LiqueFieD NATurAL GAS
7/30/2019 Gnl 28pages a4 Gb
2/28
The benefits of a
clean energy source2
The LNG market
4
Liquefaction
8
Shipping
14
Regasification
16
Trading and
marketing20
Total, innovating
in LNG technology22
Totals LNG
activities worldwide24
7/30/2019 Gnl 28pages a4 Gb
3/28
1
Ov th last two dcads, lfd natal gas has gown n mpotancto bcom a vtal lmnt n th global natal gas balanc.
Consmpton of LNG s gowng vy stongly by abot 7% p ya
and dspt th conomc downtn that bgan n 2008, ts sha of th gas makt
s sng stadly as wll. LNG mt aond 7% of wold gas dmand n 2008 and
ths fg s pojctd to s to naly 11% n 2015.
Th tadtonal LNG makts (Nothast Asa, eop and Noth Amca) as wll
as mgng makts (inda, Chna and Soth Amca) claly appcat
th advantags of an ngy soc that s at onc ngy-ffcnt, clan, andas asy to tanspot as ld hydocabons.
in ths contxt of stong gowth, Total, whch was among th LNG ndsty
pons, s backd by vy sold postons n th pstam and downstam
sgmnts of th gas chan.
O objctv s to ncas o LNG podcton by dvlopng nw pojcts.
in ths spct, 2009 has bn a watshd ya fo Total: th stat-p of two
majo lfacton pojcts qatagas 2 and Ymn LNG wll n th shot tm
allow th Gop to boost ts LNG podcton by 50%. Oth pojcts nd
way o nd stdy n Nga, Angola, Astala, rssa and ian wll pmt
th pst of podcton gowth thogh th dcad 2010-2020.
O ablty to gaant sals fo o lfacton pojcts s a dcsv advantag
n mtng ths objctvs, whch s why w hav bn stngthnng
o downstam LNG psnc. Total has acd ntsts n fo cvng
tmnals n inda, Mxco, Fanc and th untd Kngdom and has svd
lag-scal gasfcaton capacty n a tmnal n th untd Stats.
W a now stdyng fth mpot tmnal pojcts, ncldng on n Coata
ntndd to spply Sothn eop.
By consoldatng o potfolo of cstoms n ths gowng makts and
scng physcal accss to makts as wll, w a n a poston to pchas
LNG oslvs, thby facltatng th lanch of nw pstam pojcts.
Jean-Marc Hosanski
Senior Vice President, LNG
Total Gas & Power
7/30/2019 Gnl 28pages a4 Gb
4/28
Gas-fd pow plants not only hlp to mt stadly xpandngdmand fo lctcty, wth savngs n constcton tm and captalcosts, bt wth cognaton and combnd-cycl tchnologs,thy also hav lmtd nvonmntal mpact bcas thy a xtmlyngy ffcnt. Ths mans that mo sabl ngy s podcdfom lss natal socs. Lvagng natal gas socs sthfo a ctcal challng.
THE BENEFITS OF A CLEAN ENERGY SOURCEGlobal dmand fo natal gas s gowng fast than dmand footh fossl fls, lagly bcas of ts nvonmntal advantags.Combston of natal gas dos not podc havy nbndcomponds and also gnats lss gnhos gas mssons,thanks to ts hgh hydogn contnt.
2
7/30/2019 Gnl 28pages a4 Gb
5/28
Maintaining integrity
evythng abot an LNG pojct choc of sts fo th
lfacton plant, loadng faclts and gasfcaton
tmnal; szng of pmnt; slcton of tchnologs to
b sd s caflly stdd so as to ns optmm asst
ntgty. Mtoologcal xtms and ssmc sks a
also dly takn nto accont. Optmm safty dstancs
a calclatd fo ach plant st, povson s mad fo
pmannt montong, and mgncy pmnt, sch as
tnton tanks and f-fghtng systms to cb th
consncs of a potntal lak, a always ncldd.
Total s pa tc patng n a nmb of advancd sach
pojcts to mo accatly assss sks and thby
mpov faclts dsgn, opatng pocds and,
wh ncssay, vacaton condtons. Th Gop also
contbts to th ndstys ntnatonal ntatvs to
nhanc LNG shppng and stoag safty thogh ts
patcpaton n th Socty of intnatonal Gas Tank
and Tmnal Opatos (SiGTTO), whch ovss
complanc wth stngnt constcton and opatng
standads fo LNG cas and tmnals.
Patrice Lecomte
Senior Vice President,
Health , Safety,
Environment & Sustainable
Development,
Total Gas & Power
The applicationof the highest safety
standards in the design and
construction of the facilities,
constantly improved risk
management and the
promotion of a strong safety
culture in our operations are
basic rules and imperat ives.
Total implements
internationally recognized
safety management systems
that demand constant
vigilance and a commitment
to progress.
Safety throughout the LNG chain
Podcton, handlng, tanspotaton and stoag of LNG and ths s tof all nflammabl sbstancs nvolv navodabl sks. So all possbl cas takn dng pojct dsgn and daly opatons to mantan th hghst
possbl safty standads.
3
7/30/2019 Gnl 28pages a4 Gb
6/28
THE LNG MARKETLNG tad has gown at a makabl pac.
Tadd volms hav ncasd at an avag at of aond 7% a yafom 2000 to 2008 and xcdd 230 bllon cbc mts n 2008.
LNG, helping to interconnect gas markets
Th wol d gas makt s st l l bas ca ll y gonal and
chaactzd by long-tm contacts and dffnt pcng
fomlas n ach zon, bt ths gonal spaaton s now
waknng.
Ths s bcas cagos of LNG, nlk p pln gas, can
b asly dvtd to a nw dstnaton, wth th stong
ncas n logstc capacty n th past fw yas (LNG
cas and gas tmnals) now fth nhancng
flxblty. Thfo t s possbl to abtat btwn
dffnt mpot makts and sll at th bst pc.
Th LNG sgmnt ths plays a balanc ng ol btwn
wold gas makts. So fa, ths abtag phnomnon
nvolvs only lmtd volms of gas bt ts mpotanc
wll gow as th sha of LNG n wold gas consmpton
ncass. Ths wll slt n a mch stong colaton
btwn makts that w pvosly ndpndnt.
indd, ths can alady b obsvd btwn th untd
Stats (Hny Hb) and th untd Kngdom (NBP).
4
7/30/2019 Gnl 28pages a4 Gb
7/28
In Asia
LNG satsfs naly all gas dmand n Japan, Soth Koa
and Tawan, whch togth accont fo aond two-thds ofth wold makt.
Nothast Asa s a mat makt, long domnatd by
natonal and gonal mpot monopols bt now
xpncng swpng changs fom ncasd comptton
btwn gonal plays. As monopoly postons a bng
challngd mo and mo, a nd has asn fo mo
flxbl and dvs spply mchansms, wth mo mphass
on shot- and mdm-tm contacts n patcla.
Th Chns and indan makts off xtaodnay gowth
potntal fo th LNG ndsty n Asa.
in Chna, dmand fo gas s gowng fast and nth th
contys dynamc domstc podcton no ts pplnmpot contacts can mt cnt nds. in ths favoabl
contxt, LNG mpots a xpctd to ncas by an
stmatd 15% a ya. Chna s now scng ts mpo ts
va a gowng nmb of long-tm LNG pchas
contacts and s bldng th ncssay cvng
faclts.
in inda, th stady gowth of ngy dmand and
nsffcncy of domstc gas socs, at last n th
shot tm, a spng ntst n LNG, patclaly fo
pow gnaton.
At psnt, LNG acconts fo 10% of gas dmand (and
22% of mpots). Bt ths pcntag s ncasng
stadly and LNG consmpton s pojctd to ncas
vy sgnf cantly n th comng yas, sng fom
57 bllon cbc m ts n 2008 to 130 bll on n 2015.
Makt l bal zaton s modl ng th l andscap.
Nw cstoms a mgng, nmos cvng
tmnals a bng blt, and vn thogh long-tm
contacts a st l l th l, th s stong gow th n
shot-tm and spot tads.
In Europe
New opportunities an new markets
Th latv mpotanc and th ol playd by LNG dff sgnfcantlyn th th man makts: Asa, eop and Noth Amca.Nvthlss, LNGs gowth potntal n ach gon s hgh, fo a vaty
of asons. At th sam tm, nw makts a mgng.
Masaki Yamaa
LNG Marketing Manager,
LNG Div ision, Total Gas & Power
In the early 2000s, the first signs of de regulation
in Japans energy sector, strong growth in Asian LNG
markets and stif fer competit ion among LNG producers
led Total to strengthen i ts LNG marketing presence
in Japan. An LNG off ice was set up in Tokyo to capita lizeon the proximity of the LNG players in Northeast Asia
(Japan, South Korea and Taiwan), which is still the
biggest import market in the world, and to leverage
new growth opportunities in the reg ion.
The specific mission of the Tokyo office is to analyze
market trends, identi fy new opportunit ies for shor t,
medium and long-term supply contracts, and make
appropr iate market ing recommendations to other
Total units, working closely with the LNG team in Paris.
Our local presence also means that Total can respond
faster to new trading opportunities, in cooperation
with Total Gas & Power Ltd.
5
Japan, a thirst for LNGJapan has bn th wolds lagst mpot of LNG
fo naly 40 yas.
in 2008, th conty accontd fo 40% of th global
makt, mpotng 69 mllon mtc tons, p 3% fom
2007. Wth 2/3 of mpots sd fo pow gnaton
and 1/3 fd nto th gd fo ndstal, commcal
and hoshold s, LNG cntly mts a lttl mo
than 13% of Japans pmay ngy nds. Gvn thscontys ngy scty and nvonmntal concns,
Japans LNG mpots a bond to ncas vn
fth n th comng dcads. To handl th gowng
mpot volms, Japan a l ady boasts 27 LNG
cvng tmnals (a cod that s lkly to stand fo
som tm) and addtonal facl ts a now nd
constcton.
7/30/2019 Gnl 28pages a4 Gb
8/28
6
The Unite States: regulator
of global LNG flows?
Wth th stat-p of nmos nw LNG pojcts lanchd
n th md-2000s n qata, Ymn, rssa, indonsa,
avalabl volms of LNG wll ncas spctaclaly
n 2010-2012/13. in som makts, ths wll tmpoaly
lad to a spply spls. Gvn th flxblty and th
consdabl sz of th uS gas makt (th tms lag
than th wold LNG makt), th untd Stats wll no
dobt play a ky ol n absobng a sgnfcant pat of
ths LNG volms. Ths addtonal nflow of LNG wll
sv, among oth thngs, to dv ncmntal makt
gowth. it can also b xpctd to pompt nw comptton
btwn gas and coal as fl fo pow gnaton, as
wll as a confgaton of domstc gas podcton
(shtdowns of th last poftabl gas flds).
Convsly, f dmand fo LNG w to s (and pcs
wth t), th spply-sd flxblty njoyd by th untd
Stats wold nabl ths conty to f p antts of
LNG fo oth makts to by.
untl cntly, LNG playd only a magnal ol n Noth
Amcas ovall nata l gas consmpton, wth annal
mpots flctatng btwn 10 and 25 bllon cbc
mts, dpndng on dmand and th pc of local
ppln gas. Howv, th staton s volvng apdly. in
th last fw yas spply has dvsfd (npt of non-
convntonal gas) and majo gasfcaton capacty has
bn addd. Factong n th stady gowth n gas dmand
n ths zon, as wll as th mpotant ol bng playd by
non-convntonal gas (at tactv at vayng pcs) n u.S.
domstc gas podcton, dmand fo LNG s xpctd
to ach 40 to 70 bllon cbc mts by 2015.
In North America (Canaa, Unite States, Meico)
40%A BOOMING ENERGY SEGMENTToday, LNG accounts for more than a quarter of theinternational gas trade, a figure that is forecast to riseto by 2015. Volumes are
projected to grow by
around 7% a year.
7/30/2019 Gnl 28pages a4 Gb
9/28
26,218BCF (Billion cubic feet)
Totals proved reserves
of gas at the end of 2008
7
TOTAL ANd LNG: A SUCCESS STORY OF NEARLY 50 YEARS
The LNG industry was born at Skikda in Algeria during the 1960s with a project
intended to supply the UK and French markets. Involvement in this world first gave
the Group an early lead in LNG expertise. A few years later, Total was also a player
in the LNG boom in Asia and the Middle East triggered by Japans decision to give
preference to LNG. The Group was thus involved in construction of the Bontang
plant in Indonesia and the Adgas project in Abu Dhabi. Both plants started up in
1977 and were decisive steps in the Groups gas strategy. Total subsequently
participated in major projects in Qatar, Nigeria, Oman, Norway and Yemen and
gradually broadened its port folio of activities to become a leading LNG player.
in th Sothn Con (Agntna, Bazl, Chl), gas mpots
a stll vy modst and manly sd to mt swng
dmand dng th cold months. Bt th Sothn Con
s skng to sc and dvsfy ts gas spply and cold
ncas gas mpots n th comng yas. On patclaty
h s th gons stong ntst n offsho gasfcaton
faclts, whch nvolv both shot constcton lad
tms and lss havy captal nvstmnt.
South America: an emerging market
5.4%Totals share of the world LNG market in 2008. The
Group marketed 9.15 million metric tons of LNG, making
it one of the top three international companies in this
market.
7/30/2019 Gnl 28pages a4 Gb
10/28
LIQUEFACTIONCololss, odolss and non-toxc LNG manly consstsof mthan (mo than 75%) along wth than, popan,btan and ntogn (lss than 1%).
Gas is transporte from the fiel by ppln thn
pocssd to mov ld condnsats, acd (CO2,
H2S and oth slf componds) and wat. in addton,
ts mcy contnt, whch can cood th alloys sd
n pmnt fo sbsnt stags of th pocss, s
also movd.
The LNG has to meet st ngnt commc a l
spcfcatons that can vay dpndng on th dstnaton
makt. Ths spcfcatons ncld hatng val
and Wobb ndx, whch chaactzs th combston
popts of th gas.
Heay hyrocarbons (condnsats) and any lfd
ptolm gas (popan and btan) a solatd va
pcoolng and factonatng n a ss of dstllaton
pocsss. Th gas thn ndgos hat xchangs n a
ss of fgaton cycls, bcomng ld at aond
-160C. Thn t s stod at atmosphc pss ntlt s loadd on an LNG ca.
Liquefaction plants comps dffnt sctons fo th
sccssv opatons, whch ncld gas pfcaton,
lfacton and stoag as wll as pot nfastct.
Th pmnt sd s vy lag, ng spc f c
mat a l . Appoxmatly 10% of th natal gas
avng at a lfacton plant s consmd fo ts ownopatons.
8
7/30/2019 Gnl 28pages a4 Gb
11/28
Abs orb er & R ege ner atoreed Gas
K.O.D.
PropaneRefrigeration
MCRRefrigeration
DeethanizerDepropanizerDebutanizer
FractionationC5+
LPG
LNG
H2O & Hg Removal
CO2
S cr ub Co lu mm Ma in Hea t E xc han ge r Bo il of f
H2S & CO2Removal Dehydration Cooling Liquefaction Storage
H2S
LN G
LP G
LNG takes up 600 times
less space than natural
gas in its gaseous
state but contains
the same amount of
energy. So LNG can
be transported at
atmospheric pressure
at a temperature of
-160C aboard purpose-
built ships to terminals
where it is regasifiedand fed into the natural
gas transmission grid.
9
Christophe Thomas
Head of the LNG department ,
Strategy, Business development, Engineering
and R&D d ivision,
Total Exploration & Production
Total enjoys an international reputation for its LNGprofic iency, acquired dur ing many years of act ive
technical participation in a large number of LNG projects
involving a variety of technologies, in many dif ferent
countries. For more than 40 years now we have been
involved in all the main technological advances, that have
taken the industry from the first small ADGAS and
Bontang liquefaction trains to the large-capacity trains
now operational in Qatar.
Alternative liquefaction processes are now challenging
the near-absolute domination of the C3-MR process
originally developed by Air Products & Chemicals Inc.
(APCI). An outstanding characteristic of Total is
our involvement in projects using the five or six main
processes currently available on the market. We are
determined to maintain complete freedom of choice,
which doesnt prevent us from working on improvements
to enhance process ef ficiency.
Given the capital-intensive nature of the LNG projects,
we have to be more rigorous than ever in the preliminary
phases preceding the investment decision. Nevertheless,
forecast future demand for LNG naturally encourages
Total to consider liquefaction projects in increasingly
difficult locations such as the Barents Sea that require
us to devise innovative technological solutions such
as modular plant construction and transfer systems
that can be used in the open sea.
Units making up a liquefaction plant
7/30/2019 Gnl 28pages a4 Gb
12/28
10
Totals net LNG prouction in 2008 ae up to more than9 million metric tons. Wth th stat-p of two majo Mddl eastlfacton pojcts, qatagas 2 and Ymn LNG, th GopsLNG podcton wll ncas by 50% n th shot tm. Ths wll lft thGop nto a hgh lag, stngthnng o poston as a ladngplay n th LNG ndsty and a majo podc n th Mddl east.
As a p on of qa ta s ga s nd st y, Total was th
dv bhnd qatagas (l at to bcom qatagas 1) n
1984. Wth ts th tans and an ovall capacty of
9.9 mllon mtc tons p ya aft dbottlnckng,
qatagas s contnng to xpand v a th qatagas 2, 3
and 4 pojcts nvolvng dffnt ntnatonal patns.
Th am has bn to man th wolds lagst spp l
of LNG.
qatagas 2, th wolds f st ntgatd pstam/
downstam pojct, was nagatd on 6 Apl 2009.Th pojct nvolvs th nmannd of fsho plat foms,
two lfacton tans ach wth a capacty of 7.8 mllon
mtc tons p ya, 14 q-Flx (215,000 cbc mts) and
q-Max (265,000 cbc mts) LNG cas, and th Soth
Hook gasfcaton tmnal n th untd Kngdom.
Total s a 16.7% patn n th scond tan of qatagas 2,
alongsd th natonal company qata Ptolm (65%)
and exxonMobl (18.3%). Th Gop also has an 8.35%
shaholdng n th Soth Hook tmnal and has
contactd wth qatagas 2 to pchas 5.2 mllon mtc
tons of LNG p ya fo a pod of 25 yas. Ths LNG
wll play a sgnfcant ol n mtng Totals gas spplycommtmnts n th Atlantc Basn (Fanc, untd
Kngdom, Noth Amca).
Qatargas 2, the worls first integrate LNG project
7/30/2019 Gnl 28pages a4 Gb
13/28
11
Ymn LNG s by fa th most ambt os pojc t
v ndtakn n ths conty and Total s playng
th ladng ol. Th Balhaf lfacton plant on
Ym ns soth coast has two t a ns wth a
combnd capacty of 6.7 mllon mtc tons p
ya. Th fdgas s podcd n th cntal
gon of Mab, 180 klomts ast of Sanaa,
and tanspotd to th coast va a 320-klomt
ppln. Aft naly fo yas of constcton
wok, Ymn LNG statd ts commssonngopatons n smm 2009.
As th lagst shahold n Ymn LNG
Company Ltd, Total (39.62%) s pojct lad,
playng an actv pat n ts dvlopmnt. Th
Gop povdd assstanc n al l ky aas
(tchncal, maktng, fnanc) and scondd
psonnl to occpy ky postons n th company,
ncldng that of Gnal Manag.
Tota l Gas & Pow has also sgnd a long-tm
sals and pchas agmnt wth YLNG to lft
2 mllon mtc tons of LNG p ya ov 20 yas.
Most of th gas wll b shppd to Atlantc Basnmakts.
Yemen LNG: a newcomeron the LNG scene
One of Totals top priorities in all projects is to
minimize the impact of its activities on the environment
and the local communities. The site location for the
Yemen LNG liquefaction plant was chosen after
studies carried out in consultation with stakeholders
(local communities, the authorities, international
experts). The plant and associated infrastructure
were designed for minimized impact on biodiversity
and marine currents. Total also helped to implement
a Coastal Zone Management Plan devised by the
World Bank to conserve the Gulf of Aden coastline.
At the same time, sustained efforts were made to
integrate all project activities into the local socio-
economic fabric. Starting in 2006, Yemen LNG
implemented a wide-ranging recruitment and training
program for local technical personnel. The company
has set up its own training center and trained some
200 technicians and operators (among others) who
will be working at the plant. Yemeni nationals already
account for nearly two thirds of all Yemen LNG
personnel and the company aims to raise this to
90% in time. The same attention is being paid to
gender diversity, and women already account for
more than 25% of the personnel at Yemen LNGs
head office in Sanaa.
AN ExEMPLARY PROJECT
7/30/2019 Gnl 28pages a4 Gb
14/28
12
in Jly 2007, Total and Gazpom sgnd an agmnt
fo th fst phas of dvlopmnt of th gant Shtokman
gas and condnsats f ld n th Bants Sa. inFbay 2008, th Shtokman patns st p a nw
company, Shtokman Dvlopmnt AG (Total 25%), to
dsgn, constct, fnanc and opat ths fst phas
of dvlopmnt. engnng stds a cntly
nd way. Th fst phas of dvlopmnt tagts a
podcton of 23.7 bllon cbc mts of gas p ya,abot half of whch (7.5 mllon mtc tons p ya) s
to b xpotd n th fom of LNG.
Shtokman (Russia)3
A jo nt po jct of Sonangol (22.8%), Chvon (36.4%),
BP (13.6%), en (13.6%) and Total (13.6%), Angola LNG
wll pocss assocatd gas fom ol-podcng offsho
blocks (Total e&P Angola opats som of ths offsho
flds and holds a stak n oths) and fom gas flds
ddcatd to th pojct.
Th gas fom offsho f lds wl l b collctd and ppd
to a lfacton plant cntly nd constcton nZa povnc. Th plant wll podc p to 5.2 mllon
mtc tons of LNG p ya, along wth assocatd lds,
and podcton stat-p s plannd fo 2012.
Svn LNG cas chatd by th pojct wll tanspot
th LNG to th Glf LNG engy gasfcaton plant now
nd constcton na Pascagola n Msssspp (untd
Stats). Onc gasfd, th LNG wll b sold to th
pojct patns commcal sbsdas n th untd
Stats. Total Gas & Pow Noth Amca wll pchasand makt Totals sha of th gas.
Angola LNG (Angola)1
Total s a 24% pa tn n th ichthys of fsho gas fld,
locatd n th Bows Basn abot 200 klomts off th
nothwst coast of Astala. Total and ts patn inpx
(76%, opato) hav lanchd basc ngnng stds
fo th dvlopmnt of th ichthys fld and th constcton
of a lfacton plant na Dawn, 850 klomts to th
ast. Ths stds wll b th bass fo contacts to bld
th podcton, pocssng, tanspot and lfacton
nfastct. Th dvlopmnt schm wll ncld
sbsa wllhads connctd to a Cntal Pocssng
Faclty basd on a sm-sbmsbl platfom, a Floatng
Podcton Stoag and Offloadng nt (FPSO) fo th
condnsats and a gas ppln to th lfacton plant,
whch wll b blt na Dawn. Th plant wll ntally hav
2 tans wth a combnd capacty of abot 8.4 mllon
mtc tons p ya of LNG, bt povson wll b mad to
ncld 4 addtonal tans. Th Dawn plant wll also
podc 1.6 mllon tons p ya of LPG (btan and
popan) as wll as condnsats.
Th ichthys plant s xpctd to opat fo abot 40 yas
and wll mak a sgnfcant contbton to th local conomy,
mployng mo than 2,000 popl dng th constcton
phas and abot 300 popl onc th plant s opatonal.
Th ichthys pojct s xpctd to go nto podcton halfway
nto th dcad 2010-2020, and th LNG shold b
shppd to Asan makts, manly Japan.
Ichthys LNG (Australia)2
Top priority for Total is to increase its LNG prouctionand dvlop nw lfacton capacty. Sval nw pojcts and constcton o nd stdy.
3
1
4
6
5
2
7/30/2019 Gnl 28pages a4 Gb
15/28
13
Total has a 15% ntst n th Nga LNG lfacton
plant on Bonny island. Th plant, whch alady nclds
sx tans, has a podcton capacty of 22 mllon mtc
tons p ya. Stds fo a pojct to add a 7 th tan
wth a capacty of 8.5 mllon mtc tons p ya a nd
way. Total Gas & Pow has sgnd a 20-ya pchas
agmnt wth Nga LNG to lft 1.375 mllon mtc
tons p ya of th LNG podcd by th ft tan 7.
Nigeria LNG train 7 (Nigeria)5
Total s a 17% pa tn al on gs d N g as na t on al
company NNPC, en and ConocoPhlps n th Bass
LNG pojct n th Ng Dlta (Nga). Th pojct
nvolvs two tans, ach wth a capacty of 5 mllon
mtc tons p ya, and wll xpot most of ts LNG
podcton to th eopan and Amcan makts.
Fdgas wll com fom th pstam gas opatons of
pojct patns, wth Total havng th ght to povd
half th gas. Th plant s xpctd to stat podcng n
th mddl of th dcad 2010-2020.
Dtals of gas spply fo th pojct a cntly bng
fnalzd. Th ngnng stds hav bn compltd
and ppaaton of th plant st s nd way. Total Gas
& Pow wll b among th bys of th LNG podcd.
Brass LNG (Nigeria)4
Total s lad patn fo th Pas LNG pojct n ian, wth
an ntst of 30%(1). Th oth patns a Ptonas and
th natonal ol company NiOC. Th pojct nvolvs th
constcton of a lfacton plant 60 klomts nothwstof Assalyh. Th plant, wth two tans podcng 5 mllon
mtc tons p ya ach, wll tak fdgas fom Block 11
of th offsho Soth Pas fld, whch wll b dvlopd
nd a by-back agmnt, wth Total also patcpatng
n th dvlopmnt. Half th LNG wll b xpotd to th
Asa-Pacf c Bas n and hal f wl l b shppd to eop.
Basc ngnng stds hav bn compltd anddscssons a nd way wth NiOC on th contactal
famwok.(1) Company stmats aft LNG bys ntd th pojct
Pars LNG (Iran)6
7/30/2019 Gnl 28pages a4 Gb
16/28
deicate technologies
Th nd to tanspot lag volms of lfd gas ov long
dstancs, at vy low tmpat and n condtons of th
tmost safty nvolvs majo tchncal constants. in patcla,
LNG cas th most ffcnt nslaton possbl,
both to pvnt th LNG fom wamng p and to potct th
adjacnt vssl stcts fom xcssv chllng.
As a slt, only abot a dozn shpyads woldwd a
abl to bld LNG cas. Ths vssls, costng btwn
$200 mllon and $250 mllon ach, a th most xpnsvcago shps n th wold.
Wold LNG shppng capacty s gowng fast, wth a
flt of 305 vssls n opaton and 76 nwblds on
od n Jn 2009. Th majo Soth Koan shpyads
domnat th bldng makt. Th s also a tnd
towads lag vssls; th standad sz has sn fom
125,000 cbc mts to 165,000 cbc mts, and a
nmb of vssls wth capac ts angng fom 215,000
cbc mts (q-Flx) to 265,000 cbc mts (q-Max)
hav bn blt fo th qata pojcts n whch Total sa stakhold.
14
Total has gand vy sold xpnc n ths ky lnk n th LNG chanthogh ts patcpaton n a lag nmb of pojcts. Saftymnts and th gowng mpotanc of contollng tanspotatonn a mo flxbl LNG makt hav ld th Gop to bcom modctly nvolvd n shppng.
SHIPPING
Moss Rosenberg LNG
carriers feature
self-supporting spherical
cargo containment
systems. These tanks are
made of thick aluminum
plates that are welded
and insulated. They are
attached to the ships
double hull using a steel
skirt at the spheres
equator, equipped
with a thermal brake made
from a special alloy.
MOSS ROSENBERGLNG CARRIERS
7/30/2019 Gnl 28pages a4 Gb
17/28
TOTAL ANd LNG CARRIERS
1973: Sgnat of th fst long-tm
chat agmnt fo a Total pojct
(ADGAS/LGSC)
1986: Fst spot chat agmnt,
fo a cago fom Bontang n indonsa
fo dlvy to Boston (wold dstanc
cod fo th LNG ca Pollenger)
1990: Fst acstons of vssls (Gastor
and Nestor) fo an el f pojct (Nga LNG)
2002: Sgnat of a fst long-tm agmnt
dctly by a Total sbsday (Total e&P
Nog fo Snhvt LNG)
2002: Fst shot-tm chats by th
London tadng tam (Hyundai Oceanpia,
Oman-Zbgg)
April 2006: Dlvy of thArct ic Lady,
a 147,000-cbc-mt LNG ca,
th fst vssl chatd by Total tslf to
tanspot th Gops podcton of LNG fom
Snhvt n Noway.
March 2009:Ymn LNG, wh Total s
th lad shahold, bgns long-tm chat
of fo 160,000-cbc-mt LNG cas.Total psonnl spvsd constcton.
Since 1995, through its stakes in variousLNG schemes Total has been involved in numerous
LNG transport operations and we have acquired
expertise in developing new projects. With Snhvit
we reached a new milestone, chartering our first vessel(Arctic Lady), which will form the basis of a fledgling
fleet that is expected to grow as new projects are
undertaken. A large team of experts was also set up
to supervise the construction of the four LNG
carriers on charter to Yemen LNG.
In addition, the increase in LNG trading has created
a need for short-term charters.
Totals Vetting Department is actively involved
in verify ing that our shipping operations comply with
the most stringent safety standards. Six Total experts
are in the fie ld on a daily basis, supervising fleets
and ship-owners to ensure that the vessels are
in prime condition and the crews fully trained.
Membrane LNG carriers use a technology developed by
Gaz Transport & Technigaz, in which Total has a 30% stake.The LNG is contained by a thin double metal barrier, or
membrane, that creates liquid-tight containment barriers
and maintains its mechanical properties at low temperature.
Loads are transferred to the double hull by the insulation,
which protects the structure from the cold. The tank shape
is designed to make optimal use of the available space on
the vessel.
MEMBRANE LNG CARRIERS
An increasingly strategic challenge
Wth th dvlopmnt of long LNG chans and
tanspotaton to v mo mot dstnatons,
shppng acconts fo an ncasng sha of LNG
ndsty captal xpndt and opatng costs. in
addt on, contol l ng tanspotaton cats val
bcas plays can dct shps to tak advantag
of g ona l p c d f f ncs th ogh a b t ag
tansactons, whch a gowng apdly.
Howv, th gowth of th LNG sgmnt dpnds on
compans mantanng an xcllnt shppng safty
cod and complyng wth vy stngnt standads
concnng shpbldng and cw alfcatons.
Jacques Besse
Vice President LNG Shipping,
Total Gas & Power
15
7/30/2019 Gnl 28pages a4 Gb
18/28
REGASIFICATIONTotal has gasfcaton capacty n all th man gas makts:Noth Amca, eop and Asa. Ths dct accss to a nmbof dffnt makts has allowd th Gop to consoldat tsdownstam potfolo. it s also a ky advantag fo th dvlopmnt
of nw lfacton pojcts.
16
7/30/2019 Gnl 28pages a4 Gb
19/28
LNG receiing terminals comps
offloadng nstallatons, cyognc
stoag tanks, pmps and LNG
gasfcaton nts.
The LNG is heate from -160C
to jst abov 0C at hgh pss
(btwn 60 and 100 bas), sally
sng sawat pcolaton hat
xchangs, a tchn that s
hghly ngy ffcnt. Th LNG
can also b hatd by bnng
som of th gas.
When the gas leaes the terminal,
ts hatng val s adjstd by
blndng wth oth stod gass
bfo t s gas f d and, f
ncssay, by addng ntogn,
btan o popan bfo th gas
s fd nto th dstbton gd.
Securing access to consumer markets
rgasfcaton logstcs a ctcal to scng accss
to nd makts.
Th stps takn by th Gop dmonstat Total s
commtmnt to stngthnng ts psnc n ths vtal
lnk of th LNG chan and a pat of an ovall pocssdsgnd to sc otlts fo th Gops podcton
fom th Mddl east, th Glf of Gna, nothn eop
and th Asa-Pacfc gon.
Ths s why Tota l, whch alady ss th B lbao and
Baclona tmnals n Span, has acd ntsts o
svd capacty n a nmb of tmnals n th wolds
man consm gons: indas Haza tmnal,
opatonal snc 2005; Mxcos Altama faclty, whch
cam on stam n lat Sptmb 2006; and n eop,
th Soth Hook tmnal (untd Kngdom), whch bcam
opatonal n 2009, and th Fos Cavao tmnal (Fanc),d to go nto svc n lat 2009. Total s also stdyng
a pojct fo a thd eopan facl ty, n Coata.
in th untd Stats, Total has sgnd p fo lag-scal
svd capacty at th Sabn Pass tmnal n
Losana, on th Glf of Mxco.
17
7/30/2019 Gnl 28pages a4 Gb
20/28
SABINE PASS (UNITED STATES)
Capacity subscribe
by Total: 10 bcm/year
Oerall capacity:
26 bcm/year (Phase 1)
then 40 bcm/year (Phase 2)
Start-up:September 2008 (Phase 1)
then 3r quarter 2009 (Phase 2)
As of April 2009, Total has 10 bil lion
cubic meters per year of regasification
capacity in the Sabine Pass terminal,
built and operated by a subsidiary
of Cheniere Energy Inc. The facility
can accommodate the biggest LNG
carriers currently operating (up to
265,000 cubic meters) and is equipped
with three 160,000-cubic-meter
storage tanks (Phase 1). Two more
similar storage tanks will be available
by the end of the 3 rd quarter 2009,
when Phase 2 is due to be completed.
In addition, Total has also reserved
equivalent capacity in a downstream
pipeline. This gasline will tie the terminal
into a number of natural gas trunklines,
thereby securing access to the main
gas markets in the northeast United
States. Total has also signed up for
0.06 bcm capacity in salt-cavity
storage facilities located at the endof the pipeline.
SOUTH HOOK(UNITED KINGDOM)
Totals equity interest: 8.35%
Capacity: 21 bcm/year
Start-up: 2009
The South Hook terminal in Milford
Haven (Wales) is the largest
regasification complex in Europe and
can accommodate todays biggest LNG
carriers (Q-Flex: 215,000 cubic meters,
and Q-Max: 265,000 cubic meters).
Total has an 8.35% interest in the
terminal, alongside Qatar Petroleum
(67.5%) and ExxonMobil (24.15%).
The terminal, with a total capacity
of 21 billion cubic meters per year,
is designed to regasify production
from Qatargas 2. It will receive
Totals share of production from the
second Qatargas 2 train, that the
Group plans to market in the United
Kingdom.
South Hook can fulfill up to 20% of
Britains overall gas needs, offering
the country (and indeed Europe as a
whole) a much more secure and
diversified supply of gas.
SOUTH HOOK SABINE PASS HAZIRA
18
BLENdING INTO THE LOCAL ENvIRONMENT
The South Hook terminal has five storage tanks each holding
155,000 cubic meters of LNG that is maintained at a temperature
of -160c thanks to double concrete walls. The tanks, 41 meters
high and 100 meters across, have been built in a small valley amid
cliffs so as to minimize their visual impact: a very successful idea
because they are hardly visible from the nearest village. At peak
construction, nearly 2,400 people were employed at the site, 40%
were recruited locally. Once the terminal is fully operational,
80 people, mostly recruited locally, will be employed at the site,
where about 160 LNG carriers are expected to come in per year,or one every two days.
7/30/2019 Gnl 28pages a4 Gb
21/28
ALTAMIRA(MEXICO)
Totals equity interest: 25%
Capacity: 6.7 bcm/year
Start-up: 2006
Located on the east coast of Mexico,
the Altamira regasification terminal
came on stream in fall 2006. With a
jet ty and two 150,000-cubic-meter
storage tanks, its initial capacity is
6.7 billion cubic meters per year.
The site configuration will allow
construction of the third storage
tank, which would double the
capacity of the terminal. The natural
gas from Altamira is sold to the
Mexican electricity utility, under a
long-term contract, to supply several
gas-fired thermal power plants.
FOS CAvAOU (FRANCE)
Totals equity interest: 29.8%
Capacity: 8.25 bcm/year
Start-up: late 2009 (e)
This terminal, in Frances Fos-sur-
Mer industrial zone on the Cavaou
peninsula, is being built by the Socit
du Terminal Mthanier de Fos Cavaou
(STMFC), a joint-venture subsidiary of
GDF Suez and Total. The facility will
have three 110,000-cubic-meter tanks,
and regasification will be carried out
by three seawater regasifiers (this
technology prevents CO2
emissions).
The new terminal will mainly handle
Totals Middle East production.
HAZIRA(INDIA)
Totals equity interest: 26%
Capacity: 5 bcm/year
Start-up: 2005
Indias second regasif icat ion
terminal, Hazira is located in Gujarat
state on the countrys northwest
coast. Designed to handle 5 billion
cubic meters of gas per year, it
may later be expanded to process 8
billion cubic meters per year. Gas
arriving at Hazira is sold directly to
end-users (power companies, industrial
users, fertilizer manufacturers) as well
as to local gas companies.
AdRIA LNG (CROATIA)
Totals equity interest: 25.58%. Capacity: 10 bcm/year
Start-up: 2015 (e)
In October 2007, Total became a shareholder in a new company,
Adria LNG, set up to carry out studies for construct ion of an LNG
import terminal on the coast of Croatia. The other partners in the
venture are E.ON Ruhrgas (31.15%), OMV (25.58%), RWE (16.69%)
and Geoplin (1%). The terminal is expected to be built on the islandof Krk on Croatias northern Adriatic coast. This terminal, located at
the door to Central Europe, will be very well placed to serve Italy and
Germany as well as markets in the immediate region.
ALTAMIRA FOS CAvAOU
19
7/30/2019 Gnl 28pages a4 Gb
22/28
TRAdING ANd MARKETINGTh globalzaton of ngy makts has adcally tansfomdmaktng pactcs n th LNG ndsty: th oppotnts fo tadnghav xpandd consdably, th nmb of plays has ncasdand bsnss modls hav bn adaptd vy apdly to th nwnvonmnt. LNG now acconts fo 27% by volm of wold gas tad.
A changing enironment
Th gd co nt ac t al lat ons hps th at pv o sly
govnd spply agmnts a stad ly b ng
wttn. Bys a now skng gat flxblty n
tms of pcng fomlas and cago dcton class
and both bys and podcs pf a combnaton
of long-tm, shot-tm and spot contacts. Ths
nv onmn t s mo condc v to a b t ag
tansactons, wth th gowng nmb of spot dals
now accontng fo 15% of woldwd tad.
New marketing skills in an enironment requiringrapi response
Fom th stat, Total alzd jst how mpotant LNG
wold bcom n th ntnatonal gas tad pct.
Bldng on ts cognzd xpts n tadng cd ol
and ptolm podcts, Total s now consoldatng tsLNG tadng opatons on both sds of th Atlantc
Basn and n th Pacfc zon too.
Th Gops objctv n tms of LNG maktng s to
optmz th flows fom ts woldwd potfol o by
lvagng th tadng sklls that hav bn acd
and consoldatd ov th last fw yas.
20
7/30/2019 Gnl 28pages a4 Gb
23/28
Total s consoldatng ts potfolo of pchass fom podcsand sals to consmng conts wth th am of maktngmo than 100 cagos (vssls of all szs) p ya n 2010.
Patrick dugas
LNG Trading Manager,
Total Gas & Power Limited,
United Kingdom
We handle all types of LNG transactions for the Group,
including direct purchase of LNG cargos at loading
por ts or receiving terminals, ship char ter ing, capacity
rese rvat ion at regasif icat ion facili ties for resale in local
markets, and spot or short-term purchases /sales.
Total has a growing LNG por tfolio, with new LNG plants
star ting up, particularly in 2009 wi th Qatar and Yemen.
Over the years, we have also developed skill in geographical
arbitrage transactions and a lso (mainly for operational
purposes) commodity arbit rage (pipe line/ liquef iedgas arbitrage ). Our a im here is to optimize our use
of available volumes depending on the constraints and
opportunities in the marketplace at any given time.
21
7/30/2019 Gnl 28pages a4 Gb
24/28
TOTAL, INNOvATING IN LNG TECHNOLOGY
Total s patcpatng n nmos LNG sach pojcts focsdmanly on mpovng safty, optmzng th thmal ffcncy of th LNGchan and dcng costs. To fth nhanc compttvnss,
Total has also lanchd r&D pogams on actal lfacton pocsss,dvlopmnt of socs n challngng gogaphc nvonmntsand nnovatv nfastct fo LNG tansf and stoag.
22
Meeting the growing challenges of resource eelopment
rsach h has th man thsts:
Fstly, offsho lfacton. Ths s a vy topcal thm
fo Total, whch s lookng closly at th concpt of a floatng
offsho lfacton plant and has awadd a contact to a
ladng spcalst ngnng company fo th concptal
dsgn of a floatng LNG plant (offsho lfacton faclts
on a floatng hll) and an nnovatv LNG tansf systm
opatng n opn-sa condtons.
On two pcomng lfacton pojcts Total also
poposs to s modla constcton tchns, whch
hav sgnfcant advantags n mot sts and/o thos
wh wok s patclaly dffclt o costly.
Lastly, th pomsng otlook fo Actc gas svs has
pomptd Total to stdy possblts fo stablshng LNGplants n sv clmatc condtons, wh challngs
ncld, among oths, vy wd tmpat angs and
sas that a c-bond a lag pat of th ya.
7/30/2019 Gnl 28pages a4 Gb
25/28
23
Simplifying transfer systems
Two oth ams of Totals r&D a to s mplf y LNG tansf
systms and to ns that cnt systms can b sd
n a gat ang of nvonmnts.
Total has wokd on th dvlopmnt of an LNG tansfsystm that can b sd n opn-sa condtons. Th
systm ss a flxbl LNG pp and a lght connct/
dsconnct appaats that ncopoats th safty
systms sd n convntonal LNG tmnals.
Th Gop s also a patn n th Floatng LNG Ln
Jont indsty Pogam lookng at an aay of at tactv
soltons fo tansfng LNG at sa wthot th nd fo
ovhad tansf (loadng boom wth flxbl LNG ln).
And fo a nmb of yas now, Total has bn actvly
sppotng a pojct to dvlop a pp-n-pp-typ
sbsa cyognc tansf ln. Ths nvonmnt-fndly,cost ffctv solton has bn chosn fo th Bass
LNG pojct n Nga.
Improing LNG storage systems
Stoag whth at th lfacton st o at an mpot
tmnal s a vtal lnk n th LNG chan. Total s nvolvd n
a nmb of sach pogams to mpov safty, nslaton
and constcton tchns of cyognc stoag tanks.
Lnd ock cavn stoag has th potntal to sto lag
volms of LNG wth only mnmal sfac faclts d.
Gostock, a company n whch Total has a 50% sha, has
hlpd to tst a 15-cbc-mt plot nt n Soth Koa.
Th plot has now valdatd th concpt and cavn stoag
s xpctd to mov to th commcal phas.
Atomaton and standadzaton of th constcton of
mmban tanks has gnatd nw ntst n ths
tchn, manly fo s n pojcts n dffclt zons (th
Actc ) o cont s wth hgh labo costs (Asta la ).
evalaton of nw constcton mthods has also ld tonw soltons that can b optmzd to st st condtons
o avalablty of local labo. Fo xampl, constcton of a
dobl-walld conct nvlop can dc th amont
of spcal stl d, as wll as spcal wldng
tchns, ths allowng a pojct to s local manpow.
Improing energy efficiency along the whole LNG chain
Fo both fnancal and nvonmntal asons, lfacton pojcts ngnng stdsthat allow th managmnt of ach nw pojct to antfy tchncally fasbl gans and s howthy stand p to th cnt conomc alts of th LNG makt and th constcton makt.
Total s also valatng tchns that cold mpov th ngy ff cncy of cvng tmnalswhl dcng gnhos gas mssons and covng th ngy contand d to xtmcoolng dng lfacton.
7/30/2019 Gnl 28pages a4 Gb
26/28
SABINE PASSUSA
ALTAMIRAMexico
17
16
FLowS
REgASIFICATIoNTERMINALS
LIquEFACTIoN
PLANTS
TOTALS LNG ACTIvITIES WORLdWIdE
24
Reasificatin terminals
Site 15HAZIRA(India)
16ALTAMIRA(Mexico)
17SABINE PASS(USA)
18SOUTH HOOK(United Kingdom)
19FOS CAVAOU(France)
20ADRIA LNG(Croatia) Projectunder study
Tota capacity 5 Bcm/year 6.7 Bcm/year 26 Bcm/year (phase 1)
40 Bcm/year (phase 2)
21 Bcm/year 8.25 Bcm/year 10 Bcm/year
TOTAls equity
interest
26% 25% Capacity suscribed
by Total: 10 Bcm/year
8.35% 29.8% 25.58%
Commissioned/
panned
2005 2006 2008 2009 End 2009 (e) 2015 (e)
Liefactin plants
Site 1ADGAS(Abu Dhabi)
2BONTANG(Indonesia)
3QATARGAS(Qatar)
4NIGERIA LNG(Nigeria)
5OMAN LNGQALHAT LNG(Oman)
6SNHVIT LNG(Norway)
7QATARGAS 2(Qatar)
8YEMEN LNG(Yemen)
Tota capacity 5.6 Mt/year3 trains
22.2 Mt/year8 trains
9.9 Mt/year3 trains
21.9 Mt/year6 trains
OLNG : 7.2 Mt/year2 trainsQLNG : 3.7 Mt/year1 train
4.2 Mt/year1 train
15.6 Mt/year2 trains
6.7 Mt/year2 trains
TOTAls equity
interest
5% Total supplied
40.8% ofthe gas in 2008
10% 15% 5.54% (T1/T2)
2.04% (T3)
18.4% 16.7%
in the second train
39.62%
Commissioned/
panned
1977 1977 1996 1999 2000 (T1/T2)
2005 (T3)
2007 2009 2009
7/30/2019 Gnl 28pages a4 Gb
27/28
SouTH HooKUnited Kingdom
FoS CAVAouFrance ADRIA LNg
Croatia
HAZIRAIndia
NIgERIA LNg (train 7)Nigeria
BRASS LNgNigeria
ANgoLA LNgAngola
PARS LNgIran
ICHTHYS LNgAustralia
BoNTANgIndonesia
qATARgAS 2Qatar
qATARgASQatar
ADgASAbu Dhabi
YEMEN LNgYemen
oMAN LNgqALHAT LNgOman
NIgERIALNg Nigeria
SNHVIT LNgNorway
6
SHToKMANRussia11
4
3
1
8
5
2
19
20
18
15
14
10
7
12
13
9
9ANGOLA LNGAngola)nder construction
.2 Mt/yeartrain
3.6%
012 (e)
Prjects and extensins nder stdy
Site 10ICHTHYS LNG(Australia)
11SHTOKMAN(Russia)
12BRASS LNG(Nigeria)
13NIGERIA LNGtrain 7 (Nigeria)
14PARS LNG(Iran)
Tota Capacity 8.4 Mt/year 2 trains 7.5 Mt/year 10 Mt/year
2 trains
8.5 Mt/year
1 train
10 Mt/year2 trains
TOTAls equity
interest
24% 25% 17% 15% 30%
(Company estimatesafter LNG buyers
entered the project)
7/30/2019 Gnl 28pages a4 Gb
28/28
TOTAL S.A.2, plac Jan Mll
La Dfns 6 al:Euros5,867,52
0,185.00.RegisteredinNanterre:RCS542051180.PrintedinFrance.October2009.Designedby:StudiosMenthe&Chocolat.Photocredits:AllrightsreservedTotal.M.Roussel,Th.Gonzalez,L.Zylberman,
e,LerenEiliv,Statoil/Total,L.Sauser,L.Stephane,S.Rivoallon,T.Haga,A.Picard,M.Richards,S.Williams,P.Dugas,Total/Camel,STMFC/Altivue,GettyImages(A.Baxter),D.R.,X-Bycourtesyof:S
HI,Cheniere.Illustration:Nando.
LiqueFieD NATurAL GAS