36
©2015 GREENERSOL LANDSCAPE LIMITED ‘the greener soluon’

GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

©2015

GREENERSOL LANDSCAPE LIMITED ‘the greener solution’

Page 2: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |2

GREENERSOL

PAGE

About us 3

Services 4

Gallery 5

Projects list 30

Organization structure 34

The team 35

Contacts 36

Contents

Page 3: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |3

GREENERSOL

Greenersol Landscape Limited is a premium Kenyan landscaping company

based at Evergreen Center , Kiambu Road.

Our team brings with it a wealth of experience that extends over a period of 15

years in the industry. Being among the pioneers of landscaping in Kenya, we

have played a role in landscape transformations across the nation. Our

commitment to construct world class gardens and outdoor spaces assures all

our clients quality service.

Custom-tailored services are offered by our well trained team, comprising of

landscape architects, project managing specialists , supervisors, and skilled

artisans, to suit the varying requirement from private clients, housing schemes to

hotels and industrial companies, with optimum outcomes.

Greenersol’s team commitment to provide cutting edge design and expert

installation of quality gardens assures clients exceptional satisfaction.

About

About us

Page 4: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |4

GREENERSOL

DESIGN Conceptual Design

Detailed Design

Bill of Quantities

Estimates

Master planning gated communities, corporate institutions , schools and sports facilities

BUILD

Landscaping Indoor & Outdoor

Hard Landscaping

Irrigation systems and garden lighting

Sports Fields

Fencing & CCTV installation

Waterfalls & Specialized Stone works

Retaining Walls

Shade Structures

TRADING Grass & Ornamental plants

Pots & Plants

Water Works Products

Gardening Tools

Hard Landscaping materials irrigation System

MAINTENANCE Soft Landscaping & tree pruning/felling

Hard Landscaping

Irrigation System

Sports Fields

Water Features

OTHERS

Plant Propagation

Nursery Management

Surveying services

Services

Page 5: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |5

GREENERSOL

50+ Projects

GALLERY

Page 6: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |6 GREENERSOL

BAHATI RIDGE ESTATE, THIKA

During installation

After installation

Soft Landscape installations-town houses

SITE LOCATION:

THIKA

SITE AREA:

-55 TOWN HOUSES (200 SQM. /

UNIT)

-8 BUNGALOWS (800 SQM. /UNIT)

-9 VILLAS (1100 SQM. / UNIT)

-AVENUES AND GREEN AREAS

-WASTE WATER TREATMENT AREA

SCOPE OF WORKS:

-LANDSCAPE GRADING

-PLANTS INTSTALLATION

-MAINTENANCE

-IRRIGATION INSTALLATION

PROJECT COST:

15 MILLION

PROJECT PERIOD:

12 MONTHS

STATUS:

COMPLETE

Page 7: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |7

GREENERSOL

BAHATI RIDGE ESTATE, THIKA Soft Landscape installations-town houses

During installation

After installation

Page 8: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |8 GREENERSOL

GARDEN CITY RESI: PHASE 1 Soft Landscape installations

During installation After installation

SITE LOCATION: RUARAKA, THIKA ROAD

SITE AREA: 3,500 SQM

SCOPE OF WORKS: -LANDSCAPE DESIGN

-LAWN AND GARDEN 3,500 SQM

-CRAZY PAVING 1,050 SQM

PROJECT COST: 4.8 MILLION

PROJECT PERIOD: 2014 NOV-2015 JUNE

STATUS: COMPLETE

Scheme design

After installation

Page 9: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |9

GREENERSOL

GARDEN CITY RESI: PHASE 1 cont. Hard Landscape installations

Finished mazeras paving

Mazeras laying during construction

Wooden pool heater screen

Garden bench

SITE LOCATION: RUARAKA, THIKA ROAD

SITE AREA: 3,500 SQM

SCOPE OF WORKS: -LANDSCAPE DESIGN

-LAWN AND GARDEN 3,500 SQM

-CRAZY PAVING 1,050 SQM

PROJECT COST: 4.8 MILLION

PROJECT PERIOD: 2014 NOV-2015 JUNE

STATUS: COMPLETE

Page 10: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |10 GREENERSOL

Landscape installation

After installation

After installation

GARDEN CITY RESI: SHOW HOUSE

SITE LOCATION: RUARAKA, THIKA ROAD

SITE AREA: 450SQM

SCOPE OF WORKS: -LANDSCAPE DESIGN

-IMPLEMENTATION AND

MAINTENANCE

PROJECT COST: 0.5 MILLION

PROJECT PERIOD: 2014 NOV-2015 JUNE

STATUS: COMPLETE

Scheme design

After installation

Page 11: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |11

GREENERSOL

NDEGE GARDENS ,KAREN Landscape design and installation

After installation

During installation

After installa-

During installation

SITE LOCATION:

KAREN, NAIROBI

SITE AREA:

1/2 ACRE

SCOPE OF WORKS:

-LANDSCAPE GRADING

-PLANTING DESIGN AND INSTALLATION

-PAVING

-RETAINING WALL INSTALLATION

-MAINTENANCE

PROJECT COST:

1.5 MILLION

PROJECT PERIOD:

3 MONTH

STATUS:

COMPLETE

Page 12: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |12 GREENERSOL

NDEGE GARDENS ,KAREN Fountain design

SITE LOCATION:

KAREN, NAIROBI

SITE AREA:

1/2 ACRE

SCOPE OF WORKS:

-FOUNTAIN DESIGN AND BUILD

-MAINTENANCE

PROJECT COST:

1 MILLION

PROJECT PERIOD:

1 MONTH

STATUS:

COMPLETE

Page 13: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |13

GREENERSOL

SITE LOCATION:

KAREN, NAIROBI

SITE AREA:

1/2 ACRE

SCOPE OF WORKS:

-FOUNTAIN DESIGN AND BUILD

-MAINTENANCE

PROJECT COST:

1 MILLION

PROJECT PERIOD:

1 MONTH

STATUS:

COMPLETE

Fountain Construction

NDEGE GARDENS ,KAREN cont.

During Construction

After Construction

After Construction

Concept render

Page 14: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |14 GREENERSOL

KURAHIA HOMES , JUJA Club house lawns & Jogging track

After

Before

SITE LOCATION:

KURAHIA HOMES, JUJA

SITE AREA:

29,500 SQM

SCOPE OF WORKS:

JOGGING TRACK CON-

STRUCTION

,LAWNS AND TREEIING

PROJECT COST:

3.5 MILLION

PROJECT PERIOD:

6 MONTHS

STATUS:

COMPLETE

Page 15: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |15

GREENERSOL

KURAHIA HOMES , JUJA Gate area and avenue greening

During installation

After installation

SITE LOCATION:

KURAHIA HOMES, JUJA

SITE AREA:

250 SQM

SCOPE OF WORKS:

AVENUE GREENING

GATE AREA LANDSCAPING

PROJECT COST:

1.2 MILLION

PROJECT PERIOD:

2 MONTHS

STATUS:

COMPLETE Concept: Landscaping for security

Page 16: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |16 GREENERSOL

NDEGE GARDENS,KAREN Water feature construction

Before

Construction progress

SITE LOCATION:

KAREN, NDEGE ROAD

SITE AREA:

6M DIAMETER

SCOPE OF WORKS:

POND REDESIGN AND

CONSTRUCTION

PROJECT COST:

0.5 MILLION

PROJECT PERIOD:

7 WEEKS

STATUS:

After

Construction progress

Page 17: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |17

GREENERSOL

After installation

During installation

After installation

During installation

SITE LOCATION:

KIGWA , KIAMBU ROAD

SITE AREA:

3000SQM.

SCOPE OF WORKS:

-GRADING AND LANDSCAPE

PLANTING

PROJECT COST:

2.1 MILLION

PROJECT PERIOD:

2 MONTHS

STATUS:

COMPLETE

Landscape design and installation

KIGWA RIDGE, WINDSOR

Page 18: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |18 GREENERSOL

PEPONI, NAIROBI Slope stabilization construction

Construction progress

SITE LOCATION:

PEPONI

SITE AREA:

25M BY 3M

SCOPE OF WORKS:

-SLOPE STABILIZATION

(LATTICE WALL )

PROJECT COST:

0.37 MILLION

PROJECT PERIOD:

2 WEEKS

STATUS:

COMPLETE

Construction preparation

Completed works

Page 19: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |19

GREENERSOL

CHALBI TOWN HOUSES, LAVINGTON Soft landscape installation

SITE LOCATION:

CHALBI RD, LAVINGTON

SITE AREA:

400SQM

6 semi-detached town houses

SCOPE OF WORKS:

-LANDSCAPE DESIGN

-GRADING

-PLANTING IMPLEMENTATION

PROJECT COST:

0.5 MILLION

PROJECT PERIOD:

7 WEEKS

STATUS:

COMPLETE

Page 20: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |20 GREENERSOL

SAVUTI HOMES, KITISURU Grading design & Landscape installation

SITE LOCATION: KITUSURU, NAIROBI SITE AREA: 15 UNITS (600SQM PER UNIT) SCOPE OF WORKS: -GRADING DESIGN AND LANDSCAPING PROJECT COST: 1.96 MILLION PROJECT PERIOD: 13 MONTHS STATUS: ONGOING

CHALLENGE

NEED FOR BUILDING PADS ON A 37% SLOPE

SOLUTION

SLOPE CUT BACK TO ALLOW FOR PARKING ON TOP

OF DSQ ROOF SLAB (SAME LEVEL AS ROAD) ,

1.5M SPLIT INTRODUCED IN THE HOUSE BETWEEN

LOBBY AND LIVING ROOM

BASEMENT INTRODUCED TO MITIGATE HEIGHT

USABLE 30M X 12M GARDEN CREATED AT BACK-

YARD (4.5M FROM ROAD LEVEL)

Page 21: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |21

GREENERSOL

SGR-Standard Gauge Railway Slope stabilization, drainage works and Planting

SITE LOCATION:

MTITO ANDEI SECTION

SITE AREA:

40KM STRETCH

SCOPE OF WORKS:

-SLOPE STABILIZATION

-DRAINAGE INSTALLATION

-SLOPE PLANTING

PROJECT PERIOD:

-

STATUS:

ONGOING

Finished Drainage treatment

Pedestral/motorist underpasses embankment treatment

Herring bone Slope stabilization before planting

Herring bone stabilized slope after planting

Page 22: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |22 GREENERSOL

HELICONIA WATER GARDENS, KABETE Cont. Landscape design and installation

SITE LOCATION:

LOWER KABETE

SITE AREA:

-13 HOMES ON 5 ACRES BLOCK

SCOPE OF WORKS:

-LANDSCAPE GRADING

-PLANTS INSTALLATION

-MAINTENANCE

PROJECT COST:

7 MILLION

PROJECT PERIOD:

15 MONTHS

STATUS:

IN PROGRESS

Page 23: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |23

GREENERSOL

HELICONIA WATER GARDENS, KABETE

SITE LOCATION:

LOWER KABETE

SITE AREA:

-13 HOMES ON 5 ACRES BLOCK

SCOPE OF WORKS:

-LANDSCAPE GRADING

-PLANTS INSTALLATION

-MAINTENANCE

PROJECT COST:

7 MILLION

PROJECT PERIOD:

15 MONTHS

STATUS:

IN PROGRESS

Landscape design and installation

GRADING MASTER PLAN

Page 24: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |24 GREENERSOL

OSOTUA VILLAS, NAIVASHA Landscape installation

SITE LOCATION: NAIVASHA SITE AREA: -25 VILLAS 300SQM EACH -1 STUDIO HOUSE COMPLEX SCOPE OF WORKS: -LANDSCAPE GRADING -PLANTS INSTALLATION -MAINTENANCE PROJECT COST: 10 MILLION PROJECT PERIOD: ONGOING

Page 25: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |25

GREENERSOL

Planting beds Concept

During installation

After installation

SITE LOCATION:

Ngong town

SITE AREA:

SHOPPING MALL PARKING LANDSCAPE

WORKS

SCOPE OF WORKS:

-GRADING,

PLANTING DESIGN AND

INTSTALLATION

PROJECT COST:

2 MILLION

PROJECT PERIOD:

4 MONTHS

STATUS:

COMPLETE

MILELE MALL, NGONG’ Landscape design and installation

Page 26: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |26 GREENERSOL

SITE LOCATION:

ELDORET

SITE AREA:

PARK, GATED COMMUNITY

HOMES AND AVENUES.

SCOPE OF WORKS:

-LANDSCAPE DESIGN

-GRADING

-SLOPE STABILIZATION

-PLANTS INSTALLATION

-MAINTENANCE

PROJECT COST:

28 MILLION

PROJECT PERIOD:

12 MONTHS-EST

STATUS:

ONGOING

GREENPOINT PARK , ELDORET Park landscaping

Page 27: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |27

GREENERSOL

SITE LOCATION:

ELDORET

SITE AREA:

PARK, GATED COMMUNITY

HOMES AND AVENUES.

SCOPE OF WORKS:

-LANDSCAPE DESIGN

-GRADING

-SLOPE STABILIZATION

-PLANTS INSTALLATION

-MAINTENANCE

PROJECT COST:

28 MILLION

PROJECT PERIOD:

12 MONTHS-EST

STATUS:

ONGOING

GREENPOINT GATED COMMUNITY,ELDORET Gated community landscaping

Page 28: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |28 GREENERSOL

SAMPLE CONCEPT DESIGNS

Pergolla concept

Mr. Musau Landscape Master plan

Runda concept Landscape design

Easy blocks retaining wall Driveway greening concept

Page 29: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |29

GREENERSOL

OTHER PROJECTS

During installation After

Garden estate

+ MANY MORE!! Log on to www.greenersollandscape.com for updated works

Gazebo design-Karen

Page 30: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |30 GREENERSOL

MAJOR PROJECTS CONTACT PERIOD STATUS

1 Bahati Ridge Gated Community, along Thika-Muranga road, THIKA

-Designed and implemented Landscaping of townhouses, access road and gate area

Pinnacle

Kate-P.J. Manager

Jan 2014-June 2015 Complete

2 Garden City Residential Phase 1 Ruaraka, NAIROBI.

–Designed and implemented apartments’ outdoor spaces Landscaping

MML

R.Gichoi- P.J. Manager

Dec 2014-May 2015 Complete

3 Savuti Estate Housing Scheme, KITUSURU

-Designed and implemented Landscaping of 14 townhouses, club house and grading works design

Blueline Properties

2014-present Ongoing

4 Kurahia homes, JUJA

-Designed and implemented Landscaping of club house park and jogging track construction 7acres

Kurahia homes 2014 Jan-June 2015 Complete

5 Osotua villas, NAIVASHA

-Designed and implemented Landscaping of 22 town houses & 1 apart-ments complex (with interior plant-scaping for studio house)

Tamarind and Pinnacle 2014-15 Ongoing

6 Namanisho Park ,Matasia, NG’ONG

-Design and implementing Landscaping of 26 townhouses

Epco builders Jan 2015–June 2015 Complete

7 Heliconia gardens, LOWER KABETE

-Design and implementing Landscaping of 13 townhouses & grading works design

Pinnacle

Moses-P.J. Manager

2014-present Ongoing

8 Town houses –Kibuwa enterprises, Chalbi rd. LAVINGTON

-Designed and implemented Landscaping of backyards and gate front

Kibuwa Enterprises

R. Kibuchi-P.J. Manager

2014 Oct -May 2015 Complete

9 KTN Standard Group Green Park, Mombasa Rd, NAIROBI

-Designed and implemented Landscaping of common green areas

Standard Group 2013 Complete

10 Milele Mall, NG’ONG

-Landscape implementation

Epco Builders Feb 2015-June2015 In progress

11 Greenpoint park and residential units, opp. Kenmosa ,ELDORET

-Design and implement Landscaping (Eldoret) 400 units on 900 acres

Elso Ltd. Implementation starts in 2015

Pending start

Projects list

Page 31: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |31

GREENERSOL

MAJOR PROJECTS CONTACT PERIOD STATUS 12 SCSS Temple and residential flats , along Southern Bypass, LANG’ATA

-Implementing Landscaping works

Mr. Parbat April 2015-present Ongoing

13 Gated community at Tigoni, LIMURU

-Designed and implemented Landscaping of 23 country homes

Mr. Koinange 2012 Complete

14 Savannah Cement Factory, Mombasa Rd

-Designed and implemented Landscaping of common green areas

Savanna Cement 2012 Complete

15 Braeburn School, NAIROBI

-Football pitch re-turfing project

Braeburn 2012 Complete

16 Bahati Ridge Gated Community, along Thika-Murang’a road, THIKA

-Designed and implemented irrigation system works

Pinnacle

Kate-P.J. Manager

May 2015– Aug 2015

Complete

17 KMA Real Estate Scheme, MTWAPA

-Design and implement Landscaping of gated community apartments

Epco builders July 2015– present Ongoing

18 Park Eco-design for Mr. Wasswa –Kampala, UGANDA

-Designed for Landscaping of eco-design park, 70 acres

Mr. Wasswa 2012 Complete

19 Kencom Sacco homes, Kiambu Rd

-Landscaping of Public green areas ,spine roads and arteries

Pinnacle

Mr. Kamau-P.J. Manager

June 2015– pre-sent

Ongoing

20 Apartments at Gakawa/Kahura Block 1, NANYUKI

-Design and implementing of landscaping works

Graceland developers Aug 2015-present Ongoing

21 Gulf power plant, ATHIRIVER

-Design of treeing and grassing concept for industrial plant on 3 acres

Wartsila Ltd. June 2015 Complete

22 Standard Gauge Railway (SGR),Mtito Andei Station

-Slope stabilization, drainage installation and landscaping-40km section

China Rd and Bridge - Ongoing

Projects list cont.

Page 32: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |32 GREENERSOL

MINOR PROJECTS CONTACT PERIOD STATUS 23 Gitau’s residential home, Muthithi Rd ,KIAMBU

-Designed and implemented Landscaping of residence

Mr. Gitau Feb 2015 – July 2015 Complete

24 Kiplagats’s residential home ,Gigiri

-Designed and implemented Landscaping of residence

Kiplagat Nov 2014-June 2015 Complete

25 Kabage’s residential home ,KAREN

-Designed and implemented Landscaping of residence, fountain construc-

tion and currently maintaining

Mr. Karanja Kabage Jan 2014– Nov 2014 Complete

26 Hon. Wathika’s residential home, Kigwa ridge

-Designed and implemented Landscaping of residence

Hon. Dick Wathika May 2013-Nov 2013 Complete

27 Satchu’s residential home, WINDSOR

-Designed and implemented Landscaping of residence

Ali Khan Satchu Nov 2013–June 2014 Complete

28 Nabila’s residential home, NYARI

-Designed and implemented Landscaping of residence

Mr. Nabila Sept 2014-Jan2015 Complete

29 Carolan residential home, TIGONI

-Design and implementing Landscaping of residence, grading and slope

stabilization works

Mrs. Carolan June 2014-Oct 2014 Complete

30 Mr. Murathe residential home, Kirwara, MURANGA

-Design and implementing Landscaping of residence

Mr. Murathe July 2015– present Ongoing

31 Mr. Ngunjiri residential home, Garden Estate, NAIROBI

-Design and implementing Landscaping of residence

Mr. Ngunjiri Dec 2014–Feb 2015 Complete

32 Mark Ross residential home , KAREN

-Designed and implemented Landscaping of residence

Mark Ross Feb 2014-June 2014 Complete

Projects list cont.

Page 33: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |33

GREENERSOL

MINOR PROJECTS CONTACT PERIOD STATUS 34 Mr. Kigwe, Nairobi

-Security hedging landscaping and driveway shouldering

Mr. Kigwe 2014 Complete

35 Warokera residence, RUNDA

-Lawn Irrigation system installation on 1/2 acre

Mrs. Warokera May 2015 Complete

36 Mr. Batt residence, Mazeras Rd, LAVINGTON

-Lawn overhaul and tree pruning on 1/2 acre

Mr. Batt Aug 2015 Complete

37 Mr. R. Gichoi residence, Edenville estate , Kiambu road

-Garden maintenance

Mr. R. Gichoi June 2015-present Ongoing

38 Muhugu Real Estate Scheme, KAREN

-Designed and implemented Landscaping of 2 townhouses

Pinnacle Ltd 2013 Complete

39 Mr. Musau residence, MACHAKOS

-Design of Landscape for residence on 4 acres

Mr. Musau June 2015 Complete

40 Mr. Ntutu residential home, NAROK

-Design and implementing Landscaping of residence on 2 acres

Mr. Ntutu June 2015 Complete

41 Mr. Sirma residential home, KAREN

-Design and implementing Landscaping of residence on 1/2 acre

Mr. Sirma May 2015– present Ongoing

42 Kemei Residence, SAMOEI

--Design of Landscape for residence on 2 acres

Mrs. Kemei July 2015 Complete

43 Hon. Khabogo residence, WINDSOR

-Design of Landscaping of residence

Hon. Khabogo Aug 2013 Complete

44 Heri Square, RUAKA

-Design and landscape installation

Mr. Muigai Aug 2013-Dec 2013 Complete

Projects list cont.

Page 34: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |34

GREENERSOL

DESIGN

TEAM

Mike Njau Kimutai Mengich

PROJECT MANAGER DESIGN MANAGER DIRECTORS

Accountant

Macheru Wagura

Driver Edward Waweru

Sales

Representatives

LANDSCAPE ARCHITECTS

Aloyse Maigo

Nicholas Kemoi

Deborah Chelang’at

Interns

SITE SUPERVISORS Fred Aluvusia

Simon Chege

Edward Mengich

Watson Kinywa

Benson Ojiambo

Julius Mwambingu

Morris Odhiambo

Casuals

TECHNICIANS

Gardeners

Masons

Electricians

Plumbers

ADMINISTRATOR Francisca Wambui

Organization

Page 35: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |35

GREENERSOL

Kimutai Mengich

Is an accomplished Landscape Architect graduate from JKUAT with top honors in Bsc. Landscape architecture (2008-2012). Currently

pursuing his masters degree in Msc. Construction Eng. & Management. He’s had a wealth of experience over the last four years when

he started off as an apprentice in his first assignment in 2010 during his third year of study. Kimutai leads the design team and project

oversight.

Mike Njau

Is an accomplished golf courses superintendent having worked actively for two International 18-hole golf courses. He has a decade

long wealth of experience in landscape build and maintenance. Njau leads the field team in site implementation for all our projects.

He’s also part of the design team.

Fred Aluvisia

Is a former estate manager at Windsor’s gated residential estate( Kigwa ridge), Aluvisia has a wealth of over 12years experience in im-

plementation and maintenance of landscapes. He leads implementation of projects and manages the company plants nursery.

Aloyse Maigo

He is a Landscape Architect graduate from JKUAT with top honors in Bsc. Landscape Architecture (2008-2012). He has built 4 years

field experience in both design and site implementation in various landscape firms and varying scale of works. He forms part of the

design team and also on site implementation management.

Team roles

Site analysis, Concepts and themes formulation, Design, Drafting, Rendering, 3D impressions, Design implementation, Site manage-

ment

The team

Page 36: GREENERSOL LANDSCAPE LIMITED · ments complex (with interior plant-scaping for studio house) 2014-15 Ongoing 6 Namanisho Park ,Matasia, NG’ONG-Design and implementing Landscaping

Company profile |36

GREENERSOL

Contact us

...love green, love life...

© Greenersol Landscape Limited 2015

‘the greener solution’ Greenersol Landscape Limited

Office line: 0722-898135

Mobile: 0721 849 254 or 0722 863 970

[email protected]

[email protected]

www.greenersollandsape.com

P.O. Box 37234 - 00100

Nairobi, Kenya.

Located at Evergreen Center, Kiambu Rd. Rm 15