Upload
chaz-rigdon
View
272
Download
3
Tags:
Embed Size (px)
Citation preview
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Greenville County, SCLand Development DivisionNPDES MS4 Permit ImplementationConstruction/Post Construction Program
K.F. Holbrook, PE Woolpert, Inc.
Construction Site Runoff
Stormwater Management in Greenville County
May 30, 2007
Furman University, Greenville, SC
Future of the Construction and Post Construction Water Quality Program
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
In the Beginning (1994)
Simple ProgramSimple Program Followed State Law and RegulationsFollowed State Law and Regulations Peak rate controlPeak rate control Velocity controlVelocity control Sediment controlSediment control Program operated by the SWCDProgram operated by the SWCD
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Program Evolution
In 2000 Greenville County issued MS4 Storm Water PermitIn 2000 Greenville County issued MS4 Storm Water Permit Ordinance revised to include authorities for implementationOrdinance revised to include authorities for implementation Program audit to set baseline performanceProgram audit to set baseline performance Automated permit tracking system implementedAutomated permit tracking system implemented Computerized field inspection systems implementedComputerized field inspection systems implemented EPA evaluation of the MS4 programEPA evaluation of the MS4 program Flood protection projects initiatedFlood protection projects initiated Program reorganized into Public WorksProgram reorganized into Public Works Second cycle NPDES permit effective July 2007Second cycle NPDES permit effective July 2007 TMDL’s developed for Enoree and ReedyTMDL’s developed for Enoree and Reedy Ordinance revisions requiredOrdinance revisions required Cites become co-permitteesCites become co-permittees
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Process
Project Application logged upon receiptProject Application logged upon receipt Assigned to Plan Review Assigned to Plan Review Plan Review conducted comments providedPlan Review conducted comments provided
For Subdivisions three iterations before permitFor Subdivisions three iterations before permit For Commercial two iterations before permitFor Commercial two iterations before permit
Preconstruction meeting prior to issuing permitPreconstruction meeting prior to issuing permit SCDHEC approval for NPDES requiredSCDHEC approval for NPDES required Permit issued Permit issued Plans and Documents handed off to the inspectors Plans and Documents handed off to the inspectors
for follow upfor follow up Site inspections for compliance beginSite inspections for compliance begin Each site is inspected once every two weeksEach site is inspected once every two weeks Upon final stabilization project is closed and CO Upon final stabilization project is closed and CO
issuedissued
Field General Score
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
4413
4445
4479
4600
9732
32
9837
16
9838
23
9838
52
9838
77
9939
60
9940
12
9940
50
9940
96
9941
56
9942
39
9942
53
9943
19
9943
56
Site ID Number
Fie
ld G
ener
al S
core
(%
)
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
GREENVILLE COUNTY STORMWATER PROGRAMGREENVILLE COUNTY STORMWATER PROGRAM
YEARYEAR # APPLICATIONS# APPLICATIONS# #
PROJECTSPROJECTS# #
INSPECTIONSINSPECTIONS
20032003 303303 169169 955955
20042004 311311 175175 25752575
20052005 305305 155155 31473147
20062006 322322 114114 20302030
YEARLY AVERAGEYEARLY AVERAGE 310310 153153 21172117
Overall Site BMP Score
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
4413
4445
4479
4600
9732
32
9837
16
9838
23
9838
52
9838
77
9939
60
9940
12
9940
50
9940
96
9941
56
9942
39
9942
53
9943
19
9943
56
Site ID Number
Sit
e B
MP
Sco
re (
%)
Field General Score
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
4413
4445
4479
4600
9732
32
9837
16
9838
23
9838
52
9838
77
9939
60
9940
12
9940
50
9940
96
9941
56
9942
39
9942
53
9943
19
9943
56
Site ID Number
Fie
ld G
ener
al S
core
(%
)
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
PROJECTS BY DISTURBED AREAPROJECTS BY DISTURBED AREA
DISTURBED AREADISTURBED AREA # PROJECTS# PROJECTS
0 - 4.99 Acres0 - 4.99 Acres 374374
5 - 9.99 Acres5 - 9.99 Acres 8484
10 - 14.99 Acres10 - 14.99 Acres 6767
15 Acres and larger15 Acres and larger 9696
TOTAL PROJECT AREATOTAL PROJECT AREA 25,792 ACRES25,792 ACRES
TOTAL REPORTED DISTURBED AREATOTAL REPORTED DISTURBED AREA 5,068 ACRES5,068 ACRES
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
More Stats
YEARYEAR # # COMPLAINTSCOMPLAINTS
20042004 6969
20052005 132132
20062006 6666
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
What is in the Future
Staff analysis and assessment for meeting program needsStaff analysis and assessment for meeting program needs New enforcement procedureNew enforcement procedure Improved complaint managementImproved complaint management Improved permit and inspection trackingImproved permit and inspection tracking Third party inspection requirementsThird party inspection requirements New application/inspection fee structureNew application/inspection fee structure Implementation of TMDL requirementsImplementation of TMDL requirements New ordinance revisions for water qualityNew ordinance revisions for water quality Credit policy modifications for enhanced maintenanceCredit policy modifications for enhanced maintenance Updated design manualUpdated design manual Design tool developmentDesign tool development BMP developmentBMP development
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program Storm Water Management Design Manual
Greenville County Storm Water Management Design Manual
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Question/Comments
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Field Protocol
2 Field Auditors2 Field Auditors Traversed entire site using the original Traversed entire site using the original
erosion control plans as a guideerosion control plans as a guide
Collect Data on Rugged Pentop ComputersCollect Data on Rugged Pentop Computers Store data in database specifically design for Store data in database specifically design for
field reviewfield review
Digital Pictures of Site and BMPsDigital Pictures of Site and BMPs
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Sediment Basins
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Sediment Basins
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Basin Outlet Structures
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Basin Outlet Structures
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Temporary Sediment Traps
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Silt Fence
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Rock Ditch Checks
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Riprap or Aggregate
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Outlet Protection
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Stabilized Construction Entrance
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Storm Drain Inlet Protection
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Pipe Slope Drains
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Runoff Control Measures
Construction Site Runoff
Greenville County Storm Water Management ProgramGreenville County Storm Water Management Program
Straw and Hay Bale Applications
Construction Site Runoff