    Business Sectors

    Power Generations Energy Solutions Project Engineering Machinery Supply Auto Control Solutions Parts & Services

    Environmental Protections TotalSolutions

    Thermal power plant by burning urbangarbage

    Ethonol Vinasse treatment

  • 7/31/2019 Gne Presentation 201009

    3/20

    Power Generation-Thermal

    Steam Boiler CFB/PC/Bagasse/Biomass

    Steam Turbine Condensing/Extraction/Back Pressure

    Turbo Generator Direct Coupling/Gearbox, Air/Hytrogen

    Cooling Total Controls

    DCS/PLC, Instrumentations

  • 7/31/2019 Gne Presentation 201009

    4/20

    Hydro Turbine Axial Inflow/Intrusion/Pressure

    Inflow Hydro Generator

    Single Shaft/Gearbox Total Controls

    DCS/PLC, Instrumentations

    Power Generation-Hydro

  • 7/31/2019 Gne Presentation 201009

    5/20

    Business Associated with: CNIEC, CHEC GXYA China Science Group Hualan Engineering Top Brands of Manufacturers

    Power Generation-Thermal

  • 7/31/2019 Gne Presentation 201009

    6/20

    Sound Track

    Thermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mwmajor boiler, turbine, generator plus auxiliaries, 3 sets

    Heat and Power Plants for Sugar Mills bagasse boiler 35-85t/h, turbogenerator 3-12mw major boiler, turbine, generator plus auxiliaries, 5 sets

    Heat and Power Plants for Textile, Chemical Mills CFB/PC boiler 35-120t/hturbo generator 3-15mw major boiler, turbine, generator plus auxiliaries, 2sets

    Thermal Power Plants of Burning Urban Garbage CFB boiler 35-65t/h, turbogenerator 6-15mw major boiler, turbine, generator plus auxiliaries, 2 sets

    Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment600t/d

    Auto Controls: DCS, PLC, Instrumentations: 60 sets

    Hydro Power Plant 3-10mw: major boiler, turbine, generator plus auxiliaries,2 sets

  • 7/31/2019 Gne Presentation 201009

    7/20

    Typical Thermal Power Plant

    Huaxing Power Plant, Baise, China Boiler 1*220t/h CFB, 9.81MPa, 540 Turbo Generator: 1*50MW, 9.0MPa,

    500 Completion: Dec., 2004 Notes: Second hand turbo generator,

    made in 1959

    Total Plant

    Turbo Generator

    Control Room DCS Operator Station Feed Pumps

  • 7/31/2019 Gne Presentation 201009

    8/20

    Captive Power Plant (1)

    Deyongjia Garment Plant, Dongguan,China

    Boiler 4 75t/h, CFB, 3.98MPa, 450 Turbine 15MW 3.5MPa 435 DCS BTG synchronized auto controls

    Date of Completion: May, 2001

    Total Plant

    TG Set

    Control Room Power Panels Coal Conveying

  • 7/31/2019 Gne Presentation 201009

    9/20

    1 2 3 4 Boiler auto controls, Baiganhua Sugar Mill, Baise, China Honeywell HC-900 DCS system

    All boilers communicate to each other plus remote controls EJA series pressure transmitters, ZKZ series control valves , Wayleber

    flow meters

    Captive Power Plant (2)

  • 7/31/2019 Gne Presentation 201009

    10/20

    Power Plant Burning Garbage

    Dongguan Garbage Power Plant, 2 151 12mw, 1200t/d garbage handling,Guangdong, China

    Ningbo Garbage Power Plant, 2 15mw, 800t/dgarbage handling, Zhejiang, China

    Boiler 65t/h CFB, 3.98MPa 450 Turbo Generator 15mw, 3.5MPa, 435 Date of Completion Dongguan-March, 2005,

    Ningbo-Dec., 2005

    Dongguan Plant

    Ningbo Plant

    Control Room CFB Boiler Turbo Generator

  • 7/31/2019 Gne Presentation 201009

    11/20

    International Projects

    AA Group, 300t/h, CFB Biomass,Thailand

    Boiler 300t/h, CFB, 9.8MPa, 540 Date of Completion under construction,

    to commissioning in Oct. 2008

    Signing Ceremony

    Technical AgreementSigning

    Site Survey Site Survey China Representatives

  • 7/31/2019 Gne Presentation 201009

    12/20

    International Projects

    SSYPL, 2*35t/h, CFB 2*7.5MW STG, India

    2009.04.25 Signing of contract with SSYPL

    Signing Ceremony

  • 7/31/2019 Gne Presentation 201009

    13/20

    Lhoknga 2 16MW Power Plant EP Project , Indonesia Boiler 75t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator 15MW, 3.5MPa, 435 Associated with CHEC, 2006

    Used plant package supplied to Indonesia, 2008 . Boiler: 2 75t/h,CFBC Boiler, 3.9MPa, 450 Steam turbine and generator 2 15MW, 3.5MPa, 435

    HFO DG Sets, 4 10MW, 2008, package supplied to Indonesia 4 10MW, HFO DG Sets Associated with GD Imp/Exp Corp.

    International Projects

  • 7/31/2019 Gne Presentation 201009

    14/20

    International Projects

    India KPPL 2 25MW thermal power plant EP Project Boiler 2 130t/h, PC Boiler, 3.9MPa, 450 Steam turbine and generator 2 25MW, 3.5MPa, 435

    Contract Signing

  • 7/31/2019 Gne Presentation 201009

    15/20

    SSYPL, Surat, India

    - Boiler: CFB, 2x35t/h, 3.82MPa, 450

    - TG: 2x7.5MW, 3.82MPa, 435

    Typical International Projects

  • 7/31/2019 Gne Presentation 201009

    16/20

    DCS Applications

    Typical DCS installed

    XDPS-400, Shanghai Xinhua MACS, Beijing Hollysys WebField ECS-100, Supcon PCS7, Siemens Florence 2000, ABB UMC-800/HC900, Honeywell

  • 7/31/2019 Gne Presentation 201009

    17/20

    Typical PLC installed

    S7-200/S7-300, Siemens Schneider Allen Bradley FX2N, Mitsubishi

    PLC Applications

  • 7/31/2019 Gne Presentation 201009

    18/20

    Drum leveler

    PressureTransmitters

    TempratureProbe

    Generator Hydrogen

    Cooling

    50MW TurboGenerator

    IndustrialMonitors

    Speed Sensors

    Sony Video Camera

    Installed Instrumentations

  • 7/31/2019 Gne Presentation 201009

    19/20

    1 2 3 4 Boiler auto controls, Baiganhua, Baise, China

    Honeywell HC-900 DCS system All boilers communicate to each other plus remote controls

    EJA series pressure transmitters, ZKZ series control valves ,Wayleber flow meters

    Typical Projects

  • 7/31/2019 Gne Presentation 201009

    20/20

    Guo Neng Electricals Ltd.Addr.: Rm1612, Xincheng Intl Bldg, No.92 -1,

    Nanning, Guangxi, 530028 ChinaTel: 0771 5511310 5501300Fax 0771 5511852Email: [email protected]