and Strategy

    3/35

    6.7 Food crops: Strategic challenges 24

    6.8 Minerals: Strategic challenges 266.9 Wildlife: Strategic challenges 27

    6.10 Wind and solar energy: Strategic challenges 286.11 Coordination of ASALs Development Initiatives at district level 28

  • 5/21/2018 Garissa District Vision and Strategy

    4/35

    Abbreviations

    ALRMP Arid Lands Resource Management Project

    ADC Agricultural Development Corporation

    ASAL Arid and semi-arid Lands

    CBAHWs Community Based Animal Health Workers

    CBO Community Based Organisations

    DDC District Development Committee

    DFRD District Focus for Rural Development

    DMO Drought Management Officer

    DPM Department of Personnel Management

    DSG District Steering GroupEMCA Environment Management and Coordination Act

    ERSWEC Economic Recovery Strategy for Wealth and Employment Creation

    FAO

    FD Forest Department

    GTZ Deutsche Gesellschaft fr Technische Zusammenarbeit

    ICRAF

    KARI Kenya Agricultural Research Institute

  • 5/21/2018 Garissa District Vision and Strategy

    5/35

    NARC National Rainbow Coalition

    NEMA National Environmental Authority

    NGO None Governmental Organisations

    NRM Natural Resource Management

    SWOT Strengths, weaknesses, opportunities and threats

    UNDP United Nations Development Programmes

  • 5/21/2018 Garissa District Vision and Strategy

    6/35

    1 Introduction and background

    This vision and strategy for Garissa district was refined and finalised during a district

    consultations workshop held on March 21-23 in Garissa Town. The workshop

    participants were drawn from a cross section of stakeholders involved in the

    districts socio-economic development.

    1.1 Strategic planning approach

    This section sets out the approach adopted in fine-tuning and developing the district

    vision and strategy. The Arid Lands Resource Management Project (ALRMP) of the

    Special Programmes Ministry in the Office of the President contracted

    PricewaterhouseCoopers to assist in refining the visions and strategies for the 22

    districts involved in the project. Each district, under the direction of the DroughtManagement Officer, had undertaken consultations with the community and

    developed a draft vision and strategy. The focus of the community consultations

    was how to leverage the natural resources resident in each district to improve the

    livelihoods of the people.

    In order to refine the district visions and strategies, ALRMP and

    P i t h C d th f ll i ll h

  • 5/21/2018 Garissa District Vision and Strategy

    7/35

    consultations took the form of a three-day workshop. For the Upper Eastern,

    North Eastern and Rift Valley axis, the workshops took place on March 21-23rdwhile the Southern Rangelands, Mt Kenya Region and Ukambani axis held

    their consultations on March 29-31st.

    1.1.1 Format of the district consultations

    This section sets out the framework used to refine and develop the district vision

    and strategy. The seven-step framework was used to facilitate the district

    workshops. The steps were:

    Step 1:Identify each districts key natural resources (the natural resource

    base)

    Step 2:Identify the key strategic challenges that constrain the sustainablemanagement of natural resources in the district. This involved undertakingcomprehensive SWOT analysis of the district with respect to the naturalresources and peoples livelihoods. It also entailed undertaking a detailed

    PEST analysis to identify the political, economic, sociological andtechnological forces that impact on the way natural resources are managed in

    the district.

  • 5/21/2018 Garissa District Vision and Strategy

    8/35

    2 District profile

    2.1 Administrative profile

    Garissa district is the provincial headquarters of North Eastern Province. It borders

    Isiolo district to the northwest, Wajir to the north, the Republic of Somalia to the

    east, Tana River district to the west and Ijara to the south. The district covers an

    area of 33,620 square kilometres and is administratively divided into 11 divisions,

    42 locations and 60 sub-locations. There are three constituencies, namely Dujis,

    Laghdera and Fafi. The constituencies are vast and sparsely populated. There are a

    total of 45 wards under two local authorities namely, Garissa Municipal Council and

    Garissa County Council.

    2.2 TopographyThe district is basically flat with no hills and mountains. The major physical features

    are seasonal laghasand the Tana River basin in the western side. Most of the

    seasonal laghas in the western part drain their waters into River Tana while those in

    the eastern side flow to the Fafi swamp and into the Somali Republic.

    Garissa is generally semi-arid. Its soils range from the sandstones, dark clays in

    t h t ll i l il l th Ri T b i Th l hit d

  • 5/21/2018 Garissa District Vision and Strategy

    9/35

    activities. Garissa has a lot of ground water potential along its western fringe with

    the Merti aquifer stretching from Shantaabak division to Jarajilla division. Along the

    aquifer, the water is fresh while in some parts of Jarajilla its saline. The northern

    and central parts of the district have no underground water making the areas

    difficult for human habitation during dry periods.

    2.4 Population and Settlement

    The district was estimated to have a population of 329,868 people in 1999 whichwas to rise to 396,904 in 2006 and to 460,215 by 2008, according to the 1999

    population census. The population of the district is concentrated in small pockets

    surrounding water points and market centres. These are the areas where basic

    services like education; health, security and commercial activities are found. These

    also coincide with the location or sub-location headquarters. The major towns alsoattract large populations especially Garissa town which accounts for 20% of the

    district population.

    Dadaab and Jarajilla divisions accommodate refugees in three camps with

    population of 130,000 people, forming a temporary settlement within a radius of 13

    kilometers from Dadaab market. This population, which is 35% of the district total,

    h ti i t th i t d il bl i th i i it

  • 5/21/2018 Garissa District Vision and Strategy

    10/35

    3 Natural resources in the district

    The following are the key natural resources in the district.

    Pasture

    Livestock

    Water

    Land

    Wildlife

    Solar and wind energy

    Medicinal plants

    Mineral resources

  • 5/21/2018 Garissa District Vision and Strategy

    11/35

    4 Situation analysis

    4.1 Overview

    Garissa districts economy is mainly pastoral. The main economic activity is keeping

    of cattle, camels, goats and sheep. Increased livestock population has led to

    overgrazing and competition over watering grounds. Poverty is high in the district

    and the competition for resources is exacerbated by the influx of refugees mainly

    form Somalia. The districts physical infrastructure is generally poor and

    investments in health and education low.

    4.2 Summary Strengths, Weaknesses, Opportunities and Threats(SWOT) Analysis (SWOT) Analysis for Garissa district

    In order to gain a broad understanding of the issues that affect the management of

    natural resources in the district, the following is a summary SWOT analysis distilled

    from the analysis undertaken at the district consultations.

    Strengths

    Well-endowed with natural capital

    Opportunities

    Increased Government and

  • 5/21/2018 Garissa District Vision and Strategy

    12/35

    Conflict over dwindling internal

    resources

    High water table

    Weak human capital base due tolow investment in education

    Poor or non-extant physical

    infrastructure such as roads,

    irrigation canals, factories,

    hospitals and telecommunications

    Fragile eco-system that is beingpushed to the limit

    Collapse of traditional pasture

    management practices

    Land tenure system

    Rampant insecurity in the region

    Endemic poverty and rising

    population

    HIV/AIDS

    Predominance of livestock

    monoculture

    Low interest in private sector

    investment

    Rapid population growth

    Growing vulnerability to climatic

    shocks

    Pasture degradation from

    population pressure and invasive

    i

  • 5/21/2018 Garissa District Vision and Strategy

    13/35

    4.3.1.2 Disease and pest prevalence

    This is largely due to the lack of a system to monitor and control livestock diseases

    due to the porous nature of the districts boundaries. A key constraint in this regard

    is the limited access to veterinary services in the district. The high incidence of

    poverty among the pastoralists and poor physical and marketing infrastructure has

    dampened private sector investment in animal health. Emphasis has to be laid ontraditional knowledge and building the capacity of Community Based Animal Health

    Workers (CBAHWs) to fill the lacuna.

    4.3.1.3 Poor livestock marketing infrastructure

    In common with other ASAL regions, the district lacks proper livestock marketing

    infrastructure. This is due to the constraints imposed by poor physical and industrial

    infrastructure. The result is limited access to markets outside the district and eventhe country.

    4.3.1.4 Land tenure constraints

    Land in the district is primarily trust land or communal. The current land tenure

    arrangements are deemed to be inappropriate in the face of growing individual

    herds that use common pastures.

  • 5/21/2018 Garissa District Vision and Strategy

    14/35

    4.4.1.1 Inadequate access to clean water for domestic and livestock consumption

    The district is prone to periodic droughts and access to safe water continues to be a

    challenge.

    4.4.1.2 Poor management of existing water works

    The exploitation of underground water is hampered by inadequate water where bythe existing boreholes are old and often in a state of disrepair. A significant number

    of the dams and earth pans have silted up reducing their water-holding capacity.

    Communities need to be capacitated to manage this resource sustainably.

    4.4.1.3 Contamination of water

    The quality of water, especially dams and pans, is contaminated by human and

    animal waste. Siltation has also reduced the quality of water.

    4.4.1.4 Underutilisation of potential

    The district is prone to periodic droughts yet the potential for irrigated agriculturehas not been fully tapped. The waters of the Tana for irrigation have not been

    tapped fully.

    4.4.1.5 Frequent flooding, frequent changes of river course and flush floods of River Tana

  • 5/21/2018 Garissa District Vision and Strategy

    15/35

    4.4.4 Strategic challenges

    The key strategic challenge revolves around access to quality and sufficient grazing

    resources.

    4.4.4.1 Quantity and quality of pasture

    The quantity and quality of pastures are adversely affected by overgrazing, lack of a

    system for delineating and preserving reserve grazing pastures and near extinctionof palatable species especially after the el-Niorains of 1998.

    Further pastures are threatened by cutting down trees for charcoal burning,

    firewood, building materials and uncontrolled mushrooming of settlements

    especially around provincial administrative centres where security is better.

    4.4.4.2 Access to pasture

    The collapse of traditional range management structures has jeopardised access topastures that were traditionally set aside for dry season grazing. Livestock is now

    often moved into these areas without consulting elders.

    4.4.5 Opportunities and potential impact

    Better management of pasture (and water) is at the heart of improved livestock

    production in Garissa district.

  • 5/21/2018 Garissa District Vision and Strategy

    16/35

    is leading to degradation. Strategic initiatives should focus on the development of

    an appropriate land tenure system for the district to enable people to take better

    care of the land.

    4.6 Other resources

    4.6.1 Emerging livestockSnakes, chameleons, tortoises, butterflies and other emerging livestock have

    potential to provide alternative income sources for households. Social capital to

    enable local to take advantage of the growing market in these livestock must be

    nurtured at the local level.

    4.6.2 Wind and solar energy

    The district enjoys long periods of sunshine and windy conditions that are suitablefor solar and wind energy generation.

    4.6.2.1 Key strategic challenges

    The key challenge with regard to wind and solar energy is the availability of

    appropriate technology to harvest these resources. Current technologies tend to be

    costly.

  • 5/21/2018 Garissa District Vision and Strategy

    17/35

    4.6.5 Sand and other minerals

    Very little is known of the mineral deposits in the district. The most immediate

    action for the exploitation of minerals in the district is to have a comprehensive geo-

    survey of the mineral deposits. This would then inform the nature and extent of

    exploitation in the district.

    The district has plenty of sand but its exploitation is haphazard and environmentallyunsustainable. Guidelines need to be developed to guide the harvesting of sand

    without degrading the environment.

  • 5/21/2018 Garissa District Vision and Strategy

    18/35

    5 Vision, Mission and Core development principles

    5.1 Vision

    A vision depicts the districts preferred future state, its dream with regard to the

    sustainable utilisation of the natural resources that reside within it. The two key

    running themes that informed vision were:

    Sustainable and equitable utilisation of available natural resources

    Improved livelihoods for all

    The following is the district vision for the future:

    A just , emp owered and prosperous Garissa distr ict

    5.2 District Mission

    The district mission captures the essence of what players commit to do to realise

  • 5/21/2018 Garissa District Vision and Strategy

    19/35

    The following are the core development principles for Natural Resource

    Management in the district.

    Just ice and equity in accessing and benef it ing from natural resourc es

    Respect for indigenou s know ledge and local culture

    Respect for diversi ty

    Inclusiv eness especial ly for wom en

    Focus on v alue addit ion

    Proact ive part ic ipat ion of local communit ies in developm ent in i t iat ives

  • 5/21/2018 Garissa District Vision and Strategy

    20/35

    6 Strategic challenges, response and investments

    6.1 Introduction

    The process of preparing this vision and strategy included a consultative process

    under which districts teams were facilitated to:

    Identify strategic challenges inhibiting full realization of benefits from naturalresources resident in the district

    Develop strategic initiatives to overcome the strategic challenges

    Provide indicative development investments to implement the strategicinitiatives to enable full realization of benefits from the natural resources

    Identify external agencies that would be crucial in resourcing the strategicinitiatives

    In the following section are presented the results of the consultative process. The

    presentation starts with a narrative of the strategic challenges in the realization of

    the given natural resource and a table indicating the planned strategic initiatives,

    indicative investment resources and external agencies whose participation will be

  • 5/21/2018 Garissa District Vision and Strategy

    21/35

    PricewaterhouseCoopers ALRMP 16

    Garissa District Vision and Strategy

    6.2 Pasture: Strategic challenges

    The challenges confronting use of pasture in Garissa district are overgrazing, mushrooming of unplanned

    settlements leading to land degradation especially around administrative centers, haphazard grazing with no respect

    for reserve pasture, increasing drought frequency and disappearance of palatable grass species. These have made

    livestock rearing difficult. To address these challenges and problems, the district team that developed the vision andstrategy has proposed the strategic initiatives in the table below

    Table 6.2: Pasture resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Increase livestock off-take 100,000,000 Mo&FL

    Plan settlements 20,000,000 GOK, Community, local authority

    Regulate grazing patterns 10,000,000 UNDP DDC/GOK, community

    Rehabilitate refugee affected areas 50,000,000 NEMA/GOK-Forest department

    Conduct community environmental awareness education 20,000,000 GOK/Community, local authorities

    Intensify alternative economic use of prosopis species,

    intensify mechanical control

    20,000,000 NEMA/GOK-Forest department

    Identify alternative livelihood ease pressure on thepastures

    10,000,000 UNDP DDC/GOK, NGOs, CBOs

  • 5/21/2018 Garissa District Vision and Strategy

    22/35

    PricewaterhouseCoopers ALRMP 17

    Garissa District Vision and Strategy

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Total 230,000,000

  • 5/21/2018 Garissa District Vision and Strategy

    23/35

    PricewaterhouseCoopers ALRMP 18

    Garissa District Vision and Strategy

    6.3 Non-wood forest products: Strategic challenges

    These present the opportunity for diversified livelihoods for Garissa people. The most daunting challenges inhibiting

    full exploitation of these is unorganized growing of the trees producing the products, inappropriate harvesting resulting

    to wastage, low quantity of the products need for improved seedlings, poor marketing and lack of primary process to

    add value. In the table below are presented initiatives for each of the existing non-wood products.

    Table 6.3 Non-wood forest products resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Enhance honey harvesting, refining and improvemarketing

    50,000,000 KEFRI, GTZ, NGOs

    Improve germ-plasm/ genetic pool, enhance market

    access and promote exploitation, establish miniplantations for the gum arabica

    20,000,000 KEFRI, ICRAF,

    Improve resins breed, promote more responsible

    harvesting and establish primary processing of theresins

    20,000,000 KEFRI, , ICRAF,

    Determine the value of the product and promote good

    harvesting practices for thatch materials5,000,000.00 FD, Ministry of Tourism

    Promote better understanding of the potential of herbalplants in the district, enhance responsible harvesting,create and nurture markets within and outside thedistrict

    10,000,000.00 MOH, Community, FD

    Promote the growing and weaving of reed and fibres to 5,000,000 MOH, Community, FD, NGOs, CBOs, Women Groups

  • 5/21/2018 Garissa District Vision and Strategy

    24/35

    PricewaterhouseCoopers ALRMP 19

    Garissa District Vision and Strategy

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    promote alternative livelihoods

    Promote consumption of wiled fruits, their processingand marketing both within and outside the market

    5,000,000 MOH, Community, FD, NGOs

    Total 115,000,000

  • 5/21/2018 Garissa District Vision and Strategy

    25/35

    PricewaterhouseCoopers ALRMP 20

    Garissa District Vision and Strategy

    6.4 Livestock: Strategic challenges

    High disease prevalence, inbreeding resulting to weaker animals, lack of external markets and insufficient market

    infrastructure are the key strategic challenges affecting livestock rearing in the district. In table below are presented

    the key strategic initiatives to address these challenges.

    Table 6.4: Livestock resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Improve disease surveillance/control 200,000,000 MOLFD,ENNDA, KLMC, GTZ

    Promote traditional breeding system & educate

    community on importance of proper breeding

    50,000,000 ALRMP, Community, KLMC

    Enhance local and external markets 20,000,000 GOK

    Improve road network 2,000,000,000 GOK, Development Partners

    TOTAL 2,270,000,000

  • 5/21/2018 Garissa District Vision and Strategy

    26/35

    PricewaterhouseCoopers ALRMP 21

    Garissa District Vision and Strategy

    6.5 Water: Strategic challenges

    Overexploitation of underground water, poor distribution of water points, deteriorating water quality, silting pans, poormanagement of water resources and poor harvesting of water are key strategic challenges in water utilization in the

    district. The table below presents strategic initiatives towards addressing these challenges.

    Table 6.5: Livestock resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS)

    IN KSHS

    KEY EXTERNAL AGENCIES

    Regulate underground water exploitation develop andstrengthen WUAs

    10,000,000 MOWD NWS Board

    Proper distancing of water points

    Develop and strengthen WUAs

    5,000,000 MOWD, ALRMP II, NWS Board

    De-silt water pans, develop and strengthen WUAs 30,000,000 ALRMP II, MOWD, NWS Board

    Develop and strengthen WUAs, de-silting of existing earth

    dams

    30,000,000 Community, NWS Board

    Develop water supply systems, innovative water

    harvesting technologies (zai pits, etc)

    100,000,000 Relma-in-ICRAF for water harvesting

    Carry out conservation activities in highlands 40,000,000 MOWD, ALRMP II, NWS Board

    Programme for river bank protection and manage thecourse

    100,000,000 MOWD, ALRMP II, NWS Board

  • 5/21/2018 Garissa District Vision and Strategy

    27/35

    PricewaterhouseCoopers ALRMP 22

    Garissa District Vision and Strategy

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS)

    IN KSHS

    KEY EXTERNAL AGENCIES

    Conduct study on better control of evaporation 5,000,000 MOWD, ALRMP II, NWS Board

    Total 320,000,000

  • 5/21/2018 Garissa District Vision and Strategy

    28/35

    PricewaterhouseCoopers ALRMP 23

    Garissa District Vision and Strategy

    6.6 Land: Strategic challenges

    Unclear land tenure, unresponsive land policies and regulations are some of the bottlenecks adversely affecting landuse in Garissa district. In the table below are presented some of the strategic initiatives to address these challenges

    Table 6.6: Land resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Ensure the district unique land ownership issues areappropriately reflected in the on going land policy

    development

    0 NGOs, CBOs,

    Advocate for proper demarcation of district boundaries(take into a/c socio-economic/cultural orientation)

    10,000,000 DDC, Ministry of Lands and Housing ,

    Advocate for more community involvement in landmanagement decisions

    5,000,000 NGOs, CBOs,

    Total 15,000,000

  • 5/21/2018 Garissa District Vision and Strategy

    29/35

    PricewaterhouseCoopers ALRMP 24

    Garissa District Vision and Strategy

    6.7 Food crops: Strategic challenges

    Little use of irrigation, disinterest in crop farming, high cost of pump-fed irrigation, high cost of farm inputs, weak ornon-existent farmers associations, poor soils, little and erratic rainfall, occupation of prime land by the dreaded

    mathenge plant,unclear land ownership and invasive species are some of the problems and challenges preventing

    optimal crop agriculture in Garissa district. Ten years ago, there were virtually no local food crops and fruits sold inGarissa town from the district. To day the market place is awash with bananas grown in Garissa. This indicates two

    things. One it is evident that some people have taken up crop growing as a livelihood. Secondly, feeding habits have

    changed such that locally grown food crops have local consumers. In the table below are presented some strategicinitiatives to address the challenges and take advantage of the local peoples changing feeding habits.

    Table 6.7: Food crop resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Fully exploit irrigation potential includinggravitational irrigation

    200,000,000 MoA/MoW

    Intensify research on suitable crops and

    appropriate technologies

    10,000,000 KARI, UN bodies, ADC

    Improve marketing infrastructure, value-additionand micro-processing

    10,000,000 ALRMP/MoA

    Introduce early maturing varieties and drought-resistant strains, seeds certification for planting

    10,000,000 MoA, IFAD, WFP, KARI

    Promote Agro-forestry/research 10,000,000 TARDA, KEFRI, ICRAF,

    Proper management of prosopis e.g. use for

    firewood and charcoal.

    40,000,000 MoA, KARI, FAO

    Introduce credit facilities for farmers 10,000,000 NGOs

    Improve extension services 40,000,000 MoA

  • 5/21/2018 Garissa District Vision and Strategy

    30/35

    PricewaterhouseCoopers ALRMP 25

    Garissa District Vision and Strategy

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Total 330,000,000

  • 5/21/2018 Garissa District Vision and Strategy

    31/35

    PricewaterhouseCoopers ALRMP 26

    Garissa District Vision and Strategy

    6.8 Minerals: Strategic challenges

    Lack of information on quantities and location of minerals in the district, minimal mining activities, unorganizedmarketing of mining products and poor mining methods resulting to environmental degradation are the main strategic

    challenges in mineral wealth utilisation in Garissa. The table below presents some of the strategic initiatives to

    address the challenges.

    Table 6.8: Minerals resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Conduct study on location and quantities of minerals inthe district,

    10,000,000.00 Dept of Mines and Geology

    Intensify exploitation of known deposits 50,000,000.00 Dept of Mines and Geology

    Strengthen marketing systems 20,000,000.00 GOK, community

    Improve/enforce responsible mining practices 20,000,000.00 Department of Mines and Geology/GOK ,Community

    Conduct environmental impact studies 20,000,000.00 Department of Mines and Geology/GOK

    Total 120,000,000

  • 5/21/2018 Garissa District Vision and Strategy

    32/35

    PricewaterhouseCoopers ALRMP 27

    Garissa District Vision and Strategy

    6.9 Wildlife: Strategic challenges

    Rampant poaching for trophies and game meat, unfriendly wildli fe policy, limited information on numbers of wildliferesident in the district, increasing human/wildlife conflicts, habitat degradation and exclusion of community in the

    management of wildlife.

    Table 6.9: Wildlife resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN

    KSHS

    KEY EXTERNAL AGENCIES

    Streamline policy 50,000,000.00 KWS, Parliament

    Better collaboration on cross-border

    management/consultations, wildlife census through GISand aerial photography

    100,000,000.00 KWS, NGOs

    Support community-driven eco-tourism,

    Adequate and timely compensation for loss of human

    life and property

    100,000,000.00 ALRMP, KWS

    Community training, better community educationprograms/tours

    10,000,000.00 NEMA, GOK/KWS,

    Improve management of game reserves/parks andexisting sanctuaries

    10,000,000.00 NGOs, CBOs, NGOs

    Research on ecotourism 10,000,000.00 KWS, NGOs

    Establish community-based tourism

    Recruitment community wildlife scouts for surveillanceand scouting

    10,000,000.00 KWS, KTB, NGOs

    Total 290,000,000

  • 5/21/2018 Garissa District Vision and Strategy

    33/35

    PricewaterhouseCoopers ALRMP 28

    Garissa District Vision and Strategy

    6.10 Wind and solar energy: Strategic challenges

    Policy constraints to development of alternative energy systems and high initial installation costs are the tow keystrategic challenges that have resulted in limited use of wind and solar energy in Garissa district. The table below

    presents the strategic initiative for addressing the challenges.

    Table 6.10: Wind and solar energy resource management matrix for Garissa district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS)

    IN KSHS

    KEY EXTERNAL AGENCIES

    Install wind and solar demonstration units in public

    institutions to pilot wind and solar energy use in thedistrict.

    5,000,000 Ministry of Energy, KenGen , NGOs

    Provide information on uses and benefits of the two

    sources of energy

    500,000 ALRMP, Ministry of Energy, KenGen, NGOs

    Total 5,500,000

    6.11 Coordination of ASALs Development Initiatives at district level

    Before the commencement of the ALRMP, ASAL issues in the district were not addressed in a coordinated manner.

    The Drought Management Officers and the District Steering Groups have taken the role of coordinating the ASAL

    development initiatives in the district. Broad based consultations indicate that this arrangement is working well in theinitial 10 districts to benefit from the ALRMP. The consultations show that given the contentious provisions in the draft

    constitution, it would be prudent to continue coordinating ASAL development initiatives within the current arrangements

    where the DMO is the focal point and the DSG members coordinate inter-sectoral ASAL initiatives.

  • 5/21/2018 Garissa District Vision and Strategy

    34/35

    PricewaterhouseCoopers ALRMP 29

    Garissa District Vision and Strategy

    It is recognised that the DSG is a sub-committee of the DDC but it needs strengthening so that it is able to handle theenhanced role of coordinating the implementation of the ASAL NRM Strategy initiatives. As such the table below

    indicates the strategic initiatives to be achieved and the indicative investments required for effective coordination of the

    ASAL NRM strategic initiatives.

    Table 6.11: Coordination of development initiatives in the district

    STRATEGIC INITIATIVES ESTIMATED INVESTMENT

    RESOURCES (10 YEARS) IN KSHS

    KEY EXTERNAL AGENCIES

    Enhance the role of DSGs to take on initiatives on

    natural resource management at the district level

    5,000,000 Ministry of Special Programmes, DDCs,

    Sectoral Ministries, NGOs, CBOs, PrivateSector

    Develop a programme for implementation of

    ASAL initiatives in the districts (as per strategy)

    5,000,000 Ministry of Special Programmes

    Drought Management Officers

    Develop a monitoring and evaluation system for

    ASAL initiatives in the districts

    5,000,000 Ministry of Special Programmes

    Conduct regular reviews of ASAL activities in thedistrict

    50,000,000 Ministry of Special Programmes

    Make DSGs more inclusive i.e. include privatesector organisations involved in natural resource

    management in the districts

    0 Ministry of Special Programmes, DDCs,Sectoral Ministries, NGOs, CBOs, Private

    Sector

    Hold regular working sessions to advance

    implementation of ASAL strategy initiatives

    20,0000 Ministry of Special Programmes, DDCs,

    Sectoral Ministries, NGOs, CBOs, PrivateSector

    Total 65,200,000

  • 5/21/2018 Garissa District Vision and Strategy

    35/35

    PricewaterhouseCoopers ALRMP 30

    Garissa District Vision and Strategy