Guidance on managing process safety in decommissioning projects

Guidance on managing process safety in decommissioning ... · GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS 7 FOREWORD This document has been produced by Atkins

  • Upload
    others

  • View
    24

  • Download
    14

Embed Size (px)

Citation preview

Guidance on managing process safety in decommissioning projects

The Energy Institute (EI) is the chartered professional membership body for the energy industry, supporting over 20 000 individuals working in or studying energy and 250 energy companies worldwide. The EI provides learning and networking opportunities to support professional development, as well as professional recognition and technical and scientific knowledge resources on energy in all its forms and applications.

The EI's purpose is to develop and disseminate knowledge, skills and good practice towards a safe, secure and sustainable energy system. In fulfilling this mission, the EI addresses the depth and breadth of the energy sector, from fuels and fuels distribution to health and safety, sustainability and the environment. It also informs policy by providing a platform for debate and scientifically-sound information on energy issues.

The EI is licensed by: − the Engineering Council to award Chartered, Incorporated and Engineering Technician status, and − the Society for the Environment to award Chartered Environmentalist status.

It also offers its own Chartered Energy Engineer, Chartered Petroleum Engineer, and Chartered Energy Manager titles.

A registered charity, the EI serves society with independence, professionalism and a wealth of expertise in all energy matters.

This publication has been produced as a result of work carried out within the Technical Team of the EI, funded by the EI's Technical Partners. The EI's Technical Work Programme provides industry with cost-effective, value-adding knowledge on key current and future issues affecting those operating in the energy sector, both in the UK and internationally.

For further information, please visit energyinst.org

The EI gratefully acknowledges the financial contributions towards the scientific and technical programmefrom the following companies

Andeavor Phillips 66BP Exploration Operating Co Ltd Qatar PetroleumBP Oil UK Ltd Repsol SinopecCentrica RWE npowerChevron North Sea Ltd Saudi AramcoChevron Products Company Scottish PowerChrysaor SGSCLH Shell UK Oil Products LimitedConocoPhillips Ltd Shell U.K. Exploration and Production LtdDCC Energy SSEEDF Energy TAQA BrataniENI Total E&P UK LimitedE. ON UK Total UK LimitedEquinor Tullow OilExxonMobil International Ltd UniperInnogy ValeroKuwait Petroleum International Ltd VattenfallNexen CNOOC Vitol EnergyØrsted WoodsidePerenco World Fuel Services

However, it should be noted that the above organisations have not all been directly involved in the development of this publication, nor do they necessarily endorse its content.

Copyright © 2019 by the Energy Institute, London.The Energy Institute is a professional membership body incorporated by Royal Charter 2003.Registered charity number 1097899, EnglandAll rights reserved

No part of this book may be reproduced by any means, or transmitted or translated into a machine language without the written permission of the publisher.

ISBN 978 1 78725 089 5

Published by the Energy Institute

The information contained in this publication is provided for general information purposes only. Whilst the Energy Institute and the contributors have applied reasonable care in developing this publication, no representations or warranties, express or implied, are made by the Energy Institute or any of the contributors concerning the applicability, suitability, accuracy or completeness of the information contained herein and the Energy Institute and the contributors accept no responsibility whatsoever for the use of this information. Neither the Energy Institute nor any of the contributors shall be liable in any way for any liability, loss, cost or damage incurred as a result of the receipt or use of the information contained herein.

Hard copy and electronic access to EI and IP publications is available via our website, publishing.energyinst.org.Documents can be purchased online as downloadable pdfs or on an annual subscription for single users and companies.For more information, contact the EI Publications Team at [email protected]

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

3

CONTENTS

Page

Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

Acknowledgements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 1.1 Background. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 1.2 Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 1.3 Terminology used in the document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 1.3.1 Use of the terms HS&E, safety and process safety. . . . . . . . . . . . . . . . . . . 11 1.3.2 Use of the terms 'stage' and 'phase' . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 1.3.3 Use of the terms SCE and SECE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 1.3.4 Use of the term ALARP. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 1.3.5 Document structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

2 Scope and application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 2.1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 2.2 Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

3 Managing process safety within the project life cycle . . . . . . . . . . . . . . . . . . . . . . . . 15 3.1 Background. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 3.2 Project phases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 3.3 Project management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 3.4 Project initiation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 3.4.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 3.4.2 Process safety objectives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 3.4.3 Specific process safety related tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 3.4.4 Main output. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 3.5 Select and develop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 3.5.1 Process safety objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 3.5.2 Specific process safety related tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 3.5.3 Main output. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 3.6 Project engineering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 3.6.1 Process safety objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 3.6.2 Specific process safety related tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 3.6.3 Main output. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 3.7 Execute . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 3.7.1 Process safety objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 3.7.2 Specific process safety related tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 3.8 Post project review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

4 Generic guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 4.1 Decommissioning project stages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 4.2 Communication with stakeholders. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 4.2.1 Main stakeholders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 4.2.2 Stakeholder assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 4.2.3 Planning for stakeholder engagement . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

4

Contents continuedPage

4.3 Interaction with regulators and compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 4.3.1 UK legislation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 4.3.2 Non-UK legislation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 4.4 Industry and company guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 4.4.1 Company guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 4.4.2 Industry guidance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 4.5 Determining and managing the hazard profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 4.5.1 Generic process hazards and risks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 4.5.2 Risk assessment techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 4.6 Managing people . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 4.6.1 Project organisation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53 4.6.2 Competency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53 4.6.3 Training and awareness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53 4.6.4 Monitoring and improving performance . . . . . . . . . . . . . . . . . . . . . . . . . 54 4.7 Human and organisational factors considerations . . . . . . . . . . . . . . . . . . . . . . . . . . 54 4.7.1 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54 4.7.2 Decommissioning-specific guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55

Annexes

Annex A Application of the EI PSM framework elements within the decommissioning . project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

Annex B Thermal power generation specific guidance . . . . . . . . . . . . . . . . . . . . . . . . . . 67 B.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 B.2 Decommissioning plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 B.3 Historical data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 B.4 Interaction with regulators and compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 B.5 Determining and managing the hazard profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 B.5.1 Dust. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 B.5.2 Asbestos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 B.5.3 Lack of asset condition information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 B.5.4 Ignition sources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 B.6 Risk assessment techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69

Annex C Onshore Oil and Gas and petrochemicals specific guidance. . . . . . . . . . . . . . . 71 C.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 C.2 Project plan to decommission a facility. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 C.3 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 C.4 Handover to demolition contractor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 C.5 Interaction with regulators and compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 C.6 Determining and managing the hazard profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 C.6.1 Protective functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 C.6.2 Process hazards and risks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 C.6.3 Risk assessment techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

Annex D Offshore sector specific guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 D.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 D.2 Stages of decommissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 D.3 The UK offshore Oil and Gas regulatory regime . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

5

Contents continuedPage

D.4 Hazard profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86 D.5 Well plugging and abandonment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87 D.6 Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88 D.7 Emergency response . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89 D.8 Pipelines and subsea infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

Annex E Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91

Annex F References and bibliography. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

6

LIST OF FIGURES AND TABLES

PageFigures

Figure 1 Didcot A power station collapse. UK – 2016 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Figure 2 Development and decommissioning project life cycles . . . . . . . . . . . . . . . . . . . . . . . 16Figure 3 Typical phases within a decommissioning project. . . . . . . . . . . . . . . . . . . . . . . . . . . 17Figure 4 Decommissioning project timeline and section references . . . . . . . . . . . . . . . . . . . . 19Figure 5 UK HSE human factors framework. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55Figure D.1 Typical offshore decommissioning workflow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82Figure D.2 Worked example – operations, inspection and maintenance framework . . . . . . . . . 85

Tables

Table 1 Generic decommissioning project stages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37Table 2 Key focus areas mapped to the EI PSM framework . . . . . . . . . . . . . . . . . . . . . . . . . 47Table 3 HOF checklist for decommissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55Table D.1 Typical offshore decommissioning stages. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

7

FOREWORD

This document has been produced by Atkins Limited on behalf of the Energy Institute (EI). It is intended to provide useful guidance on managing process safety in decommissioning projects in the energy sector generally, with additional guidance for the offshore and onshore oil and gas, petrochemical and thermal power station sectors.

Although it is anticipated that this publication will assist those involved in decommissioning projects, the information contained in this publication is provided as guidance only. While every reasonable care has been taken to ensure the accuracy of its contents, the EI and the technical representatives listed in the Acknowledgements cannot accept any responsibility for any action taken, or not taken, on the basis of this information. The EI shall not be liable to any person for any loss or damage that may arise from the use of any of the information contained in any of its publications.

Whilst written in the context of the United Kingdom (UK) legislative and regulatory framework, the principles set out in this publication can similarly be applied in other countries, provided national and local statutory requirements are complied with. Where the requirements differ, the more stringent should be adopted.

The above disclaimer is not intended to restrict or exclude liability for death or personal injury caused by own negligence.

Suggested revisions are invited and should be submitted to the Technical Department, Energy Institute, 61 New Cavendish Street, London, W1G 7AR.

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

8

ACKNOWLEDGEMENTS

This publication was prepared by Michael Green (Atkins – SNC Lavalin) with contributions from the following:

Phillip Amos Atkins – SNC LavalinPaul Franklin Atkins – SNC LavalinJennifer Pearce Atkins – SNC LavalinJohn Ryder Atkins – SNC LavalinJohn Spiteri Atkins – SNC Lavalin

Further contributions were provided by:

Lee Allford Energy InstituteJune Calder UK HSEAndy Geddes EDF EnergyPeter Gedge BPColin Howes DNV GLAshley Hynds UK HSEPiers Puntan ENIJoshua Rice NDAMark Taylor ERMDella Wong CNRLAzzam Younes ABB

The EI wishes to record its appreciation of the work carried out by the contributors.

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

9

1 INTRODUCTION

1.1 BACKGROUND

The number of facilities in the energy sector that are coming to the end of their operating life and are likely to be decommissioned in the coming years is increasing, not only due to their age but also to inefficient plants and processes, operating costs, changes in technology and more demanding environmental regulations.

This will place a greater demand on organisations within the energy sector that may be involved in the decommission of these facilities, including facility owners and operators, regulators, contractors and others in the decommissioning supply chain. A key objective for all involved in decommissioning will be to do so safely, and in particular without major accidents occurring with the potential for injuries or fatalities.

Unlike major investment projects where there is clear potential for value creation, decommissioning will generally involve a significant commitment of capital and other resources without, in most cases, adding any revenue value to a company's business. To some extent, decommissioning is largely concerned with managing a company's liabilities and so there may be a temptation to do it at as low a cost as possible. This can be constraining for those tasked with leading and managing decommissioning projects.

Incidents such as the structural collapse at the Didcot A power station in the UK in February 2016, in which four workers were killed (see Figure 1), provide a stark reminder that the need for effective management of process safety within the energy sector does not end when the plant stops operating.

Figure 1: Didcot A power station collapse. UK – 2016 (reproduced with kind permission of PA images)

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

10

In recognition of both the likely increase in decommissioning activity and the obligation on all involved to see that it is undertaken with the utmost consideration given to the safety of those exposed to associated hazards, the EI has commissioned this guidance document for managing process safety in decommissioning projects.

The EI defines process safety as:

'a blend of engineering and management skills focused on preventing catastrophic accidents and near misses, particularly structural collapse, explosions, fire and toxic releases associated with loss of containment of energy or dangerous substances such as chemicals and petroleum products. These engineering and management skills exceed those required for managing workplace safety.'

The requirement in high hazard sectors of the energy industry is to have robust systems in place for managing major accident hazards (MAHs) such as loss of containment, fire, explosion, structural collapse, etc. This applies across the life cycle of a facility from concept, through design and construction, and into the long-term operation of the facility. However, plant operators may have less corporate experience and fewer systems in place for managing process safety when it comes to plant decommissioning.

1.2 DEFINITIONS

The following definitions apply within this guidance document:

Cold suspension/cold stack – frequently applied in the offshore sector, this term refers to the period when an installation or subsea facility has gone through its final shutdown. Any wells will have been permanently plugged and abandoned. All process equipment will have been cleaned and will be ready for disconnection, dismantling and removal.

Decommissioning – includes all the activities related to taking equipment out of service: isolating; cleaning; disconnecting; dismantling; removing; demolishing and disposal. It does not include mothballing or reusing.

Final shutdown – refers to the point at which the facility has stopped producing or operating with no intention to recommission in the future.

Hazard – the intrinsic property of a dangerous substance or physical situation, with a potential for creating damage to human health or the environment.

Human factors – refer to environmental, organisational and job factors, and human and individual characteristics, which influence behaviour at work in a way that can affect health and safety.

Process safety – a blend of engineering and management skills focused on preventing catastrophic accidents and near misses, particularly structural collapse, explosion, fire and toxic release associated with loss of containment of energy or dangerous substances such as chemicals and petroleum products. These engineering and management skills exceed those required for managing workplace safety.

Major accident – an occurrence such as a major emission, fire, or explosion resulting from uncontrolled developments in the course of the operation and leading to serious danger to human health or the environment (whether immediate or delayed) inside or outside the establishment, and involving one or more dangerous substances. Note that this is the

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

11

legal definition for a major accident taken from the UK Control of Major Accident Hazards (COMAH) Regulations.

Note also that for the UK offshore sector, a legal definition of a major accident is given in the 2015 Safety Case Regulations (SCR 2015).

Making safe – the process of cleaning, freeing equipment of hydrocarbons, disconnection and physical isolation, and waste management. In relation to pipelines, this involves depressurising them and removing any hydrocarbons. Then the pipelines are cleaned and purged, with the cleaning programme based on the specific needs of the system. This may involve the use of pigs, which are maintenance tools used to clean or inspect the insides of pipelines.

Safety Critical Element/Equipment (SCE) – any structure, plant, equipment, system (including computer software) or component part whose failure could cause, or contribute substantially to, a major accident is safety critical, as is any that is intended to prevent or limit the effect of a major accident. In the UK, the term Safety and Environmental Critical Element (SECE) has been established under the 2015 Safety Case Regulations. This extends the SCE definition to include equipment or systems intended to prevent or limit a major environmental accident or whose failure could cause a major environmental accident.

Warm suspension/warm stack – the facility will have gone through final shutdown, but the process systems will not have been fully isolated and cleaned.

1.3 TERMINOLOGY USED IN THE DOCUMENT

Further to the definitions presented in 1.2, clarification is also given in this section on terminology that has been used in this guidance document to ensure the reader understands the context of certain terms used.

1.3.1 Use of the terms health, safety and environment (HS&E), safety and process safety

In this document, where there is a broader relevance or significance, reference is frequently made to HS&E and safety, as well as to process safety. In general, where this is done and there is no specific mention of process safety, it can be assumed that this is implicit within the reference to HS&E or safety.

Note that as is stated in the abbreviations in section 6, where HSE has been used, this refers to the UK Health and Safety Executive.

1.3.2 Use of the terms 'stage' and 'phase'

To avoid confusion, where the terms project stage or stage have been used, it is in relation to the physical decommissioning activities executed at the site, such as 'cleaning and isolation' or 'dismantling/disconnection'. Further discussion on project stages is given in 4.1.

This is distinct from 'project phase', which is defined as follows:

Where project phase or phase have been used, it is in the context of the project work in support of the decommissioning programme itself, including 'initiate', 'select and develop', 'project engineering' and 'execute', which are discussed in further detail in section 3.

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

12

1.3.3 Use of the terms SCE and SECE

The definition for an SCE is given in 1.2. However, in the UK offshore sector, the Safety Case Regulations now extends this to SECE. This brings within this definition any equipment or systems intended to prevent or limit a major environmental accident or whose failure could cause a major environmental accident. Generally, the term SCE has been used throughout this document, but when using the guidance in the context of the UK offshore sector, the wider SECE definition should be applied.

1.3.4 Use of the term ALARP

ALARP is short for 'as low as reasonably practicable'. This involves weighing a risk against the trouble, time and money needed to control it. Thus, ALARP describes the level to which workplace risks should be controlled. It is a regulatory requirement in the UK. However, in other countries where it is not recognised in law, this approach to managing risk may be seen as representing good practice. The term is used in this guidance document, so the reader should consider whether its application is a regulatory requirement or would be an implementation of good practice.

1.3.5 Document structure

This guidance document is set out in the following sections:

The background to the guidance document, along with definitions and clarification on terminology, is presented in section 1.

The aspects of decommissioning that this document is intended to address and the energy sectors it focuses on, together with how the guidance should be applied, are presented in section 3.

As this guidance is intended to be a useful reference to process safety professionals and others who may be tasked with HS&E responsibilities during a decommissioning project, Section 3 has been included to provide support on key process safety related considerations at various points in the project life cycle, from initial project set-up through to final decommission and removal.

Generic guidance on several areas identified as key in the EI workshops on process safety in decommissioning is presented in section 4. Guidance that is specific to thermal power stations is included in Annex B, the onshore oil and gas and petrochemical sector is covered in Annex C and the offshore sector in Annex D.

Abbreviations are presented in Annex E and documents referenced in the document are presented in Annex F.

The EI has published a High level framework for process safety management which is relevant to this guidance document. For this reason, aspects of the Framework that are specifically relevant to decommissioning have been identified and presented (with minor text changes as appropriate) in Annex A.

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

13

2 SCOPE AND APPLICATION

2.1 SCOPE

In September 2016, the EI convened two workshops on managing process safety in decommisioning projects: one for onshore facilities, which had representatives from the conventional power generation, petroleum refining and bulk storage sectors, and an offshore workshop, which had representatives from the upstream oil and gas sector.

The workshops comprised scene-setting presentations that shared knowledge, experience and challenges between the delegates and structured discussion sessions, which focused on key process safety in decommissioning issues. The workshop proceedings were written up in the Technical workshop proceedings: Process safety in decommissioning projects (1st edition).

From the workshops, it was concluded that there was a requirement to develop guidance on managing process safety in decommissioning projects within the energy sector. It was proposed that the guidance should focus on some common core issues and address:

− project management;

− the stages of a decommissioning project (from late-life operations through to dismantle/demolish and removal);

− communication with stakeholders;

− interaction with regulators and compliance with legislation and industry/company standards;

− determining and managing the hazard profile, and

− managing people.

This publication is intended to provide guidance on managing process safety within decommissioning projects generally within the energy sector, with more specific guidance and information provided, where possible, in the following industry sectors:

− offshore oil and gas;

− onshore oil and gas and petrochemicals, and

− thermal power generation.

In keeping with the EI's definition of process safety (see 1.2), this guidance focuses on managing process safety in the context of prevention and mitigation of higher consequence events. For this reason, occupational safety is not addressed in detail but is covered briefly where considered appropriate.

This guidance has not been developed for application within the nuclear sector, for which radiological hazards would be the dominant consideration.

GUIDANCE ON MANAGING PROCESS SAFETY IN DECOMMISSIONING PROJECTS

14

This guidance is intended to support those with direct and indirect responsibilities for managing process safety, or with wider health and safety responsibilities, on a decommissioning project. The guidance does not address the following:

− disposal, decontamination and reinstatement of the site and ongoing surveillance;

− planning for decommissioning during the early design of a facility;

− mothballing, and

− reuse.

2.2 APPLICATION

This publication is intended as a guide for managing process safety in the decommissioning of facilities in the offshore and onshore oil and gas, petrochemical and conventional thermal power station sectors.

The document should be used to inform and guide the reader on core common issues that are of relevance to the management of process safety during the decommissioning life cycle. It is not intended to provide an exhaustive or prescriptive guide, but instead should provide a road map for process safety management through the identification of key issues to be considered. It also provides guidance on how to address those issues and includes details of further relevant reference material. It should, therefore, be used alongside other industry information sources available on decommissioning and process safety.