Ongoing Activities 7/30/18 - 8/3/18 Upcoming Activities 7/30/18 - 8/3/18 Photographs Safety Sector Demolition of ceilings – Phase 2 MEP safe off – Phase 2 Demolition of restrooms – Phase 2 Electrical overhead rough in – Phase 2 Layout of priority walls – Phase 2 Plumbing rough in – Area C Restrooms Demolition Red Zones CMU wall infill – Phase 2 Demolition of Media Center – Phase 2 HVAC overhead rough in – Phase 2 From the start of the project, workers on the APS Harper Archer project understand the importance of demolition red zones. “Danger Do Not Enter” Signage Installed Only the demolition crew are allowed in the area. All proper PPE required. Silica procedures posted. Harper Archer Elementary School Project Purpose Statement: Through a highly-phased conversion, we will create a safe and quality learning space for future generations. Final Front Entrance of Phase 1

Harper Archer Elementary School - Atlanta Public Schools...Priority Wall Layout Harper Archer Elementary School Project Purpose Statement: Through a highly-phased conversion, we will

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Harper Archer Elementary School - Atlanta Public Schools...Priority Wall Layout Harper Archer Elementary School Project Purpose Statement: Through a highly-phased conversion, we will

Ongoing Activities7/30/18 - 8/3/18

Upcoming Activities7/30/18 - 8/3/18

Photographs

Safe

tySe

cto

r

• Demolition of ceilings – Phase 2• MEP safe off – Phase 2• Demolition of restrooms – Phase 2• Electrical overhead rough in – Phase 2• Layout of priority walls – Phase 2• Plumbing rough in – Area C Restrooms

Demolition Red Zones• CMU wall infill – Phase 2• Demolition of Media Center – Phase 2• HVAC overhead rough in – Phase 2

From the start of the project, workers on the APS Harper Archer project understand the importance of demolition red zones.

• “Danger Do Not Enter” Signage Installed• Only the demolition crew are allowed in the area. • All proper PPE required.• Silica procedures posted.

Harper Archer Elementary SchoolProject Purpose Statement: Through a highly-phased conversion, we will create a safe and quality learning

space for future generations.

Final Front Entrance of Phase 1

Page 2: Harper Archer Elementary School - Atlanta Public Schools...Priority Wall Layout Harper Archer Elementary School Project Purpose Statement: Through a highly-phased conversion, we will

Priority Wall Layout

Harper Archer Elementary SchoolProject Purpose Statement: Through a highly-phased conversion, we will create a safe and quality learning

space for future generations.

Removal of Locker Curbs

Demolition of Floors in Area D Temporary Window Protection in Area E

Demolition of Restrooms in Area D