land scaping

Embed Size (px)

Citation preview

  • 8/21/2019 land scaping

    1/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.

    1.11.1.11.1.21.1.31.1.41.1.5

    1.21.2.11.2.21.2.3

    1.31.3.11.3.21.3.3

    1.3.41.3.51.3.61.3.71.3.81.3.91.3.101.3.111.3.121.3.131.3.141.3.15

    1.3.161.3.171.3.181.3.191.3.201.3.211.3.221.3.231.3.24

    1.41.4.1

    1.4.21.4.31.4.41.4.5

    1.51.5.11.5.21.5.31.5.41.5.51.5.61.5.71.5.81.5.9

    010 Se

    QCS 2010

    LANDSC

    GENERAScope .....ReferencQuality ASubmittalJob Cond

    SHIPPINShippingStorage ...Handling .

    PRODUCGeneral ...Plants......Labels .....

    WorkmanSoil PrepSubsoil PSpreadinSoil SpeciAlternativSoil AdditiSoil AdditiAlternativCompostContractoThe Supe

    ChemicalPlantingPlantingDry PlantTurf FertilMulch ......Guys andEdging MIrrigation

    SITE PRGeneral

    Sub-SurfaFinishedPlantingProtection

    PLANTINPlant PitsBackfill MInstallatioInstallatioCultivatioSeeding ..SpriggingTurfing ....Plant List,

    ction 28

    PE PLAN

    REQUIR.................s ..............surance ...................

    itions .........

    , DELIVEnd Deliver..................................

    S ...............................................................

    hip / Qualiration .......eparation .and Prepfication .....Soil Specves Procve - ProceSoil Additpecificati

    rs Responrvising Offi

    Testing foroil Mixtureoil MixtureFertiliser ...iser ............................Stakes .....terial ........ater ........

    PARATIOequiremen

    ce Gradingrading .....perationsof Existing

    ................................ixture ........for Treesof Palmsof Turf Ar

    .................

    .................

    .................Spacing a

    Part

    ING ..........

    MENTS .............................................................................................

    Y, STORy ....................................................

    ..................

    ..................

    ..................

    ..................

    fications ........................................ration of T..................ification .....edure A .....ure B ........

    ive Specifins .............ibilities .....ers Resp

    Fertiliser E..................(Sweet Soi............................................................................................................

    FOR PLAts ..............

    ...................................nd LayoutVegetatio

    ..................

    ..................

    ..................and Shrub..................as ............

    ..................

    ..................

    ..................d Sizes ....

    1 L

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    GE AND H...................................................

    .................

    .................

    .................

    .................

    ..................................

    .................psoil ........

    .................

    .................

    .................

    .................ations .........................................nsibilities .

    quivalence.................l) ....................................................................................................................

    NTING AR.................

    ..................................

    .................................

    .................

    .................

    .......................................................................................................................................

    ndscape

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ANDLING .......................................................

    ..................

    ..................

    ..................

    ..................

    ....................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    of the Co................................................................................................................................................

    EAS ............................

    ....................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    Planting

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ....................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    post ..........................................................................................................................................................

    ..................

    ..................

    ....................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    ..................................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    ..................................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    age 1

    ........... 3

    ........... 3

    ........... 3

    ........... 3

    ........... 5

    ........... 5

    ........... 6

    ........... 6

    ........... 6

    ........... 7

    ........... 8

    ........... 8

    ........... 8

    ........... 8

    ........... 9

    ........... 9......... 10

    ......... 10

    ......... 10

    ......... 11

    ......... 12

    ......... 13

    ......... 14

    ......... 15

    ......... 16

    ......... 18

    ......... 19

    ......... 19

    ......... 20

    ......... 20

    ......... 20

    ......... 20

    ......... 20

    ......... 20

    ......... 21

    ......... 21

    ......... 21

    ......... 21

    ......... 21......... 22

    ......... 22

    ......... 22

    ......... 22

    ......... 22

    ......... 23

    ......... 24

    ......... 24

    ......... 24

    ......... 25

    ......... 25

    ......... 25

    ......... 25

  • 8/21/2019 land scaping

    2/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.61.6.11.6.21.6.31.6.41.6.51.6.61.6.7

    1.71.7.11.7.21.7.31.7.41.7.5

    1.81.8.1

    1.8.21.8.31.8.41.8.51.8.61.8.71.8.81.8.91.8.10

    1.91.9.11.9.21.9.31.9.41.9.51.9.61.9.7

    1.101.10.1

    1.111.11.11.11.2

    1.11.31.11.41.11.5

    1.121.12.11.12.21.12.3

    1.13

    1.14

    010 Se

    QCS 2010

    ANCILLAEdging PlMulch ......WateringPruning ...Anti-DesiClean upMaintena

    EXISTINCare of EIdentificatFertilizingFertilizingPruning a

    PLANTINGeneral ...

    NomenclaGuarantieAccessoriTransplanPlantingWater CoPercolatioInstallatioInstallatio

    GRASS ...MaterialsWorkmanSoil PrepDelivery ...Seeding ..PreparatiWatering,

    APPLICAGeneral

    WARRANPlant EstPlant Mai

    ReplacemLawn MaiFinal Acc

    MAINTENGeneral ...AppearanGrass Ma

    APPENDI

    APPENDI

    ction 28

    IES TO Pant Beds ....................of Plants ....................cant Appliand Site Rce during

    LANDSCisting Lan

    ion of ExistExisting TrExisting Snd Cavity

    MATERI.................

    ture ..........s Plantines .............ting Plantsime...........sumption .

    n Test .......for Treesof Palms

    .................and Produhip ...........ration .........................................n and InstCutting, a

    ION OF Pequiremen

    TEE, MAIblishmenttenance d

    ent Plantstenance dptance .....

    ANCE .......................ce of the Gintenance .

    X A Land

    X B Land

    Part

    ANTING ..........................................................................ation .........storation ...lanting O

    PING .......scaping ....

    ing Plants ..ees ...........rubs andork ...........

    LS .............................

    ..................Material ..

    ..................

    ..................

    ..................

    ..................

    ..................and Shrub..................

    ..................ts ......................................................................................llation of Cd Completi

    ESTICIDE .ts ..............

    TENANCEnd Warraring the E

    during theuring Plant..................

    ..................

    ..................round ..........................

    scaping D

    scaping D

    1 L

    .................

    .................

    .................

    .................

    .................

    .................

    .................erations ...

    .................

    .................

    .................

    .................roundcov

    .................

    .................

    .................

    ..................................

    .................

    .................

    .................

    .................

    ..................................................

    .................

    .................

    .................

    .................

    .................

    .................arpet Grason .............

    .................

    .................

    AND HANty Period ..tablishme

    stablishmEstablish.................

    .................

    .................

    .................

    .................

    tails 1 .......

    tails 2 .......

    ndscape

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................r Beds ........................

    ..................

    ..................

    ....................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................s .................................

    ..................

    ..................

    DOVER ......................t Period ....

    nt Period .ent Period..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    Planting

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ....................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ....................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    ..................................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    ..................................

    .................

    .................

    .................

    .................

    .................

    .................

    .................

    age 2

    ......... 35

    ......... 35

    ......... 35

    ......... 36

    ......... 36

    ......... 36

    ......... 36

    ......... 36

    ......... 37

    ......... 37

    ......... 37

    ......... 37

    ......... 37

    ......... 37

    ......... 37

    ......... 37

    ......... 38......... 38

    ......... 39

    ......... 40

    ......... 40

    ......... 40

    ......... 41

    ......... 41

    ......... 42

    ......... 42

    ......... 42

    ......... 43

    ......... 43

    ......... 43

    ......... 43

    ......... 44

    ......... 44

    ......... 45

    ......... 45

    ......... 45

    ......... 45

    ......... 45

    ......... 46......... 46

    ......... 46

    ......... 46

    ......... 46

    ......... 48

    ......... 50

    ......... 55

    ......... 57

  • 8/21/2019 land scaping

    3/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.

    1.1

    1.1.11

    2

    3

    4

    1.1.2

    1

    010 Se

    QCS 2010

    LANDS

    GENER

    ScopeWork covenecessary

    Landscapeof soil, layplantings,warranty,operationsDocument

    The detailContractor

    Related SSection 6

    Section 12

    Reference

    The followi

    ASTM C51

    ASTM C54

    ASTM C13

    ASTM D42

    ASTM D26

    ASTM D29

    ASTM D29

    ASTM D29

    AS 3743 --AS 4419 --

    BS 1377 --

    BS 3998 --

    BS 4043 --

    BS 3882 --

    BS 3936 --

    BS 4428 --

    ction 28

    CAPE P

    L REQUI

    red under tto perform a

    planting isut of plantshrub plantippliances ain a worktion.

    pertainingshall execut

    ctions are aRoad w

    Earthwo

    s

    ng standard

    6 -------------

    9 -------------

    6 -----------

    2 -----------

    07 -----------

    74 -----------

    76 -----------

    77 -----------

    ------------------------------

    ---------------

    ---------------

    ---------------

    ---------------

    ---------------

    ---------------

    Part

    LANTIN

    EMENT

    is sectionll operations

    inclusive buand areas, tng, tree plad servicesanship lik

    to this scope his work a

    follows:rks

    ks Related t

    are referre

    pecification

    pecification

    tandard M

    ggregates

    tandard Me

    tandard Croducts

    tandard Meat Materia

    tandard Me

    tandard Me

    otting mixeoils for lanustralia

    ethod of te

    ree Work

    ransplantin

    opsoil

    ursery Stoc

    eneral Lan

    1 L

    onsists ofrequired fo

    t not limitedurfing, seednting, landsnecessary f manner,

    e of work as per the de

    o Buildings

    d to in this P

    for Vermicu

    for Perlite L

    thods of Si

    thods of Pa

    lassification

    thod of Tels

    thod of Test

    thod of Test

    . Standarddscaping a

    t of soils fo

    Trees

    k and Shru

    scape Ope

    ndscape

    urnishing alllandscapin

    to finisheding and spriape edges,r and incideaccording t

    re herein Aails in Appe

    art:

    lite Loose Fi

    oose Fill Ins

    ve and Scr

    ticle Size A

    of Peat,

    t for Moist

    for pH of P

    for Particle

    Australia, Sd garden u

    civil engine

    s

    ration

    Planting

    labour, eqherein spe

    rading, supging of ne maintenanntal to com the provi

    pendix A andix A and

    ll Thermal In

    ulation

    en Analysi

    alysis of soi

    Mosses, H

    re, Ash, a

    at Materials

    Size Range

    ydney Austrse. Standar

    ering purpo

    ipment andcified.

    plying andlawns, gro

    ce period, lleting all thions of th

    nd Appendippendix B.

    sulation

    of Fine an

    l

    umus, and

    d Organic

    of Peat Mat

    aliads Australia

    es

    age 3

    material

    preadingnd coverndscapeplantingProject

    B. The

    d Coarse

    Related

    Matter of

    rials

    , Sydney

  • 8/21/2019 land scaping

    4/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    010 Se

    QCS 2010

    BS 5236 --

    ANSI Z60-

    Official Me

    The AustrGovernme

    Standard

    Grade anAgriculture

    EnvironmeSewage Sl

    EnvironmeProtection

    KirchhoffWater Quaof Texas,

    RaymentChemical

    RHS Com

    RHS Ency

    The RoyalSociety, U

    Post, Geor

    Sunset We

    Wyman, DYork, U.S.

    Tropica Co

    ction 28

    ---------------

    1 -------------

    hod of Anal

    lian Dangert of Australi

    lant Names

    Standard, Florida, U

    ntal Regulatudge, Unite

    ntal GuideliAgency, NS

    , Malina Jlity Improveustin

    E and Higethods. Ink

    lete Garden

    lopaedia of

    Horticultur

    ge E., Flora

    stern Garde

    onald, Wym., Colliers

    lor Encyclo

    Part

    ultivation aategory

    merican St

    sis, Associ

    ous Goodsa

    American J

    for NurseA

    ions and TeStates Env

    nes, Use, Australia

    nd Barrett (ents. CRW

    inson FR (1ata Press, N

    ers Manual,

    Plants and

    l Society A

    of Syria, Pal

    n Book, Lat

    ans Gardeacmillan Pu

    edia of Exot

    1 L

    nd Planting

    ndard for N

    tion of Anal

    ode (ADG)

    oint Commit

    y Trees

    chnology,ironment Pr

    and Dispo

    2003) CharR On-line R

    992) Austrorth Ryde S

    , Royal Horti

    lower, Roy

    -Z Encyclo

    estine and

    st Edition.

    ing Encyclblishers, Lo

    ic Plants an

    ndscape

    of Trees in

    ursery Stoc

    tical Comm

    , Departme

    tee on Horti

    Part II: P

    ontrol of Ptection Age

    al of Bio

    acteristics oeport, Centr

    lian Laboratydney Austr

    cultural Soci

    l Horticultur

    aedia of G

    inai, Americ

    pedia, Macdon, Secon

    Trees, Alfr

    Planting

    the Extra

    unities (AO

    t of Infrastr

    ultural Nom

    lms and T

    thogens anncy, Cincinn

    solids Prod

    Compost:for Water

    ory Handbolia

    ety, UK

    l Society, U

    rden Plant

    an Universit

    illan Publid Edition, 1

    d Byrd Gra

    Large Nurs

    C Internatio

    cture and

    enclature (A

    rees, Depa

    d Vector Attati, OH, US

    ucts, Envir

    oisture Hoesources,

    ok of Soil a

    K

    , Royal Ho

    y of Beirut.

    hing Comp86.

    f

    age 4

    ry Stock

    nal)

    ransport,

    JCHN)

    tment of

    raction in

    onmental

    lding andniversity

    nd Water

    rticultural

    ny, New

  • 8/21/2019 land scaping

    5/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.1.3

    1

    2

    3

    4

    1.1.4

    12

    3

    4

    5

    6

    7

    010 Se

    QCS 2010

    Quality As

    Landscapirespective

    Landscapelandscape

    All landscEngineer.provided.

    Defective

    (a) Deathe f

    (b) Not i

    Submittal

    The ContrThe Contrcertificateused in the

    The Contrand that th

    The Controf the Engi

    The Contrstart of thincluded in

    Qatar. Thnurseries,

    The Contrschedule sfor compleweekly barecommen

    A soils repurposes iprepare aanalyst shlike. The r

    case of imreport shaminimum, t

    (a) Tota

    (b) Soil

    (c) Exc

    (d) Avai

    (e) Org

    (f) Avai

    (g) Tota

    ction 28

    surance

    g, plantingstandards, u

    work muswork. Work

    pe materialManufactur

    lant materia

    , dying orirst leafing o

    n accordan

    ctor shall suctor shall sf origin formanufactur

    ctor shall se same are

    ctor is to suneer.

    ctor shall s Contract.the Works

    schedulerowers and

    ctor shall shall identifyting the tasis identifyindations addi

    ort is to bethe Works.

    physical anll also proviport shall b

    ported soil,ll identify the soil shall

    l salts (Elect

    pH

    angeable S

    lable Phosp

    nic matter

    lable Zinc,

    l Sulphates

    Part

    and soil prenless other

    t be underthall be perf

    shall be srs certifie

    l shall be co

    therwise dut, whichev

    e with the P

    bmit catalogubmit manuall chemicalers country.

    bmit certificree from ins

    bmit his met

    bmit a Planhis schedu

    and highligh

    hall be doplant materi

    bmit a weeasks to beks. The Cotasks comional to a m

    submittedThe Contra chemical

    de recomme submitted

    the report se source(s)be analyse

    ro-Conducti

    odium, Calci

    ates

    s a percent

    anganese, I

    1 L

    aration shaise directed

    aken by aormed and

    hipped withanalysis

    nsidered to

    fective upor is later

    roject Docu

    ue data andfacturers cls and pesti

    ates confirects and dis

    hod statem

    t Procuremle shall idets plants th

    umented wial sources.

    ly work schompleted o

    ntractor willleted, task

    onthly repor

    y the Contrctor shall arnalysis ofndations onto the Engi

    hall be sub from whicfor:

    ity of soil s

    um, Magne

    ge

    ron and Bor

    ndscape

    ll conform tby the Engi

    experiencupervised a

    certificatesfor standar

    e any tree,

    completion

    entation.

    literature ofrtified analycides shoul

    ing the origease.

    nt for his fe

    nt Schedultify the sout must be i

    ith the listin

    edule for apa weekly bthen modifto be compcontains all

    actor for allrange for anhe soil andsoil amendeer for app

    itted at leah imported

    lution)

    ium and Po

    on

    Planting

    the relevanneer.

    d subcontrall times b

    of inspectiod package

    hrub or pla

    of the Wor

    manufactursis of all st clearly sta

    in, size, age

    tilizer applic

    within fourrce of ever

    ported du

    g of names

    roval beforasis and the and submileted, problthe above i

    soils to beapproved inirrigation went, fertilis

    roval before

    st 10 dayssoils are t

    assium

    t requireme

    actor speciqualified p

    n as requir products

    nt which is:

    ks or six w

    ers and supndard prode that the

    of all plant

    ation for the

    teen (14) d plant specto non-ava

    and locati

    work is staanticipatedit the schedms encoun

    n details.

    used for landependentater to be ur applicatio

    soil is plac

    prior to deli be furnish

    age 5

    ts of the

    lising inrsonnel.

    d by theshall be

    eks after

    liers.cts. Theroduct is

    materials

    approval

    ys of theies to beilability in

    ns of all

    rted. Thescheduleule on aered and

    dscapingnalyst to

    sed. Theand the

    d. In the

    ery. Theed. At a

  • 8/21/2019 land scaping

    6/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    7

    8

    9

    1.1.5

    1

    2

    3

    4

    1.2

    1.2.1

    1

    010 Se

    QCS 2010

    The soilquantitiesvigorous pl

    Additionalthe Engineconsistenc

    An operatishall be fuminimum, t

    (i) irrig

    (ii) fertil

    (iii) sali

    (iv) pestproc

    (v) turf

    verti(vi) pro

    (vii) genprot

    (viii) equimai

    (ix) land

    Job Condi

    The Contrportions oflandscape

    No plantinduring inteSeptember

    When speplanting scthe plantinmaintenan

    Planting of

    SHIPPIN

    Shipping

    Prior to saccordancdelivery scAll unaccemay requereserves tthe Project

    ction 28

    nalysis shahich when

    ant growth.

    oil sampleer and analand comp

    ons and marnished forhe manual

    tion details:

    isation: inclu

    ity control: i

    icide/fungiciedures, and

    grass man

    cal mowingagation and

    ral maintenctive fencin

    pment invtenance m

    scape maint

    tions

    ctor shall pr the Site bework requir

    shall be cnse daytimeand mid-M

    ial conditiohedule shall

    will be inse and warr

    trees and s

    G, DELIV

    nd Deliver

    hipping allwith stand

    hedule in adptable plantt inspectioe right to reDocumenta

    Part

    ll also incluincorporate

    shall be tased. The retibility of su

    intenanceear round cill include t

    including w

    ding fertilise

    cluding lea

    e/herbicideschedules

    agement: i

    or thatch reseasonal re

    ance: includg and gradin

    ntory: inclnual

    enance per

    oceed withcome availd.

    rried out dheat. Planty.

    s warrant abe submittealled at nonty remain t

    rubs will oc

    RY, STO

    plants shallard practicevance so thmaterial shat the sour

    ject any plation.

    1 L

    de fertiliserwith the s

    en at the rsults will beply.

    anual is toare of instale following:

    ater applicat

    r descriptio

    hing metho

    applicatio

    cluding m

    oval, rollinplacement

    ing pruning,g

    uding mai

    onnel requi

    nd completble, workin

    ring periodand trees

    variance tod to the Enadditional che same as

    cur prior to l

    RAGE A

    be inspecs and procplant mate

    all be remoce of the plt material t

    ndscape

    s and otheil will provi

    te of one incompared

    be provideled plants t

    ion rates an

    s, applicatio

    ds and leac

    ns: includi

    wing proce

    , overseedif all flowers

    stakes and

    tenance p

    ements and

    planting opwithin sea

    of heavy rhall only b

    the plantingineer for rest and all cspecified h

    wn planting

    D HANDL

    ed, dug, adures. Therial may be ied from thnts prior toat does not

    Planting

    r amendmee the requi

    every 20 loith the origi

    by the Cobe followe

    maintena

    n rates and

    ing progra

    ng safety

    dures, aeri

    g and sprigand flowerb

    ties, replac

    rocedures

    job descripti

    erations asonal limitati

    in, sandstomoved or

    time and ciew and apnditions anrein.

    s.

    ING

    d made rEngineer snspected uSite immeelivery to tmeet the q

    nt requiremred nutrient

    ads or as dinal sample

    tractor. Inby the Ow

    ce procedu

    application

    monitoring

    applicatio

    ication, top

    gingeds

    ement and

    and manu

    ions.

    rapidly as pions for eac

    rms, heavylanted bet

    nditions, aroval. In su

    d obligation

    ady for shall be notifion arrival aiately. Thee Site. Theality requir

    age 6

    ents andlevels for

    rected byo ensure

    tructionsner. As a

    es

    chedule

    rates,

    dressing,

    clean-up,

    facturers

    ssible ash type of

    winds, oreen mid-

    proposedh cases,such as

    ipping ined of thethe Site.

    EngineerEngineerments of

  • 8/21/2019 land scaping

    7/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    2

    3

    4

    1.2.2

    1

    2

    3

    4

    5

    6

    010 Se

    QCS 2010

    The Contrdesiccatiovehicles wi

    Fertiliser,original unname, tradin bulk andfertiliser sh

    Palms shaltime of loafollowing

    (a) Wheanduse

    (b) WraPeritime

    (c) Do n

    (d) Do n

    (e) Do n

    (f) Use

    (g) A bpaltheshall

    (h) The

    (i) Thetarp

    (j) The

    Storage

    Plants shalprotected fon the dayand waterthe plantsplanting.

    Root balleballs cover

    Bare rooteagricultural

    Seed anddesignatedgerminatio

    Soil, compseparatelysoil mixing

    Fertilisers,manufactu

    ction 28

    actor shallof leaves.

    th the load

    esticides, fopened coe name, or ta certificatall be kept d

    l be shippedding until aanner:

    n the palmstighten the.

    the root bdically, the

    .

    ot damage t

    ot water the

    ot permit th

    only sharp t

    d of 150ms shall be hed of the tr

    l be placed

    entire load s

    palms shallulin and dr

    palms shall

    l be installerom exposuof arrival shd to good hdo not dry

    and contaed with appr

    d trees ansoil or peat

    fertilizers s or approvand the pu

    ost, fertilisein approveoperations

    antidessicaers unop

    Part

    protect planAll plant mroperly cov

    ngicides, ctainers bearademark. Iindicating try and prote

    by coveredrival at the

    are to be shwrapping a

    ll with a minburlap mus

    he growth b

    trunk of the

    root ball to

    ols in cuttin

    of moist ooisted by mck. They shver the root

    hall be cove

    be secureding the pal

    be unloaded

    as soon are to wind aall be storedorticultural sout. No pla

    iner grown toved soil, p

    shrubs shand kept m

    hall be keped by therity percent

    s and othe locations aommence.

    ts, pesticidned contai

    1 L

    ts to preveterial shallred in transi

    hemicals anring the mlieu of con

    he above incted from c

    truck. Suchsite. The p

    ipped, gentld tying of

    imum of twot be watere

    ud in any m

    palm.

    become dry

    g and trimm

    rganic soileans of nyloall be laid cto keep th

    red snugly

    in such as.

    using nylon

    possible afnd direct suin shadedtandards unnt shall be

    rees and plat or straw

    all be heeldium moist

    t in dry stEngineer.ges.

    amendmend in a ma

    s and otherners, each

    ndscape

    nt damagebe deliveret for protecti

    d seed shanufacturerainers, fertilormation shntamination

    transportatilms shall b

    y place therond. At le

    layers burl. Do not a

    nner.

    .

    ing.

    hall be placn or canvasarefully in am moist.

    ith two laye

    anner so a

    or canvas s

    ter delivery tnlight prior treas, protectil planted.stored on si

    ants shall bnd kept me

    d into prepuntil planted

    rage awayll seed co

    ts shall bener to avoi

    chemicals sfully labe

    Planting

    to the rootin a close

    on from dryi

    l be deliver guaranteeisers and sll accompa

    n shall nottransporte

    alm horizost two laye

    p. Saturatellow the bur

    ed on the flslings andalternating

    s of tarpauli

    s to prevent

    lings.

    o the Site.o installatioted from theare shall bte for more

    placed clodium moist

    ared trench.

    from contantainers sh

    delivered to contamina

    hall be delivlled, confo

    balls, contd vehicle ong winds.

    ed to the Sd chemicaled may be

    ny each deli

    xceed 24 hd and handl

    tal on a levrs of burlap

    with water alap to dry o

    oor of the tlaced horizfashion. Mo

    n.

    wind from

    lant materia. Plants notwind and mtaken to enthan 3 day

    se togetherntil planted.

    es and cov

    minants inall show cl

    the Site ation and we

    ered to theming to

    age 7

    ainers orin open

    ite in theanalysis,furnishedery. The

    urs fromed in the

    l surfacemust be

    nd cover.ut at any

    uck. Thentally on

    ist burlap

    lifting the

    l shall beinstalled

    aintainedsure that

    prior to

    with root

    red with

    areas asarly the

    d storedtting until

    ite in thepplicable

  • 8/21/2019 land scaping

    8/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.2.3

    1.

    2.

    1.3

    1.3.1

    1

    2

    3

    1.3.2

    1

    2

    3

    4

    5

    6

    7

    8

    9

    010 Se

    QCS 2010

    regulationsby the Con

    Handling

    Care shallBalled andearth ball.handled by

    Chemicalsor work of

    PRODU

    General

    All plantsDocument

    Substitutioand the Eobtainable.

    Plants shal

    Plants

    Only nurse

    Plants to b

    be sound,eggs, and

    Deciduousindicated,

    Symmetricfree from o

    Groundcovspecified.

    Trees shall

    Shrubs, vi

    containersPalms shaeaten by pplanted. Pof an adultgrown pal

    The diggin

    (a) Refron

    (b) Trimgro

    (c) Satu

    ction 28

    and bearintractor on-si

    be taken toburlapped

    Containerthe trunk or

    shall be stony kind sh

    TS

    nd turf mation and be

    s shall onlngineer aut

    l be supplie

    ry grown pl

    e used in th

    igorous anave a norm

    and evergrnd display

    ally developbjectionable

    er and vine

    be earth ba

    es and gro

    or formed hll have straiests or withlms shouldpalm and ps are avail

    and lifting

    ove all sucs

    remaining fing tip. Wra

    rate the enti

    Part

    the tradee shall rem

    void injuryplants shallrown plantsstem.

    red in a mall be permitt

    erial will cotrue to the b

    be madeorises a ch

    from localit

    nts shall be

    e Works sh

    free from dal healthy a

    en trees sho weak crot

    d trees anddisfigureme

    shall be pr

    lled and burl

    und cover p

    mogenousght parallelroot systemhave vigorooper hardinble. Off sho

    f palms sh

    ers, all flo

    ronds to 65in burlap cl

    re root ball

    1 L

    ame and win his respo

    o the plantsbe handle shall be h

    nner to avoied within sto

    nform to thotanical na

    hen a plantange order

    ies similar t

    provided ex

    ll be well br

    isease, sund non-brok

    ll be a singlches.

    shrubs shant.

    ovided with

    lapped cove

    lants shall

    soil sectionssides and

    extendingus root systss. Palms sts are not a

    ll take plac

    ering and

    % of originloth and sec

    ith water pr

    ndscape

    arranty of thnsibility.

    . Material s carefully tndled by t

    d cross contrage area.

    varieties se as listed i

    (or alternatiproviding f

    the climati

    ept for pal

    anched and

    cald, windbn root syste

    le trunk with

    ll be provid

    he number

    red or pot gr

    e provided

    .ealthy stemabove the lm, a crown

    hall be ballecceptable.

    in accordan

    ruiting parts

    l length, lifturely tie in p

    ior to excav

    Planting

    e producer.

    all not be d avoid crace container

    amination.

    pecified orn publicatio

    e as specifr use of th

    conditions

    species.

    formed plan

    urn, abrasiom.

    a single lea

    d with unifo

    and length

    own.

    in well esta

    s that are nvel which thof new leav

    d and burla

    ce with the

    and appro

    ronds to enlace

    tion

    All product

    ropped fromking or bre. Plants sh

    o measurin

    shown in ths.

    ied) is not oe nearest e

    f the Projec

    ting stock.

    ns, harmful i

    der, unless

    rm habit an

    f runners fo

    blished in r

    ot rotted, ine palm wases, leaves tped unless

    ollowing pro

    imately 30

    close and p

    age 8

    if stored

    vehicles.king thell not be

    g, mixing

    e Project

    btainablequivalent

    t.

    hey shall

    nsects or

    therwise

    shall be

    r the size

    movable

    fected ororiginallyhe colourcontainer

    cedure:

    % of the

    otect the

  • 8/21/2019 land scaping

    9/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    10

    11

    12

    13

    14

    1.3.3

    1

    1.3.4

    1

    010 Se

    QCS 2010

    (d) Digcutti

    (e) Undhear

    (f) Wra

    maxiThe minimconform tothan specif

    Containerhold theContainers

    A plant sch

    (a) Bota

    (b) Co

    (c) Qua

    (d) Size

    (e) Con

    (f) Addi

    Plants whioutside coare not roon plantdrawings.

    It is the C

    The EnginContractor

    Labels

    Each plantshall be lecorrect plaand not re

    Workman

    The Contrstandard panalysis is

    (a) Soil

    (b) Peat

    (c) Ferti

    (d) Org

    (e) Soil

    (f) Pest

    (g) Gra

    ction 28

    ith hand tg roots no

    r cut rootst

    root ball

    imum soil mm accepta

    the measuied may be

    grown treesarth intactshall be suf

    edule is to

    nical Name

    mon Name

    ntity

    ition

    tional Pertin

    h are providitions aret bound. Graterials sc

    ntractors r

    eer can rejresponsibil

    , or group oibly tagged

    nt name anoved.

    hip / Qualif

    ctor shall sroducts, theto be provid

    Mix

    lizer

    nic Manure

    Conditioner

    icides

    el Mulch

    Part

    ols a verticloser than 2

    and careful

    with burlap

    isture.le sizes ofements spesed with th

    , shrubs, grwhen remoficiently rigid

    e provided l

    ent Data

    ed in potsacceptableound coveredule, suffi

    sponsibility

    ct any planity.

    f plants orwith a dura

    d reference

    ications

    ubmit samp manufactued by recog

    1 L

    al sided tre50 mm from

    ly lift tree,

    and secure

    ll plants mecified in the

    approval o

    undcoverved from tto hold ball

    isting the de

    or other conrovided theplants shallicient to co

    for potting

    t that is ro

    ontainer ofble, waterprnumber if

    les of mateers analysiized labora

    ndscape

    ch to a mithe stem

    voiding an

    with wire

    asured befoProject Dothe Engine

    nd vines she containeshape and

    signated pla

    tainers andare equal i

    be of the ser fully th

    n plants as

    t bound. A

    the same soof and wepplicable. L

    rials for apps will be acories.

    Planting

    imum dept

    shock whi

    mesh to co

    e pruning inumentation.r, at no ext

    all have sufrs, but shalrotect root

    nts and follo

    which haven quality toecies, sizes designated

    required to

    ll costs of

    ecies, varither resistaabels shall

    roval as peeptable. F

    of 750 m

    ch may da

    ntain soil a

    normal posPlants larga cost.

    ficient rootll not be r

    ass during

    wing inform

    been acclifield grown, and spaci area as s

    prevent roo

    otting on w

    ty, and sizet label indi

    be securely

    r the list ber all other

    age 9

    , cleanly

    age leaf

    nd retain

    ition shallr in size

    rowth tootbound.shipping.

    tion:

    atised totock andg shownhown on

    binding.

    ill be the

    of plant,ating theattached

    low. Foraterials,

  • 8/21/2019 land scaping

    10/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    2.

    3.

    1.3.5

    1

    2

    3

    4

    5

    6

    7

    1.3.6

    1.

    2.

    3.

    4.

    1.3.7

    1.

    2.

    010 Se

    QCS 2010

    (h) Woo

    (i) Prun

    (j) Gyp

    (k) Woo

    Soil sampllocation, s

    Samplingno addition

    (a) Testspe

    (b) Copi

    Soil Prepa

    Soil prepar

    Soil: soil isapproved

    Drainageforeign su

    Stone Mulforeign su

    Wood Barmm x 50 m

    Permeablewith perm

    resistant tunaffected

    Nursery: sof proven

    Subsoil Pr

    The Contrlevels and

    Break up sorder to ac

    Where theminimum d

    Root Barriand hardfoundation

    Spreading

    Topsoil Filleach layer

    Final Grad

    Drawings.

    ction 28

    d Mulch

    ning Paint

    um Paint

    d Stakes

    es will bemples will b

    nd testingal cost to th

    s shall be pified require

    es of the te

    ration

    ation materi

    composedite. Clay is f

    tone: Crustances and

    h: washestance, eve

    Mulch: com pieces wi

    Membraneability to w

    all naturallby direct su

    hall be Qatxperience.

    eparation

    ctor shall eprofiles requ

    oil for a dehieve tolera

    topsoil is toepth of 200

    r (Root conlandscapeto prevent

    and Prepa

    ing: spreadby watering

    ing: when

    Part

    aken by the tested at

    hall be theClient, by

    erformed inments.

    t results sh

    ls and prod

    of a mixturrom Govern

    hed hard devenly gra

    white stonly graded 2

    iferous woth a pH of 4.

    non-woveter of 80 litr

    y occurringlight for up

    ri based co

    cavate andired.

    th of 200 mces specifi

    be laid on rmm.

    rol system)structure sustructural da

    ation of To

    over preparlightly befor

    topsoil is r

    1 L

    e Engineercertified soi

    responsibilitn approved

    sufficient n

    ll be furnish

    ucts shall c

    of sand anent approv

    rable stoneed from 20

    e pebbles,5 to 50 mm.

    d bark, free5 as minimu

    n, 70% poles/m2/sec a

    soil aciditieto one mont

    pany speci

    Provide Ea

    m and gradd for the fini

    ck sub-stra

    is to pad thch as sidemage due t

    psoil

    d subsoil inspreading

    asonably d

    ndscape

    upon his ril lab at the

    of the Concommercial

    mber to en

    ed to the En

    nfirm to the

    d clay. Saned site.

    washed fremm minimu

    washed fre

    of diseasem.

    propylene,t 100 mm h

    and to teah.

    alizing in gr

    rth filling as

    to levels ashed level o

    a, break up

    trees pits,walks, pavroot penetr

    layers not ethe next.

    ry and wor

    Planting

    quest andontractors

    tractor andtesting labo

    sure that th

    ineer for a

    description

    is dune sa

    e of loam,to 30 mm

    of loam, s

    and pests, n

    .3 mm thicead of wate

    ring and str

    wing and c

    necessary t

    nd profilestopsoil.

    and loosen

    renches, ovments, andation as per

    xceeding 20

    able, grade

    P

    at randomexpense.

    hall be perratory.

    e materials

    proval.

    erein after.

    nd from Go

    and, clay,maximum si

    and, clay,

    ot shredded

    k, weighingr. Membran

    ess and is t

    ltivating of t

    o achieve th

    hown on dr

    the rock sur

    er the servi concretethe details

    0 mm and fi

    to levels s

    age 10

    time and

    ormed at

    meet the

    ernment

    nd othere.

    nd other

    , min. 10

    70 g/m2,is to be

    o remain

    he plants

    e subsoil

    wings in

    ace for a

    es pipesbuildingsrawings.

    rm gently

    hown on

  • 8/21/2019 land scaping

    11/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    3.

    4.

    1.3.8

    1.

    2.

    3.

    4.

    5.

    010 Se

    QCS 2010

    Finished Lmm belowlevel of adj

    Fallow Perfallow for scultivation

    Soil Speci

    The contrmoundinggrading wo

    Soil mix sh

    (a) 80%

    (b) 100

    Dune San

    weeds, stremoved s

    Dune sandbefore pla

    Dune sand

    (a) Phy

    (b) Loa

    (c) Che

    (i)

    (ii)

    (iii)

    (iv)

    (v)

    (vi)

    (vii)

    (viii)

    (ix)

    (x)

    ction 28

    vels: unleadjacent paoining buildi

    iod: whereeveral montor by applic

    fication

    ctor shalland finisherk.

    all consist o

    sand and 2

    sand for g

    : shall be

    nes or othrface crust

    shall be obtting on pur

    shall posse

    ical Charac

    N

    N

    y sand, cla

    ical Chara

    Salinity (E

    SAR (Sod

    Boron (sa

    pH:

    Free carb

    Chlorides:

    Sulphates

    Nitrates:

    Phosphor

    Exchange

    Part

    s otherwiseving or curbgs married-

    possible cas. During thtion of herbi

    e responsi grading.

    a mix of du

    % clay for

    rass in footb

    suitable for

    r foreign mand gypsofe

    ained fromose of salt

    s the follow

    eristics (Ta

    Table 1: Du

    ieve Size

    o 10 sieve

    o 35 sieve

    o 140 sieve

    o 200 sieve

    to be less

    teristics:

    CE x 1000):

    ium Absorpti

    uration extr

    nates:

    :

    us:

    able sodium

    1 L

    stated, finiss not less tin with adjoi

    rry out cultiis period, prcides if per

    le for thehe specifie

    ne sand and

    ll plants in

    all and spor

    inclusion int

    atter takenrrous accu

    n approvedashing of s

    ing physical

    le 1):

    ne Sand Gr

    %

    han 0.002

    ion Ratio):

    ct):

    :

    ndscape

    hed levels oan 150 mm

    ning soil are

    vation of toevent growtitted.

    rocurementd mix shall

    clay with th

    arks, roads

    s fields.

    o the soil m

    from a maulations.

    source. Irrignd.

    and chemic

    ding Criteri

    of Material

    100%

    85 to 10

    5 to 25

    0 to 10

    m

    less than 4

    less than 2

    less than 1.

    between 6.

    less than 0.

    less than 2

    less than 1

    less than 7

    10 15 pp( hour sh

    less than 1acetate

    Planting

    f topsoil aftbelow finisas

    soil sufficieand seedin

    , transportabe strictly c

    following p

    and open ar

    ix and free

    imum dept

    ate at maxi

    l characteri

    assing

    %

    0 ppm

    7.5

    5% air dried

    0 ppm in sa

    % in neutra

    ppm in sat

    in 1.5 amke)

    5% in neutr

    P

    r settlemented ground

    ntly early fg of weeds

    tion, mixing,ontrolled ov

    roportion:

    eas.

    from excess

    of 500 m

    um rate for

    stics.

    soil

    turation extr

    l saturation

    uration extra

    onium nitra

    al normal a

    age 11

    to be 70loor slab

    r it to liey further

    placing,er all the

    ive salts,

    having

    two days

    act

    xtract

    ct

    te extract

    monium

  • 8/21/2019 land scaping

    12/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    6.

    7.

    1.3.9

    1

    23

    4

    5

    010 Se

    QCS 2010

    (xi)

    (xii)

    Clay shall

    Clay shallroots, stonnoxious wundesirablthoroughly

    Al ternativ

    Alternativeladmixturessubstance

    The ContrMaterial shcompactio

    The soil sh

    (a) pH v

    (b) elec

    (c) free

    (d) chlo

    (e) sulp

    (f) exch(g) boro

    The soil sh

    ction 28

    Potassiu

    Magnesiu

    e obtained

    have unifores, clods leds, sticks

    insects abroken up.

    Soil Speci

    ly (to Claus of subsoilthat may be

    ctor shall fuall be storeand maint

    all comply

    alue:

    ro-conducti

    carbonates:

    ides:

    ates:

    angeable sn:

    all comply

    Si

    Part

    :

    :

    rom an app

    compositirger than 5and other

    nd plant di

    fication

    e 1.3.8) soi, foreignharmful to p

    rnish agriculin piles lesined free of

    ith the follo

    not

    ity: les

    les

    les

    les

    dium: lesles

    ith the gradi

    Table

    ve Size (m

    5.000

    2.380

    1.180

    0.600

    0.300

    0.150

    0.075

    1 L

    roved sourc

    n and struc0 mm in glitter. It shsease orga

    l shall beatter, toxiclant growth

    tural soil fros than 1 mcontaminati

    ing chemic

    less than 6.

    than 4 m

    than 0.5 %

    than 200 p

    than 200 p

    than 15 %than 1.5 p

    ng criteria in

    2: Grading

    ) % by

    ndscape

    100 400extract (

    25 100extract (

    .

    ure, a Leaneatest dimll not be innisms. Prio

    weet sandsubstance

    pon the En

    approvedtre high. Piln and cons

    l criteria:

    5 nor more t

    mhos/cm s

    air dried.

    pm in satur

    pm in satur

    in neutral nm, hot wate

    Table 2.

    riteria

    Mass Pass

    100

    65 to 100

    45 to 100

    35 to 80

    5 to 48

    0 to 15

    0 to 3

    Planting

    ppm in 1.our shake)

    ppm in 1.our shake)

    clay characnsion, pockfected with

    to mixing

    or washed, weedsineers app

    ites.es shall beruction debr

    han 8.5

    aturated ext

    ted extract.

    ted extract.

    rmal ammor soluble.

    ing

    P

    5 ammoniu

    ammoniu

    ter, and beets of coarnematodesall lumps

    marine sannd any mroval.

    protected fris.

    ract at 25oC

    ium acetat

    age 12

    nitrate

    nitrate

    free frome, sand,or othershall be

    d free ofterial or

    m undue

    .

  • 8/21/2019 land scaping

    13/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.3.10

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    010 Se

    QCS 2010

    Soil Additi

    There areprocedure

    Procedure

    Peat shall

    water site.and conditifrom sticksthan 4 andbasis. Pea

    Manure shsheep, horand a pHmaterial.health certused on th

    VermiculitC516.

    Perlite shal

    Fertilizer srelease 2analysis.

    Granular fby weight,grass usepotassium

    Plant DerivIt shall bcharacteris

    (a) Org

    (b) C:N

    (c) Parti

    (d) Hu

    (e) pH

    Dry Plant

    (a) Ferti

    (b) Pacof a

    (c) Granitro

    (d) Con10may

    Turf Fertilithe manuf

    Edging Maor other adrawings.

    Irrigation

    Engineer alife. Water

    ction 28

    ves Proc

    two applic(B).

    A Consists

    be a natur

    Peat shalloned in stor, stones, ronor more tshall be del

    all be the dses, goat, calue of 6.0anure shall

    ificate shalltop dressi

    shall be h

    ll conform to

    hall be commonth mini

    rtilizer for tr5 % nitrogeminimum 1

    and micro n

    ed Fertilizer heat treatics.

    nic content:

    ratio more t

    cle size not

    ic Acid mor

    -6.

    ertilizers sh

    liser shall b

    ets of slowalysis.

    ular fertilisegen (N), 10

    rolled releaavailablebe in packe

    er shall becturers gua

    terial shallapproveddging anch

    ater shall b

    s being suitsources sh

    Part

    dure A

    ble proced

    f the followi

    l product of

    e shreddedage piles forts, and othean 7.5. Thivered in un

    ecomposedow or chickto 7.5. Manbe heat trebe submitteg of grass a

    rticultural gr

    ASTM C54

    mercial gradmum and

    ees, shrubs,(N), 10 %1 % nitrogtrients.

    s: shall be ued, free fr

    more than

    an 20%

    bigger than

    than 10%

    ll have follo

    commercia

    release ferti

    r for trees aavailable

    e fertiliser shosphoric aor tablet fo

    commercialranteed stat

    e galvanizey the Engin

    ors shall be

    e provided

    ble for irrigll not excee

    1 L

    re, contrac

    ng compon

    sphagnum

    and granulat least 6r objectionaminimum

    damaged co

    animal mann manurere shall beated, free fd for the prrea.

    ade and fre

    .

    e and unifohall bear t

    ground covavailable phen (N), 11

    sed in all sm seeds

    0%

    2 mm for 80

    wing proper

    l grade and

    liser shall b

    nd shrubs sphosphoric

    hall consistcid (P) andm.

    grade, freeement of an

    d steel, poleer. The mas recomme

    y the Contr

    tion. Waterd the followi

    ndscape

    ors shall fo

    nts:

    peat moss/

    ated to pasonths afterle matter. Itrganic contmmercial ba

    ure of fullyith nitrogenfree of ston

    rom pathogoposed sa

    e of any toxi

    rm in comphe manufac

    ers and seaosphoric aci% availabl

    il mix as altnd nemato

    of the mix

    ies:

    uniform in c

    ear the man

    hall consistcid (P) and

    f, by perce5 % potassi

    flowing andlysis.

    ethylene, eterial shallnd by the m

    actor from a

    shall be freeg paramete

    Planting

    llow EITHE

    eat humus

    through axcavation.shall havent shall beles in air dry

    fermented, phosphories, sticks an, weeds aple. Animal

    c material a

    sition. Fertiturers guar

    onal shall cd (P) and 5

    phosphori

    rnative optides and p

    mposition.

    ufacturers

    f, by perce5 % potassi

    tage by weim (K). Con

    uniform in

    ectrostaticale to the sinufacturer.

    n off-site so

    from substrs:

    P

    R procedur

    derived fro

    12 mm mehe peat shpH value o85% on a dcondition.

    re-dried heacid andd non-biodnd other pomanure sh

    nd conform

    lizer shall banteed stat

    onsist of, p% potassiu acid (P)

    on to animalssess the

    uaranteed

    ntage by wem (K).

    ght, 5 % nitrtrol release

    omposition

    lly paintedes designat

    urce approv

    nces harmf

    age 13

    (A) OR

    a fresh

    h screenll be freef not lessry weight

    t treatedotassiumgradablellutant. All not be

    to ASTM

    of slowment of

    rcentage(K). Fornd11 %

    manure.following

    tatement

    ight, 5 %

    ogen (N),fertiliser

    and bear

    luminiumed in the

    d by the

    l to plant

  • 8/21/2019 land scaping

    14/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.3.11

    1.

    2.

    3.

    4.

    Pla

    Pal

    Tre

    ShrLar

    ShrSm

    He

    GroCoSe

    La

    010 Se

    QCS 2010

    (a) pH:

    (b) total

    Soil Additi

    There areprocedure

    Procedure

    Manure: ssheep, horand a pHmaterial.health certused on th

    Soil conditi

    (a) Soilpeat

    (b) Mat

    (i)

    (ii)

    (iii)

    (iv)

    nt Type

    s

    s

    ubse

    ubsall

    ges

    under &sonal

    n

    ction 28

    to 7

    dissolved s

    ve - Proced

    two applic(B).

    B Consists

    all be theses, goat, calue of 6.0anure shall

    ificate shalltop dressi

    oner: shall

    conditionermoss, it mu

    Ta

    rials shall N

    classifiedCommissi

    classifiedGoods (A

    classifiedTransport

    flammabl

    Soilonditioner

    NA

    NA

    NA

    NA

    NA

    6 ltr/m2

    6 ltr/m2

    Part

    lids: less th

    ure B

    ble proced

    f the followi

    ecomposedow or chickto 7.5. Manbe heat trebe submitteg of grass a

    e as detaile

    shall be adst meet the

    le 3: Soil A

    OTbe:

    as hazardoon, Australi

    as a dangG code) or

    as a dangof Dangero

    or explosiv

    Peat

    100ltr/Tree

    100ltr/Tree

    20ltr/Shrub

    20ltr/Shrub

    10 ltr/linear m

    20 ltr/m2

    20 ltr/m2

    1 L

    an 1000 pp

    re, contrac

    ng compon

    animal man manurere shall beated, free fd for the prrea.

    in the follo

    ed with thequirement

    ditives Pro

    us accordin(NOHSC)

    rous goodequivalent

    erous goods goods by

    e

    Orga

    Animal

    25 kg/Tre

    12.5 kg/Tr

    7 kg/Shru

    5 kg/Shru

    5 kg/linear

    5 kg/m2

    5 kg/m2

    ndscape

    ors shall fo

    nts:

    ure of fullyith nitrogenfree of ston

    rom pathogoposed sa

    ing paragr

    organic mbelow (Ta

    ortion for Pl

    g to Nationriteria or eq

    by the crite

    for transpRoad and R

    ic Fertilize

    or Pla

    5 Kg/T

    e 5 Kg/T

    1 Kg/S

    0.5 Kg/S

    m 0.5 kg/lin

    0.5 kg

    1 kg/

    Planting

    llow EITHE

    fermented, phosphories, sticks an, weeds aple. Animal

    phs.

    nure only,le 3).

    nts

    l Occupatiivalent

    ria of the

    ort by Austail or equiva

    InoFernt

    ree 100

    ree 50

    rub 25 g

    hrub 25

    ear m 25 g/

    m2 25

    2 50

    P

    R procedur

    re-dried heacid andd non-biodnd other pomanure sh

    as a replac

    nal Health

    ustralian D

    ralian Codlent

    ganictilizer

    MiD

    g/Tree 4

    /Tree 4

    /Shrub 3

    g/m2 3

    linear m 2

    g/m2 2

    g/m2 2

    age 14

    (A) OR

    t treatedotassiumgradablellutant. All not be

    ment for

    & Safety

    ngerous

    for the

    xingpth

    cm

    cm

    cm

    cm

    cm

    cm

    cm

  • 8/21/2019 land scaping

    15/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.3.12

    1

    2

    3

    4

    010 Se

    QCS 2010

    (v)

    (c) Coprocconcomenvicont

    (d) Accicontfor d

    (e) Han

    (i)

    (ii)

    (f) The

    (g) Fertiwhicwaswatorga

    (h) Disp

    (i)

    (ii)

    (i) MatSub

    Al ternativ

    Should themay use th

    Preamble

    The followiagent. Her

    Definition

    HACCPchemical aproduct ins

    Supply Co

    (a) Allequi

    (b) It is

    phymus

    ction 28

    poisonouSchedulin

    position / Iess must bistent withponents, aonmentallyain chemical

    dental Releent above 3isposal. Av

    ling and st

    Handling:safe worinhalationeating. P

    Storage:sources.damage a

    Contractor s

    lizers/planth might caued throughrways whicnisms.

    osal Consid

    Waste Di

    material ian approv

    Legislatio

    rial shall ctances (AI

    Soil Addit

    Engineer de specificati

    ng is a specinafter des

    Hazard Annd biologicapection.

    ditions

    roducts supalent stand

    noted that

    ical and ch not comp

    Part

    or allocateg of Drugs a

    nformation derived frrganic prinimal by-prsafe and iss or genetic

    se Measur2%. Ventilaid generatin

    rage

    Before usepracticesObserve

    ohibit eating

    tore in wellEnsure connd sealed w

    hall ensure

    utrients muse reducingsoil to watmight cau

    rations

    isposal: Re

    covered wied landfill si

    : Dispose o

    ntain onlyS) or equiv

    ive Specific

    cide on anon listed bel

    ification forribed as th

    alysis and Cl controls as

    plied shallard subject t

    the compos

    emical pararomise the

    1 L

    a poison snd Poisons

    on ingrediem naturally

    cipals. It shducts, manot harmful

    ally modified

    s and Spillte spillageg dust.

    contractorsare recomgood perso, drinking a

    ventilated atainers arehen not in u

    he safety of

    st be benefi growth orrways. Cone algal bloo

    use or rec

    th moist soile.

    f in accorda

    hemicals lilent.

    ations

    alternative sow hereinaft

    ompostedcomposte

    ritical Contra means o

    onform fullo the agree

    ted product

    meters statagronomic

    ndscape

    chedule nu(SUSDP) or

    nts: The m occurringall NOT coure or m

    to animals,materials.

    ge: The soirea. Collect

    shall carefulended toal hygiene,d smoking i

    rea, removeadequatelye. Check r

    the workers

    cial to plantburns in seractors shalms, with po

    ycle where

    to prevent

    ce with Qat

    ted on the

    oil Additiveer.

    roducts suitproduct.

    l Points is aprevention

    , to the staent of the

    may vary,

    ed within thcharacteris

    Planting

    ber by Staequivalent

    aterials usnd sustaintain synthenure by-pr plants or h

    l conditioneand place i

    ly read theavoid eyeincluding wcontamina

    d from oxidilabelled, prgularly for l

    and the en

    at low levsitive specil minimizeential for to

    possible.

    ust generat

    ari local legi

    ustralian I

    to Clause 1

    ble for use

    method tharather than

    ndards indiupervising

    (within acc

    is specificaics of the

    P

    dard for th

    d in the pble sourcesic chemicaloducts. Itumans and

    must haven sealable c

    roduct labeor skin conashing hanted areas.

    sing agentstected fromeaks or spill

    ironment at

    ls, not in hies. Excessertilizers re

    xic effects o

    lternatively

    ion and dis

    lation.

    ventory of

    .3.11), the

    as a soil am

    t addressesinspection o

    ated hereinfficer (SO).

    eptable limi

    tion. Suchproduct an

    age 15

    Uniform

    roductionand are, animal

    must beshall not

    moistureontainers

    l. Use oftact ands before

    and heatphysical.

    all times

    gh levelsshall be

    leased ton aquatic

    , ensure

    ose of to

    Chemical

    ontractor

    elioration

    physical,f finished

    or to an

    s) to the

    ariationsd where

  • 8/21/2019 land scaping

    16/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    1.3.13

    1

    2

    3

    010 Se

    QCS 2010

    variof th

    (c) The(Thwithplacprin

    (d) Thethespe

    (e) Theandbasiplacbe g

    (f) Theman

    Asrequ

    Compost

    All compoand 5. Thefor a top-duse).

    Table

    Heavy Mecontamina

    Arsenic

    Cadmiu

    hromium (t

    Copper

    Lead

    Mercury

    Nickel

    SeleniuZinc

    As a minimeet the tpathogen

    Pathogenthermophilithe windro(131oF) ormaintained(USEPA).

    ction 28

    tions in anae product.

    contractorSuppliers

    the agreemdocumentiples of HA

    contractor supplier thaification.

    supervisingdocumentati the Contrment to all

    ranted or wi

    whole quaufacture an

    uch writtenested by th

    pecificatio

    ted productparticle sizessing prod

    4: Contami

    alnt con

    otal)

    um requiremperature,isinfection

    disinfectionc decompow compostihigher for 1at 55oC (1

    Part

    lysis occur t

    hall demon) of the coent of the stion of a sitCP is nece

    hall supplyshall clear

    officer mayion) is deector mustw for interph-held as a

    tity require/or source.

    evidencesupervising

    ns

    s must confdistributio

    uct (Table 5,

    nant acceptconditi

    maximumcentration

    20

    1

    100

    100

    150

    1

    60

    5200

    ment, all cotime and tund vector re

    and weeition of orgg method,

    5 consecutiv1oF) or high

    1 L

    e supervisi

    strate to thposted proupervisinge based prosary.

    ppropriately indicate t

    reject any ped not to cubmit all dretation of tpropriate.

    d to complNo change

    f the sourofficer.

    orm to thegrades of t

    as specifie

    nce concenioners (NS

    g/kgO

    mposted prrning frequduction.

    seed rednic matterthe tempere days or ler, there sh

    ndscape

    g officer m

    e supervisinuct have Hfficer. Whe

    duct manag

    production ahat the pro

    roduct or bnform to stcumentatioe analyses

    te the projof source w

    e of the c

    minimum rehe compostin AS 441

    tration limitsEPA).

    ganic checontamina

    DT/DDD/D

    Aldrin

    Dieldrin

    Chlordane

    Heptachlo

    HCB

    Lindane

    BHCPCBs

    ducts to bency as spe

    uction shalhich produ

    ature of thenger. Durinll be a mini

    Planting

    st be inform

    g officer thCCP accre

    e HACCPment plan t

    nd samplinguct confor

    tch that (onndards spe 10 (ten)and for app

    ect must bill be permit

    mpost mu

    uirementsd productsoils for lan

    for compost

    icalt

    maxi

    E

    used as aified by the

    be achieces a humu

    windrow isthe periodum of 5 tu

    P

    ed prior to p

    at the manditation orccreditationhat demons

    documents to the c

    the basis ocified hereiorking day

    roval of pla

    of the sated without

    t be suppli

    specified inust meet t

    dscaping an

    ed soil

    mum concmg/kg

    0.5

    0.02

    0.02

    0.02

    0.02

    0.02

    0.02

    0.02not detecta

    soil conditioUSEPA sta

    ed by thes-like materi maintainedwhen the crnings of th

    age 16

    lacement

    facturersquivalentis not inrates the

    tion frommposted

    analysis. On this

    prior toement to

    me type,approval.

    ed when

    Tables 4e criteriad garden

    ntration

    ble

    ner mustndard for

    aerobic,al. Usingat 55oCmpost iswindrow

  • 8/21/2019 land scaping

    17/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    T

    (f

    A

    4

    5

    010 Se

    QCS 2010

    Tacom

    Compost

    Partic

    Heavy metachemical c

    p

    Electrical

    Wett

    otal water h

    Chl

    % organ

    ffective CatCapacit

    Exchangea

    om exchan

    received m

    (i)

    (ii)

    (iii)

    Contaminagreen-wasindicate pdeleteriousplastic or s

    In additionand organiand Table(e.g. NSWhigher con1,500 mg/

    compound

    ction 28

    ble 5: Cheosted soil c

    prop

    Parameter

    le size

    l and organintaminants

    H

    onductivity

    ability

    lding capac

    ride

    ic carbon

    ion Exchang(ECEC)

    le sodium

    eable catio

    oisture cont

    Methods ithe Austr

    Referencparamete

    Methodsthe chemHigginson

    methods.tion of thee and/or thor compostmaterial (ftones) will b

    , the fines oc contamin5) for minimEPA - thre

    centrationsg and 2,80

    are permitt

    Part

    ical testingnditioner to

    erties of the

    NS

    ity

    *

    e *1 M

    s)

    *1 M

    nt

    ndicated bylian Standar

    to AS 37requiremen

    receded byical properti (1992), Au

    ompost marough pooring practicer example srejected b

    f the componts, to veri

    izing the cohold levelsf trace elemg/kg ma

    ed, at a 0.2

    1 L

    results requiverify the scomposted

    Test M

    Top Dressi

    EPA - thrgrade A

    1:5 soil wa

    1:5 soil wa

    Appendix

    Appendix

    *1:5 soil w

    Dichromate

    ammoniumpretreatm

    ammoniumpretreatm

    *Oven-dry

    a hatch (#)d AS 4419 -

    3 - pottingts are base

    an asteriskes of soil,tralian Lab

    occur duecontrol in tand procedoil, sharpsthe supervi

    st ( 40%

    < 600 mg

    >15% by

    > 40 meq/1

    < 15%

    < 40% by

    ements ared garden us

    he methodard (AS 374

    ecognised fe text Rayl and water

    ion as withg productio

    hes found tontaminant

    nalyzed forhold levels

    azardous suse can bee beneficial. No detect

    age 17

    irements

    5mm,

    a 5 mmmm sieve

    e 4

    5

    m

    es

    kg

    ass

    00g

    ass

    based one.

    and the3).

    r testingent and

    chemical

    unicipaln. These

    containsuch as

    chemical(Table 4bstancesade that

    , limits ofble PCB

  • 8/21/2019 land scaping

    18/59

    ConsolidatedEngin

    eeringConstruction

    QCS 2

    6

    7

    8

    9

    1.3.14

    1

    2

    3

    010 Se

    QCS 2010

    Attributesof Qatar, t

    (a) a hipeat

    (b) a hi

    part(c) a lo

    mini

    (d) a hithegrou

    Application

    (a) Theche

    (b) Co

    for ais inmaiappli

    (c) Thefertilicomwithshallenafor e

    (d) The

    the rThe contrarandom sacompositecompost ssieving. Th

    Internationcertificatesupervisin

    Contracto

    The contrbased siterecords cothe relevan

    The contracalculate teach speciexpressed

    The contrcompostedmajor nutrifertilizer ap

    ction 28

    f the Compe composte

    h total wat

    h cation ex

    as a replac chlorideize the sal

    h proportioslow-releasndwater

    rates shall

    compostedical propert

    posted prod

    pplication toorporation itenance opied to the su

    rate of applizer equivalposite sampthe particlebe undertale the calcuase of appli

    maximum a

    esults of chctor shall emples eachsample ofmple shall

    e size of a b

    ally accepteof analysisofficer.

    rs Respon

    ctor shall v and produmply with tht sections o

    ctor shall ue plant-ava

    fic batch ofon the oven

    ctor shallsoil conditi

    ent (most cplication rec

    Part

    st shall bed product m

    r holding ca

    change cap

    ment for spion concentconcentrati

    of the nitro organic f

    e as follow

    product willies at rates

    ucts verifyin

    soils in Qatnto the soil,ration such

    rface of the

    ication to sence of thele shall beretained onen on the clation of fertation.

    plication ra

    mical testinsure that th

    having a volnot less thbe air driedatch will be

    d testing msupplied wi

    ibilities

    erify that tht manage

    e USEPA pthe specific

    e the resultilable (immcompost intdry mass b

    lso calculatner on the

    ommonly phommendati

    1 L

    appropriateust be verifi

    pacity to fu

    acity (nutrie

    agnum pearation andon in the ro

    gen and phrm, to red

    :

    be incorpoetermined

    g complianc

    ar as a soilto a depthas pluggingoil as a top

    il of a com product.creened ththe sieve empost (ref

    ilizer equiva

    e permitted

    g of the rece supplier tume of not ln 2 ltr (Apovernight (rdetermined i

    ethods musth each co

    e compostent plan, athogen disi

    ation.

    s of the chdiate fertilizended for usis of the