SAP SOLUTI ONS FOR GOVERNA NCE, RISK, AND COMPLIANCE Checklist Proc ess C ontrol 2.5 Implementation Checklist SAP GRC Regional Im plem entat ion Group Applicable Releases: SAP GRC Process Control 2.5 IT Pr act ic e / Topic A rea: GRC / Process Control IT Scenario / Capabilit y: GRC / Process Control July 2008

Grc Implementation Check List

Embed Size (px)

Citation preview

Page 1: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 1/9

SAP SOLUTI ONS FOR GOVERNA NCE,

RISK, AND COMPLIANCE

Check l i s t

Proc ess Cont ro l 2 .5 Im p lem ent a t ion

Check l i s t

SAP GRC Regional Im plem entat ion Group

Appl icable Releases:

SAP GRC Process Control 2.5

IT Pract ic e / Topic A rea:

GRC / Process Control

IT Scenar io / Capabi l i t y :

GRC / Process Control

July 2008

Page 2: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 2/9

© Copyright 2008 SAP AG. All rights reserved.

No part of this publication may be reproduced or

transmitted in any form or for any purpose without the

express permission of SAP AG. The information contained

herein may be changed without prior notice.

Some software products marketed by SAP AG and its

distributors contain proprietary software components of 

other software vendors.

Microsoft, Windows, Outlook, and PowerPoint are

registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, OS/2, Parallel

Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390,

OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP,

Intelligent Miner, WebSphere, Netfinity, Tivoli, Informix,

i5/OS, POWER, POWER5, OpenPower and PowerPC are

trademarks or registered trademarks of IBM Corporation.

 Adobe, the Adobe logo, Acrobat, PostScript, and Reader

are either trademarks or registered trademarks of Adobe

Systems Incorporated in the United States and/or other

countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered

trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame,

 WinFrame, VideoFrame, and MultiWin are trademarks or

registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or

registered trademarks of W3C®, World Wide Web

Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.JavaScript is a registered trademark of Sun Microsystems,

Inc., used under license for technology invented and

implemented by Netscape.

MaxDB is a trademark of MySQL AB, Sweden.

SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAP

NetWeaver, and other SAP products and services

mentioned herein as well as their respective logos are

trademarks or registered trademarks of SAP AG in

Germany and in several other countries all over the world.

 All other product and service names mentioned are the

trademarks of their respective companies. Data contained

in this document serves informational purposes only.National product specifications may vary.

These materials are subject to change without notice.

These materials are provided by SAP AG and its affiliated

companies ("SAP Group") for informational purposes only,

 without representation or warranty of any kind, and SAP

Group shall not be liable for errors or omissions with

respect to the materials. The only warranties for SAP

Group products and services are those that are set forth in

the express warranty statements accompanying such

products and services, if any. Nothing herein should be

construed as constituting an additional warranty.

These materials are provided “as is” without a warranty of 

any kind, either express or implied, including but not

limited to, the implied warranties of merchantability,

fitness for a particular purpose, or non-infringement.

SAP shall not be liable for damages of any kind including

 without limitation direct, special, indirect, or consequential

damages that may result from the use of these materials.

SAP does not warrant the accuracy or completeness of the

information, text, graphics, links or other items contained

 within these materials. SAP has no control over the

information that you may access through the use of hot

links contained in these materials and does not endorse

 your use of third party web pages nor provide any warranty 

 whatsoever relating to third party web pages.

SAP NetWeaver “How-to” Guides are intended to simplify 

the product implementation. While specific product

features and procedures typically are explained in a

practical business context, it is not implied that those

features and procedures are the only approach in solving a

specific business problem using SAP NetWeaver. Should

 you wish to receive additional information, clarification orsupport, please refer to SAP Consulting.

 Any software coding and/or code lines / strings (“Code”)

included in this documentation are only examples and are

not intended to be used in a productive system

environment. The Code is only intended better explain and

 visualize the syntax and phrasing rules of certain coding.

SAP does not warrant the correctness and completeness of 

the Code given herein, and SAP shall not be liable for

errors or damages caused by the usage of the Code, except

if such damages were caused by SAP intentionally or

grossly negligent.

DisclaimerSome components of this product are based on Java™. Any 

code change in these components may cause unpredictable

and severe malfunctions and is therefore expressively 

prohibited, as is any decompilation of these components.

 Any Java™ Source Code delivered with this product is only 

to be used by SAP’s Support Services and may not be

modified or altered in any way.

Page 3: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 3/9

Document H is tory

Document Version Description

1.30 Document Updated with lists

1.20 Document Updated and use new template1.10 Document Updated

1.00 Document Created

Page 4: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 4/9

Table o f Contents

1. Background Information .................................................................................................1

2. Contacts ...........................................................................................................................2

3. PC Application Pre-Installation and Installation Check .................................................2

4. RTA Pre-Installation and Installation Check (Optional – for Automated Controls

Only) .................................................................................................................................3

5. NWBC Pre-Installation and Installation Check ...............................................................3

6. PC Application Installation Verification and Post-Installation Checks .........................3

7. RTA Post-Installation Check (Optional) ..........................................................................4

8. NWBC Post-Installation Check .......................................................................................5

9. Handoff from installation team to the configuration team .............................................5

Page 5: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 5/9

1 . Back ground In format ionSAP GRC Process Control is designed to help companies document, monitor, test, andcertify their internal controls -- supporting manual controls and delivering out-of-the-boxautomated controls for SAP and non-SAP environments. This implementation checklistcontains the list and verification steps of pre-installation, installation, and post-installation forPC system, RTA system, and NWBC. It also includes the handoff list from installation teamto the configuration team.

Page 6: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 6/9

2 .Con tac t s

Contact Name Comments  

Customer Name

Customer Number

Installation Number

CPI Project Number

Account Executive

Project Manager - Customer

Project Sponsor - Customer

Business Expert - Customer

Technical Expert - Customer

Functional Consultants

Technical Consultants

Ramp up Coach

Back Office Contact (GRC RIG)

Front Office Contact (Support)

3. PC Appl icat ion Pre-Inst a l la t ion and

Ins ta l lat ion CheckOwner: Technical Consultant 

Deliverable  Date/Reviewer  Comments 

Identify System Landscape for Installation ofProcess Control 2.5 Installation

Pre Installation Guide Section 2.1 & 2.2 

Check the Hardware System Requirements

Pre Installation Guide Section 2.3 

Check the Software System Requirements

Pre Installation Guide Section 2.4 

Check if the correct package is downloadedfrom SMP

Pre Installation Guide Section 2.5 

Check the PC 2.5 Installation note and relatednotes

Pre Installation Guide Section 4 

Page 7: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 7/9

Check for WTS remote support capability

Install PC 2.5, for detailed information refer toPC2.5 installation guide

Upgrade PC 2.5 to the current SupportPackage

RFC connection is setup in PC 2.5 to client 000

Check BI-Java contents on Java stack for ADS

Check pre-requisites to integrate with BI system(Optional)

Pre Installation Guide Section 2.8 

4. RTA Pre-Inst a l la t ion and Insta l la t ion Chec k

(Opt ional – for Aut om at ed Cont ro ls Only)Owner: Technical Consultant 

Deliverable  Date/Reviewer  Comments 

Identify System Landscape for Installation ofProcess Control 2.5 RTA

Check the PC 2.5 RTA notes

Check if the correct RTA package aredownloaded from SMP

Pre Installation Guide Section 2.6 

Install PC 2.5 RTA and Support Packages

5. NWBC Pre-Inst a l la t ion and Insta l la t ion Chec kOwner: Technical Consultant 

Deliverable  Date/Reviewer  Comments 

Check the SAP NWBC note

Pre Installation Guide Section 2.7 

Install SAP NWBC

6. PC App l ic a t ion Ins ta l la t ion Ver if i ca t ion and

Post -Inst a l la t ion Chec k sOwner: Technical Consultant 

Deliverable  Date/Reviewer  Comments 

Customer installed the SAP Process Control

Page 8: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 8/9

2.5 package – GRCSPC 250

Check for installed SAP PCcomponent under System -> Status

Check for the correct package levelusing transaction SPAM, the GRCSPCpackage should be visible

Post Installation Guide Section 2.1

Update PC2.5 (GRCSPC) Support Package

Post Installation Guide Section 2.1

Perform Client Copy (SCC1)

Post Installation Guide Section 2.2 

Check Customizing for Case Management

Post Installation Guide Section 2.3 

Customer Activated ICF Service

Check for activated services using

the transaction SICF. These servicesare inactive by default after installationor support package upgrade.

Post Installation Guide Section 2.4 

Create Initial Process Control 2.5 User

Post Installation Guide Section 2.5 

Maintain System Data

Post Installation Guide Section 2.7 

Perform ADS configuration

Automated Testing and Monitoring (Optional)

Configure RFC Connectors

Register Connectors

Implementation logistics confirmed.

7. RTA Post -Inst a l la t ion Check (Opt ional )Owner: Technical Consultant 

Deliverable  Date/Reviewer  Comments 

If PC RTAs (GRCPCRTA 250_XXX) are installedin the ERP system

Check for installed SAP PC RTAcomponent under System -> Status.

Post Installation Guide Section 3.1

Activate the BC sets for PC 2.5 RTA

Post Installation Guide Section 3.2 

Establish RFC connection between the SAPGRC Process Control system and the systemwith RTA.

Post Installation Guide Section 3.3 

Page 9: Grc Implementation Check List

8/2/2019 Grc Implementation Check List

http://slidepdf.com/reader/full/grc-implementation-check-list 9/9

8. NWBC Post -Insta l la t ion CheckOwner: Technical Consultant 

Deliverable  Date/Reviewer  Comments 

Configure NWBC

Post Installation Guide Section 4.1

Log on to NWBC as ICMAN and check all thework centers

Post Installation Guide Section 4.2 

9 . Hando ff f rom insta l l at i on team t o the

c onf igura t ion teamOwner: Technical and Functional Consultant 

Deliverable  Date/Reviewer  Comments 

System landscape information including:

System ID and Client

System access information

Transport setup between systemsand clients

Users information

Initial Process Control 2.5 Users

Pilot Users

Remote connection information

S user for raising OSS messages on behalf ofclient

Information of Process Control system

Initial versions and service packs

Need Basis administrator who has SAP_ALLauthorization to perform workflow configuration,trouble shooting, and sign-off notificationcustomizing.