8
Tormax iMotion ® TN 110 In-Floor Swing Door Operator Installation/Facilitation Guidelines Center Pivot Application – Right Hand Operator w/ Flush Mounted Box General Contractors Table of Contents Door Fabrication Details 1-2 Electrical Details 3-5 Masonry/Pit Details 6-7 REV - (09/12)

General Contractors - Construction

  • Upload
    others

  • View
    22

  • Download
    2

Embed Size (px)

Citation preview

Page 1: General Contractors - Construction

Tormax iMotion ® TN 110 In-Floor Swing Door Operator

Installation/Facilitation Guidelines

Center Pivot Application – Right Hand Operator w/ Flush Mounted Box

General Contractors

Table of Contents

Door Fabrication Details 1-2

Electrical Details 3-5

Masonry/Pit Details 6-7

REV - (09/12)

Page 2: General Contractors - Construction

TORMAX TECHNOLOGIES INC.

DOOR FABRICATION DETAILSNOTE: " * * " - INDICATES COMPONENT IS JOB SPECIFIC OR OPTIONAL

REV - 09/12

CENTER PIVOTDOOR SHOE

TN OPERATOR ASSY

BOX

WEEP DRAIN

TN OPERATOR ARM

DOOR

PIT

JAMB

(TERRAZZO) COVERFLUSH MOUNT

CONTROL BOX

ACCESSIBLE HOLE FOR WIRING

NOT ACCESSIBLE

*SEE ELECTRICAL DETAILS FOR INTERNAL CLEARANCE

*FUNCTIONCONTROL

PANEL*

*JB**JB*

15 AMPS MIN110 VAC

50-60 HZ

RIGHT HAND CENTER PIVOT

Page 3: General Contractors - Construction

TORMAX TECHNOLOGIES INC.REV - 09/12

TYP

DO

OR

CE

NTE

R P

IVO

TD

OO

R S

HO

E

TN O

PE

RA

TOR

AR

M

JAM

B

AA

C LO

F D

OO

R

Dril

l & T

ap M

8x1.

25, x

1" (

5 P

lace

s)

OR

Inst

all 5

x Th

read

ed In

sert

with

M

8x1.

25 T

hrea

ds in

Doo

r Onl

y

C LPI

VOT

*TBD

2 3/

4 R

EF5

1/8

3 15

/16

TYP

4 P

lace

s

PIVO

TLC

SE

CTI

ON

A-A

JAM

BD

OO

RTN

OP

ER

ATO

RA

RM

DO

OR

(RE

F O

NLY

)

(REF

ON

LY)

1 3/

8

(TN

OPE

RA

TOR

AR

M N

OT

SH

OW

N F

OR

CLA

RIT

Y)

JAM

B(R

EF O

NLY

)

DO

OR

FA

BR

ICA

TIO

N D

ETA

ILS

B B

1 13

/16

MIN

SE

CTI

ON

B-B

SCA

LE: 2

/1

1 3/

81

1/2

25 1

/8 C

hann

el L

engt

h

2 5/

8 R

EF

PIV

OT

PIV

OT

PIV

OT

1 25

/32

RE

F

Page 4: General Contractors - Construction

TORMAX TECHNOLOGIES INC.

ELECTRICAL DETAILSNOTE: " * * " - INDICATES COMPONENT IS JOB SPECIFIC OR OPTIONAL

REV - 09/12

RIGHT HAND CENTER PIVOT

JAMB

CONTROL BOX

PIT

ACCESSIBLE HOLE FOR WIRING

NOT ACCESSIBLE

*SEE ELECTRICAL DETAILS FOR INTERNAL CLEARANCE

DOOR

TN OPERATOR ARM

WEEP DRAIN

BOX

TN OPERATOR ASSY

DOOR SHOECENTER PIVOT

(TERRAZZO) COVERFLUSH MOUNT

110 VAC

*JB**JB*

*FUNCTIONCONTROL

PANEL*

50-60 HZ15 AMPS MIN

Page 5: General Contractors - Construction

TORMAX TECHNOLOGIES INC.

ELECTRICAL DETAILS

REV - 09/12

110V AC (IN)

24V DCTO ACT.

SWITCHES

*JB**JB*

*FUNCTIONCONTROL

PANEL*

*TN110CONTROL

BOX*

TO TN110OPERATOR

ACCESSIBLE HOLE FOR WIRING

NOT ACCESSIBLE

ENCODER CABLE

MOTORCABLE

NOTES:(1) " * *" INDICATES JOB SPECIFIC LOCATION. CONSULT GC FOR FURTHER DETAILS.(2) REF NEXT PAGE (ELECTRICAL DETAILS, SHT 3) FOR WIRING DETAILS.(3) REF TN110 OPERATION MANUAL (P/N: US801461) FOR ADDITIONAL INFORMATION.(4) INSTALLATION AND WIRING PRACTICES MUST COMPLY WITH LOCAL CODES.

Ø MAX. 1-5/16"

Ø MIN. 15/16"

10 AMPSLINBUS CABLE 75'-0" SUPPLIED BY TORMAX

Page 6: General Contractors - Construction

TORMAX TECHNOLOGIES INC.REV - 09/12

pwmOUT40V

out1OUT24V SW2

RS232

LIN-BUS

out2OUT24V

n1GND24V N

n2GND24V N

n3GND24V N

n4GND24V N

GN

DN

24

V

OU

T

GN

DN

24V

OU

T

sf1sf2

GN

DN

24V

LN

GN

DN

24

V

OU

T

sf3sf4

123456

123456

123456

12345678

12345678

LIN-BUS

CANBUS GN

DLH

24

V

CANBUS GN

DLH

24V

Mo

tor

Enc

oder

OU

T

GN

D24

VA

BC

LIN

VTM

PG

ND

BR

UW

+

EncoderMotor

PowerSupply

Bra

keSe

lect

Le n

code

rM

mot

or

HW

Eti k

ette

HW

Etk

ette

CA

RD

24V

5VB

rake

Jum

per

max

none

mn

1

234

1 1

Enc

oder

Mot

or

12

34

56

12

34

56

7

24 VABCGNDLIN

TMPGNDBRUVWGND

12

34

56

12

34

56

7

24 VABCGNDLIN

TMPGNDBRUVWGND

Do

not g

roun

d sh

ield

of

enco

der c

able

at t

he o

pera

tor

Gro

und

scre

en o

fm

otor

cab

le in

scre

w c

onne

ctio

n

Enco

der c

able

Mot

or c

able

PN

: US

8013

7820

aw

g, s

hiel

ded,

6 co

nduc

tor,

stra

nded

wire

.M

ax 8

2’

PN: U

S801

379

14 a

wg,

shi

elde

d,7

cond

ucto

r, st

rand

ed w

ireM

ax 8

2’

cabl

5/16

”22

/24

mm

cabl

11/3

2”24

/27

mm

cabl

e Ø

15/3

2”27

/30

mm

ca

ble

Ø1

- 5/1

6”

enco

der a

nd m

otor

grou

ndin

g br

acke

ts

(see

cab

le p

lan

for c

ondu

it sp

ecifi

catio

ns)

Leng

th =

82'

Max

Botto

m V

iew

Of C

ontro

l Box11

0 V

AC

4 3 2m

eo

xam

Jum

per

ekra

BV5

V42D

CAR

eetk

EH

W

eek

Eti

HW

oto

mM

ode

ce

L

Brak

eSe

lect

y pl up Sr e wo P

r o ot Mr e od nc E

+

WU

RBD

GN

PTM

VN

LIC

BA

V42

DGN

TUO

edoEn

ctooM

V42

H L DN

GSUB CAN

V42

H L DNGSUB CAN

SUB N- L

8 7 6 5 4 3 2

8 7 6 5 4 3 2

6 5 4 3 2

6 5 4 3 2

6 5 4 3 2

4 s 3 s

TUO

V42

N DN

G

NL

V42

N DN

G

2 s s

TU

O

V42

N DNG

TU

O

V42

N DNG

NV 42 DNG4

NV 42 DNG3

NV 42 DNG2

NV 42 DNG

V 42 T UO2 o

SUB N- L

2 RS23

2 SWV 42 T UOo

V04 T UOmwp

TN11

0 C

ON

TRO

L BO

X

115V

AC

(108

-125

V)

AC

230V

(198

-264

V)

50/6

0 H

z

N 1

NL23

0

115

15 A

MIN

Che

ck C

orre

ct P

ositi

onO

f Vol

tage

Sel

ecto

r

1 15/16

ELEC

TRIC

AL D

ETAI

LS

Page 7: General Contractors - Construction

TORMAX TECHNOLOGIES INC.

PIT PREP DETAILSNOTE: " * * " - INDICATES COMPONENT IS JOB SPECIFIC OR OPTIONAL

REV - 09/12

RIGHT HAND CENTER PIVOT

JAMB

CONTROL BOX

PIT

ACCESSIBLE HOLE FOR WIRING

NOT ACCESSIBLE

*SEE ELECTRICAL DETAILS FOR INTERNAL CLEARANCE

DOOR

TN OPERATOR ARM

(TERRAZZO) COVERFLUSH MOUNT

WEEP DRAIN

BOX

TN OPERATOR ASSY

DOOR SHOECENTER PIVOT

110 VAC

*JB* *JB*

*FUNCTIONCONTROL

PANEL*

50-60 HZ15 AMPS MIN

Page 8: General Contractors - Construction

TORMAX TECHNOLOGIES INC.REV - 09/12

WE

EP D

RA

IN

17 3

/4

19 3

/4

6 7/

8

CO

VE

R A

NY

UN

USE

D H

OLE

S A

RO

UN

D B

OX

AN

D F

ILL

OU

TER

PE

RIM

ETE

R W

ITH

MO

RTA

R.

!W

EEP

DR

AIN

MU

ST

BE IN

STA

LLE

DO

R M

AN

UFA

CTU

RE

R'S

WA

RR

AN

TYW

ILL

BE V

OID

.

NO

TES

:

2 7/

8

1 3/

16

WEE

P D

RA

IN

2 7/

8

(1) E

nsur

e pr

ovis

ions

for w

eep

drai

n an

d el

ectri

cal w

iring

hav

e be

en m

ade

prio

r to

fillin

g th

e pi

t with

mor

tar.

(2) W

eep

drai

n m

ust b

e in

stal

led

or m

anuf

actu

rer's

war

rant

y w

ill b

e vo

id.

(3) W

eep

drai

n ha

rdw

are

to b

e pr

ovid

ed b

y G

C. W

eep

drai

n in

stal

latio

n &

loca

tion

of te

rmin

atio

n m

ust c

ompl

y w

ith c

ity a

nd(o

r) s

tate

cod

es.

(4) *

* =

Job

spec

ific.

PIT

DIM

ENSI

ON

S:19

-3/4

" L x

17-

3/4"

W x

6-7

/8" D

FLU

SH

MO

UN

T B

OX

SH

OW

N F

OR

RE

FER

EN

CE

C LPI

VOT

C LPI

VOT

JAM

B

**P

IVO

T O

FFS

ET

BO

X LO

CA

TIO

N T

OLE

RA

NC

ES

ø1 5

/16

2 P

LAC

ES

INS

TALL

WE

EP

DR

AIN

IN E

ITH

ER

HO

LE

3 7/

8±1/

2

PIT

PR

EP

DET

AIL

S

OF

PIT

0±1/

4

LC

C LO

F PI

T

C LO

F B

OX

0±1/

2

PIVO

T