© 2009 Halliburton. All Rights Reserved. 3
Well Completion
Defined as “the design, selection and installation of equipment and the specification of treatment and procedures necessary to bring the well into production and thereafter to produce in a manner which satisfies the operator’s objectives for the field development”.
TWBPERMA-SERIES®
PACKER
HYDRAULIC CONTROL LINE
SURFACE-CONTROLLEDTUBING-RETRIEVABLESAFETY VALVE
SIDE POCKETMANDREL
LANDING NIPPLE
FLOW COUPLING
FLOW COUPLING
SIDE POCKETMANDREL
SIDE POCKETMANDREL
LO LINERHANGER
RH HYDRAULIC-SETPACKER
CIRCULATINGDEVICE
BLAST JOINT
NO-GO NIPPLE
SLIDING SIDE-DOOR®
CIRCULATING DEVICE
© 2009 Halliburton. All Rights Reserved. 4
( )( )( )
Evaluating the WellEvaluating the Well
•• After the drill bit After the drill bit reaches target depth reaches target depth the well must be the well must be evaluated.evaluated.
•• Logging While Logging While Drilling (LWD)Drilling (LWD)
•• Electric Wireline Electric Wireline conveyed conveyed logginglogging
© 2009 Halliburton. All Rights Reserved. 5
Data Inputs to Formulate Design Criteria
Reservoir Parameters
Fluid Characteristics
Rock Characteristics
Production Constraints
Well and Completion Appraisal
Design Criteria
© 2009 Halliburton. All Rights Reserved. 6
Run and Cement Run and Cement the Casingthe Casing
•• Zonal IsolationZonal Isolation
•• Control flow from the Control flow from the desired formationdesired formation
•• Run the casingRun the casing
Completing the WellCompleting the Well
A.A. Run and cement Run and cement the casingthe casing
© 2009 Halliburton. All Rights Reserved. 7
Run and Cement Run and Cement the Casingthe Casing
•• Zonal IsolationZonal Isolation
•• Control flow from the Control flow from the desired formationdesired formation
•• Run the casingRun the casing
•• Cement the casingCement the casing
•• Swell packersSwell packers
Completing the WellCompleting the Well
A.A. Run and cement Run and cement the casingthe casing
© 2009 Halliburton. All Rights Reserved. 8
What is a Packer?
TUBING
SEAL
CASING
Tool used to form an annular seal between two concentric strings of pipe
OR
Tool used to form an annular seal between the pipe and the wall of theopen hole
© 2009 Halliburton. All Rights Reserved. 9
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
Displace to Completion Displace to Completion BrineBrine
•• Replace solids laden Replace solids laden fluid with solids free fluid with solids free fluidfluid
•• Run in the work stringRun in the work string
•• Circulate out the drilling Circulate out the drilling mud with the mud with the completion brinecompletion brine
•• Filter the brineFilter the brine
•• Pull the work stringPull the work string
© 2009 Halliburton. All Rights Reserved. 10
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
Perforate the CasingPerforate the Casing
•• Provide a flow path Provide a flow path from the reservoir to from the reservoir to the well borethe well bore
•• Run the packerRun the packer
© 2009 Halliburton. All Rights Reserved. 11
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
Perforate the CasingPerforate the Casing
•• Provide a flow path Provide a flow path from the reservoir to from the reservoir to the well borethe well bore
•• Run the packerRun the packer
•• Run the perforating Run the perforating assemblyassembly
•• Fire the guns and Fire the guns and stabilize the wellstabilize the well
•• Pull the spent gunsPull the spent guns
© 2009 Halliburton. All Rights Reserved. 12
Perforating
Wireline casing guns
Through tubing wireline guns
Tubing conveyed perforating
© 2009 Halliburton. All Rights Reserved. 13
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
D.D. Install sand control?Install sand control?
Install Sand ControlInstall Sand Control
•• Filter formation material Filter formation material from oil, gas or water from oil, gas or water production.production.
•• Run screen and packer Run screen and packer assemblyassembly
•• Drop the ball and set Drop the ball and set the packerthe packer
© 2009 Halliburton. All Rights Reserved. 14
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
D.D. Install sand control?Install sand control?
Install Sand ControlInstall Sand Control
•• Filter formation material Filter formation material from oil, gas or water from oil, gas or water production.production.
•• Run screen and packer Run screen and packer assemblyassembly
•• Drop the ball and set Drop the ball and set the packerthe packer
•• Perform gravel packPerform gravel pack
© 2009 Halliburton. All Rights Reserved. 15
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
D.D. Install sand control?Install sand control?
Install Sand ControlInstall Sand Control
•• Filter formation material Filter formation material from oil, gas or water from oil, gas or water production.production.
•• Run screen and packer Run screen and packer assemblyassembly
•• Drop the ball and set Drop the ball and set the packerthe packer
•• Perform gravel packPerform gravel pack
•• ReverseReverse--out excessout excess
© 2009 Halliburton. All Rights Reserved. 16
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
D.D. Install sand control?Install sand control?
Install Sand ControlInstall Sand Control
•• Filter formation material Filter formation material from oil, gas or water from oil, gas or water production.production.
•• Run screen and packer Run screen and packer assemblyassembly
•• Drop the ball and set Drop the ball and set the packerthe packer
•• Perform gravel packPerform gravel pack
•• ReverseReverse--out excessout excess
© 2009 Halliburton. All Rights Reserved. 17
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
D.D. Install sand control?Install sand control?
Install Sand ControlInstall Sand Control
•• Filter formation material Filter formation material from oil, gas or water from oil, gas or water production.production.
•• Run screen and packer Run screen and packer assemblyassembly
•• Drop the ball and set Drop the ball and set the packerthe packer
•• Perform gravel packPerform gravel pack
•• ReverseReverse--out excessout excess
•• Pull out of the wellPull out of the well
© 2009 Halliburton. All Rights Reserved. 18
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
D.D. Install sand control?Install sand control?
E.E. Install production Install production packer and tubingpacker and tubing
Install Production Install Production Packer and TubingPacker and Tubing
•• Seals and protects the Seals and protects the casing from erosion and casing from erosion and corrosioncorrosion
•• Run the production tubing Run the production tubing in the wellin the well
•• Circulate the inhibited Circulate the inhibited packer fluidpacker fluid
•• Set the production packerSet the production packer
© 2009 Halliburton. All Rights Reserved. 19
What is a Packer?
TUBING
SEAL
CASING
Tool used to form an annular seal between two concentric strings of pipe
OR
Tool used to form an annular seal between the pipe and the wall of theopen hole
© 2009 Halliburton. All Rights Reserved. 20
Packers
What type of packers are there?
10 basic types of packers
4 most common types
TUBING
SEAL
CASING
© 2009 Halliburton. All Rights Reserved. 21
Mechanical Double Grip Packer
Description:Mechanically set using combinations of rotation and tension or compression.Tubing may be left in tension, compression, or neutral.Holds pressure from above and below.
Applications:Production, testing, treating, and service work.
Limitations:May be difficult to operate in deep or deviated conditions.Avoid exceeding safe tension rating.
VALVE
SLIP
PACKINGELEMENT
SLIP
© 2009 Halliburton. All Rights Reserved. 22
Hydraulic Set Packer
Description:Tubing pressure set, shear release.Mechanically held, holds pressure from above and below.Some have counterbalance valve system.
Applications:Deviated wellbores.Below hydraulic set dual packers.Stacked single string completions.
Limitations:Consider load on release pins under all expected operating conditions.With counterbalanced packers, consider temperature effect and compensate with slack-off weight.
VALVE
SLIP
PACKINGELEMENT
SETTING PORTHYDRAULIC
SETTINGCYLINDER
SLIDINGSLEEVE
BLANKINGPLUG
© 2009 Halliburton. All Rights Reserved. 23
Seal Bore Packer
Description:Wireline, Mechanical, or Hydraulic set.Permanent or retrievable.Holds pressure from above and below.Requires tubing seal assembly.
Applications:Production, testing, treating, gravel packing, extreme service.
Limitations:Force analysis recommended for all applications.
STINGER
POLISHED SEALBORE
SLIP
PACKING ELEMENT
SLIP
© 2009 Halliburton. All Rights Reserved. 24
Hydraulic Set Dual Packer
Description:Tubing pressure set, shear release.Dual tubing strings.Holds pressure above and below.
Applications:Upper packer in a multi-zone production completion.Generally run with hydraulic set or seal bore packer below.
Limitations:Avoid severe pressure reversals.Force analysis recommended to determine combination of forces.
SECONDARYSTRING
SECONDARYSTINGER
HYDRAULICSETTINGCHAMBER
HYDRAULICSETTINGPORT
PRIMARYSTRINGABOVEPACKER
SLIP
PACKINGELEMENT
SLIP
PRIMARYSTRINGBELOWPACKER
SINGLE PACKER(Hydraulic Set)
© 2009 Halliburton. All Rights Reserved. 25
Completing the WellCompleting the Well
A.A. Run and cement the Run and cement the casingcasing
B.B. Displace to completion Displace to completion brinebrine
C.C. Perforate the casingPerforate the casing
D.D. Install sand control?Install sand control?
E.E. Install production Install production packer and tubingpacker and tubing
© 2009 Halliburton. All Rights Reserved. 27
Surface Production System
TO SALES STORAGETO SALES STORAGE
PNEUMATICPNEUMATICACTUATORACTUATOR
PNEUMATICPNEUMATICPRESSUREPRESSURETO SSVTO SSV
SAFETYSAFETYCONTROLCONTROL
PANELPANEL
LO AND HILO AND HIMONITOR PILOTMONITOR PILOT
FUSIBLEFUSIBLEPLUGPLUG
SANDSANDEROSIONEROSION
PILOTPILOTHYDRAULIC PRESSURE TO DHSVHYDRAULIC PRESSURE TO DHSV
FUSIBLEFUSIBLEPLUGPLUG
LO AND HILO AND HIMONITOR PILOTMONITOR PILOT
INSTRUMENT AIRINSTRUMENT AIRSUPPLYSUPPLY
LEVEL SWITCHLEVEL SWITCH
TOTOSALESSALESLINELINE
SEPARATORSEPARATOR
LEVELLEVELSWITCHSWITCH
LegendLegend
Pneumatic LinePneumatic LineHydraulic LineHydraulic Line
QUICKQUICKEXHAUSTEXHAUST
HEATERHEATER
CHRISTMAS CHRISTMAS TREETREE
© 2009 Halliburton. All Rights Reserved. 28
Standard Three Phase Separator
Back pressure vale
Baffle
Mist Extractor
Daniels
Turbine meters Liquid level controllers
PSV Rupture disk
Back pressure valve
Baffle
Mist Extractor
Daniels
Turbine meters Liquid level controllers
PSV Rupture disk
Completion Process
Ricki JanniseTechnical Advisor - Completion Tools
281 988 2282 [email protected]
QUESTIONS & ANSWERS