GETCO TRANSMISSION DIVISION, HALDARVA (FORMERLY AS G.E.BOARD) TENDER NO :- TRDH /TECH/2011/14 Subject: - Equipment erection and bus-bar stringing work and Control wiring for 50MVA, 220/132kV Transformer at 220kV Haldarwa Sub-station. Estimated Cost: - Rs. 435457.00 Price of Tender: - Rs. 440/- Time Limit :- (6) MonthS. (TECHNICAL BID)

GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

  • Upload
    others

  • View
    18

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

GETCO

TRANSMISSION DIVISION, HALDARVA

(FORMERLY AS G.E.BOARD)

TENDER NO :- TRDH /TECH/2011/14

Subject: - Equipment erection and bus-bar stringing work and

Control wiring for 50MVA, 220/132kV Transformer at 220kV Haldarwa Sub-station.

Estimated Cost: - Rs. 435457.00

Price of Tender: - Rs. 440/-

Time Limit :- (6) MonthS.

(TECHNICAL BID)

Page 2: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

TRANSMISSION DIVISION, HALDARVA

AT.POST.HALDARVA (DESAI)-392011

DIST.BHARUCH PHONE-02642-232450 Web site: getcogujarat.com Email: [email protected]

Sr. No.

Name of Work Estimated Cost Rs.

Time Limit Tender Fee Rs.

E.M.D. Rs.

01 Equipment erection and bus-bar stringing work and Control wiring for 50MVA, 220/132kV Transformer at 220kV Haldarwa Sub-station.

435457.00 6, Months

440/-(Non refundable)

4360/-

Executive Engineer (TR) GETCO, Transmission Division

HALDARVA

Page 3: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

GUJARAT ENERGY TRANSMISSION CORPORATION

LTD.

TRANSMISSION DIVISION, HALDARWA

TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-

bar stringing work and Control wiring for 50MVA, 220/132kV Transformer

at 220kV Haldarwa Sub-station.

1. WAGES TO BE PAID AND TIME OF PAYMENT ETC. BY THE CONTRACTOR

:-

(A) The Contractor shall pay minimum of wages as per prevailing rates from time to

time per day or rates fixed under the minimum wages Act. whichever is higher. The

wages of every contract labour employed by him under this contract shall be paid by

him before the expired of 7th

day of the last day of the month in respect of which the

wages are payable (i.g. wages of a month have to be paid by him in the first week of

the next month). The payment shall be disbursed in the presence of management

representative during the working hours in factory premises and the contractor shall

get the entries certified in the register of wages by the representative of the GETCO.

Any default will result in cancellation forthwith or else the contractor shall be

punishable to the extent of Rs. 100/- fine per each day.

(B) The Contractor shall give his telephone number and address to the GETCO so that in

case of labour troubles etc. the contractor can be contacted. The contractor shall

arrange to have his office outside the factory premises and the Contractor keeps

himself present throughout the working hours.

2. LABOUR LAWS :-

(A) Person below the age of 18 years shall not be employed for the work.

(B) No female worker shall be employed in the night shift between 7 p.m. to 6 p.m.

(C) Contractor shall maintain a valid labour licence under the contract labour

(Regulation and Abolition Act) for employing necessary manpower to be required

by him. In the absence of such licence, the contract shall be liable to be terminated

without assigning any reasons thereof.

(D) The Contractor shall at his own expenses comply with all labour laws and keep the

GETCO indemnified in respect thereof some of the major liabilities under various

labour and industrial laws which the contractor shall comply which are as under :-

(i) Payment of contribution by way of Employer’s Contribution towards

Provident Fund, Family Pension Scheme, Deposit Linked Insurance Scheme,

Page 4: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

Administrative Charges, etc. at the rates made applicable from time to time

by Government of Gujarat/ Government of India or other Statutory Authority.

(ii) Payment of deposit in respect of each contract labour at the rate of Rs. 30/-

with the office of Commissioner of Labour as per the Contract Labour

(Regulation and Abolition Act).

(iii) Licence Fees as prescribed under the Contract (Regulation and Abolition) Act

and rules framed there under depending upon the number of work men

employed by the Contractor.

(iv) Paid Leave facility and wages as per the provision of the Factory Act at the

rate of one day for every 20 days of working.

(v) Identity Cards as prescribed under the Factories Act with Photo affixed

thereto, the same for identification.

(vi) Payment of retrenchment compensation, Notice pay and other liabilities as

per Industrial Disputes Act. any payment to the Contractor’s employees

arising out of any claim or disputes under the Industrial Disputes Act. 1947 or

any other labour laws.

(vii) Payment of Compensation in case of accidental injury.

(viii) Provision of crèche if the female labours employed are more than 30

numbers.

(ix) Maternity Leave as per the Maternity Benefit Act. The above are some of the

major liabilities of the Contractor in addition of other liabilities prescribed

under the various labour laws in force from time to time from statutory

Authorities likes State Government / Government of India which the

Contractor shall have to comply with.

3. PROVIDENT FUND & FAMILY PENSION SCHEME :-

The Contractor shall submit along with his bill (Month wise) a statement regarding

deduction against employees Provident Fund & Family Pension Scheme in respect

of each concerned employee. Provident Fund & Family pension Scheme at the rate

of 8.33 (or at the rate made applicable by the Government from time to time) of the

wages. The Contractor’s contribution and his workers contribution towards

Provident Fund and Family Pension Scheme shall be deposited by the contractor

with Regional Provident Fund Commissioner, Ahmedabad.

4. DEPOSIT LINKED INSURANCE SCHEME :-

The Contractor shall have to deposit ½ % of the wages in respect of employees who

is a member of the Provident Fund as the contribution to the Deposit Linked

Insurance Scheme with Regional provident fund commissioner Ahmedabad.

Page 5: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

5. ADMINISTRATIVE CHARGES :-

Administrative Charges for maintaining Provident Fund Account shall be deposited

by the Contractor with Regional Provident Fund Commissioner, Ahmedabad at the

rates applicable.

6. PAID LEAVE FACILITY :-

Paid Leave at the rate of one day for every twenty days worked by the contract

labour shall be provided by the contractor to his workers. He shall maintain leave

record leave cards for individual labourer which shall be duly verified and approved

/ certified by the authorized officer of the GETCO.

7. WORKMEN’S COMPENSATION FUND & EMPLOYER LIABILITY

INSURANCE :-

The contractor shall employ adequate number of experienced Staff at site for daily

supervision and for maintenance of various registers and records required under the

contract. No payment for supervisor shall be admissible.

8. CONTRACTOR TO INDEMNIFY THE GETCO :-

The contractor has to submit Indemnity Bond on the stamp paper of Rs. 100/- as per

the prescribed format appended with the specification enclosed. The contractor shall

indemnity the GETCO and every member officer and employees of the GETCO also

Engineer in charge and his staff against all actions, proceeding, claims, demands,

costs and expenses whatsoever arising out of or in connection with the matters

referred in here in above else where and against all actions proceedings, claim,

demands, costs and expenses which may be made against the GETCO or

Government for in respect performance of his obligation under the contract

documents. The GETCO shall not be liable for or in consequence of any accident or

injury to any workmen or other person in the employment of the “Contractor or his

sub-contractor and the contractor shall indemnify and keep indemnified the GETCO

against all such damage compensation and against all claims, demands, proceedings,

costs, charges and expenses, whatsoever in respect thereof or in relation thereof.

9. WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE

Insurance shall be effected for all the Contractor’s insurance engaged in the

performance of this contract if any of the work is subject, the contractor shall

required the sub-contractor to provide workmen’s Compensation and Employer’s

Liability insurance for the latter’s employees unless such employees are covered

under the contractor’s insurance.

Page 6: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

10. The GETCO shall not be responsible for any accident / loss / damage to GETCO’s

property or contractor’s labours / technician arising out of any accident (Electrical or

Mechanical) during execution of this job.

11. The GETCO reserves the right to terminate this contract at any time during its

tendency without giving notice of termination or any reasons thereof.

12. The GETCO will be entitled to deduct directly from the bills to be paid to the

contractor any sum or sums payable by you and which sum/sums the GETCO is

required to pay as principle employers on account of your default in respect of all

liabilities referred to in above clauses.

13. The contractor will be required to produce a Solvency Certificate for an amount as

decided by Executive Engineer and also to produce his Income-Tax Clearance

Certificate.

14. PAYMENT OF SECURITY DEPOSIT: -

The Contractor will have to pay the Security Deposit at 5% of the order value on

placing the order 2.5 % will have to be paid in Cash or Demand Draft in favour of

‘GUJARAT ENERGY TRANSMISSION CORPORATION LTD.’ within 7 days

from the date of the issue of work order, and the remaining 2.5% will be recovered

from the first two R.A. Bills and higher percentage of security deposit may be fixed

at the discretion of the Executive Engineer / Supdt. Engineer.

15. TIME LIMIT :-

The Time Limit for the above work will be 45 working days from the date of issue

of work commencement order. The time beginning the essence, the same will be

strictly adhered to.

16. SIGNING AGREEMENT: -

The Contractor will have to sign an agreement as per GETCO’s rules in the

prescribed form of the GETCO. The cost Rs. 50/- of the Stamp Paper will have to be

borne by the Contractor.

17. PAYMENT OF BILLS :-

Normally, one R.A. Bills will be paid every month, however, looking to the progress

of the work it will be reviewed mutually and 90% of the cost of work done will be

paid to the Contractor on his presentation of R.A. Bill giving the material account

thereof. Remaining 10% Payment will be made after the entire work is completed

satisfactorily in all respect. The payment will be made through Account Payee

Cheque. The Bill should be submitted to The Executive Engineer (TR.) Haldarwa.

18. DEPARTURE FROM SPECIFICATION AND DRAWINGS :-

Should the tenderer wish to depart from the specification in any respect, they should

draw attention to such departure giving his reasons thereof and should get approved

the same before doing any further work, unless this is done this specification shall

held good. The working drawings are attached with the tenders. However in case of

Page 7: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

any clarification the decision of Engineer in charge will be final & binding to the

Contractor.

19. AVAILABILITY OF MATERIALS AND IDLE LABOUR CHARGE :-

Materials are readily available and arrangement made to procure the rest. However,

the Contractor should be carry out the work as and when the materials are received.

No idle labour charges will be borned by the GETCO in case such occasion of idle

labour arises, due to want of a any materials. However, this idle period will be

counted for the period of assessing the time limit for completion of work as

mentioned in the work order. Contractor has to collect the material as and when

available and should be keep in his safe custody.

20. GETCO does not accept any responsibility as factory Act, Minimum wages Act,

Workmen’s Compensation Act, Insurance Rules etc. or any other act, rules or

regulations that have to be observed by the contractor for carrying out the work.

Subject to the availability of raw materials, the contract is to be completed within 30

working days from the commencement date or as may be mentioned in the work

order.

21. The contract will be governed by the General Condition of works Contract of the

GETCO, a copy of Booklet will be available along with the tender issued by the

Division Office, Anjar and Contractor is deemed to have studied the same

thoroughly before filling up the tender.

22. ACCOUNTING OF GETCO MATERIALS :-

The contractor will be fully answerable and responsible for all the material issued to

him for the work by the GETCO for any theft, loss of pilferage and shall have to

furnish account for the same after completion of the work and before preparation of

final bill, If the loss referred to above is not made good before final bill as per rules

of the GETCO. Contractor has to maintain Site Register Material Account Register

regularly.

23. PROGRESS OF WORK & PENALTY :-

You will have to submit fortnightly progress report regularly in duplicate to

Engineer in charge and the Executive Engineer (TR.) Haldarwa. If found that the

work is unsatisfactory or not progressing as per schedule then any action would be

taken by the GETCO as may deemed fit to see that work is completed at the risk and

cost of the contractor. The completion time allowed shall be strictly observed. If the

work is not completed within the scheduled period, penalty at the rate of 0.5 % of

the contract value (of delayed work) per month or part thereof the contract value

subject to the maximum of 10% of the total contract value will be levied. This will

be deducted from the bills payable either against this contract or any bank guarantee

or any other amount payable under any other contract with the GETCO.

24. Contractor will not allow to work after working hours except in special case, if any.

25. The Contractors has to engage required strength of skilled persons for the said work

to avoid complication & unnecessary delay to complete work timely. The Contractor

will be solely responsible for labour claims arising out of the labour employed for

this job.

Page 8: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

26. The detailed drawings of equipments can be seen from this office during any

working day and the equipments, which are to be erected, can also be seen

physically at Haldarwa store during any working day and time.

27. The Contractor has to arrange for minor fabrication (if required) at free cost &

follow all labour laws I.E. Rules safety rules, Insurance rules, GETCO rules at his

risk & cost.

28. The tenderer should furnish details of past experience of such job of similar nature

completed by him satisfactorily within the time limit in GETCO without this

certificate offer shall be rejected out rightly.

29. The Tenderer will be abide by and fulfill all the terms & provisions of the “Tender

and Contract” for works as applicable and in case of any default there to the GETCO

shall forfeit the S.D. or any other action as may be decided by Executive Engineer

(TR)Haldarwa.

30. The contractor has to co-ordinate & co-operate fully with Engineer-in-Charge and

commissioning Engineer of the supplier for erection of all equipments / structure /

accessories, etc., and any other items which are not conveniently included in the

specification but requires for completing the job.

31. In case of any dispute / doubt, the decision of Executive Engineer (TR.) Haldarwa

shall be unchallengeable, final and binding to the Contractor.

32. The quantum of work as mentioned in Estimate / Schedule ‘B’ is tentative and it can

very differ as per site condition. The payment shall be made only on actual work

executed or order quantity whichever is less.

33. Security Deposit will be refunded after / completion of one year or guaranteed

period over whichever is later.

34. All legal complication or disputes are subject to Bharuch jurisdiction only.

35. No higher rate or revised rate will be applicable for the work, if work is held-up /

closed due to whatever so reasons.

36. The Time Limit for the work may be reduced and contractor should make all this

efforts to complete the work within stipulated time limit as may be given by the

Engineer in charge depending upon emergency of work GETCO reserves the right to

reduce the time limit without giving any notice.

37. The Contractor has to remain in contact in close days with Engineer in charge of

work who in turn shall issue detailed instruction for the commencement of the work.

38. The contractor has to maintain Site Register covering all aspects of Material

Received / utilized for day to day work and has to obtain signature of Site Engineer.

39. A fresh & valid solvency Certificate of the extent of 20% of the ordered value will

have to be produced by the contractor and party has to surrender original solvency

Certificate to GETCO before commencing of work.

Page 9: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

40. Contractor will abide by and fulfill all the terms and conditions and general terms

and condition of the contract for works available in the office.

41. The Contractor will be solely and responsible for any accident / damage either to

equipments or any human being during the time of execution of work.

42. All other general terms and conditions as prevailing in the GETCO shall be

applicable to this contract.

43. Prior intimation in writing for starting the job will be given by GETCO for the work.

44. Contractor will have to make his own arrangement for all tools, tackles, wire ropes

etc. for the work.

45. Contractor will fully and solely responsible for any shortage, damage, leakages to

the transformer or any it’s accessories that may occur during transportation

dragging, draining of oil, erection work etc.

46. The cost of damages, if any will be recovered from the Contractor’s bill. The

assessment of which will be done by field Engineer at his sole discretion and his

decision shall be binding to the contractor and shall be considered as final and

unchallengeable.

47. The Contractor will have to give indemnity bond to GETCO against any possible

claim of compensation for damage to contractor’s equipments or staff or any of third

party during the execution of work.

48. The Contractor will have to complete entire job as per directive and instruction of

Engineer in charge. If he fails to do so entire work will be carried out at Contractor’s

risk and cost.

59. The contractor has the experience of survey work and produces the list of survey

instrument and bio-data of Supervisor / Surveyor / Engineer / Technician to be

engaged for the job.

50. The tender shall be issued to only the experience and Contractor who has completed

such job of similar nature and magnitude satisfactorily in time. However, issuance of

blank tender, will does not qualifies the tenderer to offer the bid.

51. Tender offer without payment of E.M.D. required Certificate, Documents, bar chart

list of Tools, Tackles, Equipments etc. required for execution of job will be out

rightly rejected without assigning any reason thereof and decision of the Executive

Engineer (TR.), Haldarwa will be final and unchallengeable.

52. The contractor will be governed by the GETCO’s general conditions of works

contract. The Booklet will be available in the concerned office in any working days.

In the event of placing order, the contractor will have to sign this booklet alongwith

other documents and agreement. All the usual terms and conditions of the GETCO,

though the same might have not been mentioned in this specification or contractor

booklet will applicable to this contract, and the decision of the Executive Engineer /

Superintending Engineer shall be binding on the contractor.

Page 10: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

53. In case of non - availability of some items / materials you will have to collect the

same from other nearly store center for which you shall be paid as per GETCO’s

rules and S.O.R. rate.

54. Specification in any items mentioned in tender are subject to change without any

prior notice and binding to the Contractor.

55. THE GETCO shall deduct the Income - Tax & Taxes as per prevailing rules from

each and every bills.

56. If the work is required to be carried out during fix outage then the contractor has to

deploy adequate man power, material, tools etc. well advance and has to complete

the entire work during this specific outage period only, failing to which GETCO

shall be at liberally to deduct the amount of revenue loss due to prolong outage.

57. If required by GETCO you shall have to provide free to & fro traveling facility to

our Junior Engineer or Surveyor for the work.

58. The tender include all minor accessories and items of work which may not have

been specifically mentioned in the specification / Schedule etc. but are essential for

completion of work. The Contractor will not be eligible for any extra payment in

respect of such minor accessories and item of work.

59. The Contractor shall not refuse to execute the work order at any time and it will be

his sole responsibility to execute and complete this work as per the instruction of

Engineer - in - charge.

60. For shortages of any materials issued by the GETCO for the work, recovery shall be

made from you, on the basis or prices of the materials (prevailing the date of

settlement of materials Account) plus 15% supervision charges.

61. The Contractor has to carry out all the works in accordance with revised and latest

provision under I.E. Rules Act made there under and as per instruction of Engineer-

in-charge.

62. The tender shall be issued only to capable contractor and must have of experience

for transportation of transformer and erection work must have sufficient capacity of

trailer and carried out 3 such job of heavy carting and power transformer erection

work.

63. Registered class ‘A’ Contractors with the GETCO and having furnished Rs. 5 Lacs

Bank Guarantee towards lump sum permanent deposit are exempted from to renew /

extend the validity of registration and Bank Guarantee well in time before expiry

dates.

64. The S.S.I. Industries will be exempted from the payment of Security Deposit

provided a competency certificates is issued by the Regional Division Officer of the

National Small Scale Industries Corporation to the effect that the firm is capable of

executing the order.

65. The tender shall invariably furnish a monthly average erection capacity (in Km. And

rating) along with list of available machinery, tools, tackles etc. for erection of line.

Page 11: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

66. The tendered shall submit offer for erection or foundation work.

67. No subcontractor, Power of Attorney shall be allowed.

68. All the materials issued by GETCO shall be transported to the work site on same

day and to be preserved in safe custody failing to which GETCO shall initiate Police

actions, similarly as per instruction of Engineer-in-charge, you have to credit the

material at GETCO store without any loss of time failing to which GETCO shall

initiate Police action.

69. No part rate or reduces rate shall be allowed in final bill.

70. Contractor has to co-ordinate E.I.C. of planning of outage & work schedule thereof,

so as to complete all the planned work in outage. Contractor has to deploy adequate

manpower accordingly.

71. Any delay causing extension of outages shall be contractor’s responsibility and

appropriate amount (in term of Rupees) as decided by Executive Engineer (TR.)

Haldarwa shall be recovered from Contractor’s bill as a penalty.

72. Any access work done beyond specification and drawing shall be at Contractor’s

risk and cost.

73. The undersign reserve rights to reject any or all the tenders without assigning any

reasons thereof. Issuance of blank tender does not automatically qualifies the

tenderers for award.

74. No tools, tackles, manpower, crane facilities etc. will be provided by the GETCO.

75. The Contractor has to follow all labours laws, safety rules and regulations. The G.E.

GETCO does not take any responsibility in case of accident or injury to the workers.

The safety / security of men, materials & equipments shall be sole responsibility of

the contractor.

76. The Compliances of all Central / State Govt., rules, safety and insurance rules etc.

and that of local body, is a must condition for the agency.

77. The contractor has to submit the list of tools, tackles, equipments with him along

with his tender offer. The tender without this list and other required documents (as

mentioned above herein the tender) should be rejected out rightly.

78. The Contractor has to deploy minimum 8 to 10 skill labours / fitters at site daily

failing to which GETCO shall deduct Rs. 1,000/- per day from the bill.

79. During the stringing work of line if any EHT / 11KV / L.T. line comes on the way

the Contractor has to dismantle, restringing, kept on original position etc. work to be

carried out. No any charges will be paid extra for this work.

80. The bidder shall specifically note that GETCO will not pay any extra amount to

wards any type of claim except for the description indicated in Schedule “B’. The

party has to carry out all other / additional required activities / work as directed by

Engineer in charge which is not mentioned in Schedule but required to be

Page 12: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

completed as per the site condition and for this work no extra Payment shall be

made by GETCO

81. It will be bidder’s sole responsibility for erection of complete line / equipment in all

respect as per the provision of I.E. rules and procedures and as per the instruction of

Engineer in charge.

82. In addition to the general of the construction particular attention shall be paid to the

final finish and every effort shall be made to have the entire work contented wish

standard of workmanship by the Contractor.

83. GENERAL :-

[a] Electricity Rules :- All the works shall be carried out in accordance with latest

rules under Electricity Act.

[b] Testing :- Complete Installation shall be put to the necessary test as required

and should be approved by Government Electricity Inspector.

[c] The interpretation of specification doubts etc :- In case of any doubts about

what is mentioned in specification or schedule or elsewhere, the tenderer should get

all doubts cleared from the Department in writing and in advance of filling in the

tender. In case of difference of opinion about interpretation of specification etc. the

decision of Executive Engineer will be final and shall be binding to the contractor to

the tenderer.

[d] It is the responsibility of the contractor to hand-over the line free of all defects

on completion of the work. If within a period of six months due to bad workmanship

like slanting of cross arms, bad painting of poles, defects in guy sets, conductor etc.,

it is the duty of the contractor to rectify the same at his own cost within seven days

from the date of receipt of such notice. If the contractor does not take up the work,

same will be carried out at his risk and cost.

[e] Accounts of Materials issued :- The contractor shall have to maintain

accurate day to day and item wise account of use of issued materials which shall be

got checked from time to time by the representative of the GETCO. The contractor

will be responsible for custody and preserving the issued materials till the work is

handover by the Contractor after completion.

[f] The contractor has to maintain site Register, covering all the daily details of

Material receipt & utilization, progress of work etc. This register shall be checked

and signed by Engineer in charge & Executive Engineer during the site visit. Any

bill without site register shall not be passed.

84. The tenders shall remain open for acceptance, at least for a period of 120 days from

the date of opening of tenders for processing the work order.

Page 13: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

The GETCO does not bind itself to accept the lower or any tender. The Executive

Engineer (TR.) Haldarwa, Reserves the right to reject any or all tender without

assigning any reasons whatsoever.

The contractor should employ as a Supervisor with sufficient qualification and

experience who could supervise the execution of work throughout. He should

always be present on the site.

The contractor shall be responsible for breakages, losses and thefts of material

during transit or erection after the materials issued from the stores till the completion

of work and are taken over by the GETCO.

The erection work should be commenced within seven days from the date of receipt

of instruction from the office of the GETCO and should be completed within the

time limit there after.

85. WORKING DAYS :-

In case, it is not possible for the contractor to continue the work either due to heavy

rains or other reasonable causes, such facts should be immediately put to notice of

The Executive Engineer in writing. If the reasons for stopping the work are genuine

the Engineer may ask the contractor writing to stop work till cases (for such

stoppage) are overcome and the Engineer will ask the Contractor to start the work

again in written. The period of such stoppage will not be considered as a part of

working days moreover the contractor cannot claim compensation for such

stoppage.

As regard damages to the materials, equipments, contractor himself will be

responsible. If there is any compensation to be paid in respect of ‘WORKMAN’

Compensation Act or any other statutory provisions, the same will be paid by

Contractor directly. If he thinks fit he may take necessary insurance covering at his

cost.

Tenderer has to produce experience certificate alongwith tenders. Tenders submitted

without experience certificate will not be considered valid.

86. The contractor will be responsible for the loss, distribution of deterioration of the

materials, stores or articles supplied to him by the GETCO, even if such a loss

distribution or deterioration has occurred under any circumstances whatsoever

beyond his control as if the materials, stores or articles so supplied were his

property.

87. The contractor shall co-operate with the GETCO in recording measurement etc. as

expeditiously as possible and he shall fulfill all the requirements which are

necessary to finalize the accounts on the basis of its records and pay him such

amount as if found due to him together with the amount of security deposit. If any

Page 14: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

remaining payable to him after deduction there from the amount due by him to the

GETCO.

The GETCO shall not entertain further claim from thereafter.

88. The competent authority can delete any item in schedule of the tender, if he feels

that the rate quoted by the contractor for that item is abnormally high when

compared to the estimated rates.

89. Contractor has to submit their working schedule along with tender to complete the

line in view of time limit given in tender. Bar chart is also to be submitted.

90. Time limit extension will be given if line materials is not supplied in time and

farmer objection not cleared in time but if materials given in time and farmers

objection cleared in time, then no time limit extension will be granted and penalty

will be imposed as per rules.

91. Delivery of Material :- All material / equipment required for this work as per

schedule shall be delivered at any store centers of 220 KV S/S Haldarwa TR.

Division, Haldarwa jurisdiction and contractor has to take delivery from these stores

at his own cost only. Girders will be issued at one end of line.

92. The Contractor shall not refuse to execute this work order at any time and it will be

his sole responsibility to execute and complete this work as per the instruction of

Engineer in charge.

SIGNATURE OF CONTRACTOR Executive Engineer (TR.)

GETCO, Haldarwa

Page 15: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

GUJARAT ENERGY TRANSMISSION CORPORATION LTD.

Transmission Division, Haldarwa

SCHEDULE – A

SPECIFICATION FOR THE WORK OF Equipment erection and bus-bar stringing

work and Control wiring for 50MVA, 220/132kV Transformer at 220kV

Haldarwa Sub-station.

[1] SCOPE OF WORK :-

1.1 Contractor should handle all the material, equipments, insulators carefully, as they are

delicate items & costly. There should not be any damage to any equipment,insulators

etc., otherwise cost of material,insulators will be recovered from contractor’s bill

1.2 All equipments, material, insulators, cables will be issued from 220 KV

HALDARWA S/s.

1.3 Tender should be submitted in to separate bids i.e. technical bid and price bid.

1.4 Other condition of GETCO for the work should remain unchanged.

[2] GENERAL TERMS AND CONDITIONS :-

2.1 Prior intimation in writing for starting the job will be given by the GETCO.

2.2 Works completion certificates to that effect must be taken from Engineer-in-charge

after completion of whole job and should be attached with the bill to be produced in

triplicate, to the concerned Trans. Division with a copy to C.O., Bharuch.

2.3 The cost of damages, shortages breakages will be recovered from the contractor’s

bill. The assessment of which will be done by field Engineer at his sole discretion

and his decision shall be binding to the contractor and shall be considered as final

and un-challengeable.

2.4 The GETCO will not be responsible for any accident, injury etc. to the contractor’s

labour or any disability to those persons during execution of whole job. Any damage

to the contractor’s equipments during execution of work will be liability of the

contractor.

Page 16: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

2.5 Contractor will have to give indemnity bond to GETCO against any possible claim

of compensation for damage to contractor’s equipments or staff or any other third

party during the execution of whole job.

If for any reason, GETCO is called upon to pay any such claim or compensation, the

same will be recovered from the contractor bill any where pending with GETCO

even at any later date.

2.6 No crane, nor any facilities will be provided by the GETCO at any place, Contractor

will arrange every thing required for completion of the job.

2.7 Contractor or his authorized representative should constantly remain present while

execution of whole job to avoid completion.

2.8 Contractor must engage sufficient skilled labours and competent experienced

supervisory staff in executing the job, so as to avoid unnecessary delay and to

complete the work timely.

2.9 Contractor will have to complete entire job as per directives, if he fails, to do so,

entire work will be carried out at Contractor’s risk and cost. Due intimation for

starting the job will be given by the GETCO.

2.10 On completion of the work, the bill have to be submitted in triplicate to the

concerned Engineer-in-charge.

2.11 A solvency certificate to the extent of 20% of ordered value will have to be

produced by the Contractor.

2.12 Contractor will abide by and fulfill all the terms & conditions and general terms and

conditions of the contract for works available in the office.

2.13 Successful tenderer has to enter into agreement with GETCO on stamp paper of

appropriate value. The cost of the same will be borne by the contractor.

2.14 Contractor will be solely and fully responsible for any accident, damage either to

private or public properties any human being during execution of the entire job.

2.15 Other original terms and conditions as prevailing in the GETCO will also apply to

these jobs.

2.16 The GETCO shall arrange for insurance cover in the name of GETCO as per

prevailing rules of Corporation.

2.17 Party has to furnish the Registration / details of House / Trailer, Tools, Tackles

certificate of such experience etc. alongwith his tender offer without which his offer

Page 17: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

shall be rejected. All other terms & conditions of GETCO shall be binding to the

contractor.

2.18 Party has to quote the rate as % rate as per schedule – B and the offer should be

valid upto one year and can be extended on mutual understanding.

2.19 Contractor has to employee sufficient skilled manpower for speedy and safe

transportation of the transformer.

2.20 In case of any dispute or doubt, the decision of Executive Engineer (TR) Tr. Dn.

Nakhatrana shall be final and binding to the contractor.

2.21 All the general terms & conditions of the GETCO’s contract booklet shall be

applicable in this contract.

2.22 If the contractor will fail to arrange for sufficient capacity of Trailor in time and due

to this any revenue loss occurs, the same will have to be born by the contractor.

2.23 The successful tenderers will have to pay 5% security deposit of the Tender value.

2.24 The tender offer without required certificate / documents will be out rightly rejected

without assigning any reason thereof. The decision of Executive Engineer (TR)

Haldarwa will be final & unchallengeable during execution of job.

2.25 The GETCO shall deduct the Income Tax as per prevailing rules from each & every

bills.

2.26 Following documents are required to be submit along with TECHNICAL BID.

• Latest Solvency Certificate issued by Scheduled Bank of appropriate value.

• Copy of Registration of Bidder in appropriate class.

• Copy of P.F. Registration No. with copy of last challan.

• Copy of PAN No. / TDS Deduction.

• Copy of TIN No./S.T. Reg. No.

• Copy of Service Tax Reg. No.

• Copy of Power of Attorney as the case may be.

• Copy of Partner sheep deed.

• Experience Certificate of similar work carried out.

• List of Tools and tackles.

• Vehicle No.

• Any other documents required for particular and specific work.

• Income Tax Clearance Certificate copy, wherever applicable.

• D.D. for payment of E.M.D. amount.

Executive Engineer (TR)

GETCO,Haldarwa

Page 18: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

SCHEDULE – ‘C’

For licence and contract labours (R&A) Act : 1970

Head office circular No. IOR:DRG CONTRACT 501

Dated : 19-12-1995.

(1) If Contractor employs more than ‘9’ contract labours, he has to get licence for

same from the office of the Asstt. Commissioner of labour, Ahemdabad.

(2) They have to make the payment to contract labour in the presence of

GETCO’s representatives.

(3) The said payment is in conformity with the minimum wages prescribed by the

authority under minimum wages act.

The Executive Engineer (TR) Haldarwa should not release any payment to contractor

against this order till they submit the undertaking.

Executive Engineer (TR)

GETCO, HALDARWA

Page 19: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

GETCO

TRANSMISSION DIVISION, HALDARVA

(FORMERLY AS G.E.BOARD)

TENDER NO :- TRDH /TECH/2011/14

Subject: - Equipment erection and bus-bar stringing work and

Control wiring for 50MVA, 220/132kV Transformer at 220kV Haldarwa Sub-station.

Estimated Cost: - Rs. 435457.00

Price of Tender: - Rs. 440/-

Time Limit :- (6) MonthS.

(PRICE BID)

Page 20: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

GUJARAT ENERGY TRANSMISSION CORPORATION LTD.

Transmission Division, Haldarwa

SCHEDULE – B

NAME OF WORK :- Equipment erection and bus-bar stringing work and

Control wiring for 50MVA, 220/132kV Transformer at 220kV Haldarwa

Sub-station.

Sr. No.

Description Unit Qty Rate in Rs. Ps

Amount Rs. Ps.

01 Erection of 220KV breaker (All type /make) including fixing all its accessories, fittings , connections etc. complete as per owner’s supplier’s instruction manual and as per instruction of Engineer –in Charge including individual & inter pole wiring of operating box and that with M.K. box. Erection is to be carried out by using required capacity of crane only. Rates are inclusive of dragging / loading / unloading of same from site store to erection site.

Set of 3 pole

1 12000.00 12000.00

02 -Do- but for 132 kV Breaker. However, erection without crane is permitted.

Set of 3 pole

1 12000.00 12000.00

Erection of CT (All type make ) on its erected structure including complete dragging/loading/unloading of same with crane only from site store to erection site and fixing of required clamps, connectors as per instructions of Engineer –in –charge.

a) 220 KV CT (with crane only) Per phase 3 2500.00 7500.00

03

b)132 KV CT (with crane only) Per phase 3 1200.00 3600.00

04 Erection of LAs (All type/make) on its erected structure including complete dragging/loading/unloading of the same from site store to erection site and fixing of required clamps, connectors, corona rings, surge counter and other accessories etc. as per instructions of Engineer –in –charge.

Page 21: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

a) 220 KV Per Phase

3 750.00 2250.00

b) 132 KV Per Phase

3 380.00 1140.00

05 Erection of Double break isolator (All make) with earth blade on its erected structure consisting of 3 base channels with porcelain/solid core insulator including interconnected piping with operating mechanism and accessories with final adjustment for simultaneous operating & closing . The rates are inclusive of dragging / loading /unloading of the same from site store to erection site as per instructions of Engineer-in-charge.

a) 220KV

b) 132 KV

Set of 3 Phase

Set of 3 Phase

3 1

4000.00

4000.00

12000.00

4000.00

Erection of polyclone/Solid core/ Bus post insulator/HBPI on its erected structure complete, fixing of accessories and shifting of same including loading /unloading from its site store to erection site.

b) 220 KV Per No 10 500.00 5000.00

06

d) 132 KV Per No 01 400.00 400.00

Erection of Gantry S/S & Equipment structure including punching of nut bolts. Rates are inclusive of shifting of same up to erection site from its s/s Store.

a) 132 KV MT 09 1800.00 16200.00

07

c) 220 KV MT 20 2500.00 50000.00 08 Stringing of Single “MOOSE”220

Bus complete in all respect with fixing of all fittings, insulators sag compensating spring and all accessories as per the instruction of Engineer –In-Charge

Rmt. / Single

Conductor

300.00 80/- 24000.00

a) -DO- but for 132 single “MOOSE” /Panther

Rmt. Single Conductor

100.00 80/- 8000.00

09 Stringing of overhead earth wire in switch yard on S/S structure including jointing, jumpering, tensioning, clamping etc. complete as per instruction of Engineer –in –charge

Rmt. Single Conductor

400 22/- 8800.00

Page 22: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

Preparing and fixing of required length of jumpers in the switchyard on respective Bus & equipments, tensioning & dressing of jumpers complete as per instructions of Engineer –in –charge

10

c) Single MOOSE/PANTHER Rmt. / Single conductor

800 12.00 9600.00

Installation of earthing strips as shown below including digging of 600 mm depth and 450 mm wide trench/fixing on structure as per attached drawing including fixing arrangement with two bolt arrangement, jointing with nut-bolts and lap welding and applying zinc rich paint on added joints including supply of GI nuts & bolts as per specification.

a) 75 x 10 mm GI strip Mtr. 350 38.00 13300.00

11

b) 50 x 6 mm GI strip Mtr. 500 22.00 11000.00 12 Installation of earthing pits as per

drawing attached herewith by providing 100 mm inner diameter cast iron pipe of 13 mm thickness and 3000 mm length. Work includes fabrication and fixing of GI strips for earthing connection as per drawing attached. Excavated earth pits should be filled by mixture of coke /charcoal, salt and sand up to top. Further this includes providing of Brick masonry chamber of size 450 mm x 450 mm and depth up to 1000 mm as per the instruction of engineer in charge including light type CI cover with frame and applying 12 mm thick cement plaster in 1 : 3 inside and to all the exposed faces up to 300 mm below. Foundation level, curing etc. complete. Extra earth should be removed away from the site, S/S premises or refilling earthing pits if required. All required materials for this job such as C.I. pipe cover with frame, salt, cement, sand, charcoal gravel, bricks etc. to be supplied by the contractor. Required bolts, nuts and washers, number plates or painted plates also shall be arranged by the Contractor. Tentative quantity of salt and charcoal shall be 2.5 cu.m.

No. 19 6800.00 129200.00

13 Erection of control panel, relay panel ,C/R panel or RTCC panel including grouting of panel, jointing with adjoining panels including required fabrication for entry of control cables and complete

Page 23: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

vermin proofing. Job includes supply of required bolts, nuts etc. and shifting of panel from S/S site store to work site

b) 220 KV Per No. 3 600.00 1800.00 d) 132 KV Per No. 2 550.00 1100.00

Pr Providing and fixing of mesh type earthing pit for transformer neutral size:- 3x3mmx2.mm by using MS flat by digging any kind of soil and refilling it with mixture of wood charcoal, salt each 500 kg and black cotton soil (to be brought from out side if required ) and to be level as per original mesh of size 3.0 mtr x 3.0mtr. to be prepared by using MS flat 75x10mm at the spacing of 1.0ft in X & Y direction. This also includes supply and providing of 75 mm dia 3.0mtr long GI pipe “ B” Class having 30 holes to be drilled on the periphery and 150mm size flanges on top and including welding, bolting ,fitting of 2 Nos. 75 x 10mm size GI earthing strips(Appro.10mtr) with mesh and GI pipe as per specification(All materials to be supplied by contractor)

No Job 34617

34617.00

14 Laying of 1.1 KV PVC armored copper / aluminum cable inside hume pipe / cable trench including binding /clamping of cable with GI wire as per requirement including supply and fixing of identification tags on both ends and at distance every 100 mtrs for following size.

A)4C x 2.5 mm 2 , 4C x 4 mm2 , 7C x 2.5 mm 2 ,2C x 2.5 mm 2 Copper control cable or any equivalent size of all LT cable

Per RMtr. 2100 4.50 9450.00

B) 12C x 2.5 mm , 12C x 4 mm 2 , 19 C x 2.5 mm2 , 27C x 2.5 mm 2 , Copper control cable ,

Per RMtr 2000 7.50 15000.00

15 Termination of control cable at panel/MK/equipments including supply of required size of brass

Page 24: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

cable glands, lugs,ferrules, PVC binding tages ,button etc. for the following size.

a) 2C x2.5 mm 2 2Cx3.5 mm 2 , 4C x 2.5 mm 2 7 C x 2.5 mm 2

, 4C x 4 mm2 copper control cable or any equivalent size of all LT cable

Per End 36 100 3600.00

b) 12 C x 2.5 mm 2 , 12 C x 6 mm 2 , 19 C x 2.5 mm 2 , 27 C x 2.5 mm2, copper control cable , 3.5C or 4 C x 10 mm 2 ,70 mm 2 aluminum armored or unarmored LT power cable

Per End 52 250 13000.00

16 Erection of out door type marshaling kiosk including leveling , alignment ,grouting etc.(KIOSK) supplied by GETCO free of cost.

220kV No 1 500.00 500.00 132kV No 1 400.00 400.00

17 Providing and Fixing pipes of following size for cable protection including fixing with equipments , structure ( including required band/ coupling)

A G.I. PIPE “A” CLASS

50mm dia Mtr 50 195.00 9750.00 18 Providing and fixing of connectors

of following size and type including fixing hardware.

A Stud type 5mm sq size No 50 35.00 1750.00 B Stud type with disconnecting link No 50 100.00 5000.00

C Screw type 10mm size No 100 30.00 3000.00 19 Preparing of cable and control

wiring schedules bases on the schematic drawings supplied by the Board for the switch yard and control room equipments as mentioned below.

A Complete set of 100 MVA 220/132kV transformer

Job 1 5000.00 5000.00

B Complete set of 132kV side for transformer

Job 1 1500.00 1500.00

Total 435457.00

Rs. Four Lacs thirty five thousand four hundred fifty seven only.

Applicable Govt. Tax (Service Tax) will be paid extra on production of

necessary document

Executive Engineer (TR.)

GETCo, Haldarwa.

Page 25: GETCO - Gujarat Urja Vikas Nigam · GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION DIVISION, HALDARWA TERMS AND CONDITIONS FOR THE WORK OF Equipment erection and bus-bar

:: C E R T I F I C A T E ::

I am / we are willing to carry out the above works at _____________ % above / below the

estimated cost. The Total Amount of our tender works our of Rs. __________________ (In

words Rupees _______________________________________________________)

SIGNATURE OF CONTRACTOR

WITH SEALED & DATE.