25 november 2011
Hanzelijn Technical solution for the signalling
system
Ronald Doeleman, MIRSE
Hanzelijn : Context
• New line Lelystad-Zwolle (50 km)
Hanzelijn - Technical solution - 25 November 2011 2
Hanzelijn : Context
• New line & stations under construction (commercial service 12/2012)
Hanzelijn - Technical solution - 25 November 2011 3
Hanzarail Context
RVTO Hanzelijn
Document 01 Opdrachtomsschrijving
Document 02 Eisen
specificatie BBGF
Document 02.2 Eisen
specificatie BBGF
subsysteem Bovenleiding
Document 02.3 Eisen
specificatie BBGF
subsysteem Geluidschermen
Document 02.4 Eisen
specificatie BBGF
subsysteem Energie
voorziening
Document 02.1 Eisen
specificatie BBGF
subsysteem Spoor
Document 02.5 Eisen
specificatie BBGF
subsysteem Beveilinging
Document 02.6 Eisen
specificatie BBGF
subsysteem ATM
Document 02 Eisen
specificatie BBLLS
App1 Eisen Breakdown
App2 Lijst bindende documenten
App3 Overzicht raakvlakken BBGF
App4 Raakvlakken BBGF
Document 02.5 Eisen
specificatie BEVIL
subsysteem Beveilinging
SPES Hanzelijn1 - SPES System/SubSystem (SSS)System Specification Working Staff ProtectionIRSs BEVNL
2 – Gebruikersprocessen (User processes)
3 – Operational Scenario ERTMS L2 Overlay
4 – Functional Requirements Dutch Interlocking
5 – Voorschriften (Avs)
Basisovereenkomst(+ Appendix)
Addendum
Appendix XIV : Service Framework Agreement
(+ Annex)
RVTO Lelystad
Hanzelijn - Technical solution - 25 November 2011 4
Hanzarail Context
• Call for tender end of May 2008 (including requirement specifications and operating principles)
• Tender Design process during 5 months led to a refined specification dossier based on Change Requests issued by the suppliers.
• Negotiation phase from Jan to April 2009; update of specification dossier based on signalling specialist meetings (e.g. finalisation of entrance in level 2 principles).
• Since contract signature in May 2009, close collaboration between Prorail and HanzaRail Team (dedicated specialist meetings at least once a month).
Hanzelijn - Technical solution - 25 November 2011 5
Hanzelijn : Signalling system
Flevolijn
Almere
New:IXL & ATP (ATB-EG)
Lelystad Opstelterrein
Lelystad Centrum
GoederenwachtsporenSwifterbant Dronten Hattemerbroek
AanslTunnel
Drontermeer
VeluwelijnLelystad
OpstelterreinAansl
Kampen Zuid Zwolle
New: IXL & ATP: ATB-EG & ERTMS
L2
Hanzelijn - Technical solution - 25 November 2011 6
Scope of supply
Signalling scope (technical) BBGF : Lelystad
Opstelterrein
Lelystad Centrum Goederenwachtsporen
SwifterbantDronten
HattemerbroekAansl
Tunnel Drontermeer
Veluwelijn
LelystadOpstelterrein
Aansl
Flevolijn
Kampen Zuid
Beveiliging:NS54 en ERTMS
Beveiliging:NS54
Beveiliging:NS54 en ERTMS
Beveiliging:NS54
• The Greenfield part shall be equipped with an IXL controlling signals and ATB-EG + ERTMS L2 as overlay + Hand Held Terminal (track worker protection);
• Train equipped with ERTMS can run in ERTMS Level 2 at 200 km/h or in ATB EG (140 km/h) if it is not equipped with ERTMS
• Interfaces − Point Machines (EBI
Switch) − Signals − Track circuit
• Interfaces − TTI − B-Relay IXL
(Hattemerbroek) − VPT Zwolle
Hanzelijn - Technical solution - 25 November 2011 7
Scope of supply
Signalling scope (technical) BBLLS :
• Lelystad station equipped with an IXL controlling ATB-EG and signals, trains can run in ATB at 140km/h.
Perron
PerronLevel 2/
Level STMLevel STM
B-RelaisIXL
• Interfaces − Track circuit − B-Relay IXL (Almere
Oostvaarders) − VPT (Amsterdam)
• Interfaces − Point Machines (NSE
Steller) − Signals
Hanzelijn - Technical solution - 25 November 2011 8
Generic Architecture - BEVNL
Hanzelijn - Technical solution - 25 November 2011 9
Architecture - BBGF
SDM
VIS
To KBV
JRDL
-R
Central Equipment Room at Lelystad RHA30
Gateway
CLC R
FE 1 N FE 2 N
Gateway
CLC N
OD
LM
OD
LM
ED
LM
ED
LM
MCESmax 6
Adjacent IXLTTI
Relay cabinet
Lineside signal
EIA 485
PM max 6
WAK
Point Machine
tracksideelements
trackside elements
tracksideelements
tracksideelements
TFMNetwork 3
ODLM ODLM ODLM ODLM ODLMODLM
EIA 485
Redundant CNET
FE 1 R FE 2 R
Gateway
Gateway
Gateway
Gateway
CLC
FE 1 FE 2
ATB-EG
UM/ PM Cabinet
LEU
switchable balise
OD
LM
OD
LM
MCES
Relay
Lineside signal
RK RK
Connection to CNET Lelystad
UM Cabinet
ATB-EG
TFM Cabinet
RK
TFM Cabinet
RK
TFM Cabinet
RK
TFM Cabinet
RK
RBC MSS
NTG GSM-R to the NTG via GSM-R Network
HPU
KMC
+ UPSto external
power supplyInternal power supply
RHA 30
TFMNetwork 2
TFMNetwork 1
Hanzelijn - Technical solution - 25 November 2011 10
Architecture - BBLLS
SDM
VIS
to KBV Central Equipment Room at Lelystad
RHA30
Gateway
CLC R
FE 1 N
Gateway
CLC N
ODLM
+ UPS
MCES max6 UM
Cabinet
EIA 485
TFM Network 1
RHA30
ODLM ODLM
Redundant CNET
FE 1 R
CLC
FE 1
Connection to CNET Greenfield
to external power supply
Internal power supply
ODLM
EDLM
EDLM
EIA 485
PM max6 PM
Cabinet
Relay cabinet
Cable frame (outside BBLLS scope)
Signals
ATB EG
Points
ODLM
MCES max6 UM
Cabinet
EIA 485
RH20
ODLM
EDLM
EDLM
EIA 485
PM max6 PM
Cabinet
Relay cabinet
Cable frame (outside BBLLS scope)
Signals
ATB EG
PointsAdj IXL
JRDL(shared with BBGF)
RHA30
OD
LM
OD
LM
ED
LM
ED
LMEIA 485
EIA 485
UM/ PM Cabinet
Cable frame (outside BBLLS scope)
Signals ATB EG Points
MCES max6
PM max6
Hanzelijn - Technical solution - 25 November 2011 11
Main functions
• Dutch application of Euro-IXL signalling rules, including: − Set, lock, monitor, release, cancel routes, − Manage ATB-EG, − Manage Signals, − Manage Movable elements, − Manage TTI, − Interface adjacent IXL, − Interface RBC − ATB-VV
Conventional IXL functions
ERTMS Level 2 overlay
• ERTMS and ATB-EG/Signals are driven in parallel by IXL (no consistency check between both).
• Work area management Hanzelijn - Technical solution - 25 November 2011 12
Hanzelijn : Main Operational Processes
• Traffic Controller does not know whether a train is fitted with ERTMS or not
• Driver has to respect signal at danger (Red or dark) even if Cab signalling allows to run
• Consistency of TSRs shall be ensured procedurally
• Driver can change the ATP system in case of degraded mode
ERTMS Level 2 overlay
Hanzelijn - Technical solution - 25 November 2011 13
Hanzelijn Implementation – Status
• IXL and RBC software development finalised
• IXL and RBC configuration ready
• IXL-RBC integration on-going
• Installation of cabinets along the tracks 100%
Hanzelijn - Technical solution - 25 November 2011 14
Hanzelijn Implementation – Status
• GASC SML300T ISA assessed + delivered
• SASC LLS final (in service 19 september 2011)
• SASC BEVNL 01-12-2011 (+ restrictions)
• System ready from technical point of view: 31-03-2012
• Start “Integraal proefbedrijf”: 01-06-2012
• Commercial operation: 12-12-2012
Safety Case Infrastructuur
Safety Case BBGF
Specific Application Safety Case
BEVNL
Generic Application Safety Case
SML300T
Hanzelijn - Technical solution - 25 November 2011 15
Cabinets along the tracks
Hanzelijn - Technical solution - 25 November 2011 16
Equipment in central room (RHa30)
Hanzelijn - Technical solution - 25 November 2011 17
CLC
Hanzelijn - Technical solution - 25 November 2011 18
Gateway - ODLM
Hanzelijn - Technical solution - 25 November 2011 19
UPM
Hanzelijn - Technical solution - 25 November 2011 20
TFM33
Hanzelijn - Technical solution - 25 November 2011 21
TFM33
Hanzelijn - Technical solution - 25 November 2011 22
B-Relays
Hanzelijn - Technical solution - 25 November 2011 23
VIS
Hanzelijn - Technical solution - 25 November 2011 24
SDM
Hanzelijn - Technical solution - 25 November 2011 25
RBC
Hanzelijn - Technical solution - 25 November 2011 26
NTG (release 3)
Hanzelijn - Technical solution - 25 November 2011 27
HPU
Hanzelijn - Technical solution - 25 November 2011 28
Eurobalise
Hanzelijn - Technical solution - 25 November 2011 29
Lineside Encoder Unit (LEU)
Hanzelijn - Technical solution - 25 November 2011 30
MMS
Hanzelijn - Technical solution - 25 November 2011 31
RH20 (LLS)
Hanzelijn - Technical solution - 25 November 2011 32
RH20
Hanzelijn - Technical solution - 25 November 2011 33
TRANSPORT
www.alstom.com