213
- : - -- DEPARTMENT OF ENERGY- - --- - - ALBUQUERQUE OPERATIONS OFFICE - - CONTRACT NO. DE-ACO4-83AL1 8796 - -- GREEN--RIVER,- UTAH- -- Completion Report ~ VOLUME 4C 0 - - APPENDIX B f- - - -- - - :-Remedial Actions- : Contractor ~~: for the- ----- Uranium Mill Tailings--- ---- - --- - : ---- Remedial Actions- Project ------- MAY 1990--- : - - - ~~~MK-FERGUSON COMPANY A MORRISON KNUDSEN COMPANY

Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

- : - -- DEPARTMENT OF ENERGY- - ---- - ALBUQUERQUE OPERATIONS OFFICE

- - CONTRACT NO. DE-ACO4-83AL1 8796

- -- GREEN--RIVER,- UTAH-

-- Completion Report ~

VOLUME 4C0 -- APPENDIX B f- - -

-- - - :-Remedial Actions- :Contractor

~~: for the------ Uranium Mill Tailings--- ----

- --- -: ---- Remedial Actions-Project

------- MAY 1990--- :

- - - ~~~MK-FERGUSON COMPANYA MORRISON KNUDSEN COMPANY

Page 2: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

I

UMTRA PROJECT - GREEN RIVER, UTAH

CALCULATIPNS

FINAL DESIGN

CONTENTS

Calculation No

10-536-09-00

10-474-01-00

10-563-01-01

10-551-02-00

10-591-03-00

10-591-02-00

10-591-01-00

10-536-10-00

Durability of Rock Borrow at Fremont Jiqction,,Utah Source

Riprap at Fremont Junction Borrow .Squ~ce

Bedding Material - Top Slope and Sideslopes: Gradation forMaximum Drainage Capacity Without Significarf Erosion ofAdJacent Soil

Wastewater Handling - Wastewater Accumulated Volume

Bedding Material - Rock Types

Infiltration: 'UNSAT2" Analysis - Input and Output

Tailings, Offpile, Buffer Materials: In-Place ParameterCharacterization

Compaction of Contaminated Materi-als: StatisticalEvaluation of Degree of Compaction g' - -'

2706B

Page 3: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MKE DOCUMENT NO.5057-GRN-C-01-00721-OQ

Calculation Cover Sheet

CaIc. No. /CSS0?£-pO

Contract No. So51- o5 Discipline AI /sC-T No. of Sheets

Project

Gre4env Zi Uvrc U RA t tt sv

Feature

Item

- :l ' s: .s.. References

3,bV"X JEAi voWiejl 2.4 WwAVi1u MO,

3. \Q8* 509-6 L~e T-C S lC4 -¢, tt5

t,4E & 0 0uT4 It * Sbsl- C.O-L- oq- vob1t - 00

4. "________________ sui~J t ,.e 46

"WL ~ccu A-tF 50s7-C-04-L-6o1 o0oi0,'b-oo.

Preliminary Calc. Q Final CaIc. 3 Supersedes Calc. No.

Rev. Caicutto ey Dat Checked By Date Approved By Date

No.~~~~~~~~~~~~~~~~~~~~~~~~~~~~om4-n

Page 4: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project 9 1"I"N ti '- bath

Feature 'V_-v' By0L-'

Item. i~fit2 ^ v cco, v*i;L _ru-

Sheet ;;Contract No. S°¢-- 5 File No.Designed WA x\.- Date 1 \L16 &Checked AM Date L -.

Re t4t (cevs (co 4'k

S. Ioomi0tx tfskm, UiTPfZ^, war. \'%CU44\ at- /

ksoc%&*f-S) SoS ) O9£ oo Asvowo

4 So0s7-c'w- C- 01- 00b61-oo .

k'1 c~t~4w

Page 5: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet 'lbProject 'JTC4- Contract No. 'So 5705 File No.

Feature ILr't't' "t0 '2' te-"k'- t Designed J Date '2ImS's

Item FreLoIt v,%e ki ukthtIOUTIC Checked LI c Date_ _____f__

ev oi oa b from kt\- Mvoto 4C 4 f ue&keov>

U6~x 60r ¢^L S ~oviLdt,;}s<\^C~

(sVA #{4Arte #JL

3j.rto r u t 7 To

'ZP% t^ Ats r+etw>^sbW^ EW/~,eA ~ 'Ml>

vk.'1 pi v~tW ro t e.Eviow4 :$ ti tQ etro'F.a .wbjtt rv.,~t p. -- 0 Q O<JA+; O > Jtt o ^ , ^ tJ ct b i~v%. * w tW ,#its\ A dtv

*t Lvo. rwfS AvnO,5 0 -IO, GO, FC; tr.%v \4 qt~e k J>v;,

L-~jw~is~ bof s~w 44 +,As coe. crWho .iMw kyw-k tAs

rJA-its of k tvcA!;&9 4tbt AtF G tte++s

Louos ofb~ v VA -eA psis tew- ;2 4 oaq -Ft 49%tic

Page 6: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

( ( C 0,

p,&eOposr, ,RocK pXROM) sOURCe ZIMMr5 PPrfeVA/r -f'AIcrrol(snrcH -. Alor ro s'cs4.e)

AP~peox. N/arq( *) ',qpppoiecwX r',srs'ttS 3A~r3AJt6

rrsplr eGA-pta49e~ Pcldo)tozar(porAS7 rcs rf/ 7c "pi rvewwozes

SpRAV-4AaurED -P.VOVd-DFtS eU.ATo7.)

RgumftlkrAPDICD 70 VAICIA I F YIJ Avr4Er b * 4z -,rtz s

p, r 5 Rr s icnfs) etwopPwlo n~t s r-r IN /X4 Af \

,// r .4rvog rA ir °r Do x r \go0 AID 9gfo#~z.

0-�

0

.%b 'lcl lZA0or00000Y"'I 5 CreK- Aav)*

0%

\

\\~~~~~~~~- 9-

\7I.* R I

IIiIi

IIII

II

- ro t~ wr razsmCrTOM.* ,.?O 7/ rAIcHANOX

-ew-Or CPA,#f4%4 jr.*&,e 9f-. orcoaf xep se eowmtSpezz°

#INO B*,Pt LP ^eImgefC44$?r/vD$.

J e °PE JflArl

WI

:r o 0

0**°m lbO :

z0

M) 0 - :1; -D rK - -

I

II

Page 7: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

C C C

P--

4;

A-1p~~~~ ~~~~~ p -\

F '- g-; * 0 .. -

E it 1

* ?.b t

r~~~~~~eC

I..{i ' -

1%~~~~~~~~O

A

-4

C~, r-,

Ak V

? ! t

Co

f6

IN

I-v

tb

La

r-,

g a.

o b X0(0

In

IP .D-

;y10IK I6n

Page 8: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

( 'C (

.5-e4l lLI6

TP- ZA at2b 9

T?- 3A ! US% L.' 9

93F ts Ila45 q..' 9

ianj3 4.3 I

IA.1 3.2. z.% r _11 . ...... %.

L4 Atwk-o.~(to e~scu$)

\1 5 w

j ..-.. -.. .. - ...

i ., ---. .....

sC. 1; (Co4SMuo 5 .

,Squ&A4v&Is5

1.S,-". 04,-�A rw*.o-

; S V

.. . .II _

.2 .¶ L I -

'31 b.S \\ j-

s w.

. . . _..

Te*ZwkS5 A."f

.q w- M

1 7- .4 to

1Zt,b 1.1 io_O _~ ...

10~

%3

-T? -A I It 1I5% 3' I

_ L.& .i~e . t~ .7_2. ' ._ _ . F . . . -- . .. . . _.._

VULC61%-dt ja\t 1 IM 7.l' 9

3 .'5 Z >- - -

3's --

44 2. 1L 7.t 1

1.1~~~~ -4 t 1 - -;11 5'- II

(I'& .1- ._ .tal S.7 101314 C {

.(o %1. It

i. .

*. .4.

00

~. 0

(D _Cl

LL-.

___________ _______________ 4. 1

*

&.

9 I 1. 3.1 2 K... 10' It 19.9

IIC

Bo

am'i

>!, m

C/)

oD

z

rik

CZ

mZ

0

0

mmnw

C D

I

.D

=r

i I _._ __

AA 4e.k uA-" ooet G Ir + -eeto.u 45 tvc'q-T ovs

2. 23, 12

,\dA\ \4oiJi k*A ;j r4fvp14.

Wn P-bc- om.itf- & *t.t S ( em rW = \3cy

t, i t i

iW": $ oie. - Y o)~- s -

Page 9: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

C ( (

CD

3..

3.

'% ft-4M*-E 43

'VAf4 tf 1t44

'c(%T"Qkk Was Mt scored iak4L at\ ;

oars Hf L41&f4 - *rr lo oiA

I = *-tA V eiuht

'-i sf

W fR, t

ED 00 0a Pa5D .

3 9v 2

0

7 °1

do-TAPLE %

-R ~- C:ImAz~\. _ .

0Dita

.'

Page 10: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

C ( C

CZ,

- ms

03z D

F , r'fl co

5'im

rn

I. I fxE..e fl3

2.. Be ten 44

\1 = etA Jq\A.e

s = at1l;iSC-D

NN - WC14

0D a °tD(D 3000

00

TWLC 3% z

XI,. Sta'0 tt5~- 5cu%~lD'~ek n t

Page 11: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MKE DOCUMENT NO.5057-GRN-C-01-00888-00

Calculatlion Cover Sheet

Cole. No.f ./..0

Contract No. Discipline 2'-'& 5 LI No. of Sheets

Project CJ1LAJ- ut.

Feature IL; f ,

hem J Foct 3@UoC4r

Sources of Data + "-5 I

a. L\s \.iOL3 J 4MrAt - MI A

C-o "~vt FeUvr'rk §St~ttio~C-U l 1ro

%I C i' I-C e tverrU St8

Preliminary Cakc. Final Caic. s Supersedes Cakc. No.

Rev. Revion Calculation By Date Checked By Date Approved BS Dte

- --,.Perm %&-naw

Page 12: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet IiProject MORRISONKNUDSEN COPANM I r_ C Contract No. 5051 o5 File No.Feature % 2 tck Designed rAL Date 5/9/05

IUtm- oA

Es+8~\tt tWaDQFJtE *Sro<A -avX,~6vvU. a:L -Vt>^¢c

'.u1KAAvi_ 6errD :)vrte ti Ott i5sv ~~ to e- t v-.( -w7 v

7IMTX blTUot I I

FewDv A\sk , t.rtf 5 (1A Vis, A ?i C.,, J T

AA. ~ ~~~~V U V(L. i..ed*'r \

(B~rlz ^ G~en+- + <X.^^J ° <G^2W- r.i > *..

C el f e I' PI, ILL k 4I'

tD C\.4 vtute-k ro vr'j <k erapfilav%. o re4S A It C n1Dr'^&\

& s |-t~lSh ,qt~ 1 tw*Iv *tS. ;vh8 T; cs"'- r act) ( if j~u e~v lr. L..\1 Cs m& ok AV ruavAt txoffckSeltss anx* W

Akst~1L 4Iz eLe s (j ).A.

A4l Os cors.

Page 13: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project A MORRISON KNUDSEN COMPANY V Nr 2A I & awFeature 5;!; z pItem Fr(tnsvel Jcl3J'. 1 -lartoh Sevq((.

Sheet '2./1Contract No. 5° E1-o File No.Designed -_ - A Date 5 I I 6Checked Z Date wEo,91

ett r ? 0?

1; @ r 'o;o j mAtl Av(5 °k isAw Mt IAvoVsVoV IC : I s

,10-CJI'5f"'vvJ ratr-4 elJ 4I W.L kaWar vve-% :

kPIZ.1-r~, T*e4

A

C

pD

j1K-s

UtDOT- 4-

&-'-AJ % 0 V-S J.Lv'4L

.1 %'. ( W'. I tj i 0,

A.-tJ A4

r J $.It &let IL kv{' tW(k-AA ° 'fr'4A i ;:s i

�'_J 'L. 'N' -� ;A� -to-5iku volwtme of m ti~rkij Jk

Q61?lk 4 te-tm

Wt cvru 5Lf0)

face.

tmt ̂ S�I

I ¶

AB

C

4 SI

S (I

- V.

\) ITihA -

M11W

Ul1l 133

(3111{35

k557l I)-

Ct" rF f V * L

Page 14: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project D AMORRISONKNUOSENCOVPANY U jMAt &_R lFeature R. P".,p . ItItem - A f3,err

Sheet 3/ I7Contract No. I-D File No.Designed h )(- Date $57Checked =;/ Date 4/1

A5_((J)

3. Tk \sv~s &si wft (rdt f) of htit e v \vo.w- fr VUj 1 %

w'%J; 6 ^ t'tf;'kv "t ? r °A h< tE-.,,A~T fct s~ &ee cl , sf ~a L

4. 5'A # vo~ AU " ~ L blSo,61 poro o & > R . i r\ ;. vv m4tr % qt

\.A. \\ & ,f ),%Q ; k \ L~ V%= r,;0<t f fit 0.,1 A - J01A

/0 \,34

5. Ab~ SO7i ( rAc5v&V4e IN t fi

2- e: D et 6 Ws ov

Vi l 0 f evo

.0 k's a ocw\'; '-\~k" rv\ V4aiw, .% 0 o f

"4imkt k"VV0101% 0 I.1-, I (v 'I r44 .

b. 7vk Dwt\d I;fse reef V CL- A-&sfurtesopl\V

;\S°0'~~~~~~~~~~~~~~~~~~~~~~6 % t \v W .L s

D '. I. to3 V. -s. 1

g: 2.3) i 41A'v, wk~.. l

L~ Io,^UIAJ t\~.M4\ &MkV~AO,%k 0 C\ v5t t~

Page 15: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet +/IIProject Q MORRISON KNUOSENCOMPANY U g &; (' a oContract No. ' - ' "* File No.

Feature VpAAD I I I Designed ' Date 5 1 1 4i2...Item dJv i -) P, t<:efrElI ' &' L Check e eate s Date

-_ . P_ _._ _

A

A 3L-49 bSol,

31- 3k, 3\<

C5001

r65- 3< 0LIDf-sii - -

ZY-32 o a

C t 8t-£

'YL 3b Jg~~~~b2

,t. .S@v& .\ 4ts .f u.\s' &rt oa \~v tbcV 'Jo tuw L (C r S fi

p !

3 Fsjx.at tsfdJ oo °(m r9Xts

,4 )1 A o-..'.M ~l 4 4 3

TPb E I] ki0%#*A ef^ 0 cA10-1W G AII 1D~~~~~~t5I~rU 1 ' p2

Page 16: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS INCProject (AORRISON KNUDSEN COUPANY 0Rttk- 6e- Contract

Feature V- 'i DesignedItem iu c ro C ILow S Checked

A~jsr|l~s(od

Sheet 511File No.Date 5 iDat e 41I

6* (LoA\h 1t g ldc'.s ILX re~tte M* 41 Volyt tt A°.o~t X tgt\ d~vvilost ovJ

VCZ 7D Y 1A bL 'sA t , ) (%I'LS x 2-) - 4 E -5VI-

C. ycL\4

~, I _3 ~~~~-5

.t W),.sax Q I z ,

-7. Ih P i <L CJalv b EL0J tiP

\ cecD et V ,,, A-s is

)Ju U, L: Jk cf Vt&je. l At

I

I

i

i

;-~ C

t CA\ f. t -*L~4 J W t

Page 17: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project ' MORRISON KNUDSEN COMPANY \J t-kk A JFeature tIDMb IItem - EL4Mf Jvett4D0 so rry Ovet

Sheet _ s/ 1_Contract No. SOSI-T S File No.Designed K( Date 5 iChecke Dat ?o '

C ALCQ -- 1IoIfI-

- ~L44~4l. T, vfL 4 ..A^IL . f64. ' ?it f.f\E V V,,

P )74 %OY 'J %S \-riV 2st

I VT .jO

'I. wvtc� VIS+l = Vlb rf i4A. \C.4-V- tlr,4d. Zs \^' rNowir(V..- AI OA( 4EhlD

VT ~o~cA' \I\Jki.-j Sr~

'B~)J~ 4 ~ i*&VA~~~)JfVVT. ~ 4

'I6 IJb - -Lg fjmkQrvAkE' , ?4Id1 [60 - ?G 1"ie KV, ;-

bN Y 'U I c1M QI 1 I y

Page 18: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

CI bLE S- tIVEA N

C

F 0

^l

i7I.'9p

CA-

(g

z.ao

Z _k'O

zaP

:CZ

r2Z

\It'.~1 kCJ -,,d

J i

.O,.~ . . 4 ' . .A .

aINC.con

0g 0.

0 a -

:D (D

000

Nokes; I.2..

.5x t0b I

A % s%0i4 'IS of ""S I I%.\JDo" b- "C-k So\ -.s,

'I

~ -C I) e. 11 1i; c w z IL'".It, 4 8- e. klr ',AQCVA. -%.

Page 19: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

C/ ( (

TAZLj NE - Ar. -. .A n d _~~~~%-.

I.by~I rZ<\.Vze eztpue Ai Inc;say\ eV. Olk ltv\LkrvoL Iv

.TS-3x - \41;.

.5 - .Z...

T. 5 7- \ Z.S IL

(- %S 31S -543

'to 1- (3 A) .t 5 6q

. ._ nibq , Tout113 1

0 v a - 'AC M o~ro I-3 By \, I ,.* i, atoned I 1 G0

i p_

Page 20: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

( ( (

I a1-------

T1,i~rm;^ k IV S4+t P ru ~ St r6Ukl

T~~teeA I~b0Se*(r~ I v(uttv

36-4A8 o,?3 Si

3 1-3j r.2. 3157

- -3- - -4 - -v

ts- t2 O3

i 7-) 5.ot tc.:466

w_ vt \nJ.ql 44

I.Acl (o~~~~~~~~~~~~~~~~

-'I oat

.Z

50

- m

aE z

ozIcn

pZ

,<I

el

nI a n

S _

7 00

D0 -1

-~ 06P0

4ITm S i SEi~A t40445 W.. Y'V VXi , . 7

Page 21: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

( (. (

ThpLe :¢ � q-Lf� -D:--- - - - - :

:3Mft-liAik Soxo-

$Tv\ksrto>lOrU4jAt

(ie)

\T olv tTvh-L 41> veti

(U14~ ;

I

3-

z -xz"o

'iSCO

' Z

- _C-, -

MIM

o16S

-4,0ci

II 0t,2

,koo'-

3.49

(3, %i) L(00- 42�

(cqa )

G_ 1 . .

p .

w'0%s ' sAly M. V) 13 W. T A, U L ,A 7.

O *CD MI

01) p

i ' -- -

Page 22: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGI EERS, INC.Project (Da MORRISON KNUOSIN COMPANY u w f - S Q >

Feature e I e." IItem ,jnt I I rrt-,1 .50V to (

- I~u~tS

Sheet -_till iContract No. " e'5^lOFile No. - IDesigned s' k J Date . .;,ACheckedZ - Date

kAt a'AJIk U *OLJ "I I

% ;t

I -- I-

A

5

C.

l 2 - II

2~S-3L

15 - 118 -l2L - ISto- it i

. ,

tS- ji~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~16 - tic 1IS - IsI-L- is !

10-1 It

fn.. ~ ~~. I _1E

t~; / 0X S5 D i r-'(0 4-I p55" C.)sAc9 J3 isA(6~ Eii

3 t

V7os31n5l7'I-7 1-74s43 -*@S-

;15

~rlC'1

C 9

Ve - 1 •

19- 'IVr - lS

32t- 1%

2. - 3b

1 2- 110-it

i

Ii

jI

I

I

i

I

I __

iIii

_ I 3 5_ ._ 11

S9U V 1

tot14 )to

£-4_ 'D4 --

SS.7

-tst- &a. ¢t O \ottu I v SA , EUvWi\dulL vo\fvv . s � �,&t % &

p{A (ttf 3), %- wev\vw;S 0,rL t u ebE=

Page 23: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

A l6twls

PI'G7q

n - -3;:.,m

lz/,13

V- 4----------

__-:_ --.:7- �: 7, "I--- -- -- ---- ---- ; - �� - , - - : -- - -- .t-4 rlt rim, - -- - - -2 t -------. ---zI -. , --tia .- . . - ..- --- , -- -� &d--- -

-7- ..HEEEE4=- - -.-0I ZF--

- ; i . . - - .i . -E�-1-- 1.---. -L -- -- -- - , - -L - -- -i p-.. i I I ! ---oI . I

a

77

7.1

w-- -- - - .1 .- - -.- - - . .--- 7 -- - ---- - -- --- - - ---- , - -

I-- -- - - I ---- - -- -- --- - - -- - --- - - -- -- t -- �- --- r- --- - r - ._- r - _- - -- --,- --

i 7 '747 :7 .7

2_ F

!F-,

Page 24: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

i Arb uqb~t i\

N~s1 k tv k e

te. i ~Uk(ttzd IlA_

Sheet 3/i-ItFile No.Date 5 10i|s

. Date :t~ t.

D

'50-34

is -3D

II- is

I b - 2.2

o-iS

T; -

2-2.oo

A1qoo

"70

v1 ))

34- I t DO

3 4,3ao

41,o 0

I A e)Do

I Z30I -O O

'Z.IPi _2 .

1 l 1.0 O

JSTc 0

0

~ * I i-~*

ZL4 iI 00

i 5, rIC

. Lv - v

I

(0 P. ;v

U-,

t VI

1~I '2 m

4-# X\u .A,~ ek\tSs \ L ~. t~iit~~se Bscse z~~cs~x eh

K&Of? ; -RO- t4 cw' t wk

25VI 1\ 1-i > t;

rvAL • ( AjA \ '~

( r I---

TAV-LC _A~L etJAt'M 1 c'. V 1JULiuwvp

Page 25: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

ProjiFeabItem

MORRISON-KNUDSEN ENG~hEERSO NC. Sheet /lect AORSNNOEOPA U('\7zR- A ; Contract No. File No.ture P¢^i Designed- Date 8'

Fftt~~~~t tt\\ \ M.rc ftr mL CheckeelV Date°/

¢WOt'\L> YOtALo~ <e~t pr CO t v<w@ rl2>. AOJ%-*,

te 8o~t~s ( nS assoc~ted J\Wii4S) >ft .. t

'UsA B% CAstonC 4B

3.; 1oo 1 loo I l~~~~~~~~~~~oo4 I4 1? 114c

ZS SZ I a7.t too

\4 26,\§S, I 3° 5I\° 4S eq \S IL v: \t t 1 0 o

tz,06+ #.l$ 'sy i

}t\9 ^ ;^+tft\ | tj 5~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

II V� ?4 L,6 V7 I

IIII

ar Y Vs "it.

Page 26: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

I

0 -a 0cp a- W. -

C,

U

-- -:::-r-:-7- -- -. -

-, -. .----. 4

- - - - .---------- t----------.-- --------------.-----..

- - . .....� � -- - .-- � --- -.

i�.m ---- �---- _____________________ I .'.---.______ -- _______

tji __ __ - - -- -- --- -- - - _____

-� __- - -.------ - - --- ______ ---- -

_____ ______ -- - -- ------ 4

__ ____ -. ___ ___

.I- - 7L - -- ---- , i

3 -~~ -C

_ *-o ffl T 4-_ , -:.. _-_-- - a -- -.--- -f- . F , . .. -, - -

-z �--------.

.

4U'S

--4

t5A

w - -- -- - I- - - ..- - - -. - - . - --- -- - '. - - - - . - - ... --.-

. I.-- - - -.-- - I

. --- .- - - - .1 .

- ---------~~~~- -

'.a-.

II

Page 27: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(~MORRISON-KNUDSEN ENGIJEERS INC Sheet ___/__

PDAIORRISON KN4UDSZNCOMPANY -" IS 7ntract No. 5 File No.ProjectCotatNFeature ? P r&t Designed K) Date s- PA ..

Item E ok A, 0 a> e(r o' 5S.v, L Checke ijt. Date c,+ft

WA A~c C'. SvLL. ".1AiV) eVpK 4+

(^ r3ICL _ Wa\, tEL, V. I *b Usw+ erTC4'A

a~ 4 {rz u~ ¢-Uwv cL Ai~v.& ocA-j Rqj-

- rer. wtAfrJct 5eA II ..J 6vrtAI &#J j*zCK

~~~~~~~~IA

?-Ir -6 ?eV BV CA e Ak4 fTvo4 f*~ fq\6 w.\,

(QtUt4 AV #6 "IV lqv \wC t. %. 'ro#,L Vsg'v'Mi_3ef Y, IS VIAteow aefiliqj.erelch r>c

I. Tk wv*fjk of k prew. T) 4 ;C 4zwA 9 W\\ )V,

2. ArtmL A~ 4 M~ e r' va~tCL(. \,.L ¶)4v%0A4 V'ltCA vv\v'iKL.

kvc Z.0 reo . V~-wet1 rn.c 0+014J

t Gto-uA IAAkerk41 S*4 t71%L- TGVV4 Cwvxciuflate Sg A \a~~~~~~~~~~t t pX se.>> v\

-~~~ flit Zo 0 rt6Sl (X+^ 8 fit&iplS

'%Oew *60rta.

Page 28: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project U MAMORRItONKNUOSENCOIIPANY UMXf &e13

Feature l4, peup I,Item tfoey Juh*Q J I 4 f A vr

Contract No.5° 0Designed tA-J

Sheet i] IllFile No.Date _ - I - MDate Odl762,

Co~ctv5fw% C AL s-f LCvr~

Page 29: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS INC.AMORRISON KNUDSEN COMPANY ' ( 4 iLA1& 9 t

ProjectFeatureIHam

.Sheet

Contract No. S ' Salvo - File No.Designed KJ (-y Date . 6 53Checked -

VFr e e't ai v 4 . V r Sours

A?? E N -0K

(D5p.4D

Page 30: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

- I ~- ..w ' N

(C ,40 36 30fa"LY I (t "

7 . 1 8I NCHES

15A , I

I_ V ,,12 10- uu r TrT UT- '- - I I *, I :I I .- ,I I .1 I I I I I | |i !i ,

P

e:D71P-

m

FwI

3 -d,CG:::mIT-1,

I -

9C

8C

VI"

:0

l4A'0

I -

a- __

.- �-____ ____ __

- - _______________________ _______________________ 1

- - - __

- -

a - __________ _____________ �.----- -I-- - ____

0 -- �------ ________ ______ ________ ______ ______ I

______ A,'' ,.,tI, I I ______ ____________________________________ ___________

31

2i

40 36 30 25 20 15 12 10 6

SIZE36"

25"

i5"

12"6"

INDIVIDUAL WEIGHTRETAI NED

0

CUHULATfVEWEIGHT RETAINED

0.

0

640

560

780

2100

0640

1200

1980 a4080 ^

cv

PERCENTPASSING

100 _ v,'-0q , ..... g. . 5

I 4433 . J.L q

,; a D,1Z %TOTAl. SAMPLE WEIGHT

21,161 pounds

r

'1

.n ;: 0-- c? f-~

c0 vr

c.-:

7>

TEST HOLE NK-3 LABOMATORY SAMPLE tflUHFER: 22i- � - d � -

Page 31: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

C- ::CI'I-

SIEVE SIZE IN INCHES

20 18 15

50

60

80

90

1or

I ND I V I DUAL t'E I GHTRETAINED

CUMULATIV YWEIGHT RETAINED

PERCENTPASS I NGSIZE

36"

25"18"

15"

122"6"

0 0

0 0

12801160

1280

2b40

3160

6240

720

%'\. 7 a X.... arc 0 4

tst

&. -...

100

X qz.l5? t5.03

)r 00.Gl'?g' 61 113080

_7,;;;..

- - 1. lL

Ia 0

TOTAL SAMPLE V!E I MIT

16,297 pounds

LASORATTOAY SAMP'.rE 2266,TEST HOLE MK-5

Page 32: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

( I

7- I~~SIEVE SIZE IN INCli_

'' ,''r I .....

100440 36 30 25 20 18 I15 I I in

41 1 9- I-I I I I I i I I I i I f I I 12- -1 _ II 1- -- I. ..

A,''-I -

90

80

70

:0xA602

-050#AIA

=0

_ _ _ _ _ _ _ _ _ _ _ I _ _ _ _ _ _I_

~_- .:

_ -. __. _____.__. . .__ - -

. __ ____..

--.--- I I. . I __ .

. 3°

Ce

* I

\ (.

ab

i_r_U_

F 60

_ _ _ _ _ _ _ _ _ _ _ _ -- 4- 4 4~~~~~~~~~~~~~~~~ I Ia-li r - I - - - - - I --- --- -- -- -I --- - i - -- --- -- - I - - - I -7 flr-v

. . I -, . I20

l1i

=. ____ .- I I I I .,m It f t# %2 n o~ i|s, -- .-

80

hii,1 Ju u~ *z4. 2U la 15 12 10 6

ft!p�.

SIZE36"

25"189'

15"122"6"

INDIVIDUAL WIEIGHTRETAINED

0

0

0

CUMULATtVEWEIGHT RETAINED

0

0

0

PERCENTPASSING

X -

Fo1% I

460

860

3040

460

1320

4360 t"

N~

ov

I C

-rlp '0F 9%c

for-V

100 , b.

,9-1 q7.I .5.

X q1. 63..- - l- t ,X 73.ot s

TOTAL SAMPLE WFICGHT16,162 pounds

TEST HOLE UDOT 4 LABO"nTWn S441T. X19"IFR'tV: 22r,.'

Page 33: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MKE DOCUMENT NO.5057-fRN-C-01-00881-Q1

_- .

Clcu lation Cover Shoet

Calc. N l .-- 3 -Contrae;t tlo. - 5 f Discip ne ./ost4 No. of Sheets .&°/Project UI T;R A (SR-

. 9v~~~~~~~~~~~~~~1~c&X.A

Feature

,.BFDPII ZAIfA rY ,/4L - TOP-51-6o4E 4 1VP

Item~4 t 4 T/A/ OR IM7A/.-o~-7W4M6Z4 d.Q-4RC /T)

z<r cT S/6A)/T/ Air gCO•,0/L 4 Ap Ci~-.ZI. 5/L

Sources of Data

Sources of Formulae & References e •£ 4'd 7- r . A5 )

1 .. £~~fr l .,&urfgrre' -m#ii 7 -e o7ft7bCJ 65 fe/cr 2 rfdefi A /fayi~a s-f ~s/tf/ 8fOa I

-7stc a aS-1 .e-{e->-) ef axy o /c?-r 8Z/r4ppt-c. Zioe. 'PoCri 1,0B fas-me /Vashrc_fe A9/^a. ct ,~e~r A4 Aix,-C A .

Ira -,"eo Pde* 7e -, fHrs 74,re7o f o-, y9/w MYR altf 744 r f

f_ -cceJ ., f , ev. 6_ -55- ea

J.I7t/.1ftS~t I{EiI ______ - ae7e - -

oc _________A_ ,/ .{W#• °5. jt21 0000t RC. /tor tc Ž1

Preliminary Cak. 0 FinalX ,ak. El Supersedes Cale. No.:

le~~ &d seA I;, . _,

1 Zi2,83z~s,7, / o.C Z-t)-I

. . ,,r-lro .O . 4" ~4,2=/,X r C-4/Z MRev Revision calculation Ey Date Checked By Date Approved By Date

r14/

(2t)

Form 42-,10

Page 34: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGIR~~~~~ AI--!S2 KNTE PANT

Project ' A- SEFeature AEDI/A)6 -A-Prol#dgItem

lEERS, INC._

.. _....-

Sheet tContract No. - 5i5 File No.Designed a' Date ',-z 6 -8Checked f2 2 _ Date &-. fi&

rJraa/r5 / xc 6raw-vA

gre~leRexJcos re-W)

-s Csoc.) V /59$Yi ae+i-cook Co. /etork.

1. / 44~//d S77, /f 6fY

Wa ley ,/ .ofl s, / 4&

8. 6 45. efwe r f flie

BVAIIFXC o-7 / x/eicL

f7c~~ 4,v f 6eocf4i

Ao. lee i,,. . °

Aes- crYe y ypv>

>t/Ct ~- 4'6 / fg

f0 a-.SI AlC/ealr,- I7/A. Ajn5PeyfedM of w

a147 . CJce° .Dcs

e4Llr .//ta2iS

'i 54tel /

6v-ep7'Iws ,f _0 / RBeA4e-v1r / TA

/1/ /l69S /fea s.r,La l/;J/rvy Ata- /?fSY2, 50 / / /?eczn'tS ,

ARPJ ald 4h/60t- 47?r l-rfne el 4 t

. 'SJ a-S 6roave/ ,*C//ers"$ v75'E

le d c,0 " aC/° mfef 4nz l prs

-o 6$we-,z Jae rv r fj4,eAo} /66 - ^e d eycc/

Page 35: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.G A UOftRISON KNUIJSN C !PAN!

Project 5,^12- IFeature -/?6APPA6 6dAfPT7 ,04/ IItm I

Sheet - f___Contract No. 1LZL. . File No.Designed d_15506. Date '7 v-,fChecked - Date -/LA

S.tal44q ': . fOR ropsieos5 P .5SBOP

* T e bedclinj mnvetra i'*4

hSf8 Aca )//_

(ofe/o(y of oAn * )f xo / f

aljOced4 A, -e drain /efyer A

er~.iJ fo st Irei /f ero).

#ieis. (e.1. lecl aee. 3).J

A'po 7rotct eycIV7$nt ei-os'cJ

= Dfn~fi6 ,Kcvease ca ,anc~e eD?04ci4

.epetAM 7%e vtpper-eJ 6eJ-ae y r ar1c

J uat msed *o de~er#ntne jra{c< ~I

;4#tG1 /(yrO-bfl O roll 1'wCov7k

xi tL1 pw-i'r P.45f~Q

A2# t /-/00

A14. q /6 - 58

,Vo./O - /5

yO. ?zo 0 - S

pS1/6A 66PDVA6

/-fT64 ?lL 6CAA4r/OAI

tcff~ nueJ 5(eelt I A>

*- fieehs I1A, 2, 4 ZA RrSvSAeeft t4 z o f ev. 0

s/ee-fs /6A 8 18/6 B

fele s-.4ee45 I & z_ ° w.0Atzve "ee*r a r

rv Re V. 1,

Page 36: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGIProject _UM KNA- URSPAN

Feature A-E M DAC 6gdiM4r1041Itgm

JEERS, INC._-.

Sheet t.A.Contract No. -s File No.Designed nedr Date - ?-PAChecked 2e Date 4-/1° jt

;_-.41w, _

'11~ ~761s"AINAA!Y (c ou)

* 7/e fiosf opr~/eftb /cJ

eii re&/oa/egr frewmea2~b/e

ttpap occ"I ItSHS

pre4#/( e f 9i~e 4e

/4wevz5 - oe (e vseS be

6t5 cE *1,/4U/lffi 27$

j&4 /ft¢reaJ~7~~n b1n r

* 7hs.s desn asss;

aexjep4e c/CAn' 101 c,

tr s sl//yi Ja'c ( ' es/eS)

. Theref.> 6vyn~%a4cf ~f/f/afq0

Weyr' rye-rd/ess tt 717;e

I JJn y O46'm 6-e a D se1

ox&irloye /cyr- above /~e

,ef.

e-r jre-- - e pro vi dex

C/IJC ~eSSe_=1 wfy/K- 771c CPveo

Page 37: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

r f-

-- DE_-AbJALV-7s T~oL. JToS; 0. Z<. K /6 ao

~~MORRISON-KNUDSEN ENGINEERS, INC. o msw&#v comot ;IbA0; o. S ~ /l oA NW O"VN~IVD90 COMNYse

U. S. STANDARDSIEVE OPENING IN INCHES

U. S. STANDARDSIEVE NUMBERS

4 010 1 20 30 40 5060

HYDROMETER

100 I2 a a 4 3., 2 4 I & I I 100 200

s0

60

wS..z6*

_ . 1. I L.__ -- 1--1I br - - -w - 0

_ _ .. \ _ qL_ E1 _r _ - - ~ | |* I .* 1@ I I I ._1

_ = F _ _ ffi 0 _ _ r _ _- _ I I | | |S 5f~-e

_.. ___I\ I1 r_- - - - -| If |I -_ -11 - IIIls

- _- . gI1 __@11 I - -- 2C .. I

_ _. _ - \I'\ I \ _ 1 l I I I1II! I I Ll I I

_ .. .I , 1 1-ML;n_ 1 5

I 11 - -l . .- -_ _1. l__I _ J 11. I _l , _ _ I . _ I 3C

* I * ~~liltI

-- N - M

I.-

I >eft

Iinat

C)

'-4_I_1ruN L W-F} F-,K-&Ld*&4 V- I -At I _

_ - '-I-~---N ~-~QL4A,- - - I Kr PA--1 ~ . ~; .! t-t u VI W ; .4*- . rr-ri- +-. I-f- IN rl4tr'r '-IC I t?

re 1 I _&,P-

i 'ti

AI

so _- - ' ~ ~ ~ -I 1jL. -60i + _ t - - . 1 1 1 r I ICI 1 170

. . t ~~I I"1L5._\ L 1. 811@I~ I .g I I

o . L 1k 1L .i LL .i 11 l1111 HI 1 1 I Is

so

00 ZO 10 SO 03O0~~~00 100 ~ 50 90 s - 0.5 0.1 0.05 - 0.0I 0. 005 - 00I

0UI-z

fthI0.

,'-4N

r-

r,IC

It0

I

\-1

I

I

GRAIN SIZE IN MILLIMETERS

I C:OES F a R A V E L I S A N D I; _, = I SILT OR CLAY

COARSE | FI II W.DiUm I FINE

i nWPTU

I

7i- q. �u DEa WSYT Jy. V-.JA - O AI

AWA-L Y'4, eSa'rAe .s1AK 1,"WM44 dAl2/i - 1--- 9frf ~ - 9- -0

�AA'k4t�4rkQf A'2 ThPSLdP�.

.. J0 O 5'eS?

.fi35fr -'/kiA GIA 6.;A447T,

IfI

h. . . .

A A )P 5 / , 3 ' • . ~ , 1 ~ ~U )J J 1 //. . .

_j"0--AP e C/A h X - o>7dJ 4 -JirA -fJ. , r , r

.MO~E-We- 1 7- 7 -ARes-____ _ _ _ _ _ _ _ i W V ' Ca _- -d I

'°5I EU ~ .5hr'Fer 2 A rore .Aror1oov £ r A 4

Page 38: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

QMORRISON-KNUDSEN ENGII/A A-1TWdJ2

NK";¶MPAP1V

EERS, INC.Proiect. . -J--. _

Feature _MItem

vo 'v1

:,i/lAfi a"PD4rloo

Sheet 2A -Contract No. 5457 File No.Designed ): Date - -AWChecked tl .5= Date g- p

J6azm Y1e (, cAf.)

fazpgze r/gs oP D43Y6-a 3rj)P1W6 6'APA7rYo4:

pOgr/eK ( ) _-_ 4_ _ _S _l C

/'I~~4K Al/it) i$/m' /It"I / / a, I( m.IIA/

D, 4' ozs 3 L O.Bb /6 o.7S lo o./0s

DHs S.VzI/ / /' 7 / °. Zg /0 0. 5

(D" Des gn" refecS -o t/a4

eo aty5,sV ees ".&L"es 5e/,,:recf 'c1 & aCe9a S-l ce7/w/ oYS+8 e f1n we^z .

& Pen^oect,'l/' I e-f/,rno4'eJ 44sIf ~f D , %ee ,by7 eœ i

rfie 4 I6/1'76 esbno-feS 5 JS/v ewe dj dolaa -flto

She,d e; f a/^ -1r 5< JCe/I/6~s ;).

Agree ,fp, /? Z - 23 ; fco dotf, aI&.>

Page 39: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

Q MORRISON-KNUDSEN ENGI EERS, INC.Project it"-P - 94.vFeature A'Dn/A6 ,Z>4,7Yo Iitem PVsejof/1,7VZP/M/fr dY I2 f/6/-/

Sheet n. ^Contract No. -.1 File No.Designed ,_ 6 Date Y 2-718Checked .. , i2-_Date 6-f Lf

Pe cagcd*if('eSC c/e L -/fe$fyn 5 toR(c h pyr

4e /etr-niviny r~otrap 6e JI, SA ~3ssedafzr7? Te' m

Off(7&~oches WhiRh afv/iz /bf f' 7r'e<f'c 9o freve*'-f o

ofc Jo' Y SjoceJ tJ /y of ~6ec/cgiy ,,7+?fiy-/

fhe ~t/9ferva.e cpprp*oac61 A baseS 07n oe ¢bserve~S iye/wairh

of SJs,, 5vect /0b f/MiŽI le¾s t ,d,,c-a-fes 7/i-do//s

PecteL E ae =vde/a 6le fJ-e 6SA ape~s-c/$,ie/ f/l . C///

0'8 sro,/s - 4/ /F 5o,/5 tprr~ec/ hy R iayer Mr,- . ers

of C1 1dr5 0 fyrtL ve/e

7-bi5 Cav-laf l#6'es /vwg ::o hewlt%Tb i /c a-d '-~ t Jse t;! - /yeo6'o4 y za~e-i-a/ oca-tri

/%~~~e 7-t/2/e L/ /e &dOe X, .sM/f /a>er c~w

«n.s g0 sr la

pk'c ;-{-#g

' V4 o"&-"l /&4/lP7,1; r -;

,p e 7f ver li a,/ eoobl"Zorati.~~~~~~~~~~~~

!. ¢~~~~~~~~~~~~~~~~(c

Page 40: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(OMORRISON-KNUDSEN ENGINEERS, INC.2v SONR50 wUlbPANY

Project ENG IIfFeature DIfiA/06 e4O1 047YON I

Sheet yContract No. J S7 File No. _Designed -, G Date __-_Z_ 8Checked , Date .- -.. 4 .Item

.. w ... _

-r. &tA CK 5OaA1/D X7F4f °17 70/A

' / oer of Pedch;Z7 4fiOr - 1s fA/0ced ewseaSJ; rof 4 o

VI $1fifj~j? A'ot vEWe~ad e8-s/* o £~ -e/yf so '1 Ay&r>

6"d1 a-/so 9o protect /he X0i / layer fram ./.rn^e vtrz

,#8jrote A~rowgA 'Ke rtta o . o'c/ ec sE4C 7b /Ae

e¢//<- c ee ( %-0 re, f> ,(,e 5 - S. 9):

eso-f'~A u,,aff ,p:fes ve 74- dy fyii .L/5 jco

Vezoc4A $/~rv/fn r5 fvoa a/ o/SS, , ~e

,rn Ki-gt- Co 71%frie ,-coyA /Je rI,-o%'d voe /-d

a^/oc\j /%e biffae o~f /e v~rijor~ a7 d So/ eco

caese ~ros/o 7 0 F .- */ , 7f yoJs a-e /eoc<jh.

V e -ofe? nr Ai/

base eoe e-ov'ro 1&5 r

,c- Ilf7e cef7eULa Fe- hedd

f. 5.8) elf Za./ f Re / f 7,A

le.su-//ec/ /# d/7'U4m o/ t'c

,f en e41 -a /4JeO72JF (ue fo

3 10, 1 Ref. 9), 7ho5e-

Page 41: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

()MORRISON-KNUDSEN ENGINEERS, INC.(a ORIO N E COMPAM

Project ee 14- KU025CNFeature -M2 - J6 g5MZ~,rl-OAJ 1Item

Sheet -<Contract No. 505 File No.Designed _ , Date _ Z -FChecked 44' c- Date f-- f

f; f r joeeee essen4 f, ¢1//O

,-Vfew,Oett Oj _rOe ;XS

,1khC> ra~d,-e~- f,-aen ffe

tore verd et~z~y _r,'~1 Vw .,2

re*e hecdtSy,, e-vem ad'er- /&ite

.no 1/ I /nIb 7 Ae ASe4V~tI,,

.EC .It'rfX36s

;X--0

lloweve-rl eL S/Pfi S zWfe ;H ro,61e has xzrjoen

u~lth Xf,9 friecf cr;/pib AZr-l o/#,- _$!;C_,

/;/ ctYe4-c ,ne%1e~r&L/ (es-/7 t a.i ,getL/eo6/si~ /ti4 s

goO 5#~z// fo <2//W ~vee*1 & dre4aeye ra-4s 0

7Xe /e 7ioz y f- re/a 'veS s)o41 C, ,s //ic'

firee #o° ,½f/b-ofie }c 9e .so/ cg ptv'e*A/,> 7X'vA

.e- ki/ivs be/oe 7s c/d resc/ 'vC

seja~f ve '/Rac* A5 (y °' - Ct"-ed &par-& I# *'. 75 ,o

r' kOC ionrfnea6/e be- kl /ayer. 7o 7

beckdusj gfr/o#Io/ C,~ eff c 06c* 7 e /ess 57tir<ye~f

7'aZu CS-tfes.i~7 crsec'{', ye#+ Ie~Se fD}orfc

7e orjfy' /AAet- Aro 4{; h e 74 e4~cffio, a0

5D;/ sfO?3 cat 6et ,prel e6d*d &y //ern re cyzoronc~es..

...Tsi o'e e~o'er~ine@ik, /e c-bvy of %so/ 6-ee6i' 6t ye-

of y-1in re,"cgced' 7-D a. , Ixnl

Page 42: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(QMORRISON-KNUDSEN ENGINEERS, INC. Sheet 6Project 7 ______ Contract No. __6___ File No.Feature -_Ac e6 ApftrloA l Designed -_- Date d-Z6-8SItem -_I Checked - 4- Date * nt

pohem 4e lae6r ugt.5 ,7XreC e--o~- _57'¢ewJ 7%/4 4¢ }>9

_zor az~~~~~~~~~, ssc( afJeve ; gf ey 2 ~ A/ i;< f o,TO # tsca-e/ee7.2 e, r~~i

iec ,ffev1S0 s ,o'ec i e f' AC' , ere We aeD

sife W Ite fofer- ,,eLl/ 4As Aj OA JsAY 7Xe s,;e of ire

itmyp. .2? I'4s cose,, /V wtf eoi re/ceo A et o 7A ile

rde' evew boeht 9%e laer A'rsfs WiJ oe a sfxe o'e e,

Vag~oft ofi vef A'i? s wo " CLrgv~e sv</y7 z

,ef / 5 1 / f e-0et/,Ve /c-a- p5 da/k ,so;

r if e44f ec7 fc ,o e re ,> rt aY hoc1

low s fot 7c- tuoYC PS 7'WOyV A eoJy /fr:/coces ft

Ac be JWav~y /=.. / z;erS ace. Kz e Sf~er dAlouJ. //e

4w VC/4e~lle 7id ,oosse. a. g;ve* '-a/ ,>z a cz-1X-

Cv~ IA- /rr Je j.e cJ C/ tea-/er it.-s4 bF e

v ofi/tn e ev7 ,ec *eJ o A c ,*/,9 reS Cov

c¢4ei' e e)5e, ec je re/t 7Xrbe ,i0 f e t

/a-yie 7osts J 4a re,'oS 4zv<e

oter a-, 1 t de/'-s /' r 7 s( s-Shd £ut

C'{.sO,7 Oef& 6ec/4, O 4 ,pree/ed wi7ect ap~'yc/rJn

5frct f7/9ec cer,-ta e~g, b /,1rnif j, kns~t9'a-f ,iw ye/oe:,fies.

Page 43: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.a ORIp N0NXPANY

Project £U VM! "NKSm IFeature PWAA• 644bAPdeu IItem I

Sheet -ZContract No. - -r iZ File No. _Designed -A'.5G Date 4'Z8-S5Checked _ = -' Dat- - flm r.. e

Nrz APf1o4 c H

4. gs7 e e t/A- e now ncr ye/lcc Y,es y> 5°t / ,y.es

7&haf xu4 ecaes 6e e4 6e4.dey Sen9/ y /%

z. eteyA/z IxJdv-6, /,:efs, f-'if vesc,5 ,a9~ oY6/c

yXgehOcs ; : ,pc o-/ /.r-/e f} s

s'// AX ".rec/ 70 le & c-e qgra'ed/ L, feyAe?6 7-7- 8

c. Du/e<-,vi -ie ~ tm f8 a 7%d ' f y/v," ,/ze

nPe-r/i/r & Oef le, -d/se I *e e' ' a ve. 6(1/e: St/ce

Review cU' ttsfle o 4"e A C0 e-ae r'e f

bepeevIA 4' fsfj /')D. ,e ve s/0 MP /aAY >1a7r"ee<7efveEe~ 6 o*

ber^Xrfra )f ve/ ro7 fx~aaXYAes~f~e¢ W1 j'14C47' ctrl ff co frrze r Z i -/erevewf,-v-

Page 44: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGIIA MORRISON KNUODNU OmANY

Project C-7X4- yFeature -AoZPAIJ6 C,2ZP4r1tIJA)Item

JEERS, INC. Sheet _8Contract No. &° File No._Designed -... e 6... Date -A9 6-Checked , Date -

l

K'.ALLOOK61-6 11,X44CIR~~~~~~S

Jrp , 9n/ 7szs

heewewv ka~ad 8/iiyA# a~~# e Okac AVV

wil// C7Icib aclepe z

7Zo C.+sct-e /of~4 pfr4n(

e,/f'e# 6ry re**iov f

Ivorao /Ayer, s h &foes e fe,'w Vec/

toI 3.sav'doc uhPI

SAVDY C4A|

,n$7t 6 relJ 4e/e'e ,hp-(o6/e

al o ie ' 6 o//Xf A'a'dry yc/

s~~ao e 7i fepta6 Xzyc-a .4r

,/, oA Z 7 y fle

,I,,e-A /5 /-Se e-e we a-, n

6-f oz}Att /-frw> 1r"arW116CC

*A ~

"5; *f Cl irc7'/e frces. 4o,&fo>

sa- dcf bondisj of cfpe, - wAadnne/

$2¢xftVE' fre *{7f ,57j a~t

I.'Al//Wa 6le Ve/oc a'Lox.

.

fekferevi1ce S-i;- e_1-al elcb

teexcliv-e /,sc ; t wS,

7%AJV is j;o * m'e _ e

Page 45: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

)MORRISON.KNUDSEN ENGI 1EERS, INC.Prolect R "NNU 3VICOwu

Feature eA'DP1A6 eG4 )DA 0K) _Item !

/o idez-ioes f fx vff

T VaJe of fef-trots L/e ye-lo

v7'aw sriewe e's.,11O a/40 ee

6r /eo4i) of IAe so, / -,o

,2 Z 'o'KD f/Xi 5/ele'f ex

Gtry d 'e ) 't'c ucfrnc'5v

3 Tn/ezs f, f, ~e/cc'/y:;

/lefineab,/, fy k is e;Za ,'§

asnts akwy'i'e oV JecIgi

for^°s ed4^ a f i^vJea<*3.g; 3p

Sheet -Contract No. 7 File No.Designed -A 6 Date 1Z-84Checked . 7. 2L ' Date -

: // ,' c071e , e d,

,v-t rc-v&6e ileS

~/e~Ac~ (e.jAey

4n~dM f f$ / ),

rl/'

l ve/c#,O o ' >c

252 ), . ^ asv-/c j

!. ec 7%, c of f/ow

47 7to ~7e/ 6dweef ko

-e C , o- f %fjo. ,4

4 ,4veraye f

-rOX 2/eZ

-o4,e~w TA sTOC40o~<Xo~iZ K/a o;5z__G

Page 46: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

O MORRISON-KNUDSEN ENGIIA MORAISON KNUDSEN COMPANY

IEERS, INC.Project /7,s-r7w4 - e5,fe-Feature PDDbIMS e544z>4r1o A)Item

Sheet /La.Contract No. .. 5•7 File No.Designed -,6 Date 4' R -Z -Checked -L - Date ±'-"

!

7/e wtQ 6e a f * .Vexvye ,rs/-/ajeeccw

ve/ocl~f

Aefe efo/e

v e for / ,; e., I # 7e aeciAv f//ud ve /e C I~fr% "v;" tIis

extirmJ

Vf k V'

A- becvdl{y#. a

as A /a0 s:

.?e~4 z- 0.3 .

ci /X4a/ V1 ~ O1. i iL/seC4.#I d : 4k 5Ire

1/se 5.s 2r/

a: SC+e -- 6,. 7

vf 0. //,fec-

? 7racl e r-n,. Al'o. 6k1'-,#y-1, - c2$s 7)

I

Ci. k (o, o)0.3

k= Z/

?7- re (c-ye ,

flf/e C K r44-ec

k = 6 r e#.A

ldtl 4 v

ec or

ve /OC *s/,

5/o-r

I k (5 Orr4ec.

kss- ,// / s/a7ef-s71

Y, 66 0, •-ff1 fec r /ess

Zewf 10-7-

/,!;;P :yp- Ol-5s ldesm;/ec

-e4,ta-6 e 7-vc* zg w 40 e xfee PP, /1 7-i.l

,J-6C 7-7-496

Page 47: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet . .Project Contract No. .. I°S f- File No. _Feature tAO6 4b4PAT'e'4 Designed, A6 Date A1ff8Item Checked_ _ __t _ Date t' :

of - 7-/,e/ c4"oas , a.s bee-i rssr eve

/s7 roe47a/ fo //o2S o/eI ea,*i we//&-earewel c 6caornels

0 r~~~~~~~

S~~~~~~~~~~~~~'o 5 v e~ teowes e,

A Thews- eXfe eld' c aj~p/ 6eJ f cn-aa . , 4,euder

e-olvi2X lwa/v ar c,"A~e- foc/ la-- =zzf b so "oe e 0

> ,2@_//ge aeplloei ~jogW 6e i!y eefi/y6

A. fihe ZAs>o-x W'tleo6w t -tiJo De o¢ef

s a re/adivefy /oe'?e v.tAe. 7 -4=ct rvcx tL

ctmer6 J185 avdbJ fycH o f' e pdJvoS / zf vo >~~~~rev

Page 48: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

~MORRISON-KNUDSEN ENGINEERS, INC. Sheet J2-Project rrAq K , Contract No. .520 File No. _Feature xFbZ Lvvs gJafE4 Designed G6_ Date '-Z-0 fSItem _ Checked A)itA Date uL^ft ŽL

a G/eclc/ /ayer /s 16reCeS.weyssav ,14uefert /eac//l&

of So/is bepeA vyoy / t/yel-

i et p /py5 '0/h Jf Oessove fwcei ew-/ ye/e./es#!s frow Me

,'lw ayove &e epref Co-na reaed /Xe So;/4ee s/'e/ VI)

,eyp{J44.s Waoe4-e 1c, age feW0'-1e 7eC nfcfecy

e4oS~ ' /c'<i ,M4f /ae.~- /~ ,7kge.j5 d / r s-ee eF

/btfer~nedloie frotec hve /tjyernr r-,e /o z ,,mw-ewhe

sasow/JO6 h nfeyi;d ASefzlf,.66-67)l,e /7eseo u .=wr

6tfi}.fizn 5-,&5 V //- era> 5Wsec 5/a

°R/25 D,,,* 7le .7.nJ-/est- 5i.E .SZa1J c/a ss- ffes

vS 4£e .sc/ e e i W Ay ) .s c s ' IISA

c/¢SA/a ~'~aVf 5s/e.g. = -4#55-/ e/,, .

T/e res"d 1lc o-f Ile ere4 -6ple e+-/badi/ 7.e

74re 4kz~er o ofp1rfeciSve /oatsy eo/ ose m eM ,

L4*t^ SdL ,a~.t' Cifor ,*7 c/e fetmni j 7e.

aesia5W ,e-we c-f /e. 6e ,e .1 es &/fs

indtlcfed J Iisrft rake o f /IKe ,4~4e .so

of avc04 /D~) .4 /54ec-f&>) od- ct Afda ,yre/e of

/. ~ i a3 c wj i3df;6r-e c az~iia/. fo e,/%iev of

Page 49: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(~MORRISON-KNUDSEN ENGINEERS, INC. Sheet /3Project _ Co PANT Contract No. . °0 ;7 File No.

Feature =ADD/,96 o Designed 2-.--- Date 41'Z3-06Item Checked - Date -/ t

7'Ae i%/Owi!f profec/ive /a rfin 4 o 5CAe',,

0 0ca

/6 /,

16 $1,?

1/6 o"

/-f4 TrkYE4L

A/ple 9Aiat ^'Ae_ effeeft of /elyCrt 14weldeeS aJ Ii 0,J

fie ea eww~ionecd by referoral Aa laVefs e wi e

grii sree /i4c4. 7Ae eescI/ _,pAest 7% eac-A /Ayer-

re'acedl Yfe &eosW7 rVe b) 5 Ame5, '-y A / /ayerS

xifie;{;ve/y,/Ae effeqt of etwA a-Adr M fe

"os/t6n raie of bis-e- .sot'/ 6c'4 6e /e- * Aft 7Xe

,irecv-di¢y /tyer. 'f.e41.4V a roA e1,osAn y

4Odd Akzc ea'a/Ne1 7 d zeIoe-dso a7W7 eqf

jf/dzs vhe/oc dfes ~ e 4ASeoj +y ovef-/yi'9

fk/s ke.g 1y eddies, jels, a~tzJ ar6l/ewice- /;q 97/aW I

OCe r;/rao aheve 1-re- tPa) Ne -O, , 0

Page 50: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.AN ORION KNU E1N COMPANY

Project r N IT'lluP -

Feature . .EL)DAJ6 cRAI J/OA/Item

Sheet /ItContract No. _O5- File No. __ _

Designed -J? 6, Date > ̂ -33Checked if Date L-1 Z 4 i

of /4yet4-s 4Aeede/ A reaa 5vCA x 4SA 'wosf ro,-e

s/ad yo'r > A'raMeo yaf ;er~r l fS w~i eaev -Seea e, /ceeAr-t$.i s/i

Chee,i i: pc 'a-y e FC /sye :

2Aoso/oe ~ ~, /00'

tz°Ap(D~o~~x ~ # ' alv 7%'ijfs - I'

Bcdlf~x(AN-z 0,j 27'f I,44f5 0.

a(c 4.v o,/0-53sO2-o/ /pa. C-S $L si3 )

^gofv t /;'z' ' {X0 z

7_4r9 -.

I~ -. 3wf

It 390

~ 3-3 "15J (oJ,0)Mz

/4 0od of 33 Ayers ree t$ 7's 416W- 7',

re5 adL i,-? ao ccwj 4.# e,-oam e e f La e

p /aSfclov/ Sichce o'ta#z fY<4'! ~tv'J 6, a4S2

Cve /he fi',oo-ap // 4e re/L#7 3*1S4//

76etetev 0jt-i eioewp 4 er -f nro/eclv''e

Irvfs l a/4wae/e ve/oclfr ovl.oaca (e;. i7e-/, 8-A)

Yeewis cvvf/'fiodrre YAr odetermlwtn/ a-e -1 e /p, 7 IC-;,

<^,noen<C eSS'VP_ /ea 4.ycf s o,/

Page 51: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(OMORRISON-KNUDSEN ENGINEERS, INC.Project ,irfr'-,UYztYFeature rt P/At C e4.DoP4 frfO ACItem

- e/oAP6?%W VS ,I`fO5, I/TY

Sheet - 'I....Contract No. 5.057 File No.Designed -.. r±i. .. Date - Y-.I 7Checked 7 42ZZ... Date tC- f-L

Opel-neabk'/ .6 o f .S4"t 41J 7 ray ve/s:T * 9

,Af-4 746e1 4Jt/sec

pDo&L £oc04,wcei -.- -- - I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3/8 - ve/

.5-" c~va ve

om - / t reds

2-6~n~ .$fz/

3,mr 3 /if "

S - I" wUe!

,ffMvel (dewls-e)

(c-ase)

291 N~/f,+c 6D44 '> p. (Aa 4eeF 6)

1.°

3.7

/3 97

,i

7p/e Zgeef 9/

/1

II

I

A-c'n ate frb/e. 460ynve deoi'4i 5 9 sec/c~ya4-e a Vaqyoabe W/,% yelot;XVel lt7 e 7e41-6/ve5 ("e--rft

w;41, /lo- c6ec- 9v eddbc koszdea' & fhr cre'-

ft /j e Jhinock e.~bcui/*ed. es~ ttoaf*W 6y k. Stc

of 4lcf.) C c -6/ bes ez6 ve w'/( .s, AI&*

ve/ocIb'eU A8 VaJ/(,s /ess 7fia 0,11a6/e o/s-

0 1 ~ 4-4,eomSr l'yv _34. 7 /5 /,/)

i{ cl,, 7f /<sf ,e r5te~ d (see top /0 i- )

Page 52: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

OMORRISON-KNUDSEN ENGINEERS, INC. Sheet AProject £e AMMIT&T"wUpSY Contract No. F File No.Feature ASKP01'6 Dl47104 Designed PaK Date 41-AItem Checked l7 2 2 - - Date - (2

P/S ce x A)

A4 A4 SedAJy /nersŽHI jr:/es! 6e/wsvee1 ~ r 7l I-e

-r ite wf // /,fti o$'/ 41ef-1,4/ yeloches /A> A ).

ZZMeS Yz o f a//ozeA/eA llrmLo & f0s

ta*idiwk/3j '0vedr ac e't adr i rr

J $4ee 7e we4r1e /ae-el C' 4.a f/U c /--

,0re ;fO /e /e c 92 e 4 d 4 iC 7 )Ori5 y 50 rad n /%/O V~o' 7S - ~ go 4ve-er

6 /i oi u4'rcfa~ /r 6/ jed/cy -/r'sr>/ 5-Ar~/ i~t

be 7co re a rs. e . .Z 6Aco/( redace 47e -zG*j7e

Vf 1e pa5. u ecd jrc70 ;107o'i5 ,4<7 A;e 3 o.n4 ;f7 @'

Dy Mc ee- a4 ft

Wew~ers f- have /eaSe/ly /a-rye pcer 6 /'4o f 6o60 1 - 9 c 6e/ Sr/'me ,4 /O" e/)ec

ZI::* ,aniewiS s/czi ^o fpwe

fpfv-rt1ei JG-r- ,prmct'c0 Cuif'

C*-Se r "exf't )

Page 53: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

~MORRISON-KNUDSEN ENGINEERS, INC.Project rAc , pPANTY

Feature -J 2eAP1, 6 4Item

Sheet Ii!Contract No. - 4105I L File No.Designed r Date W-2f -ScChecked _ 9!!2... -Date f- 1--&

Xdeaede A re ve4 eaf Jed , 7o 0

of aboctt B ,, 3). (C 1ACd. /0M536-0Z-e'2I £-3).

(4'e CD50),,,,& Z . 6 " (siKC C.SJ. Al. o-53oz o2z pe C -Z Ž7

,'r The rhC /aJ ;,d7c/ cedeSe / a 6ewdd#y ,r4eee/ 6,4 *,of O.ZS- e's/ec cfe er Ic/cdpaoai~e otepace dlreeap cti

lotzslfae fryiS-W*-frfrec7% (per .I6,wos c-4scassi

,.E. h >-s-6s). - - -n

t Key. 1 fe w- y -ar

po' 7-eg-?

-vnC U.S7/tVE¢M 7t: P.<L /--8 PE-5--

/. 7Ze Ic,/towtij Jfayrc~ddn f~v 6e~da'y agc ' .-'>

,,dfepga.Se eo n 1-d,,per rn A efaV .5 41

.5e e O. 6"

5/fe 2g.nc: 3/v"6g~ L/IyA~{ /7ffi) fi a s^.

i. 7e estid*deS fed 1 e4l6&,d% A- ? 5Sq;ez ,5 , X lie

rY'44e oF S k iz. * J- Iywrada7l; CL ve M

be7WC&$m protoaed /dAns (see 4/11ec/1#vW z)

~' 3, OMeW l,~/t~~$waw he s>f/- fVXe ,7/Ada//JCA e5sri 6see 5I,' x4ee4 / t) . 's- sre/ekfeo

Page 54: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet /9Project "s7- OS N^ Contract No. 40r File No.

Feature REAAd2) 4472,1-06 Designed Z CS Date Y-86GItem Checked s Date - f Y

76 afral'ove ("O'ewia-ew wwt retred o?-'P/gce

,wm-';wv4 Zs 0. 2- co/sec See _xee/ /l ... r ~

(E) Seo'e yewpreit-o t¢f />r/ermn {ros"w o f

Af~e -selecf fl;// a/d re-do-7 16rlle-r 7~er/S 7

4d (e) 'pfr e eC4 it-

/ZdIU 1 y -> 4d ne-otec gws f/P Cs/o1,40s

Page 55: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet/6d(4 *

Project cQu ontractNo. #7 File No.Feature &A2D01 A, Designed ^ Date !!z-S8Item Checked Date

S•/o(,1 A1~e Y - o

*Jev/6 ?-?-~-a48r/1e Seedl~ nyna0eai?>, j;/ve,, 6t/o (' Cl! /-,~, PK' 7+

!ryoh1c44/v 01 fo .) wi/I s 7zf ocreazs? ,ese Ia74ve

OcaeL/o-Ci ,'Xo ye en "Avone*tf 4~asre e-%1d 1,oleve^-tso~~~~~~~aa~~~e'pe 0l Ae ymefo /ijeaV m~ee

S~r~gic O7'~ {2cl/a<e- 5oj/ (i<es 6tzeaS 1ke

vfp&r hcddadg /Ayer- ano/ Jace.* -, Aj7e drCaiez /a, ,er

o 4we /%e ,H/on -Krffr o 60-rzr, e) . Sic {///&r

ol a Ae ^Dc 4esecs 7 8 JeS 4ec7 re l4,

-ow- Alas rj*LAo8we4d- 6 ie sL?*a;s,6?>

V'es- ___s f _r __e ,Frador elrw.S

e~l F6 pire,.FW ig>r "X' rxsssw 6 01 " S8 -/°°40/o

- d~~~~Oesvyfl -8 -ee f/eebI-Z *.tnd

A/c. Sta 3 ?-7-86

Alo. /0 O ZP7K -

7@he 6or/vro/eef /Ayer' izr .Xs'a sJ (As dessfe/)

.J'e re~a/dvd<y ,verwe4/eS 7gere iSe<> - wi7c&of >oavw

of 0 4-4,waye 4l4 ~ z7' je 6chzeei tyc b ce6/z /~e y''tf7

above f;- ,he/oBy F~eX, r/pra/'. Tge 9jftdcdR z6awe

5Aofc/ 6e oV ,is- /be acra'/eye /aariejr ct6jve / Ae.rbve fa, hell7 hcea 7X .I e,n,Ab a-bo.

Page 56: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

( ( (MORRISON-KNUDSEN ENGINEERS, INC.A COMPA"NY

U. S. STANDARDSIEVE OPENING IN INC1ES

U.S. STANDARDSIEVE MbMERS

4 810 98 20 3040 5600

HYDROWETER

1900a a 4 3 2 & I A I I 100 200

___________________________________ - . - . S - * - * - * . -

I � I I -T I II I ._

80

60sW o

I-*

,3 40

20

10

R I * I

S ~~~41I;~

* I~x I

a a I II I i l

0

I0

20

Io-

30 5

w40 -

C*

50Wdz

70 cn

q

eow

I.-z

wI.

90

100

I

z

'-4N

I-;Co'-

cho L30

I ! Ia � I - I � & * - I - a a -. - a a a a

D 2 )0 100 50 t0 5 I 0 5 I 0. 05 0.01 0.005 O.0oo

GRAIN SIZE IN MILLIMETERS

COBBLES 0 R A V E L I S A N P SILT OR CLAYL I ~COARSE FINE [COARSE MEDIUM FIM 1

SAMLE HO. ELE. R DEPTH CLA"IFICATION NAT WY. U. Pt PI " P4r/

_ _PPA) 6 / J f SEL--_.- ThAosLOPE * = =

- - - -ZGATE ,2~ 9 ? -8 8krkm

CAn 910 f�&�(�4�

Page 57: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project C i4TA S M

Feature BCPDA"/6 KdCAD-47/-t/Item

Ea. I

Sheet ./-

Contract No. .. 05. - File No.Designed c Date 7/,/S7.Checked .. attg- Date_______

/C-za f.t ;F e 0./3 ) f

vf,-~~~~~ 0.r ab ,A0L)

k~ov 06.53 lfec e,6* A0ie:Z '= 16 co,-<fceCV

.6 "cq x z r-a0'; szee 1AsfA4, C~

/jtfld f I fo /6 t/sece o-r /

/ felAcc ,,, ROeef. 7

e&se c-C 0.6t e0;- 8 e-Ref-9),k-r 'O. 6 0$d e

/6 c'7ec 0.6 ('pr)L =,> (_p/-5)0aK= s;z' Wm

le /J 8 -s Aaedo/ *,. 7 /e z_

Fa</e Z. ,sof/e s ~fQ*S 7fltf A .speC'flensr/-/5e z, o5~es yC J atFe

/1-1 , Ie -s ep~ ' wai~ 7ts4$&deAI .sd% derevi-v,

Values jr K: V i- j reas f9 wf o~d ;. Vih/ea

f{Xr 1: 0-.J' 74sts, use of «Dere3, .wcl0

6grve f~s . _ .o. z S /5 ~ 6 e ccnsfr vZ- S~reOn KWC WaP, of

Page 58: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project a- - 2 7AIFeature & 6LPNd,. 64WmA,4rloaItem

tV., I

Sheet A °Contract No. 'gos7 File No.Designed - -- Ed.6 Date 7-2-"6Checked - Date 7,rR

A 64riec) = (jo ,wu-4))

/6 c @se' .. g zAW30)ax = //,W

G. z'e vAc /aze- nd (/ 6yrcA4 4 d:

/. 7e lauoef, Aoc/ yr /lcn y ,s-. S;Zw

J.f Dci ~ 9' t*' os$ =on#/ fo e c~fvf~r

6S frac/td' .se/ecAS Fvf~e 4~s~ovoe

pre vsou$s•, (rsh4eef -) . fXefef,, } deA s t P

teJ - c41n& pro 4./1y w/e jc d orccerA6

il AMIIrd' A A'e/f. ?z

(ogI;f /wer od' elAx jejicit A coe..tsak 7e

rwus//er olke of Al: v= . fr- CLO4C-d Of' O .2

re4ative A dAet fw- L -o.°/ jfve* ;'' 72k z

K4 eod e 8)

a. Z ,)

vD, r c/sec _ 0. : (pirl-

t(A"/ Jo I"

(P/J) 13�_ *r --"/. / -- �_

Page 59: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.A AOtSQN KNUS3NC UMPANY

Project .4TAZ4 egAPAW

Feature BL"b/A16 sAp,471)0AT/Item

91767tIj

Sheet Z/-Contract No. rVAE? File No.Designed . A*6 Date 7E-7SChecked RIwec Date 7-SF

3. /7Os/ ?Fen ts

6k = ' ox)) 0e

0.- em *'sec = (/) 0 f "^) (Po) - '0, 5 - #of

'see sied ). -7 5;' A a,/,10exde6 ' , "-'z1es1

.I>*s cee /ps '.F 2 4n1 c/ "/o rs^rPzLp- g/e A

CD>Stvc , 5 r6 ,8ri) [e e. A~/o -5e -d2 -0,p.,-4

a- - oecf~~647-? a / A, re. o, . 60

X,/41,41 1r"1S/ 5w_4IA1Z r 6vfo r- s eecr D<5z6 J)

(6 ,9A'ERe) /CAI. *4fip.

Awo #4 0.5

k~f - /9/

P/0 Z/ 8

J'oo I- -

-~ 3 7&W" . a redvcce xe'Yre-4a'/,o1I (5, 3 )

7Ze e 0, 7 kdo/ rrca.o i a v> p/e s/ ~ x ee/ z; A

aJ in 055 C 55 & 4 " i/ $ nd /fc tf/oWn k b s

- cdeder ,mie eks ip , fa 4 ?'at'.

Page 60: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

DMORRISON-KNUDSEN ENGINEERS, INC.Project _esevPAW

Feature 614PD726 14Ao-Item

i1~ E 1

Sheet 2...Contract No. .5 'OS File No. . -Designed - Date ;--S-5Checked r Date ' -,r

p,/SC ce55 /0Oxa:

/* _7fecf^to~ cf /A C 0 r7-yW5, ,eS/1 : '"'ct

o side a of atczeab/e ra'do Of.

z. v4 wide xecf aept-b- 4 E 9zaa ,,n ,. }5es--~

('.'p A v- />°o;ii/). /kwserve z%;e ,r/e-/ FY ,oz-

gyraki-6y d{irci/o prossci/e 6jeemg ceVrni konc//)

,in~eas~ews 05 /me elcex'6/e j yIC 1 e / S-.

.3 #4 n~-fc? ro~z n f/I/ be /pto o/4e~ e/

ecO~~~~~a~~~avg~%l dg ccze} o/ctZ 6aCe~fpec tLI bCA hiidlf f )/aye o c/

ckekspect fo aeecj$ X~lr;}f f fuoc-tC'

used ei .. lAee-3,-io ~f ectcfvz rk.s #Woc4 ~ Vhe10c1 eSb gsdaf co

de~tskn~c s{;e-nv ,frm<6zrp c

{JX,; beese,+zz ge 'prres- f6 we yl~-es~

Csl 0sm ree/fs -ZI

Page 61: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet 3Project C"O PYContract No. Cn5rc? File No.______Feature ACtb>pV6 644P.4 7n/oV Designed Date Pt 7-68Item - Checked / Date _-1

/1 ~ ~ ~ ~~~~~~~~~~41

6. kFS/6'tJ~ Fteao/46 642a4r/dv~C/-. TRp$IZpF- A4fU) 5z/p5Cf-~P;.

/. 9 r.-/edgrsroo o-s.%s4-,7mer Azft 7r 7t sm-we

S&aj em, o ve~/oc, A ~es _-,t'es4a1 ess Ws// h-ek

crjic& weel l 4eS/0^esl /e svee i hes

"11/lowable "Pr"ore re/ocy /y .

71a-A4, eecluxivy rweAinv*nf ,oe-cne cz.60 . W

z. J~e ci-L4)dJ? f0w 9~ec,' zZ esn.gefe~w,>fev ;/ &Y- 'pr -le ,Pero 'c f

7rolwwnA.res s e 4rcdiczy a a-re

-",i 5Aee 2&.

Page 62: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

( (

11I

104 1uMe Ito

ItaeM .mstd Sla thl oetutlos Is imsafly the sme so the amspokshe ofthenoraldeph venInIslthata P~asds .Acemahoetoy, the 01-18es by

1.3. "A Wrmo "a by two eap"Aee sashed dwiesubd la zxMqple6 02 eshee be*VOd is the proort psin

be Onomt us OW ,ssSapposetibsteb -mdp -Its'dthoOAnlvalm Asignaftue.

xsA thes wielatty is 4.45 190. whlkh IO grevif them the abumltPermt pufskWt vuisoyhrh _ A ai b rmu_.

When the heat hydreuf. "diss1 Iqs ,usbd Osubet tAt .4 A1 Ves OM It M UV.eb*ied bfs Tulle 74, is AIM - 107.7 OM ahuptify; the deph IO lumd to be

wls~ft lk Ln filer, te* best ihydice tueldal _olm lt hafb hesegue,itheai* t td j 4 Om V2t

ilI I

01214 eV CISANXIOU MO t1tti11s IFLOWi.

I,:

.d Re _ amatio au"d in tentatively , _omended for design at uedibleettenashe. It aslottdd be noted tteithe meth at *th panti sta wilserve only as a guide and wil no aupplant aeperience and sound ungi-

* nearing judgmuent.1. The Maximu Pemissble Velocity. The mearmow per~nfet

mov, at the merewhAl serly, In the greatest mens velocity that wiltnot eem erosion of the channel body. This velocity is very uncertaln

* and varhabl, and me be estionatd erly with atperenee and judgrent.Inh pasal, old and welseained chennefa will stand much higher Mal-

116

II. .. Tso 14L Mamwt teussua Tuacrim lluwomms, at bansa o a* two Coampoem"s, UUW4",UrIU.UeU V.uu

CoavWM tot uon PA BOAu" *W Ime RtansAso"(fat VIVW uheuws of Om"t s ab attina ugle)

:*

IL 0OU CifIL W7llOW SCM 3 00 iLT

T. Metbda of Appac. The behavior of how In on uvodible han-net is Influenced by am may phyIl factews and by fied candite aseonplex and uncertain that precise design of such hannelat the presentstop of knuwlodgs a beyond the ealm of theory.' The unifor,41aw,furmula, whieh is uuitblge for the design of stable nonarodibl ehsnebl,prsvidea an ineuflient eatuition for the desig of cretible channels.Thi i becaue the stability of adible eihnnob, which governa thedesig, Ih dependent mainly on the propertie of the material tfming thechannd body, rather than only on the hydraulic of the flow in the ohtmsnel. Only after a salke auction of the redible channel is obtained canthe uniform-fow formula be ued for somputing the velocity of flow anddipharge.

Twe metbods of approah te the proper design of deedible cael.re described here: the of W ined"Wbl e u ip ntl the methd o

fretdse fi ee. 'he methnd d! peiasoltlle veloity ha been sued exten-vely forthe deip of earth cnel n the United States to enure freedom

trutn nor. The method of tractive forc hae amtlmen#-etn ts ed inEurope; ila inow unde cniprehenAve Investigation by the UH. Ilumean

I It 1as bee. metlsd that ""ea CINOele a uend"tos boeahs O ie y eldersheasl ay, hydliA, ms d soW" physel r tb In met. Ac a utleetep i invowlgslus, the Aun" protee of the no tere the ehu _st

body shud ha eapluu It may be th a sWee uehesa bets. wosad e orhydrnto of the Material ia pwvdlag a Under I% ems place sd the i eetif_ theureusmr. rFot srea dimbmean of the Omphlty at ibhis pHOM, Ml Nt .

Oswte ot~imaesiClearaabea riut eol.

r, tr rW, aft

,b-iO~k ...................... .Io.-.i.Bady l.. .sa-mal................. 3.7 0 .07 2.5 e0.5oft In.ee i. .................... s 2se *.8 2.00 0.1AWWVII et, _1oftd . ................ .. 2.60 0.540 2.66 .. 05

Oadw am .rt ...................... 0. W. 20 0.070 I."6 eaVliuae -................... 5r1 16 0.410 2.26 6.1

IT h, Veryel .................. I02 2.70 a.W 5. .AWiWW slit s% .e .......... SM .7S 0.20." 0.3 6.40WNS a hrdpa ................... e. 0.60 .7 0." S.

Foe ac.Ois 2.56 0.070 0.66 0.3OradeInetelehlensw aaedhlal. ems ov 0.28 .t.s e.enGksdedsliteta4oa whr oWeMds . ..... *.M 4.00 0.43 S. 0.5OCann d, NO Cl ............... *.C 4.00 6.20 G." 6.07(s landmp .............. 0.0 .40 0.6 A.B 3.3 0

kN44g~twit

",-

Y.j.j..11

'time Portiamed Swehey Wale Wer ,seoa fW c" iIi by _t ftu eldCmseeiftt M Jes* Itwetieb .mE the OMurlea 88ty at Civi 90gaue

tie that new on, becas the old ehanne bed in uulty better stal- "-

Iaed, particularly with the depeaitioa of cdh idal matter. When othereontitions amr he mtme, a deeper chnnel will convey waer at a higher

men velocity without erosion than a shallower oe This is prbbeasuae the scouring is caused Primarily by the bteom veities snd,4for the eime mean, velocity, the bottom velocities ae greater l the As4lower ch"neL

'P-

,e6?g6E S8-.' - gN ;

I6

."

Page 63: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

r f

zl sE

166 a 03 MvMUM OS 0 CWAffNWIA MR U MNO H FLOW

Attempts' we reeda early to della a mmo reloctry 'hlt wold esiwwither silti" r oring. Fron the pinesentdy viewpoint, how-es, It is doubtM whether molh a OcIty actually ests. Is 1915.

a. . . . . . . . .-r X z

IK KI HTF167?

'11

lIIi

I

-";z ( 490%1 3

I I GT I -I I.0 - =ar- I

ofcapa I

to" glem

I

II

aI , l 9 D 1 ('t

lie. 7-. CCWm twoin VJEMI.da44fte w mm64 y1-vdsltims frt~mie seWh

I F,.. V mW1.1. UAA.. dA"aes pem 641-e dw~el la fas n..hem!, su-b.

mcverery 1261 pused probably the frstble of mwhoem mel"velocities that amr safe spinst erusion. In I95 Fortier and l$ ey 1n27published the we-known tble ofd l'hsmnuible Canal Velacites" shownIn Table 43. Th values In this abte a"e fr wegoseoneul chanels dmall slopes ad for depths of flow 1m than .IL Te table lso show

'Ik but0 femaem toeui far "k smitn n au as~ea ding ~edy far ulft-ladmeisatoo mas Puhflee is36 h b Krssudy 1101 r-e a study of low ditchrge sa"dethi of 22 eaMsel oflli Uppe "adu Vftha bsciptise system in us~la. India. theKennedy 1ernia VW dowvelad as

r, * .Or (7.4

Onr rleboomist- andoew 0-0it tt; C . 0O64, dssele pbrs'ya the Sesne ci the smtwt kmng tte ehe_se hoy;-d J - 08,0 espuswt whh ic. oil Ak~hbl. Kesee iteratudie by ot1he o"gisee, theaie af C _essy rmgmedmd eSA OKtetxmety be e_ scl theAG found 1 INgypt; 0. 39 l e an Sued Salh sw1so them fud i two PImbs. India; 3. hr Com ht km edy sub; 3.M1 fo sadylace, silt. sad fat carssilf at herdocdct.For elmet s, a vTOS ofa be suaseted.

Ar hel deeig at cowsam csyigs t s we, the ewdy feuul issew psectisny ohmealut and is holn iphad by molhodt based en LoeS #c~inthecy 111-11.L fie' ts bed-lad Iweetm 1171, and MNaddaek-lscpsd Pdijdoof Channel teomety fift oTne wkltnses g0es seetheds. Comm-

P"rehe b#hteiope am bete fad h .111 to ftl

sItable t Values for Tarmu meterish and the coverted volue for tecorresponding peenluible tractive (or, whichwill be discussed later (Art. 7-13). In IWO), aRiumb magaslin r2s9 pssbllebed valem of maxi- * _mum peramlnmilh velocities (figs. 7.3 ad 74) .ahove which seor wohid be produced In nuh__ 7_sis Material of a wide rusg of particle dsce and _varmas kinds of ohesive soil. It also ave the I _ _variation of thee velocities with channel depth et _(fit 7-6).

Temarimum hlsvelctien ed __above are with reference to taiht eho"For sinOus anneblu, the velocitics dOd heowered in order to raro e soor. PerIent s oredction sugesed by Lans 291 a % fslightly inous canals, 13% for dratelysinou canals, and 22% for very sious annTse perentafge vah"s however, atuenery opproimalte, since no accurate data are avilbl 0 . 3st the present thie. t t

T-10. Method of Permible Veloct. UsVng Pit.14. CuVe show IsUASI.t.. cecrsetiau ofthe rmaxunwu pemisible velocity as a criterion, Va lftit 9te

the design procelure for a channel sectiuon, s. deh fr belh _eivesmWd to be twpevoidal, eonebs of the following -da" aem- at-

steps:~~~~~~~~~~~~~tb

5o 4e: :A a

I I1

� (N'IL

t"Vil4

d4cm

I '3,i.

- t14

Page 64: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

OMORRISON-KNUDSEN ENGINEERS, INC.sAy MORRISON KNUSE CMANY

Project - - ---FeatureKa3M

1

SheetContract No. -X5Z File No.Designed 4 Date "s' 2'-65Checked 4 vr- Date ,-,

5I, I.

Table 6.1a. Maximum PermLssible Velocities Tablesby Fortier and Scobey (1926).

Original Material

Excavated

For Canals

Mean velocity of canals after aging (d 3 ft)

Clear water,no detritus

n ft/sec m/sec

Watertransportingcolloidal

siltft/sec m/sec

Water

transporting

noncollo idalsilts, sands

gravels orrock fragments

ft/sec m/sec

1. Fine sand( COllo tdal)

2. Sandy loam

(noncolloidal)

0.02 1.5 0.46 2.50 0.76 1.50 0.46

0.02 1.45 0.53 2.30 0.76 2.00 0.61

3. Silt loax.

(nor.cclloidal)

4. Alluvial siltwhen noncolloidal

0.02 2.00 0.61 3.00 0.91 2.00 0.61

0.02 2.00 0.61 3.50 1.07 2.00 0.61

S. Ordinary firm loam 0.02 2.50 0.76 3.50 1.07 2.25 -0.69

6. Volcanic ash

7. Fine gravel

0.02 2.50 0.76 3.50 1.07 2.00 0.61

0.02 2.50 0.76 5.00 1.52 3.75 1.14

8. Stiff clay (very

colloidal)

9. Graded, loam tocobbles, whennoncolloidal

10. Alluvtal siltwhen colloidal

11. Graded, silt tocobbles, whencolloidal

12. Coarse gravel

(noncollotdal)

13. Cobbles and

shingles

14. Shales andharcd pans

0.025 3.75 1.14 5.00 1.52 3.00 0.91

0.03 3.75 1.14 5.00 1.52 5.00 1.52

0.025 3.75 1.14 5.00 1.52 3.00 0.91

0.03 4.00 .1.22 5.50 1.68 5.00 1.52

0.025 4.00 1.22 6.00 1.63 6.50 1.98

0.035 5.00 1.52 5.50 1.68 6.50 1.98

0.025 6.00 1.83 6.00 1.83 5.00 1.52

Page 65: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.A MORRISON KNUDSEN COMPANY

ProjectFeature IItem

Sheet A- *rContract No. A____ File No.Designed 52- Date -Checked IF r Date -L- & :

Table 6.lb. Maximum Permissible Velocities Tablesby Etcheverry (1916).

Mean VelocityMaterial (fps)

Very light pure sand of quicksand character 0.75- 1.00

Very light loose sand 1.00- 1.50

Coarse sand or light sandy soil 1.50- 2.00

Average sandy soil 2.00- 2.50

Sandy loam 2.50- 2.75

Average loam, alluvial soil, volcanic ash soil 2.75- 3.00

Firm loam, clay loam 3.00- 3.75

Stiff clay soil, ordinary gravel soil 4.00- 5.00

Coarse gravel, cobbles, shingles 5.00- 6.00

Conglomerates, cemented gravel, soft slate, tough hard-pan,soft sedimentary rock 6.00- 8.00

Hard rock 10.00-15.00

Concrete - 15.00-20.00

UACCrv goA' 1 -

Page 66: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.a MORIS0ON KNUDSEN COMPANY

ProjectFeatureItem -

Sheet X -Contract No. 50_SZ' File No. .-Designed 1e 6 Date sq. -g 5Checked A;P I- Date i-- At

ccgefiE6 g

Table 6.1c. Maximum Permissible Velocities Tables 1

by U.S. Army Office (1970).

Mean ChannelVelocity (fps)Channel Material

Find sand 2.0Coarse sand . 4.0Fine gravel2 6.0Earth

Sandy silt 2.0Silt clax 3.5Clay 6.0

Grass-lined earth (slopes <.5% 3Bermuda grass - sandy silt 6.0

- silt clay 8.0Kentucky Blue Grass - sandy silt 5.0

- silt clay 7.0Poor rock (usually sedimentary) 10.0

Soft sandstone 8.0Soft shale 3.5

Good rcck (usually igneous or hardmetamorphic)* 20.0

lBased on TM 5-886-4 and CE Hydraulic DesignConferences of 1958-1960.

2For particles less than fine gravel (about 20 mm -

3/4 in.).

3Keep velocities less than 5.0 fps unless goodcover and proper maintenance can be obtained.

*May be used with judgment in durable bedrock.

/r/oTr£c: 7h-,,s 714,6/e i' &e sede Ad, 1.,Te;~~ 7C "-' aer.

Ap t- ///O -_Z -/6/ l,

Page 67: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.A MORRISON KCNUDSN CQUPANV

Project teyPA 1-, V

Feature PDDJc A1<oAItem

Sheet 6 - &fz- Contract No. _ __ File No.- Designed ? .... Date !-z-ep_ Checked '&2- Date____/__F_

a)_/,-/I If C- /57C1 V 0

f. 'PROS6 :

ffitsfn fe i;t0/bzet/ fia Jc f owc vele~cl_ ctszv CSc" eelafnsh;

&isd/4 eg-ta.? r; (6~oae ~wY/ b)~s J~L0 e ' /1/)

Fr *p>/~e yralctdaeOi e',,a. Sete Re V. rearise a eolre >

2AM~~~~R~f~rS rx6eef Z

2.~ ts 9"FPs 0 DP 'A) ~ o P6/Y o ( <Ae t 4z S674'n con J ^?P 60

(i,7) ~~~~~C...WM) pl

oz60,i3 O.,4

&I. Z , . / 6,/C~~~~6 S . 'r.Z

,1v6. 0.32- (o.35) // 3.-

.4ssrco-ed. ei(2a "/a a.oa f 0I'V f- =o / (, r,))" S;JJQY btse -v ,Jof Aou_ or / Se f ..

3. CSU ?r/A7OAt5A/ /, 4p. 5-3 ,, ,tiOe-Cie - e/l / /hV6f_, /q6)

V1 = / dz I rCi °' IC='s J 4o

q. 17.4 ?4 f fc C2 ItAr/oA/ (A44W'e I Ph, Y.a441 /1967, f )

k: cM$e C, to0 = C," C, '0 Z-00 -,5-0 Av/Ovse to1w rao : c4 c

(ra^,A' $ Aec'if6gfa71i)

AeV 21"Me_ V# olyl 74- be /f. 3 .ko"",, Jr4 yoeje f

B A V'O Fv- egoarse rave/ (Z.ia o. 0ba w, S

fjtf&w- e -, r ". Z n x ) ac, e y- el = &.3 *).

"4 C,> t/-<aS~ /00

Page 68: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProJiFeatiItem

MORRISON-KNUDSEN ENGINEERS, INC. Sheet g - ^3)Ct r&£O "25JOS, - - Contract No. - ri.4ŽIz File No.ire BtADDQG G~tAD4 r/o/v Designed Ad Date ALA-ER

Checked ,c Date f L.5R9Mevef: 5O~~~w> ^EDDHG g - t*/z/rF~

rgs*c' t/1/ cirrt 6wvDVI 0' S e-p- (-f'c)

/q4:A6I .,q,44 I A4 V6,

CSM

/M4 erA/ .L 3

23 (^1

/Z

C. /S a

0. D 800. 0v

k . .n

rNep 41. fvocm rlkct /0)

v f - If n~P

wherfe V i.% c4ral/o Eed az si-r'( lif&" 3 / p, a, - 8/; -5 = O. 0-5 J

_ I

(SfI Vd^be i5 edct1/4 * as f//ows

V k - WseAe " V n Vf (see 'csVave)

77,,s vo-lue o 6e eonA/ered gew "Svep /edv

pe-neah 0./, c' d J iVes 0f ife.s f de/ /

a •,Z s/~e ~S; /3 fAe .. s~w as o69tzM by CSaf

Seconci v .e 6 0W,?t i, P e( ) ' 's c lcd/e o/ iWu4f c

re/o nsAie fJ- V; g sc /.O. 7Ve vake is showu

\yieldee S,4 fo- s/fes lie 5leper f;Aui 2zO '.

Page 69: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

I MKE DOCUMENT NO. 5057-GRN-C-01-00526-00

Calculation Cover Shoet

Catc. No. M-57-OZSP-4Contract No. 0.Z5°5 7 Discipline N tdo. of Sheets

Project trA1C/RFFNW 1V t2R

Feature WATEWATFP, HAMDLJNW

Item WASTEWAI' VOUMULA1D V01f EF

Sources of Data

I) MKC UJVf.rA/15wfPV- -EC-Ah 1 4J.' - F-& Dpeln /

2) F-ad,, tor%,i VWV, le . iiec;,i Ane l XIr*0i-C Wc4- & MW70JI/Als /Zlv £*} G /r~*, UF*. rl s /911

Sources of Formulae & References3) NoAA 74-4'c"/4 /Ae,6.t A'W.. &I P1 a

A_4 rw. y' kff- us S. , u.s. p. cf *AAOAA; VWs$) WxAJ4,fihD.CGJ AC9e',0. /

4) > McA4tlly -%ooW Afths of . (/ S.

' IVOAA e joC && W 33, FVvAhOJA, AH¢r ctC Aut'*9 U- s* !2. VS. PVelt. of C: Cv'etc.#, A-A,, Vws, ¶sg'rftj D.c, 4 /

/) esos4^s~o os //wan<4v} AloAA dJmNO/ jvk'unIF.l S^eI&Ye, D'Jr, >/J'#A*k- CA1W Stv 'EL.4(hJ S/A,.s'c J)A Cais' 4:ka.'?c /I/.cqJP4J-;U9Z( p - : (704)-; zf-oUt2) 'CI/J~ya'fl' of F.U VS. AIO 20, G A# A-c- ,VT'

Preliminary Calc. Final Calc. s Supersedes Calc. No.

Rev. Ra a Date Cc B e Ao B lut_~~~ReI~ _aclto _ aeCekdB ae Apoe yDt

Page 70: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.DAV;ZloRRm INt~t C1A_

Project £ Gr k7 &V YrZA~rt(~v)j

Feature sA5TrhA4?rp Rumo; VOLirEItem CONFT&Ts

SheetContract No. EEZ. File No._Designed f4 Date - 03 7Checked 7 p Date /2 /

CONTENTS_

1. S UMMYA Xy

2. PURPOSE AND seoPC 3

3. PRoecPDRE'jON cr//ecAh'4 '"Aly

3

4. REsw.-rs 5

£. C ONCI.Us0o,0 ANP REN MMiffVbA7TON5 7

A PPEWb.1X A : A.rAw/ MON TIA' PRECZJ, TEP AAD FVAPoRA TroIDA 1A.

A PPEN I)i X E: R/?FAJ0lot EA S1N DES) J0.

R ATIONAL A4PPROACH pol FSTIMATANG RETENTION

BASIJ WATEf VOLUME 5l1NG IWEAN CLIMATIC DATA.

Page 71: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(G& MORRISON-KNUDSEN ENGINEERS, INC. Sheet 2 LU SA NOR= E C_ 4y

Project tJM' AMA &@ Contmct No. fO 5057 File No.Fetur WASTFJ A r RVNOF'F Vo.F Designed. H..M Date .. °daLeItem SUAOMAAY Checked Wa- Date 12Jl"'

I. SuM'4ARY

-7Aer co/c4AdabY (c x~s ,6suJ- A:( Li WA4Ae, maA, A"4144/I /S46I ~ 4/

0 xtv'As s' & &fy wt0 Ak f nro

of /Aee c /hn$D4's -

"ej Aww 0.0 O.9? fF d&WAF Hew ^1 6 sLJW0A/tiod Of A,4i 4 bf of* x4AA, of evqoAA-0K khrm

eU4e Vo/4 44/ kl / 9 AF evtp 1k , is4e,, A' 94o. v

( 4) .7 :WAv ir & hSbI:Sd (V4l etdy a., SAVA-st

-eve.1- (SwA c4 lo-yecA *-A tv,* wtG&

fA, b ti 40v O'hw,( r &"4J0S A f4 j'CW tA4.' *s A*# /4

f ,J5 & 4 / tv , A; Gffq, '

(iv) 7@ 6/4 .2s ~ J v is ~4V V d* cojiA v oMI- A4 # aq ;//, Z v4,L -^dgj cXoa-y-~P A2C I A we:v-5AU IlscZ& 1-{Av e}z

f W wXAxws of 4 5~-~'- (/ A y4- "h e" A&I VA /4W. h-Aaev, oow /

of Hv tad4 i>i rL4V ISA ^MI! 6Ei JC9 4f C S4

v0d d;f qew d r /424 A*C IS e $-y

24- - rk 4w a cCW. 7X4 wlv, k// lu' & __ w>d44*2 4

de44d'ayd. l 1 xe- w1 o doe ws. g nwt 4ed t4

/1,¶%fs e-sW14kYI y i&, A'PPFS Phf, iv'w' "S4

w^ S/4AtS "oje- efv fJ 6Irk SIAZAXS& dA4rU4-/& d U 6 /X0Vbdr aOU1- ZZ;<' C

Page 72: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

~MORRISON-KNUDSEN ENGINEERS, INC. Sheet _ _

QAIIOIUUJ "XUDZ"OMA !Project u Fil Contract No. -fFlFeature DeASiTAVFR AVDtJvj Dgned Al.. Date DA 041L7Item RUVOFF V0L 1Mff Checked Date JL '.

e IA ocww ht. xe, h40 /lC .5 K61x ";ao:w>*

2. PVAPOSE AND ScoPE

V/Ask wdSs WI/ k-, 9.,e^*Acd dM&4y I-A #44A~ xe*'J ex,401

'p1- He., Gfs#v I1we uAsh4c4v%4$j yAie - A vwAoa.Sch-

da'ru us, Gh~e~ A &Aiod )e4 u ~ Ws hWA I .X L EXa ;" sy ; oW~shtauosh III" I r fw#%O3 e & C N ; pv. Pw hR fR&cEFDJR

*pay i v mkj~f efz/ W4 dAA-fe.

Tf& Icow"JabM s a am, /&ui -'(.e- destw/ k/civ

;F i i, A£etdcd A A. 7a+ xv 4tol" .h e

vSD~i 1.4- of d V fZu AO~hl f4,- 4.e- o., e~s.4/o(' /1 ) '...,

3. f Roc'PrURE

fr t 1"CC/ AiV/4* 7VC g CSI 44 p #r 9('sX 14 t0- o4A;* 3 4-9yrAllowVa J, iG-retsi'i An Aroe- ;v; L*Fe aw esc, ielew

Me~vtnA1L4 Ae~f MW tAiftl- . 7 X0/i4 f e-vkilc4l o..ie aAW4

Cf,;A DQA Te6sos A/S t vwi 6if# e A). *1lw, A I fz YV ya, shA4 ;s ;nde A." 41)4. A . Whv"s v4%v-y oas 4s i

ao " °1 ~ f -Y 7XeH~ is c&Ali f- o.J ;q.,oy. 4f 404 . s0 "

J47: //O"/0Iw, R. 40> 7At, #-4k/ ew4dt A& a, 4,.s A- -k4,

6"4, AVI AZAdA 44Ai frk k9^C<el 4f~

f~wp ft Altz4 A#- + WX; 3 f(OU/. 3) + to^1<4& w^At,. x"AA4 pi e vq o AA-^d-& aeW Ava;aJk fww oA ,mA-reS AaA.Ll # 44ws 33 ( p,/ 6' . A ASU 4A >

Page 73: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(~ MORRISON-KNUDSEN ENGINEERS, INC. SheetDAORRIS INlt COPN he

Proiect Contmct No. 5057 File No.Feature WA.STFw1AR HEAP4/ TN6 Designed Al. Date .. n4/AItem h ¶w4efUf i ? e¼A 4'kziA Checked .±!r Date 1-lU7

A.

.p7aA ew 7w aX"' SCS 6atl &44441 Ia"*.sVCy;&ja'J S e/ &UA , /0 -y - .4--V S4v.dowc ow oww A4wu- #A4. Ite s /$a4v "u:

*7'/v4 d."'ii "WSA &i, p p &IAi o~ 4cujL

&f T&R00f 46" AP

. /Z 3 291 AF

To A4 4-do AF

SfCS C4C-1 Almw Afi-i 4r{/ e", Gy * S

~~~~~'~~~~ mlstt/ /Ao_ mf (&/ . R f/

Page 74: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(~MORRISON-KNUDSEN ENGINEERS, INC. Sheet i/a A"SNSEN "O'Project s uMas/d;K Contract No. 5°7 File No. 7Feature WAS¶rwA-rrQ AeAmpDitAr.J Designed_ HAI Date a C.? Af 7Item Woj#ewS , Vo/Wwt i A yir Checked > Date 1z7

A^s/ys~r:

7 4e c4v4J ri of qoiyil h-s Ivv -h, eo.vcea- f'460

¢u H4AAA0 cpjJ"~o7 i/ Afl hOcs 64

bi& 4tili4ow o. aA,, f kg' i~dw //AA' J7 kiu 4i/d -esX'*.4t.

H4, Aa4;, J"< IAO "'Va 14b &vy'IJWA 4,c *4f "e 4-vucA"£%c ~~-~.~- .rW^A f&.iw & il&4 jCLZdft iVV~ IAJ44WC1.A4 If

+Sf~ bh[S* W 4 avtJ. e w'Sur' Sa9,e4S'E-LA.4AA4I,'i

4. gESOULTS

ZTA #.xFrzx",A arJy.& fox H. ^v.v *x^W owvf ^4 G4k>vi. *vowkV ccwh TAeM, Ixe eri w4ls 6 '.

<AA" ^"t 64tAy Co&*Ac.vs / /4 7, II, 19 i4 ?¢6 ato 64&Iik14~ om WMAeI '4 14idu'cdA I."c /Aueku~ ",Ao 41e/s$4e'-

7'k A4-AAV~j/6 Cd4ku64 owl cp/w/Ahfl16 &4$4a .* bi

S'IM'qAI WA"th( Cc'. X) &7v4?-~Wi4~~ dvs~w C.r A et v~A..1AWdU VO/IJ4 (Col. 2 t)u, cr w Sc - 7UTse c,4k"AAo.4 expfaJ'44ed uv Ap~4i> 6.

Page 75: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 76: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

QMORRISON-KNUDSEN ENGINEERS, INC. Sheet 7z

Project tiM7RA 7,A Contract No. 5057 File No. .Feature /A rSTEr44r AkADLp41N6 Designed H - Date 4d °04/7Item W4.jk&vS vo/u cales. Checked 1- Date 12{w 7

5. CONCL-USJOS AwND RECoMMEVI.T1ONS

4A& , nMy iAfkW iJSZ JFh a4' e$ 1 0.0 t

r 0o Z AF dapaV ke, d f 4

Fez r1t c g rk.. nf 'k { /S bt o h

i-A& k- a.evofd4IW1 vll . 9 I. 62 A F ov4& &ic s.'

7Atse oI4s =w oI/.ed oC&%, $f4tA44t eff £~ evqoc b^ lofl'ief

" 44y cofh'0~4- w Safe. ( &14 Jo.14," = 0.0 '^ Wi cj)_

yo/u*te.s 4A& /'rv t-v ." /,( olI#t1ew duw to' a,{ t i# -ca ;cv

&4S1- 4sed' fvt e &*LJ I&~ ,4A,. 40- /0 -yei-f.- 4614- SK;4K *a~t

iW4S 4iiL, ' Si~s, (4 aesfogM S;4S at4AedIDJ/ zeiomd sedl' £r hiMV easall/ovi-. 7Aht f4" a S- /ShMW,(J (h

&.4 d'pam.c 4Ay A' AVI

.7k {M &4i.- a5t if des~4d k bv fr4%o.s

tAmIM44 44-fe[ AXIZAC W11 /0 fR "afAA' 4"%Pvl kA/ W 4.M v U"O-A4 'Cd~~

L,wu of 4AAO, 04 s A-9%& ,, J, JFA9-J- 0-44 H4, '/ YA

-Afe S/A.fw en s erg4>d4 ^ KIA*JUA An)V /C-/ W4 *.iatIv y S 7k- j dwvs o

Page 77: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(~MORRISON-KNUDSEN ENGINEERS, INC.Project ,aff -AFeatureItem

Sheet AContract No. 50L.. - File No.Designed - PM . Datet 0,9}DChecked - y Date -t/Y,

A PPENDSx A

AEaM MONTHLY PRECP, TrEMP AND EVAPoRA47oN DATA

Page 78: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

CLI T OF TE UITED STATES NO. 20GE RIVER, UT

(

CLIHATOLfiGICAL SUMMARYPERIOM: 1V1-80El RATIAN: 407o0 FT

________________ ~TEMPERATURE r bIF __ _ _ _ _ _ _ _ _ _ _ __ _ _ _w. 7 m t C rq

MEANS EXTREMES MEA R DEtREE DAYS E * _ SNOW IEA

*^ ss * *6. *2. *1 ie 30i 5 |o o 2 7o o .6 Z517|.e -1

00

APR~ 36.8 .3 23.1 4. 85125.730 0 1oZ0 31 85 12o o 1o99 0 .40 1.678 .4 14 4.0 6 1 6 .037 1 06

JUN9~ 89.9 51.4 70.71t05. 79 29 35+7 9 t7 0 0 0 17 188 .34 1.869 .7069 24 . .0o o 1 0

._L _. 78 . t+ 1 41l6 1 9U -O 0t -r -43 W -. _t _ 75 ---; _ . -l -t ._AUG 93. 3 57 .0 75 . 21l07. 79 6 39+ 751 29 24 0 0 0 0 316 .7w9 2.82157 1. 346519 .0 .0 0 29 0 o

SEP 84.89 45.8 65.4 11+ 79 8 25+ 7 1 9 o0 361 0 72 8 .40 3.61 1.34 610 1 .0 .0 0 2 0 COCT 71.2 34.5 52.9 90+ 19 2 127 0 0 12 0 375 0 .78 4.1372 1 .061 o .1 2.0 71 0 C"ov 53.9 22.6 36.3 74+ 7 1 - e+ 68 0 0 27 0 101 0 .46 2.9557 .7 79 02 .5 4.075 1 0 C

jUc 40.9 12.8 26.9 605+ 77 49 -15. 679 22 07 5 31 2 18 08 .34 1.28 65 .70 69 20 2.8 2.7 72 1 0 C

EAR | 60.413461 51 .171 61-25|AUG JAN OCT AUG JANYEA I a -I 2 16 RI_45 If7 741 -28 I 1791 Aol a, 17 1199 1 12 I %,02 I 10217 If 6041 4-241721 1.341f.R1 191 in 1 >& n1 791 I6 n1*FROM 1951-80 NORIALS 0 ESTIMATED VALUE BASED ON

DATA FROM SURROUNDING STATIONS+ ALSO ON EARLIER DATES.

DEGREE DAYS TO SELECTED BASE TEMPERATURES IF)

BASE HEATING DEGREE DAYS

BELOW JAN FED "AR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN65 1299 907 710 399 142 17 0 0 72 375 801 1181 590360 1144 776 555 256 58 0 0 0 19 232 651 1026 471757 1051 696 462 176 25 0 0 0 7 157 561 933 407055 98 643 404 133 14 0 0 0 0 116 501 871 367150 847 517 262 53 0 0 0 0 0 42 358 716 2795

BASE COOLING DEGREE DAYS

PROBABILITY THAT THE MONTHLY PRECIPITATION HILL BEEGUAL TO OR LESS THAN THE INDICATED PRECIPITATION AMOUNT

MONTHLY PRECIPITATION IINCHESIJAN FrP MAR APR MAY JN -NH AINr CFP nlrT mnv nr

- -

| _rsx r X ax waxers Worry w _ns non nine _r [at | roux care

-h

0:wEd-.

a.-

-j

m0EX

.05

.10

.20

.30

.40

.50

.60.70.80.90.95

.00

.00

.04

.09

.15

.23

.34

.47

.671.021.37

.00.00.03.08.14

.22.32.44.62.93

1 .253

.00

.00

.04

.11

.19

.29

.41

.56

.7

1.15

1.52

.00

.03

.11

.18

.25

.34

.44

.56

.73

1.01

1.29

.00

.00.13.25.36

.48

.61

.78

1.001.35

1.70

.00

.00

.02

.07

.14

.21

.30.42.58

.061.14

.02

.04

.08

.13

.19

.26

.35

.46

.61

.88

1.15

.01

.O6

.15

.26

.39

.53.72.95

1.28

1.84

2.41

.00

.07

.19

.28

.38

.49

.61

.76.96

1.291.61

.00

.02

.11

.21

.34

.49

.69

.931.291.90

2.52

.00

.02

.09

.16

.23

.32.43

.57

.76

1.091.41

.00

.02

.07

.13

.19

.27

.36

.48

.64

.921.20

ABOVE5557606570

JAN FEB0 160 130 90 00 0

MAR00000

APR3419700

MAY218sfin10836a

JUN471

411

324

90

JUL713651558

403

248

AUG SEP626 316564 259471 181

316 84

174 24

OCT NOV51 030 012 00 0

0 0

DEC

00

000

ANN2445211516701027544

DERIVED FROM THE 1951-80 MONTHLY NORALS

THESE VALUES HERE DETERMINED FROM THE INCOMPLETE GAMMA DISTRIBUTIO 't

kBEt-n N-

Page 79: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

C ( (DEG HNI DEG "IN

423418 GREEN RIVER. UT LATS 39 OoN LONG: 110 loU PERIOD: 1951-00

FREEZE DATA

PROBABILITY OF LATER DATE IN SPRING ITtHtu JULY 3tl TUAN INDICAtEOI*IgO 7nfl m fl -0 i 40 30 -20 tO

SPRING FREEZE DATES IMO/DAYI

35 5*04 Sit* 5*14 Sol? 5120 5124 5*27 5*21 f5*05-32 4020 4*25 4*.30 Slav So0% 5*09 5*13 5*1? 9122

20 .180 41*5 4*16 412l 4124 4*27 4125 S*02 5s0624 2*02 4*01 4*00 4*10 4*13 4fi7 4*20 4*12 5s0t

W 20 2*12 3116 3*22 312*2 322 4101 4104 4*06 41144 IS 2*24 3*03 sle0 3112 21l1 3*20 2124 3*25 4*10

PROBABILITY OF EARLIER DATE IN FALL IBEGINNING AUG 11 THAN INDICATEDI*II to no _an 40 sKn -O6 70 _n qo

GROWING DEGREE UNITS TO SELECTED BASE TEMPERATURES IFI

flASE

40

ASso nS45 n

S

55 S

Sn

GROlING DEGREE UNITS

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT

2

2

0

0

00

00

00

20

22

3

30

0

0

000

1301S2

53

56

15

is22

00

360

512

223

279114

12941

43

a

a

679

1191

524

803373

502

234277116

124

930

2121780

1583

630

1132480

7s7

332456

1187

330"

1032

2615877

2009

7221479

5671023

11004409

'4S

3560790

279635

2114480

i503

7685176

68e4178

469

328

323

2437189

1642

415

5591

2704448

148

3416

62

249915

1707

NOV

655656

194467

33419

024"9

01707

DEC

4

56601

4468

03419

02499

01707

ANN

5660

4468

3419

2499

1707I.-

w

FALL FREEZE DATES 11MG/DAY25 9*12 9*15 gill 9*22 5*24 5*27 5o*0 10*03 10*0732 5*20 5*25 9*29 10*02 1005 10*00 10*11 1001S 10*20a2 10*02 10*07 te101 10*11 *o0*1 10*15 10122 10*25 10*2024 10*12 #o0*? 10*20 I0*o2 0102S 10*29 10*31 11*04 11*0020 022 10*25 10*30 11*02 11*05 11*07 III*0 11114 t111Sis 10*25 S1*04 10so0 11*12 fills 1I/IS 11*22 11*2S 12*02

-- FtrN-tfttYY--tereftt-fl* D"*CAtEO- FREEZE-4REt PERIOO UOAYSI_

I in 70 32 4 Q0 40 -70 o -O -N u MONTHLY DAtA _ S _ SU" OF_ MONTHLYDATA

FREEZE FREE PERIOD

1l as ISO 42 35 III 125 122 II? It$ 102-2 174 155 i51 155 i51 147 142 135 120a2 155 165 l63 175 Sig 170 155 I * I 15324 215 a21 205 200 155 oSv 165 175 171

, 20 24S 225 220 225 220 5as 210 204 19SI s 274 254 255 250 244 226 231 224 213ISIPROBABILITY OF OBSERVING A TEMPERATURE AS COLD. OR COLDER. LATER

IN THE SPRING OR EARLIER IN THE FALL THAN tHE INDICATED DATE.

0/00 INDICATES THAT THE PROBABILITY OF OCCURRENCE OF THRESHOLDTEtPERATURE IS LESS T4AN INDICATED PROBABILITY.

GROWING DEGREE UNITS FOR CORN

NS

44 147 286

SO 197 4e3

454 571 7f6 678 51 : 342 93 8 38s6937 1508 2224 2902 3413 3755 3848 3856

NOTE: FOR CORN THE BASE IS 50. AND THE DEGREE UNITS AREADJUSTED FOR TEMPERATURES BELOW 50 AND ABOVE 86

OTHER CLI"ATOLOGICAL DATA ARE AVAILABLE IN A VARIETY Or SUM"ARIES AND FOR"ATS. SUCH AS THE

CLI"ATOGRAPY Of THE UNITED STATES: ND. 60 - CLIMATE OF STATES: NO. 81 - MONTHLY NOR"ALStAND SUPPLEMENtS: ANNJAL DEGREE DAYS TO SELECTED BASES DERIVED FROM THE 19s1-60 NORMALS;AND MONTHLY PRECIPITATION PROBABILITIES. SELECTED PROBABILITY LEVELS DERIVED FROM THE

1951-O0 NORALSIz NO. 84 - DAILY NORMALSs NO. 85 - DIVISIONAL NORMALS. A VARIETY Or DATA

IS AVAILABLE EITHER ON MAGNEtIC TAPE. MICROFICHE. OR PAPER COPY.

TO OBTAIN INFOR"ATION ABOUT CLIMATOLOGICAL DATA AND RELATED PUBLICATIONS.

CONTACT:

DIRECTOR

NATIONAL CLIMATIC DATA CENTER

FEDERAL BUILDING

ASHEVILLE. NC 2eso-26%

IOR TELEPHONE: 17041 259-06821

DEPARTMENT OF COMMERCENATIONAL OCEANIC AND ATHOSPHERIC AOlMNISTRATION

NATIONAL ENVIRONMENTAL SATELLITE. DATA. AND INFORMATION SERVICENATIONAL CLIMATIC DATA CENTER

ASHEVILLE. NC

u v? 7 0

"se""-"*^^-^lltw~~~~~~ttt utewe

Page 80: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

F-I46te g - MIA "NM n tes

.~~~~~~~~~~~~SM.

stte IN&,*~~~~~~~~~~~~~~~f.- Jb. M Fear Ap " Ads

lis,11 on" ftp nets" 41 99W1 1.91 3310 ItlEIr (e.t'eeE I,.P.Sao P. Pt Ato Ih 99.6 1.1 "a0 * II

Telotto 41 9M 311 9.04 3.e2 11.66 6.49 M4.931* 4P, 8- 139' 40 41 *1 41 41 Al

ii t as s . s

n X ---- ~~- -4--2-1W----------- _- _ .3I.66 31.3n0 91e, Ill' 14' 1, _ 3)1'~ ~ ~ ~ ~~~~~~~~~~~~~~~~I1

4. St', 309' 19' 20

ft... mg"o Imeleft~ 42 316 . P.9" 1.19. .13-39'-60';-v W -- u2

tam.Io-q 42 3934 1.60 6.9t

19' 69', III* 49' It is,aw _ ~~~~~~~~~~~~~~~~~~~is, 44*

.a "to. note bo Its. 41 S1i 4.11 6.11 1.14410 46'. IItl 49' 86 it to

so," Is It

oh"*4 62 3m 1.64 1.6 M1.0Mis', 34'. 09 34 19 21 24

13. 9 13

.601" Mt eII 1921 I.I" 66.62 34.39St* 69, la" no 19 20 19

29be90 ste til ms It

Fe ~ ~ ~ ~ ~ ~ ~ I ii, io

A0 n4't she 0 36* t IN t, ter # ottl t Ps lif to 0*9 Iofvraio opo 0pwils~ell whet tb on I S" "w of W4 of wo

64 ellap-1 -*Is OM* (fttevl)

004,~~~~~~~~~~~~~~~~~~04

d* 31, II..leto #1 t. 14 14.10 toe w. l dedtlit3 of Owpttt 66 mle

~~~~~~~YtI66 .6 .0,6 .0pw4 . .0.0 8,1., 30. _qt ,9 ....L.~~~~0 *, .1 .m.ti ma.

C -.-- -- - WNNM�

( _x t .

Wg., A" a*ltm, emAss A PAN 3"Y"24126 JINtCn )0 TWARS OX "Oft Of R3C0W8 FOR 3331 11OWTW

May- P_ allw f-sd 2.091ft A" se.a" _~I leasm Date

Jog #Al Spp act V.o 3. 04* *00 000 004 went "SITT,

16.61 It Ln s.9 3s.n S." *3 1.eI0 9 i6 Is so 9

004 adds 04 04 0000 0000 00* 041041

32.14 31.82 9.09 6." 4.n6 3.I SO.2 ".3to 41 - 41 48 39 As9 as q Is 14 of 6 *

61 3l69 St"4

0066

8".14 2139 l823

4

* n6t *ns

0^ . 913 911

36.0e M1IS 8010 4 a _P

0000 0400 00 4404, 0004

16.01 3.9 1.2 - - 35.180 IL" IS."- 8 20 to

-9.36 1.90 i3 .1 - . 43.20 . -

I2 14 16 20 9

9.9 0.41 9.69 4A4III 86 36 9M; 1.6 3.14 LOS4 '

3.68 .61 14 I.6s 3.91 - o

1 a 32 Is

I1.91 30.90 .69 6a. 4221 *1 2 20It. to to t"UNe36 30 8g 20 ,

n6.4 t.11 9.6 A1334 14 36 83 60 31

6.02 * - - 2134 1

0.99 9.13 2.48 4.99 11.6 _ _98 it so 43to 1 14 14 6

* * 912 911

* *nt91 n 61

* St"S to/"19

* 1119 80119

* 616 9139

* 9136 nem

,,,. .. . t. u I 6 1 .m 116 .000t9.6.,

Z 11o '1ctLr - 1I

R

Page 81: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

-^

I

f

I A n

I i

'-, 1 ) [.S'1 1

I 7t

00 Al~~~~~I

~~~~~~~~~~~~~~- ---

At J- ' II Inw --e

IS me J-p.. , k.

u.,-SS

/ ak.L X i'

=/ V ! s;'''iw'

0 ? r l a 1 /~ ;2<

Page 82: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(.-'

. a

.7

Page 83: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(~MORRISONUKNUDSEN'ENGINEERS, INC. Sheet A4Project rrMA/v Contract No. 5-007 File No.Feature %/ATw7AY HAIIDL7tN Designed L. Date SL49 asItem P0oCkVREL r4oD ELApdR#4T/MA fS71tTM-riFS Checked . Date L27J.JDa

ReF~b' 5&tiivw cvroSi o n Esbm4ts:

1-46 fuli4v so s:6

NO48A 4P i ,4- Aws 3 (Svzx: 5sbIJW A, o' F, VSU4~W (fWS XV4AA j sog Au 4 -A y

ft0A >A Mt MS 3-f (&k3) : Av"4X &,o f4 yeM C A P rvoo 'w470 -

/voes AM wV s rv*,6 fw 0ove 4/ f = 404

(Aet s* Afey- OcA)rFSd Rc'w AgX. 5)

A~e-. Ss #nyj- )cay PW v+So fl. - C

7WI 30° (btA*s O e0 S eV4;oM1Wbr- is ovA-Ws&e 4544s , 1i 9 h v F~ oFV40'gYOW d^X o iMav.'

7,14 ytehwv;. (,fo- 3: T- IO I' dff~'Odi> H fs

of sAAOV, Je', *A44, , AA, 4,db A £4e. I di.0,'0#'.Ao

s o) 144 f ;P'7 (44', Metdv) £~.I4- 4 /'

Page 84: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEFProject rimAI R -re

Feature WASMFWAAM *1Ab#XYL7A,

Item _ pwzAn7y" AT GWAI

4 ENGINEERS, INC...

Io ari a vr A.wz

TNv.

AvS, ,4,4vw$ -

MW4

At'1

AseYosl

J~~~

11o1 0. // 6Iw

Al 0431

oes.If 0

A-9 o-/40.-0.9l

tU o o-iit tf olfA -9 lol

S 04 = 1.0

JO" 1*1'O S ;A

----

1s t 3'13011 v 1F"

4' - 6-3

O r S- 4Z

a, I 27

~~~~~~~~I./0" *1-

Sheet 'A-7Contract No. I4Z. File No.Designed -WM Date 0, o t/Z.Checked )M -' Dateluj?

o oZs

o. ob5o. o77

o0.140O-ISo

a.o(7O-031o'D, z

_ v 4 O.00->~ 40 sO

Page 85: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

)MORRtSON-KNUDSEl ENGINEERS, INC.£UYORIUSQN IKIUDSEN COUPAEiwI7I4 p~Prniect

Feature WASITMr/A'fir RA#DIJ7N z

Item BAs5& D&-dO 41h',AM I

Sheet A -RContract No. AOF7 File No. _Designed kM -_ Date 2 D ateChecked D1 . Date 12:?

YEAA A1g0rf

J,9*, /4pz;1

A1MI

J4.

01c.kc6VhA41 G.C

ele"'.ql

SOIL

SC5

A10.

90

90

90

90

909o

95'

7AI D.

OF tA'(5

Pawtt w0z 1 I,

14MP.

(O F)

ME'AAJ

PFICECJP.

M~tb#A$h

(�) �)

i

I

I

I

I!

Fj-7

61.6

70-7

Q9.g

Ut3M61

o.46

o 610. 3

0.73

0.61

O. 7f

0.1690' 8

0.0

ao

0.0

0.0

0o0

'Co ioo 50

Z.80

Page 86: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(3 MORRISON-KNUDSEF%ORRC7 KeNUDO PANY_, .. . ., ety

ENGINEERS, INC.ProjectFeatureItem -

WAf,'raaJ1rRP -RAWDL rs

Sheet A-9Contract No. Z0 .. File No.Designed RA Date es 1.9fChecked 2L... Date

. . . ...... _ .-

la-q", AA 67l10"WAI

Mo4W Mo"A4A &7o1o-tn; 1/o' /0' (pl.

q

M~f&M C/lAs A Mv

G m"' ,Vv- , , La: 3f9 0 ')

/W

qty

J44l

5X

OcFl

00-

A v

R.A-.

1)

C. 31

7*94

t.S99-1f

7.909 .1 '7.A0

'V.A.MA.

3)

M&y- 04d-

t. 4 3 ?L'

tove, /lbe^Yri -' o070

AU',"Pou&P;tWsk%/n

_ 7~v,.t,"t ~xyw C.Ob)i ry

as JR

o .20

0.1 '4214

O.%C vs~ 9

ami ("-a

PSS C."s S-/qJd)

P" Co e/;, V-- ik

14 r/ (f "- Oa-)Ap5a WA' 04 (

( #Ufb5')

FCws e VAo.A i f 7O7 0 30 y, ivkc4f- Oc,) FwS e Vsl &I-tiv 0M/A'4X rt F', s5.

Page 87: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

Q MORRISON-KNUDSEtA MWORAISQN VMUtMPM CMPANY

ENGINEERS, INC.Project * MI7t'vR--Feature WASTrw.ATF 1,'ANPL]f NghtAm &askc A/A, Callf/A, I

Sheet 4. J1DContract No. 5£07 File No.Designed HO Date .oChecked -bu Date

MtwAJn/114 A'A7 6of

(o 4. P ~ . Lt

I'rAy 71

J1dw . 9.3 k

$S '1d1 7.1,evi ~4'',

* x--¢- Py t z U 1u0tvL\ 9l 08IV: 6C2 f- I ~ # F- -4 f) -

fe wi

2. S2 -7

S5 1

7 4

fcAVAL .1,1 el (44Zv - A

OJIO

0oq,

olJj

11.6'14.317. 1

I F.O

Ii. 0

7.1

3.,

-

L.-

A4.w - ( /00.O%

o.15

o-II

/I= /f.f3I. 7-0/ of AID ~. E C J A . A - 6 O M I .J j f i

Page 88: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(~ MORRISON-KNUDSEt£ MOORRSON KIUSEN COMPANYIm-r A I -D Al

I ENGINEERS, INC.ProjectFeatureItam

Sheet RContract No. 5 .57 File No.Designed- - Date o. Z4 9ffChecked A- , Date 1-14-10

A PPENDI X B_ 4 -

RETErTION BA SIN DESIGN

Al TI ONAL.

WANrEL

APpIZO.4Q MR V7TIZMA-UG RPTEN7JON N4SlN

OLZUM V51NG MEAN C1 MJ STIC D47A

Page 89: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

c9C #a iby; MN Bdoft

NTION BASIN DESIGN

taminated surface water which may be either,

e discharge or, treated and discharged to

in an effort to keep the basin relatively

F a retention basin is that due to a 10-year

Retention basins collect coraccumulated to avoid offsi

offsite on a regular basis

empty.

The minimum design volume o

24-hour storm.

A separate rational analysi of the retention basin water volumes should

be made to evaluate surface water runoff during the life of the project

using mean monthly climaticj data with adjustments for basin evaporation,

snowmelt, infiltration, wa er used for construction, and inflow due to

possible dewatering. The same basic information is utilized to 1)

estimate the volume of watr that might accumulate over the life of the

project when no offsite di charge is desired, and/or 2) to substantiate

data for discharge permits. A microcomputer modeling program is

available for performing such a rational analysis.

The ten year 24-hour storm

calculated by a rational armonthly runoff volume by re

storm at those sites wher

and eventually melts.

volume will usually exceed the monthly runoff

alysis using mean climatic data. However, the

tional analysis may exceed the 10-year 24-hour

snow accumulation from month-to-month occurs

The design volume for the jetention basin shall be:

Accumulating Design

If the contaminated u

of the project to avc

treatment, the desigy

24-hour storm volume

ater is to be accumulated over the life

id/minimize offstte discharge and water

water volume is the sum of a 10-year

lus that maximum volume attributable to

- 1 - 4005-GEN-R-01 -DRAFT-004147U/0116U

Page 90: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

'normal' water accumwater usage with conwater, dewatering, sr

I0

I

/ OY: Vwj(- fl&* CHC lD 4f: Y AtN of, f8

tion based on a rational analysis of

eration for evaporation, construction

nelt and infiltration.

.

Non-Accumulating Desi

Case I

If the maximum montl

analysis occurs durn

design water volume

10-year 24-hour storm

if water inhfull basi

ten days. If not, thi

of a 10-year storm p

rational analysis.

Case II

If the maximum mont

analysis occurs durin

volume shall be the

maximum volume by a

Li y net inflow volume by a rational

g a normal construction month, the

hall be the larger volume due to a

r as determined by a rational analysisi can be treated and discharged within

basin should be designed for the sum

us the maximum monthly volume from a

ly net inflow volume by a rational

a non-construction month, the design

im of a 10-year 24-hour storm plus that

ational analysis, unless adequate waterItreating capacity is nOade available during that month.

IWhere high groundwater lev

to the above, additional w

The need for water treatme

coordinated with project

capital costs and possible

Final determination of whe

required is dependent on t

degree of contamination wi

volumes of snowmelt) and

Is and/or space limitations restrict adherence

ater treating capacity may be substituted.

t and the water treatment plant size should be

management because of high water treatment

availability problems.

ther or not treating of water will actually be

e degree of contamination in runoff water. The

1 likely vary with time of year (less with high

xtent of disturbed soil due to construction.

- 2 - 4005-GEN-R-01-DRAFT-004147U/O11SU

Page 91: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

PRa= A to Ft A. no. fm. 5oa025 B-i r / ,IQ~ -E a

RATIONAL APPPROAC)R VO'TTTWT 'RVIWTOTN RAdTH DESTCHI WATERVOI£HBE USING MEAN CLIMTIC DATA

A. INTRODUCTION

THIS PROCEDURE PROVIDES THE DETAILS PRIMARILY FOR DETERMINING THEAVERAGE TOTAL MONTHLY RUNOFF VOLUME THAT SHOULD BE EXPECTED INRETENTION BASIN(S) USING LONG TERM AVERAGE CLIMATIC DATA WITHCONSIDERATION FOR SNOLT CARRY-OVER. A SPREADSHEET USING LOTUS1-2-3 SOFTWARE TO COMNE THE TOTAL RUNOFF VOLUME IS AVAILABLE.THE AMOUNT OF RUNOF IS CALCULATED USING THE SOIL CONSERVATIONSERVICE METHOD. SNOMLT IS COMBINED WITH RAINFALL TO ESTIMATETHE MONTHLY TOTAL RUNO F.

THE SPREADSHEET ALSO CIALLOWANCE FOR EVAPORAITHE TOTAL ANTICIPATED VWATER IS NOT DISPOSED

LCULATES THE MONTHLY NET WATER BALANCE WITHION AND CONSTRUCTION WATER USE, ALONG WITHATER ACCUMULATION WHICH COULD OCCUR IFF MONTHLY.

THE SPREADSHEET MUST BE MODIFIED TO REFLECT THE LATEST CONSTRUC-TION SCHEDULE DURING WHICH THE RETENTION BASIN WILL BE OPERATING.THE THIS PRIMARILY A FECTS THE CALCULATED AMOUNTS OFAND THE ANTICIPATED AC¢UMULATED WATER VOLUMES.

EVAPORATION

B. INPUT DATA

THE REQUIRED DATA INPU'1. RUNOFF DRAINA,2. RETENTION BAS

PURPOSES 0]3. POND EVAPORAT4. AVERAGE ANNUA

MINE EVAPO

TO THE SPREADSHEET INCLUDES:E AREA (ACRES): USED TO COMPUTE RUNOFFN(S) CAPACITY (AC-FT): USED FOR COMPARISONLY.tON AREA (ACRES): FOR COMPUTING EVAPORATION, LAKE EVAPORATION(INCHES): USED TO DETER-iATION.

5.

6.

7.8.9.

10.

11.

SOIL SCS CUR NUMBER (CN): WHEN MONTHLY MEAN TEMPERATUREIS BELOW EZING, A MINIMUM CNK95 IS RECOMMENDED.

MEAN NUMBER 0 DAYS PRECIPITATION IS GREATER THAN 0.1INCHES WAT

MEAN TEMPERA , DEGREES FAHRENHEITMEAN PRECIPI TION, INCHESMEAN SNOW DE H, INCHESCONSTRUCTION WATER DEMAND- MONTHLY AVERAGE (AC-FT).

THOSE HO S OF NO-CONSTRUCTION MUST SHOW 'ZERO',USUALLY, CEMBER, JANUARY, AND FEBRUARY.

EVAPORATION D STRIBUTION FACTORS (DECIMALS) FOR EACHMONTH OF 5E YEAR.

LOWING INFOR KTION IS USED TO COMPUTE THE TOTAL RUNOFFTHE MEAN TEM ERATURE, MEAN SNOW DEPTH, MEAN PRECIPITATIONMEAN NUMBER OF DAYS PRECIPITATION IS GREATER THAN 0.1kRE AVAILABL FROM THE NOAA CLIMATOGRAPHY OF THE UNITED). 20. 1951- 1980 USING THE CLOSEST RECORDING STATION TO

THE FOUVOLUME:AND THE IINCHES JSTATES NCTHE SITEi(S) .

Page 92: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

I

Easer ITMA /6r aFEAME / :C

E

mR. NO ... =A F 0. NO.ESIGND DA'Vt DTr_mXED iAel _E MM &Ll 4j9/7

ADDITIONAL INPUT FOR OVNRALL WATER BALANCE ARE:

aurpinrG unmurmIL COnSTRUCTION WATER DEMAND: USED IN PLIACINGt ' '-by- &--id _-. by i _. .CONTAMINATED EMBANKMENT MATERIAL. APPLIES ONLY TO DISPOSALSITE WHICH IS BEIN EVALUATED, OR WHEN PROCESS SITE WATER CANBE TRANSPORTED TO DISPOSAL SITE. TRANSPORTING OFCONTAMINATED WAT OVER PUBLIC ROADS IS NOT CONSIDEREDPRACTICAL BECAUSE iDDITIONAL PERMITS MAY BE REQUIRED. DURINGMONTHS OF NO CONST UCTION THIS EQUALS ZERO.

MONTHLY EVAPORATIOI r DISTRIBUTION FACTORS: USED TO DISTRIBUTETHE TOTAL ANNUAL L1KE EVAPORATION. AVAILABLE FROM THE NOAATECHNICAL REPORT NWS 33 OR U AVERAGE MONTHLY EVAPORATIONDATA FROM OTHEU E OC WHICH CAN BE ASSUMED TO BEREPRESENTATIVE OF 0HE PRESENT SITE.

AVERAGE ANNUAL KE EVAPORATION: AVAILABLE FROM CLIMATICATLAS OF THE UNITEI) STATES.

POND EVAPORATTN M1

BOTTOM AREA. WHERWMAY BE EXPRESSED AdVOLUME(SEE ATTACH]MODELED AS CONICALPOND IS LESS THAN I

NY A :

NUMBER DAYS RAIN P

pEt: FOR RECTANGULAR PONDS, USE THE PONDI DIKED RETENTION AREAS ARE USED, THE AREA

A VARIABLE FUNCTION DEPENDENT ON PONDD EXAMPLE). DIKED RETENTION AREAS MAY BEVOLUMES. THE AVERAGE SURFACE AREA WHEN THELL IS APPROXIMATED BY:

AAVGeKAF (VP/VF) /

ASSOCIAM WITH V UIIE OFBTE I(E5CWDI~

Vu4OrAL ImuI VODLE ECR TWP HimK=O. 5 CNV S TME AREA TO

AVEPAGE END AREL AS WHEEVARClA=IN AREA GOES FRM A2TO ZE.

ER STORM: AN EVALUATION OF HISTORICAL DAILYtDS OF THE SITE SHOULD BE MADE TO DETERMINEt OF DAYS ASSOCIATED WITH RAINFALL EVENTSPITATION IS GREATER THAN 0.1 INCHES. THE{IS DATA IS USED TO SIMULATE BACK-TO-BACK

PRECIPITATION RECOTHE 'NORMAL' NUMBEWHEN DAILY PRECIMINIMUM IS TWO. T.24-HOUR STORMS.

Page 93: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

- *

smT B-- 5Or /CfM I.. &02ssrm-.n.:=3C D /SIM. qo. D I T E NO.

ITEM____ _____ ED__ _ D__E _9*7

C. -CALCULATIONS

CALCULATION OF TERMS AR AS FOLLOWS:

DESIGN SNOW: IF AVERAGE TEMPERATURE IS LESS THAN 33 DEGREEFe SNOW IN INCHE S WATER IS THE LESSER OF MEAN SNOW (INCHESOF WATER) OR M PRECIPITATION. CONVERSION OF INCHES OFSNOW TO INCHE OF WATER IS BASED ON 8 INCHES SNOW EQUALONE INCH WATER.

RAINFALL: MEAN PIECIPITATION MINUS DESIGN SNOW (INCHES OFWATER)..

ACCUMULATED SNOWP CK: IF AVERAGE TEMPERATURE IS LESS THAN 33DEGREES F., THE SUM OF PREVIOUS MONTH SNOW PLUS NEW SNOW.

SNOWMELT: IF M A DAILY TEMPERATURE IS GREATER THAN 32DEGREES F., ALT THE ACCUMULATED SNOWPACK BECOMES SNOWMELT.

TOTAL RAINFALL D SNOWHELT: RAINFALL AND SNOWMELT ARE'COMBINED TO CO SERVATIVELY SIMULATE POSSIBLE RUNOFF DURINGSNOWMELT CONDITIONS.

NUMBER OF EVENTS: AVERAGE NUMBER OF BACK-TO-BACK STORMS PERMONTH DETERMIN D BY DIVIDING THE TOTAL NUMBER OF DAYSPRECIPITION C ATER THAN 0.1 INCHES BY TWO DAYS RAIN PEREVENT AND ROUN ING TO THE NEAREST WHOLE NUMBER WITH AMINIMUM OF ONE

WATER PER EVENT: TOTAL RAINFALL PWS SNOWMELT DIVIDED BY THENUMBER OF EVEN S.

IS': CALCULATED FROM SCS EQUATION WHERE S=(1000/CN)-10

TOTAL RUNOFF VOLME: CALCULATED FROM SCS EQUATIONI(E)=(P-.2S) /(P+.8S)

WHERE P EQUALS THE WATER PER EVENT WHEN (P-.2S) IS GREATERTHAN OR EQUAL O ZERO, OTHERWISE EQUALS ZERO.

Page 94: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

-

ERNEST Us grarFET=E

SK

EVAPORATION:* ** *** ** *

THE LESSERMONTH DIVIDIWATER PER El

*****1

THE LESSER(2) THE SUM

EVAPORATION

VA]ED BVENT

AVA:OFAND

;si~mr B-6o. NO. FILE _O `

iXXE~~DM Act DoI 9 p

WITH WATER TREATMENT***********OF (1) MAXIMUM POSSIBLE EVAPORATION PER

A FACTOR OF SAFETY OF 2.0, OR (2) THE

NO WATER TREATMENT*************UZE OF (1) MAXIMUM POSSIBLE EVAPORATION OR

TOTAL RUNOFF PLUS TOTAL RUNOFF MINUSCONSTRUCTION WATER.

MM POSSIBLE EVAPORATION IS THE EVAPORATIONTHE AVERAGE ANNUAL LAKE EVAPORATION TIMES

EVAPORATION DISTRIBUTION FACTOR.

NOTE: THE MAXIAREA TIMESTHE MONTHLY

RUNOFF EXCESS: a TAL RUNOFF MINUS EVAPORATION.

NET WATER BALANCE: RUN(TION.

-CCUMULATED WAT4R: THEVOLUME PLUS NEV RUNOFFWATER. EVAPORATION IS

)FF EXCESS MINUS WATER FOR CONSTRUC-

PREVIOUS MONTHS ACCUMULATED WATERMINUS EVAPORATION AND CONSTRUCTIONDEDUCTED BEFORE CONSTRUCTION WATER.

Page 95: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

f

MKE DOC. No.5 }-GRN-C-01-01686-0n

CaIculation Cover Sheet

Celc, No. /pS/O-00

Contract No. 05 Di wciplie 11..cEwp-ln a No. of Sheets -3

Project /R/ -eR

FeatureAPPV/J6 A14Tfi WA ki

Item

PzocV( xy6

Sources of Data

| ~,e£FJL~CL: 4i~ K 2t.

Sources of Formulae & References

aIKE5,, 2,4av st /9k? "II P ,PrE-6 e 'e Al e dfcalsf5y &cerin- '%Z c•,c ;7 ,to / '- E , ec i $cK(/kyc vfpc), 5a4

fcL-ceiS5co/ Cr4 (/tfe pvo arcdq, c5a. 7-6NtA-.2T-z/-o/66?-O)

Preliminary Cakc. Q Fnal Calc. 3 Supersedes Calc. No.

_ _ _ _ _ _ _ _I_ V . _ _ _ _

Rev. | #;efrtioSn Calculation By Date Checked EBy Date Approved ey Date

Form 42 -,0

I

Page 96: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORR1SON-K 'IDSEhProject eFeature AeppwI)6 ^OMRIA-JAItem &f ocZ 7Ype (

Pete ,-he i'Xe fefrce.je

r'cz ssyp e calvories aM4

f be ddiJ ,nre'@i .

,6Ym 795e h'~"b~y ,e 0

xndSnysr fo tro phic

JAmdflrgwor 6rec' ,t

ENGINEERS, INC. I Sheet 1/3Contract No. o File No. . -

Designed 6.. . Date- Date-8 7Checked &/.-,d Date O&-za -1

bk we~ ' of 'ode/W' in ea4 of &e 7%ree

for sco0r-1g roCv44it a5P

B'eJJhfy ?oofei'4' st$p/e LA'd Ce Irogc

5 ~~-ticJ avea/ re ouncc

.23, f 5uny cf ekho~s i

a/s- ay/ Al/. SB-.pUw- co/'

ler 6f fA11cd dlawid C9,O Ce/cacL4.

& 7abhe Af, sfec,'4SeIoi £e4,

daes er C et sl'O oAee~rolby xityle-,f

^,*?, OZ2e78/ ,c5r. c5 e

-r &.lefyti r cZt /C scor e J 7/6

ef e~~v ve- -rcdee .

Page 97: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

6 &XnrP - 56oA1 50f7g£ Ps.. ft6 i )G TAtS 2/

CONSULTING ENGINEERS ILAND SURVEYORS

- X1 1§ *5Oy 6L SO. G JunvC, OS8tS4-?22*OtX242-O20* FAX 242.1,67

SUMMARY OF MTHODS AND FINDIG

PETROGRAPHIC ANA YSIS - SAMPLE NUMBER SB-DUR-001

MX-FERG SON GREEN RIVER PROJECT

AUGUST 23, 1989

A sand and gravel sample of proposed riprap bedding was delivered toWcstern Engineers, Inc. in G and Junction, Colorado, by MK-Ferguson forlaboratory testing. Following 1 boratory testing (specific gravity, absorption,soundness, abrasion, and ASTM C 142), a request was made for identification ofrock types cou.prlsing the partles e of sand and gravel and also the percentagespresent In each size range (1 1 2 - 314, 3/4 - 3/8, 31/8 - No. 4, and No. 4 toNo. 10) both by particle count and weight. As directed, 150 particles wereidentified for each size range only 105 particles were available in the 1 1/2to 3/4 inch sizes). The purpo of this report is Zo present the results ofthis petrographic analysis.

The sand and gravel sap1 was screened to obtain sufficient amounts ofvach of the four size range:, nd 150 particles of each size counted (exceptonly 105 particles of 1I 12 - /4 Inch sizes were present). The gravel sizeparticles (1 112 - No. 4) wer each broken with a hammer and the rock typedetermined by observing hardness texture, color, luster, cleavage, and reactionto dilute hydrochloric acid. E th rock type was separated into groups for eachsize range and the particles cou ted and weighed.

The sand sizes (No. 4 - No. 10) were Identified using a binocularmicroscope (30 X) and essential y the same identification techniques, althoughbreaking of each particle was no practical.

A table i6 attached to th is report which summarizes the results of thepetrographic analyslu. The p atLltb wtzr imotly limestone, fine-grainedAandstone, and quartzite with le sser amounts of slIltstone, calcareous siltstone,chert, quartz, and granitic rock.

The majority of the partic es examined were unweathered, bard, and dense.The softer particles were tostl composed of siltstone, calcareous siltstone, afew of sandstone, end a few of limestone. However, even much of the siltstoneand calcareous siltatonc van f good quality. Some of the aandctone andlltcaone was fairly porous.

Yrepared by: DSI;

[reeens -t -. s T es~e t7~o . =_

?-ZS -1473 28 -

WLS'LKK LNUMNLEKS, INC.

9ac4i .u4 )Joe C. BarnesConsulting Geologist

NW.D.I 22031

I

Page 98: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

C ( (.4

GENERAL PETROCRAJPHIC ANALYSIS OP SAND AND GRAVEL

BEDDING MATERIAL - SAMPLE NO. SO-IDUR-Ol

MK-PERCUSON GREEN RIVER PROJECT

AUGUST 1989

* Only 105 particles present in sample of 1 1/2 - 314 Inch sizes.

Rock type of each particle determined by visual methods.

5 *he S5 -ssexlw *ee yos 71cqb,mjer-le p Ad ,7 Beefk Z

g t4

4 On

Page 99: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

mvp nnc- 5057-GRN C-01-01678-oo

- d~~~~~~~Calculation Cover Shoet

CaIc. No. /O--55/-OZ-0x0Contract No. SDcl pine LLoES o. of Sheets 6 £2.Project

L) M17I1 A-Piv rt-Pt, (6eA/)

FeaturelN Ft L7kftf I 0t

hemUNSAT)-' ALr SPs - u oXT TuT

Sources of Data

Sources of Formulae & References

Preliminary Calc. D | Final Calc, s Supersedes Calc. No.

- ----- 'I- I es _

-_____ ___ _ -

______________ -i _____________ _ _______

Rev. *NO. Flevawwn Icubation B9Y Date CheckedBy Date Approwd By Date

IForm 4241O

t.

Page 100: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

~MORRISON-KNUDSEND VORRISlONNU)MCOMPA YI/

)m7w

ENGINEERS, INC.PMProject

FeatureHem

q

Sheet LContract No. L'rF-a File No.Designed P r- Date -r/2 E& /J1

Checked -- Date 2- 20 '-/S

J. f K 4. . .I

11UAi Jr- 1-w w-0 | | 7, ! . ,

u I

rt-aSfC.s 4 SmCES I Of DArA

Z . *'/ , yc d e -

3. NRC .w1r A

5.1C A /~6 " I(PEv1L - f(.. A-, AA

JidiA 4 t jrc./1 , 2?4I d4k-pfr g~W/J -e Sof S

- ts C S -tr.t P'( (L ' P '

6"J- 07-VD/5 S5O-O .. e Z /, Iq 6

ct( ''/

useaS s 6&'A4CLIL s U 4NSATZ - Vty V It rc -At . A J' C/ k-33

-tt 'to - 8 R.L rt , )eS Js.t C6tk S p'gr,191. mict- Doc.No. 5S-s~Rc-l2 O

" A en "f vv'41-, - E s .;.,.,t f 't&(rfe(L4. C PVr;f (C ! /c71L I ttf ( 0 t -

',C IG Ce . Ap . t5- Sf B1tversl

Page 101: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISONAKNUDSE~ ENGINEERS, INC."0"T 9K 1 p to"tv"rProject .

FeatureItem_-

IL. dX

Sheet IContract No. -orv-p- File No.Designed '? Date -V/a29/&Checked <ro Date I P .<j

I'UW&AT2 ' - /AL / / 0 ,, r

I

Noos ' 5cop&_

.

A5 rcgeL t .

a~4 4j p~usSt t&Ee Y

l4 e j 4 v,

C-ef. .3 ). JFU NJT2

e v rtG4 "- ( i'i 9 - Lu.

(ff U ) I TLA

r vey" v cf Y-f,

cr. c

TLht ;1..L ;c A L; 'O

.;stvt, <1 b

04, b evs KiL SL £q-AL-s1ef frocE ss t

6ced Ka4( dA dt, 't rpt7 A72;

es "tt S 56 'UNSAT2' 44acAt4SI *rS1 44itrs

;t5pejjS- f NeC. ;OF"jet..S Ot4 jftj~eeh p_'Z# R,47:p,

*l OL I £C 44,144 L p40ktt k44'd.AL (fe)

44&;( (ttu,;I(4L44 t~eiestua let eRes 0

cg ~~p IAS Uv sC o -ff a n a"'

>;e f; tL _";/ . PO-nrv.e) t1i 1,.

_ , _

A S>ut t-A A taA

C¢f; (I a-4 ?

4- (t rtf 4 4-v 6C AC4

G f- a ^ at;~~~~

4-o: (4' ri. J. c.~ 6 7'1t6 . l g;hoi-i Ist ,Lve z.

kfs fiS~ r"44t'rx cuive)& a. k4-t f%''4

6 '(21IVS}172' St4~ t:

Page 102: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

~~~~~~~~~~~~~~~~~~~I

ProjeFeattItem.

wMORRISON-KNUDSEN ENG1NEERS, INC. Sheetkc l'7PJ^1a1tU Contract No. -0-s7? File No.ure hf{.eoDesignedPL Date p/

UNt "£# - s>4 Checked 5-Pi _fDate. 7-iP-,(r

H Ydwpwi c +t C 50 L t tz 6 o#e r , ,

'5 OIL' 14ses a w - I't. e~rteA- -S 1,4.e-S "-e wts

taSA-tvctS ct4AXCXt4tfC F ~)# "4,,ot"40,tr

ed6~~~~~~~~~~~~V#t~- Uot:o {&), x{ eeta teC6) .3 o

-6civ s"-tieto 4 eL, h, 4AA 149AAd "A-s-VA X%

,t¢ o Ct6l6'I4 VP5 C,$.c1 ,x v . M 9(k) P o * -C ecby 8 vv r (s t Aepy t, At4) "¢2: 44,zA -e,,- DA4- vot e4 -(k s-t.-cf<

lstri Mt L t~t tix C 1 ReLS, vtasc*;+ 0 aG

'SC'6~~~~~X ' hv S 11' t'+v; rp. _JS 4 v

YZAC COf ,;z0'76t " .4.A SA- f n So~tl~ LAI I tSid-t - . ffCev4 r,, 5C'

4(tr tv'l Clt(ptx 8 w c&9',tSf.t 5 ; ? ts &

ts C~~~tl~~~r,,./,9t;>s sx i it6 peX vll~~~~~~~~~~T, v s ¢{

. L:-C Pyn ft. Ift f CA IC ' P) f"a) cvftw- ts...ud fo flue Se se;Apt} A4BV' "(^@1i -Vat /

-1 k ,g C>t"41 Ph ->fti« 'SI L zv H2

fv tL ft 9 f&t

# z~tWrd-;a

,~ ee tzoiz ,fi SOIL -@ ETCate

Le f-fa "RE1r f-",O 4we Arx AA, si

LU let/r"oc 9civ^4 tA 4,t a -6A.W¢ ,'tf

Page 103: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(DMORRISON-KNUDSEN ENGINEERS, INC. Sheet_it g"IsalN rwDoS" cou"If

Project c' ,A-N Contract No. 5'- > File No.Feature _4" Designed a Date 7

Item ;A54t2 - 'r Al ''ar' Checked Date .

.J/&.. weErc s __ V L. v W., v '4- -

/,,.. sg ' t -̂ *CaJ@ 4 44 A 4

e, e , Li 11 _7; t4>t.*r,,t>t-

j iAr.(6 {" 1 aW jZ 9/t- -2: /;;- ._- J

*<z-t' ~".'c '._ < tef 2 64 Z (4W>~ ~)

1/

2-'7-, f_

7 4_

Page 104: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

II

Ur7T1IA- 5

4MKE DOC. 4005-GEN-R-04-066 97-00

~ iiT 11IPROGBMY:

PURPOSE:

data.

InC.F77PrL

7-%/ -r9

To analyze observed #oil water retention and hydraulic conductivity

DESC~iPT'ON: *This program can

observed retention and unsatur

data. The soil water retentio

by Brooks and Corey (1964) or

the unsaturated hydraulic coad

using the retention functions|

models of BurdLne (1953) and

program (van Genuchten, 1978),

unsaturated hydraulic conducta

assuming the conductivity at

program allows the analytical

observed retencdon and conduc

optcmizat'on process Is based

(Marquardt, 1963).

The soil water retention

6 - n+ r

tl + (oh)hI

66 - eOr

(ch)U 9

be used to fit several analytical functions to

ted hydraulic conductivity or diffusivity

curve can be described with equations proposed

an Genuciten (1980). Analytical funitious for

ctlvlty (I) or diffusivity (D) were obtained by

4 conjunction with the predictive hydraulic

ualem (1976). As in an earlier version of this

the computer code can be used to predict the

vity from observed soil water retention data,

aturation (X.) to be known. In addition, the

functions to be fitted simultaneously to

ivity data. As before. the least-squares

on Harquardt's nazimus neighborhood method

curves are given by

I/r;.,

el2 f colar~~where 6 Is the volumetric soi water content, 6 is the residual water

content, 6a is the saturated ater content, h is the pressure head (for

notational convenience taken ositive for unsaturated soils) , and where a,

and a are empirical constants. The Inverse of a in Eq. [21 is frequently

.referred to as the air entry value or bubbling pressure. For a deti1ed

discussion of Eqs. [11 nd IZ 1, see van Genuchten and lielsen (1985).

Mualemls predictive con uctivity model is given by

[1)

[21

[31£ l It ' [s Se fese)/fC I

Page 105: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

tll'?re-6- - -el IV S h &

.rrJ __-

* 0

__ _ ._ Z l~~~%I.

where

S If(Se) ' Ie b -dS'

and Se is a reduced water contezbe expressed in a similar form

T. a t8 L g(S )/&(I)

whter *

RETC Z139 % 4

111 f>/ 7-z-,.g )

[41

t: e- (0-0 )/(0 e ). Burdine's model cans folows

1[1

[63S

0 h 2(S;)

Note that both models contain two unknown coefficients: the saturatedhydraulic conductivity# K5, and au unknown parameter L. Hualem (1976)

concluded from an analysis of srveral soils that L in his model should beabout O.S. We will keep I as a potentially unknown coefficient in theprogra=, thus adding more flexilbility for fitting different types of data

sets. The same is also done for Burdine's model; the parameter L in thatmodel was originally fixed at (Burdine, 1953; Brooks and Corey, 1964).

Choice of a particular re ention and conductivity or diffusivity function

in the program is governed by he input parameter HTYPE. This parameter

determines the type of recenti c model (e.g., Eq. [13 or [23) and the type ofmodel used for calculating the hydraulic conductivity (Mualem or Burdine) as

follows

HTYPE

~12

' 3 '.4-. 5

6

Type of Recentlon mode:L

Eq. [13Eq. [13Eq. [13Eq. (1lEq. (2jEq. 123

with variablewith variablewith a - 1-1/nwith a - 1-n

and nm and n

K is predicted with ;

Hualem's model (Eqs. 131 and [41)Burdine's model (Eqs. [5I and [61)Mualem's modelBurdine's modelmualem's modelBurdine's model

Page 106: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN INGINEERS, INC. Sheet 7D MOR~ISON KUMSEN COM P'YERIN.Su _____

Project UMONIUIUJCNLJ Contract No. 4-SO? -0b File No.Feature I [' f ", '&.- Designed P p Date - /LeItem 'uP35¶2' 4-1t t OalpLit Checked / Dates

'V1\&P.Trz' JAWALTfS

- TiAtc * k'4h ws ca' ld a$ 194,11, 5 I 5*. q c

- Co~es StL~Ld

6 6 ~s *9j o(d .@ f;~ @~ (ees;A2I), t- c=

_ ,fifi OacA~w Cc<; a&L 1; i 0 ~A~ I e S~z-v Mi- ltrX''/g i.A 5¶A

- t ;>ot~ t.. nzt--- 1'S (oo @ . ye-*cct

- 11( brtt,\ h-ftQ~t (@iXX % 'ka ,v;

It-tx; f-t itrz.;8. ei' C &L tcYtr ~ b t l i

2tf 'tI t ( -<( l ') tC- j(C Ac C44 1 .

-7 AX 4A. eb - sod ,Oys wxsT al4vr~t2f W. loa vcsS-e~sYtir10+ aA1 (=A C§ 16ty

Nv c- fV C i ' Xv's&A L.- eCwA sn 6 4, J

4's 41-c ?t&V? Irl CZ , Sdtf AF V'CY *rAWCL

b'SX SS~e*_ +& >8~ , 5u-1-p 5 s '

64. LLI$K.

CGnurt UNSA iTZ OUie-as fi:.i 4't Av$-A$ af-kL

POffist Df ltvVkit E ',cd erv 4A ol F~ACct'rcO.

G

Page 107: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

aMORRISON-KNUDSEbA MORRISON KNUDSEN COMPANY

ENGINEERS, INC.ritA -4IProject .

FeatureItem

Sheet 74Contract No. s0 ) File No._Designed $ Date -7-/IChecked r2L - Date 4Lr/L.. 1 0CPM ' ̂ . -I. I

IlIwIl - --- . - - I -- --- - - -

_a ' ;c A5 ~ C --

.' f-.2 I--e,4 ". , x '/ /0",

C.- . Ct. a ,He be ' 's he~~~ r'-, 7, - 117~- 4- '2 ' -i "L1

=:' 6, (-- .>f- t/ acr

o k /tQ . t /4'v , As_2 a Zr

' c;-e-su( .AL / A C f- 5

S L ,q zm -t-rCC, ;/ ("�)

6�- , r. 11-L.>, /' "6.# t /< L :ZZ/ , -

Page 108: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 109: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 110: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 111: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 112: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 113: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 114: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 115: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 116: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 117: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 118: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(CU*%! SEMI-LOGARtITHMICS 9CYCLIESXM IOgVSION5

rYj KEUVFFL & ME5R CO. MAM EUIAS

1 CPU , OOFU WQ

I S I I I I III I I I

i I I I I I* I I I I I I

* * * * *- * S

IA, III1

LA D.o II II I

U' .I II II I

-l?* I I-j4J

I I I11s A| | l E | l l e seXlWlEl

1I 'It'I

I

if

'I'll............1. - �......

......

......111-111

a

11111ILIBM

IM

- .~ ~~~ . . . . . .. .

0

I lIn'I'll1 1! 1 !! ! 41 MMUN1111111

+. ... . .... � 1. I -

. ..I ....... .... . .

- .. ..... ...

. .. ...... I .. . -

......

. ... ...... '' ... I .

I

III it411M."MININ111111

. , .......

II I1 I 1 t i i i Ilii .I 1:11 i~ f-4I--~-4fIIIhIIIIIIIIIIItI II] i ti X I U I iI ali IIiii "WWWIIII 11-1-4"I"-+4IMI44I "4~441H III

0%IZ0

(4

.111

11 III44ImI1 II ItW ThR'hU[-fII+f{ I I~1~lI]I1~Irnuiiii- .7 ~~~~~~1.~ . .. .......

i IffiliIIIIIIIIIIIIIIIIII Hill ...........~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~I

I\'

Page 119: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

~MORRISON-KNUDSEN ENGINEERS, INC.

XA . I I tL f I. e,

ProjectFeatureHa~m

Sheet /f_ _

Contract No.5>' '65 File No. _Designed -/ Date 7-Z 'i -e

Checked BY L Date (.L.a /. .w...

VA4LI'C-S F #~IY0a4V1LXe. 4G4.O~e.rA17 (L) Ca -mOF bvre (0.do&2L 5s1-5r)

-4

C-

D

C.) __ --- 1- '/6 L

- fly_ _

.S*'A'e -~

SAM -iC -'p

Page 120: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

OMORRISON-KNUDSEN ENGINEERS, INC.A MORRIUS01 YNUOSE COMPANY

Project (hirATnA s,

Feature ±NF LTA'rr*k'J

Item 'Vssy,< AsAt-'5t5

Sheet I 9Contract No .5D 5 File No.Designed -pE V L- . Date 77-T-5-Checked Ai1S' Date -' ; 9

APPENIDIX

Page 121: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

-')-

5,J144 -C, J:?-a p Lc Y4/4 lp -7 w- V t

NON-LINEAR LEAST SQUARE ANALYSIS................................

5OtL tOiA7PVT - tAtLAv(qS

LTS FOR RUN 4 2

c ULTRA -- GREEN RIVER -- TAILINGS 4BROOKS & COREY77/25/89 33>

INPUT PARAMETERSz===:=z==

NWCEL NUH4ER............................NUMBER OF OBSERVATIONS...................NUMBER OF COEFFICIENTS...................RESIDUAL WATER CONTENT.................SATURATED WATER CONTENT................SATURATED HYDRAULIC CONDUCTIVITY.......

6102

0.0420024000 ` hft 5f yJ-sb

OBSERVED DATAU==:=3SgZ

I X(l)

1 15150.00002 10100.00003 7070.00004 4040.00005 2020.00006 1010.00007 707.0000*' 505.0000

303.0000101.0000

Y(I)

0.04200.04500.04600.04800.05600.06600.07800.09100.12400.4000

ITERATION NO

123

567a9

LCR

0.04200.04200.04200.04200.04200.04200.04200.04200.04200.0420

ALPHA

1033.041000486.313600215.71190068.120120

104.71980098.423460

100.921300100.766700100.776100100.776100

N

0.31480.32440.36230.46680.83261.09951.23281.25261.25391.2539

SSQ

0.9722480.5351290.2426690.0433750.0094980.0007320.0001670.0001560.0001560.000156

Page 122: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

V1*4"4d, 2.

CL~.. Jrt ;Ist{,-CORRELATION MATRIXzzzzuuim

I 2

21.00000.2856

NON-LINEAR LEAST-SAURRE ANALYSIS: FINAL RESULTS. _=_ __

95S CONFIDENCE LIMITS

-VARIABLE VALUE S.E. COEFT. T-VALUE LOER WPPER

ALPHA 101DO.7761 isp 0.9913A j1.2539] h 0.0311

101.662340.2M4

96.4903 103.021.1821 1.3257

---- ORDERED BY COIPUTER INPUT--------

MOISTURE CONTENT:NO. PRESSURE OBSERVED FITTED

1 15150.00002 10100.00003 7070.0004 4040.00005 2020.00006 1010.0000

707.0000/ 505.0000

303.000010 101.0000

0.04200.04500.04600.04U0.05600.06600.07800.09100.12400.4000

I 0.04270.04310.04370.04550.05030.06190.07310.08950.13200.3990

RESIDUAL

-0.00070.00190.00230.00250.00570.00410.00490.0015

.0.00800.0010

------.-CORDERED BY RESIDUALS.-------------

MOISTURE CONTENT:N0. PRESSURE OBSERVED FITTED

S76432a

1019

2020.0000707.0000

1010.00004040.0000707.0000

10100.0000505.0000101.0000

1515O.OOOO303.0000

0.05600.07800.06600.04800.04600.04500.09100.40000.04200.1240

0.05030.07310.06190.04550.04370.04310.08950.39900.04270.1320

RESIDUAL

0.00570.00490.00410.00250.00230.00190.00150.0010

-0.0007*0.0080

Page 123: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

IAf td4 -l

SOIL HYDRALLIC PROPERTIES=

K IPRESSURE UC(cm)

100.7761 3, 0.4000104.9641 3 4- 0.3821109.6100 3, 6 0.3642114.7222 Y.3-60.3463120.4052 9tS 0.3284126.7648 4/S 0.3105133.9353 4 . 0.2926142.0808 U-1 0.2747151.4560 Ls-0.2568162.3393 t 33 0.2389175.1601 1.j.t 0.2210190.5143 6.7So.2o31209.2776 . ? 0.1852232.7944 7, 0. 1673263.2473 8 .t0.1494304.U76 0.1315363.7476 1 9.3 0.1136

KCm/r)

2.08801.753561.46321.20760.96590.79520.63250.49540.38100.28700.21100.15060.10380.06840.04270.02470.0129

RELATIVE K

1.00000.84080.70080.57m40.47r20.38080.30290.23720.18250.1370.10100.0710.04970.03280.02Q40.01180.0062

5f-ox 0 -p5*

SD I= se _ Z .0 #I1 -4r

1.00000.95000.90000.85000.80000.75000.70000.65000.60000.5500O.SOOO0.45000.40000.35000.30000.25000.2000

efrt 7w18

PARAXETERS OF THE K-FUNCTION3== CSZzg=

ASSUMING THE RELATIONSHIP OF THE RELATIVE HYDRAULICCMMWUCTIVITT AND THE EFFECTIVE SATURATION TO BE A

01__ CUT LINE ON A LOG-LOG PAPER, THE AVERAGE SLOPE IS:

SATlK 2.088 U,c./hr

7q' 7 as.2 0.01;. e.5 68. c " ,PI

11- 3.196141 I

o.vooUJS, O. o 0t l

o .a9fD. 0rZ0D W3S

,6 i

ur ,I I5 I5 S. p k :

6""'t -~ la K -_ i (17 Se) - j ;wl~u ps - 3.1 9s 141

'2j.4 I C~vcv ' fw-cow

tro#sf tl~ A - f

(!Gt),,

(,,u t w. /0O. ? Io 6( z L t Vt V.Vi4

f, ~ . 2 f 7 !:k"-r

Page 124: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

- 4-d61M4 A,; 1.

;~se o s 44 7-1.t-Jf........................ ............................... -SOIDL '0t7fhtT- OtplL6 "Arc-RzeflL

X ON-LINEAR LEAST SQUARE ANALYSIS

-------- I ---- ~------._.

JLTS FOR RUN# I

<c4 UITRA -- CREEK RIVER -- < I BROOKS & COREY7/25/89 >

- -I

INPUT PARAMETERScum_MODEL VUliBER ... ..................

UKBER OF OBSERTIATJSNS .hUBER OF COEFFICIEITS...................RESIDUAL VATER CO .NT . .SATURATED MATER CONETE. IT..SATURATED CDRAULIC CONDUCTIVITY......

6102

0.07O00.31001.62M0

OBSERVED DATAU3n3333Z~zz

I Xcl)

1 15150.00002 10100.00003 7070.00004 4040.00005 2020.00006 1010.00007 707.0000

505.0000

IT AT N 303.0000^5 101.0000

ITERATION NO VCR

YT )

0.07500.09950.11150.12500.13450.14500.19000.19650.21000.2600

0I23

67

0.07500.07500.07500.07500.07500.07500.07500.0750

ALPHA

3922.1850001261.909000197.54420040.56679068.69453064.54380064.41075064.436010

N

0.20100.19500.21210.26240.38070.38820.38750.3876

SSo

0.4861750.2472310.0648640.0060120.0020630.0019370.0019370.001937

Page 125: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

44~~4At% 4(, -,wd

'k *IP 7-i/"CORRELATION MATRIXsw UZUUZUU

I 2

1.000022

1.00000.7938

NON-LINEAR LEAST-SWJARE ANALYSIS: FINAL RESULTS

95X CONFIDENCE LIMITS

VARIABLE VALUE SE. COEFT. T-VALUE LWER LPPER

ALPHAN

64.4600.3876

14.11300.0428

4.S657 31.83 96.979.0573 0.2889 0.4863

-------- ORDERED BY COMPUTER INPUT.-....

NOISTURE CONTENT:NO. PRESSURE OBSERVED FITTED

1 15150.00002 10100.00003 7070.00004 400.00005 2020.0000

1010.0000707.0000505.0000303.0000

10 101.0000

0.07500.09950.11150.12500.13450.14500.19000.19650.21000.2600

0.10330.10810.11300.12230.13680.15590.16790.18080.20400.2724

RESIDUAL

-0.0283-0.0086-0.00150.0027

-0.0023-0.01090.02210.01570.0060

-0.0124

--- O---ORDERED BY RESIDUALS..............

MOISTURE CONTENT:NO. PRESSURE OBSERVED FITTED

7

943S26

10l

707.0000505.0000303.0000

4040.00007070.00002020.0000

10100.00001010.0000101.0000

15150.0000

0.19000.19650.21000.12500.11150.13450.09950.14500.26000.0750

0.16790.18080.20400.12230.11300.13680.10810.15590.27240.1033

RESIDUAL

0.02210.01570.00600.0027

*0.0015*0.0023-0.0086-0.0109-0.0124*0.0283

Page 126: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

-vzl ,Zt, -Al OL~ % '

FY L' ;L/w/

rOl'l 7tf-jfSOIL WDRAUILIC PROPERTIES=.

j eK~~w

64.4360 211 0.3100y3.5s4 1.'13 0.2M84.5640 2 I0.296.0012 3.31r 0.2748

114.5m39 33&Co.2630135.3559 4.4'1 0.2513161.7275 t.301 0-2395195.8042 6%2 Y 0.2278240.7188 n Ib 0.2160301.3052 VI 0.2042385.3026 . S' o.9M505.6600 /W7 0.18

(cuhr)

1.62001.15080.80340.53010.368r0.24120.1t350.094r0.05640.03220.01750.0089

RELATIVE r

1.00000.71040.4150.33960.2Z760.1490.09470.0585o.Oua0.01990.01080.0055

SD

1.00000.95000.900o0.8500O.8OOO0.75000.70000.65000.60000.5500O.SOOO0.4500

PARAKETERS OF THE C-fUICTIONrsuzzas

ASSUIING THE RELATIONSHIP OF THE RELATIVE HYDRAULICCORWMCTIVITY AND THE EFFECTIVE SATURATION TO BE ASTREIGHT LINE ON A LOG-LOG PAPER, THE AVERACE SLOPE IS:

SATIz .62 c Whr no 6.5314

r 29~.t 4o.3j ,

0.o3 lii. ooq / rx(o'

I I

I 0.31f i0. 23'4-D

o. o'38

f>t V /-1 §60 ), I

W&" 7" - .- r 3 3 e8dq

WtA.-A r ~ 14, it 3 z

Page 127: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

- p- ,6z4 wtCw44� 2(p rL , /17G

At4'1 74k-fl................................VWi-LINEAR LEAST SOMAE AXALYSIS................................

.'SO iL.' O0k4pAT

LSS FOR RU # 3E -- kF Ff -/, & -OREY X

ttc ~NTRA -- GREEN RIVER -- BUFFER *C BROOKS & COW£ IV 30.02

INPUT PARAMETERS

MODEL NUMBER. ............................NUMBER OF OBSERVATIONS...................kwUEa OF COEFFICIENTS...................RESIDUAL WATER CONtEIT.................SATURATED WATER CONTENT................SATURATED NYDRAULIC CONDUCTIVITY.......

6112

0.09500.29000.9720 C4-u/k, = 2.7 )(16- 6l/_C

OBSERVED DATA

I XCl)

I 10.10002 101.00003 202.00004 303.00005 505.00006 707.00007 1010.0000co 2020.0000

4Q40 .00007070.0000

10100.0000' ,

ITERATION SO YCR

YCI)

0.29000.26000.24000.21500.18500.16500.14U50.13550.12850.12100.1110

0I23456

0.09500.09500.09500.09500.09500.09500.0950

ALPNA

232.480800100.725400

18.08M7017.22321016.82904016.88684016.885330

N

0.20850.21440.22620.24810.24520.24570.2457

SSQ

0.0885900.0413730.0070350.0065320.0065290.0065290.006529

Page 128: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

4~kv1A4 -4 1 p ~ 4pyt y'vw

CJ. Lt73f9CORRELATION MATRIX

_ _ _ _ _ _ _ _

I 2

1.000021.00000.6100

NON-LINAR LEAST-SQURE ANALYSIS: FINAL RESULTSsazc _

t95E cc

VARIABLE VALUE S.E. COEFT. T-VALUE ILOWER

NIFIDENCE LIMITS

UIPPER

I w32.6S31 0.3343

16.U8i30.2457

6.96690.0392

2.42376.2721

I.In0.1571

-..----ORDERED Y C UTER INPUT------

1 -'%5 10.1000 0.2900 0.31622 }I 101.0000 0.2600 0.22073 W :202.000 0.2400 0.20104 '%\303.O0 0.2150 0.19095 15"5.0 O.U50 0.1764 ^' 77.0000 0.1650 0.17Z

^%."'1010.0000 0.1U S 0.1664" 020.0000 0.1355 0.1552

<6 040.0000 0.1285 0.14580lt" 7070.0000 0.1210 0.1392

11 N10I00.0000 0.1110 .13

--- IORDERED BY RESIDUALS.-----.------

NDISTURE CONTENT:No. PRESSLRE OBSERVED FITTED

RESIDUAL

-0.02620.0393Q.03900.0241b.oo54

-^0.0079-0.0219-0.0197-'0.0173-0.0182-0.0245

234S69

1087

ltI

101.0000202.000030.O00S05.0000707.0000

4040.00007070.00002020.00001010.0000

10100.000010.1000

0.26000.24000.21500.18500.16500.12850.12100.13550.144s0.11100.2900

0. 22070.20100.19090.17960.17290.14580.13920.15520.16640.13550.3162

RESIDUAL

0.0393.0.03900.024110.005440.007940.017340.0182*0.019740.0219*0.0245

,0.0262

Page 129: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ L- .,-' ._

^a,^od - '64 atFCL45v4

OIL NYWAILIt POPERTIES

T) OIle

. .

5.926M o .4?40.290532.715 /. ?Jf. 2 M41.8 7 37 0.251054.452 I. 3*(0.2413n.1062 .3 0.231597.4916 3. l9 0.2218

135.03M6 (W 0.2120

K RELATIVE KCi) I

0.9720 - 1.0000.!979 0.61S10.35 0.36900.2093 0.21S30.118 0.1Z20.0647 0.06650.030 0.03490.0170 0.01750.0051 O."1

OD

1.00000.9500o.90oc0.8500.WM000.75000.70000.65000.6000

PARAMETERS OF TlE K-RUCTION* _ _ _ __UUU

AWJIIN TNE RELATIONSHIP OF TIE RELATIVE .TDRAUICEMUTIVITY AN TUE EFFECTIVE SATURATION TO BE AiSTREICNT LINE ON A LOG-LOG PAPER, TNE AVERAGE SLOPE IS:

SATKE .972 cAr 1N 9.377619

-3

j. ' i5

K d~v.

'is . i*16. 4, 0i.J3

'z3 i's8.o,\OII

oD3 I

O. Mflo,,is

IK I, '{(I.7stJ}

,= K. ses93

Page 130: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

/4,'. (- ^~. Ii-I 4s 4 a4 to ' -Art 7-r.- kit.,d sk> ?/?JP 'rage ,. s

i I

2 1EXAMPLE

1 0.0420

K>y EXAMPLE1 100.042

0 0101303505707

1010202040407070

1010015150

7 I, ,1: CALCULATE CURVE WITH KNOWN PARAMETER VALUES

0 3 2 1 0 0 8 30.4000 .0100, 3.00 0.50 0.5

5: GREEN RIVER; TAILINGS10 3 2 1 0 1 8 30-0.4000 0.010 3.00 0.50 0.51 1 1, 1 0

.400

.124

.091

.078

.066

.056

.048

.046

.045

.042

GREENRIVER TAIL

0.00058

0.00058

Page 131: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

i -8oo *q t 7-lffl* * *************************************************CA***i~V41.17

* i

* ANALYSIS OF SOIL HYDRAULIC PROPERTIES* I* EXAMPLE 1: CAICUIATE CURVE WITH KNOWN PARAMETER VALUESK>

*******

*

MUALEM-BASED RESTRI TION, M=1-1/NNTYPE= 3 METHOD= 2

* *

INITIAL VALUES OF THE COE'FICIENTS

NO1234567

NAMEWCRWCS

ALPHA* NM

EXPOCONDS

INITIAL VALUE.0420.4000. 100

3. 000. 667. 000. 006

INDEX0000000

C0%T1. Ut117WnmvfT. ?DIDlnElrTE'l IWMl¶Vcl - %QJL" 5n.vuftI"JJ.w rn. wEr Qv

WC.0442.0465.0510.0599.0689.0778.0868.0957.1047.1136.1226.1315.1405.1494.1584.1673.1763.1852.1942.2031.2121.2210.2300.2389.2479.2568.2658.2747.2837.2926.3016.3105.3195.3284.3374.3463.3553.3642.3732

p.1265D+04.8940D+03.6316D+03.4455D+03.3626D+03.3129D+03.2786D403.2531D+03.2331D+03.2167D+03.2030D+03.1913D+03.1810D+03.1720D+03.1638D+03.1565D+03.1497D+03.1435D+03.1377D+03.1322D+03.1271D+03.1223D+03.1177D+03.1132D+03.1090D+03.1048D+03.1008D+03.9684D+02.9296D+02.8911D+02.8527D+02.814 lD+02.7751D+02.7353D+02.6942D+02.6511D+02.6053D+02.5553D+02.4987D+02

WGF3.10t2.952.802.642.552.492.442.402.3672.3362.308

2.25B2.23P2.2142.1942.1752.1572.1392.12'12.1042.0872.0712.0542.0372.0202.00,31.98,61.9681.9501.931

1.8891.8661.8411.8141.7821.7451.698

Lira--r - * 1

COND.4976D-11.5632D-10.6377D-09.7232D-08.2999D-07.8239D-07.1807D-06.3437D-06.5926D-06.9511D-06.1445D-05.2104D-05.2958D-05.404lD-05.5391D-05.7047D-05.9052D-05.1145D-04.1430D-04.1766D-04.2157D-04.2612D-04.3137D-04.374OD-04.4430D-04.5217D-04.6112D-04.7127D-04.8276D-04.9576D-04.1104D-03.1270D-03.1458D-03.1671D-03.1912D-03.2188D-03.2504D-03.2872D-03.3307D-03

LOGK-11.303-10.249-9.195-8.141-7.523-7.084-6.743-6.464-6.227-6.022-5.840-5.677-5.529-5.393-5.268-5.152-5.043-4.941-4.845-4.753-4.666-4.583-4.503-4.427-4.354-4.283-4.214-4.147-4.082-4.019-3.957-3.896-3.836-3.777-3.718-3.660-3.601-3.542-3.481

DIF.1407D-05.5633D-05.2259D-04.9102D-04.2068D-03.3718D-03.5885D-03.8599D-03.1189D-02.1581D-02.2039D-02.2569D-02.3178D-02.3872D-02.4659D-02.5548D-02.6551D-02.7681D-02.8952D-02.1038D-01.1199D-01.1380D-01.1585D-01.1816D-01.2079D-01.2378D-01.2721D-01.3116D-01.3574D-01.4109D-01.4740D-01.5495D-01.6410D-01.7539D-01.8964D-01.1082D+00.1333D+00.1693D+00.2256D+00

LOGD-5.852-5.249-4.646-4.041-3.685-3.430-3.230-3.066-2.925-2.801-2.691-2.590-2.498-2.412-2.332-2.256-2.184-2.115-2.048-1.984-1.921-1.860-1.800-1.741-1.682-1.624-1.565-1.506-1.447-1.386-1.324-1.260-1.193-1.123-1.047-. 966-. 875-. 771-. 647

Page 132: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

.3821

.3911

.3955

.4000

.4308D+02 1.6344 .3835D-03 -3.416

.3383D+02 1.529 .4520D-03 -3.345

.2671D+02 1.42'7 .4980D-03 -3.303

.OOOOD+0I .5800D-03 -3.237l

.3280D+00

.5878D400

.1006D+01

-. 484-. 231

.003

3J

END OF PROBLEM -M. -'-7

=_ _ _ _ I uIr-4. P rL a /2 /e ?

Page 133: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

L lt fe / r* ** ****** ***** ****** **** * *********************** *

-- * ANALYSIS OF SOIL HY RAUIC PROPERTIES *\I * *

* EXAMPLE 5: GREEN ; TAILINGS. * ,, ,*

* MUALEM-BASED RESTRICTION, N=1-1/N ** ANALYSIS OF RETENTIbN DATA ONLY ** MTYPE= 3 METHOD= 2 ** I*

OF THE COEFFICIENTSINITIAL VALUES

NO1234567

NIT01234

i 567

15

NAMEWCRwcs

ALPHANM

EXPOCONDS

INITIAL VALUE.!0420.14000.1j100

3.i0000.16667.15000.0006

INDEX0011000

SSQ.02279.01175.00390.00309.00245.00236.00233.00233.00233

ALPHA.0100.0045.0060.0049.0054.0051.0052.0051.0052

IN3.100002.155232.!65763.'19243 .!20863.'46173.143653.151183. 15082

CORRELATION MATRIX

12

11.0000-. 8060

2

1.0000

RSQUARED FOR REGRESSION OF OBSERVED VS FITTED VALUES = .98595953---- =--_e--e _= =-=

NONLINEAR LEAST-SQUARES ALYSIS: FINAL RESULTS__== ____=.:6 __==_ __

VARIABLEALPHA

N

VALUE.00516

3.50816

S E. COEFF.. 00062.51443

T-VALUE8.356.82

95% CONFIDENCE LIMITSLOWER UPPER.0037 .0066

2.3219 4.6944

OBSERVED AND FITTED DATA,

NO P LOG-P<_> I .1010D+03V3 2.00 3

2 .3030D+03LA 2.48 43 .5050D+031@X 2.70 34 .7070D+03r 2.84 45 .1010D+04VA 3.00436 .2020D+04 104-1 3.3054

WC-OBS.4000.1240. 0910

I .0780.0660.0560

WC-FIT.3761.1440.07371.0558.0477.0430,

WC-DIF.0239

-. 0200.0173.0222.0183.0130

4

Page 134: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

'/4 ^4L, -Jwy~d7 .4040D+040V-§ 3.6064 .0480 .04228 .7070D+040t- 3.8494 .0460 .04209 .1010D+051% 4.0043 .0450 .0420

10 .1515D+05A%1 4.1804 .0420 .0420

SUM OF SQUARES OF OBSERVED TTED VALUES

a'*Jf7'Z5sf 33M*" rc ?/714f

.0058; .0040\ .0030

.0000

RETENTION DATACOND/DIFF DATA

ALL DATA

UNWEIGHTED.00233.00000.00233

WEIGHTED.00233.00000.00233

SOIL HYDRAULIC PROPERTIES (MTYPE - 3)

WC.0442.0465.0510.0599.0689.0778.0868.0957.1047.1136.1226.1315.1405.1494.1584

-' .1673.1763.1852.1942.2031.2121.2210.2300.2389.2479.2568.2658.2747.2837.2926.3016.3105.3195.3284.3374.3463.3553.3642.3732.3821.3911.3955.4000

P.1466D+04.1112D+04.8426D+03.6374D+03.5404D+03.4800D+03.4372D+03.4046D+03.3785D+03.3568D+03.3384D+03.3224D+03.3082D+03.2955D+03.2840D+03.2735D+03.2637D+03.2547D+03.2461D+03.2381D+03.2304D+03.2231D+03.2161D+03.2093D+03.2027D+03.1962D+03.1899D+03.1837D+03.1775D+03.1713D+03.1650D+03.1587D+03.1523D+03.1456D+03.1387D+03.1314D403.1235D+03.1148D+03.1047D+03.9244D+02.7520D+02.6145D+02.OOOOD+00

LOGP3.1663.0462.9262.8042.73$2.68t2.64t2.602.572.552.522.502.482.472.452.432.4212.4022.2392.2372.3692.342.3302.322.3072.2932 27

2.249

2. 214

1.966

2. 18'32.16321 14722.119g2.09'22. 002.090

1.789

COND.1600D-10.1574D-09.1549D-08.1527D-07.5834D-07.1512D-06.3170D-06.5810D-06.9708D-06.1516D-05.2249D-05.3203D-05.4415D-05.5923D-05.7768D-05.9995D-05.1265D-04.1578D-04.1945D-04.2370D-04.2861D-04.3423D-04.4064D-04.4792D-04.5615D-04.6542D-04.7585D-04.8754D-04.1006D-03.1152D-03.1316D-03.1498D-03.1702D-03.1929D-03.2184D-03.2471D-03.2796D-03.3166D-03.3594D-03.4102D-03.4736D-03.5144D-03.5800D-03

LOGK-10.796-9.803-8.810-7.816-7.234-6.820-6.499-6.236-6.013-5.819-5.648-5.494-5.355-5.227-5.110-5.000-4,898-4.802-4.711-4.625-4.544-4.466-4.391-4.320-4.251-4.184-4.120-4.058-3.997-3.938-3.881-3.824-3.769-3.715-3.661-3.607-3.553-3.499-3.444-3.387-3.325-3.289-3.237

DIF.4185D-05.1563D-04.5848D-04.2201D-03.4810D-03.8419D-03.1306D-02.1877D-02.2562D-02.3367D-02.4301D-02.5373D-02.6595D-02.7979D-02.9542D-02.1130D-01.1328D-01.1549D-01.1798D-01.2076D-01.2389D-01.2741D-01.3137D-01.3584D-01.4091D-01.4668D-01.5327D-01.6086D-01.6966D-01.7994D-01.9207D-01.1066D+00.1242D+00.1459D+00.1734D+00.2092D+00.2579D+00.3281D+00.4387D+00.6421D+00.1169D+01.2044D+01

LOGD-5.378-4.806-4.233-3.657-3.318-3.075-2.884-2.726-2.591-2.473-2.366-2.270-2.181-2.098-2.020-1.947-1.877-1.810-1.745-1.683-1.622-1.562-1.504-1.446-1.388-1.331-1.273-1.216-1.157-1.097-1.036

-. 972-. 906-. 836-. 761-. 679-. 589-. 484-. 358-. 192

.068.310

END OF PROBLEM

Page 135: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

-44*Z 4-j6 d )412 1 7

EXAIMPLE 1: CALCULATE CURVE WITf KMl PAVAIETER VALUES' 0 0 3 2 1 0 0 8 301

1750 .3100 .0100 3.00 0.501 0.5 I'--XANPLE 5: GREEK RIVER; OFF-PILE FATERIAL.

10 10 3 2 1 0 1 8 30!0.075 0.3100 --- 0.010 3.00 0.50 0.S I

0 0 1 1 1 1 0101 .260303 .210505 .197707 .190

1010 .1452020 .1354040 .1257070 .112

10100 .10015150 .075

rL&/L ZN

GREEN RIVER OFF-PILE MATERIAL 7-949 7-24f7 lft.

).00045 o&ha py C

Page 136: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

'1'AXb.a -Au -/a-s I L. =*J

U t ~ t _ _ _ _ _

* !

* ANALYSIS OF SOIL HYDRAULIC PROPERTIES i

K> EXAWPLE 1: CALCULATE CLIVE 1ITH KNOIN PARAMETER VALUES

*i~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

-I* f)° 7-ts-fl

de. P tL -7/zs-(a

*

*

*

*

a.*

*

**a.*ap:***aA�p..�pta�:p�papp mt*aaa.a**.a.aaa.,.,a

INITIAL VALUES OFTHE COEFFICIENTScau3333333EM3333u3.ua

NO

1234S67

KANEYCRvca115

ALPHA

NEXPoCONDS

INITIAL VALUE.0750.3100.0100

3.0000.6667.5000.0005

INDEX0000a00

SOIL HYDRAULIC PROPERTIES (Nnl~ggggzguzug.uuuzz

WC.0765.0779.0809.0868.0926

.1044

.1103

.1161

.1220

.1279

.1338

.1396

.1455

.1514

.1573

.1631

.1690

.1749

.1808

.1866

.1925

.1984

.2043

.2101

.2160

.2219

.2278

.2336

.2395

.2454

.2513.2571.2630.2689.2748.2806.2565.2924

P.12650D04.8940D+03.6316D+03.445D5Q3.36260+03.3129D%03.2786.03.2531D+03.23310+03.2167D+03.2030D+0.1913D403.1810D403.17200D03.1638D403.1565D+03.1497r+03.1435D+03.1377D+03.1322D003.1271D+03.1223D+03.11770103.1132D+03.1090D03.1048D+03.1008D+03.9684D+02.9296D+02.8911D002.85270.02.8141D002.M7D+02.T7530402.69420402.6511D002.6053D+02.5553D002.49870.02

LOGP3.1022.9512.6002.6492.5592.4952."52.4032.3672.3362.3082.2822.2582.2352.2142.1942.1752.1572.1392.1212.1042.0872.0712.0542.0372.0202.0031.9861.9681.9501.9311.9111.8891.8661.8411.8141.7821.74S1.698

PE a 3)

COmO LOck.3861D-11 -11.4s3.4369D-10 -10.360.4948D-09 -9.3b6.S611D-08 -8.251.23270-07 -7.63.6392D-07 *7.194.1402D-06 *6.853.26670-06 -6.574.4598D-06 -6.137.7379D-06 -6.132.1121D-05 -S.950.1632D-05 -5.787.22950-05 .5.439.3135D-05 -5.,04.4183D-05 -5.379.S4670-05 -5.*62.7023D-05 -5.153.68870-05 -5. I.11100-04 -4.'55.13700-04 -4.863.1674D-04 -4. j76.2027D-04 -4*y;.2434D-04 -4..2902D-04 *4.37.34370-04 -4.464.404U-04 -4.93.4742D-04 -4.24.553CD-04 -4. 57.6421D-04 -4. 92.7429D-04 -4 29.8560-04 -4A367.9856D0 *K 4.0.1131D-03 -3.N.12960-03 -3. 8.14MOD-03 -3. t.1697D-03 -3.,70.1943D-03 -3.712.2228D-03 -3.652.2565D-03 -3.591

DIF.1663D-05.6658C-05.2670D-04.1076D-03.2444D-03.43940-03.6956D-03.1016D-02.14060-02.1869D-02.2410D-02.3037D-02.3756D-02.4576D-02.5506D-02.6558D-02.77430-02.90780-02.1058D-01.12270-01.14170-01.16310-01.1873D-01.2147D-01.24570-01.28110-01.32160-01.3683C-01.42240-01.4856t-01.56030-01.6495D-01.7576D-01.89110-01.1060D+00.1279D+00.1576D+00.2001D+00.26670+00

LOGD

-5.779-5.177-4.573-3.968-3.612-3.357-3.158-2.993-2.852-2.728-2.618-2.518-2.425-2.340-2.259-2.183-2.111-2.042-1.976-1.911-1.849*1.787-1.72-1.668-1.610-1.551-1.493-1.434-1.374-1.314-1.252-1.187-1.121-1.050-. 975-. B93-. 803-.699-.574

Page 137: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

.2983

.3041

.3071

.3100.26710+02

1.6341.5291.427

4,.29760-03 *3.56.3507D-03 -3.45.3W64-03 -3.4 13.45XV-03 *3.347

16wy,,, -,&u -ovx",to/c"ULS( i

.38770400

.69410.00

.11900.01

-.411-.158

.075

END OF PROBLEM= xZs= z 33 z

Page 138: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

374A1 -A&* - g4&ttl 4h~

,ip** * **A---------------- I [-------- o6tk er S/

ANALYSIS OF SOIL hYDRAULIC PROPERTIES i

* EXAIMPLE 5: GREEN RIVER; OFF-PILE IUTERIL1

* IEJALEM-BASED RESTRICTION, NlelJ1I

.

C

0'

. ANALYSIS OF RETENTION DATA ONLYKTYPEm 3 NETNCD- 2

IiIiI

*

- q~ qm ~~~ ~~ p~ *

INITIAL VALUES OF THE COEFFICIENTS_

NOI23

567

KMEKCRWCS

ALPHA

NEXPOCONDS

INITIAL VALUE.0750.3100.0100

3.0000.6667.5000.0005

IIDEX00I¶a00

Sso.05107.00995.00420.00135.00126.00126.00126.00126

ALPHA.0100.0094.0096.0082.0083.0084.0084.0084

N3.00001.71701.36111.46521.4441.4Wl.A41.4W

CORRELATION MATRIXC==m=3.3Z~ZsZ~ZZ

1 2I 1.0000 I2 -. 8909 1.0000

RS0UARED FOR REGRESSION OF OBSERVED VS FITTED VALUES a .95840519gsinzzz=zzzzzzt ra sssszzZ u uSzzuzzzuuzzzzzzggzzzuz zzg

NONLINEAR LEAST-SOLIARES ANALYSIS: FINAL RESJLITSZZZZZZZZUZZUUZUUZZUZZZZUUE5UUZZZZSEUU3ZU Em

VARIABLEALPHAN

VALWE.00837

1. m6

S.E.COEFF..00210.06134

OBSERVED AND FITTED DATA

No P LOG-P1~l .10100+03 2.00432 .3030D+03 2.48143 .5050D+03 2.70334 .7070D+03 2.8494S .10100+04 3.00436 .2020D004 3.30547 .4040D+04 3.6064

WC-OBS.2600.2100.1970.1900.1450.1350.1250

T-VALUE'3.98

24.16

; C-FI.26g.214.18m.17Zs151

I.134.11l

95X CONFIDENCE LIMITSLOWER UPPER.0035 .0132

1.3408 1.6237

T YC-DIF8 -. 00985 -. 0045i1 .00895 .01758 -. 01288 .00029 .0071

Page 139: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

a .77000D04 3.494 .1120 .1079 .10105D+O 4.0043 .1000 .1026

10 .1515E0.5 4.180 .0750 .097

SW OF SUJARES W OBSERVED VERSUS FITTED VAL4SEZZZU-------UZU I~332U3U

<- t -_4 -

.0042-.0026-.0227

3,P-%tif 7-zytt

o., fre- "m

UHEICNTED WEIUNTEDRETENTION DATA .00126 .0012ACONO/DIFI DATA .0 .000(

ALL DATA .00126 .0012b

SOIL EMDRAULIC PROPERTIES (NTTPE * 3)-- - - - - - unu _ a

s

.0765

.0779

.OBW9

.0868

.0926

.0985

.1044

.1103

.1161

.1220

.1279

.1338

.1396

.1455

.1514.1573

k '.1631.1690.1749.1808.1866.1925.1984.2043.2101.2160.2219.2278.2336.2395.2454.2513.2571.2630.2689.2748.2806.2865.2924.2983.3041.3071.3100

P.4444D+07.1056D+07.2508D D6.595D8+05.25700+05.14150+05.89010D04.6094D+04.4421D+04.33470+04.2616D+04.2097D+04.17150+04.1426D.04.1202D+04.1025D.04.8828D+03.7663D+03.66903.5890D*03.52050+03.4618003.4112D.03.3672D+03.3286D+03.2944D+03.2641D+03.2369D+03.2125D+03.1903D003.1700D+03.15150D03.1343D+03.1183D+03.1033D003.8916D+02.7561D002.62470+02.4949D+02.3626D+02.2191D+02.1349D+02.OOOOD+OO

LOCP6.6486.0245.3994.m4.4104.1513.9493.7853.6463.52S3.4183.3223.2343.1543.0803.0112.9462.U42.8262.7702.762.6642.6142.5652.5172.4692.4222.3752.3272.2792.2312.1802.1282.0732.0141.9501.8791.7961.6951.5591.3411.130

cow.10640-18.1066D-16.1069D-14.1071D-12.1586D-l.1074D-10.4736D-10.1593D-09.4443D-09.1081D-08.2370D-08.4787D-08.9050D-08.16200-07.M2D-07.4561D-07.72630-07.1124D-06.1696D-06.25050-06.36290-06.5170D-06.7254D-06.10040-05.1374D-05.1861D-05.2498D-05.3S326-05.4397-05.5782D-05.7568D-05.971D-05.1285D-04.1672D-04.2178D-04.2846D-04.37450-04.4985D-04.6763D-04.9503D-04.142D-03.1919D-03.4500D-03

LOml.18.93-16.972-14.971-12.970-11.800-10.969-10.325

-9. M8-9.352-8.9,66-8.625-84.20-8.d43-7.7o0-7.557

-7.139-6.g49-6.*-6.601*6.40*6.i87-6.P39

*S.862-S.730-S.j02*.5 78-5.3 tT-5.i38-5.1 21

-4.4279

., 77

4.34

-.3 ,O

DlF.6673D-09.7944D-08.94590-07.1126D-05.4797D-05.1342D-04.2981D-04.s726D-04.9952D-04.16080-03.2457D-03.35940-03.50770-03.6969D-03.9343D-03.1228D-02.1586D-02.2021D-02.2542D-02.3165D-02.3905D-02.4781D-02.5816D-02.70370-02.84770-02.10180-01.1219D-01.14570-01.1742D-01.2083D-01.2494D-01.2997D-Ol.36170-01.43950-01.5392D-01.6701D-Ol.8483D-01.11040+00.1499D+00.2194D+00.38200.00.6099040

LOGD-9.176-8.100*7.024*S.948-5.319-4.872-4.526-4.242-4.002-3.794-3.610-3.4"-3.294-3.157-3.030-2.911-2.800-2.694-2.595-2.500-2.408-2.320-2.235-2.153-2.072-1.992-1.914-1.836-1.759-1.681-1.603-1.523-1.442-1.357-1.268-1.174-1.071-. 957-.824-.659-. 418-. 215

END OF PROBLEMmass=

Page 140: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 141: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 142: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 143: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 144: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 145: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeatureItem -

MORRISON-KNUDSEN ENGINEERS, INC.A MORRISON KNUOSEN COMPANY

1 Fs I R A, - A

I it ; it rf'n

" U1 Arz , A C, ._, 34 _

Sheet 's34Contract No. 6- 5 q-° File No. _Designed r' 7 L Date V/If/AChecked '? - Date 7- ff ' '' '.0

Ca cL4awdIf 5 . oS1e c 4Ib~'4-t~ A AZA, 'e 0 &,& p- fti +I'mi ;- SI p. (si.ov{- J �1

14 = *tLt Axx d i4 i fw

Al In A!y 4xVr_ g.'

( / -I 1' L, - .0 -- 7 )

-a No - Af .4

d.

AJ 4A-C h = ho A rsk et

O ' -p2cb.e L h t t... "L3 = 2 14_.

IVA._ !fA72' o>e,,)

Page 146: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

: le ? - . .,*f Ez-E t; ; -

MORRL0N-UKDSEN ENGINEERS, INC.AmoiR2SOI #JucawI ct UX7RA~~n -OLQProject

FeaturEItem_

e

. _ . .-

I ovF, L A7 ieA a J

-- .. ,.,So O-r rSheet V'Q -Contract N. hFie No.____Desfgned _ Date 7 zc' -Checked , Date - E/2

" I . It , _

.L4S~rz 2 a- .*._.,. - _ * 0 * __ _ . ,

_. _ ___,_,, .......... . . ... ... .... A. _.- .. .

' e& -11 - ( 44fl -. 4 Ck. lo), . , , . ,

T;&C (u.) I

1%

AO C 2 3 v

14

O A .

A. - 5. 34 5 _ ; j ,Sot

A~~~~~~~~~~- .U' *

A'~~~~~~~~~~1A. .5@ , z/2

G L~ . ) . va , V Z ?

4 , -. *

7f./x

6 s4. ) c~~~~~~~~~~~~~~~1

'4 - . .114�

I/

Page 147: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. .- Set j

Project tJI~~~~~1~~ - Contract NR ie No.___

Featuren f7I'vu~.u lbD Designed Date 76

Bern -VUr,;'•ArZ Chocked______Date_______

cc.z Got4 .- v

I Ic V-t yo .)MOD1 U- 937

Al

Ad9 S 0~~~~ 4~

~~'1 ~ H *~~j -~ .j'C14

I-~~~~~~~. KYC*0010/7

I

Z 1/! J . -4-

Page 148: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

hes~~~ sba -h L8,.%h>S. '2 .¶ bs*. \; ... .. F 'm i

( MORRISON-KNUDSEN ENGINEERS, INC.;s . : ! Sheet________ -ProJect - Contract No....wjI File No. -;Feature I I I4f? nad, Designed - Dat 72.6-y

Item v Checked_____ Date __/__6_

......... .. .... ... ....... _..A ... ..... _ .......... .. ......7 . ..

To ( .)JAAL S3 515

-L,~~~~~~~~~~~~~~~~~~~~~~~~~~~-

O~~~~~~~~~~~~~~3 a to/

~ 30 \

&~~~~~~~~~~~~~~~~~. , 1' z... vt~

,v YH

A.

- I. VI'O -I .

\ /5. zo, 1156b .l I 3;7.

- -8 3 . 'V

5'4-I c

S- 1 "-la-

9A)-%

-4-00

14

A,

.. .. I

N-, z -,

Page 149: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

j.~~;MORP N-KUEN ENGINEERSI;NO _____

Project . Uontis =,p". -b1 _ NO"Feature Designed ' Date '.ZZ6 *- tItem ILVwSAr2 ' Checked Date

even& e- X3 _.ft 2 CI.4.1., 7,

SoXO I 2.3 -s L 7 r ./4 eA

(, t~efset.. 64

_ _ 5 O3/ r->Z

-- §;r: /4'/C_ C5

A'LSI -, 3

C-- e~~~~~

=~ ( 3.tt8~~o> 6/ c/-'

e&.ow _ _. ii w P

AOflC S3- Ss Lf

(t ,? .09/5, / 3{, ou- 3Zt-

- -/'il' 'C' i1

Page 150: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDS£N ENGINEERS, INC.Project D N 1 M - _ o riFeature f _P sItL1 --Ar:aItem ,Ply fA1z - .t s W|/0 L-vx

ns0 - s,- Sheet .. c_Contract No. File No.Designed . PrL. Date 7/Checked 4, f ' Date 7/ZL- -9

C. tov . ,,,,r; iCto~ aBE ( Prf" 4 Sh. /S )

'7, O OjbaS

T' w ( kA 4.)

O 6~~~ -22Zg

,$~~~~~~~~~~~,

lri. | S | -/A.A6 -/4~~~~~~6 ,7 7_ ~ ~ ~~~i i' _6;l ~ '14

3H -/4to Z6 -/4, L14 .

o~~~oc

- - O 3 H I

H -/4, 0/C -/4 aoo

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Og O ';- i

f -/ 4. CCO C4, C)

c4

14

A-

Page 151: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeatureItam

MORRISON-KNUDSEN ENGINEERS, INC.A MORRISON KNUDSZN COMPANY

- ~ V m I S. Ai (; * I. '

S 4 Ir2' 1OAJR5 r2' A.. .I.,e

ez! I heet I/9Contract No. __ File No.Designed /" (L Date- faChecked II" Date 2 z s ;..W...

C4v.R B; /

,0

To wt ( &ttu.) (S~3~)

I -f ( 9 O O a 1 L e '

7i O

YY .~ ~ ~ ~ ~ ~ ~ ~ A

*~~~~f~ i~e . ''' o

-/41.o 0/ ' 14 o

4. \

3o 81r. t ~~~~~-/4, AD .6,1133

F-

Page 152: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeatureItem -

MORRISON-KNUDSEN ENGINEERS, INC.aA WORRISON KNUODSEN COMPANY

I I 'L r I T fr 7r J

' m ra5' r ~z,

!r *; ;

Contract No. /Designed - rYEChecked -- 'f /

Sheet 50File No._Date 211-6 /,Date 7- ' ;

C'A'�A - & !

_�5_ I,

T' b ~

° 4 -, *rqF -26

: . .4A -114

i ;~~ ~ 1 4 , i- -/4 O - f4 L o /_1;~~~ i OO/- 4>OO

. 1 > 7~~1X 'yr.H g

15~~~~~~~~0 c'4 'a

46 yr. H 2

62, e r .- >'i. 4

h -

. X~~~~~~4

e.{Z(. H ' ! °~~~

! 1

i.

Page 153: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.A MORSISO NUDSNCOPANY

Project tJM7PA /ewFeature /'#. /4;.

Item I 2' 9

atUoAL 7 op oF7 ttf .'eca

Ce ff ' . 6 y

i~~s~~ 0 /1I t 6 yr.

fr~s 4Yx(to~ +

4viM ' veec- = t

AJ~aZt (j) -fi S 6i of offp~/e h

c8, - S, yr.

Sheet .5-I

Contract No. . V.5 File No.Designed ? - Date - AP7fChecked 8 i> Date 7-2 "-; *

2

O40, &,, j .=- 0 9 2-,t/ 4a. = 3 x. 10StL . & 4. rx /a & C,/

il-- viltv 4, - e . s ' 0

st JsW

/4wa /.6xfto

KXsA _ - Y Iy/ 0 Ch./s

'.A _ 3a432 Y IO'c //S.

A{., Vt4 t. K t >0J^ C)

Page 154: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

*�%� P. *s.ae. - - -

: 6MORAISON4NUDtN ENGINEERS, INC. C 's',: -os Sheet ;-"-'

rrolect . - QW. ContraAt No File No.______Feature -ITsfL: Ite.J Desgned. Date a i

Item. "JpS^75t R4

I . tChocked rL Date /26/>\ S c kf /^r . -> 5 ;1x i6 ) rr ~ tLc i; r

�1�1 I1 ) .!7 . , = 64:� - - . . J4

7; (vt

Ao

A- .-- w7

e.'

M q~~ - >-S73

*~~~~i,~ ~ 30 3;

~~~ -Z.o~7 I-f-,-

d4. H - s.3,; -'

4 <,j\4*'~~~~~O4

A'~~~ s t ~ t

S,37~ ~ ~ ~~~~_

-K§S.C~~~ 4 . '\ /~ '-

A1 -J.t-'.

H

A,

If,

Page 155: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

;- -iMORRISONKNUDSEN ENGINEERSD INC. ': G v.g -os Sheet . - ,Project .i-G f C No. # File No. -Feature UJPLfi7,eDJ Designed i Date i' IItem - Checked Prc Date_______... ..... . _, .... ,.... .TX.. . .. .. Y... . ...at................6 . ..

ze- SC 6-,t~~~~~~~~~~~~~~~v ,r *6;.C G...:. -': ' *

T -c(vz )o'Vo L Sf

- I-4-~~~~~~~1

_~

1-

/~~~~~~~~~~~~~~~~~~3 . \/jA' 40e H

H

, X +y; < {36 ,/.-

14

L44h '5 rJ n, C

+5.4 > \ /~~~~~~~oo

14.i

* - * .7

A' /.. 1

Page 156: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

:;-MORRISOnN USEN ENGINEERS, INC. - - - Sheet '

peqoect t~~~ otatN.File No.Feature . fiLtRP J A DesignedL Date 74 ff .

Item e O^J Alf A ' CheCd p rL- Date -7/ /

\ _ ' 4 -- = ,20 . . ~~~~~GO-.'... j

T; ~ r t. )0jrL •5 S

Ot. iL

14 -/3.?Y?

-,- H 3 I'~ i.s -, ,4

L . .7S0 9 # ° t/ , s _i.

AYi' '1\

-~~~~~~~ . H5wQ SZ-;

.~.. . H3so .'

tt) t -/~~~~~~~~~~~~~~~~'

.4 -@6St~i

14�1'

. .

1 .. ......... ... .. 1

Page 157: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

PiojeFeatiItem.

Ic. _0

MORRISON-KNUDSEN ENGINEERS, INC.(a A MORNISON KNUDSEN COMPANYT

ire At dA'

, cjN 5,* rz ' A.t4, t

Sheet _ _Contract No. r- If$ File No.Designed ,1j Date 7*"- AffChecked .r-- Date WL . -

.- - 4

)

C~~~~~z2. ~ ~ ~ ~ ' Lqg #2.3 - f

tdx :.(Fo4'( 9(4.2 _~iVO 5 5 s

VA 50X6Re.f4 "_ Y v

SAvsOa SS I _ p / ;4 .4-SU%.4,

6we's ,ff;5 r / .6AD'f

4LS4?'tA- , /F 7 (

A4°C S'3 SS $ f~a

(f t? _ j. C _,¢2

gt454.<<.tr51 tS744-w v At'£

Page 158: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeatureItgm

MORRISON-KNUDSEN ENGINEERS, INC.

I (I sfL1Rfeft. I A eAr!2 ' A-- , -

5- Sheet . _ _

Contract No. 4A 1 File No.Designed ' rL. Date :A tChecked -' ff - Date 7 ' '25'4/, x V- ie' GA "VO , " V -; .1�� (7DtA4q.*1- ' ( "", +. SA. 14f .fv.= -. 7

To - ( -V- . )Neh L

-2z6

(4 ~ ~ ~ ~ ~ ~ ~ 4

' i o1/6I

- t / 3'.

30 | A | _/,~i .. q,34 -- p4 67

Gt 2. D,

4~~~~~~~~~~~~~~~~~~~~~~~~~4

H

4,

A.~~~~~~~~~~~~~~~~~~~~~~~~~.

A-

Page 159: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeatureItem -

. 61 O

MORRISON-KNUDSEN ENGINEERS, INC.DA MORRSON KMU¶EW"MF~N

I ti ful RAr:tA a. ' AS Sk -r; ' t

Soi7.og Sheet -_5_ 7Contract No .. File No.Designed Pre- Date I / ,AChecked -- -kr," Date 7?264/

4 oDfb

Te7;t ( v.)

o iN X/A. /

-t /3 7 g

Ii~ -. 9r -6.08

v H \~

& (-I2 2 a

A. -

H-

A-

Page 160: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeatureItem

MORRISON-KNUDSEN ENGINEERS, INC.1 O I tOLN U O A 2r a -

f AIFIL1 Verf e pJ

soX7-o Sheet _Contract No. . File No.Designed f L Date _/'6 /.

Checked - Date 7N QJJ SAT2' I Oj

�-� DDC't.L C:

f0

To- (-v.)AifAhL

_ ~ ~~~ ~ ~ . 2 -

\~~~~~~~~~~~- 9 d -7- -2

Vt.~~~~~~~~A

a4 -6. ?v, -6. yg ,7

-4 3 7 ,/o+

3 cr ~ ~H -g*9*%--f9 v

~~~~ 30

-75% 6~~

9§. = | | >g-.g7?

H~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.

14

A-

Page 161: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeature

.4tqm -/ n

MORRISON-KNUDSEN ENGINEERS, INC.AORSON K SN COMPN

iM7'7 ei&V

*/ /L, r4; ,^, C4,. ,-i< , .( . _ 14.1

Sheet S?-Contract No. &-6? '-7 Fle No.Designed ine Date - ^i5Checked -122-flf k Date 7 -t i i

V

lVedx, 6I9 3 Top qI .'le ,

6 i - TJ S 6 yt = 0,4 #V

A-4 'l t

.. , - I = 1 o-

f s,, _ 4,.t ryC /

44v ' vtCc cz 4 'C t t /. 9 t' a.- JFC15K .Sc.s7f va -11< /

A~ k@ e ' S t 6f t o foy(tI .A.

~~~~ k~~~

K o.e t x , , 6 3

~~~~~~

r4 to 2D2=, ry 0 '3

tsu.= 4.rao~~~~~2>./slSee Jt % .2 k&/

N 0 dx EJS) --O 9 rrp q7 ";tf7' &AX-21tX

( r.A T-* fk w$

1s. ,eC) 0 io /or0 .a cox

6.b 4x to

KJ-At= ,.2?vIO>C/c

4Z1m VtclACi4, = L. ks I - / W0 OS>c, C.=°/ ,

7" flI' Tm,- 7f" Z-ro = 6 / yk-

Page 162: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeaturItem -

IeMORRISON-KNUDSEN ENGINEERS, INC.

I MII -A _G#J

! (AJfIL- IR:r aJ. J. SE 'Ts 72- ' Cut ,,,

tsf-or Sheet baContract No. * L File No.Designed p rZ c . Date _7w/2 6 X'

Checked -_ /__ - Date -77 7 ' -;

I &T

T.~ (1-2w.)

f. Sk. 1-7)"

= :7 l,,4 IX, = -/ It

evi , .- =

f/ a- *s

2-

0 14

H 3 306 o

@ ~~O. /30e e4 ° el8414 -

_ _ _ _ _ _ _ _ ,q o . O ,47 co4 L

-X- H '/

.~~~L'~ ~

'4

j1�

Page 163: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeatureItem -

MORRISON-KNUDSEN ENGINEERS, INC.£ MORRISON KNUOEOUPn _ GQ

IA4iA 'LI'eA -r4e4

SS?-O7 Sheet 6/Contract No. ' File No.Deslgned - ne & Date ~z/ /2

Checked - Date 7 Z A; '

p C^"?S-- s --.0.

v

~1T- ( ?v .)

A4L. 40|0 _ ~ /t_1,f9 X i

YV ff - ~~~~~ ~ ~~t3, f- D

-4-~~~~~~~~~1

A-

ov ~ ~ ~ ~ ~ A G. z. o .Sl E

L

A- 6z. H \ w

. .

14

A-

Page 164: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project M rm 1 - -MNFeature f tifiL1 RAp e aJItem QgevvS. Ou 7

rf '~~ C- :,>

Sheet _ _ _

Contract No. .r .-. File No.Designed ?rL . Date :/2 &/a

Checked ,'/ Date 7': -i';

7.

To ( Av . )

H -'47 -2b

A 30A-St

'V ~~~~~~~~~~~40

_ _ p s~~~~~~~~~

7'?,,' ~Ii r°/°/+63 a \0g)~~~~~~-

_ 9 s lW~~ff v {e O .rt1

-, q v H -t 95 / -X3. Q 7oc_

l.At S Otcr

A..].9S_ 3

1-

A.

Page 165: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.a MORISON KNUDSEN COMPANY

th~ 7A lergProjectFeatureItem - A- /Z'/ Ier

Sheet _ J

Contract No. £"-E -7 File No.Designed P re Date - : i /c8

Checked AL Date 7-77 - g

A-led-f D -- O TP 07 ayyr'lk x~.

Ka.. =02p

46,)J(

91- _r IC1 I0

f~xr =t 2,! y~ .. 0 oIX!.

A~~~v~ ( vic -P s a{ sSf1 Y.D~ vU*Z t a. 0< t7fr.

k~oe i -~ ') . O, f @;~'/L *,4e

lE,0e -

K ,t. =krolt '

kl,.u rtr

0s, D

o , 9 2 7 4

3 ) 0-?4.ref & G/

/. 3t r x / 6 I c/S

it- vltett Mr ' i. k.-rL- - 6. 7. tO;{- " eo,,/5

-Fou Aix ',A4 = 3,6 S 3 1v/% .

J D d- 7 k. @ , *,? I , a

¢A / V_-( :

4,* 1, 5 C

kwa =

s. 6 y,.0,60 2ro, 17? 9

/., ix{ to-

1,77y to _""C^_

JosL.J4- 4 7 2z to ? co,/.

4&. S elt-f Vdea = C' A 0 s 6Z /,4o y/0 -. /

7p,1 ffi 9 7i~a if I-Vzc, = fs r- \

Page 166: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProJeFeattItem

lll- ~ ~ ~ . ..

IwF2~ORRISON.KNUDSEN ENGINEERS, INC.O - sgeet .

act tfsirA ;ii~'~J tContract No. FlleNo. w .ire fDjf1L:ZfeAEv Designed .2... Date -7-27-

-- ' UA1Y2s *L f i Cecked P Date '

6 O",t i',- F, y t> , ,,, , ...... . - -_Vw ._.' ' _.

To t (?t>.),oAAL 2 3

p ~~~~~~116

'V 0

_ /r. 3?'7 - /.b

A3 ' \/

.i Hf Y~f 5 - /v o c

& ' , q f i > ,, , ,L,

4~~~~~1H - r.'fb85' -9 4 f:.' 1

#1 _ q ,*{ ,; -o~~~~~.1 tV;: L

VVa GL. \/~ ~

f5.4 ~~.4/

i~~. . . ... - ..... _

. .. .

i

' ! !-*__ _..

__ ... .. .__ ._ _ _ _ _ _ .................... . .

Page 167: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

' 2 MORRISO MUDSEN ENGINEERS:INCi4[NO Sheet_;

Project -Contract' NF.ie N... o.................... FFeature (IfWL:EAz ":'J Designed k.. Datee'7'Item v5F3 ; Checked 1L. Date_______

.. ... .- .. ..........

To;-c (?v.)... I 5. 53

/3 D \/~~~~~~~i/-

_~~~~~~~~~.. ...5 ...... ./ *-! ... 5

0 IA\

AL

l ,/ 1-3, e 5,

YZ H _,3.xq; j - ' ..e.

A- ,Gt3 ,I' ,?;

_ V

OGL.7 Ff \/

A' ~ ~ B ,1eZ.I7 ;

14~~~~~~~5

a-- .6. \

4I.-

.4

14

Al

1�

Page 168: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

: -- -- ;;MORRISON*UDSEN ENGINEEINC. - SheetProject An Contmact No. tLFile No. IFeature DesfiLgne (J. D..si Date 7- '7Item Check . ......... 4

.K-/ '~~~~~~~~~~~~~~~~~~~- - e- F

TIb4L ( Atu..) I '3 -5

- ~Zg'-

-4,,

,OV 30

-. v

_

£."

\~~~~~~~~~~~,/V

_,,.,U5 -t~~~~~~~~~~~~3 446.1n5341 ~ ~~~~~ p. o4 .I2GL7

, I N534 S ~~~~~OZ lO ,I t_

lot 3-

s~~~~~fF.

_ ..

. .

A'

*1�

Page 169: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

'~W'~ "MORRISON4KN DSEN EN~Z~~~*"

Feature dzh Destgned . Date.ZiwItem ' A)M 7, Checked L Date n ;

-- nw. C vOU., v

(7SOVVA t- 3_ L -V S 7 5 CA -- D ,

CV 7'.^- 6v _ Isf. 5-

4C -, 6 St 6. )~'411e L3f, I51 ~= , / V/SC

A ~ ~~~' s$=stk E 2o,.to~; fo _,09 Ft

A1V04E S 5-S 3 ".&/ -le~4 -X

/ C _ 4,oo

& , _I: 3. , e j69qq5 Z . / ?2v5

-r (3Iid-- 4~r'-9 c-pzJ

aIC '4E.A-4c- Z. *fwt

,.zygotic -ta & , O5.3

q 4F (/v < C c"/f

Pr7 4

I

owe-* S~A - s +, *f y~

r- 5s.SL o

Le, 'r ,73 k - f. Z - S VR.-7

. . -( (/ >" A- ) (Z *'7 c, - s) : ifLS C "Ir

9'o7 ko-' C'Y5-

-I

.1

v -.d

// V -P--4 'o6 '4�- '-4� 6 - �4 le 11W-0-1

Page 170: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

Pike Doc. 5057-Grn-C-01-01652-00

Calculation Cover Sheet

Caic. No. Le L9.-ooContract No. < 0I Discipline No. of Sheets -

Project U MTda- &Al

Feature T&'A7vq~$ ,) M- ?Nt (e4v"'%OAt

Item T VA1 MAR u. \( I C A \; A*

Sources of Data

I. W<E o49 * 156ltcaos7-oo " L'Os{E

-Sources- of-Formubie-4-References--;?,

Preliminary Cat. D Final Calc. Supersedes Caic. No.

Rev. RvsoCacuatamon By Date Ctwckd By Date Awproved By DateNo.

Form 42410

Page 171: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.P (ojct A MORRISON KNUDSEN COMPANY a TL~-6 4Project =- 6' / m

Feature Te;kf . OfpAi A4C0' if -t-qrwsItem tY V'% 7YOr r I n

Sheet 4- C:Contract No. 5 C SI - File No.Designed e dC- _ Date Z1 5.11 % I

Checked_ _____C_ Date ;741'

US U KK\A(Y

D, &~vk 0 A wd~i 0\ W ce5\° V> 3~ - 4 rt- t& a- ; 6fvXD.

tei~~~M0V% .wifeXA COJ4 efi j fih:8 t

t\lAJJL Nvc N., a'\\a 0 5 (=Q T 0 (a 4-)

gt1AL v&\W c{ bt 4 ' dUVV. £AXr kedJ awiji ^ JvD

MC}4 (k >{L&g bt~ltoLd1o& wa-er UAE4 AtJ e4 vIralCt"-A of >t\\, 4 S itsks Vg tv{; coj-i

fLa"'te M\tl6 bpfkt AAetedKl~vS-S

Page 172: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

3(M~MORRISON-KNUDSEN ENGINEERS INC. Sheet AProject UP TIATfR -6 Contract No.'°510S File No.Feature ^ P . M IAAI Yk Designed J3F Date?. 10 JJ I!Item .rvtol ..o. la r.% -4 1"Checked Woe- Date .2 -

-v P, V S (w

8VA VtLt pO%) ,IA~ j-A

- ¾YW%&Ar;c ScF (

- f Udtr c ecef*WI

2. V& 4-YJfv jSi. t q c4AAt) , cuWr

~ JD~vvCJtat Itr6We 4

is cis vvi4 jkLM_ M"V'. 1-s V&QrSO& 04 prdovu~eA4tJ

zF ~ 6.-L Cif *O" ceWA

~ ~~h~ J~q~s~ct-4ui sts

pIf~ ,) nf rple , tf

<fte~pC~bi(A -W1,v~e4FA ew P 4ts; .

AVt)L t tet eL4AiCA c~ LLCJC&.*i(v, ;s

Pf;<> ~ ~ coi\~f 9t>* \f~v $e(St9 & i

Page 173: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

.1~ t-, AT* It A T IA rS

1CVo18i

Co si-oSC*4. wur3

A-L.

I ~- p toLL-.

5Sf fAVeLC * JCIO') /.G(18) \Yk (~?cf)! - I --4-

we- 031

-oAo- o4\

- o40

-os4

_ o45

- 041

-o4l-o5c>

- DSz

= oSA

- O56

_* oloz

-oil

. A -Y- _ _ _ 1 -I_.

rl

4.'4 / *1.V

3.7 / -S.S7315 / 0.',

4., /443.3 / .L.3%D / 4Li

5.3 /I° .53- IG.3

4.1 /( 0 43.4 5.4S., /1 %

&.3/ 5n3.3 / v.-3.3 / S>L

3,1. /Seo

4.o / Sl..~3.7 /5.g5-Qo /1 55,4 /891.9 /3 QS,.1 /ID 5S.3 /S.

(4,F /S.545, /- b3) /(1.t4 s A7.

34n1o~

L"- jw %'

. o44-

Lir.v U;gi4uw

Is It

M

0oo. v

c1o1'ql. f

IVZ. oqq-(o

qlol~147bqB.l.I

ql .31I¶.2.

c11'1

.os4

ctv5

1441o4.4Io'L.'q,.s

Li-j

1--

Cj-

2

.. .

-----r I

Page 174: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

TA-, Ll 0-S5° r1 Jo S C,,. Iflc

712 fo'

| _ _ _ _ _ _ _ _ _ _ _ bL1O / 2 3 I Yok ( f 1.l-013- ol4o1 5

-O161

cM-A- \4t

-V.'

145S

-ItoS

-1no

41../ b 45,9 / o.

5*1 / ',

4t b

3.54

Sib 1S. o3.g

~e~

Si

z.S

'3.I.S

43.

435.-s

5-LS.,B1.3

4 3

5.o

4.S.

.- a\_ t| | O VlT 4

cI$7

0

-J

oZ--;-

J

yr

I'm

Q-F

1

Page 175: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

\-tL - t4&S505-7-05eSQ A w /51-O

4-4

,,

.

'604% I JAt\a�,, w(%~L) :50-"f �_ -W w K%) :5wt-J4 . uj (0o_ _ l-1* _ . ,

-n4

-'-is

-1-If

-[S3-Ieq4

-l11

-I z7- MI

-lso-1e13

-1q4-186

-( 7.0o

103-lo4

-\qC5-l2e(

$.k

'4.o

4463.31A44.\S.?5.4

41.1A, \3.0

i-;Z .,LZ.b3.0Z..A257..53.9

4.3. S

4I5.1I

4.3

~II

J.kI A3.43.05.3s.1.

cq-I4-go7-2.og

7-oq

12.Iz

Z.13

- V'33

_ ZZ5

_--ZA

Z34-4913

-d..4-o

e4 .3.3

4.1

4S.4.\o3.o1

I'S54 tS.65.4

Sit

IAo

's.9

404

4.4

S6Z

1.0

b" 3

.5.66.0q.2.I-ASq

8.0sjsS 54.0S, J

S b1.o

C WM - 9AX

-B45-AM

- 7_4(

T.a('.1

_.T,._

__.,

.+ ~~( 6, s .VA)

41~ ~ VY.

W

ICd

V-r_4e.<,

c1%s.

I I ___________________________.

Page 176: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

* ik, jIJb 1~;

50S' I-oSu~(LAZ -&RK

c0 frFILC:VA r G-q Dv Sn mU KTRA -

- I

ce ,r Lu ( /0 oi *& (tr(

ttO~ -eo\

-OOS

b 07

-OttO

- 0\7

-013

-ol.3

-07.5

-0245-o7-'I

-b50

-031

-) 0\9

2 0(0

b50~-DsO

O 37-

O-5 14

S.5 / 25.b /\rv$L(o3 Il't.S

S(ot

4.1 /IX.441} / *'

7.c/ I3.35v4 lid.

5,1 /% J

7.S / s4.1S-,- /Ic.S(D.3 /Ilf

4.4 /s.bC~o/ u.s

T /0 IZ-7 .o/ iz4

s.o / S 81.b /i4.-

I,^4 /\1.4

5.7 / IO.S

5.3 /.5'3 / .%

47 61 \ro7/ 14.

IL?.o 7.

1\4. 6"4"

lZ4o7

t\t.lxii7

bs9. O

All\.

11+.o

I IS '('Ivz-7lt\I5.

II+.

ll7 2-

1"4.3

JU)

4:co

2?-_y..4

* .9

Page 177: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

0 ~e51171II b

s Os 1 -o se,-J Alto

ii i -

-ellt i 0 l0 / er 7s KA c )i- .

w^-- -o-3s

-018

-0o7

-0o4

K4~- WLS

-Ole

- 0o0

- oo9oo- P-i

-o s-Dos

-001-OIe

- bo5 - SLl

-o.\o

-OI

-0Z IL00- ol- 1

-013-mA\_D 15

-Oki

-Glb

-07,k

_D Z

1 57/At.5I41 /1045.4 /.14b5 / 5bod / 1I.35. / IVsu

1.4.'. - t

5.1 I"

c~o

1.3

1.1

Ist

S, c

5.iS3S

MoS4-(o5.5

VW .1

ItS"

_'&F I

I FAI L

T ALL

'FAZ L

-a

. T4(4)

1j

t

A

. _________ I

Page 178: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

R�G

OFF elLEtI-.1~ ~I W-1 r -t -

s o s1- o $Rd.Aa h"t 71/-AIP

A-1

C, 1p1 -4 :[&LACE

to cr�)S o~~~~~~m k_______________4

4.

DILI

lo2.Olt1

- ez q

-D 9

-o4f

-o35

-oSA

(0.3

s.01S. ~o

4.9446.5G463.1S. 0s.9I

4445.b4.1

4.2..

43.

S .1

4.>L

S.50S.D

4" b

4, A

574

4.6

4-1

5.16.4;

LC4-A- Om1

-0&07

-o16

-017-064

-ocz

-oq2- 93

(DI7

s.I

5S.S(o.35.S5

4.o

'14,7.0

A.S4 t,6

7,.o

b .1

5,S4 b5. SO6.4I kGS

".1

Siob.16.3

6-4

S.15 .L

elf

o-

If

014

I - ---I

Page 179: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

6 FFe_1 LE,1'lI1 i0 Kr"- &tlwS 0 5-7- OS

W., MO C,

S ( MLZ 4IL(a

m

II

i

I

I0i

CWmI- oi4

-091

-al

-I v

lo

-It'z

- lNe-- lo4

-VZ

-t12.

I.D

4.j

4.9Ailt0.05.4

5.4151.

1.1

5. S-5.64~1All5 .5

41

54.4-s--

S,.sS1.

4S.4,34"t

4.l(.0

S."

.~~~ .j

CR-t - 12.1

t18~~i

k-o 4.2.

-1373

1.53 ~ 3.

-131 31in ~~31S'lit4 5,3

-v4 1 3.34

Z S7¢ 4.4-

S74-7-( 3.

-2.54 310

F.

t,

ci

Page 180: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(;1, r F e P <MAVLP. i) 00A V"XI, - ftQA

505-Wa-c4. W 71hy.P

- I

I (ax s 4_t __tw )

JEST * | j a(tc' ;) (1. )

-00S,

* ~-006I

-ob t

-064

I-oIc3

' S F:P,- 0lI -o

i o12.

S R- WS-o c

, -013

-oSI

- D6S1U-Oi

-c70

-071 1

:l-015%

\\ o. '\2o. 0

\'LLI

A3. o

( .?

4m64'Io

Im 4"W4 5VX2d6i

lt3.t .Skk 6.3 9 .L

\ 1. . 5C. b

\kR.o @'.1X3.q : t. b

.1T7-

9.j ?.

lI.4A

ti.,P t

l3.o5% 5T o 61+.510t4.1S

314316'.1.

'iA;

IS', 0 S

Is. Is

M5ot

MS. .\t S. o

IL%.l

IZA. S

itL.6

M.V%

Wt5.3s

7.S11T 3Io.I

8.95. I

q1.3

18,B. o

7. D1. (pF

^*~ ft-A ,'rf L )

Page 181: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

I -*.. r." I

.10111 ( s

TKTSEIFCTO:me._- -9511

IJATP. ( I

.QA INTRY "0.--9--l' on�- A--z?&� -GBEEN RIVER, UTAH

4", r MW.% -f Ir Mr. II & eCM-- A.9 'r C% - AQ&

CURnVE 2 OF

tF.St tJO. ICMAMN K"TRY TYPKS OF HA^X. IDnY (1ntifllff NET DRY rERCENT FIX. DRY PASS/

M. H1ATERIA1l. |W [tlTV~ MI)ES lU DENS ITT K"ttY l0STURm )E"S ITY,6 FAIL1

o 5rA-N-Coa =i v.8 s^%oD Z. 7.3 r? ~70 2 p7A-,S

A167,31 611-498177C 5

~~~~I - f r-oto Z,2 D IZ47, 1 19. If.{ a? Nz gs-o PA

t WS9, 4 At 6 54 S ^~~~ - Scw5+_ _ eu~t--St-- --- - Ism -- -l-R.--~--1st -~Z---Z3|-4l -q-- 6

fsZra 8,s - 55F2-2-oN C ,£*,, < #, 5 {v~d, tzWe_ -7 Ill-<1=-?.

tsnso F~vsr e 8,q f_ W .63±m

_I.

-

Sr_2 A--ook__

filSwca8 6540,89t

A)69,,414 £ Sy9,oed'8cuso * czo

nlfo -N, To?, 6 :%"fvrew) * +00

4-J 12 S ^

i5fv--4-005

sfG _

-S!A

*-CO$

rC&tye,sTir

dLo1yB

SOX

a"/

rA vpoXtd

fg!,5

IZ5,df

10.83 / Z% 7. ",4f

sbq

�� 1��j ��j .- I 1��

10.8 1 15O.'s- 1 11113-- q71z

-7,4

5. I=$fd _ f% .

Sf3~1j _ _--- -- ~ I~ I . . . . I II

=a- -7

I

I

.~~~~~~~~~~~~~~ -4, O_ Q.).~~~~~~~~~~~~~~~~ . T .. ._ , 71_-. T-jWQ. eA �- TQ i 5r-�7-

� TAI3Ni - Z7Jt

LE. IC.\ cki f ��ftjrv-p 1)14 7

------ -I6ef-w _~ . _ _ D . . . ._

Page 182: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

fA.=tE- r` ' COMM^Y I

.Jznl :~ 6tccg" fa,* Kl"U ilINAL c -. EQUI~tmt^|-

,.~~HAH (,,3a ,,.'-. 8.

- 2g.a!EN g,, E RIVER. IITAWT1ES T SPECIFICATIONSt 0~7ZC v ., *-- w z . .

Trs r t0). LOCATloN E"TRY TYPE. OF fIAX. DinY orrltll?1 WFT DRY PF.RCIU.0 1 1AX. DRY PASS/

. ._ i _ [ N~~~~~~O. HtATER~l | llENSltTY tlOISTURE DITYSI llENITY HOtTsRI DE" tNSTY* FQII.j

SF ^- - Olo N se£Fs Ess~qm4 oos Cl 1 S 1 I 32.5 12na G . 4I q'7. 4 PASS

stA N 017 61EeV. -40901 4SoS Cl 0\_ \i 130.3 llQ-c e 07 CIqS. G PA-',* . .-- qoo _ . OfI sf A

Isth-Wl elev "69C 59 4-0S l 2 /. Cl 1at.1- i0;o L (p t.9 PASS

SF ^ l l ° 1 tlev. -i°^ d 4-0S. A-_-l---- -,,-9---l2.- w3tq 1.PAS1~~~ ~~ el .e _ I 13- 1 __.

SFA N-02C Clev 40elq 5t^C ,8: 1 2 4 10. 0 131. I1 I e. 4 q tqS. 2 PASS

5FA- N-0 S lev 4101 4S *CZG 54 |0.2> 131,2 t20-7 e 7 ((0.3 Mss

sAJ-0l-22. cle3v.41VI~ SFA 12,'SA 10%G 2e 13D.S I l'q9 9 q PASS

SAN-023 NsAev. 41,01 SLA 12.'&z3q I C) 132,3 12-0.2 el1. 5 b qQ,5 PAss.N,5q450 FScl(.O SEh- S'5y\. .-..-

srkA N-om4 Elev.4101 -4 -03 SNA t 1.32 l71 . q . q t R .9 PASS

srA f -0t5F15selq Esesiv SVA <( < S 1Ola, %3_( g 900tI-A .~ .~, . . . .

~~~~~~~~~iVV Lu l. -0 la -C) 1 o3AA - -47 2 .-

| [ \ I T~~~t 5 31 (co tt Z rcz 5t s f P I~( c:

7-AVILE 3~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

4,1e TAT0tn Cpl ... p. ,<> ijwe. 1MI MM)v i .r}ny next-04--_ W-44 Iz 7)7

. -A. I-~ -h L-%vm wf -%,,-

_ _ * _~~I -b 8;4 st- -w_ ..... -_._-

Page 183: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

tAKr8own ICOMPAti._.r$ . I.11)nS oluew. GREEN RVER, UA ENMC .GREEN RIVER, UTAR o fls

_ __-

rI*wr REIIFICATtOtig: -tZ m4 z-i. ~ - . * - - _W A% - - - 4 5 -

_________ 'm c1saqs ' % - - - 1 2Q i i...

rn~sr ,.o. LlOCATIOtCUiRVEF.NTRY

NO.TYt'F. OF

HATEtIAl.FIAX. 01fY

DEUS ITY)I'TIMh1t

HO I STIIREWIET

DIffS ITYIVRY

DnRNSl ?PERCEN

bOUISTIIRre

2 OF1lAX. DRY

DWS ITY .rAsS/FAIL.

VSq-jqo 6 Ssw0 srF-hS1y5VA-U 91 CERev. 4101. 4 4.co3 S 17I3.'1 10 1O332.4 12zO q. 4 953. PASS

7 SVe63 sn-- 54 . I y tS.z PASSAl - -0210 |EIev. 410o 4-003 |a ZA IVL 122.|Z 0|t5. 7 I

s r A - l I - 0 2 ( o _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~

5 h-.1-027 tlev. 4100 .1|003 123/'I 0 |33.l 1ZZ' |g

- - (Ts-r4r es'Itt, s tPi- 1-- ;- -.stA-U-o/g0 Elev. 4100 4003 5,4 12.3.1 10.6) 1.1

(-02q N s470 6 s SrA- ';iIl -t.StA-ie-oq Clev. 4100 4'00O1 C 12.3 1 2.C 13I.2 z el 0 R7.I AS

6- rsO L cs 54t :H71n211 ..~~~~~~~~~C tE Cl. I A

___ I_ ITFWF31 (c6rt l ___ _ _

._________ _ _ _ _ .AX~ - I~ l

IWl~tA IOn: SŽ~')etec iblse -n - .EV1E1 )Y: _11 1711A R6. . I._..-.-. REVIEWED _ ... .. 4.._:ulIlSLus,!ItILa,,h ccnmZ.iaJ:} { f.. At _ oR hn'@ + ro1uAirlrt, tspe Sr-h-r-no)1

Page 184: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

?.IK-FEn:lY COMwrnta bwo.^* &

Jon: A 6veee P;ve

f~lt'..IL . 4!QIhmO4ts

A mm GREEN RIVER., UTA:JIt .Lt ar epWOR I FI At114 IOS n-t I . _P. -?5 - e--

A-.1 di an Io... a .n,..rz�-- f - _ L

_--- --L IV . - . I ; - - -

1-.;r tit. IAICATIO" K.HTRYNl).

TYrPt OFHATErIA A1.

11AX. DIlYDElNS ITY

Hr? rI T1111110 ISTIIRF.

tnT I . RiY

let9NSIT'Y DlSNIT

,PFRCF.NhOIST11n

FlAX. lMYIENS IT!

PASS/FAIl.

sr-g4-os. foE¢ao59+ S Z< o I2q.7 II-.. 9 (.5 - O6-4 PBs

;6~ ~~ eO}/ 4FJ 6AM6s ________ _______ _______ ________ -4 ________ _qIc_ _- 1__ 4__

.S ~ ~ ~ ~ ~ ~ ~~ I~ ''-W1<+ 5'8i5- |{ ' ,Z4 121.7 £i.| Z 0. c IPAssll . o e o - |5 fg4 , fcl aq4 1204s |. G -4 01 |PAS|-- ij3 e) F- a00 z

-0- PASS

,Sr cA 4iat oz1 0-. 5p -) '5 A 1. / 1 . 3 a. el 2_____ PASSfeeU l 410 . -

______ ______ _ ___ ____ __ __ ___ _ ____ _____ _ __ ~ 0 25T r'SSU _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _S

;__ _C

T__ _G

.__ _ _ _ _ _M

s_

fjS9, 3.7

1a ea

F: 6911 cl.*1o f,

Sr- -4S.w-4 ec.45x-c

175. .4 to.8 133 17--.3 B£-A 0(7. S PASSI I

J 5jn ;f3 -&z 7

. I III

Ln (AX' -A 7 117Ir7

13:e-.--

_- -, . I I -- - '- I -

TRBEL E 3 (CO nt

0It% C3 :t- -

%J I 'IT.'

__~~~~~~~ __ _

f .B ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~IIv . . t___ _

.(( X07pt4f I

11lTRAlTI : 1, .&,,* ,P,- (fr- l.I.VI :ICFI) Ii?: ________________

4. , 11 I L -c': --

Page 185: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

4i i rvr <- I COMPA11 I.0.

cy .7o

J~ . , -

:_FS SPCFCTM5 _ *

r S OIGIDiATI . &% Cl- A -1

I eENrg wj ~rRE Yr: Qss~t 4 41 -.. d-M- oiff c-:.-A

-3 % .( .. x, .4I41M

t ! 5tss1QA FtURY HO. W6!:::-UTA- ___d_vo__ .a _.~~~~~~~~%.... __ _ 1i;/ - . ! . ._t_ r-- ' - - - .

(:IInVF. . . I ,ZOr

fit) N. 1ICA:TIO" FN~lfty TYPE OFr f/AX. DnY (rtTIIIIIl "RE DRY rErncEN HAilX. nRY PAiSS/

Nt) , HATEnIA pe1. uryN MT >ISTURtE l IENS ITYe lENSIT RUttI STuR , DMITY ' FA I11.

I~~~~G le/ I IN i _ ,e~

.StA N1Q37'RI FEW, 4101 4 |e - b4 %. _ 4_

sr N04N| q04l0,X1 e A >e-ll11sth-N- 0~41 ()(Iv Itl034oWS 02 F-IT. .

A- - "0-41 -432 sq@ 14- 9 7. | 5l .. |>

G~~~ Ie.403 4- sr_

r- fLC t A. rI -I -<I-- - __ I I :E1 __16aItI - -ri 44x ,a <5o

. -=AXf/p c-e~ *a A-N_ trr S-m I9t .-&I AA4jq .q r-b!= Ir

c a-- r- -i L . . - r E

'M'� �Fl Tn-rdt . v \4 .e_-Zr- I rAs-r'& ; - Coo9 -i r- _ - -,~~~~~~~~~~~~~~-l I I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

4=

:2�1 --AZT

�6�p.7-fVB1 31(C-b t *f ovgi~W9 M?

N C>_��l -I . .~~~~~~~~~~~ - i

WYes bte,IIIl! AT II 0.n itf'.VIrt@F:I nYl Jo "( --- 7 4

* .4 I At ......... o ̂ % t^."O;, A.......A. a o- Po .. _ ^.1 J ,. . I 4r.

I6.14.1 .

Page 186: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

0 1AK.rEnr"010l COMPAtl( 4 qw IS*r%

11-rS TSl?,CIEIAT IONS I~ g VT:;r ':? 6

1,09..

UKIUIINAL a# s"

I O~tA CRHN RIVER IUTAII CI IaE-RYW 4:t F . -r _

.. ,"g y_ ev A

F"-. &A .-_ e~~~~~~~~~~~~~ - - 6-=_ * -~ I Z- *

'i r!; r tit). IMAM"loCUM.VFrN1'RY

mD.TYRr OF

HTF1rI Al.fiHA~X. DRlY

DF.IIS ITOPrTIM11`1 NErT

,101t.STURlt I) .NS TYMRY-

IIFNS ITYrPEnCID

Htt'?STUP

% OFHAX2. DRYIlENSlTY -

PASS/FAIL.

.~~C W. ....0. .3...

£fJ 517 f30 ar 3'0 4- SO"

:56-d-o4& 4-rsv Ifo | ~D|7.z | Z1|Ifl|i | 7- 8t|g5

:,,bYk-c+l * a4 .o 7 c£w- 5Aq xg-).q . .-.

I +-ft LE � (C 5

Lnqc�I VA

C--

�sIt-: w;; XC-t

saE- - r

.( a coq 1 .; o rf rcp ' ok `0

I �� I

. . . f

Z�4 UA ��

7)-,Z� --

-- -- I I��I- a �- 5 -

111 1 TA1111t Slt%6_.c_ ItyVI31l-1' lyl'l. .o, b - r..r - ---- i~t 1-- I

-.- M11u1uLLs.v-, . ,

Page 187: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

; *-C-a- - -.,,, ,, j.4

t I r *. .. . rrrr

4.6'uev" - _ __ __ _ 3ATE.-

a ax~'l\I~%1ll 9ML pu

CGREEN RIVER lTAH NC. _ .... 2 -T -

TEST - kr;*, -q,&-, M.-. a..e- C - .-

-- -- - - . - - , M II -

lF~flr tit). LAATION(CURVE*NTRY

119.TyPE. op

FHATtl IALSflAX. tinY

Dl)IS ITYOPTIMIIII

noI STURIiK I)ENSITY)RY

DENSITYPERCEN

HOISTliU

Z z or"AX. DRYD)ENS ITYT

PASS/FAIL

I 'I _ . . I I I t _-*-I -

sr A 11I037-P2(seu.3 'S10eqoc.(lov. 4101' 'St A -+t Mr S, #H

'Sit t2.3 l26.A1 1- .zI,\, phsS

SIA NODQ1 Lieu. '110 _ _ ___ El I2 4101I 1 0. o.4 S. | PASS

s D40 ?c-x t1e;1Q01 /// _ S.q |l 16. 3 . PS

srtA-I 046 r.(ev.iIO2 \ ___ \0_ 1zL.A 11b.3( 'Q ' 9.2 p'SS

1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~~~~~1 . t

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ V._lt_ _ _ _ _ _ _ i7 I 7 .q qI3 SE. 7 | PAsSEI_ 4103 -_P-A1-S--S-

sFA -N- MIK4/P;M4.30 E-SB4O

E(ev. '4104 4-007Sala 117. 2 H.'? 12(o.7 11p.2

-AS.13fA- fl 05X2

uolsaiE. 'E1i0Clev. -110-4 S1-A 2 .l1LI

SvkA%L14.2 Jae; IAo.1 ll0-1 G-�� toQ.(o

PASS

PASS

VC. S7 -- m&D Itv"A 5 az IE Jv U* zW v- IAL,.~F _ _- -~ - I I -- . --0

ThyJLE 3 (' cOt)'w _-.1,

a-?U. I

q.,11WII'AVIIR: ,T PLee blyi

- - ~ - = A -- L ., :~ m -a- - ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . 2

ItI.V I4F1I) RFY: t/ , eme'O"- II>.. -.. = e. -. - ..-.... ... .. . ........

.I C ,Auiww2w IASC_4arb dal i1i . (cc4lk-Cled_ = e ~. -

* + ^ate (sac' eV I- o0i, .e."3?sjcLAl,.fe CI.

Page 188: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

tAK r~rI'- ' COMPAIY

.1011:1-~

- -

E . - - -

URIG.0I v GsUK I~~~~IN~ AV7RYN-4:5-

GMEN RIVER, UTAH q1-.ln - -4 lbCrm ^-C es _

TEST srlENFICATwfl:L Vx% I r - evl-_ A QM.9L 11

Elks v a-a,&. %-.# m ff-'% I E

:o. r S-- I I_ {*pt . £_e-sF asr-_S5 *G CV ' t o * * ' l' ' ^'

*t S s S tnC J ' - * - o * -* * - -lf * § I s _ * * i '- @ @

- IV --- 1 * I I

TIST lit). IAJCATIONN).

TYrr. OFIHbATERAL,

HlAX. I)RYl)F.NS ITT ISTt I lllMHS ITY

nrYDENSITY

.PERCKNIIOISTlIR

% OFlAX iftRY

DF.NSITT !rAss/FAIL.

I I - - I~~~N B -~~ -'-I

,rA- - 053NIU,7M CStevo

Clev. 4103St h-4-00Z

%4'Ilq

c,)aojq,2-I 10.t 114.2, 7?.s cls.s PASS

S -013Elev.410 24 I ( 4 A ft " 1 Z7.Z ; .7 ( -- Phs &

st A N -Os; E6104(((l26.s l S1 2- 4>) MhS

__ _ _ _ _ _ _ _ _ _ fs 3 E L *:_ __

1-~~ - -. I . -

C~c,+ ss ~kd itz>1 -II.

__.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Ac ._.4 __. e

. . . 4 1 =s~~~~~~~4fvliL E 3 (ost ) <ot~~~~~~~~~Z

mKfla W.A/orF l!TOt: REVIE141w-3 ny:

*'1 )fll t@, E'" 4 * , . ...- PI. - %Wr-w -- I .... #--

Page 189: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

.1011: r uln

irs'r SPEL'IFI(ATIOtIS2 ,?crm- - mp~4 7_

0IAM~

C7 rye1i el= & :p~o

=r-nh IM A C!T- J1 L tfEEmfu

GREEN RIVER, UTAW ITAHO-A97.2. - A. .r ureC: _ x*- - I%- ' ~ - _ C - - I- a r - t -

1 .,r tit). lOCATIONEIlnvr.ENTRY

tus.TYI'P OF

IIATFR I Al.11AX. PinY

DI1,15 UrYOPTltHIM

F1I9tSTUIRtEWE.T

I)ENS ITYDRY

_DENSITY

PERCMI

HtOISTUI

% Z OFtIAX. 1)11YDENSITY.

rAss/FA l.

- -. , . . . . , . I .I - - =

4U-NCS?' Nsnso7 eCoSClev. 4103

'StCA -4-co0

SwS..)" llq.?. I2.2P 117.1 0c,12

iQ

14 cleai-ce.A Aelqf

Ph~ss'I - I I - II 4' * *

t WA -H 1 OVs E ev. d 10i

qs'q41,o ES' I.5F'11ft. 4104

tZ4ts. k-4Ne 7.0 C'?.-,-f I . _--II

I.; te -os~q 1_/ / / 12%.01 ll5.0 N q7.2, PASSI -I - -I- I I- I-- 1 _

cW -

?4eVO &S41'd- 1.17

(4.- ( I � 14 �- __X49 -wo> k A _s -PASS. -~'I _ - . .

-I I I I�I*-ii

SrA-N-Oo

lev-. 4104SFA -4 -CC

c~.IIs2,1L1 Ilq.2. 10.19>1122.Gl 1 14. .7I.14'1 PrssI I _ - l I -I 1 . _ 1

if -I r-; 11 -2 Q ' I--1PM -

_ _ _ ~~ , - _ _ -_ _ _ a ¶ B_ _ ._m

= = l l=EC acts ethyl ; Ire? - 1 = 1H -I v * . I ____~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

,11.,MAI'DR: ,,Noe5 ildcc' It)tV E,., f.1,.) n1y:Hi A- i - - -- ; ., -,,; I. _44s :llnl-;)leflt3>sXlmlll I filet Irniflffe~o

_e -Meadow-.& -im<

.~~~~~~~~~~

Page 190: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project £ MORRISCM KNUOSE14 COMPANY - ZV

Project O8aU~i~"ttW5Feature .\A1q , t Pfe. , t (- d B #Item ?ft r'.L Cr ,

Sheet4Contract No O 51-oS File No. -Designed - - Date < & JJ IChecked W- c Date

17,JPLf1C. :TV'fC~ ( VS,)

7 7 k� sts � Sut

S�&k -N - I Kvfl k -h- I B�

_______ ~~~Y4 ( e ) w (') +-A~M4

I T JY &o, .7 O.V13 , O

� A 6LE 13 (to J. )

Page 191: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUD N NGI EE IN.Project (D IORRISON K A

Feature T _.'Atas 0 bpEW. IrA c i

Item- Tu.\Xct ir', r CVA4 'td4 1l.

Sheet + - °Contract No. $P57-2° File No.Designed t' -' Date <b Jv',I 81Checked P' C Date 77TELL .

, • (LL Ln )

4 , CAXWY4 e. 4e Ica (LIJ YA) h Pst

joeI~~ Ir v ol st

r- \ff tp,

-HD -)si

I uJ

4\J-e2 Yz1 = j 12. 4 c P,

7 A.- AAi V% W .v~v; ) 6( '

(cgek of t~ vtA.,~tsI)S be La~eJ lete -o YV< \r2 L8A&ct.

OT ' tt aXON4: io-A )

;r

t'UL55

kta 1('V - s \4) yi AAA -&- � '- 4J \T ) 5�f e., �Z-

e~rx) <effl . r\ &tv C-k O~ L If-St A \ \- A-,

#°O * . -

AV4 t Om+TC [,(: o V& ,wId-I 0V%,

14%6D- -a ; A: ve-u M*& r I OLU AOL T svAJ I

Ti- '5'

K4v vcaves &0A ASX*4x. 4kviJiovS 4, Wt 04Ae c044J k4lAtS

e,4 4o Pe 5 w 4, e e. ts DJ + Oc-t %O

Page 192: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENG NEERS, INC. Sheet ___Xl

Project J H_" 11-U O&NKNOSE tM l & Contract No. •C57hD File No.Feature 'i~irtl: (5 A 'ki I Designed A' Date- J'

Item N\VA& AvW i JC-f ke'-t -w'tL 't8 'Checked WSc, Date Z6W

I ~~~~~~I

+. q glul 7.0 ~~~7.2w

71A"fS ______ ____ I.S6 ts. ~

&IE5

0 -4 e I (I "&J &-Smu

~~~ ~ k

vc~kue- . ( XC \41V idd A v 1 - \1 jkv 6. ) IIe *)

(LW cA 0f L~i.L ifJ &i

r, = tw'3.e V- - 0eVx) ~r

(D -6 e_1ki1W4JI

_�_VA I KV�

Li 0'V\'J Y4 \"kvEs ) i .e .

-. 6- = 1, �7wro >(\ (tJVAI'LA DC J LC-SJ %( 0 *V%

kvi_ co- wk Lt

TIft~L 4-

Page 193: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUOSICAMYORRIZONKNUOUNiCOMPANiY I

ProjectFeature .L;\.^cS., r& L

Item zrxP \yW~P *F%LC i ;

EN4 ENGINEERS, INC. Sheet -&2.Z) RI Vt~-(~-6-7-zm ContractNo. 0 - o FleNo. ___5FieN

-l (~ Designed M 3r- Date'IC-~Av~a t p Visa-f a Checked Wo c. Dateo o

-..-- , . _. ...... I

T- r'-

b7t;E . e8 t ~ I lI. 1 o

_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ ~ I i. 0

OtE5

61

02- Q I= ey MAAV

tI

7AWI11IiiiTii

1-3.

| IiL

1 , f

Page 194: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(OMORRISON-KNUDSEN ENGINEERS INC. Sheet A -7-o*s~wc"~ .(&A ,>A ,Project A3 x * k ft - 7d Contract No. Se' 1-0 5 File No.

Feature %T\A\Ms5 . 64'O\L , ,AL f $4' IS , Designed .Ads Date SiItem CWC Q C "" ' t^f'UChecked MCOCA Date-7/z>9

CW&Le6 ]DATA SC T

M-WL "0&?43 A 44

T~~~v'~~s 1p-,^TA~ AS S lie .; -r

v ft Lc &ck,

.1i 5C~T Useo T0 -rb -8T

IMAIT'L __'P____ v - u

Th ~i fdS 55 4+ I-I

et 10-- A0 -- 's~b's - 0.9

-I ALLE (Ob

Page 195: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

)MORRISON-KNUDSEN ENGINEERS, It4C. Sheet

Project ^ItIOKtStPY8,T _{ Contract No :. i S' File No.Feature 7ftk\%A5. bvr-,fpi. ,4 A1Ck Is Designed KJG- Date Z )t8

Item; 1VkPACL 'pnmwliere;c,, Checked WOC Da t e

D c { utt sevs -zom><l:: 4 "\t z

(,\sd nA t"tr qkve %-ew 6'ettd &v . ~s

8\tI~tofKofA\\ veJ, 6ttd25^5t F8

^^ At'o Aur -YA 443t awe e 4K b4 A-WApi tcsis

to ( ) \~~~~9i14 zj)10 0,J J XS4 25i'144 A4%4V bs cot :,,r. CtAV E14, jai Ae~

W~~~~~~~~~t~~~ t° jeL (Vos, v& a #ptR S

Page 196: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

Pj MORRISON-KNUDSEN ENGINEER, INC.Project A NOWON KNUOSEN COMPAPYIV RG

Feature tkAp 0{40ittL. Rer .MdeVialsItem l Ae LL

Sheet f-ZBContract No.5° 1 5 File No.Designed -3 Date >,Juk4 bnChecked W0c.- Date 7Z .

.E UeeLFAE~krr

_U>vf04:%K Mftavu v S 0e vjcye Cc* It'd (OQC)

eft"'ImioeA ,AI a klt 4Ylm.") Lmd vv"- CSL' m 613

of tb#,AfitfvL ftf\l UV 4t >-u v t6 vv \ S *08 v¢\sI

O 55'f V g tvJ I -,r011 l11S .

?" LJ",(-

A

I. O fL 0_J ys Ws M.,,fi L 4'vo, Yef. I rz -err^Id r,\kU 7-9.

,., A14t ,.ALS Jf 6 9tA v.J Y - L W L4te* w5,

( oevtj~q (OAA\;6 _stklita .lv$C" tw4u+ -I* ;iQ t

vaio

kI Nek OKC. # J Y,4 wg1 V\s f4 J{ekAL tv(te 0. "~k$ at

*1 t -. oWf p e 7 Tt'l te(fotJS

j~s V ,w VJ Xfecil \i ceOsCJ Of ttL S41.4 VMk49^S

O.& +AL vcfi l_ WU:e,,hV

Page 197: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

m V1- 6-1VVA1T~,A Ie~ 9 4Pr..O--

� 41, T UL 0 6. 5

,~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

'D t I8 3k

_ uv .9) -4J

C.Pr - 0 0

f - ozAC.tA- 4-o5TC A-4- b1JCtA- 4- t12.7Ck-k4 -0o1.eEA- 4-os7C$-- 4-o5tc'-VA- o35CfIA- A-o3q-CA- 4 -03 SCK-4 -o36(

CM-A- 03'CM -A - oAo(-14 - 4 - o41cW- 4-o4zC k-4-c45e.&A- A4-

14'A

I 1 ot"Ji\

03. o

103' 0

1o5*\

04 .4102,3

-01t-tof.1035i

tF3.

'4- I 2 1 A c LA- 6..A

i beo -.4 k -,.

vcy tjfSU. v o10tN -

N 1= - --

,- - -

%5 =Q = ,A=

-- - 11- - \D-

-.--- 1A~!D.06- %,AIIo-- D 1.25

_ _ _ 2.1?..34

3,OL

- + 4-eth cameJ, -'57

-* A LE 7I (441W P re- i)

Page 198: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

6 t Pe"le

CoNtROL ot-C1

C-4o~ VW E L

LKs- lk0^3 loM 1L.7'- 4-ooso q \?.(a

Lt-V4 - v3l

!^- A - vo7 I. 7.5.7

C tA-li - '0I .1COA- -oo7 .7c#A- it, o iZA.2.

CA\- 4 -- L i"-

t i 4-1- 4 i- 1\L

ctA-4--V7

Icyt-4-o1q ; twt\V~CtA 4oL

CM-4-OO - fCfAh - 4- ?-03 ; C1.24

JMT) 4 \V G.24cm. Wic -A

umT4^- raoc. tro W/o C,

I

7 =.\)C- lel _

- "'V 02c t .5 30, .s o

23I'L - 94-

0 oS04.00O

*4-p* La 4 Lvow;4.s4

T TNLE 8

(act'ro tVA tfle 1)

Page 199: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

(~MORRISON-KNUDSEN ENGINEERS, INC. Sheet ___2___

Project o - Contract No. S"105 File No.Feate eT hr kS0PI Designed- MJi5- Z Date 1 12Item . eNt_ r o Checked tp - Date /

T v A. f:LL

. (ZapA5'a)_

CbtnIY4L I M.

~~dL11

(\rAO4 I5,o

- _ _ _ _ _ _ _ _ __Z-7. 4o~

SM &t-v. j I J____-* Davo Amv %#I~ oe hws' i) Aes �$3

vbt vf~L *rF i.

I:IiTs 01

Page 200: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.Project (a£A MORRISON KNUOSEN COGPANY kJ tAJ a_ (f- tt

FeatureTmL\WVui 64ed.A bT1IPu t ker'\.Item.Qu\Let F4 dW4-rC k 'r V ste~d.,1,V-.

Sheet A42Contract No. S 0S File No.Designed W C- Date -I %IoChecked oc- Date 7/Za -

t'4 ftWZ-~KFL

lo2.1 7 &vf4O'7Vr,~5

a b - " 'I-e T T ' 7-

7ABLE \ 0

Page 201: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA
Page 202: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MKE DOC. 5057-GRN-C-01-01761-00

Calcutation Cover Sheet

C8IC. No. /-/-ContractNo. 5°ss-o5 Discipline utS 'A .2E No. of Sheets - .

ProjectvA ^T IL- 6.

Feature * ~ Aeteb of e4 1,+.. FA'.-:

Item E\%¶V1 £ at ioC,. 'Of JevC.'-

Se~eese-

Sources of Formulae & References1., -g(vCSo i-) @ ' ) J5

VA.

Preliminary Cakc. Q Final Cakc. s Supersedes Calc. No.

16 - __ o0I ISi5J .4...... __._/____

11�d

Ne. RAevion culcuWtio By Date Checked By Date I ApproveB DByNoI I _ _I_ _ _ _-

WOff 4Z2"U

Page 203: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet . L/ .Project )tO \ VC (-@ Contract No. 5c t1-o 5 File No.Feature Cootc toe Of st~hAu XMerQ;f&6\S Designed M,)C Date 7s Oc- 6?Item S~t C&tLcV Checked R MtS Date /0/o/UP

w.\flo tc$we't tofa 40 le$5v to OA Le9w c\<2

\ts~~~~~~~~~~~ae~sV vfh-(-%&W~J A ° |e C6 Opzle'J.'. £cv4 4 f%4,% J 3

w.v~ W.t. £c~t4 j.s t.w. '6X£a*+'._

8ffif't ~ 16{$^ At v Up'o \ fk\LmvK pt~

A~ L~as~J ~~ 1 L &'.'k Om-A\R .L$, fliddow jjr kL& uoK su*S ^~efkcAv 6 :e*ui .i;^, +tc mJz*,sk C Itti^t mL

?t (Ix-2 7~ u~to 1f +; (rbf i,

147 ; O ffi@S {t 2v

Page 204: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

~AUOR3MORRISON-KNUDSEN ENGINEERS, INC. Sheet .41Project .MI N CNY & Contract No. ' File No._Feature (oU0Ji'o- AA 6kS Designed Date : ct *-Item - Checked.LR i.S Date 1Itt.

M\t '~C~e-s 0 l4v&k% I Y'41 9k X I a t Os

0<¢^ T 7PQ t4) 6 ~-; t4 2k'D f

J" .1 4in tw% to Of AAA 5UYNC10 X i 0 4d t.r

a c0 J 5ii ofL S +t W. 4

vt~ r t i kt V¢\QtL o P Il tJCv VAt V&0( P*\t f t l

? -AA 7 ) - , 'd\ IS S

kT [(7 - V) e4 rn

Page 205: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet 1?.A MORRISON KNUOSIN COMPANY

Project UAN , tNX f 0 Contract No. SO50I-5 File No.Feature (pSrtto% 1 6.>>WvdJ 14tpr\Vi Designed LO( Date -'i OcA S9Item 5ht&VtAcal SvrLv.ti U Checked RLJ S Date 6 eo/'p9

Vix * . Wjatew e~e. ^ i~k c td 'd-;t. tL 0 J4%4l o{t z. kvjar.so~ - L ao4- $wklL ,<c -att{LC; S

is e.A~t~LJA'J s v'ag D li

wL Seew~.LLA~ek q, -ft vQ ef I . K ... 4

LtA\) -~4 voeik\A %, t 70 r 4-Le- up .' oh3 kl M VA

t~ ~ PA At, fiQ Xt\\g $- - 4.54t# \s',-'e~ uc \ OWe \Ct.-s . %st -^\\>s tt otv; tau~i; ¢- \. o.!, -. 54t tr O

,vLe;( 5%4rJi :J^>t \% {t ~%ZFr.AS r1

Page 206: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet AiL.proAMORSOjectINCMPK kUkiQA' G&iO Contract No. 5051- File No. ____

Feature ('v4kOv d W4kQ'f4 1 Designed k~(- Date -i6 QA'SItem I ~~ &UChecked - ......... Date....LRLIZWkL..

r% UL Tig.L t i1sV

"A C's ~ 4~~ #At"*1 Ofk Vr s A-~ al

W "eat-J 01'

Page 207: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

ProjectFeatureItem -

MORRISON-KNUDSEN ENGINEERS, INC.( MORRISON KNtJEN COMPANY - (P-ao

{o -fa -eQ~^ 't!~i5tA*; St; Coi 9..V $t (LA

Sheet 5 ./ 7Contract No..25.L File No. -Designed - M f o Date .1, Q o.. 9Checked -/?M1 .. Date A L0/Ln.

C AL CuL(\7 IT

- 7oCAA~ Cwk- LJoj S~I6, IN~ C;i)')I (4Z.

K ,fK

: I iv'i, U~o~0 erj

6) AJ0fM&v11v_1(4^ 04 V\V (' \~O U4

P ~ fI " 6L - fa wtf A~ 7 . 1

A 9* . 0 **.

I'lOL .'iZ 2 (V 7. /0 i%,4. , = -" Y x / 1a- (A",

OLT F "'J:3Al

7Id 7" 901,o l

A 'r -

,= o / .A

� C Y. z 101.) ��9 cx-ce)

0. r'-�15

), 4L 5 tu_ N%'J'%ECJ verv Vio.'J 10�1'W43 vv-4'k It- C;'W'tJ.3^

oA 6 ivo �Lv_ i0q, ei gkv'� MKJOVA lot-Aloyk 15 JL�ow� !I"� I .

Page 208: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC.DA MONKNDE OPAY ,1- 6&f43Project

FeatureItem -

I I ., -r J MLV' 4-

Sheet -Contract No.5 57('¶; File No. -IDesigned -t '- Date -U> Ott iChecked S ..Mc Date - f?/rt.. , I

- ~~fi k C -, Utv% 0Aje R kfItPA. 5 ' (AMVJ1DA

J&wv�sw-io#� i -J � M pt'-A+v�

% - 0 CI ." -~

* ,.4. I. 4. ['

*G4,cI1J. LyUCs,?iOlx vo A"

k> A- < 'J vr,'tI

4To JV orUt eC)' Jaz ~ Va \

~~--q'I\ � /40

r\.r 7 )/<

-=: t 11.

('1cA W ~1 n 6 ro(4 I~o Oa v,, to *' f ('t &-w LL

A .'4 v96 L-

~ 2?41

I 6.1-11%. . 0qi

1. k. IA. ?U~La v '\02' fkl~ qA l

Page 209: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

MORRISON-KNUDSEN ENGINEERS, INC. Sheet 71A MORRISON NUDSENt COMtPANY

Project DA N .KDE CON- 0 Contract No. 6(S7O0' File No. _Feature -i CA i or-ctLM- fMbK1:ckvbesigned-M Y- Date lf cc. 3Item -5 \t; c u& I * Checked J Date zo/TD/R.

C oJLwSItvs $

6tv j f Stab* , o -Ie'l Mp4 pit s 4ot.

Rotto iiK W^ ti ljO~Sf c~tl ct. s.V7 1 j '1. '7. ?T ¢s~zA'e\8

lr~L tvA~\" 'f JJ~e0%4 fk , gJL'L r)f-er'IuVi'~ OAp"A'ait

of Wjof~J uf~. \~~vJv&\je.

Page 210: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

1AA%% CIOJVA&4t%

St OLV bi'

A~ 'p4/o/ 1//TtC. keS4&

TADUf 31U MI:

OFF-PILE CONTAMINATED MATERIAL(Sheet 1 of 2)

DryDensity

LD~f)Sam~le No.*Percent

CompactionMoistureContent(%)

PercentDryerthan OMC

MKE-001MKE-002MKE-003MXE-004MXE-005

MKE-006MKE-007MKE-008

KE- 009MKE-010-Rl

MKE-011MKE-012MKE-013MKE-014MKE-015

MKE-016MKE-017MKE-018MKE-019MKE-020

NKE-021MKE-022MKE-023MKE-024MKE-025

MXE-026MKE-027MKE-028MXE-029MKE-030

108.7-113.4'105.2-112.2-114.1-

118.2.120.7.118.7-117.2'118.1'

117.2-115.0O116.8'115.3.119.5-

119.0O115.6-111.2-117.0O118.1'

111.7'119.3'114.2'117.8'121.3'

114.5-114.6.119.7'113.1"113.0'

97.8-91.3'90.3'90.3-91.1-

94.4.92.2'94.5.94.4.95.1-

96.3t94.5.96.0.94.7.96.8.

96.4.93.7'96.9'94.8'95.7.

90.5'96.1-91.9'96.8-99.7.

98.3'98.4a96.2'91.1'97.0-

5.5.5.6-6.3'5.6'6.8'

5.6-4.1-7.0'5.4.5.1.

7.5.5.7-6.3'4.4-6.0'

5.0'6.6.7.0-6.8-6.0'

6.6'7.6-5.8-4.8-6.4.

5.8'5.7-4.8'5.3'5.3.

7.6.5.1-5.6'5.1-3.4.

4.6.3.8.3.0-5.3-5.6'

3.3.5.1'4.5.6.4'4.6'

5.6.4.05.3'3.8'4.7.

4.0-3.1.4.9.6.0'4.4.

6.1'6.2.6.0.5.9'6.6'

*Note: 1 failed point not included.

DOAA- 4 AOL Ibk44 NA tQS- 21

595:7-RN ~~0~~7CIIN.PPT ~~~~~~~~05 G6-CIUT -A 01I-DPm-n"'--n ---.

Page 211: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

UfAT(LA-O

35 ocv4-70

~~AeZA^ 7/4

OFF-PILE CONTAMINATED MATERIAL i*(Sheet 2 of 2)

DryDensity(p3cf)Sami~le No-*

PercentCompaction

MoistureContent(%)

PercentDryerThan OMC -

MKE-031MKE-032MKE-033MKE-034MKE-035

MKE-036MKE-037MKE-077MKE-078MKE-079

MEAN

STANDARDDEVIATION

105.2.114.9'114.0'115.1'119.4.

119.2'105.5'108.7'115.1'120.0'

115.19-

4.19"'

90.3'98.6'91.6'92.5'97.1 '

96.9.90.996.4.92.7w96.6'

94.67

2.71"

6.3-4.7.7.0'7.7.5.7.

4il-5.44.9.6.1.5.7.

5.85-

0.91

5.6'7.2-3.8-3.1.5.2.

6.8-7.1-7.6-4.6'5.0-

5.14'

1.25-

Coefficientof variation

.0364- 0.0286-" 0. 1560 "

Coefficient ofSkewness

-0.215"" __

.9

*Note: 1 failed point not included.

*i Ajd VonJJ4 go Q% k4L ta

5e59 GGPJ; Rl

Page 212: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

A~~1 Yr -, 6J- 0,a 4 a, i1/LI&o51 A- p'a-Q I~J 4

S 35 Os ie89,IOA~

TAILINGS *(Sheet 1 of 2)

DryDensity(pCfISample No.

PercentCompaction

PercentMoisture DryerContent(%) Than OMC

MKE-038lKE-039MKE-040MKE-041MKE-042

MKE-043MKE-044MKE-045MKE-046MKE-047

104.2-104.9-106.9'102.3'99.4.

100.0'97.1'96.2.97.8.98.8.

93.7.94.3-90.0.98.0.95.2'

95.8.95.2-95.2.96.8'96.6.

5.9-3.3.5.5.2.9.4.4.

4.7*3.7-3.9.2.8d3.3'

7.4.9.9.7.7.

10.6'9.1'

8.8.10.8-11.1'12.2.11.7'

K>

MKE-048MKE-049MKE-050

0KE-051MKE-052

MKE-053MKE-054MKE-055MKE-056l4KE-057

102.0'99.6'

101.2'97.6'98.8'

95.7'96.3'99.2'99.1'

197.9'

99.7.97.4.97.1'93.5.94.6.

91.7 '93.0'95.8'95.7.96.9 '

3.0-5.3'3.9.4.1'3.4.

5.1-6.3-3.3.3.3-6.1'

12.2'9.9 -

10.4-9.4.

10.1'

8.3-7.5.

10.5 '10.5'8.9-

MKE-058MKE-059MXE-060MKE-0661MKE-062

MKE-063MKE-064MKE-065MKE-066MKE-067

97.0'96.8-98.1

101.9'103.1'

98.7'98.1'97.5'98.4-

101.0.

96.0'95.8'95.2'98.8

100.0'

97.7.97.1-96.5'91.4'93.9.

3.2'4.0.3.7'5.8'5.4.

1.9'6.7'5.3.4.1'5.3.

11.8'11.0-11.1'8.9'9.4.

13.1.8.9k9.7.9.0.7.8'

exk4J4 PVVV , & 0- 0.,1

C 5 7 c r J .r; GT- - 1 1- - 'I'l

Page 213: Green River, Utah, Draft, Completion Report Volume 4C ... · kPIZ.1-r~, T*e 4 A C pD j1K-s UtDOT- 4-&-'-AJ % 0 V-S J.Lv'4L.1 %'. ( W'. I tj i 0, A.-tJ A4 r J $. It &let IL kv{' tW(k-AA

~4 rtkhW 4kr- % -0* CA "L",~

v MT-f~ C& '

-5 k oi ~C O.)k-a tol'sOryI

TAILINGS *(Sheet 2 of 2)

DryDensity(pcf)Sample No.

PercentCompaction

MoistureContent(%)

PercentDryerThan OMC

MKE-068MKE-069MXE-070MKE-071MKE-072

MKE-073MKE-074MKE-075MKE-076

MEAN

STANDARDDEVIATION

104.4'102.9'99.5.96.8,

109.9G

97.9.95.2'98.7'98.7'

99.73/

3.2 lv/

0.0321/

95.0'99.4.96.1'93.5.95.1'

96.9'94.3.95.7,95.7.

95.65"'

2. 16

6.7.4.8.3.9.5.0'3.9.

3.9.4.2.5.9.5.2'

4.44,.-

1.18'-1

6.6'9.0'

10.2.8.808.8-

11.1.10.8'8.9'9.6'

9.78V'

1.46w"

0.1494 okCOEFFICIENTOF VARIATION

0.0226 - 0.2654 V

Coefficientof Skewness

4 t~VvQ-OL9 * -G.. a--

'S 0 5 7 ORN 5u~~~nuN.~~DT . 1: ~~A~Y ~q