Page 1: Harper Archer Elementary School - Atlanta Public Schools...Priority Wall Layout Harper Archer Elementary School Project Purpose Statement: Through a highly-phased conversion, we will

Ongoing Activities7/30/18 - 8/3/18

Upcoming Activities7/30/18 - 8/3/18

Photographs

Safe

tySe

cto

r

• Demolition of ceilings – Phase 2• MEP safe off – Phase 2• Demolition of restrooms – Phase 2• Electrical overhead rough in – Phase 2• Layout of priority walls – Phase 2• Plumbing rough in – Area C Restrooms

Demolition Red Zones• CMU wall infill – Phase 2• Demolition of Media Center – Phase 2• HVAC overhead rough in – Phase 2

From the start of the project, workers on the APS Harper Archer project understand the importance of demolition red zones.

• “Danger Do Not Enter” Signage Installed• Only the demolition crew are allowed in the area. • All proper PPE required.• Silica procedures posted.

Harper Archer Elementary SchoolProject Purpose Statement: Through a highly-phased conversion, we will create a safe and quality learning

space for future generations.

Final Front Entrance of Phase 1

Page 2: Harper Archer Elementary School - Atlanta Public Schools...Priority Wall Layout Harper Archer Elementary School Project Purpose Statement: Through a highly-phased conversion, we will

Priority Wall Layout

Harper Archer Elementary SchoolProject Purpose Statement: Through a highly-phased conversion, we will create a safe and quality learning

space for future generations.

Removal of Locker Curbs

Demolition of Floors in Area D Temporary Window Protection in Area E

Demolition of Restrooms in Area D