  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    First Commercial Production (FCP) - Garraf Field Development ProjectFirst Commercial Production (FCP) - Garraf Field Development Proj... 132 129 15-Aug-10 09-Feb-11

    Detail Design EngineeringDetail Design Engineering 132 129 15-Aug-10 09-Feb-11

    CoordinationCoordination 132 65 15-Aug-10 11-Nov-10

    DECGD0001 Technical Document Register 132 65 15-Aug-10 11-Nov-10*

    DECGD0002 Master Project Schedule (for Detaul Design activities) 88 23 15-Aug-10 14-Sep-10*

    DECPR0001 Document Numbering Procedure 81 23 15-Aug-10 14-Sep-10*

    DECRE0001 Engineering Decision Register 72 22 15-Aug-10 13-Sep-10*

    DECSP0001 Basic Engineering Design Data (BEDD) becomes Job Design Specification 82 23 15-Aug-10 14-Sep-10*

    DECSP0003 Project Scope of Work (Excluding Pipelines/ Drilling) 80 22 15-Aug-10 13-Sep-10*

    DECSP0004 Modularization Strategy Document 49 22 15-Aug-10 13-Sep-10*

    CIVILSCIVILS 80 76 15-Aug-10 28-Nov-10

    SpecificationsSpecifications 80 33 15-Aug-10 28-Sep-10

    DECVSP0001 Civil Structural Design Basis 80 23 15-Aug-10 14-Sep-10*

    DECVSP0002 General Specification for Excavation and Filling 73 23 15-Aug-10 14-Sep-10*

    DECVSP0006 General Specification for Concrete Works 73 23 15-Aug-10 14-Sep-10*

    DECVSP0007 General Specification for Structural Steel 73 23 15-Aug-10 14-Sep-10*

    DECVSP0012 General Specification for Steel Piled Foundation 38 23 15-Aug-10 14-Sep-10*

    DECVSP0013 Civil Structural Scope of Work for Construction Works at EPS 22 22 30-Aug-10 28-Sep-10*

    DECVSP0016 Architectural Scope of Work 22 22 30-Aug-10 28-Sep-10*

    General Civil DrawingsGeneral Civil Drawings 33 33 30-Aug-10 13-Oct-10

    DECVDW0116 General Notes Sheets (2 Sheets) 33 33 30-Aug-10 13-Oct-10*

    DECVDW0117 EPS Site Layout and GA 33 33 30-Aug-10 13-Oct-10*

    DECVDW0118 EPS Surface Drainage Plans (13 sheets) 33 33 30-Aug-10 13-Oct-10*

    DECVDW0119 EPS Underground Closed Drains Piping Network (6 sheets) 33 33 30-Aug-10 13-Oct-10*

    DECVDW0120 Details for Collection Sumps, Pits and Drainage Man-holes (3 Sheets) 33 33 30-Aug-10 13-Oct-10*

    DECVDW0121 EPS Foundation Plan - Piles (17 Sheets) 33 33 30-Aug-10 13-Oct-10*

    DECVDW0122 EPS Foundation Plan - Concrete (8 Shees) 33 33 30-Aug-10 13-Oct-10*

    DECVDW0123 Tank Foundations, Concrete Rings and Slabs and AB Layouts 22 22 30-Aug-10 28-Sep-10*

    DECVDW0124 Details for Steel Piles (6 Sheets) 33 33 30-Aug-10 13-Oct-10*

    DECVDW0125 Reinforced Concrete Foundation Details (6 Sheets) 33 33 30-Aug-10 13-Oct-10*

    Building drawingsBuilding drawings 76 76 15-Aug-10 28-Nov-10

    DECVDW0209 Switch Gear, Battery UPS Building General Arrangement 66 45 15-Aug-10 14-Oct-10*

    DECVDW0210 Switch Gear, Battery UPS Building Views and Sections 66 45 15-Aug-10 14-Oct-10*

    DECVDW0223 Control Room Plans & Details (10 Sheets, Arch & Struct) 42 42 30-Sep-10 28-Nov-10*

    DECVDW0224 Electrical Substation Plans & Details (12 Sheets, Arch & Struct) 42 42 30-Sep-10 28-Nov-10*

    DECVDW0225 Process Interface Building Plans & Details (6 Sheets, Arch & Struct) 42 42 30-Sep-10 28-Nov-10*

    ConcreteConcrete 73 73 15-Aug-10 23-Nov-10

    DECVDW0303 Tank Foundation Plan, Section & Detail 50 13 15-Aug-10 31-Aug-10*

    DECVDW0304 Foundation for Flare 39 39 30-Sep-10 23-Nov-10*

    DECVDW0305 Vessel Foundations (KO Drums, Closed Drain, etc) 39 39 30-Sep-10 23-Nov-10*

    STRUCTURALSTRUCTURAL 76 76 15-Aug-10 28-Nov-10

    DES DW0101 Module Size and Configuration 43 21 15-Aug-10 12-Sep-10*

    DES DW0109 Pipe Rack Plans and Details, PAR's 42 42 30-Sep-10 28-Nov-10*

    DES DW0110 Pipe Rack Plans and Details, Stick-built & Sleepers 42 42 30-Sep-10 28-Nov-10*

    DES DW0111 Structural Steel Drawings for PAU's 42 42 30-Sep-10 28-Nov-10*

    DES DW0112 Structural Steel Details for Lifting and Transporting PAU's and PAR's 42 42 30-Sep-10 28-Nov-10*

    ELECTRICALELECTRICAL 99 98 15-Aug-10 28-Dec-10

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 1 of 19 12-Aug-10 13:02

    Actual Work

    Remaining Work

    Critical Remaining Work

    Milestone

    First Commercial Production (FCP) - Garraf Field

    Development Project

    TASK filter: Item.

    Oracle Corporation

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    Electrical CalculationsElectrical Calculations 50 50 30-Aug-10 07-Nov-10

    DEELCCA0004 Protection Relay Settings and Coordination Study Report 50 50 30-Aug-10 07-Nov-10*

    Electrical DatasheetElectrical Datasheet 98 98 15-Aug-10 28-Dec-10

    DEELCDS0010 General - Datasheet for LV Electrical Motors 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0011 General - Datasheet for MV Electrical Motors 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0031 Main Substation 6.6kV Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0032 Main Substation 400V Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0034 Process Substation 400V Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0037 Well Cluster 1 Substation 400V Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0038 Well Cluster 2 Substation 400V Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0039 Admin Substation 400V Switchgear Datasheet (SB-7720) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0040 Water Intake Substation 400V Switchgear Datasheet (SB-7760) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0042 Personnel Camp Substation 400V Switchgear Datasheet (SB-7730) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0050 Substation 110VDC Uninterruptible Power Supply Datasheet Book(Commo... 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0051 Plant 230VAC Uninterruptible Power Supply Datasheet Book(Common DS ... 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0060 Transformer Datasheet Book (Common DS for Facility) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0100 Personnel Camp 6.6kV Ring Main Unit No.1 Datasheet (RMU-7530) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0101 Personnel Camp 6.6kV Ring Main Unit No.2 Datasheet (RMU-7531) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0102 Well Cluster No.1 6.6kV Ring Main Unit No.1 Datasheet (RMU-7540) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0103 Well Cluster No.1 6.6kV Ring Main Unit No.2 Datasheet (RMU-7541) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0104 Well Cluster No.2 6.6kV Ring Main Unit No.1 Datasheet (RMU-7550) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0105 Well Cluster No.2 6.6kV Ring Main Unit No.2 Datasheet (RMU-7551) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0106 Water Intake Station 6.6kV Ring Main Unit Datasheet (RMU-7560) 89 55 15-Aug-10 28-Oct-10*

    DEELCDS0200 Busduct Datasheet Book (Common datasheet for facility) 53 53 17-Oct-10 28-Dec-10*

    Electrical DrawingsElectrical Drawings 99 98 15-Aug-10 28-Dec-10

    DEELCDW0001 Single Line Diagrams 78 45 15-Aug-10 14-Oct-10*

    DEELCDW0102 Switchgear Symbols Legend (Added 14-Jun-10) 78 45 15-Aug-10 14-Oct-10*

    DEELCDW0120 Main Substation 6.6kV Switchboard Metering & Protection Diagram (SB-75... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0130 Main Substation 400V Switchboard Metering and Protection Diagram (SB-... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0131 Process Substation 400V Switchboard Metering and Protection Diagram (S... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0132 Admin. Substation 400V Switchboard Metering and Protection Diagram (S... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0133 Well Cluster No.1 Substation 400V Switchboard Metering and Protection D... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0134 Well Cluster No.2 Substation 400V Switchboard Metering and Protection D... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0140 Main Substation 230VAC Uninterruptible Power Supply Single Line Diagram 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0141 Process Substation 230VAC Uninterruptible Power Supply Single Line Dia... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0142 Admin. Substation 230VAC Uninterruptible Power Supply Single Line Diagr... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0143 Well Cluster No.1 Substation 230VAC Uninterruptible Power Supply Single... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0144 Well Cluster No.2 Substation 230VAC Uninterruptible Power Supply Single... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0150 Main Substation 110VDC Uninterruptible Power Supply Single Line Diagram 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0151 Process Substation 110VDC Uninterruptible Power Supply Single Line Dia... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0152 Admin. Substation 110VDC Uninterruptible Power Supply Single Line Diagr... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0153 Well Cluster No.1 Substation 110VDC Uninterruptible Power Supply Single... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0154 Well Cluster No.2 Substation 110VDC Uninterruptible Power Supply Single... 42 42 29-Sep-10 25-Nov-10*

    DEELCDW0200 Main Substation Layout 99 65 15-Aug-10 11-Nov-10*

    DEELCDW0201 Process Substation Layout 99 65 15-Aug-10 11-Nov-10*

    DEELCDW0202 Admin. Substation Layout 42 42 01-Nov-10 28-Dec-10*

    DEELCDW0203 Well Cluster No.1 Substation Layout 42 42 01-Nov-10 28-Dec-10*

    DEELCDW0204 Well Cluster No 2 Substation Layout 77 45 15-Aug-10 14-Oct-10*

    DEELCDW0206 Personnel Camp 6.6kV Substation Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0220 CPS Electric al Equipment Layout Key Plan 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0221 CPS Area 1 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 2 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEELCDW0222 CPS Area 2 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0223 CPS Area 3 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0224 CPS Area 4 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0225 CPS Area 5 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0241 CPS Area 1 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0242 CPS Area 2 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0243 CPS Area 3 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0244 CPS Area 4 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0245 CPS Area 5 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*

    DEELCDW0300 Well Cluster No.1 Cable Routing Nodal Layout 68 45 15-Aug-10 14-Oct-10*

    Electrical Lists and SchedulesElectrical Lists and Schedules 97 87 15-Aug-10 13-Dec-10

    DEELCLS0001 Electrical Load List 97 45 15-Aug-10 14-Oct-10*

    DEELCLS0002 Electrical Equipment List 73 45 15-Aug-10 14-Oct-10*

    DEELCLS0004 Electrical Cable Schedule 73 45 15-Aug-10 14-Oct-10*

    DEELCLS0005 Essential Power Generation Electrical Load List 73 45 15-Aug-10 14-Oct-10*

    DEELCLS0006 Electrical Material Take-off 31 31 01-Nov-10 13-Dec-10*

    Electrical Specifications and PhilosophiesElectrical Specifications and Philosophies 88 45 15-Aug-10 14-Oct-10

    DEELCSP0001 Electrical System Design Philosophy 78 45 15-Aug-10 14-Oct-10*

    DEELCSP0003 Specification for Electrical Installation 88 45 15-Aug-10 14-Oct-10*

    DEELCSP0004 Earthing and Lightning Protection Philosophy 83 45 15-Aug-10 14-Oct-10*

    DEELCSP0005 Technical Specification for Electrical Requirements on Packaged Equipment 88 45 15-Aug-10 14-Oct-10*

    DEELCSP0030 Specification for Low Voltage Switchgear and Controlgear 88 45 15-Aug-10 14-Oct-10*

    DEELCSP0031 Specification for Medium Voltage Switchgear and Controlgear 88 45 15-Aug-10 14-Oct-10*

    DEELCSP0033 Specification for Power Transformers and Neutral Earthing Resistors 88 45 15-Aug-10 14-Oct-10*

    DEELCSP0035 Specification for Cathodic Protection Equipment and Materials 83 45 15-Aug-10 14-Oct-10*

    DEELCSP0039 Technical Specification for Uninterruptible Power Supplies 83 45 15-Aug-10 14-Oct-10*

    DEELCSP0040 Technical Specification for DC Batteries and Chargers 83 45 15-Aug-10 14-Oct-10*

    DEELCSP0043 Technical Specification for Transportable Packaged Substations 88 45 15-Aug-10 14-Oct-10*

    DEELCSP0044 Technical Specification for Ring Main Units (Added 8-Jul-10) 83 45 15-Aug-10 14-Oct-10*

    DEELCSP0150 Specification for Low Voltage Power and Control Cables 83 45 15-Aug-10 14-Oct-10*

    DEELCSP0151 Specification for Medium Voltage Power and Control Cables 83 45 15-Aug-10 14-Oct-10*

    DEELCSP0281 Specification for Low Voltage Induction Motors 83 45 15-Aug-10 14-Oct-10*

    DEELCSP0282 Specification for Medium Voltage Induction Motors 83 45 15-Aug-10 14-Oct-10*

    Electrical Equipment RequistionsElectrical Equipment Requistions 22 22 01-Nov-10 30-Nov-10

    DEELCMR0001 Equipment Requisition for Switchgear 22 22 01-Nov-10 30-Nov-10*

    DEELCMR0002 Equipment Requisition for Power Transformers and Neutral Earthing Resist... 22 22 01-Nov-10 30-Nov-10*

    DEELCMR0003 Equipment Requisition for Uninterruptible Power Supplies 22 22 01-Nov-10 30-Nov-10*

    DEELCMR0004 Equipment Requisition for Electrical Cables 22 22 01-Nov-10 30-Nov-10*

    HSEHSE 110 65 15-Aug-10 11-Nov-10

    DEHSLS0001 Schedule of Hazardous Sources (Added 28-Jun-10) 65 45 15-Aug-10 14-Oct-10*

    DEHSPL0001 Project QHSSE Plan 65 22 15-Aug-10 13-Sep-10*

    DEHSPL0002 Pipeline HSSE Plan 65 22 15-Aug-10 13-Sep-10*

    DEHSPL0003 Project Health Plan 65 22 15-Aug-10 13-Sep-10*

    DEHSPL0004 Environmental Plan 65 22 15-Aug-10 13-Sep-10*

    DEHSPL0005 Waste Management Plan 65 22 15-Aug-10 13-Sep-10*

    DEHSPL0006 Facility Operations Plan 65 22 15-Aug-10 13-Sep-10*

    DEHSPL0007 Construction HSE Plan 65 22 15-Aug-10 13-Sep-10*

    DEHSPR0001 HSE Plan 77 34 15-Aug-10 29-Sep-10*

    DEHSPR0002 Health Risk Assessment 77 34 15-Aug-10 29-Sep-10*

    DEHSRE0001 QRA Study 110 65 15-Aug-10 11-Nov-10*

    DEHSRE0002 Design Safety Philosophy 95 45 15-Aug-10 14-Oct-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 3 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEHSRE0003 Overall System description and philosophy report 95 45 15-Aug-10 14-Oct-10*

    DEHSRE0004 Utility System description and philosophy report 95 45 15-Aug-10 14-Oct-10*

    DEHSRE0005 HAZID Terms of Reference Updated for DD 88 45 15-Aug-10 14-Oct-10*

    DEHSRE0006 HAZOP Procedure (Report) Updated for DD 76 45 15-Aug-10 14-Oct-10*

    DEHSRE0007 SIL (Instrumented Protected Function) Assessment Report 88 45 15-Aug-10 14-Oct-10*

    DEHSRE0008 Operating control and safeguarding philosophy 88 45 15-Aug-10 14-Oct-10*

    DEHSRE0009 Alarm and Shutdown & Controller set up point 88 45 15-Aug-10 14-Oct-10*

    DEHSRE0010 Flare Radiation Study (in conjunction with Process) 88 45 15-Aug-10 14-Oct-10*

    DEHSRE0011 Overall System dDescription and Philosophy Report 89 45 15-Aug-10 14-Oct-10*

    DEHSRE0012 Utility System Description & Philosophy Report 89 45 15-Aug-10 14-Oct-10*

    DEHSRE0013 Operating Control & Safeguarding Philosophy 89 45 15-Aug-10 14-Oct-10*

    DEHSRE0014 Alarm and Shutdown & Controller Set-Up Point 69 45 15-Aug-10 14-Oct-10*

    DEHSRE0015 HAZOP Study Report - Updated for DD 69 45 15-Aug-10 14-Oct-10*

    DEHSRE0016 HAZID Study Report Updated for DD 69 45 15-Aug-10 14-Oct-10*

    DEHSSP0001 Specification for Fire Fighting System 88 45 15-Aug-10 14-Oct-10*

    INSTRUMENTATIONINSTRUMENTATION 98 97 15-Aug-10 27-Dec-10

    DEINSDW0001 Control System Overall Architecture Diagram (Sheet 1 of 2) 55 11 15-Aug-10 29-Aug-10*

    DEINSDW0002 Process Control System Architecture 54 11 15-Aug-10 29-Aug-10*

    DEINSDW0003 ESD System Architecture 53 11 15-Aug-10 29-Aug-10*

    DEINSDW0004 Custody Metering System Architecture (Sheet 1 of 3) 51 11 15-Aug-10 29-Aug-10*

    DEINSDW0005 Well Site/Cluster Control Architecture 50 11 15-Aug-10 29-Aug-10*

    DEINSDW0006 Fire & Gas System Architecture 52 11 15-Aug-10 29-Aug-10*

    DEINSDW0007 Pipeline Leak Detection System Architecture 48 11 15-Aug-10 29-Aug-10*

    DEINSDW0008 Cause and Effect Matrix 43 11 15-Aug-10 29-Aug-10*

    DEINSDW0009 General Arrangement for Control & interface rooms 98 65 15-Aug-10 11-Nov-10*

    DEINSLS0001 Instrument Index 95 65 15-Aug-10 11-Nov-10*

    Instrument DatasheetsInstrument Datasheets 56 56 15-Aug-10 31-Oct-10

    DEINSDS100 Data Sheets for Analysers 22 22 15-Sep-10 14-Oct-10*

    DEINSDS101 Data Sheets for Control Valves 24 22 16-Aug-10 14-Sep-10*

    DEINSDS102 Data Sheets for DP Flow Transmitters 22 22 15-Sep-10 14-Oct-10*

    DEINSDS103 Data Sheets for Fire Detectors 22 22 16-Aug-10 14-Sep-10*

    DEINSDS104 Data Sheets for Flow Meters 22 22 16-Aug-10 14-Sep-10*

    DEINSDS105 Data Sheets for Flow Switch 22 22 30-Sep-10 31-Oct-10*

    DEINSDS106 Data Sheets for Gas Detectors (LOS) 22 22 16-Aug-10 14-Sep-10*

    DEINSDS107 Data Sheets for Gas Detectors (Point) 22 22 30-Sep-10 31-Oct-10*

    DEINSDS108 Data Sheets for Level Switches (External) 22 22 30-Sep-10 31-Oct-10*

    DEINSDS109 Data Sheets for Level Switches (Insertion) 22 22 30-Sep-10 31-Oct-10*

    DEINSDS110 Data Sheets for Level Transmitters (Displacer) 22 22 30-Sep-10 31-Oct-10*

    DEINSDS111 Data Sheets for Level Transmitters (Insertion) 22 22 15-Sep-10 14-Oct-10*

    DEINSDS112 Data Sheets for Level Transmitters (Tankage) 22 22 15-Sep-10 14-Oct-10*

    DEINSDS113 Data Sheets for MOVs 24 24 15-Aug-10 15-Sep-10*

    DEINSDS114 Data Sheets for Orifice Plates 24 24 15-Aug-10 15-Sep-10*

    DEINSDS115 Data Sheets for Pig Detectors 22 22 15-Sep-10 14-Oct-10*

    DEINSDS116 Data Sheets for Pressure gauges 22 22 15-Sep-10 14-Oct-10*

    DEINSDS117 Data Sheets for Pressure Switches 22 22 15-Sep-10 14-Oct-10*

    DEINSDS118 Data Sheets for Pressure Transmitters 22 22 15-Sep-10 14-Oct-10*

    DEINSDS119 Data Sheets for Regulators 22 22 16-Aug-10 14-Sep-10*

    DEINSDS120 Data Sheets for Relief Valves 24 24 15-Aug-10 15-Sep-10*

    DEINSDS121 Data Sheets for Restriction Orifice Plates 24 24 15-Aug-10 15-Sep-10*

    DEINSDS122 Data Sheets for Shut Down Valves 24 24 15-Aug-10 15-Sep-10*

    DEINSDS123 Data Sheets for Temperature Gauges 22 22 15-Sep-10 14-Oct-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 4 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEINSDS124 Data Sheets for Temperature Transmitters 22 22 15-Sep-10 14-Oct-10*

    DEINSDS125 Data Sheets for Thermowells 24 24 15-Aug-10 15-Sep-10*

    DEINSDS126 Data Sheets for Vibration Switches 22 22 15-Sep-10 14-Oct-10*

    Instrument RequistionsInstrument Requistions 73 73 16-Sep-10 27-Dec-10

    DEINSMR200 Requisition for Level Interface Transmitters 22 22 28-Nov-10 27-Dec-10*

    DEINSMR201 Requisition for Analysers 22 22 28-Nov-10 27-Dec-10*

    DEINSMR202 Requisition for Building Fire Detection System 22 22 16-Sep-10 17-Oct-10*

    DEINSMR203 Requisition for CCTV 22 22 28-Nov-10 27-Dec-10*

    DEINSMR204 Requisition for Control Valves 22 22 16-Sep-10 17-Oct-10*

    DEINSMR205 Requisition for DP Flow Transmitters 22 22 28-Nov-10 27-Dec-10*

    DEINSMR206 Requisition for ESD System 22 22 16-Sep-10 17-Oct-10*

    DEINSMR207 Requisition for Fire & gas System 22 22 16-Sep-10 17-Oct-10*

    DEINSMR208 Requisition for Fire Detectors 22 22 28-Nov-10 27-Dec-10*

    DEINSMR209 Requisition for Flow Computer System 22 22 16-Sep-10 17-Oct-10*

    DEINSMR210 Requisition for Flow Metering Skid 22 22 16-Sep-10 17-Oct-10*

    DEINSMR211 Requisition for Flow Meters 22 22 16-Sep-10 17-Oct-10*

    DEINSMR212 Requisition for Flow Switch 22 22 28-Nov-10 27-Dec-10*

    DEINSMR213 Requisition for Gas Detectors (LOS) 22 22 16-Sep-10 17-Oct-10*

    DEINSMR214 Requisition for Gas Detectors (Point) 22 22 28-Nov-10 27-Dec-10*

    DEINSMR215 Requisition for High-Sensitivity Smoke Detection System 22 22 16-Sep-10 17-Oct-10*

    DEINSMR216 Requisition for Level Gauges 22 22 28-Nov-10 27-Dec-10*

    DEINSMR217 Requisition for Level Interface Transmitters 22 22 28-Nov-10 27-Dec-10*

    DEINSMR218 Requisition for Level Switches (External) 22 22 28-Nov-10 27-Dec-10*

    DEINSMR219 Requisition for Level Switches (Insertion) 22 22 28-Nov-10 27-Dec-10*

    DEINSMR220 Requisition for Level Transmitters (Displacer) 22 22 28-Nov-10 27-Dec-10*

    DEINSMR221 Requisition for Level Transmitters (Insertion) 22 22 27-Oct-10 25-Nov-10*

    DEINSMR222 Requisition for Level Transmitters (Tankage) 22 22 27-Oct-10 25-Nov-10*

    DEINSMR223 Requisition for MOVs 22 22 23-Sep-10 24-Oct-10*

    DEINSMR224 Requisition for Orifice Plates 22 22 23-Sep-10 24-Oct-10*

    DEINSMR225 Requisition for Pig Detectors 22 22 27-Oct-10 25-Nov-10*

    DEINSMR226 Requisition for Pipeline Block Valve Stations PCS 22 22 23-Sep-10 24-Oct-10*

    DEINSMR227 Requisition for Pipeline Leak detection system 22 22 23-Sep-10 24-Oct-10*

    DEINSMR228 Requisition for Pipeline Leak Detection System 22 22 23-Sep-10 24-Oct-10*

    DEINSMR229 Requisition for Pressure gauges 22 22 27-Oct-10 25-Nov-10*

    DEINSMR230 Requisition for Pressure Switches 22 22 27-Oct-10 25-Nov-10*

    DEINSMR231 Requisition for Pressure Transmitters 22 22 27-Oct-10 25-Nov-10*

    DEINSMR232 Requisition for Process Control System 22 22 23-Sep-10 24-Oct-10*

    DEINSMR233 Requisition for Regulators 22 22 23-Sep-10 24-Oct-10*

    DEINSMR234 Requisition for Relief Valves 22 22 23-Sep-10 24-Oct-10*

    DEINSMR235 Requisition for Restriction Orifice Plates 22 22 23-Sep-10 24-Oct-10*

    DEINSMR236 Requisition for Security System 22 22 27-Oct-10 25-Nov-10*

    DEINSMR237 Requisition for Shut Down Valves 22 22 23-Sep-10 24-Oct-10*

    DEINSMR238 Requisition for Temperature Gauges 22 22 27-Oct-10 25-Nov-10*

    DEINSMR239 Requisition for Temperature Transmitters 22 22 27-Oct-10 25-Nov-10*

    DEINSMR240 Requisition for Thermowells 22 22 23-Sep-10 24-Oct-10*

    DEINSMR241 Requisition for Vibration Switches 22 22 27-Oct-10 25-Nov-10*

    Instrument SpecificationsInstrument Specifications 38 38 05-Sep-10 26-Oct-10

    DEINSSP400 Functional Design Specification for Buildings Fire Detection System 19 19 30-Sep-10 26-Oct-10*

    DEINSSP401 Functional Design Specification for CCTV 19 19 30-Sep-10 26-Oct-10*

    DEINSSP402 Functional Design Specification for ESD System 20 20 05-Sep-10 30-Sep-10*

    DEINSSP403 Functional Design Specification for Fire & gas System 20 20 05-Sep-10 30-Sep-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 5 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEINSSP404 Functional Design Specification for Flow Computer System 20 20 05-Sep-10 30-Sep-10*

    DEINSSP405 Functional Design Specification for Flow Metering Skid 20 20 05-Sep-10 30-Sep-10*

    DEINSSP406 Functional Design Specification for High-Sensitivity Smoke Detection System 20 20 05-Sep-10 30-Sep-10*

    DEINSSP407 Functional Design Specification for Pipeline Block Valve Stations PCS 19 19 30-Sep-10 26-Oct-10*

    DEINSSP408 Functional Design Specification for Pipeline Leak detection system 20 20 05-Sep-10 30-Sep-10*

    DEINSSP409 Functional Design Specification for Pipeline Leak Detection System 20 20 05-Sep-10 30-Sep-10*

    DEINSSP410 Functional Design Specification for Process Control System 20 20 05-Sep-10 30-Sep-10*

    Instrument DrawingsInstrument Drawings 43 43 29-Aug-10 26-Oct-10

    DEINSDW500 ESD Cause and Effects Matrix 20 20 29-Aug-10 23-Sep-10*

    DEINSDW501 F&G Cause and Effects Matrix 20 20 29-Aug-10 23-Sep-10*

    DEINSDW502 Layout Drawing of EPS AMS system 19 19 30-Sep-10 26-Oct-10*

    DEINSDW503 Layout Drawing of EPS Cable Routes 19 19 30-Sep-10 26-Oct-10*

    DEINSDW504 Layout Drawing of EPS CCR Equipment 19 19 30-Sep-10 26-Oct-10*

    DEINSDW505 Layout Drawing of EPS ESD Network 20 20 29-Aug-10 23-Sep-10*

    DEINSDW506 Layout Drawing of EPS F&G detectors 19 19 30-Sep-10 26-Oct-10*

    DEINSDW507 Layout Drawing of EPS FGS Matrix Panel 19 19 30-Sep-10 26-Oct-10*

    DEINSDW508 Layout Drawing of EPS FGS Network 20 20 29-Aug-10 23-Sep-10*

    DEINSDW509 Layout Drawing of EPS Fibre Optic Cables 19 19 30-Sep-10 26-Oct-10*

    DEINSDW510 Layout Drawing of EPS Instrument locations 19 19 30-Sep-10 26-Oct-10*

    DEINSDW511 Layout Drawing of EPS PCS Equipment Room 19 19 30-Sep-10 26-Oct-10*

    DEINSDW512 Layout Drawing of EPS PCS Network 19 19 07-Sep-10 03-Oct-10*

    DEINSDW513 Layout Drawing of EPS PCS Remote Equipment Rooms 19 19 30-Sep-10 26-Oct-10*

    DEINSDW514 Layout Drawing of MCC IRP panels 19 19 30-Sep-10 26-Oct-10*

    DEINSDW515 Layout Drawing of Water Intake Station Cable Routes 19 19 30-Sep-10 26-Oct-10*

    DEINSDW516 Layout Drawing of Water Intake Station Equipment Room 19 19 30-Sep-10 26-Oct-10*

    DEINSDW517 Layout Drawing of Water Intake Station ESD Network 19 19 30-Sep-10 26-Oct-10*

    DEINSDW518 Layout Drawing of Water Intake Station F&G detectors 19 19 30-Sep-10 26-Oct-10*

    DEINSDW519 Layout Drawing of Water Intake Station FGS Network 19 19 30-Sep-10 26-Oct-10*

    DEINSDW520 Layout Drawing of Water Intake Station Fibre Optic Cables 19 19 30-Sep-10 26-Oct-10*

    DEINSDW521 Layout Drawing of Water Intake Station Instrument locations 19 19 30-Sep-10 26-Oct-10*

    DEINSDW522 Layout Drawing of Water Intake Station PCS Network 19 19 30-Sep-10 26-Oct-10*

    DEINSDW523 Layout Drawing of WellSites Cable Routes 19 19 30-Sep-10 26-Oct-10*

    DEINSDW524 Layout Drawing of WellSites Equipment Room 19 19 30-Sep-10 26-Oct-10*

    DEINSDW525 Layout Drawing of WellSites ESD Network 19 19 30-Sep-10 26-Oct-10*

    DEINSDW526 Layout Drawing of WellSites F&G detectors 19 19 30-Sep-10 26-Oct-10*

    DEINSDW527 Layout Drawing of WellSites FGS Network 19 19 30-Sep-10 26-Oct-10*

    DEINSDW528 Layout Drawing of WellSites Fibre Optic Cables 19 19 30-Sep-10 26-Oct-10*

    DEINSDW529 Layout Drawing of WellSites Instrument locations 19 19 30-Sep-10 26-Oct-10*

    DEINSDW530 Layout Drawing of WellSites PCS Network 19 19 30-Sep-10 26-Oct-10*

    DEINSDW531 Loop Drawings for Block Valve Stations IO Field Devices 19 19 30-Sep-10 26-Oct-10*

    DEINSDW532 Loop Drawings for EPS ESD IO Field Devices 19 19 07-Sep-10 03-Oct-10*

    DEINSDW533 Loop Drawings for EPS FGS IO Field Devices 19 19 14-Sep-10 10-Oct-10*

    DEINSDW534 Loop Drawings for EPS PCS IO Field Devices 19 19 14-Sep-10 10-Oct-10*

    DEINSDW545 Standard Drawings for Control Valve Hookup 19 19 14-Sep-10 10-Oct-10*

    DEINSDW547 Standard Drawings for Flow Transx (DP) Hookup 19 19 14-Sep-10 10-Oct-10*

    DEINSDW549 Standard Drawings for Instrument Air Hookup 19 19 14-Sep-10 10-Oct-10*

    DEINSDW550 Standard Drawings for Instrument Mountings 19 19 14-Sep-10 10-Oct-10*

    DEINSDW551 Standard Drawings for Junction Box Mounting 19 19 14-Sep-10 10-Oct-10*

    DEINSDW552 Standard Drawings for Level Transx (DP) Hookup 19 19 14-Sep-10 10-Oct-10*

    DEINSDW553 Standard Drawings for MOV Hookup 19 19 14-Sep-10 10-Oct-10*

    DEINSDW555 Standard Drawings for Orifice Plates 19 19 14-Sep-10 10-Oct-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 6 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEINSDW557 Standard Drawings for Pressure Switch Hookups 19 19 14-Sep-10 10-Oct-10*

    DEINSDW558 Standard Drawings for Pressure Trx Hookups 19 19 21-Sep-10 17-Oct-10*

    DEINSDW559 Standard Drawings for Shut Down Valve Hookup 19 19 21-Sep-10 17-Oct-10*

    DEINSDW560 Standard Drawings for Thermowell 19 19 21-Sep-10 17-Oct-10*

    DEINSDW561 Standard Drawings for Thermowell Installations 19 19 21-Sep-10 17-Oct-10*

    ListList 41 41 30-Sep-10 25-Nov-10

    DEINSLS707 EPS ESD Control System IO Allocations 19 19 30-Sep-10 26-Oct-10*

    DEINSLS708 EPS FGS Control System IO Allocations 19 19 30-Sep-10 26-Oct-10*

    DEINSLS709 EPS Instrument drawing list 19 19 01-Nov-10 25-Nov-10*

    DEINSLS710 EPS Instrument Index 19 19 01-Nov-10 25-Nov-10*

    DEINSLS711 EPS MTO List 19 19 01-Nov-10 25-Nov-10*

    DEINSLS712 EPS PCS Control System IO Allocations 19 19 07-Oct-10 02-Nov-10*

    DEINSLS713 EPS Preliminary MTO List 19 19 07-Oct-10 02-Nov-10*

    Technical NoteTechnical Note 12 12 30-Sep-10 17-Oct-10

    DEINSTN800 Technical Note for DCS Configuration Standard 12 12 30-Sep-10 17-Oct-10*

    DEINSTN801 Technical Note for DCS HMI Standard 12 12 30-Sep-10 17-Oct-10*

    DEINSTN802 Technical Note for DCS HMI Layout 12 12 30-Sep-10 17-Oct-10*

    DEINSTN804 Technical Note for Interface Requirement to Oil Heaters UCP 12 12 30-Sep-10 17-Oct-10*

    DEINSTN806 Technical Note for Interface Requirements to Local Panels 12 12 30-Sep-10 17-Oct-10*

    DEINSTN807 Technical Note for Interface Requirements to Pipe Line Leak Detection 12 12 30-Sep-10 17-Oct-10*

    DEINSTN808 Technical Note for Interface Requirements to Flow Computers 12 12 30-Sep-10 17-Oct-10*

    DEINSTN812 Technical Note for Interface Requirements to PCS by 3rd Party 12 12 30-Sep-10 17-Oct-10*

    DEINSTN813 Technical Note for Instrumentation Requirements for Package Equipment 12 12 30-Sep-10 17-Oct-10*

    CalculationsCalculations 13 13 14-Sep-10 30-Sep-10

    DEINSCA900 Thermowell Wake & Stress Calc 13 13 14-Sep-10 30-Sep-10*

    DEINSCA901 Level Setting diagrams 13 13 14-Sep-10 30-Sep-10*

    DEINSCA902 SIL testing time calcs 13 13 14-Sep-10 30-Sep-10*

    DEINSCA903 SIL Calculation Report 13 13 14-Sep-10 30-Sep-10*

    DEINSCA904 Orifice Plate Calculations 13 13 14-Sep-10 30-Sep-10*

    DEINSCA905 Choke Valve Sizing Calculations 13 13 14-Sep-10 30-Sep-10*

    DEINSCA906 Flow Meter Sizing 13 13 14-Sep-10 30-Sep-10*

    DEINSCA907 Control Valve Sizing 13 13 14-Sep-10 30-Sep-10*

    DEINSCA908 Intrinsically Safe Integrity Calculations 13 13 14-Sep-10 30-Sep-10*

    MECHANICALMECHANICAL 88 60 15-Aug-10 04-Nov-10

    Datasheets - Heat ExchangersDatasheets - Heat Exchangers 65 38 15-Aug-10 05-Oct-10

    DEMDS0001 Mechanical Datasheet for Train 1 & 2 Crude/Crude Heat Exchanger 1E-10... 65 22 15-Aug-10 13-Sep-10*

    DEMDS0002 Mechanical Datasheet for Train 1 & 2 Crude Rundown Air Cooler 1E-1415 ... 65 22 15-Aug-10 13-Sep-10*

    DEMDS0003 Mechanical Datasheet for Train 1 & 2 Wash Water Heater 1E-5110 & 2E-5... 65 22 15-Aug-10 13-Sep-10*

    DEMMR0200 Requisition Crude / Crude Heat Exchangers 16 16 14-Sep-10 05-Oct-10*

    DEMMR0201 Requisition Air Cooler 16 16 14-Sep-10 05-Oct-10*

    DEMMR0202 Requisition Wash Water Heater 16 16 14-Sep-10 05-Oct-10*

    Datasheets - HeatersDatasheets - Heaters 65 38 15-Aug-10 05-Oct-10

    DEMDS0030 Mechanical Datasheet for Train 1 & 2 Crude Heater 1F-1010 & 2F-1010 65 22 15-Aug-10 13-Sep-10*

    DEMDS0031 Mechanical Datasheet for Fuel Gas Scrubber 65 22 15-Aug-10 13-Sep-10*

    DEMMR0203 Requisition Crude Heater 16 16 14-Sep-10 05-Oct-10*

    DEMMR0204 Requisition Fuel Gas Scrubber 16 16 14-Sep-10 05-Oct-10*

    Datasheets - PumpsDatasheets - Pumps 83 38 15-Aug-10 05-Oct-10

    DEMDS0050 Mechanical Datasheet for Crude Oil Booster Pumps P-1300 A/S 60 22 15-Aug-10 13-Sep-10*

    DEMDS0051 Mechanical Datasheet for Crude Oil Export Pumps P-1310 A/S 60 22 15-Aug-10 13-Sep-10*

    DEMDS0052 Mechanical Datasheet for Offspec Crude Oil Transfer Pumps P-1320 A/S 60 22 15-Aug-10 13-Sep-10*

    DEMDS0053 Mechanical Datasheet for Water Intake Pump (Diesel) P-4000 83 33 15-Aug-10 28-Sep-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 7 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEMDS0054 Mechanical Datasheet for Water Intake Pump (Electric) P-4010 83 33 15-Aug-10 28-Sep-10*

    DEMDS0055 Mechanical Datasheet for Water Transfer Pumps P-4020 A/S 83 33 15-Aug-10 28-Sep-10*

    DEMDS0056 Mechanical Datasheet for Produced Water Transfer Pumps P-4200 A/S 83 33 15-Aug-10 28-Sep-10*

    DEMDS0057 Mechanical Datasheet for Produced Water Eductor Pumps P-4210-A/S 83 33 15-Aug-10 28-Sep-10*

    DEMDS0058 Mechanical Datasheet for Service Water Distribution Pumps P-5100 A/S 83 33 15-Aug-10 28-Sep-10*

    DEMDS0059 Mechanical Datasheet for Potable Water Distribution Pumps P-5200 A/S 83 33 15-Aug-10 28-Sep-10*

    DEMDS0060 Mechanical Datasheet for Fire Water Pump (Diesel) P-5300 60 22 15-Aug-10 13-Sep-10*

    DEMDS0061 Mechanical Datasheet for Fire Water Pump (Diesel) P-5310 60 22 15-Aug-10 13-Sep-10*

    DEMDS0062 Mechanical Datasheet for Fire Water Jocky Pumps P-5320 A/S 83 33 15-Aug-10 28-Sep-10*

    DEMDS0063 Mechanical Datasheet for LP Flare KO Drum Pumps P-6200 A/S 83 33 15-Aug-10 28-Sep-10*

    DEMDS0064 Mechanical Datasheet for ATM Flare KO Drum Pumps P-6210 A/S 83 33 15-Aug-10 28-Sep-10*

    DEMDS0066 Mechanical Datasheet for Diesel Transfer Pumps P-6710 A/B 83 33 15-Aug-10 28-Sep-10*

    DEMDS0067 Mechanical Datasheet for Train 1 & 2 Charge Pumps 1P-1010 A/S & 2P-1... 60 22 15-Aug-10 13-Sep-10*

    DEMDS0068 Mechanical Datasheet for Train 1 & 2 Wash Water Recirculation Pumps 1... 60 22 15-Aug-10 13-Sep-10*

    DEMDS0069 Mechanical Datasheet for Well Cluster 1 & 2 Corrosion Inhibitor Injection P... 83 33 15-Aug-10 28-Sep-10*

    DEMMR0205 Requistion Pumps-1 16 16 14-Sep-10 05-Oct-10*

    DEMMR0206 Requistion Pumps-2 4 4 29-Sep-10 04-Oct-10*

    Datasheets - Filters/StrainersDatasheets - Filters/Strainers 83 60 15-Aug-10 04-Nov-10

    DEMDS0090 Mechanical Datasheet for Diesel Strainer S-6700 A/S 83 45 15-Aug-10 14-Oct-10*

    DEMDS0091 Mechanical Datasheet for Water Intake Filter Unit SQ-4000 83 45 15-Aug-10 14-Oct-10*

    DEMMR0207 Requisition Filters / strainers 16 15 17-Oct-10 04-Nov-10*

    Datasheets - TanksDatasheets - Tanks 78 60 15-Aug-10 04-Nov-10

    DEMDS0110 Mechanical Datasheet for Crude Oil Storage Tank 1 & 2 T-1400 A/B 65 22 15-Aug-10 13-Sep-10*

    DEMDS0112 Mechanical Datasheet for Crude Oil Off Spec Tank T-1420 65 22 15-Aug-10 13-Sep-10*

    DEMDS0113 Mechanical Datasheet for Produced Water Buffer Tank T-4200 55 22 15-Aug-10 13-Sep-10*

    DEMDS0114 Mechanical Datasheet for Service Water Tank T-5100 78 45 15-Aug-10 14-Oct-10*

    DEMDS0115 Mechanical Datasheet for Potable Water Storage Tank T-5210 78 45 15-Aug-10 14-Oct-10*

    DEMDS0116 Mechanical Datasheet for Fire Water Storage Tank T-5300 55 22 15-Aug-10 13-Sep-10*

    DEMDS0117 Mechanical Datasheet for Diesel Storage Tank T-6700 55 22 15-Aug-10 13-Sep-10*

    DEMDS0118 Mechanical Datasheet for Well Cluster 1 Corrosion Inhibitor Storage Tank ... 78 45 15-Aug-10 14-Oct-10*

    DEMMR0208 Requistion Tanks -1 16 16 14-Sep-10 05-Oct-10*

    DEMMR0209 Requistion Tanks-2 16 15 17-Oct-10 04-Nov-10*

    Drawings - TanksDrawings - Tanks 16 16 30-Sep-10 21-Oct-10

    DEMCA0008 Calculation API650 16 16 30-Sep-10 21-Oct-10*

    DEMDW0001 General arrangements 16 16 30-Sep-10 21-Oct-10*

    DEMDW0002 Roof Structure 16 16 30-Sep-10 21-Oct-10*

    DEMDW0003 Roof Plates 16 16 30-Sep-10 21-Oct-10*

    DEMDW0004 Bottom Plates 16 16 30-Sep-10 21-Oct-10*

    DEMDW0005 Shell Plates 16 16 30-Sep-10 21-Oct-10*

    DEMDW0006 Ladder and Railings 16 16 30-Sep-10 21-Oct-10*

    DEMDW0007 Anchor Bolts 16 16 30-Sep-10 21-Oct-10*

    Datasheets - VesselsDatasheets - Vessels 88 50 15-Aug-10 21-Oct-10

    DEMDS0140 Mechanical Datasheet for Gathering Station 1 Test Separator V-1000 70 22 15-Aug-10 13-Sep-10*

    DEMDS0141 Mechanical Datasheet for Crude Oil Storage Tank 1 & 2 Degassing Boots ... 50 22 15-Aug-10 13-Sep-10*

    DEMDS0142 Mechanical Datasheet for Crude Oil Off Spec Tank Degassing Boot V-1420 50 22 15-Aug-10 13-Sep-10*

    DEMDS0143 Mechanical Datasheet for Corrugated Plate Interceptor V-4200 50 22 15-Aug-10 13-Sep-10*

    DEMDS0144 Mechanical Datasheet for Induced Gas Flotation Vessel V-4210 50 22 15-Aug-10 13-Sep-10*

    DEMDS0145 Mechanical Datasheet for Fuel Gas KO Drum V-6000 50 22 15-Aug-10 13-Sep-10*

    DEMDS0146 Mechanical Datasheet for LP Flare KO Drum V-6200 50 22 15-Aug-10 13-Sep-10*

    DEMDS0147 Mechanical Datasheet for ATM Flare KO Drum V-6210 50 22 15-Aug-10 13-Sep-10*

    DEMDS0148 Mechanical Datasheet for Closed Drain Drum V-6400 50 22 15-Aug-10 13-Sep-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 8 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEMDS0149 Mechanical Datasheet for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-... 70 22 15-Aug-10 13-Sep-10*

    DEMDS0150 Mechanical Datasheet for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V... 70 22 15-Aug-10 13-Sep-10*

    DEMDS0151 Mechanical Datasheet for Train 1 & 2 Fuel Gas Scrubers 1V-1030 & 2V-1030 50 22 15-Aug-10 13-Sep-10*

    DEMDS0152 Mechanical Datasheet for Train 1 & 2 Dehydrators 1V-1510 & 2V-1510 70 22 15-Aug-10 13-Sep-10*

    DEMDS0153 Mechanical Datasheet for Train 1 & 2 Desalters 1V-1520 & 2V-1520 70 22 15-Aug-10 13-Sep-10*

    DEMDS0160 Mechanical Datasheet for Emergency Diesel Generator 68 45 15-Aug-10 14-Oct-10*

    DEMLS0001 Mechanical Equipment List 75 22 15-Aug-10 13-Sep-10*

    DEMMR0210 Requistion Vessels 16 16 14-Sep-10 05-Oct-10*

    DEMMR0211 Requistion Emergency Diesel Generator 15 15 26-Sep-10 14-Oct-10*

    DEMMR0212 Requsition Chemical Injection skids 16 16 30-Sep-10 21-Oct-10*

    DEMRE0001 Material Selection Report 65 22 15-Aug-10 13-Sep-10*

    DEMSP0001 Mechanical Specification for Daearator Package 75 22 15-Aug-10 13-Sep-10*

    DEMSP0002 General Specification for Unfired Pressure Vessels (Static) 65 22 15-Aug-10 13-Sep-10*

    DEMSP0003 General Mechanical Specification for Centrifugal Pumps (Rotating) 65 22 15-Aug-10 13-Sep-10*

    DEMSP0004 Specification for Packaged Skidded Equipment (Static & Rotating) 65 22 15-Aug-10 13-Sep-10*

    DEMSP0006 General Specification for Air Coolers (Rotating) 88 45 15-Aug-10 14-Oct-10*

    DEMSP0007 Specification for Piping and Valve Materials (Static) 65 22 15-Aug-10 13-Sep-10*

    DEMSP0008 Specification for Piping Design (Static) 65 22 15-Aug-10 13-Sep-10*

    DEMSP0009 Specification for Piping Fabrication and Installation (Static) 88 45 15-Aug-10 14-Oct-10*

    DEMSP0010 Specification for Piping Testing and Completion (Static) 88 45 15-Aug-10 14-Oct-10*

    DEMSP0011 Specification for Shell & Tube Heat Exchanger (Previously Spec for HVAC) 65 22 15-Aug-10 13-Sep-10*

    DEMSP0013 Specification for Emergency Diesel Generator 78 45 15-Aug-10 14-Oct-10*

    DEMSP0014 Specification for Instrument Air Compressor Package 72 45 15-Aug-10 14-Oct-10*

    DEMSP0015 Specification for Potable Water Membrane Package 70 45 15-Aug-10 14-Oct-10*

    DEMSP0016 Specifiation for Allowable Loads at Equipment Nozzles & Flanged 47 22 15-Aug-10 13-Sep-10*

    DEMSP0017 Flare Ignition System 16 16 30-Sep-10 21-Oct-10*

    PIPELINEPIPELINE 129 129 15-Aug-10 09-Feb-11

    DEPLDW0002 Key Plan - Export Pipeline Option 1 (KP0-AHDEB Tie-In Point) 65 22 15-Aug-10 13-Sep-10*

    DEPLDW0003 Overall Gathering Line & Export Pipeline System 60 22 15-Aug-10 13-Sep-10*

    DEPLDW0015 Route Map - Option 1 KP 00 -05 65 22 15-Aug-10 13-Sep-10*

    DEPLDW0016 Route Map - Option 1 KP 05 - AHDEB Tie-In Point 65 22 15-Aug-10 13-Sep-10*

    DEPLDW0018 Typical Trench & Backfilling Details - Open Cut 65 22 15-Aug-10 13-Sep-10*

    DEPLDW0019 Typical Waterway/Creek Crossing Details - Open Cut 65 22 15-Aug-10 13-Sep-10*

    DEPLDW0020 Typical Road Crossing Details - Open Cut 65 22 15-Aug-10 13-Sep-10*

    DEPLDW0021 Typical Road Crossing Details - Bored 65 22 15-Aug-10 13-Sep-10*

    DEPLDW0022 Typical Crossing Details - Horizontal Directional Drilling (HDD) 65 22 15-Aug-10 13-Sep-10*

    DEPLDW0023 Typical Block Valve Station 60 22 15-Aug-10 13-Sep-10*

    DEPLDW0024 Crossing Location Plan 60 22 15-Aug-10 13-Sep-10*

    DEPLDW0025 Pipeline Route Option Layout 54 22 15-Aug-10 13-Sep-10*

    DEPLDW0026 Alignment Sheets 39 39 31-Aug-10 24-Oct-10*

    CalculationsCalculations 60 22 15-Aug-10 13-Sep-10

    DEPLCA0001 Wall Thickness Calculation 60 22 15-Aug-10 13-Sep-10*

    DEPLCA0002 Pipeline Sizing Calculation 60 22 15-Aug-10 13-Sep-10*

    DEPLCA0003 Calculation for Pipeline Stress Analysis 60 22 15-Aug-10 13-Sep-10*

    ListsLists 75 22 15-Aug-10 13-Sep-10

    DEPLLS0001 Pipeline Drawing Index 75 22 15-Aug-10 13-Sep-10*

    DEPLLS0002 Pipeline Materials Take-off including Major Long Lead Items 60 22 15-Aug-10 13-Sep-10*

    ReportsReports 88 45 15-Aug-10 14-Oct-10

    DEPLRE0002 Pipeline Internal/External Corrosion Mitigation Philosophy 88 45 15-Aug-10 14-Oct-10*

    DEPLRE0003 Cathodic Protection Design Philosopy 88 45 15-Aug-10 14-Oct-10*

    DEPLRE0004 Site Investigation Plan - Pipeline 88 45 15-Aug-10 14-Oct-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 9 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEPLRE0005 Route Definition Report 71 45 15-Aug-10 14-Oct-10*

    Scope of WorkScope of Work 66 45 15-Aug-10 14-Oct-10

    DEPLRE0001 Pipeline Construction Scope of Work 66 45 15-Aug-10 14-Oct-10*

    SpecificationsSpecifications 99 55 15-Aug-10 28-Oct-10

    DEPLSP0002 1) Specification for Line Pipe 77 45 15-Aug-10 14-Oct-10*

    DEPLSP0003 2) Specifications for External Coating of Line Pipe 77 45 15-Aug-10 14-Oct-10*

    DEPLSP0004 3) Specifications for Hot Induction Bends 77 45 15-Aug-10 14-Oct-10*

    DEPLSP0005 4) Specifications for Pig Launchers / Receivers 77 45 15-Aug-10 14-Oct-10*

    DEPLSP0006 5) Specifications for Fiber Optic Cable & Installation 77 45 15-Aug-10 14-Oct-10*

    DEPLSP0007 6) Specifications for Barred Tees 77 45 15-Aug-10 14-Oct-10*

    DEPLSP0008 7) Specifications for Insulating Joints 77 45 15-Aug-10 14-Oct-10*

    DEPLSP0009 8) Specifications for Anchor Flanges 88 55 15-Aug-10 28-Oct-10*

    DEPLSP0010 9) Specifications for Fittings and Flanges 88 55 15-Aug-10 28-Oct-10*

    DEPLSP0011 10) Specification for Onshore Pipeline Construction 88 55 15-Aug-10 28-Oct-10*

    DEPLSP0012 11) Specification for Field Joint Coating 88 55 15-Aug-10 28-Oct-10*

    DEPLSP0013 12) Specification for Coating of Bends & Fittings 88 55 15-Aug-10 28-Oct-10*

    DEPLSP0014 13) Specification for Pipeline welding 88 55 15-Aug-10 28-Oct-10*

    DEPLSP0016 15) Specification for Topographic Survey Works 99 55 15-Aug-10 28-Oct-10*

    DEPLSP0017 16) Specification for Geotechnical Survey 99 55 15-Aug-10 28-Oct-10*

    DEPLSP0018 17) Specification for Leak Monitoring System 94 55 15-Aug-10 28-Oct-10*

    DatasheetsDatasheets 94 55 15-Aug-10 28-Oct-10

    DEPLDS0001 1) Data Sheet for Line Pipe & Coating 94 55 15-Aug-10 28-Oct-10*

    DEPLDS0002 2) Datasheet for Hot Induction bends 94 55 15-Aug-10 28-Oct-10*

    DEPLDS0003 3) Data Sheet for Pig Launchers / Receivers 94 55 15-Aug-10 28-Oct-10*

    DEPLDS0004 4) Data Sheet for Barred Tees 94 55 15-Aug-10 28-Oct-10*

    DEPLDS0005 5) Data Sheet for Insulating Joints 94 55 15-Aug-10 28-Oct-10*

    DEPLDS0006 6) Data Sheet for Anchor Flanges (Preliminary) 94 55 15-Aug-10 28-Oct-10*

    P&ID(IPC)P&ID(IPC) 89 89 15-Aug-10 15-Dec-10

    DEPLDW1000 Overall Pipeline System P&ID 72 72 15-Aug-10 22-Nov-10*

    DEPLDW1001 Pipeline P&ID 72 72 15-Aug-10 22-Nov-10*

    DEPLDW1002 BV P&ID for BV1 72 72 05-Sep-10 13-Dec-10*

    DEPLDW1003 BV P&ID for BV2 72 72 07-Sep-10 15-Dec-10*

    CalculationCalculation 110 110 15-Aug-10 13-Jan-11

    DEPLCA1004 Stress Analysis Calculation for HDD Crossing 92 92 15-Aug-10 20-Dec-10*

    DEPLCA1005 Stress Analysis Calculation for Road Crossing 92 92 05-Sep-10 10-Jan-11*

    DEPLCA1006 Anchor Flange Calculation 92 92 15-Aug-10 20-Dec-10*

    DEPLCA1007 Pipeline Load Case Analysis Calculation 92 92 06-Sep-10 11-Jan-11*

    DEPLCA1008 Concrete Coating Thickness Calculation 92 92 06-Sep-10 11-Jan-11*

    DEPLCA1009 Buoyancy Control Calculation 92 92 15-Aug-10 20-Dec-10*

    DEPLCA1010 Set-on Weight Spacing Calculation 92 92 06-Sep-10 11-Jan-11*

    DEPLCA1011 Screw Anchor Spacing Calculation 92 92 08-Sep-10 13-Jan-11*

    DEPLCA1012 Control Valve Sizing Calculation 92 92 15-Aug-10 20-Dec-10*

    DEPLCA1013 PSV Sizing Calculation 92 92 06-Sep-10 11-Jan-11*

    DEPLCA1014 Pipeline Transient Analysis (Hydraulic Detail Study) 92 92 15-Aug-10 20-Dec-10*

    DEPLCA1015 Cathodic Protection Calculation 92 92 15-Aug-10 20-Dec-10*

    Data SheetData Sheet 112 112 15-Aug-10 17-Jan-11

    DEPLDS1016 Data Sheet for Control Valve 92 92 12-Sep-10 17-Jan-11*

    DEPLDS1017 Data Sheet for Pig Detector 92 92 15-Aug-10 20-Dec-10*

    DEPLDS1018 Data Sheet for On-Off Valve (Motor Actuator) 92 92 15-Aug-10 20-Dec-10*

    DEPLDS1019 Data Sheet for On-Off Valve (G/H Actuator) 92 92 15-Aug-10 20-Dec-10*

    DEPLDS1020 Data Sheet for Pig Signaller 92 92 15-Aug-10 20-Dec-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 10 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEPLDS1021 Data Sheet for Heat Shrink Sleeves 92 92 06-Sep-10 11-Jan-11*

    DEPLDS1022 Data Sheet for Pressure Transmitter 16" Pipeline Pig Launcher at Garraf F... 92 92 06-Sep-10 11-Jan-11*

    DEPLDS1023 Data Sheet for Pressure Transmitter 16" Pipeline Pig Receiver at Ahdab Ti... 92 92 06-Sep-10 11-Jan-11*

    DEPLDS1024 Data Sheet for Pressure Gauge at Block valve stations 92 92 06-Sep-10 11-Jan-11*

    DEPLDS1025 Data Sheet for Pressure Transmitter at BVS-1 92 92 09-Sep-10 16-Jan-11*

    DEPLDS1026 Data Sheet for Pressure Transmitter at BVS-2 92 92 09-Sep-10 16-Jan-11*

    DEPLDS1027 Data Sheet for Pressure Gauge Pipeline Pig Launcher at Garraf FCP 5 5 15-Aug-10 19-Aug-10*

    DEPLDS1028 Data Sheet for Pressure Gauge Pipeline Pig Receiver at Ahdab Tie-in 5 5 15-Aug-10 19-Aug-10*

    DrawingDrawing 125 125 15-Aug-10 03-Feb-11

    Alignment SheetAlignment Sheet 125 125 15-Aug-10 03-Feb-11

    DEPLDS1029 Stanadard Symbols and Abbreviations on Alignment Sheets 108 108 15-Aug-10 11-Jan-11*

    DEPLDS1030 Alignment Sheet Key Plan 108 108 15-Aug-10 11-Jan-11*

    DEPLDS1031 Alignment Sheets - KP 0 + 000 - KP 1 + 400 108 108 02-Sep-10 31-Jan-11*

    DEPLDS1032 Alignment Sheets - KP 1 + 400 - KP 2 + 800 108 108 02-Sep-10 31-Jan-11*

    DEPLDS1033 Alignment Sheets - KP 2 + 800 - KP 4 + 200 108 108 05-Sep-10 01-Feb-11*

    DEPLDS1034 Alignment Sheets - KP 4 + 200 - KP 5 + 600 108 108 05-Sep-10 01-Feb-11*

    DEPLDS1035 Alignment Sheets - KP 5 + 600 - KP 7 + 000 108 108 06-Sep-10 02-Feb-11*

    DEPLDS1036 Alignment Sheets - KP 7 + 000 - KP 8 + 400 108 108 06-Sep-10 02-Feb-11*

    DEPLDS1037 Alignment Sheets - KP 8 + 400 - KP 9 + 800 108 108 07-Sep-10 03-Feb-11*

    DEPLDS1038 Alignment Sheets - KP 9 + 800 - KP 10 + 500 (Ahdab Tie-in) 108 108 07-Sep-10 03-Feb-11*

    Crossing DrawingCrossing Drawing 105 105 15-Aug-10 06-Jan-11

    DEPLDW1039 Road (Bored) KP 4+802 81 81 14-Sep-10 04-Jan-11*

    DEPLDW1040 Garraf River (HDD) KP 8+547 81 81 16-Sep-10 06-Jan-11*

    DEPLDW1041 Highway 7 (Bored) KP 9+141 81 81 15-Aug-10 05-Dec-10*

    Typical DrawingTypical Drawing 120 120 15-Aug-10 27-Jan-11

    DEPLDW1042 Typical for Power Transmission Lines 91 91 15-Aug-10 19-Dec-10*

    DEPLDW1043 Typical for Concrete Slab 91 91 15-Aug-10 19-Dec-10*

    DEPLDW1044 Typical for Construction Site Preparation for Bored crossing 91 91 15-Aug-10 19-Dec-10*

    DEPLDW1045 Typical for Construction Site Preparation for Horizontal Directional Drilling (... 91 91 06-Sep-10 10-Jan-11*

    DEPLDW1046 Typical Installation of FOC Manhole 91 91 06-Sep-10 10-Jan-11*

    DEPLDW1047 Typical Set-on Weight 91 91 06-Sep-10 10-Jan-11*

    DEPLDW1048 Typical Pipeline Warning Tape 91 91 09-Sep-10 13-Jan-11*

    DEPLDW1049 Typical Warning Sign for FOC Manhole 91 91 09-Sep-10 13-Jan-11*

    DEPLDW1050 Typical for Hot Bend General Arrangement Drawing 91 91 09-Sep-10 13-Jan-11*

    DEPLDW1051 Typical for Pipeline Marker 91 91 14-Sep-10 18-Jan-11*

    DEPLDW1052 TTypical for Aerial Marker 91 91 20-Sep-10 24-Jan-11*

    DEPLDW1053 Typical for Cable trench/routing and inst. Location layout at Pig stations 91 91 20-Sep-10 24-Jan-11*

    DEPLDW1054 Typical for Cable trench/routing and inst. Location layout at block valve stat... 91 91 23-Sep-10 27-Jan-11*

    Block Valve StationBlock Valve Station 129 129 15-Aug-10 09-Feb-11

    Block Valve Station 1Block Valve Station 1 129 129 15-Aug-10 09-Feb-11

    DEPLDW1055 Piping Arrangement Drawing 106 106 15-Aug-10 09-Jan-11*

    DEPLDW1056 Piping Isometric Drawing 106 106 05-Sep-10 30-Jan-11*

    DEPLDW1057 Plot Plan, Access Road and Section 106 106 07-Sep-10 01-Feb-11*

    DEPLDW1058 Cross section and Details 106 106 09-Sep-10 03-Feb-11*

    DEPLDW1059 Block Valve Station Foundation Plan reinfocement and details 106 106 13-Sep-10 07-Feb-11*

    DEPLDW1060 Typical Pipe Support 106 106 15-Sep-10 09-Feb-11*

    DEPLDW1061 Details of Security fence 5 5 15-Aug-10 19-Aug-10*

    DEPLDW1062 Details of Security gate and safety barrier 5 5 15-Aug-10 19-Aug-10*

    DEPLDW1063 Details of Stair and Handrail 5 5 15-Aug-10 19-Aug-10*

    Block Valve Station 2Block Valve Station 2 129 129 15-Aug-10 09-Feb-11

    DEPLDW1064 Piping Arrangement Drawing 106 106 15-Aug-10 09-Jan-11*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 11 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEPLDW1065 Piping Isometric Drawing 106 106 05-Sep-10 30-Jan-11*

    DEPLDW1066 Plot Plan, Access Road and Section 106 106 07-Sep-10 01-Feb-11*

    DEPLDW1067 Cross section and Details 106 106 09-Sep-10 03-Feb-11*

    DEPLDW1068 Block Valve Station Foundation Plan reinfocement and details 106 106 13-Sep-10 07-Feb-11*

    DEPLDW1069 Typical Pipe Support 106 106 15-Sep-10 09-Feb-11*

    DEPLDW1070 Details of Security fence 5 5 15-Aug-10 19-Aug-10*

    DEPLDW1071 Details of Security gate and safety barrier 5 5 15-Aug-10 19-Aug-10*

    DEPLDW1072 Details of Stair and Handrail 5 5 15-Aug-10 19-Aug-10*

    List&ReportList&Report 92 92 15-Aug-10 20-Dec-10

    DEPLDW1073 Detailed Pipeline Material Take-Off 92 92 15-Aug-10 20-Dec-10*

    SpecificationSpecification 108 108 15-Aug-10 11-Jan-11

    DEPLSP1074 Specification for Pipe Class Summary and Piping Classes 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1075 Specification for Mechanical Completion and Commissioning 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1076 Specification for Requirement of Spares 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1077 Specification for Site Preparation 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1078 Specification for Above Ground Painting 92 92 06-Sep-10 11-Jan-11*

    DEPLSP1079 Specification for Under Ground Painting 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1080 Specification for Blasting 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1081 Specification for Horizontal Directional Drilled Crossings 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1082 Specification for Pipe Boring/Pipe Jack Construction 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1083 Specification for Linepipe 3LPE Coating Repair 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1084 Specification for Welding Pipe for Stations 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1085 Specification for Reinforced Concrete Pipe 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1086 Specification for Supply and Installation of Fencing and Gates 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1087 Specification for Pig Detector 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1088 Specification for Pipeline Ball Valves (API 6D) 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1089 Specification for Pipeline Plug Valve 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1090 Specification for Pipeline Check Valves (Full Bore) 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1091 Specification for Pig Signaller 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1092 Specification for pre-commissioning of Onshore Pipeline 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1093 Specification for pre-commissioning of Block Valve Station 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1094 Specification for Block Valve Station Construction 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1095 Specification for Radiographic Test 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1096 Specification for Magnetic Particle Test 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1097 Specification for Liquid Penetrate Test 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1098 Specification for Ultrasonic Test 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1099 Specification for Buoyancy Control 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1100 Specification for Continued Concrete Coating 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1101 Specification for Set on Weight 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1102 Specification for Reinforced Concrete Structure 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1103 Specification for Pipe Haulage, Storage and Stockpiling 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1104 Specification for Solar Panel 92 92 15-Aug-10 20-Dec-10*

    DEPLSP1105 Specification for Pipeline Baseline Survey 92 92 15-Aug-10 20-Dec-10*

    Cathodic ProtectionCathodic Protection 127 127 15-Aug-10 07-Feb-11

    DEPLDW1106 Typical Power Source Unit Installation Details 106 106 15-Aug-10 09-Jan-11*

    DEPLDW1107 Typical Power Source Unit Schematic 106 106 15-Aug-10 09-Jan-11*

    DEPLDW1108 Typical Power Source Unit Remote Monitoring Schematic 106 106 05-Sep-10 30-Jan-11*

    DEPLDW1109 Typical Ground Bed Construction Detail 106 106 05-Sep-10 30-Jan-11*

    DEPLDW1110 Typical Exothermic Welding Details 106 106 07-Sep-10 01-Feb-11*

    DEPLDW1111 Typical Test Post Fabrication and Construction Details 106 106 07-Sep-10 01-Feb-11*

    DEPLDW1112 Typical Test Post Installation Details 106 106 09-Sep-10 03-Feb-11*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 12 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEPLDW1113 Typical Zinc Ribbon Installation Details 106 106 09-Sep-10 03-Feb-11*

    DEPLDW1114 AC & DC Mitigation System Overall Schematic 106 106 13-Sep-10 07-Feb-11*

    DEPLDW1115 Layout/location plan of CP network 106 106 13-Sep-10 07-Feb-11*

    DEPLDW1116 Temporary Sacrificial Anodes (where required) 5 5 15-Aug-10 19-Aug-10*

    DEPLDW1117 Typical AC/DC Mitigation Installation Detail (As required) 5 5 15-Aug-10 19-Aug-10*

    DEPLDW1118 Typical Foreign Pipeline Crossing Installation Detail (Where required) 5 5 15-Aug-10 19-Aug-10*

    DEPLDW1119 Typical Isolating Flange/Joint Detail 5 5 15-Aug-10 19-Aug-10*

    PIPINGPIPING 115 88 15-Aug-10 14-Dec-10

    DELDW0001 Piping Drawing Index 49 22 15-Aug-10 13-Sep-10*

    DELDW0002 EPS - Overall Site Layout 65 22 15-Aug-10 13-Sep-10*

    DELDW0003 EPS - General Site Layout Plan (Sheet 1 & 2) 65 22 15-Aug-10 13-Sep-10*

    DELDW0004 Raw Water Intake - Site Layout Plan 65 22 15-Aug-10 13-Sep-10*

    DELDW0006 Cluster Well Pad - Typical Site Layout 65 22 15-Aug-10 13-Sep-10*

    DELDW0007 Single Well Pad - Typical Site Layout 65 22 15-Aug-10 13-Sep-10*

    DELDW0020 EPS - Oil Line Study Transposition 49 22 15-Aug-10 13-Sep-10*

    DELDW0021 EPS - Gas Line Study Transposition 49 22 15-Aug-10 13-Sep-10*

    DELDW0022 EPS - Produced Water Line Study Transposition 49 22 15-Aug-10 13-Sep-10*

    DELDW0023 EPS - Raw Water Line Study Transposition 49 22 15-Aug-10 13-Sep-10*

    DELDW0024 EPS - Firewater Ring Main Line Study Transposition 49 22 15-Aug-10 13-Sep-10*

    DELDW0030 Equipment Location Key Plan 33 33 30-Aug-10 13-Oct-10*

    DELDW0031 Equipment Location Plan - WC-1 33 33 30-Aug-10 13-Oct-10*

    DELDW0032 Equipment Location Plan -WC-2 33 33 30-Aug-10 13-Oct-10*

    DELDW0033 Equipment Location Plan - EPS - Area 1 33 33 30-Aug-10 13-Oct-10*

    DELDW0034 Equipment Location Plan - EPS - Area 2 33 33 30-Aug-10 13-Oct-10*

    DELDW0035 Equipment Location Plan - EPS - Area 3 33 33 30-Aug-10 13-Oct-10*

    DELDW0036 Equipment Location Plan - EPS- Area 4 33 33 30-Aug-10 13-Oct-10*

    DELDW0037 Equipment Location Plan - EPS - Area 5 33 33 30-Aug-10 13-Oct-10*

    DELDW0038 Equipment Location Plan -EPS- Area 6 33 33 30-Aug-10 13-Oct-10*

    DELDW0039 Equipment Location Plan - EPS - Area 7 33 33 30-Aug-10 13-Oct-10*

    DELDW0040 Equipment Location Plan - EPS- Area 6 33 33 30-Aug-10 13-Oct-10*

    DELDW0041 Equipment Location Plan - EPS - Area 8 33 33 30-Aug-10 13-Oct-10*

    DELDW0042 Equipment Location Plan - EPS - Area 9 33 33 30-Aug-10 13-Oct-10*

    DELDW0043 Equipment Location Plan - EPS - Area 10 33 33 30-Aug-10 13-Oct-10*

    DELDW0044 Equipment Location Plan - EPS - Area 11 33 33 30-Aug-10 13-Oct-10*

    DELDW0045 Equipment Location Plan - EPS - Area 12 33 33 30-Aug-10 13-Oct-10*

    DELDW0046 Equipment Location Plan - EPS - Area 13 33 33 30-Aug-10 13-Oct-10*

    DELDW0047 Equipment Location Plan - EPS - Area 14 33 33 30-Aug-10 13-Oct-10*

    DELDW0048 Equipment Location Plan - EPS - Area 15 33 33 30-Aug-10 13-Oct-10*

    DELDW0049 Equipment Location Plan - EPS - Area 16 33 33 30-Aug-10 13-Oct-10*

    DELDW0050 Equipment Location Plan - Water Intake 33 33 30-Aug-10 13-Oct-10*

    DELDW0060 Model Key Plan 33 33 30-Aug-10 13-Oct-10*

    DELDW0100 Typical Piping Support Index 115 88 15-Aug-10 14-Dec-10*

    DELDW0101 Typical Piping Vent, Drain & Instrument Connection Detail Index 115 88 15-Aug-10 14-Dec-10*

    DELDW0102 Specialty Items Index 33 33 30-Aug-10 13-Oct-10*

    DELDW0103 Specialty Supports Index 33 33 30-Aug-10 13-Oct-10*

    DELDW0104 Isometric Drawing Index 33 33 30-Aug-10 13-Oct-10*

    DELDW0105 Tie-in Schedule Index 33 33 30-Aug-10 13-Oct-10*

    DELDW0106 Model Drawing Index 33 33 30-Aug-10 13-Oct-10*

    DELDW0107 Index 33 33 30-Aug-10 13-Oct-10*

    DELDW0108 Index 33 33 30-Aug-10 13-Oct-10*

    DELDW0109 Index 33 33 30-Aug-10 13-Oct-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 13 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DELDW0110 Piping MTO 33 33 30-Aug-10 13-Oct-10*

    DELDW0200 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*

    DELDW0201 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*

    DELDW0202 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*

    DELDW0203 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*

    DELDW0204 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*

    DELDW0205 General Arrangement PAU Area 2 - T1 32 32 29-Sep-10 11-Nov-10*

    DELDW0206 General Arrangement PAU Area 2 - T1 32 32 29-Sep-10 11-Nov-10*

    DELDW0207 General Arrangement PAU Area 2 - T1 32 32 29-Sep-10 11-Nov-10*

    DELDW0208 General Arrangement & Isometrics PAU Area 2 - T1 32 32 29-Sep-10 11-Nov-10*

    DELDW0209 General Arrangement & Isometrics PAU Area 2 - T2 14 14 01-Nov-10 18-Nov-10*

    DELDW0210 General Arrangement & Isometrics PAU Area 2 - T2 14 14 01-Nov-10 18-Nov-10*

    DELDW0211 General Arrangement & isometrics PAU Area 2 - T2 14 14 01-Nov-10 18-Nov-10*

    DELDW0212 General Arrangement & Isometrics PAU Area 2 - T2 14 14 01-Nov-10 18-Nov-10*

    DELDW0213 General Arrangement & Isometrics PAU Area 3 - T1 15 15 31-Oct-10 18-Nov-10*

    DELDW0214 General Arrangement & Isometrics PAU Area 3 - T1 15 15 31-Oct-10 18-Nov-10*

    DELDW0215 General Arrangement & Isometrics PAU Area 3 - T1 15 15 31-Oct-10 18-Nov-10*

    DELDW0216 General Arrangement & Isometrics PAU Area 3 - T1 15 15 31-Oct-10 18-Nov-10*

    DELDW0217 General Arrangement & Isometrics PAU Area 3 - T2 14 14 01-Nov-10 18-Nov-10*

    DELDW0218 General Arrangement & Isometrics PAU Area 3 - T2 14 14 01-Nov-10 18-Nov-10*

    DELDW0219 General Arrangement & Isometrics PAU Area 3 - T2 14 14 01-Nov-10 18-Nov-10*

    DELDW0220 General Arrangement & Isometrics PAU Area 3 - T2 14 14 01-Nov-10 18-Nov-10*

    DELDW0221 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*

    DELDW0222 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*

    DELDW0223 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*

    DELDW0224 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*

    DELDW0225 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*

    DELDW0226 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*

    DELDW0227 General Arrangement & Isometrics PAU Area 6 15 15 31-Oct-10 18-Nov-10*

    DELDW0228 General Arrangement & Isometrics PAU Area 6 15 15 31-Oct-10 18-Nov-10*

    DELDW0229 General Arrangement & Isometrics PAU Area 6 15 15 31-Oct-10 18-Nov-10*

    DELDW0230 General Arrangement & Isometrics PAU Area 6 15 15 31-Oct-10 18-Nov-10*

    DELDW0231 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0232 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0233 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0234 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0235 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0236 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0237 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0238 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0239 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0240 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*

    DELDW0300 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0301 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0302 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0303 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0304 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0305 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0306 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0307 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0308 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 14 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DELDW0309 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0310 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0311 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0312 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0313 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0314 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0315 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0316 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0317 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0318 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0319 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0320 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0321 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0322 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0323 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0324 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0325 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0326 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0327 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0328 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0329 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0330 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0331 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0332 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0333 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0334 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0335 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0336 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0337 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0338 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0339 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0340 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0341 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0342 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0343 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0344 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0345 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0346 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0347 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0348 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0349 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0350 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0351 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0352 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0353 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0354 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0355 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0356 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0357 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0358 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    DELDW0359 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 15 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DELDW0360 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*

    PROCESSPROCESS 93 45 15-Aug-10 14-Oct-10

    Calculation - PumpsCalculation - Pumps 56 11 15-Aug-10 29-Aug-10

    DEPCA0050 Calculation for Crude Oil Booster Pumps P-1300 A/S 56 11 15-Aug-10 29-Aug-10*

    DEPCA0051 Calculation for Crude Oil Export Pumps P-1310 A/S 56 11 15-Aug-10 29-Aug-10*

    DEPCA0052 Calculation for Off Spec Crude Oil Transfer Pumps P-1320 A/B/S 56 11 15-Aug-10 29-Aug-10*

    DEPCA0053 Calculation for Water Intake Pump (Diesel) P-4000 56 11 15-Aug-10 29-Aug-10*

    DEPCA0054 Calculation for Water Intake Pump (Electric) P-4010 56 11 15-Aug-10 29-Aug-10*

    DEPCA0055 Calculation for Water Transfer Pumps P-4020 A/S 56 11 15-Aug-10 29-Aug-10*

    DEPCA0056 Calculation for Produced Water Transfer Pumps P-4200 A/S 56 11 15-Aug-10 29-Aug-10*

    DEPCA0058 Calculation for Service Water Distribution Pumps P-5100 A/S 46 11 15-Aug-10 29-Aug-10*

    DEPCA0059 Calculation for Potable Water Distribution Pumps P-5200 A/S 46 11 15-Aug-10 29-Aug-10*

    DEPCA0060 Calculation for Fire Water Pump (Diesel) P-5300 46 11 15-Aug-10 29-Aug-10*

    DEPCA0061 Calculation for Fire Water Pump (Electric) P-5310 46 11 15-Aug-10 29-Aug-10*

    DEPCA0062 Calculation for Fire Water Jockey Pumps P-5320 A/S 46 11 15-Aug-10 29-Aug-10*

    DEPCA0063 Calculation for LP Flare KO Drum Pumps P-6200 A/S 46 11 15-Aug-10 29-Aug-10*

    DEPCA0064 Calculation for ATM Flare KO Drum Pumps P-6210 A/S 46 11 15-Aug-10 29-Aug-10*

    DEPCA0065 Calculation for Closed Drain Pumps P-6400 A/S 46 11 15-Aug-10 29-Aug-10*

    DEPCA0066 Calculation for Diesel Transfer Pumps P-6700 A/S 56 11 15-Aug-10 29-Aug-10*

    DEPCA0067 Calculation for Train 1 & 2 Charge Pumps 1P-1010 A/S & 2P-1010 56 11 15-Aug-10 29-Aug-10*

    DEPCA0068 Calculation for Train 1 & 2 Wash Water Recirculation Pumps 1P-1020 A/S ... 56 11 15-Aug-10 29-Aug-10*

    DEPCA0069 Calculation for Well Cluster 1 & 2 Corrosion Inhibitor Injection Pumps P1-6... 56 11 15-Aug-10 29-Aug-10*

    Calculation - TanksCalculation - Tanks 65 11 15-Aug-10 29-Aug-10

    DEPCA0110 Calculation for Crude Oil Storage Tank 1 & 2 T-1400 A/B 65 11 15-Aug-10 29-Aug-10*

    DEPCA0111 Calculation for Nassiriya Depot Mishrif Crude Tank T-1410 56 11 15-Aug-10 29-Aug-10*

    DEPCA0112 Calculation for Crude Oil Off Spec Tank T-1420 65 11 15-Aug-10 29-Aug-10*

    DEPCA0113 Calculation for Produced Water Buffer Tank T-4200 61 11 15-Aug-10 29-Aug-10*

    DEPCA0114 Calculation for Service Water Tank T-5100 56 11 15-Aug-10 29-Aug-10*

    DEPCA0115 Calculation for Potable Water Header Tank T-5200 56 11 15-Aug-10 29-Aug-10*

    DEPCA0116 Calculation for Fire Water Storage Tank T-5300 44 11 15-Aug-10 29-Aug-10*

    DEPCA0117 Calculation for Diesel Storage Tank T-6700 56 11 15-Aug-10 29-Aug-10*

    DEPCA0118 Calculation for Well Cluster 1 & 2 Corrosion Inhibitor Storage Tanks T1-68... 56 11 15-Aug-10 29-Aug-10*

    Calculation - SeparatorsCalculation - Separators 56 11 15-Aug-10 29-Aug-10

    DEPCA0140 Calculation for Test Separator V-1000 56 11 15-Aug-10 29-Aug-10*

    DEPCA0141 Calculation for Crude Oil Storage Tank 1 & 2 Degassing Boots V-1400A & ... 56 11 15-Aug-10 29-Aug-10*

    DEPCA0142 Calculation for Crude Oil Off Spec Tank Degassing Boot V-1420 56 11 15-Aug-10 29-Aug-10*

    DEPCA0146 Calculation for LP Flare KO Drum V-6200 56 11 15-Aug-10 29-Aug-10*

    DEPCA0147 Calculation for ATM Flare KO Drum V-6210 56 11 15-Aug-10 29-Aug-10*

    DEPCA0148 Calculation for Closed Drain Drum V-6400 56 11 15-Aug-10 29-Aug-10*

    DEPCA0149 Calculation for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-1010 56 11 15-Aug-10 29-Aug-10*

    DEPCA0150 Calculation for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V-1020 56 11 15-Aug-10 29-Aug-10*

    DEPCA0151 Calculation for Train 1 & 2 Fuel Gas Scrubers 1V-1030 & 2V-1030 46 11 15-Aug-10 29-Aug-10*

    DEPCA0152 Calculation for Desalters & Dehydrators 56 11 15-Aug-10 29-Aug-10*

    Calculation - OthersCalculation - Others 56 11 15-Aug-10 29-Aug-10

    DEPCA0181 Flare Radiation Calculation 41 11 15-Aug-10 29-Aug-10*

    DEPCA0182 Flare Gas Dispersion Calculation 41 11 15-Aug-10 29-Aug-10*

    DEPCA0183 Line Sizing Calculation 56 11 15-Aug-10 29-Aug-10*

    DEPCA0184 Process Relief / Blowdown abd PSV Sizing Calculations 41 11 15-Aug-10 29-Aug-10*

    Calculation - Relief ValveCalculation - Relief Valve 93 45 15-Aug-10 14-Oct-10

    DEPCA0250 Relief Valve Sizing for Test Separator V-1000 PSV 55 22 15-Aug-10 13-Sep-10*

    DEPCA0251 Relief Valve Sizing for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-101... 55 22 15-Aug-10 13-Sep-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 16 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEPCA0252 Relief Valve Sizing for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V-10... 55 22 15-Aug-10 13-Sep-10*

    DEPCA0253 Relief Valve Sizing for Train 1 & 2 Dehydrators 1V-1510 & 2V-1510 PSVs 55 22 15-Aug-10 13-Sep-10*

    DEPCA0254 Relief Valve Sizing for Train 1 & 2 Desalters 1V-1520 & 2V-1520 PSVs 55 22 15-Aug-10 13-Sep-10*

    DEPCA0255 Relief Valve Sizing for Train 1 & 2 Crude Heaters 1F-1010 & 2F-1010 PSVs 55 22 15-Aug-10 13-Sep-10*

    DEPCA0256 Relief Valve Sizing for Train 1 & 2 Crude/Crude Heat Exchangers 1E-1010 ... 55 22 15-Aug-10 13-Sep-10*

    DEPCA0300 Process Simulation Models (in native format) 93 34 15-Aug-10 29-Sep-10*

    DEPCA0350 Transient simulation and Analysis - upstream flow lines 73 34 15-Aug-10 29-Sep-10*

    DEPCA0351 Transient simulation and Analysis - Crude export line 73 34 15-Aug-10 29-Sep-10*

    DEPDW0003 PFD - Typical Well Details-Base Case 61 22 15-Aug-10 13-Sep-10*

    DEPDW0004 PFD - Typical Wellhead Cluster (Mishrif, Well Cluster 1) 75 22 15-Aug-10 13-Sep-10*

    DEPDW0005 PFD - Typical Wellhead Cluster (Mishrif, Well Cluster 2) 75 22 15-Aug-10 13-Sep-10*

    DEPDW0006 PFD - Gathering Station 1 75 22 15-Aug-10 13-Sep-10*

    DEPDW0007 PFD - Crude Oil Processing Train 1 75 22 15-Aug-10 13-Sep-10*

    DEPDW0008 PFD - Crude Oil Processing Train 2 75 22 15-Aug-10 13-Sep-10*

    DEPDW0009 PFD - Crude Oil Storage & Export 75 22 15-Aug-10 13-Sep-10*

    DEPDW0010 PFD - EPS Produced Water Treatment & Disposal 75 22 15-Aug-10 13-Sep-10*

    DEPDW0020 Heat & Material Balance Case A Summer (Streams 1-30) 75 22 15-Aug-10 13-Sep-10*

    DEPDW0021 Heat & Material Balance Case A Summer (Streams 31-60) 75 22 15-Aug-10 13-Sep-10*

    DEPDW0022 Heat & Material Balance Case A Summer (Streams 61-98) 75 22 15-Aug-10 13-Sep-10*

    DEPDW0030 Heat & Material Balance Case B Winter (Streams 1-30) 75 22 15-Aug-10 13-Sep-10*

    DEPDW0031 Heat & Material Balance Case B Winter (Streams 31-60) 75 22 15-Aug-10 13-Sep-10*

    DEPDW0032 Heat & Material Balance Case B Winter (Streams 61-98) 75 22 15-Aug-10 13-Sep-10*

    DEPDW0052 UFD - Flare & Blowdown System 81 28 15-Aug-10 21-Sep-10*

    DEPDW0053 UFD - Closed Drain System 81 28 15-Aug-10 21-Sep-10*

    DEPDW0054 UFD - Open Drain System 81 28 15-Aug-10 21-Sep-10*

    DEPDW0055 UFD - Fuel Gas System 81 28 15-Aug-10 21-Sep-10*

    DEPDW0056 UFD - Diesel Storage & Distribution 81 28 15-Aug-10 21-Sep-10*

    DEPDW0057 UFD - Air Generation & Distribution 81 28 15-Aug-10 21-Sep-10*

    DEPDW0058 UFD - River Water Treatment 81 28 15-Aug-10 21-Sep-10*

    DEPDW0059 UFD - Nitrogen Generation & Distribution 81 28 15-Aug-10 21-Sep-10*

    DEPDW0060 UFD - Service & Potable Water System 81 28 15-Aug-10 21-Sep-10*

    DEPDW0100 P&ID - Legend & Symbols Sheet 1 72 28 15-Aug-10 21-Sep-10*

    DEPDW0101 P&ID - Legend & Symbols Sheet 2 72 28 15-Aug-10 21-Sep-10*

    DEPDW0109 P&ID - Mishrif Single Cluster Wellhead (Added 29-Jun-10) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0110 P&ID - Typical Wellhead Cluster(Mishrif, Well Cluster 1) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0111 P&ID - Typical Wellhead Cluster Mishrif, Well Cluster 2) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0112 P&ID - Wellhead Cluster 1 Chemical Injection (Sheet 1) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0113 P&ID - Wellhead Cluster 1 Chemical Injection (Sheet 2) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0114 P&ID - Wellhead Cluster 1 Methanol Injection (Sheet 3) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0115 P&ID - Well Cluster 1 Inlet Header (Mishrif) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0116 P&ID - Well Cluster 1 Production Trunkline Pig Launcher 72 28 15-Aug-10 21-Sep-10*

    DEPDW0117 P&ID - Well Cluster 1 Test Trunkline Pig Launcher 72 28 15-Aug-10 21-Sep-10*

    DEPDW0118 P&ID - Gathering Station 1 (Well Cluster 1) Production Trunkline Pig Recei... 72 28 15-Aug-10 21-Sep-10*

    DEPDW0119 P&ID - Gathering Station 1 (Well Cluster 1) Test Trunkline Pig Receiver 72 28 15-Aug-10 21-Sep-10*

    DEPDW0120 P&ID - Well Cluster 1 Closed Drain System 72 28 15-Aug-10 21-Sep-10*

    DEPDW0122 P&ID - Mishrif Single Cluster Wellhead Chemical Injection (Sheet 1) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0123 P&ID - Mishrif Single Cluster Wellhead Chemical Injection (Sheet 2) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0124 P&ID - Mishrif Single Cluster Wellhead Methanol Injection (Sheet 3) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0130 P&ID - Mishrif Single Cluster Wellhead Closed Drain System 72 28 15-Aug-10 21-Sep-10*

    DEPDW0132 P&ID - Wellhead Cluster 2 Methanol Injection (Sheet 3) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0133 P&ID - Wellhead Cluster 2 Chemical Injection (Sheet 1) 72 28 15-Aug-10 21-Sep-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 17 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEPDW0134 P&ID - Wellhead Cluster 2 Chemical Injection (Sheet 2) 72 28 15-Aug-10 21-Sep-10*

    DEPDW0135 P&ID - Well Cluster 2 Inlet Header 72 28 15-Aug-10 21-Sep-10*

    DEPDW0136 P&ID - Well Cluster 2 Production Trunkline Pig Launcher 72 28 15-Aug-10 21-Sep-10*

    DEPDW0137 P&ID - Well Cluster 2 Test Trunkline Pig Launcher 72 28 15-Aug-10 21-Sep-10*

    DEPDW0138 P&ID - Gathering Station 1 (Well Cluster 2) Production Trunkline Pig Recei... 72 28 15-Aug-10 21-Sep-10*

    DEPDW0139 P&ID - Gathering Station 1 (Well Cluster 2) Test Trunkline Pig Receiver 72 28 15-Aug-10 21-Sep-10*

    DEPDW0140 P&ID - Well Cluster 2 Closed Drain System 72 28 15-Aug-10 21-Sep-10*

    DEPDW0155 P&ID - Gathering Station 1 Inlet Header 78 34 15-Aug-10 29-Sep-10*

    DEPDW0156 P&ID - Gathering Station 1 Test Separator 73 34 15-Aug-10 29-Sep-10*

    DEPDW0157 P&ID - Train 1 1st Stage Separator 73 34 15-Aug-10 29-Sep-10*

    DEPDW0158 P&ID - Train 1 1st Crude/Crude Heat Exchanger & Rundown Cooler 73 34 15-Aug-10 29-Sep-10*

    DEPDW0159 P&ID - Train 1 Crude Heater 78 34 15-Aug-10 29-Sep-10*

    DEPDW0160 P&ID - Train 1 2nd Stage Separator 73 34 15-Aug-10 29-Sep-10*

    DEPDW0161 P&ID - Train 1 Charge Pumps 73 34 15-Aug-10 29-Sep-10*

    DEPDW0162 P&ID - Train 1 Dehydrator 73 34 15-Aug-10 29-Sep-10*

    DEPDW0163 P&ID - Train 1 Desalter/Wash Water Recirculation Pumps 73 34 15-Aug-10 29-Sep-10*

    DEPDW0164 P&ID - Train 1 Crude Wash Water Heater 73 34 15-Aug-10 29-Sep-10*

    DEPDW0167 P&ID - Train 2 1st Stage Separator 73 34 15-Aug-10 29-Sep-10*

    DEPDW0168 P&ID - Train 2 1st Crude/Crude Heat Exchanger & Run Down Cooler 73 34 15-Aug-10 29-Sep-10*

    DEPDW0169 P&ID - Train 2 Crude Heater 73 34 15-Aug-10 29-Sep-10*

    DEPDW0170 P&ID - Train 2 2nd Stage Separator 73 34 15-Aug-10 29-Sep-10*

    DEPDW0171 P&ID - Train 2 Charge Pumps 78 34 15-Aug-10 29-Sep-10*

    DEPDW0172 P&ID - Train 2 Dehydrator 73 34 15-Aug-10 29-Sep-10*

    DEPDW0173 P&ID - Train 2 Electrostatic Desalter/Wash Water Recirculation Pumps 73 34 15-Aug-10 29-Sep-10*

    DEPDW0174 P&ID - Train 2 Crude Wash Water Heater 73 34 15-Aug-10 29-Sep-10*

    DEPDW0175 P&ID - Crude Oil Storage Tanks 1 & 2 73 34 15-Aug-10 29-Sep-10*

    DEPDW0176 P&ID - Crude Oil Export 73 34 15-Aug-10 29-Sep-10*

    DEPDW0177 P&ID - Crude Oil Export Metering Package 73 34 15-Aug-10 29-Sep-10*

    DEPDW0178 P&ID - Crude Oil Export Pig Launchers 73 34 15-Aug-10 29-Sep-10*

    DEPDW0181 P&ID - Crude Oil Off Spec Tank 73 34 15-Aug-10 29-Sep-10*

    DEPDW0185 P&ID - Produced Water Buffer Tank & Transfer Pumps 73 34 15-Aug-10 29-Sep-10*

    DEPDW0186 CPI & IGF Packages 78 39 15-Aug-10 06-Oct-10*

    DEPDW0190 P&ID - Atmospheric Flare & Train1 LP Headers 78 39 15-Aug-10 06-Oct-10*

    DEPDW0191 P&ID - Train 2 LP Flare Header 78 39 15-Aug-10 06-Oct-10*

    DEPDW0192 P&ID - MLP Flare Gas KO Drum 78 39 15-Aug-10 06-Oct-10*

    DEPDW0193 P&ID - ATM Flare Gas KO Drum 78 39 15-Aug-10 06-Oct-10*

    DEPDW0194 P&ID - EPS Closed Drain System Header 78 39 15-Aug-10 06-Oct-10*

    DEPDW0195 P&ID - EPS Closed Drain System 83 39 15-Aug-10 06-Oct-10*

    DEPDW0198 P&ID - Open Drain System (Sheet 1) 78 39 15-Aug-10 06-Oct-10*

    DEPDW0199 P&ID - Open Drain System (Sheet 2) 78 39 15-Aug-10 06-Oct-10*

    DEPDW0200 P&ID - Fuel Gas System 78 39 15-Aug-10 06-Oct-10*

    DEPDW0208 P&ID - Water Treatment Dearation & Foam Generator Package 78 39 15-Aug-10 06-Oct-10*

    DEPDW0210 P&ID - Potable Water System 78 39 15-Aug-10 06-Oct-10*

    DEPDW0211 P&ID - Service Water System 78 39 15-Aug-10 06-Oct-10*

    DEPDW0212 P&ID - Base Camp Potable Water System 78 39 15-Aug-10 06-Oct-10*

    DEPDW0220 P&ID - Diesel Storage & Distribution 78 39 15-Aug-10 06-Oct-10*

    DEPDW0221 P&ID - Instrument Air Compressor Package 78 39 15-Aug-10 06-Oct-10*

    DEPDW0222 P&ID - Instrument Air & Plant Air Packages Distribution 78 39 15-Aug-10 06-Oct-10*

    DEPDW0223 P&ID - Deaeration Package 78 39 15-Aug-10 06-Oct-10*

    DEPDW0230 P&ID - Nitrogen Generation Package 78 39 15-Aug-10 06-Oct-10*

    DEPDW0231 P&ID - Nitrogen Distribution 78 39 15-Aug-10 06-Oct-10*

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

    2010 2011

    First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 18 of 19 12-Aug-10 13:02

  • Activity ID Activity Name OriginalDuration

    Remaining Duration

    Start Finish

    DEPDW0235 P&ID - EPS Chemical Injection Packages 78 39 15-Aug-10 06-Oct-10*

    DEPDW0300 Line List 84 45 15-Aug-10 14-Oct-10*

    DEPLS0001 Process Drawing Register (Index) 79 22 15-Aug-10 13-Sep-10*

    DEPLS0002 Utility Load List 61 22 15-Aug-10 13-Sep-10*

    DEPRE0001 Corrosion Design Basis Memorandum 45 22 15-Aug-10 13-Sep-10*

    DEPRE0002 Technology selection for Crude desalter & dewatering unit 45 22 15-Aug-10 13-Sep-10*

    DEPRE0003 Process Design Philosophy 71 22 15-Aug-10 13-Sep-10*

    DEPRE0004 Process Simulation Report 81 22 15-Aug-10 13-Sep-10*

    DEPRE0005 Process Operating, control, start up and shut down philosophy 46 22 15-Aug-10 13-Sep-10*

    DEPRE0006 Relief, Flare and Blowdown Report 46 22 15-Aug-10 13-Sep-10*

    DEPRE0007 Pipeline and Trunkline Hydraulic Analysis Report 61 22 15-Aug-10 13-Sep-10*

    DEPRE0008 HAZOP Close-Out (FEED) Report 46 22 15-Aug-10 13-Sep-10*

    DEPRE0009 Transient Analysis Report 46 22 15-Aug-10 13-Sep-10*

    DEPSP0001 Technical Specification for Flare System 63 34 15-Aug-10 29-Sep-10*

    DEPSP0002 Technical Specification for Dehydrators & Desalters 78 34 15-Aug-10 29-Sep-10*

    DEPSP0004 Technical Specification for Fired Gas Crude Heater 78 34 15-Aug-10 29-Sep-10*

    DEPSP0005 Technical Specification for Produced Water Treatment System 78 34 15-Aug-10 29-Sep-10*

    DEPSP0006 Technical Specification for Raw Water Intake System 78 34 15-Aug-10 29-Sep-10*

    DEPSP0007 Technical Specification for Dearator Package 78 34 15-Aug-10 29-Sep-10*

    DEPSP0008 Technical Specification for Nutshell Filter Package 78 34 15-Aug-10 29-Sep-10*

    DEPSP0009 Technical Specification for Low Pressure & Atmospheric Flare System 78 34 15-Aug-10 29-Sep-10*

    DEPSP0010 Technical Specification for IGF Package 78 34 15-Aug-10 29-Sep-10*

    DEPSP0011 Technical Specification for Demineralized Water Package 78 34 15-Aug-10 29-Sep-10*

    DEPSP0012 Technical Specification for Fuel Gas Sytem 78 34 15-Aug-10 29-Sep-10*

    DEPSP0013 Technical Specification for Crude Oil Separators 78 34 15-Aug-10 29-Sep-10*

    DEPSP0050 Isolation Philosophy 91 34 15-Aug-10 29-Sep-10*

    QUALITY ASSURANCEQUALITY ASSURANCE 37 22 15-Aug-10 13-Sep-10

    DEQSP0001 External Surface Preparation & Painting Procedure 37 22 15-Aug-10 13-Sep-10*

    TELECOMMUNICATIONTELECOMMUNICATION 98 45 15-Aug-10 14-Oct-10

    DETDW0001 Telecommunication System Block Diagram 98 45 15-Aug-10 14-Oct-10*