GasCube Presentation

Embed Size (px)

Citation preview

  • 7/21/2019 GasCube Presentation

    1/31

    1 Wrtsil

    Wrtsil 20V34SG GasCube

  • 7/21/2019 GasCube Presentation

    2/31

    2 Wrtsil

    What is a GasCube?

    Minimum cost, pre-designed, single engine

    power plant solution using:

    W20V34SG (GasCube)

    16V34SG option

    Targeted for power plants wi th 13 engines

    Features

    High electrical efficiency throughminimization of plant own consumption

    Simple technical solut ions

    100% detail design

    No changes in the cube, options outside(tanks, sw itchgear-room etc.)

  • 7/21/2019 GasCube Presentation

    3/31

    3 Wrtsil

    GasCube highlights

    Low own consumpt ion High electrical efficiency

    low energy radiators with frequency control efficient ventilation concept

    no air conditioning

    Minimized footprint

    radiators on the roof minimum space, maximumperformance

    control panels inside the cube no control room

    Cost effic iency & project execution

    elimination of repetitive design

    minimization of material excess streamlined no change order - project execution

    containerized transportation

    high level of pre fabrication

    Integrated gas skid

    exhaust gas module

  • 7/21/2019 GasCube Presentation

    4/31

    4 Wrtsil

    Ambient temperature -5+40 C

    (+45 C special arrangements)

    Earthquake Zone 4, Occ. Cat. 3, UBC1997

    Wind load 110mph, Exp.C UBC1997

    Noise attenuation 70 dB(A) 100m

    Engine Wrtsil 20V34SG

    Charge air filter type Dry

    Exhaust gas silencer 35 dB(A) equipped with explosion relief

    W34SG Cube Aux Module 2500 kg

    Control and working air unit 650 l/min

    Maintenance water tank 3,2 m3

    Starting air compressor Single

    Starting air vessel 3,0 m3

    Frequency 50 or 60 Hz

    Control power house / remote

    Plant own consumption about 1 % at full load

    Cooling radiators Single circuit

    Ventilation Free in forced out

    Max ambient inside power house +50 C

    Intake air Louvre filtration none

    Overhead Crane 2 ton

    GasCube - Technical Details

  • 7/21/2019 GasCube Presentation

    5/31

    5 Wrtsil

    General 3D View

    Access Door

    GasCube Building

    MV-HouseLube Oil Area

  • 7/21/2019 GasCube Presentation

    6/31

    6 Wrtsil

    Plan 0.000

    5.8m

    19.4 m Outside

    Dimensions

    1 W20V34SG Engine Generator Set

    3

    45

    12 9

    678

    2 W34SG Cube Auxiliary Module3 Starting Air Unit

    4 Maintenance Water Tank

    5 Ventilation Inlet Air Louvre

    6 LV Switchgear

    7 Control Panel

    8 Frequency Converters

    9 Neutral Point Cubicle

    Building Area113 m2

  • 7/21/2019 GasCube Presentation

    7/317 Wrtsil

    Plan 5.700

    1 W20V34SG Exhaust Gas Module

    5

    2

    2 Starting Air Bottle

    3

    3 Exhaust Gas Silencer

    4

    4 Charge Air Dry Filter

    5 Generator Ventilation Outlet Air Duct

    1

  • 7/21/2019 GasCube Presentation

    8/318 Wrtsil

    Roof Plan

    1

    1 Cooling Radiators

    2

    2 Expansion Vessel

    3

    3 Ventilation Roof Fan Unit

    1

    4

    4 Stack

  • 7/21/2019 GasCube Presentation

    9/319 Wrtsil

    3D Section View

    17.44 m

    Floor

    7.9 m

    0.00

    Eave height

    Radiator platform

    12,7 m

    Height Levels

  • 7/21/2019 GasCube Presentation

    10/3110 Wrtsil

    GasCube Mechanical Systems

    - Outside

    1

    5

    4

    2

    3

    1. Lubricating oil tanks and transfer pump

    2. Exhaust gas silencer and stack

    3. Charge air inlet

    4. Expansion vessel

    5. Radiators

  • 7/21/2019 GasCube Presentation

    11/3111 Wrtsil

    GasCube Mechanical Systems

    - Inside

    2

    1. Maintenance water tank 3,2 m

    3

    2. Starting air vessel 3,0 m3

    3. Exhaust Gas Module

    4. Cube Auxiliary Module

    5. Wrtsil 20V34SG gas engine

    6. Generator

    14

    3

    56

    1

    2

    3

    4

  • 7/21/2019 GasCube Presentation

    12/3112 Wrtsil

    GasCube Auxiliary Module

    1

    5

    4

    2

    3

    6

    7

    89

    12

    10

    11

    Fuel

    1. Gas supply2. Flow meter

    3. Gas regulating valve

    Cooling

    4. HT Pre heater

    5. LT Pre heater (optional)

    6. LT thermostatic valve7. Maintenance water pump

    8. Cooling pipes

    Instrument air unit

    9. Compressor

    10. Air Vessels

    11. Air Dryer

    12. Lubrication oil pipes

    13. Engine connections

    14. Electrical junction boxes

    13

    14

  • 7/21/2019 GasCube Presentation

    13/3113 Wrtsil

    Charge Air and Exhaust Gas System

    1

    4

    5

    6

    3

    2

    5

    1

    6

    4

    1. Charge Air Filter

    2. Charge Air Silencers3. Exhaust Gas Branch Pipe

    4. Explosion relief valve

    5. Exhaust Gas Silencer

    6. Exhaust Gas Stack

    7. Exhaust pipe ventilation fan

    8. Flexible bellows9. Oil mist separator

    8

    8

    37

    98

  • 7/21/2019 GasCube Presentation

    14/3114 Wrtsil

    GasCube - Lubricating Oil System

    1. Lubrication oil tanks

    - Double shell tank

    - Size from 7 m3

    - Manhole DN600

    - Over fill protector

    - Mechanical level indicator

    - Ladders

    2. Lubrication oil pump unit

    - One screw pump 8,1/9,9 m3/h- 2 x quick camlock coupling to truck

    3. Lubrication oil pipes

    1

    2

    3

    33

  • 7/21/2019 GasCube Presentation

    15/3115 Wrtsil

    CO2 CO2

    Fire Extinguishers

    CO2

    Dry

    Powder

    Dry

    Powder

    Emergency Exit Doors

    Extinguishers

    Dry Powder (+ 6,000)

    Dry Powder (+ 3,500)

  • 7/21/2019 GasCube Presentation

    16/31

    16 Wrtsil

    Interface principle

    MV

    LV

    MV

    Optional MV-houseincluding:

    MV-switchgear

    LV-switchgear

    DC-system

    Auxiliary transformer

    MV

    LV

    GAS

    LV

    LUBEOIL

    GasCube

    Electricaldeliv

    erylimit

  • 7/21/2019 GasCube Presentation

    17/31

    17 Wrtsil

    General layout of electrical equipment

    Ventilation inlet air

    heaters

    Cube Auxiliary Module

    panels

    Starting air

    compressor panelNeutral point cubicle

    Radiator panel

    Electrical panels

    behind engine

  • 7/21/2019 GasCube Presentation

    18/31

    18 Wrtsil

    Control panelLV-switchboard

    Gas alarm panel

    Fire alarm panel

    Lighting panel

    Frequency converter

    for radiators

    Frequency converter

    for ventilationDC-charger panel

    Panel cooler

    Location of electrical equipment

    Electrical panels

  • 7/21/2019 GasCube Presentation

    19/31

  • 7/21/2019 GasCube Presentation

    20/31

    20 Wrtsil

    MV-House layout

    Auxiliary transformer

    LV-Switchgear

    MV-switchgear

    DC-system, 110 VDC

    MV-House is needed when existing electrical facilities are not possible to

    utilised.

  • 7/21/2019 GasCube Presentation

    21/31

    21 Wrtsil

    Venti lation principle for GasCube

    Free In Forced Out Ventilation

  • 7/21/2019 GasCube Presentation

    22/31

    22 Wrtsil

    Ventilation Inlet Air

    -Dampers divided into two groups

    + part of dampers can be closed during

    Ventilation Inlet Air Heaters

    Ventilation Inlet Air Louvers

    - Outside Louvre & Mosquito Net

    -Silencer Baffles- No Filtration

    colder periods

  • 7/21/2019 GasCube Presentation

    23/31

    23 Wrtsil

    Venti lation Outlet Air

    Ventilation Roof Fan Unit- Flow 10 m3/s

    - Frequency Converter Controlled

    - Noise Attenuated

    Generator Ventilation Outlet Air Duct

    - Flow app. 10 m3/s

    - Insulation against Noise Transition

  • 7/21/2019 GasCube Presentation

    24/31

    24 Wrtsil

    Venti lation Generator Duct in Hot Condition

    Vertical Extension ofGenerator Ventilation Outlet Air Duct- Additional Duct will be used for Hot Ambient Air Conditions (> +30 C)

    - Need to be checked case by case

  • 7/21/2019 GasCube Presentation

    25/31

    25 Wrtsil

    GasCube Building Foundation

    - Solid Slab, thickness 600 mm

    - EG-Set & Equipment on the Same Slab with Building Constructions

    - Designed for non-piled solution

    - Door Slabs are Separate from the Building Foundation

    3D View

    Plan View

    S f 1 G C

  • 7/21/2019 GasCube Presentation

    26/31

    26 Wrtsil

    Site Plan for 1 x GasCube

    16m

    47 mSite Area

    752 m2

    Fence with Gate Gravel Asphalt

    Grass

    Sit Pl f 3 G C b

  • 7/21/2019 GasCube Presentation

    27/31

    27 Wrtsil

    Site Plan for 3 x GasCube

    27.6m

    Site Area

    1297 m2

    47 m

    Sit 3D Vi f 1 G C b

  • 7/21/2019 GasCube Presentation

    28/31

    28 Wrtsil

    Site 3D View for 1 x GasCube

    Sit 3D Vi f 1 G C b

  • 7/21/2019 GasCube Presentation

    29/31

    29 Wrtsil

    Site 3D View for 1 x GasCube

    Sit 3D Vi f 2 G C b

  • 7/21/2019 GasCube Presentation

    30/31

    Site 3D View for 2 x GasCube

    30 Wrtsil

    Sit 3D Vi f 3 G C b

  • 7/21/2019 GasCube Presentation

    31/31

    Site 3D View for 3 x GasCube