Guidance of Construction Progress Report

Embed Size (px)

Citation preview

  • 7/23/2019 Guidance of Construction Progress Report

    1/11

    http://www.designingbuildings.co.uk/wiki/Construction_progress_report

    Construction progress report

    Construction progress reportsare prepared regularly (often monthly) by the contract

    administratorduring the construction phase and issued to the client. They will

    generally be a summary of the reports received and discussions held at construction

    progress meetings.

    Construction progress reportsmay be a combination of minutes of construction

    progress meetingsand reports received during those meetings, with key issues

    highlighted in an accompanying cover note. Alternatively they may be a re-written

    version of that information prepared specically to suit the client!sre"uirements.Construction progress reportsmight include#

    A summary of the progress made in each key area of the pro$ect.

    Analysis of progress against the programme

    An e%planation of the causes of any delays.

    &rogress photos.

    Analysis of key performance indicators.

    An assessment of any "uality issues.

    'eather reports.

    An assessment of any health and safetyissues.

    eports of any issues with neighbours (such as noise, dust, vibrations, rights

    of light, access, safety etc). eports abouto-site fabrication and o-site payments.

    *arned value analysis.

    An assessment of any design issues.

    An assessment of any other issues that need to be addressed and proposals

    for addressing them.

    Any instructions re"uired from the client.

    +ook ahead to the ne%t period (including specic re"uirements for progress

    photos during the ne%t period, which may include o-site fabrication photos).

    n construction managementpro$ects, the construction managerholds

    regular construction progress meetingswith the clientand consultant team,

    however they will also hold regularconstruction progress meetingswith trade

    contractorsto discuss on and o-site progress against the programme and to co-

    ordinate the release of information. t may sometimes be appropriate for these

    meetings to take place at the trade contractor!s premises. Construction progress

    reportswill then be prepared for the client.

    http://www.designingbuildings.co.uk/wiki/Construction_progress_reporthttp://www.designingbuildings.co.uk/wiki/Construction_progress_reporthttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Contract_administratorhttp://www.designingbuildings.co.uk/wiki/Contract_administratorhttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Client'shttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Health_and_safetyhttp://www.designingbuildings.co.uk/wiki/Rights_of_lighthttp://www.designingbuildings.co.uk/wiki/Rights_of_lighthttp://www.designingbuildings.co.uk/wiki/Abouthttp://www.designingbuildings.co.uk/wiki/Earned_value_analysishttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Construction_managementhttp://www.designingbuildings.co.uk/wiki/Construction_managerhttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Consultant_teamhttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Trade_contractorshttp://www.designingbuildings.co.uk/wiki/Trade_contractorshttp://www.designingbuildings.co.uk/wiki/Trade_contractorhttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Contract_administratorhttp://www.designingbuildings.co.uk/wiki/Contract_administratorhttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Client'shttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Health_and_safetyhttp://www.designingbuildings.co.uk/wiki/Rights_of_lighthttp://www.designingbuildings.co.uk/wiki/Rights_of_lighthttp://www.designingbuildings.co.uk/wiki/Abouthttp://www.designingbuildings.co.uk/wiki/Earned_value_analysishttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Construction_managementhttp://www.designingbuildings.co.uk/wiki/Construction_managerhttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Consultant_teamhttp://www.designingbuildings.co.uk/wiki/Construction_progress_meetingshttp://www.designingbuildings.co.uk/wiki/Trade_contractorshttp://www.designingbuildings.co.uk/wiki/Trade_contractorshttp://www.designingbuildings.co.uk/wiki/Trade_contractorhttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Construction_progress_reportshttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Construction_progress_reporthttp://www.designingbuildings.co.uk/wiki/Construction_progress_report
  • 7/23/2019 Guidance of Construction Progress Report

    2/11

    imilar reports may be prepared on management contractpro$ects in relation

    to works contractorprogress.

    Key performance indicators KPI

    /ey performance indicatorscan be used to#

    0onitor costs.

    Track progress.

    Assess clientsatisfaction.

    dentify strengths 1 weaknesses.

    Compare performance across and between pro$ects.

    Assess specic areas of a pro$ect such as sustainability, safety, waste

    management etc.

    t is important that key performance indicatorsare identied in tender

    documentationand that the regular provision of the information re"uired to

    assess key performance indicatorsis a re"uirement of the contract. This may

    re"uire the provision of sub-contractorinformation where performance on

    specic packagesis to be monitored.

    /ey performance indicatorsmay be of particular importance where

    the contractstipulates that the contractorwill be rewarded or penalised based on

    their performance relative to certain indicators.

    *%amples of key performance indicatorsthat can be used on construction pro$ects

    include#

    Cost vs budget.

    &ro$ect progress relative to milestones.

    2umber of complaints.

    2umber of incidents 3 accidents.

    The number of working hours spent on dierent aspects of the works. The use of materials (for e%ample the amount of concretepoured).

    The number of defects.

    The amount of waste generated and the amount of recycling.

    The number of variations.

    /ey performance indicatorsare also a means to helpwith the rapid comprehension

    of the current nancial position. /ey performance indicatorssummarise the

    http://www.designingbuildings.co.uk/wiki/Management_contracthttp://www.designingbuildings.co.uk/wiki/Works_contractorhttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Sustainabilityhttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Tender_documentationhttp://www.designingbuildings.co.uk/wiki/Tender_documentationhttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Contracthttp://www.designingbuildings.co.uk/wiki/Sub-contractorhttp://www.designingbuildings.co.uk/wiki/Packageshttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Contracthttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Budgethttp://www.designingbuildings.co.uk/wiki/Milestoneshttp://www.designingbuildings.co.uk/wiki/Concretehttp://www.designingbuildings.co.uk/wiki/Defectshttp://www.designingbuildings.co.uk/wiki/Recyclinghttp://www.designingbuildings.co.uk/wiki/Variationshttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Helphttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Management_contracthttp://www.designingbuildings.co.uk/wiki/Works_contractorhttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Sustainabilityhttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Tender_documentationhttp://www.designingbuildings.co.uk/wiki/Tender_documentationhttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Contracthttp://www.designingbuildings.co.uk/wiki/Sub-contractorhttp://www.designingbuildings.co.uk/wiki/Packageshttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Contracthttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Budgethttp://www.designingbuildings.co.uk/wiki/Milestoneshttp://www.designingbuildings.co.uk/wiki/Concretehttp://www.designingbuildings.co.uk/wiki/Defectshttp://www.designingbuildings.co.uk/wiki/Recyclinghttp://www.designingbuildings.co.uk/wiki/Variationshttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Helphttp://www.designingbuildings.co.uk/wiki/Key_performance_indicators
  • 7/23/2019 Guidance of Construction Progress Report

    3/11

    comparison of gures against thebudgetedvalues and also industry benchmarks

    that are published from the result of inter-rm comparison reports.

    /&!s to track protability may include#

    Turnover by director 3partner.

    Turnover by fee earner. &rot by director3partner.

    &rot by fee earner.

    nly genuinely important performance indicators should be monitored so that it

    does not simply become a time consuming paper e%ercise.

    /ey performance indicatorscan also be used more broadly as part of a bench-

    marking e%ercise to assess the performance of one pro$ect relative to another, to

    assess businesses compared to others within the industry and to assess the

    performance of the industry as a whole relative to the rest of the economy

    Health and safety for building design and construction

    To helpdevelop this article, click !*dit this article! above.

    4uildings can present a great number of possible risks both in construction and

    operation. There are many duties placed on those commissioning, designing,

    constructing and operating buildings to control those risks.The legislation aecting health and safetyin design and constructionfalls under

    the 5ealth and afetyat 'ork etc. Act through regulations that include#

    The Construction (6esign and 0anagement) egulations.

    The 4uilding egulations.

    The 0anagement of 5ealth and afety at 'ork egulations.

    The 'ork at 5eight egulations.

    The +ifting perations and +ifting *"uipment egulations.

    The Construction (5ead &rotection) egulations.

    The 'orkplace (5ealth afety and 'elfare) egulations.

    The 'ork in Compressed Air egulations. The &rovision and 7se of 'ork *"uipment egulations.

    The 8as afety (nstallation and 7se) egulations.

    The Control of ubstances 5a9ardous to 5ealthegulations (C55).

    The 0anual 5andling perations egulations.

    The Control of 2oise at 'ork egulations.

    The Control of :ibration at 'ork egulations.

    The Control of Asbestos egulations.

    http://www.designingbuildings.co.uk/wiki/Budgethttp://www.designingbuildings.co.uk/wiki/Kpihttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Helphttp://www.designingbuildings.co.uk/wiki/Commissioninghttp://www.designingbuildings.co.uk/wiki/Health_and_safetyhttp://www.designingbuildings.co.uk/wiki/Design_and_constructhttp://www.designingbuildings.co.uk/wiki/Health_and_safetyhttp://www.designingbuildings.co.uk/wiki/Construction_(Design_and_Management)_Regulationshttp://www.designingbuildings.co.uk/wiki/Building_regulationshttp://www.legislation.gov.uk/uksi/1999/3242/contents/madehttp://www.designingbuildings.co.uk/wiki/Work_at_height_regulationshttp://www.legislation.gov.uk/uksi/1998/2307/contents/madehttp://www.legislation.gov.uk/uksi/1989/2209/contents/madehttp://www.legislation.gov.uk/uksi/1992/3004/contents/madehttp://www.legislation.gov.uk/uksi/1996/1656/contents/madehttp://www.legislation.gov.uk/uksi/1998/2306/contents/madehttp://www.legislation.gov.uk/uksi/1998/2451/contents/madehttp://www.designingbuildings.co.uk/wiki/Control_of_Substances_Hazardous_to_Healthhttp://www.designingbuildings.co.uk/wiki/COSHHhttp://www.legislation.gov.uk/uksi/1992/2793/contents/madehttp://www.legislation.gov.uk/uksi/2005/1643/contents/madehttp://www.legislation.gov.uk/uksi/2005/1093/contents/madehttp://www.legislation.gov.uk/uksi/2006/2739/contents/madehttp://www.designingbuildings.co.uk/wiki/Budgethttp://www.designingbuildings.co.uk/wiki/Kpihttp://www.designingbuildings.co.uk/wiki/Key_performance_indicatorshttp://www.designingbuildings.co.uk/wiki/Helphttp://www.designingbuildings.co.uk/wiki/Commissioninghttp://www.designingbuildings.co.uk/wiki/Health_and_safetyhttp://www.designingbuildings.co.uk/wiki/Design_and_constructhttp://www.designingbuildings.co.uk/wiki/Health_and_safetyhttp://www.designingbuildings.co.uk/wiki/Construction_(Design_and_Management)_Regulationshttp://www.designingbuildings.co.uk/wiki/Building_regulationshttp://www.legislation.gov.uk/uksi/1999/3242/contents/madehttp://www.designingbuildings.co.uk/wiki/Work_at_height_regulationshttp://www.legislation.gov.uk/uksi/1998/2307/contents/madehttp://www.legislation.gov.uk/uksi/1989/2209/contents/madehttp://www.legislation.gov.uk/uksi/1992/3004/contents/madehttp://www.legislation.gov.uk/uksi/1996/1656/contents/madehttp://www.legislation.gov.uk/uksi/1998/2306/contents/madehttp://www.legislation.gov.uk/uksi/1998/2451/contents/madehttp://www.designingbuildings.co.uk/wiki/Control_of_Substances_Hazardous_to_Healthhttp://www.designingbuildings.co.uk/wiki/COSHHhttp://www.legislation.gov.uk/uksi/1992/2793/contents/madehttp://www.legislation.gov.uk/uksi/2005/1643/contents/madehttp://www.legislation.gov.uk/uksi/2005/1093/contents/madehttp://www.legislation.gov.uk/uksi/2006/2739/contents/made
  • 7/23/2019 Guidance of Construction Progress Report

    4/11

    5ealth and afety (Consultation with *mployees) egulations.

    eporting of n$uries, 6iseases and 6angerous ccurrences egulations.

    A full list is available in the appendices of 5* 5ealth and safety in construction,

    although some of the regulations listed in the publication have since been revoked

    following revisions to the The Construction (6esign and 0anagement) egulations in;

  • 7/23/2019 Guidance of Construction Progress Report

    5/11

    Rights to light

    ContentshideD

    E ntroduction ; nterpretation ? 0easurement F bstruction @ ules of thumb G emedies = ecent considerations H Bind out more

    H.E elated articles on 6esigning 4uildings 'iki H.; *%ternal references

    ntroduction

    The right to lightin the 7/goes back to general property law relating

    to easementsthat date back to 'illiam :. The Ancient +ights +aw became

    superseded by the EH?; &rescription Act. 24 n the 7A all such rights and laws

    were abolished following the introduction of electric lighting.

    Rights to lightgenerally become an issue when a new development, or proposed

    development aects the access to light of an ad$oining property. Rights to lightalso

    apply to obstructions caused by trees, hedges and so on, but there are no rights to

    lightfor open ground.

    Rights to lightcan be the result of !easements!, or can be Inuisance> issues#

    &rivate nuisanceregulates interference with a persons right to en$oy land, or

    some right in connection with that land. uch interference must be Iunreasonable>to constitute nuisance.2uisancecan be remedied by an

    in$unction, abatementand 3 or damages.

    An easementis a a right which a person has over land owned by someone

    else. Aneasementcan be created by e%press grant (for e%ample it may be set out

    in a conveyancedeed), by necessity (for e%ample if there is only one means of

    access to a site) or by prescription (the act has been repeated for at least ; comfortable use and en$oyment of

    a dwelling, or Iordinary>benecial useand occupation of other buildings.

    The levels of acceptable light have not been ob$ectively "uantied and are instead

    assessed on a case by case basis by the courts. 5owever, KsuJcient light according

    to the ordinary notions of mankindL and Ktangible deprivation to a buildingL are

    arguable e%pressions that have earned substantial feesto the legal and surveyingprofessions and given rise to specialists and e%pert witnessesin this eld.

    0uch depends on#

    The measurement of light.

    &roof of its diminution.

    The damage caused by obstruction.

    0easurement

    t is now relatively straight forward to measure, or model lighting levels on working

    planes within buildings and to assess whether there is currently ade"uate light to

    perform tasks such as reading, or whether there will be once a proposed

    development is constructed.

    2atural light to a building can be achieved in dierent forms and provide varying

    light power#

    kylights M capturing light from the higher sky :ertical window light M capturing light from the lower sky

    6ormer light

    +antern light

    loping cove light

    4orrowed light.

    http://www.designingbuildings.co.uk/wiki/Easementhttp://www.designingbuildings.co.uk/wiki/Right_to_lighthttp://www.designingbuildings.co.uk/wiki/Dwellinghttp://www.designingbuildings.co.uk/wiki/Beneficial_usehttp://www.designingbuildings.co.uk/wiki/Feeshttp://www.designingbuildings.co.uk/wiki/Expert_witnesshttp://www.designingbuildings.co.uk/wiki/Easementhttp://www.designingbuildings.co.uk/wiki/Right_to_lighthttp://www.designingbuildings.co.uk/wiki/Dwellinghttp://www.designingbuildings.co.uk/wiki/Beneficial_usehttp://www.designingbuildings.co.uk/wiki/Feeshttp://www.designingbuildings.co.uk/wiki/Expert_witness
  • 7/23/2019 Guidance of Construction Progress Report

    7/11

    8la9ingcan have variable translucency such as#

    bscure glass

    Tinted low emissivity glass

    Brosted glass

    Clear glass

    'indows can be of dierent si9es, heights and "uantity and serve varying room

    si9es with natural light. 8enerally the larger the area served by a window the more

    value can be put on to the window.

    bstruction

    The obstruction of light between an internal space of the dominant property and the

    sky by a servient property is generally caused either by either#

    5eight of an oending structureand de facto its width.

    r pro%imity and de facto its width.

    The general law on easementdoes not allow a servient property to benet in value

    at the e%pense of the dominant property if the latter has en$oyed uninterrupted

    rights for twenty years or more.

    ules of thumb

    The !F@ degree rule!, which may be used to assess planning applicationsfor

    developments impacting on windows, is not used to assess rights to light.

    The !@

  • 7/23/2019 Guidance of Construction Progress Report

    8/11

    The most likely remedy to a loss of a right to lightis an in$unction. Courts do not like

    to awarddamagesin such cases, as this could be seen as a developerbeing able to

    Ibuy> the rights of another. 5owever if damagesare awarded, they may be based

    on#

    The use and purpose (historical) of the rooms aected by the infringement.

    The loss of natural light power over the aected by the obstruction.

    The additional value to the property of the servient oender. This may be a

    proportion of thedevelopersprots, where the proportion relates to the amount of

    Noor space that thedevelopercould not have built if they had not infringed on

    the right to lightof their neighbour.

    Any loss of residual valueto the dominant property

    The law and possible remedies surrounding rights to lightare not straight forward.

    There are complications in relation to some Crown land, statutory bodiesand compulsory purchase, and under certain circumstances developerscan

    obtain light obstruction notices. f it is possible that a development will

    encounter rights to lightissues, a right to lightconsultantcan be appointed to give

    e%pert advice.

    n practice the dominant property by means of an interlocutory in$unction can hold

    up a development for a very long time while it takes its case to court. Time is

    money and the delay while the legal case goes through the courts, particularly if it

    is appealed, can bring everything to a halt. o a negotiation takes place with the

    dominant owner>s team having a pretty good idea of the value of the infringement

    to the servient owner and a deal is done or the design is changed to step back any

    light obstructing structures.

    ecent considerations

    A right to lightby prescription may be lost if a person submits to a loss of light for a

    year before making a claim. This means that complaints should be made "uickly,

    and repeated fre"uently to ensure that the right is not lost before a claim is made.

    5owever, the recent case of 5/7/ (C5C) +td v 5eaney(;

  • 7/23/2019 Guidance of Construction Progress Report

    9/11

    ee also +ight obstruction notices.

    n ;

  • 7/23/2019 Guidance of Construction Progress Report

    10/11

    arned !alue for construction contracts

    *arned value analysisis a techni"ue used to assess pro$ect progress by comparing

    the amount and cost of work that was planned to have been done by a particular

    stage with the amount that has actually been done and what it has actually cost.

    This gives a good indication of how the pro$ect is progressing compared to what was

    planned and enables forecasts to be made aboutthe eventual cost and time that will

    be re"uired to complete the pro$ect.

    Typically earned value analysisis carried out for each of the packagesthat make up

    the pro$ect. Actual outputs are measured against planned outputs (often on a

    weekly basis) using the units that individual companies use to price and measurework. This provides an opportunity to investigate discrepancies and take remedial

    action where necessary. t also provides a fairly accurate insight into the

    nancial wellbeingof packagecontractorsand provides early warning of a shortage

    of resources or of an ineJcient use of resources.

    The key is to measure actual resource against planned resource using the

    production units by which estimates have been produced in order to price a tender.

    This can be#

    5ours worked per week.

    2umber of workersper week. :olume of say concreteper week per person.

    7nits %ed per week per person.

    These items can be plotted weekly to alert the user to trends and allow them to

    investigate causes. Burthermore it provides an overall general picture of

    labour productivityfor each monitored operation.

    Carrying out this sort of analysis re"uires that pro$ect planning is broken down

    into packagesand that tender documentationis drafted to re"uire contractorsto

    supply the information re"uired.

    http://www.designingbuildings.co.uk/wiki/Earned_value_analysishttp://www.designingbuildings.co.uk/wiki/Abouthttp://www.designingbuildings.co.uk/wiki/Earned_value_analysishttp://www.designingbuildings.co.uk/wiki/Packageshttp://www.designingbuildings.co.uk/wiki/Wellbeinghttp://www.designingbuildings.co.uk/wiki/Packagehttp://www.designingbuildings.co.uk/wiki/Contractorshttp://www.designingbuildings.co.uk/wiki/Tenderhttp://www.designingbuildings.co.uk/wiki/Workershttp://www.designingbuildings.co.uk/wiki/Concretehttp://www.designingbuildings.co.uk/wiki/Productivityhttp://www.designingbuildings.co.uk/wiki/Packageshttp://www.designingbuildings.co.uk/wiki/Tender_documentationhttp://www.designingbuildings.co.uk/wiki/Contractorshttp://www.designingbuildings.co.uk/wiki/Earned_value_analysishttp://www.designingbuildings.co.uk/wiki/Abouthttp://www.designingbuildings.co.uk/wiki/Earned_value_analysishttp://www.designingbuildings.co.uk/wiki/Packageshttp://www.designingbuildings.co.uk/wiki/Wellbeinghttp://www.designingbuildings.co.uk/wiki/Packagehttp://www.designingbuildings.co.uk/wiki/Contractorshttp://www.designingbuildings.co.uk/wiki/Tenderhttp://www.designingbuildings.co.uk/wiki/Workershttp://www.designingbuildings.co.uk/wiki/Concretehttp://www.designingbuildings.co.uk/wiki/Productivityhttp://www.designingbuildings.co.uk/wiki/Packageshttp://www.designingbuildings.co.uk/wiki/Tender_documentationhttp://www.designingbuildings.co.uk/wiki/Contractors
  • 7/23/2019 Guidance of Construction Progress Report

    11/11