1 © Wärtsilä Wärtsilä 20V34SG GasCube

Wärtsilä 20V34SG GasCube GasCube_presentation (1).pdf · W34SG Cube Aux Module 2500 kg Control and working air unit 650 l/min Maintenance water tank 3,2 m3 Starting air compressor

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • 1 © Wärtsilä

    Wärtsilä 20V34SG GasCube

  • 2 © Wärtsilä

    What is a GasCube?

    Minimum cost, pre-designed, single engine power plant solution using:

    – W20V34SG (GasCube)• 16V34SG option

    • Targeted for power plants with 1…3 engines

    • Features– High electrical efficiency through

    minimization of plant own consumption– Simple technical solutions– 100% detail design– No changes in the cube, options outside

    (tanks, switchgear-room etc.)

  • 3 © Wärtsilä

    GasCube highlights

    • Low own consumption – High electrical efficiency– low energy radiators with frequency control– efficient ventilation concept– no air conditioning

    • Minimized footprint– radiators on the roof – minimum space, maximum

    performance– control panels inside the cube – no control room

    • Cost efficiency & project execution– elimination of repetitive design– minimization of material excess– streamlined – no change order - project execution– containerized transportation– high level of pre fabrication – Integrated gas skid– exhaust gas module

  • 4 © Wärtsilä

    Ambient temperature -5…+40 ºC(+45 ºC special arrangements)

    Earthquake Zone 4, Occ. Cat. 3, UBC1997Wind load 110mph, Exp.C UBC1997Noise attenuation 70 dB(A) 100m

    Engine Wärtsilä 20V34SGCharge air filter type DryExhaust gas silencer 35 dB(A) equipped with explosion relief

    W34SG Cube Aux Module 2500 kgControl and working air unit 650 l/min

    Maintenance water tank 3,2 m3

    Starting air compressor SingleStarting air vessel 3,0 m3

    Frequency 50 or 60 HzControl power house / remotePlant own consumption about 1 % at full load

    Cooling radiators Single circuit

    Ventilation Free in forced outMax ambient inside power house +50 ºCIntake air Louvre filtration none

    Overhead Crane 2 ton

    GasCube - Technical Details

  • 5 © Wärtsilä

    General 3D View

    Access Door

    GasCube Building

    MV-HouseLube Oil Area

  • 6 © Wärtsilä

    Plan 0.000

    5.8

    m

    19.4 m Outside Dimensions

    1 W20V34SG Engine Generator Set

    3

    45

    12 9

    678

    2 W34SG Cube Auxiliary Module3 Starting Air Unit4 Maintenance Water Tank5 Ventilation Inlet Air Louvre

    6 LV Switchgear7 Control Panel8 Frequency Converters9 Neutral Point Cubicle

    Building Area113 m2

  • 7 © Wärtsilä

    Plan 5.700

    1 W20V34SG Exhaust Gas Module

    5

    2

    2 Starting Air Bottle

    3

    3 Exhaust Gas Silencer

    4

    4 Charge Air Dry Filter5 Generator Ventilation Outlet Air Duct

    1

  • 8 © Wärtsilä

    Roof Plan

    1

    1 Cooling Radiators2

    2 Expansion Vessel

    3

    3 Ventilation Roof Fan Unit

    1

    4

    4 Stack

  • 9 © Wärtsilä

    3D Section View

    17.44 m

    Floor

    7.9 m

    0.00

    Eave height

    Radiator platform

    12,7 m

    Height Levels

  • 10 © Wärtsilä

    GasCube Mechanical Systems- Outside

    1

    54

    2

    3

    1. Lubricating oil tanks and transfer pump2. Exhaust gas silencer and stack3. Charge air inlet4. Expansion vessel5. Radiators

  • 11 © Wärtsilä

    GasCube Mechanical Systems- Inside

    2 1. Maintenance water tank 3,2 m32. Starting air vessel 3,0 m33. Exhaust Gas Module4. Cube Auxiliary Module5. Wärtsilä 20V34SG gas engine6. Generator

    14

    3

    56

    1

    2

    3

    4

  • 12 © Wärtsilä

    GasCube Auxiliary Module

    1

    5

    42

    3

    6

    789

    12

    10

    11

    Fuel 1. Gas supply 2. Flow meter3. Gas regulating valve

    Cooling4. HT Pre heater5. LT Pre heater (optional)6. LT thermostatic valve7. Maintenance water pump8. Cooling pipes

    Instrument air unit9. Compressor10. Air Vessels11. Air Dryer

    12. Lubrication oil pipes13. Engine connections14. Electrical junction boxes

    13

    14

  • 13 © Wärtsilä

    Charge Air and Exhaust Gas System

    1

    4

    5

    6

    3

    2

    5

    1

    6

    4

    1. Charge Air Filter2. Charge Air Silencers3. Exhaust Gas Branch Pipe4. Explosion relief valve5. Exhaust Gas Silencer6. Exhaust Gas Stack7. Exhaust pipe ventilation fan8. Flexible bellows9. Oil mist separator

    8

    8

    37

    98

  • 14 © Wärtsilä

    GasCube - Lubricating Oil System

    1. Lubrication oil tanks- Double shell tank - Size from 7 m3- Manhole DN600- Over fill protector- Mechanical level indicator- Ladders

    2. Lubrication oil pump unit- One screw pump 8,1/9,9 m3/h- 2 x quick camlock coupling to truck

    3. Lubrication oil pipes

    1

    2

    3

    3 3

  • 15 © Wärtsilä

    CO2 CO2

    Fire Extinguishers

    CO2Dry

    Powder

    Dry Powder

    Emergency Exit Doors

    Extinguishers

    Dry Powder (+ 6,000)

    Dry Powder (+ 3,500)

  • 16 © Wärtsilä

    Interface principle

    MV

    LV

    MV

    Optional MV-house including:•MV-switchgear•LV-switchgear•DC-system•Auxiliary transformer

    MV

    LV

    GAS LV

    LUB

    E O

    IL

    GasCube

    Ele

    ctric

    al d

    eliv

    ery

    limit

  • 17 © Wärtsilä

    General layout of electrical equipment

    Ventilation inlet air heaters

    Cube Auxiliary Module panels

    Starting air compressor panel

    Neutral point cubicle

    Radiator panel

    Electrical panels behind engine

  • 18 © Wärtsilä

    Control panelLV-switchboard

    Gas alarm panel

    Fire alarm panel

    Lighting panel

    Frequency converter for radiators

    Frequency converter for ventilation

    DC-charger panel

    Panel cooler

    Location of electrical equipment

    • Electrical panels

  • 19 © Wärtsilä

    Control Panel

    increa sedecre aseincrea sedecre aseex citation

    synchronisingselect/sta rt0

    breakerope nclosed

    star t stopengine

    rese t reset

    eng ineshu tdown

    breakertrip lamp t est

    genera ting s et controlm anualauto

    fue l

    main control unitgenerato r con tro lvoltag ed ro op

    p.f.engine con tro l

    spe edd ro op

    kWisoch

    S1 S2 S3

    S4 S5

    S6

    S7 S8

    S9 S10

    S11 S12 S13

    = 1/ 5A= 100. ..160V= 50/ 60H z= 80. .. 265V dc/ac

    I Uf U

    Made in F in landVaasa El ect ronicsVM AC 6 BA3

    2

    5

    i

    n nn aux Powe r

    ErrorSerial Com

    AlarmTRIP

    VPG 2 10Generator protectionrela t

    Vaasa Electronics

    SELECTION OF VOLTAGEMEASURING

    = 1/ 5A= 100. ..160V= 50/ 60H z= 80. .. 265V dc/ac

    I Uf U

    Made in F in landVaasa El ect ronicsVM AC 6 BA3

    2

    5

    i

    n nn aux Powe r

    ErrorSerial Com

    AlarmTRIP

    VPG 2 10Generator protectionrela t

    Vaasa Electronics

    = 1/ 5A= 100. ..160V= 50/ 60H z= 80. .. 265V dc/ac

    I Uf U

    Made in F in landVaasa El ect ronicsVM AC 6 BA3

    2

    5

    i

    n nn aux Powe r

    ErrorSerial Com

    AlarmTRIP

    VPG 2 10Generator protectionrela t

    Vaasa Electronics

    V

    De ifV

    DOUBLE VOLTAGE

    Dei f

    Hz

    Hz

    DOUBLE FREQUENCY

    Dei f

    TOOFAST

    SYNC CHECK

    TOOSLOW

    SYNC

    De if

    0.5

    1

    0.5

    0.9

    0.9

    cosMW

    4

    8

    0 0 0 0 0 0 0 0 MWh

    POWER FACTORACTIVE POWER

    OPERATORCONTROLLER

    OPERATORPANEL

    PMU

    GENERATORPROTECTION

    DIFFERENTIALPROTECTION

    OPTION

    PRELUBEPUMP

    EXHAUSTGAS FAN

    VENTILATIONFAN

    GENERATORANTIC. HEATER

    MAINTENANCEWATER PUMP

    HT PREHEATER

    OPTIONTURNINGEAREMRG. STOP

    EMERGENCYSTOP

    Control of auxiliaries

    MW and PF meters

    WOIS, panel type PC

    Genset manual control interface

    Power Monitoring Unit

    Generator protection relay

    Emergency stop

    Generator differential relay

    Manual synchronising equipment

    Inside of panel:•PLC, Siemens S7-300•AVR, ABB Unitrol 1000

    •Voltage control•Synchronisation

    •Battery, 24VDC, 90Ah

    Panel cooler

    Width: 1200 + 260Depth: 400Height: 2000Enclosure: IP54

  • 20 © Wärtsilä

    MV-House layout

    Auxiliary transformer

    LV-Switchgear

    MV-switchgear

    DC-system, 110 VDC

    MV-House is needed when existing electrical facilities are not possible to utilised.

  • 21 © Wärtsilä

    Ventilation principle for GasCube

    Free In – Forced Out Ventilation

  • 22 © Wärtsilä

    Ventilation Inlet Air

    -Dampers divided into two groups + part of dampers can be closed during

    Ventilation Inlet Air Heaters

    Ventilation Inlet Air Louvers- Outside Louvre & Mosquito Net-Silencer Baffles

    - No Filtration

    colder periods

  • 23 © Wärtsilä

    Ventilation Outlet Air

    Ventilation Roof Fan Unit- Flow 10 m3/s

    - Frequency Converter Controlled

    - Noise Attenuated

    Generator Ventilation Outlet Air Duct- Flow app. 10 m3/s

    - Insulation against Noise Transition

  • 24 © Wärtsilä

    Ventilation Generator Duct in Hot Condition

    Vertical Extension of Generator Ventilation Outlet Air Duct - Additional Duct will be used for Hot Ambient Air Conditions (> +30 ºC)

    - Need to be checked case by case

  • 25 © Wärtsilä

    GasCube Building Foundation

    - Solid Slab, thickness 600 mm

    - EG-Set & Equipment on the Same Slab with Building Constructions

    - Designed for non-piled solution

    - Door Slabs are Separate from the Building Foundation

    3D View

    Plan View

  • 26 © Wärtsilä

    Site Plan for 1 x GasCube16

    m

    47 mSite Area752 m2

    Fence with Gate Gravel Asphalt

    Grass

  • 27 © Wärtsilä

    Site Plan for 3 x GasCube27

    .6 m

    Site Area1297 m2

    47 m

  • 28 © Wärtsilä

    Site 3D View for 1 x GasCube

  • 29 © Wärtsilä

    Site 3D View for 1 x GasCube

  • Site 3D View for 2 x GasCube

    30 © Wärtsilä

  • 31 © Wärtsilä

    Site 3D View for 3 x GasCube