Geotechnical Report G3121
RUAKURA DEVELOPMENT Stage 1: Geotechnical Investigation Tainui Group Holdings Limited
Geotechnical Factual Report
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report. i
| Opus International Consultants Ltd
Contents
1 Introduction ........................................................................................................1
2 Site Description ...................................................................................................1
3 Stage 1 Site Investigation .................................................................................... 2
3.1 Boreholes ............................................................................................................................... 2
3.2 Test Pits .................................................................................................................................. 3
3.3 Auger / Scala Penetrometer Holes ....................................................................................... 3
3.4 Cone Penetrometer Tests ...................................................................................................... 3
3.5 Ground Water Monitoring .................................................................................................... 4
3.6 Permeability Tests ................................................................................................................. 4
4 Survey ................................................................................................................ 4
5 Laboratory Testing ............................................................................................. 4
Figures
Figure 1: Site Location Plan
Figure 2: Exploratory Hole Location Plan – Residential Zones
Figure 3: Exploratory Hole Location Plan – Business Zone North of AgResearch
Figure 4: Exploratory Hole Location Plan – Inland Port Zone and Business Zone to South
Tables
Table 1: Groundwater Monitoring Results
Table 2: Survey Coordinates and Levels
Table 3: Schedule of Laboratory Testing
Table 4: Permeability Test Results
Appendices
Appendix A: Borehole Logs
Appendix B: Test Pit Records
Appendix C: Auger Scala Records
Appendix D: Cone Penetration Test Records
Appendix E: Permeability Test Records
Appendix F: Laboratory Test Records
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report. 1
| Opus International Consultants Ltd
1 Introduction
Tainui Group Holdings Limited (TGH) and Chedworth Park Limited (CPL) are currently
undertaking investigations for the rezoning and structure planning of approximately 600ha of land
to the east of Hamilton as part of the Ruakura development. TGH has engaged Opus International
Consultants Ltd (Opus) to carry out the following:
1) Geotechnical field testing of the Stage 1 area;
2) Geotechnical factual reporting of the Stage 1 area;
3) Geotechnical assessment reporting of the Stage 1 area;
4) Pavement assessment and reporting of the Stage 1 area;
5) A desktop NES contaminated sites assessment for the combined entire area of the Ruakura
development area.
The Stage 1 investigation area comprises approximately a third of the full Ruakura development
area. Stage 1 comprises part of a proposed residential development in the north-west of the site,
an Inland Port with the Industrial land to the south of the site and another area of Industrial land
north of the AgResearch centre. The location and extent of the Ruakura area is shown on Figure 1.
This report presents the results of the site investigation field work and the laboratory testing
undertaken for Stage 1 of the Ruakura development.
2 Site Description
A general description of the topography across the Stage 1 Ruakura Development area is that it
comprises mostly open level pastoral and agricultural farmland, with slight rolling hills.
No significant boggy or marsh areas were noted at the site although it is noted that our site visit has
followed a particularly dry spell of weather. It is therefore possible that there may be wet areas or
areas that experience surface water ponding at the site, particularly during the winter months,
which we were unable to observe.
A number of associated farm buildings (both farm houses and outbuildings) are located on the site.
These outbuildings are generally barn or workshop type structures for storing crops, machinery,
maintenance equipment and tools.
There is a network of gravel surfaced ‘races’ which provide access to the field areas across the site.
A number of drainage ditches are also present across the site area, mainly along field boundaries.
Trees are sporadically located on the site but generally close to ditches or fence line areas.
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report. 2
| Opus International Consultants Ltd
3 Stage 1 Site Investigation
The geotechnical field work was carried out in April 2013 and comprised of:
• 12 Rotary Cored Boreholes
• 16 Test pits with Scala Penetrometer Testing
• 43 Auger / Scala Penetrometer Tests
• 3 Seismic Cone Penetrometer Tests (SCPT)
• 5 Cone Penetrometer Tests (CPT)
• 12 Permeability tests in borehole piezometers
• Groundwater Monitoring
The exploratory hole locations carried out as part of the Stage 1 ground investigation are shown on
Figure 2, Figure 3, and Figure 4.
The field works were scoped by Opus in discussion with TGH. All exploratory holes were
supervised full time and were logged by Opus Engineers in general accordance with the NZ
Geotechnical Society guidelines1.
3.1 Boreholes
A total of 12 rotary cored boreholes (BH101 to BH112) were carried out to depths ranging from
25.95m to 30.45m.
All boreholes were logged by Opus engineers in the field at the time of drilling. The logs are
included here in Appendix A.
The boreholes were drilled by Perry Drilling Ltd using a rotary drilling rig with HQ wireline triple
tube coring and wash drilling. Standard Penetration Tests (SPT) were carried out using split spoon
(Raymond) sampler. Undisturbed samples of fine grained soils for laboratory testing were taken
using 54mm stainless steel thin walled push tubes.
Standpipe piezometers were installed in all boreholes (see bore logs for details).
With the exception of BH110, the piezometers in the BHs were dual type with slotted screens,
surrounded by “Walton Park” sand, with a 0.5m bentonite plug above and below the chosen screen
depth and above. The details of the dual standpipes were generally for a pipe with a shallow
response zone, and a pipe with a deep response zone. PVC caps were installed at the top of all
piezometers and with a locked flush metal cover (Toby box or similar) and concreted in.
The shallow piezometer was damaged upon extraction of the casing at BH108. BH108a was
therefore drilled to the side for the purposes of installing the deep piezometer, constructed in a
similar manner to the dual pipes.
The hole collapsed at BH110 following extraction of the borehole casing and consequently a second
hole (BH110a) was drilled close to the side for the purposes of installing the single standpipe.
1 ‘Field Description of Soil and Rock. Guideline for the Field Classification and Description of Soil and Rock for Engineering Purposes.’ New Zealand Geotechnical Society Inc., December 2005.
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report. 3
| Opus International Consultants Ltd
3.2 Test Pits
A total of 16 test pits (TP101 to TP116) were machine excavated to 4m depth below ground level and
Scala Penetrometer tests were carried out generally to 2m depth in the pit.
Disturbed bulk bag samples were taken by the supervising Opus engineer.
Groundwater levels and seepages given on the test pit logs were those observed during the period
the test pits were open.
Copies of the test pit records are presented in Appendix B.
3.3 Auger / Scala Penetrometer Holes
A total of 43 Auger Scala holes (AS101 to AS144) were carried out generally to 4m depth or refusal.
All tests were performed in accordance with NZS 4402: 1988, test 6.5.2.
Shallow slotted standpipe installations were put in in the Auger Scala locations AS103, AS107,
AS116, AS121, AS122, AS125, AS127, AS136, AS140 and AS144. These installations included
“Walton Park” sand placed around the pipe and a Toby box cover concreted over the pipe to protect
the installation.
Copies of the Auger Scala records are presented in Appendix C.
3.4 Cone Penetrometer Tests
Perry Drilling carried out the static Dutch Cone Penetrometer Tests (CPT) with an electronic “Geo-
mil” piezocone, using a track mounted rig.
A total of 8 cone penetrometer tests (CPT101 to CPT105 and SCPT101 to SCPT103) were carried out
to depths between 25m and 35.01m. Three of these locations (denoted as SCPT101 to SCPT 103)
were selected for seismic cone penetrometer tests.
Water levels shown on the CPT plots are the water levels measured in the holes left by the CPT
probe soon after the probe was withdrawn.
Copies of all the CPT printout records are presented in Appendix D.
3.4.1 Shearwave Velocities in SCPTs
Shear wave velocity measurements were generally taken at 1.00m depth intervals during testing
using 3 accelerometers, one for each axis. Source shear waves were generated at the surface with a
sledge hammer by hitting a steel plate that was held down by one of the CPT outriggers. The steel
plate was struck three times on the right and three times on the left hand side to generate 6 data
files. These data files include the seismic shear wave information at each depth increment tested.
The analysis and processing of the raw data will be reported on in our interpretive report.
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report. 4
| Opus International Consultants Ltd
3.5 Ground Water Monitoring
Groundwater monitoring was undertaken at various stages as the site works progressed and on the
following days:
• 19thApril 2013
• 22nd April 2013
• 3rd May 2013
• 10th May 2013.
On Table 1 we present the groundwater levels which were measured during the works and up to the
time of reporting.
3.6 Permeability Tests
A total of 12 permeability tests were carried out within the shallow standpipe piezometers in all
boreholes. In five the flow rate was too high to establish a positive head in the piezometer. In two
the flow rate was such that a falling head test was considered appropriate. In the remaining six
piezometers a constant head test was performed.
The permeabilities were calculated using the formulae given in BS5930:1999 and the results are
presented in Table 4. The field test data is presented in Appendix E.
4 Survey
All exploratory hole locations were surveyed between the 19th and 22nd April 2013 using Real Time
Kinematic (RTK) satellite navigation techniques to enhance the position data derived from satellite
based positioning systems and used in conjunction with GPS, providing centimetre level accuracy.
The exploratory hole coordinates and levels are given in Table 2.
The “as done” locations are shown on Figure 2, Figure 3, and Figure 4.
5 Laboratory Testing
The following laboratory tests were scheduled by Opus and carried out on the soil samples obtained
during the field works:
• 6 Oedometer Consolidation
• 6 Organic Content
• 10 Atterberg Limits – Liquid limit, plastic limit, plasticity index.
• 6 New Zealand Standard Compaction
• 10 Californian Bearing Ratio (CBR) un-soaked
• 10 Californian Bearing Ratio (CBR) soaked
• 10 Particle Size Distribution (hydrometer)
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report. 5
| Opus International Consultants Ltd
Table 3 presents a summary of the laboratory tests carried out as part of this investigation.
Laboratory test results are included in Appendix F.
The testing was carried out to NZS4402 ‘Methods of Testing Soil for Civil Engineering Purposes’-
1986 or other appropriate New Zealand standards and where applicable were tested to IANZ
accredited procedures, as shown on results sheets.
Note: Image sourced from Google Earth
Tainui Group Holdings Ltd FIGURE 1: SITE LOCATON PLAN
7/05/2013 2-32113.00 Ruakura Hub Stage 1: Geotechnical Investigation Factual Report
Drawing Not to Scale
Key Ruakura Development Stage 1 Ruakura Development Future Stages
AS101
AS102
AS103
AS104
AS105 AS106
AS107
AS108
AS109
AS110
AS111
AS112
AS113
AS114
AS115
AS116
AS117
AS118
AS119
AS120
BH101
CPT101
CPT102
SCPT101
TP101
TP102
TP103
5001:5000
0 10050 150 350200 250 300 400 450 m@ A1@ A31:10000
Approved Revision DateRevision Amendment
LEGEND
RESIDENTIAL ZONES
BOREHOLE
CPT
SEISMIC CPT
AUGER SCALE
TEST PIT
200
100
5010
0mm
300
mm
ScaleProject No. Drawing No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 29 May 2013 @ 3:46 p.m. Path G:\232100\32113_00 Ruakura TGH\Drawings\CAD\Factual Report\2_1826_5_5204_FIG_2-4.dwg FIG.2
Drawn Approved Revision DateDesigned
Hamilton Office Private Bag 3057Hamilton 3240New Zealand+64 7 838 9344
TAINUI GROUP HOLDINGS LTDSTAGE 1 GEOTECHNICAL INVESTIGATIONSRUAKURA DEVELOPMENT
FIGURE 2: EXPLORATORY HOLE LOCATION PLANRESIDENTIAL ZONES
2/1826/5/5204 FIG.2 R1232113.00 1:5000 [A1] 1:10000 [A3]
G.M.B. 22May13
Hamilton Ring Road
Tramway Road
Gre
enhi
ll R
oad
Pow
ells
Roa
d
Ruakura R
oad
AS121
AS122
AS123 AS124
AS125
AS126
BH102
BH103
CPT103
SCPT102
TP105
TP106
TP107
TP108
TP104
Approved Revision DateRevision Amendment
LEGEND
BUSINESS ZONE NORTH OF
AGRESEARCH
BOREHOLE
CPT
SEISMIC CPT
AUGER SCALE
TEST PIT
5001:5000
0 10050 150 350200 250 300 400 450 m@ A1@ A31:10000
200
100
5010
0mm
300
mm
ScaleProject No. Drawing No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 29 May 2013 @ 3:46 p.m. Path G:\232100\32113_00 Ruakura TGH\Drawings\CAD\Factual Report\2_1826_5_5204_FIG_2-4.dwg FIG.3
Drawn Approved Revision DateDesigned
Hamilton Office Private Bag 3057Hamilton 3240New Zealand+64 7 838 9344
TAINUI GROUP HOLDINGS LTDSTAGE 1 GEOTECHNICAL INVESTIGATIONSRUAKURA DEVELOPMENT
FIGURE 3: EXPLORATORY HOLE LOCATION PLANBUSINESS ZONE NORTH OF AGRESEARCH
2/1826/5/5204 FIG.3 R1232113.00 1:5000 [A1] 1:10000 [A3]
G.M.B. 22May13
Hamilton Ring Road
Tramway Road
Pow
ells
Roa
d
Rua
kura
Roa
d
AGRESEARCH
INNOVATION PARK
Silverdale Road
Ruakura R
oad
AS127
AS128
AS130
AS131
AS132
AS133
AS134
AS135
AS136 AS137
AS138
AS139
AS140
AS141
AS142
AS143
AS144
BH104
BH105
BH106
BH107
BH108 DEEPBH108 SHALLOW
BH109
BH110
BH111
BH112
CPT104 CPT105
SCPT103
TP109
TP110
TP111
TP112
TP113
TP114
TP115
TP116
Approved Revision DateRevision Amendment
LEGEND
INLAND PORT ZONE
BUSINESS ZONE SOUTH OF
INLAND PORT
BOREHOLE
CPT
SEISMIC CPT
AUGER SCALE
TEST PIT
5001:5000
0 10050 150 350200 250 300 400 450 m@ A1@ A31:10000
200
100
5010
0mm
300
mm
ScaleProject No. Drawing No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 29 May 2013 @ 3:46 p.m. Path G:\232100\32113_00 Ruakura TGH\Drawings\CAD\Factual Report\2_1826_5_5204_FIG_2-4.dwg FIG.4
Drawn Approved Revision DateDesigned
Hamilton Office Private Bag 3057Hamilton 3240New Zealand+64 7 838 9344
TAINUI GROUP HOLDINGS LTDSTAGE 1 GEOTECHNICAL INVESTIGATIONSRUAKURA DEVELOPMENT
FIGURE 4: EXPLORATORY HOLE LOCATION PLANINLAND PORT ZONE AND BUSINESS ZONE TO SOUTH
2/1826/5/5204 FIG.4 R1232113.00 1:5000 [A1] 1:10000 [A3]
G.M.B. 22May13
AGRESEARCH
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report.
| Opus International Consultants Ltd
Table 1 - Groundwater Monitoring Results
Site Location
Top of Sand Response Zone (m)
Base of Sand Response Zone (m)
Depth to Water from Ground Level (m)
28/03/13 03/04/13 04/04/13 08/04/13 10/04/13 11/04/13 19/04/13 22/04/13 03/05/13 10/05/13
Bore Holes
BH101 (deep) 19.50 25.95
3.80
5.14
5.09 5.03
BH101 (shallow) 4.50 8.00
1.20
3.65
3.79 3.80
BH102 (deep) 21.00 25.95 3.33
3.60
3.62
3.62 3.56
BH102 (shallow) 1.00 6.50 3.10
3.18
3.20
3.22 3.24 3.22
BH103 (deep) 19.50 25.95
3.10
4.68
4.74 4.79 4.74
BH103 (shallow) 1.00 3.00
1.06
1.67
1.53 1.60 1.51
BH104 (deep) 21.00 25.95
4.67 4.79
4.81
4.87
4.88 4.87
BH104 (shallow) 1.50 6.50
2.25 2.20
3.50
3.77
3.83 3.80
BH105 (deep) 21.00 25.95
3.89
3.92
3.94
3.90 3.87
BH105 (shallow) 6.00 8.00
2.80
2.86
2.89
2.78 2.78
BH106 (deep) 18.00 21.90
2.71
2.78
2.68 2.63
BH106 (shallow) 3.00 5.00
2.05
2.07
1.99 1.91
BH107 (deep) 19.50 24.20
3.46
3.55
3.52 3.46
BH107 (shallow) 4.50 7.25
2.62
2.64
2.66 2.84
BH108a (deep) 19.00 22.00
3.72
3.67 3.46
BH108 (shallow)
4.00 7.00
2.93
2.93 2.90
BH109 (deep) 11.50 16.00
4.25
4.29
4.34 4.37
BH109 (shallow) 4.50 8.00
1.90
3.73
3.80 3.84
BH110a 4.50 8.00
4.00
4.20
4.28 4.30
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report.
| Opus International Consultants Ltd
Table 1 - Groundwater Monitoring Results
Site Location
Top of Sand Response Zone (m)
Base of Sand Response Zone (m)
Depth to Water from Ground Level (m)
28/03/13 03/04/13 04/04/13 08/04/13 10/04/13 11/04/13 19/04/13 22/04/13 03/05/13 10/05/13
BH111 (deep) 20.00 25.95
4.60 7.42
7.35 7.32
BH111 (shallow) 3.00 6.00
1.30 3.39
3.46 3.48
BH112 (deep) 21.50 25.95
5.25
5.25 5.22
BH112 (shallow) 3.00 6.60
4.32
4.36 4.37
Auger Scalas
AS103
4.00
2.79 2.65
AS107
1.80
Dry Dry
AS115
1.90
1.29 1.16
AS121
1.35
Dry 1.33
AS122
2.91
2.42 2.38 2.35
AS125
3.35
1.64 1.59 1.48
AS127
2.10
2.10 2.10
AS136
3.04
2.73
2.77 2.74
AS140
4.00
3.41
3.50 3.52
AS143
2.20
2.16
2.14 2.04
Note: Dip meter broken on 22/04/13, therefore no further ground water readings taken on this
day.
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report.
| Opus International Consultants Ltd
Table 2: Exploratory Hole Coordinates and Levels
Test Number
Easting (m)
Northing (m)
Elevation (m)
BH 101 1802301 5819418 38.01
BH 102 1803170 5817316 39.68
BH 103 1803619 5817198 40.08
BH 104 1804465 5816445 42.19
BH 105 1804791 5816634 41.51
BH 106 1805215 5816945 40.65
BH 107 1805222 5816342 41.29
BH 108 1804887 5816243 40.54
BH 108a 1804886 5816244 40.55
BH 109 1804567 5816084 41.95
BH 110 1804791 5815829 -
BH 110a 1804793 5815828 42.26
BH 111 1804725 5815553 41.62
BH 112 1805509 5815661 41.15
AS 101 1802123 5819612 36.49
AS 102 1802390 5819628 37.38
AS 103 1802614 5819679 36.94
AS 104 1802625 5819408 37.13
AS 105 1802308 5819235 37.03
AS 106 1802348 5819112 37.68
AS 107 1802749 5819167 38.81
AS 108 1802434 5818897 38.25
AS 109 1802733 5818926 39.59
AS 110 1802893 5818936 41.95
AS 111 1802618 5818672 44.88
AS 112 1803039 5818760 38.43
AS 113 1802888 5818535 38.63
AS 114 1803111 5818604 38.77
AS 115 1803377 5818574 38.02
AS 116 1803402 5818385 38.32
AS 117 1803463 5817813 39.10
AS 118 1803579 5817829 39.76
AS 119 1803501 5817694 39.51
AS 120 1803613 5817703 39.18
AS 121 1803673 5817537 39.48
AS 122 1803049 5817366 39.61
AS 123 1802879 5817310 39.16 Datum = NZTM
AS 124 1803018 5816886 39.60 (Page 1 of 3)
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report.
| Opus International Consultants Ltd
Table 2: Exploratory Hole Coordinates and Levels
Test Number
Easting (m)
Northing (m)
Elevation (m)
AS 125 1803500 5817247 39.87
AS 126 1803431 5817040 39.51
AS 127 1804363 5816490 41.73
AS 128 1804728 5816515 41.27
-
AS 130 1805154 5816484 41.37
AS 131 1804691 5816187 41.25
AS 132 1804448 5816042 41.36
AS 133 1804608 5815812 41.80
AS 134 1804821 5815968 42.10
AS 135 1805347 5816251 41.89
AS 136 1805392 5816058 41.37
AS 137 1805200 5815931 39.69
AS 138 1804976 5815772 41.15
AS 139 1805277 5815730 41.19
AS 140 1804947 5815488 42.02
AS 141 1804729 5815324 41.03
AS 142 1804799 5815150 42.41
AS 143 1805236 5815418 41.65
AS 144 1805236 5815418 41.46
CPT101 1802568 5818924 38.60
CPT102 1802833 5818734 39.53
CPT103 1803220 5817173 39.50
CPT104 1804883 5816647 41.12
CPT105 - - -
CPT105A 1805088 5816085 41.35
SCPT101 1802499 5819292 37.20
SCPT102 1803720 5817308 40.82
SCPT103 1804526 5816445 42.37
TP101 1802265 5819360 37.06
TP102 1802487 5819144 37.27
TP103 1802694 5818486 38.99
TP104 1803214 5817442 39.45
TP105 1803505 5817385 39.88
TP106 1803042 5817144 39.42 Datum = NZTM
TP107 1803233 5816947 39.78 (Page 2 of 3)
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report.
| Opus International Consultants Ltd
Table 2: Exploratory Hole Coordinates and Levels
Test Number
Easting (m)
Northing (m)
Elevation (m)
TP108 1803781 5817115 41.16
TP109 1804303 5816295 41.43
TP110 1805088 5816780 41.00
TP111 1805283 5816775 41.08
TP112 1805360 5816411 41.45
TP113 1804952 5816332 41.71
TP114 1804660 5816067 41.24
TP115 1805052 5815637 41.17 Datum = NZTM
TP116 1805439 5815905 41.40 (Page 3 of 3)
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report.
| Opus International Consultants Ltd
Table 3: Schedule of Laboratory Testing
Test N
umber
Sampled from
Depth (m)
Atterb
erg Lim
its
Oed
ometer
Org
anic C
onten
t
Particle S
ize Distrib
utio
n
(Hydro
meter)
NZ Compactio
n
CBR - U
n so
aked
CBR - S
oak
ed
BH 101 Pushtube 18.0 -18.6 1 1 1
BH 102 Pushtube 0.5 - 0.8
Pushtube 22.5 - 23.1
BH 103 Pushtube 0.5 - 1.1
Pushtube 3.0 - 3.6 1 1 1
BH 104 Pushtube 5.0 - 5.6
Pushtube 12 - 12.6
BH 105 Pushtube 10.5 - 11.1 1 1 1
Pushtube 19.5 - 19.7
BH 106 Pushtube 18.75 - 19.3
BH 107 Pushtube 12.5 - 13.1
1 1
BH 108 Pushtube 17 - 17.5
1 1
BH 109 Pushtube 1.0 - 1.16
Pushtube 18 - 18.6
BH 110 Pushtube 0.5 - 1.1
1 1
BH 111 Pushtube 10.5 - 11.1 1
BH 112 Pushtube 1.0 - 1.5
TP101 Test Pit 1.5
Test Pit 3.2
TP102 Test Pit 0.5
1 1 1 1
Test Pit 2.3
TP103 Test Pit 0.15 1
1 1
Test Pit 2.1
1
TP104 Test Pit 0.4
Test Pit 2.4
TP105 Test Pit 1
1 1 1 1
Test Pit 3.2
TP106 Test Pit 0.6
1
Test Pit 2.9
TP107 Test Pit 0.9 1
1 1
Test Pit 1.3
TP108 Test Pit 0.7
Test Pit 1.6
TP109 Test Pit 0.5
1 1 1 1
Test Pit 1 1
TP110 Test Pit 0.5
1 1 1 1
Test Pit 1.3
Page 1 of 2
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report.
| Opus International Consultants Ltd
Table 3: Schedule of Laboratory Testing (Continued)
Test N
umber
Sampled from
Depth (m)
Atterb
erg Lim
its
Oed
ometer
Org
anic C
onten
t
Particle S
ize Distrib
utio
n
(Hydro
meter)
NZ Compactio
n
CBR - U
n so
aked
CBR - S
oak
ed
TP111 Test Pit 0.6
Test Pit 1.7 1
1
TP112 Test Pit 0.6
1 1
Test Pit 1.5
TP113 Test Pit 0.4
1
Test Pit 1.8
1
TP114 Test Pit 0.15 1
1 1
Test Pit 0.9
TP115 Test Pit 0.3 1
1 1
Test Pit 1.3
1 1
TP116 Test Pit 0.5
1
1 1
Test Pit 1
Total 10 6 6 10 6 10 10 Page 2 of 2
Ruakura Development: Stage 1 Geotechnical Investigation. Factual Report.
| Opus International Consultants Ltd
Table 4: Permeability Test Results: shallow piezometers
Borehole Number
Test Type Calculated Permeability (m/s) Notes
BH 101 Constant
Head 7.5 x10-6
BH 102 Constant
Head a) 6.3 x10-6 b) 9.2 x10-6
BH 103 Constant
Head a) 8.2 x10-6 b) 1.0 x10-5
BH 104 Falling Head
a) 3.5 x10-8 b) 5.6 x10-8
BH 105 Falling Head
6.9 x10-7
BH 106 Constant
Head -
Unable to establish any head. Too rapid to measure.
BH 107 Constant
Head -
Unable to establish any head. Too rapid to measure.
BH 108 Constant
Head -
Unable to establish any head. Too rapid to measure.
BH 109 Constant
Head 4.0 x10-6
BH 110a Constant
Head 6.8 x10-6
BH 111 Constant
Head a) 3.7 x10-6 b) 4.1 x10-6
BH 112 Constant
Head -
Unable to establish any head. Too rapid to measure.
BH 112 Constant
Head -
Unable to establish any head. Too rapid to measure.
Note: Where the groundwater level at the time of testing was within the piezometer response zone, the results have been calculated as a) the whole of the response zone, and b) that part of the response zone below the groundwater level only. The results should be regarded as indicative only.
SILT, minor sand, dark brown. Soft, wet-saturated, slightly plastic. Rootlets (TOPSOIL). Sandfine-medium.0.14m wet, no rootlets.
SILT, trace sand, reddish brown. Soft, wet, slightly plastic. Sand fine.0.31m stiff.
0.42m trace fine-medium rounded-subrounded gravel.
Fine-coarse SAND, some gravel, trace silt, greyish brown. Loose, saturated, well graded,non-plastic. Gravel fine-medium, subangular-subrounded, lithic.
1.15m no gravel.
1.55m grey.
1.70-1.73m fine-medium SAND, dark grey.
Fine-coarse SAND, trace silt, brown. 'Loose', saturated, well graded, non-plastic.
Fine-medium SAND, minor-some silt, light brownish white. Loose, wet, poorly graded,non-plastic. Pumice.Fine-coarse SAND, minor gravel, trace silt, grey. Loose, wet-saturated, well graded,non-plastic. Gravel fine-medium.
2.25m light brownish grey.
2.66-2.72m no gravel.
2.82-2.90m fine-medium SAND, trace silt, grey. 'Loose', wet-saturated, poorly graded,non-plastic.2.90m minor fine gravel, trace medium gravel.
3.85m grey.
4.45-4.50m minor coarse gravel, subangular, volcanic.
4.75-4.78m fine-medium SAND, dark grey.
Silty fine-coarse SAND, brownish grey. 'Loose', saturated, well graded, non-plastic.
Fine-coarse SAND, minor silt, brownish grey. 'Loose', saturated, well graded, non-plastic.
5.40m grey, trace fine-medium subrounded gravel.
5.50m trace silt.
5.80m minor silt.
Fine-coarse SAND, minor fine gravel, trace medium gravel, grey. 'Medium dense', saturated,well graded, non-plastic. Gravels subangular-subrounded, lithic.
Flu
sh
Co
ve
r/ C
on
cre
teF
illB
en
ton
ite
Se
al
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
Filt
er
4
7
6
1
7
16
44
51
100
93
100
80
96
40
100
107
100
133
52
3/4//1/1/1/1
1/1//2/1/2/2
1/1//1/2/1/2
1/0//0/0/0/1
1/1//2/1/2/2
2/3//3/4/4/5
HW
Casin
g r
un to 6
.0m
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
38.009 m 1
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
3/04/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
36
34
32
of
Borehole No: 101
DE
PT
H (
m)
1
2
3
4
5
6
7
2-32113.00
4/04/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
Greenhill Road
PROJECT
LOCATION
1802301 E 5819418 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
p.m.0.8m3/04
a.m.1.6m4/04
CORE DRILLINGTESTS
4/0
4/1
3
4/0
4/1
3
Fine-coarse SAND, minor fine gravel, trace medium gravel, grey. 'Medium dense', saturated,well graded, non-plastic. Gravels subangular-subrounded, lithic.(continued)
SILT, greenish grey. Firm-stiff, wet-saturated, slightly plastic.
8.64m brown.
Sandy SILT, brown. Firm-stiff, wet-saturated, slightly plastic. Sand fine.8.71m greenish grey.
Fine-coarse SAND, trace gravel, grey. Loose, saturated, well graded, non-plastic. Gravelfine-medium, subrounded, pumice.
9.45m minor silt.
Fine-medium SAND, grey. 'Loose', saturated, poorly graded, non-plastic.9.65m silty.
Organic SILT, brown. Stiff, saturated, slightly plastic.
SILT, grey. Firm-stiff, saturated, slightly plastic.
Silty fine-medium SAND, brown. 'Loose', saturated, poorly graded, non-plastic. Silt organic.10.00m grey, no organic silt.
Fine-coarse SAND, trace gravel, grey. 'Loose', saturated, well graded, non-plastic. Gravel fine,pumice.10.20-10.30m silty fine-medium SAND. 'Loose', saturated, poorly graded, non-plastic.10.30m fine-coarse SAND, no gravel, grey/dark grey colour bedding.
SILT, grey. Firm, saturated, slightly plastic.Interbedded thinl-moderately thickly with:Organic SILT, some fine sand, brown. Firm, saturated, slightly plastic.
Silty fine-medium SAND, brownish grey. 'Loose', saturated, poorly graded, non-plastic.
Fine-coarse SAND, some gravel, minor medium-coarse gravel, grey. Medium dense,saturated, well graded, non-plastic. Gravels fine, pumice.
Fine gravelly fine-coarse SAND, trace medium-coarse gravel, grey. Medium dense, saturated,well graded, non-plastic. Gravels pumice.
13.10-13.15m fine-coarse SAND, grey.
Silty fine-medium SAND, greyish brown. 'Loose-medium dense', saturated, poorly graded,non-plastic.
Be
nto
nite
Se
al
Fill
12
7
5
16
17
89
90
91
95
87
86
44
100
0
100
1/1//2/3/4/3
1/0//1/1/2/3
1/1//1/1/1/2
2/3//4/4/4/4
2/3//3/3/5/6
HW
Casin
g e
xte
nded to 9
.0m
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
38.009 m 2
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
3/04/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
30
28
26
24
of
Borehole No: 101
DE
PT
H (
m)
8
9
10
11
12
13
14
2-32113.00
4/04/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
Greenhill Road
PROJECT
LOCATION
1802301 E 5819418 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS
SILT, brownish grey. Firm-stiff, saturated, slightly plastic.
15.40m interbedded very thinly with organic SILT, brown, stiff.
Silty fine SAND, brownish grey. 'Loose-medium dense', saturated, poorly graded, non-plastic.
Sandy SILT, grey. Firm-stiff, saturated, slightly plastic. Sand fine.Interbedded moderately thinly-moderately thickly with:Silty fine-medium SAND, grey. 'Medium dense', saturated, poorly graded, non to slightlyplastic.
SILT, greenish grey. Stiff, saturated, slightly plastic.
SILT, trace-minor clay, green. Stiff, wet-saturated, slightly-moderately plastic.
Sandy SILT, grey. Very soft, wet-saturated, slightly plastic. Sand fine-medium.
19.26-19.28m brown SILT, stiff, wet, slightly plastic.
Fine-coarse SAND, minor fine gravel, trace silt, grey. 'Loose', saturated, well graded,non-plastic.19.60-19.70m brown mottled grey fine-medium SAND, medium dense, wet-saturated, poorlygraded, non-plastic.
20.15-20.22m minor silt, brownish grey.
Gravelly medium-coarse SAND, minor fine sand, trace silt, grey. 'Loose-medium dense',saturated, poorly graded, non-plastic. Gravels fine, subangular-subrounded, pumice.
20.70-20.73m fine pumice GRAVEL, minor coarse sand.
20.85-20.88m fine pumice GRAVEL, minor coarse sand.
Gravelly medium-coarse SAND, minor fine sand, brownish grey. Medium dense, saturated,poorly graded, non-plastic. Gravels fine, subangular-subrounded, pumice.Interbedded thinly-moderately thickly with:Fine-coarse SAND, minor-some gravel, grey. Medium dense, saturated, poorly graded,non-plastic. Gravels fine, subangular-subrounded, pumice.
Fill
Be
nto
nite
Se
al
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
Filt
er
7
17
1
20
13
111
48
69
100
100
0
66
89
99
82
89
3/3//2/2/1/2
1/2//2/4/5/6
1/0//0/0/0/1
2/3//3/5/6/6
3/2//3/3/3/4
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
SPT
HQTT
SPT
HQTT
PT
SPT
HQTT
SPT
HQTT
SPT
HQTT
38.009 m 3
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
3/04/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
22
20
18
16
of
Borehole No: 101
DE
PT
H (
m)
16
17
18
19
20
21
22
2-32113.00
4/04/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
Greenhill Road
PROJECT
LOCATION
1802301 E 5819418 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS
Gravelly medium-coarse SAND, minor fine sand, brownish grey. Medium dense, saturated,poorly graded, non-plastic. Gravels fine, subangular-subrounded, pumice.Interbedded thinly-moderately thickly with:Fine-coarse SAND, minor-some gravel, grey. Medium dense, saturated, poorly graded,non-plastic. Gravels fine, subangular-subrounded, pumice.(continued)
Fine-coarse SAND, minor-some fine gravel, grey. 'Medium dense', saturated, poorly graded,non-plastic. Gravels subrounded, pumice.
Sandy fine GRAVEL, trace medium gravel, grey. 'Medium dense', saturated, poorly graded,non-plastic. Gravels subrounded, pumice. Sand fine-coarse.
Gravelly fine-coarse SAND, grey. Medium dense, saturated, well graded, non-plastic. Gravelsfine, subrounded, pumice.
END OF BOREHOLE
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
Filt
er
12
17
15
0
100
82
100
82
3/3//2/3/3/4
3/4//3/3/3/5
3/3//3/4/4/4
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
SPT
HQTT
SPT
HQTT
SPT
38.009 m 4
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
3/04/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
14
12
10
of
Borehole No: 101
DE
PT
H (
m)
23
24
25
26
27
28
29
2-32113.00
4/04/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
Greenhill Road
PROJECT
LOCATION
1802301 E 5819418 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS
Ruakura Development Stage 1 Investigations
Project No: 2-32113.00 Lab Ref No: 13/843/001
BH-101 Core Photos Page 1 of 3
Ruakura Development Stage 1 Investigations
Project No: 2-32113.00 Lab Ref No: 13/843/001
BH-101 Core Photos Page 2 of 3
Ruakura Development Stage 1 Investigations
Project No: 2-32113.00 Lab Ref No: 13/843/001
BH-101 Core Photos Page 3 of 3
Ruakura Development Stage 1 Investigations
Project No: 2-32113.00 Lab Ref No: 13/843/001
BH-101 : view looking southeast.
BH-101 Site Photos Page 1 of 1
SILT, minor sand, dark brown. Stiff, dry-moist, slightly plastic. Rootlets. Sand fine.
Silty fine-medium SAND, light brownish grey. 'Medium dense', moist-wet, poorly graded,non-plastic. Pumice.
0.85-0.90m closely spaced very thin dark brown layers.
SILT, trace clay, light grey. Firm, wet, slightly plastic.
Silty fine-medium SAND, light grey. Medium dense, wet, poorly graded, non to slightly plastic.Pumice.
Sandy SILT, light grey with orange mottles. Very soft, saturated, slightly plastic. Sand fine.
Fine-medium SAND, some silt, grey. Loose-medium dense, wet-saturated, poorly graded,non-plastic. Pumice.
Sandy SILT, greenish grey. Soft-firm, saturated, slightly plastic. Sand fine.
Silty fine-medium SAND, brownish grey. 'Medium dense', saturated, non to slightly plastic.Interbedded moderately thickly with:Fine-medium SAND, minor silt, grey. 'Loose', saturated, poorly graded, non-plastic.
Fine-coarse SAND, minor gravel, trace silt, grey. Medium dense, saturated, well graded,non-plastic. Fine-medium gravel, fine gravel subrounded pumice, medium gravel subangularlithic.
Medium-coarse SAND, minor fine sand and fine-medium gravel. Loose, saturated, poorlygraded, non-plastic. Fine gravel subrounded pumice, medium gravel subangular lithic.Interbedded moderately thickly with:Fine-coarse SAND, minor fine-medium gravel, trace silt, grey. Medium dense, saturated, wellgraded, non-plastic. Fine gravel subrounded pumice, medium gravel subangular lithic.
Co
ncre
te /
Flu
sh
To
by
Be
nto
nite
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
Be
nto
nite
7
8
3
6
10
9
30
90
170
93
71
133
76
93
100
100
45
100
109
67
100
1/1//1/2/2/2
1/1//1/3/3/1
1/1//0/0/1/2
0/0//2/1/1/2
0/0//2/2/3/3
1/2//2/2/2/3
HW
Casin
g r
un to 6
.0m
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
HQTT
PT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
39.676 m 1
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
SV - Perry's #950, const. 1.566
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
27/03/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
38
36
34
of
Borehole No: 102
DE
PT
H (
m)
1
2
3
4
5
6
7
2-32113.00
28/03/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
AgResearch North
PROJECT
LOCATION
1803170 E 5817316 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
a.m.3.00m28/03
p.m.3.33m27/03
EoBH3.73m28/03
CORE DRILLINGTESTS
28
/03
/13
28
/03
/13
Fine GRAVEL, some fine-coarse sand. Medium dense, saturated, well graded, non-plastic.Gravel subrounded, pumiceous.(continued)
Fine-coarse SAND, minor fine-medium gravel, trace silt, grey. Medium dense, saturated, wellgraded, non-plastic. Fine gravel subrounded pumice, medium gravel subangular lithic.
7.90-7.93m fine GRAVEL, some fine-coarse sand.
Fine-coarse SAND, minor fine-medium gravel, trace silt, grey. Medium dense, saturated, wellgraded, non-plastic. Fine gravel subrounded pumice, medium gravel subangular lithic.Interbedded thinly with:Fine GRAVEL, some fine-coarse sand. Medium dense, saturated, well graded, non-plastic.Gravel subrounded, pumiceous.
Sandy SILT, brownish grey. Firm, saturated, non to slightly plastic. Pumiceous. Sand fine.Interbedded moderately thickly with:Silty fine SAND, brownish grey. Loose, saturated, poorly graded, non-plastic.
9.45m predominantly silty SAND with 10cm sandy SILT beds 20cm apart.
Fine-coarse SAND, minor fine gravel and silt, grey. Loose, saturated, well graded, non-plastic.Gravel subrounded, pumiceous.
Silty fine-medium SAND, grey. 'Loose-medium dense', saturated, poorly graded, non-plastic.Interbedded moderately thinly with:Fine sandy SILT, grey. Firm, saturated, slightly plastic.
Silty SAND now silty fine SAND.
SILT, trace clay, greyish brown. Firm, wet, slightly plastic.
13.08 dark brown, organic.
Silty fine-medium SAND, brownish grey. 'Medium dense', wet-saturated, poorly graded,non-plastic.
Fine-coarse SAND, minor gravel, grey. 'Loose', saturated, well graded, non-plastic. Gravelfine, pumice.
Silty fine-medium SAND, brownish grey. 'Medium dense', wet-saturated, poorly graded,non-plastic.
Fine-coarse SAND, minor silt, grey. Medium dense, saturated, well graded, non-plastic.
Fine-medium SAND, minor silt, grey. 'Loose', saturated, poorly graded, non-plastic.
SILT, brownish grey. Firm, wet-saturated, slightly plastic.
14.65-14.71m dark brown, organic.
Silty fine-medium SAND, grey. 'Loose', saturated, poorly graded, non-plastic.
Be
nto
nite
Fill
14
8
5
9
12
133
86
122
71
93
84
0
105
67
100
2/2//3/3/4/4
1/0//0/2/3/3
1/0//0/2/1/2
1/2//2/3/3/1
2/2//2/3/4/3
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
39.676 m 2
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
SV - Perry's #950, const. 1.566
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
27/03/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
32
30
28
26
of
Borehole No: 102
DE
PT
H (
m)
8
9
10
11
12
13
14
2-32113.00
28/03/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
AgResearch North
PROJECT
LOCATION
1803170 E 5817316 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS
Fine-coarse SAND, some gravel, grey. Medium dense, saturated, well graded, non-plastic.Gravel fine, pumice.(continued)
Fine-medium SAND, trace fine gravel and coarse sand, grey. 'Loose-medium dense',saturated, poorly graded, non-plastic.
Fine-coarse SAND, some gravel, grey. Medium dense, saturated, well graded, non-plastic.Gravel fine, pumice.
16.45-16.50m silty fine SAND, grey. 'Medium dense', wet-saturated, poorly graded, non-plastic.
16.90-16.93m silty fine SAND, grey. 'Medium dense', wet-saturated, poorly graded, non-plastic.
Fine-medium SAND, minor silt, trace coarse sand, grey. 'Medium dense', saturated, poorlygraded, non-plastic.17.15-17.20m Fine-coarse SAND, some fine gravel, grey. 'Loose', saturated, well graded,non-plastic. Gravel pumice.
Fine-coarse SAND, some fine gravel, grey. 'Loose', saturated, well graded, non-plastic. Gravelpumice.
18.67-18.72m Fine-medium SAND, minor silt, trace coarse sand, grey. 'Medium dense',saturated, poorly graded, non-plastic.
Fine-medium SAND, trace silt, grey. 'Medium dense', saturated poorly graded, non-plastic.Laminated with:Fine SAND, minor-some silt, grey. 'Mediumdense, saturated, poorly graded, non-plastic.
Sandy SILT, grey. Firm, saturated, non to slightly plastic. Sand fine.
Fine-medium SAND, minor silt, grey. Loose, saturated, poorly graded, non-plastic.
Sandy SILT, grey. Firm, saturated, slightly plastic. Sand fine.Interbedded moderately thinly with:SILT, minor fine sand, grey. Firm, saturated, slightly plastic.
Fill
Be
nto
nite
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
11
14
16
11
9
67
100
69
90
76
100
27
105
96
95
1/1//1/3/4/3
1/2//3/2/4/5
1/2//3/4/4/5
2/2//3/3/2/3
2/3//2/2/3/2
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
39.676 m 3
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
SV - Perry's #950, const. 1.566
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
27/03/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
24
22
20
18
of
Borehole No: 102
DE
PT
H (
m)
16
17
18
19
20
21
22
2-32113.00
28/03/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
AgResearch North
PROJECT
LOCATION
1803170 E 5817316 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS
Sandy SILT, grey. Firm, saturated, slightly plastic. Sand fine.Interbedded moderately thinly with:SILT, minor fine sand, grey. Firm, saturated, slightly plastic.(continued)
SILT, minor clay, greenish grey mottled dark gray. Firm, wet-saturated, slightly plastic.
23.54m dark brown organic mottles.
Organic SILT, minor clay, dark grey/black. Firm wet, slightly plastic.
Silty fine SAND, grey. Loose, wet-saturated, poorly graded, non-plastic.
Sandy SILT, greenish grey. Very soft, saturated, slightly plastic. Sand fine.
SILT, dark green. Firm, wet-saturated, slightly plastic.
Sandy SILT, greenish grey. Firm-stiff, saturated,non to slightly plastic. Sand fine.
SILT, trace clay, greenish grey. Stiff, wet, slightly plastic.
END OF BOREHOLE
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
6
7
15
92
140
0
140
97
133
0/0//1/2/1/2
0/0//0/1/3/3
0/1//3/3/4/5EoBH SWL 3.73m
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
PT
SPT
HQTT
SPT
HQTT
SPT
39.676 m 4
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
SV - Perry's #950, const. 1.566
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
27/03/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
16
14
12
10
of
Borehole No: 102
DE
PT
H (
m)
23
24
25
26
27
28
29
2-32113.00
28/03/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
AgResearch North
PROJECT
LOCATION
1803170 E 5817316 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS
Ruakura Development Stage 1 Investigations
Project No: 2-32113.00 Lab Ref No: 13/843/001
BH-102 Core Photos Page 1 of 3
Ruakura Development Stage 1 Investigations
Project No: 2-32113.00 Lab Ref No: 13/843/001
BH-102 Core Photos Page 2 of 3
Ruakura Development Stage 1 Investigations
Project No: 2-32113.00 Lab Ref No: 13/843/001
BH-102 Core Photos Page 3 of 3
Ruakura Development Stage 1 Investigations
Project No: 2-32113.00 Lab Ref No: 13/843/001
BH-102 : view looking northwest.
BH-102 : view looking northeast, post-installation.
BH-102 Site Photos Page 1 of 1
SILT, trace sand, dark brown. Firm, wet, slightly plastic. Rootlets. (TOPSOIL).
0.15-0.25m light brown mottles.
0.25m no rootlets.
Silty fine SAND, light brownish white. 'Loose-medium dense', wet, poorly graded, non toslightly plastic. Pumice.
Fine-coarse SAND, trace silt, light brownish grey. Very loose, wet, well graded, non-plastic.
1.52m minor silt.
Fine SAND, trace silt, green. Loose, saturated, unifomly graded, non-plastic.
SILT, minor clay, trace sand, dark green. Very soft, saturated, slightly plastic. Sand fine.
Grey, becoming greyish green.
3.86m dark grey/black specks, becoming dark greenish grey.
Fine-coarse SAND, minor organic silt, brown. Medium dense, saturated, well graded,non-plastic.4.20m becoming greenish grey.
Silty fine SAND, light greenish grey. Medium dense, saturated, poorly graded, non-plastic.Pumice.
SILT, trace clay, light greenish grey. Soft, saturated, slightly plastic.
Fine-coarse SAND, grey. Medium dense, saturated, well graded, non-plastic.
5.15m some fine rounded pumice gravel.
SILT, light brown. Firm, saturated, slightly plastic.5.30m grey, stiff.
Fine-coarse SAND, some gravel, grey. Medium dense, saturated, well graded, non-plastic.Gravel fine, rounded, pumice.
SILT, trace clay, brown. Stiff, saturated, slightly plastic.
Fine-coarse SAND, minor gravel, grey. Medium dense, saturated, well graded, non-plastic.Gravel fine, subrounded, pumice.
6.50m no gravel.
Co
ncre
te /
Flu
sh
To
by
Be
nto
nite
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
Be
nto
nite
Fill
4
3
11
19
15
100
92
96
40
96
24
92
63
96
44
133
91
133
67
1/1//1/1/1/1
1/0//1/0/1/1
SV - 6/0 kPa
1/1//3/3/2/3
1/3//3/4/5/7
1/1//2/3/5/5
HW
Casin
g r
un to 6
.0m
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
HQTT
PT
SPT
HQTT
SPT
HQTT
PT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
40.083 m 1
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
2/04/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
40
38
36
34
of
Borehole No: 103
DE
PT
H (
m)
1
2
3
4
5
6
7
2-32113.00
3/04/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
AgResearch North
PROJECT
LOCATION
1803619 E 5817198 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
a.m.0.3m3/04
EoBH2.97m3/04
CORE DRILLINGTESTS
10
/04
/13
3/0
4/1
31
0/0
4/1
3
3/0
4/1
3
Fine-coarse SAND, minor gravel, grey. Medium dense, saturated, well graded, non-plastic.Gravel fine, subrounded, pumice.(continued)
Silty fine-medium SAND, trace coarse sand, brownish grey. Medium dense, saturated, poorlygraded, non to slightly plastic.
Fine SAND, grey. 'Medium dense', saturated, uniformly graded, non-plastic.
Silty fine SAND, grey. 'Medium dense', saturated, poorly graded, non-plastic.
Fine SAND, grey. Medium dense, saturated, uniformly graded, non-plastic.
Sandy SILT, grey. Stiff, saturated, non to slightly plastic. Sand fine.
9.50-9.55m green.
Silty fine-medium SAND, minor gravel, grey. 'Medium dense', saturated, poorly graded,non-plastic. Gravel fine.
Fine SAND, trace-minor silt, grey. 'Loose', saturated, uniformly graded, non-plastic.Interbedded moderately thinly-moderately thickly with:Fine-coarse SAND, some fine gravel, grey. 'Loose', saturated, well graded, non-plastic. Gravelsubrounded, pumice.10.30m trace gravel in fine-coarse SAND.
SILT, grey. Firm, saturated, slightly plastic.
Fine-coarse SAND, some gravel, grey. Medium dense, saturated, well graded, non-plastic.Gravel fine, subrounded, pumice.
12.50m minor gravel.
Fine-medium SAND, becoming fine-coarse SAND, trace gravel, grey. 'Medium dense',saturated, well graded, non-plastic. Gravel fine.12.70-12.80m brownish grey fine SAND, some silt.12.80m minor-some gravel, subrounded-rounded, pumice.
SILT, grey. Soft, saturated, slightly plastic.
Organic SILT, greyish brown. Soft, saturated, slightly plastic.
14.2m minor wood fragments.
Silty fine-medium SAND, bluish grey, becoming brownish green, mottled light and dark grey.'Medium dense', wet-saturated, poorly graded, non to slightly plastic.
Sandy SILT, greenish brown becoming bluish grey, dark green speckled. Very soft, saturated,slightly plastic. Sand fine-coarse.
Fill
11
13
7
20
0
64
71
82
78
33
71
89
100
107
81
3/3//2/3/3/3
1/2//3/2/4/4
3/3//3/2/1/1
2/3//4/3/7/6
SV - 17/5 kPa
0/1//0/0/0/0
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
40.083 m 2
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
2/04/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
32
30
28
26
of
Borehole No: 103
DE
PT
H (
m)
8
9
10
11
12
13
14
2-32113.00
3/04/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
AgResearch North
PROJECT
LOCATION
1803619 E 5817198 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS
Sandy SILT, greenish brown becoming bluish grey, dark green speckled. Very soft, saturated,slightly plastic. Sand fine-coarse.(continued)
Silty fine-medium SAND, light greenish grey with dark green specks. 'Medium dense',saturated, poorly graded, non-plastic. Pumice.
15.70-15.75m dark greenish grey.
Fine-medium SAND, trace silt, light grey. Medium dense, saturated, non-plastic. Pumice.
16.60m dark grey specks.
16.90m light greenish grey.
17.10-17.12m reddish brown iron pan.
Sandy SILT, minor clay, dark green and reddish brown mottled. Stiff, wet, slightly plastic.Sand fine-coarse.
17.40-17.45m reddish brown iron pan.
SILT, minor-some clay, greyish green. Very stiff, wet, slightly-moderately plastic.
17.95m light brown with black specks.
SILT, trace-minor fine-medium sand and clay, grey. Very stiff, wet, slightly-moderately plastic.
Gravelly SILT, bluish grey/green/red mottled. Very stiff-hard, wet, fines slightly-moderatelyplastic. Gravel fine-medium.
Fine-coarse SAND, trace silt, mottled brownish grey and greenish grey. 'Very dense',wet-saturated, well graded, non-plastic.
Sandy fine-coarse GRAVEL, dark green. Very dense, wet-saturated, poorly graded,non-plastic. Gravel angular-subangular. Sand fine-coarse.
Gravelly fine-coarse SAND, trace silt, greyish green mottled green and light brown. Verydense, saturated, well graded, non-plastic. Gravel fine-medium, subangular-subrounded.
Fine-coarse SAND, minor-some fine-medium gravel, minor silt, brownish green mottledgreenish brown. Medium dense, saturated, well graded, non-plastic. Gravelsubangular-subrounded.
21.45m becoming gravelly.
SILT, light green. Stiff, saturated, slightly plastic.
Gravelly fine-coarse SAND,, minor silt, greenish grey/brownish green. 'Medium dense-dense',wet-saturated, well graded, non-plastic. Gravel fine.
21.95-21.97m light green SILT.
Fine-coarse SAND, minor-some gravel, minor silt, brownish green mottled greenish brown.Medium dense, saturated, well graded, non-plastic. Gravel fine-medium,subangular-subrounded.22.10m becoming silty.22.15m reddish orange.
Fill
Be
nto
nite
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
0
22
17
50+
28
133
74
84
119
133
95
48
100
100
110
0/0//0/0/0/0
3/4//5/6/6/5
SV - refusal
3/4//4/4/4/5
12/15 for 30mm,bouncing.
4/4//5/6/8/9
HQ
Siz
e, T
riple
Tube, W
irelin
e R
ota
ry C
oring
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
SPT
HQTT
40.083 m 3
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
2/04/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
24
22
20
18
of
Borehole No: 103
DE
PT
H (
m)
16
17
18
19
20
21
22
2-32113.00
3/04/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
AgResearch North
PROJECT
LOCATION
1803619 E 5817198 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS
22.30-22.33m reddish orange iron pan.22.33m orange.23.40m light brownish white.SILT, minor clay, light brownish white. Very stiff, wet, slightly-moderately plastic.(continued)
SILT, minor sand, trace clay, light orange, mottled reddish brown. Firm, saturated, slightlyplastic. Sand fine-medium.
Sandy SILT, light brownish white/reddish brown/ brown mottled. Stiff, wet-saturated, non toslightly plastic. Sand fine-coarse.
23.50m iron pan.
SILT, greyish white. Very stiff, wet, slightly plastic.
Sandy SILT, light brownish white/reddish brown/ brown mottled. Stiff, wet-saturated, non toslightly plastic. Sand fine-coarse.
23.90m iron pan.
SILT, minor sand and clay, orange/whitish orange/ reddish brown mottled. Stiff, wet-saturated,slightly plastic.
24.43m iron pan.
Silty fine-coarse SAND, brownish white/reddish brown/ brown mottled. Medium dense,wet-saturated, well graded. non-plastic.
25.05m iron pan
END OF BOREHOLE
32
mm
Slo
tte
d P
VC
/ W
alto
n P
ark
9
13
15
133
99
133
93
0
2/1//2/2/2/3
2/2//2/3/4/4
3/4//3/4/4/4
EoBH SWL 2.97mH
Q S
ize, T
riple
Tube, W
irelin
e R
ota
ry C
oring
SPT
HQTT
SPT
HQTT
SPT
40.083 m 4
MAIN DESCRIPTION GR
AP
HIC
LO
G
OT
HE
RIN
ST
RU
ME
NT
AT
ION
SP
T 'N
' V
AL
UE
GE
OL
OG
Y/U
NIT
LOGGED
LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (2005)
2/04/2013
T de Malmanche
STARTED
CLIENT
INCLINATION/
FINISHED
DRILLING Co.
LAB REF.
PROJECT No.
NOTES
TO
TA
L C
OR
ER
EC
OV
ER
Y (
%)
R.L
. (m
)
16
14
12
of
Borehole No: 103
DE
PT
H (
m)
23
24
25
26
27
28
29
2-32113.00
3/04/2013
SP
T B
LO
WC
OU
NT
S O
RS
HE
AR
VA
LU
E
Scale 1:25 @ A3
CA
SIN
G
BA
SE
OF
HO
LE
& W
AT
ER
LE
VE
L
13/843/001
AZIMUTH
DRILLING RIG
CHECKED
25.95 mNZTM
REF. GRID
ADDITIONAL NOTES
Perry Geotech
TractorS Cooke
Tainui Group Holdings Ltd
DEPTH
DR
ILL
ING
ME
TH
OD
SA
MP
LE
TY
PE
4SHEET
DATUM
Vertical; n/a
R.L.
Moturiki 1953
CO-ORD.
AgResearch North
PROJECT
LOCATION
1803619 E 5817198 NRuakura Development Stage 1 Investigations
PIE
ZO
ME
TE
RD
ET
AIL
S
SO
IL L
OG
2
-32
11
3.0
0.G
PJ
HM
N_
TE
M.G
DT
2
6/0
4/1
3
CORE DRILLINGTESTS