Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
3.00
3.00
6.006.00 6.00 6.00 6.00 6.00 6.00
6.00
24.00
6.00
6.00
3.00
3.00
2.00
0.90
6.00
43
2
1
24.00
6.00
6.00
6.00
6.006.00
4321
PEDESTRIAN LANE
SEPTICTANK
CO
UR UR UR UR URWC WC
WCWCWCWCWCWC
WCWCWCWCWC WC WC
UR
UR
UR
UR
SS
LAV
LAV
LAV
LAV LAV LAV SS
CO
CO
COFD FD
CO
FD
FD FD
FD
KSWC
WC
WC
WCUR
UR
UR
LAV
LAV
LAV
LAV
LAV
WC WC WC
WC
UR
CO
FD
FD FD
FD
FD FD
150MMØ PVCSOIL PIPE
CO
150MMØ PVCSOIL PIPE
150MMØ PVC SOILWASTE STACK PIPE
FD
150MMØ PVCOUTLET PIPE
TO MAINSEWER LINE
CO
100MMØPVC PIPE
100MMØPVC PIPE
50MMØ PVCVENT PIPE
75MMØPVC PIPE
SANITARY LAYOUT PLANSCALE 1:100 MTS
GROUND FLOOR PLAN
LAVCO
CO
CO
CO
CO150 MMØPVC PIPE
50 MMØ PVC PIPE
75 MMØ PVC PIPE
50 MMØ PVC AIRVENT PIPE
150 MMØPVC PIPE
75 MMØPVC PIPE
50 MMØ PVC PIPE
CO
75 MMØPVC PIPE
75 MMØPVC PIPE
75 MMØ PVC VENT PIPE
150MMØ PVCSOIL PIPE
CO
100 MMØPVC PIPE
CO75MMØ PVC PIPE 75MMØ PVC
SOIL PIPE
CO
UR
75 MMØ PVC VENT PIPE
150MMØ PVC SOILWASTE STACK PIPE
75 MMØ PVC VENT PIPE
P-1
1P-1
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDINGP-1
0.90
0.90
3.00
54.00
6.00
24.00
6.00
6.00
3.00
6.006.006.00 6.00 6.00 6.00 6.006.006.006.00
54.00
24.00
6.00
6.00
6.00
6.00
PERIMETER LINE
LAV
WC WC WCWC
WC
WCUR
UR
UR
LAV
CO
CO
CO
FDFD
FD
FD
150 MMØPVC PIPE
SANITARY LAYOUT PLANSCALE 1:100 MTS
SECOND FLOOR PLAN
CO
UR UR UR UR URWC WC
WCWCWCWCWCWC
WCWCWCWCWC WCWC
UR
UR
UR
UR
SS
LAV
LAV
LAV
LAV LAV LAV SS
CO
CO
COFD
CO
FD
FD FD
FD
150MMØ PVC SOILWASTE STACK PIPE
FD
CO
100MMØPVC PIPE
100MMØPVC PIPE
50MMØ PVCVENT PIPE
75 MMØ PVC VENT PIPE
150MMØ PVCSOIL PIPE
CO
100 MMØPVC PIPE
CO75MMØ PVC PIPE
CO
75 MMØ PVC VENT PIPE
FD
FD
CO
100 MMØPVC PIPE
50 MMØPVC PIPE 50 MMØ
PVC PIPE50 MMØPVC PIPE
P-2
1P-2
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
W2 W1
6.00
6.00
6.00
24.00
6.00
54.00
6.00 6.00 6.00 6.006.006.006.006.00 6.00
3.00
6.00
6.00
24.00
6.00
3.00
SANITARY LAYOUT PLANSCALE 1:100 MTS
ROOFDECK FLOOR PLAN
CO
UR UR UR UR URWC WC
WCWCWCWCWCWC
WCWCWCWCWC WCWC
UR
UR
UR
UR
SS
LAV
LAV
LAV
LAV LAV LAV SS
CO
CO
COFD
CO
FD
FD FD
FD
150MMØ PVC SOILWASTE STACK PIPE
FD
CO
100MMØPVC PIPE
100MMØPVC PIPE
50MMØ PVCVENT PIPE
75 MMØ PVC VENT PIPE
150MMØ PVCSOIL PIPE
CO
100 MMØPVC PIPE
CO75MMØ PVC PIPE
CO
75 MMØ PVC VENT PIPE
FD
FD
CO
P-3
1P-3
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
ALL PLUMBING WORKS SHALL BE DONE IN ACCORDANCE W THE LATEST PROVISIONS
ALL VERT SOIL & WASTE STACK PIPE SHALL BE EXTEND FULL SIZE ABOVE ROOF LINE
PROVIDE 50MM Ø P-TRAP FOR EVERY 100M M Ø X 100MM Ø FLR DRAIN
PROVIDE CLEANOUT FOR EVERY FIFTEEN METERS ( 15.00 M ) DISTANCE
ALL CHANGES IN PIPE SIZES ON SOIL WASTE LINE SHALL BE MADE W THE REDUCING
GENERAL NOTES:
OF THE NATIONAL PLUMBING CODE
AS VENTS EXCEPT OTHERWISE SPECIFICALLY INDICATED
FITTINGS OR RECESS REDUCERS
HORIZONTAL LINE
PROVIDE STOP-COCK FOR EVERY FIXTURES
120m
m
.30
.10
.10
.50
M.
LIFTING COVERR.C. COVER W STL
STORM DRAINAGEPIPE LINE
.10.10 .30.50 M.
P L A N
4-12 MMØ
10 MMØ BARSCHB WALL W
BARS BOTHWAYS
10 MM THK
DRAIN LINEPLASTERED FIN.
LIFTING COVERR.C. COVER W STL
S E C T I O N
LEGEND & SYMBOLS
CO CLEAN-OUT
FD FLOOR DRAINSHO SHOWER
CV CHECK VALVE
GV GATE VALVE
SOIL PIPE LINEVSTR VENT STACK THRU ROOFF FAUCET
CB CATCH BASIN
WM WATER METERLAV LAVATORY
WC WATER CLOSET
SV SEPTIC VAULT
UR URINAL
SD SHOWER DRAINDS DOWNSPOUT
PVC POLYVINYL CHLORIDE
DRAINAGE PIPE LINE
UR URINAL
COLD WATER LINE
P L A N
.15
.05.050.400.50
.15
.40 X .40
.15
6" CHB
MANHOLE
.15
4" CHB
6" CHB
12MMØ BARSSPACED @ .20M
O.C BW
S E C T I O N
0.05
.30
.05.05
0.50
AIR SPACEWATER LEVEL
CHAMBERDIGESTIVE
.40M
WF1
SLOPE 1:10 (MIN)
Ø12 LIFT BAR
AIR SPACEWATER LEVEL
CHAMBERLEACHING
0.05
CHAMBERLEACHING
21
12MMØ BARSSPACED @ .20M
O.C BW
4" CHB6" CHB
0.05
TO MAIN
SEWER LINEOUTLET PIPE
TO SEPTIC VAULTINLET PIPE
0.05
AIR SPACEWATER LEVEL
1.501.502.40
6.00 M
2.70
MIN
SIDE
WID
TH
0.50
.15
.15
1.10
1.10
.15
.15
.15
.15
1.501.502.40
5.70 M
INSIDE LENGTH
.15
2.00
M
INSI
DE C
LEAR
HT. O
F TA
NK
3.00
MET
ERS
.15
1.75
.10
SEWER LINE(OUTLET PIPE)
TO S
EPTI
C VA
ULT
INLE
T PI
PE
NOTE: VERIFY SIZE OF SEPTIC TANK TO LOCATION
AT LEAST 2.00 MTRS. APART FROM THE BUILDING LINE
0.05
TO S
EPTI
C VA
ULT
INLE
T PI
PE
SEPTIC TANK DETAILNOT TO SCALE
GV
UP
F
EE
D P
IP
E M
AIN
W
AT
ER
LIN
E P
IP
E
WATER TANK
DO
WN
FE
ED
D
IS
TR
IB
UT
IO
N P
IP
E
BRANCH PIPE
BRANCH PIPEBRANCH PIPE
BRANCH PIPE
SECOND FLOOR LEVEL
GROUND FLOOR LEVEL
ROOF DECK LEVEL
WMGV CVFROM MAIN WATER SOURCEMAYNILAD
FHC
FHC
GV
1,000 GALLONS CAPACITY
FHC
TO MAIN WATER SOURCEMAYNILAD
GV CV
CATCH-BASIN DETAILNOT TO SCALE
WATERLINE DIAGRAMNOT TO SCALE
P-4
GV
1P-4
2P-4
3P-4
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
0.90
3.00
3.00
6.006.00 6.00 6.00 6.00 6.00 6.00
6.00
24.00
6.00
6.00
3.00
3.00
E D
S A
2.00
0.90
6.00
43
2
1
24.00
6.00
6.00
6.00
6.006.00
4321
PEDESTRIAN LANE
WC WC
URLAV
KS
WC
UR
LAV
LAV
LAV
WC
UR
M
50MMØ CWL PIPETO MAIN WATER LINE
GV
WATERLINE LAYOUT PLANSCALE 1:100 MTS
GROUND FLOOR PLAN
32MM Ø PPR CWL PIPE
32M
M Ø
PPR
CW
L PI
PE
32MMØ PPR CWLRISER PIPE
WC
32MMØ PPR CWLRISER PIPE
25MM Ø PPR CWL PIPE
WCWCWCWCWCSS
LAV
LAVGV
GV
GV
WM
CV
WC WC
UR
20M
M Ø
PPR
CW
L PI
PE
WC
WCWC
LAV
LAV
UR
LAV LAV LAV
UR
UR
UR
URURURURUR
WC WC WC WC WC WC
WC WC
SS
P-5
1P-5
GV
GV GV
GV
GV
GV
32MMØ PPR CWL RISER PIPE TO WATER TANK
32MMØ PPR CWL
20MMØ PPR CWL
20MMØ PPR CWLRISER PIPE
20MMØ PPR CWLRISER PIPE
25MMØ PPR CWL
25MMØ PPR CWL
32MMØ PPR CWLRISER PIPE
25MMØ PPR CWL
20MMØ PPR CWL
20MMØ PPR CWL
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
0.90
0.90
3.00
54.00
6.00
24.00
6.00
6.00
3.00
6.006.006.00 6.00 6.00 6.00 6.006.006.006.00
54.00
24.00
6.00
6.00
6.00
6.00
PERIMETER LINE
LAV
WC UR
SS
GV
GV
WATERLINE LAYOUT PLANSCALE 1:100 MTS
SECOND FLOOR PLAN
20MM Ø PPR PIPE
25MM Ø PPR CWL PIPE
UR
UR
UR
WC
WCGV
LAV
WC WC WC
GV
GV
GV
UR
UR
UR
UR
URURURURUR
LAV
LAV
LAV
WC
WC WC WC WC WC WC
WC WC
WC WC WC WC WC WC
SSLAV LAV LAV
P-6
1P-6
32MMØ PPR CWLRISER PIPE
32MMØ PPR CWL
25MM Ø PPR CWL PIPE
25MM Ø PPR CWL PIPE
25MM Ø PPR CWL PIPE
25MM Ø PPR CWL PIPE
25MM Ø PPR CWL PIPE
32MMØ PPR CWLRISER PIPE
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
W2 W1
6.00
6.00
6.00
24.00
6.00
54.00
6.00 6.00 6.00 6.006.006.006.006.00 6.003.00
6.00
6.00
24.00
6.00
3.00
WATERTANK
RISER FM PUMPSERVICE CONNECTION
WATERLINE LAYOUT PLANSCALE 1:100 MTS
ROOFDECK FLOOR PLAN
P-7
1P-7
SS
GV
25MM Ø PPR CWL PIPE
GV
GV
UR
UR
UR
UR
URURURURUR
LAV
LAV
LAV
WC
WC WC WC WC WC WC
WC WC
WC WC WC WC WC WC
SSLAV LAV LAV
32MMØ PPR CWLRISER PIPE
GV
GV
32MM Ø PPR CWL PIPE
25MM Ø PPR CWL PIPE25MM Ø PPR CWL PIPE
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
0.90
3.00
3.00
6.006.00 6.00 6.00 6.00 6.00 6.00
6.00
24.00
6.00
6.00
3.00
3.00
E D
S A
2.00
0.90
6.00
43
2
1
24.00
6.00
6.00
6.00
6.006.00
4321
PEDESTRIAN LANE
CB300MM Ø PVC STORM DRAIN PIPE
300MMØ PVCSTORM DRAINPIPE TO MAINSEWER LINE
STORM DRAIN LAYOUT PLANSCALE 1:100 MTS
GROUND FLOOR PLAN
200M
M Ø
PVC
STO
RM D
RAIN
PIP
E
CB CB CB CB CB CB CB CB CB
CB
CB
P-8
1P-8
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
0.90
0.90
3.00
54.00
6.00
24.00
6.00
6.00
3.00
6.006.006.00 6.00 6.00 6.00 6.006.006.006.00
54.00
24.00
6.00
6.00
6.00
6.00
PERIMETER LINE
DS DS DS DS DS DS DS DS DS DS
STORM DRAIN LAYOUT PLANSCALE 1:100 MTS
SECOND FLOOR PLAN
150MM Ø PVC DOWNSPOUT PIPE
DS
DS
100M
M Ø
PVC
DOW
NSPO
UT P
IPE
P-9
1P-9
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
6.00
6.00
6.00
24.00
6.00
54.00
6.00 6.00 6.006.006.006.006.00 6.00
A B C D E F G H I J
6
5
3
2
1
4
7
3.00
6.00
RD
STORM DRAIN LAYOUT PLANSCALE 1:100 MTS
ROOF PLAN
RD RD RD RD RD RD RD RD RD
P-10
1P-10
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
54.00
P E D E S T R I A N L A N E
ENTRANCE
EXIT
2.00
6.006.00 6.00 6.00 6.006.006.006.006.00
1234
32.70
INFORMATION
STOR
AGE
RM
CABI
NET
CABI
NET
EXAMINATION RM - 2
OFFICE
SENIOR CITIZENS & PWD LOUNGE
TRANSACTION WINDOWS
STO
CLIENTS WAITING AREA
PWD CR
CRIME LAB DRUG TESTING
MUL
TI P
URPO
SE R
M
H A L L W A Y
LOBBY
DI & NBI CLEARANCELANDBANK
WASH AREA
RECEPTION AREA
EXIT
MALE CR
FEMALE CR
EXAM RM
CLIENTS LOUNGE CLIENTS LOUNGE
CLIENTS LOUNGE
RAMP UP
COUNTER TABLE COUNTER TABLE STORAGE
PIPE
CHAS
E
UP
6.00
6.00
6.00
24.00
NP SECTION
EXIT
INTERVIEW RM INTERVIEW RM
H A L L W A Y
1
2
34
UP
CHIEF
RAMP UP
ELECTRICAL RM
6.00
ENTR
ANCE
FRO
MTR
ANSF
ORM
ATIO
N
ENTEXIT
COM
PUTE
R TA
BLE
STORAGE
UP
FE
H A L L W A Y
CR
OVAL
TRANSACTION WINDOWS
STO
NBI STO
LANDBANK DI AND NBI
PANELINTERVIEW
LOCKER RM
DI STO
CHIEF
SERVERCCTV RM
FEMALECR
WASH AREA
URINE COLLECTION
MALE FEMALE
MALECR
MAIN ENTRY
RAMP UP
PORCH
CANOPY LINE
UP
DS DS DS DS DS DS DS DS DS
ACU
ACU ACU
ACU ACU ACU
ACU
ACU
ACU ACU
ACU
ACU
ACU
ACU ACU
ACU ACUACU
ACU
ACU
ACU
ACUACUACUACU
ACU ACU ACU ACU ACU ACU ACU
ACU DRAIN LAYOUT PLANSCALE 1:100 MTS
GROUND FLOOR PLAN
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU ACU
ACU
ACU
ACU ACU
ACU
ACU
P-11
1P-11
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
ACU
ACU ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU
ACU ACU ACU
ACU
ACU
ACU ACU ACU
ACU ACU
ACU
ACU ACU
ACU
ACU
ACU ACU ACU
ACU
ACU DRAIN LAYOUT PLANSCALE 1:100 MTS
SECOND FLOOR PLAN
0.90
0.90
3.00
54.00
6.00
24.00
6.00
6.00
3.00
6.006.006.00 6.00 6.00 6.00 6.006.006.006.00
54.00
24.00
6.00
6.00
6.00
6.00
PERIMETER LINE
DS DS DS DS DS DS DS DS DS DS
P-12
1P-12
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
0.90
3.00
3.00
6.006.00 6.00 6.00 6.00 6.00 6.00
6.00
24.00
6.00
6.00
3.00
3.00
E D
S A
2.00
0.90
6.00
43
2
1
24.00
6.00
6.00
6.00
6.006.00
4321
PEDESTRIAN LANE
FIRE SUPPRESSION LAYOUT PLANSCALE 1:100 MTS
GROUND FLOOR PLAN
FHC
DRY STAND PIPE100MM Ø GI PIPE
FHC
DRY STAND PIPE100MM Ø GI PIPE
P-13
1P-13
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
0.90
0.90
3.00
54.00
6.00
24.00
6.00
6.00
3.00
6.006.006.00 6.00 6.00 6.00 6.006.006.006.00
54.00
24.00
6.00
6.00
6.00
6.00
PERIMETER LINE
FIRE SUPPRESSION LAYOUT PLANSCALE 1:100 MTS
SECOND FLOOR PLAN
FHC
FHC
DRY STAND PIPE100MM Ø GI PIPE
DRY STAND PIPE100MM Ø GI PIPE
P-14
1P-14
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
W2 W1
6.00
6.00
6.00
24.00
6.00
54.00
6.00 6.00 6.00 6.006.006.006.006.00 6.003.00
6.00
6.00
24.00
6.00
3.00
FIRE SUPPRESSION LAYOUT PLANSCALE 1:100 MTS
ROOFDECK FLOOR PLAN
P-15
1P-15
FHC
FHC
DRY STAND PIPE100MM Ø GI PIPE
DRY STAND PIPE100MM Ø GI PIPE
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING