C НЕ MTRADE ESTONIA OÜ. GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT LOW EMISSION N О x и CO. Our goal : Pure environment. Savings Reliability. MULTI-FUEL GAS TURBINE POWER PLANTS MULTI-FUEL GAS TURBINE ENGINE D – 336 - PowerPoint PPT Presentation

Citation preview

Page 1: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

GAS TURBINE POWER PLANT

MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY

CAPACITY

HIGHLY EFFICIENTLOW EMISSION NОx и CO

CНЕMTRADE ESTONIA OÜ

Page 2: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

SavingsReliability

Page 3: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

MULTI-FUEL GAS TURBINE POWER PLANTSMULTI-FUEL GAS TURBINE ENGINE D – 336

MODERNIZATION OF GAS COMBUSTION UNIT OF ANY VOLUME FOR TURBINES, BOILERS AND INDUSTRIAL FURNACES

HIGHLY EFFICIENTLOW EMISSION NОx and CO

SUPPLY OF EQUIPMENT

DESIGN AND CONSTRUCTION

RECONSTRUCTION AND MODERNIZATION

WARRANTY AND SERVICE

3

Page 4: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

The purpose of the unit is to supply electric energy to industrial and domestic facilities, to compensate for lack of energy during peak loads, and to operate on a standby basis. The unit is a mobile automated installation. The unit is equipped with system for starting and accepting loads with subsequent continuous operation, the systems of protection and indication of the state of the main engine parameters, as well as the modular noise suppression system. Operator’s compartment is separated from equipment room by double wall.

Main advantages:•high reliability;•works steadily as independent unit and in parallel with external power system;•features high maintainability and is simple and easy to control;•does not require big investments for putting into operation;•transportability.

Basic specifications:Power, kW:

rated - 2,500

maximum - 2,750

Current - AC, three-phase

Voltage, V - 6,300/10,500

Frequency, Hz - 50

Fuel - natural and casing-head gas

Drive net efficiency at rated load, %

(without regard to losses at the input and exhaust) -24

Overall dimensions, m

(without noise suppressor) - 11.4x2.5x3.7

Weight, kg

(without noise suppressors) - 28,500

4

Page 5: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

Main features:•High quality of generated energy;•High reliability;•High environmental indicators;•Transportability and high degree of prefabrication;•supplied with all the equipment, which provides autonomy.

 GP 6000

GP 7000 GP 8000

Power, kW:  

nominal 6060 7000 8000

maximum 7160 7700 9600

Type of current AC, three-phase

Voltage, V 6300, 10500/13800

Frequency, Hz 50/60

Fuelgaseous (natural or associated oil

gas)

Effective actuator efficiency at nominal load, % not less

31 31 32

Maximum overall dimensions (assembled), m:

length 20 20 15

width 10 10 11

Height, not more than 12,5 12,5 12

Weight, kg 82000 90000 95000

Technical characteristics:

GAS TURBINE POWER PLANT BASED ON GAS TURBINE ENGINE D-336

Page 6: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

6

Page 7: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

GAS TURBINE ENGINE D-336

Quantity of GTE type D-336 in usage - 154 piecesThe total operating time of GTE D-336 - more than 2 500 000 hours

Gas Turbine Engines D-336 are used as a gas compressor drive, gas lifting and crude oil pumping aggregates of capacity 6,3 МW, and also as a power plants generator drives. Engines successfully operate in different climatic zones at an ambient temperature from -60 ° C to +50 ° C at altitudes above sea level up to 2000 m.

7

Page 8: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

• Engine Modification: D-336-1, D-336-2, D-336-2Т* • Nominal Power(MCA, H=0), kW 6300 • Frequency of rotor rotation of power turbine, min-1 8200** • Fuel - gaseous *** (natural or oil gas)• Effective Efficiency, % not less then 31• Overall dimensions, mm 3932,5x1068,0x1227,4• Weight, kg 1470

* Maintaining the power up to t = +25 °С.** If necessary, modifications may be made for GTE with rotational frequencies 5000 or 3000 rev/min, and besides D-336-1 –left rotation, D-336-2, D-336-2Т – right rotation.*** Upon customer request, the engines can be converted to run on liquid fuel – kerosene of RT, TS-1 or similar fuels of foreign production.

8

Page 9: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

GAS TURBINE ENGINE D-336

MAIN FEATURES

High fuel efficiency at constant price increases for natural gas Solution of problems of reducing CO and NOx in combustion

products Minimal investment in new construction, reconstruction and

modernization High reliability and dependability

(total operating time - 2 500 000 hours) Low cost of maintenance

High level of maintainability without dismantling with the possibility of a modular repair

High degree of automation Warranty and maintenance service for the entire period of

operation

Page 10: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT
Page 11: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

EFFECTIVENESS OF A NEW GENERATION OF GAS BURNER

Low emission: NOx - no more than 25 ppm СО - no more than 8 ppm

Page 12: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

12

Indicator Designation

Unit of Measur

e

Tube Burner System

Established Combustion

Chamber

Meaning of

Technical conditions

Presented power at nominal temperature

before turbine

Nе presented

kW 8908 8908 10000

Presented consumption of fuel gas

Vf presented m3/hour

2943 3313 3600

Specific consumption of fuel gas at relatively

constant power Nе presented = const

q fg m3/kW*h

0,33 0,372 0,360

Efficency of turbine where Ne presented =

const

% 31,56 28,03 29,0

Increase of efficiency % 3.53    

Fuel gas savings q fg % 11

Page 13: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

13

AK REGENERATOR CC HPT LPT

Diagram of the temperature distribution1- specifications data(passport); 2 – Real data of measurement AK- axial-compressor compressor,CC – chamber of combustion,HPT – high pressure turbine,LPT – Low pressure turbine

Page 14: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

14

RESULTS OF MODERNIZATION

Natural gas savings 10-15%

Reduction of pollution: NОx not more than 10÷50 мg/м3 (25

ppm); CO not more than 5÷10 мg/м3 (8

ppm) Increasing project value of turbine up to

30% Wide range of turbine power regulation with high gas savings

and low NOx and CO from 10 to 120%

Fast recoupment of investment 10-24 months High level of uniformity of temperature field in gas combustion

zone and vibration decrease prolong service life of turbine (primarily a catalyst).

Opportunity to fulfill short term tasks (from 1 to 30 days) reduces losses from downtime.

No necessity in purchasing new turbines and accessory equipment.

Page 15: GAS TURBINE POWER PLANT MODERNIZATION OF THE GAS COMBUSTION UNITS OF ANY CAPACITY HIGHLY EFFICIENT

Process of gas combustion in turbine

Before modernization New Generation Burner

Thank you for Your attention!CНЕMTRADE ESTONIA OÜ

Madara 31-21, Tallinn, 10613, Estonia Tel: +372 660-10-50, fax: +372 660-10-50

E-mail: [email protected] www.chemtrade.ee