21
Name of Hon'ble MLA: Captain Abhimanyu Total population : 231737 Area (Sq km): 803.746 HSAMB Road Network Status HSAMB Roads Chronology: Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund Constituency information (2001) PWD Roads Network: NH 0.00 SH 50.25 MDR 0.00 ODR 264.24 Transferred from HSAMB 22.48 Total 336.97 (Information of PWD road network in the Constituency may not be very accurate) Completed Roads under Maintenance 38 141.38 No SR envisaged roads km 7 28.90 SR Awarded roads km 45 170.28 Sub Total: roads km New Construction going on 1 9.09 New Construction - Awarded roads km 3 6.67 New Construction - Unawarded roads km 4 15.76 Sub Total: roads km Transferred 4 21.63 Transferred to PWD (938 roads) roads km 4 21.63 Sub Total: roads km 53 207.67 Group Total: roads km 8 37.56 a) Roads Completed before 1-7-1999 roads km 23 97.29 b) Roads Completed between 1-7-1999 and 4-3-2005 roads km 11 32.99 c) Roads Completed between 5-3-2005 and 25-9-2009 roads km 7 24.07 d) Roads Completed between 26-9-2009 and 25-10-2014 roads km 49 191.91 Total: roads km Friday, February 05, 2016 Page 1 of 21 Narnaund N

Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

  • Upload
    lethien

  • View
    226

  • Download
    5

Embed Size (px)

Citation preview

Page 1: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Name of Hon'ble MLA: Captain Abhimanyu

Total population : 231737

Area (Sq km): 803.746

HSAMB Road Network Status

HSAMB Roads Chronology:

Haryana State Agricultural Marketing Board

Summary of Road Network

Name of Constituency: Narnaund

Constituency information

(2001)

PWD Roads Network:

NH

0.00

SH

50.25

MDR

0.00

ODR

264.24

Transferred from HSAMB

22.48

Total

336.97

(Information of PWD road network in the

Constituency may not be very accurate)

Completed Roads under Maintenance

38 141.38No SR envisaged roads km

7 28.90SR Awarded roads km

45 170.28Sub Total: roads km

New Construction going on

1 9.09New Construction - Awarded roads km

3 6.67New Construction - Unawarded roads km

4 15.76Sub Total: roads km

Transferred

4 21.63Transferred to PWD (938 roads) roads km

4 21.63Sub Total: roads km

53 207.67Group Total: roads km

8 37.56 a) Roads Completed before 1-7-1999 roads km

23 97.29 b) Roads Completed between 1-7-1999 and 4-3-2005 roads km

11 32.99 c) Roads Completed between 5-3-2005 and 25-9-2009 roads km

7 24.07 d) Roads Completed between 26-9-2009 and 25-10-2014 roads km

49 191.91Total: roads km

Friday, February 05, 2016 Page 1 of 21Narnaund N

Page 2: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Completed Roads under Maintenance

No SR envisaged

H - 1468 Moth To Narnaund 6.651) km.

Work Completed on 15.12.2015. Exp. upto date is Rs. 30.00 lacs.Road is in good condition.

114444 29-Dec-15

PIP Block laid in 400 m. WBM+patches complete. Likely date of completion is 31.10.2015.

111250 29-Oct-15

Construction 1992, Path 5 Karam, Crust 150 mm. Work plan 2014-15: RD 0-5800 (m), WBM Patches + PC, RD 5800-6200 = 400(m) PIP Block over GSB in 18' width + Drain (Nala) both side. narnaund Phirni). GSB and PIP complete, work of WBM in progress. & expected completion date of work is 30.09.2015.

110263 18-Sep-15

GSB and PIP complete, work of WBM in progress. & expected completion date of work is 30.09.2015.

109998 16-Sep-15

Allotted on 12.08.2014.83228 21-Aug-14

Work plan 2014-15: RD 0-5800 (m), WBM Patches + PC, RD 5800-6200 = 400(m) PIP Block over GSB in 18' width + Drain (Nala) both side. narnaund Phirni). Estimated cost 103.80 lacs.

75147 24-Jun-14

Constructed- 1992 ,Path 5 Karam, Crust 150 mm. 950m CC (Narnaund) and rest PC done in 2007.

6514 27-Sep-11

H - 1470 Sisar To Bhatol 6.042) km.

Work completed on 31.08.15. Road is in good condition.111240 29-Oct-15

Constructed 10/1991, Path 6 karam,Crust 150 mm & 325 mm in Phirni, only PC in 2006. Work completed.

110291 18-Sep-15

W/ E.I.C has order that report may be sent to S.E Hisar for making necessary recommendation apraise the E.E, SDE, JE and contract S.E Hisar to submit report.

102578 15-May-15

Inspection: On dated 12.11.2014,Sh. Kudrat Singh,SDE inspect the road. The report be send to S.E. Hisar for making necessary recommendation against the E.E, SDO, JE and contractor. S.E. Hisar to submit report within 10 days on dt. 18.12.2014.

100372 17-Apr-15

Inspection: SDO (QC) Jind send his checking report vide his memo No. 330 on dt. 25.11.2014.

91618 18-Dec-14

R/A/A for Rs. 88.24 lac on dated 08.07.2014.77868 08-Jul-14

Work alloted to Sh. Raj Kumar Malik Contractor, on 16.12.13. Time limit 6 months.

66207 12-Mar-14

A/A/D/E of Rs.7743200/- accoreded and rates also approved on 09.12.2013.

59486 09-Dec-13

Pavers over 250mm GSB and drains on both sides in 670m in Sisar. Estimated Cost: Rs. 106 lacs.

91334 01-Apr-13

Constructed 10/1991, Path 6 karam,Crust 150 mm & 325 mm in Phirni, only PC in 2006

12365 21-Oct-11

H - 1472 Koth Khurd To Jajwan 4.603) km.

Friday, February 05, 2016 Page 2 of 21Narnaund N

Page 3: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Work completed on 15.05.2015.Road is in good condition.111253 29-Oct-15

Construction 2001, Path 5 Karam, Crust 150 mm. S/R in 2007, 20 mm PC. Work plan 2014-15: RD 0-1100, RD 1750-1850, RD 2000-2100, RD 2500-3500, RD 3700-4100 and RD 4350-4600 (WBM Patches + PC). Work completed on 15.05.2015.

110264 18-Sep-15

Road is in good condition.110000 16-Sep-15

Construction 2001, Path 5 Karam, Crust 150 mm. S/R in 2007, 20 mm PC. Work plan 2014-15: WBM Patches + PC in RD 0-1100, RD 1750-1850, RD 2000-2100, RD 2500-3500, RD 3700-4100 and RD 4350-4600 . Rest unthouched . Work completed on 15.05.2015.

109999 16-Sep-15

Work allotted on 22.08.14 to M/S Shearon const.86156 01-Oct-14

A/A accorded for Rs. 20.39 lac on 19.08.2014.82789 19-Aug-14

H - 1474 Mirchpur To Barwala Jind Road 0.524) km.

Good condition.95691 09-Mar-15

Taken over back from PWDm B&R on 06.08.2013.53140 14-Aug-13

Transferred to PWD. PWD RoadID: __________.21192 16-Mar-12

Constructed 1992, Path 6 karam,Crust 150mm & 325mm in Phirni, only PC in 1996

12318 21-Oct-11

H - 1475 Rakhi Khas To Jind Barwala Road 5.505) km.

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110397 18-Sep-15

Patch work required.95821 09-Mar-15

Work Completed on 28.08.2014.91830 06-Jan-15

Work completed on 28.04.14 & final bill is awaited from SDO (Chopra).

86174 04-Nov-14

A/A & D/estimate technical sanctioned for Rs. 33,00,300/- Work allotted on 04.03.14. E.E. reported that 200 mtr Nallah completed. Provision - widening in 810 mtr (Phirni) & WBM+PC in entire area . PIP Block 110 mtr in 18' width

70163 29-Apr-14

Work alloted to Sh. Baljeet Singh contractor, on 04.03.14. Time limit 3 months.

66209 12-Mar-14

Tender received on 10.04.12 and tender approved on 27.06.12, allotted to (Sh. Suresh Chug) on 11.07.12, SR completed on 06.05.2013.

29813 16-May-13

250mm GSB + 75mm WBM + pavers with drain both sides in 810m phirni in village Rakhi Khas. Estimated Cost: Rs 80 lacs.

91328 01-Apr-13

H - 1482 Sisai To Kajal Khera 5.006) km.

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110399 18-Sep-15

Good condition.95695 09-Mar-15

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45666 18-Apr-13

Constructed 6/1999, Path 6 karam, Crust 150 mm & 325mm in Phirni, only PC in 2007

12368 21-Oct-11

Transferred to PWD. PWD RoadID : 91687839 03-Oct-11

Friday, February 05, 2016 Page 3 of 21Narnaund N

Page 4: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

H - 1483 Kajalkhera To Madha 3.207) km.

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110400 18-Sep-15

Good condition.95696 09-Mar-15

Work completed on 27.11.2012.38005 07-Dec-12

Constructed- 2003 ,Path 5 Karam, Crust 150 mm. 75mm WBM + PC sanctioned on 15/10/2010, allotted on 6/9/2011 (R.S.const. co.) Est. Cost:- 32.06 Lacs.

6528 27-Sep-11

H - 1484 Singhwa Ragho To Masudpur 5.708) km.

Work completed on 15.10.2015.Road is in good condition.111251 29-Oct-15

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110401 18-Sep-15

Construction 2001, Path 6 Karam, Crust 150 mm, Only PC in 2010. Work plan 2014-15: RD 0-500 (PIP Block 18' wide & 300(m) Nala one side) (Singhwa Ragho Phirni). RD 4600-4900, RD 5000-5050 and RD 5350-5700 = 700(m) PIP Block 18' wide, RD 4600 to 5700= 1100(m) one side Nala (Masudpur Phirni). GSB & Paver block laid in 650 m in village Masudpur. Further work of PIP Block is in progress & expected completion date of work is 31.08.2015

110265 18-Sep-15

. GSB & Paver block laid in 650 m in village Masudpur. Further work of PIP Block is in progress & expected completion date of work is 30.09.2015

110001 16-Sep-15

Work allotted on 19.08.14 .86155 01-Oct-14

Tender approved on 12.08.2014 (M/s Sindhu Const. Co.) and T/S D/S granted for Rs. 1,02,63,600/-

82469 12-Aug-14

A/A accorded for Rs. 1.02 crore on 08.08.2014.82371 11-Aug-14

Work plan 2014-15: RD 0-500 (PIP Block 18' wide & 300(m) Nala one side) (Singhwa Ragho Phirni). RD 4600-4900, RD 5000-5050 and RD 5350-5700 = 700(m) PIP Block 18' wide, RD 4600 to 5700= 1100(m) one side Nala (Masudpur Phirni). Estimated cost 120.00 lacs.

75149 24-Jun-14

Constructed 2001, Path 6 karam,Crust 150mm & 325mm in Phirni, only PC in 2010

12319 21-Oct-11

H - 1487 Girls School To Shamshan Ghat At Badchapper 0.229) km.

Good condition.95699 09-Mar-15

EE reported road transferred back from PWD (B&R) on 06.08.2013.52597 08-Aug-13

Transferred to PWD. PWD RoadID: __________.21195 16-Mar-12

Constructed 2000, Path 6 karam,Crust 150mm12321 21-Oct-11

H - 1488 Main Road To Shamshan Ghat At Budana 0.2010) km.

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110403 18-Sep-15

Good condition.95700 09-Mar-15

Taken over back from PWDm B&R on 06.08.2013.53144 14-Aug-13

Friday, February 05, 2016 Page 4 of 21Narnaund N

Page 5: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Transferred to PWD. PWD RoadID: __________.21196 16-Mar-12

Constructed 2000, Path 6 karam,Crust 150mm, Only PC in 200912322 21-Oct-11

H - 1489 Igrah To Jamni Khera 3.0011) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110404 18-Sep-15

Good condition.95701 09-Mar-15

EE reported road is patchless and in Good Condition, no patch work required.

29714 20-Aug-12

Constructed- 2001 ,Path 5 Karam, Crust 150 mm, 7 Nos, 450 mm H.P. Culvert, SR 2010, 20 mm PC Work Plan:- AR (Rs. 16000/-Per km) Est. Cost:- 0.48 Lacs.

6534 27-Sep-11

H - 1490 Phirni At Khanda Kheri 0.1612) km.

Good condition.95702 09-Mar-15

Constructed- 2001 ,Path 5 Karam, Crust 150 mm, - Nos, 450 mm H.P. Culvert, SR 2010, CC 7" . Work Plan:- Good Condition.

6535 27-Sep-11

H - 1491 Datta Moth Road To Gosala 3.9513) km.

Work of Annual Repair alloted to M/s Salasar Enterprises, Hisar on dt: 23.06.15.

110405 18-Sep-15

Good condition.95703 09-Mar-15

Taken over back from PWDm B&R on 06.08.2013.53145 14-Aug-13

Transferred to PWD. PWD RoadID: __________.21197 16-Mar-12

Constructed 2002, Path 6 karam,Crust 150mm, Only PC in 201012323 21-Oct-11

H - 1492 Khanda Road To Phirni At Village Petwar 0.7514) km.

Work Completed on 20.10.2015.Road is in good condition.111252 29-Oct-15

Construction 2003, Path 5 Karam, Crust 150 mm. SR 2010, CC in phirni portion of vill. Petwar from RD 0to 750. Work plan 2014-15: RD 0-690= 690(m) PIP Block over GSB 250mm Nalla completed in 450 m. GSB complete in 690 m & PIP block in 250 m. & expected completion date of work is 30.09.2015.

110266 18-Sep-15

GSB complete in 690 m & PIP block in 250 m. & expected completion date of work is 30.09.2015.

110002 16-Sep-15

Work allotted on 14.08.14.86154 01-Oct-14

T/S granted for Rs. 50,51,100/- on 31.07.2014.82304 08-Aug-14

Tender approved on dated 28.07.2014 ( Sh. Baljeet Kaswan Contractor). A/A accorded for Rs. 50.51 lac on 28.07.2014.

80779 28-Jul-14

Work plan 2014-15: RD 0-690= 690(m) PIP Block over GSB 250mm in widening portion & GSB 150mm on existing surface in width 18' + Both side drain (Nala). (Petwar Phirni). Estimated cost 77.24 lacs.

75150 24-Jun-14

Constructed- 2003 ,Path 5 Karam, Crust 150 mm, 2 Nos, 450 mm H.P. Culvert, SR 2010, CC in phirni portion of vill. Petwar from RD 0 to 750 Work Plan:- Good Condition.

6537 27-Sep-11

Friday, February 05, 2016 Page 5 of 21Narnaund N

Page 6: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

H - 1493 Kagsar To Igrah 3.6015) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110406 18-Sep-15

Good condition.95704 09-Mar-15

Tender approved on 27.06.12, allotted on 11.07.12 to (Sh. Suresh Chug) Work completed on 31/3/2013.

29579 20-Aug-12

Constructed- 2003 ,Path 5 Karam, Crust 150 mm. 75mm WBM + PC sanctioned on 15/10/2010, allotted on 6/9/2011 (R.S. const.) Est. Cost:- 45.83 Lacs.

6538 27-Sep-11

H - 1494 Koth Khurd To Nara 3.8816) km.

Work completed on 30.04.2015.Road is in good condition.111254 29-Oct-15

Work of Annual Repair alloted to M/s Salasar Enterprises, Hisar on dt: 23.06.15.

110407 18-Sep-15

Construction 2001, Path 5 Karam, Crust 150 mm. SR 2009, 20 mm PC. Work plan 2014-15: RD 200-550 (m) PIP Block over GSB 250mm in widening portion & GSB 150mm on existing surface in width 18'. (RD 200-800= 600(m) one side drain up to disposal) (Koth Khurd Phirni) Work completed on 30.04.2015.

110267 18-Sep-15

Road is in good condition.110004 16-Sep-15

Construction 2001, Path 5 Karam, Crust 150 mm. SR 2009, 20 mm PC. Work plan 2014-15: RD 200-550 (m) PIP Block in widening portion' (RD 200-800= 600(m) one side drain up to disposal) (Koth Khurd Phirni) rest unthouched. Work completed on 30.04.2015.

110003 16-Sep-15

Tender approved on 21.08.2014 ( M/s Sheoran Const. Co.) and D/E sanctioned for Rs. 27,16,800/-.

83245 21-Aug-14

A/A accorded for Rs. 27.16 lac on 19.08.2014.82784 19-Aug-14

WBM 20 cum, PC 2015 sqm Patches done on 20.09.2013(Exp. 217 K).

59654 10-Dec-13

H - 1495 Bheni Amirpur To Milkpur 4.5017) km.

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110408 18-Sep-15

Good condition.95706 09-Mar-15

S/R A/A on dt. 14.12.12. for Rs. 55.31 lacs, Tech. Sanctioned on 15.03.2013 to Rs. 54.69 lacs allotted on 29.03.2013 (M/S Dabaa Contractor).

38502 16-May-13

Constructed- 2004 ,Path 4 Karam, Crust 150 mm, 13 Nos, 450 mm H.P. Culvert, Work Plan:- SR Req. with Raising in 500 m from RD 0 to 500 & Metal layer from RD 1600 to 3700 & PC in balace portion from RD 0 to 1600 & 3700 to 4500 Est. Cost:- 30 Lacs.

6540 27-Sep-11

H - 1496 Koth Kalan To Barsola 5.9018) km.

Work of Annual Repair alloted to M/s Salasar Enterprises, Hisar on dt: 23.06.15.

110409 18-Sep-15

Good condition.95707 09-Mar-15

WBM 34 cum, PC 924 sqm patches done on 26.11.2013(Exp 244k).59655 10-Dec-13

Taken over back from PWDm B&R on 06.08.2013.53146 14-Aug-13

Friday, February 05, 2016 Page 6 of 21Narnaund N

Page 7: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Transferred to PWD. PWD RoadID: __________.21198 16-Mar-12

Constructed 2004, Path 6 karam,Crust 150mm, Only PC in 201012324 21-Oct-11

H - 1497 Kagsar To Narnaund Via Sulchani 8.7019) km.

Work completed on 30.11.2015. Road is in good condition.114454 29-Dec-15

A/A accorded for Rs. 49.65 lac on 03.08.2015 (Under work plan 2015-16). Tender approved on dated 04.08.2015 (M/s Salasar Enterprises) & D/E Tech. Sanction for Rs. 49,65,000/-.

106898 04-Aug-15

Work plan 2015-16: 10% WBM patches + PC 5400m (RD 0 - 1000, 2750 - 3250, 3850 - 5950, 6350 - 7700, 7900 - 8350), Lowering of road 800m (RD 5950 - 6350, 7700 - 7900) WBM 3 Layer + PC, 1 No. causeway, Earth work approximately 5000 Cum, Restoration of berms 10,000 Cum, shifting of electric pole in 600(m), EC 54.77 lacs

102456 12-May-15

RD 2745 to 3235 one layer WBM - 3' and PC & PIP block RD 3235 to 3340, 8250 to 8680 using 6' GSB in 18' wide. DOC 15.06.2014 Exp. 66.51 lacs

101792 15-Jun-14

Constructed- 2004 ,Path 5 Karam, Crust 150 mm & 175mm CC from RD 3200 to 3350 26 Nos, 450 mm H.P. Culvert.

6542 27-Sep-11

H - 1498 Sisai To Bhatla 7.2520) km.

Work of Annual Repair alloted to The Hansi Krishana Colony Co-Op, L&C Society Ltd. Hansi on dt: 23.06.15.

110410 18-Sep-15

Good condition.95708 09-Mar-15

Work completed on 06.12.2012.38006 07-Dec-12

75mm WBM + PC sanctioned on 15/10/2010, allotted on 6/9/2011(R.S. const. co.) (Rs. 69.64 lacs) for 7.07 Km. SR not started.

12124 20-Jan-12

Constructed 2002. Path 5 karam. Crust 150m. No concrete.12123 21-Oct-11

H - 1499 Pwd Road To School At Village Singhwa Ragho 0.7821) km.

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110411 18-Sep-15

Good condition.95709 09-Mar-15

Taken over back from PWDm B&R on 06.08.2013.53147 14-Aug-13

Transferred to PWD. PWD RoadID: __________.21199 16-Mar-12

Constructed 2000, Path 6 karam,Crust 150mm, Only PC in 200912325 21-Oct-11

H - 1500 Sisai To Masudpur 5.5022) km.

Work of Annual Repair alloted to M/s Salasar Enterprises, Hisar on dt: 23.06.15.

110412 18-Sep-15

Good condition.95710 09-Mar-15

(1035 Sqm) PC patches done by 30.06.2013 (Exp. 204k)55152 18-Sep-13

(502 sqm) patches done(20.06.12 to 25.06.12) Exp. 86K29582 20-Aug-12

Constructed- 2002 ,Path 5 Karam, Crust 150 mm, 20 Nos, 450 mm H.P. Culvert, SR 2010, 20 mm PC Work Plan:- Good Condition

6544 27-Sep-11

Friday, February 05, 2016 Page 7 of 21Narnaund N

Page 8: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

H - 1501 Majra To Bhatol 10.9923) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110413 18-Sep-15

Good condition.95711 09-Mar-15

WBM 7.65 cum, PC patches 2148 Sqm done by 03.07.2013 (Exp. 459k)

55153 18-Sep-13

Constructed- 2002. Path 5 Karam. Crust 150 mm. CC 800m from RD 5000 - 5800m, rest 75mm WBM +PC sanctioned on 15/10/2010 ,allotted on 25.05.11 (Suresh Chugh), Est. Cost:- 123.38 Lacs, completed on 15.03.12

29632 20-Aug-12

H - 1503 Bhaklana To Mohla 4.2224) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110414 18-Sep-15

Good condition.95712 09-Mar-15

Work completed on 20.10.2012. E.E. reported that minor patches required ( Area 200 sqm, Estimated cost 0.40 lacs

78110 09-Jul-14

T/approved on 27.02.12(24.02 lacs). No tender received on 10.03.12, received on 24.04.2012.

26063 26-Jun-12

Constructed- 2004. Path 5 Karam. Crust 150 mm.6547 27-Sep-11

H - 1505 Masudpur To Brahman Wala Pond 1.0525) km.

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110415 18-Sep-15

Good condition.95714 09-Mar-15

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45669 18-Apr-13

Constructed 2005, Path 6 karam, Crust 150 mm12370 21-Oct-11

H - 1506 Ugalan To Ghuskhani 1.4026) km.

Good condition.95823 09-Mar-15

Work completed on 31.07.201491831 06-Jan-15

R/A/A for Rs. 15.30 lac on 02.07.2014.79816 02-Jul-14

Work alloted to Sh. Raj Kumar Malik Contractor, on 16.12.13. Time limit 2 months.

66211 12-Mar-14

AA for Rs. 13,26,900/- on dated 28.10.2013.59791 11-Dec-13

PC with WBM patches in entire length. Estimated Cost: Rs 12 lacs.91337 01-Apr-13

Constructed- 2006 ,Path 5 Karam, Crust 150 mm, 1 Nos, 450 mm H.P. Culvert.

6550 27-Sep-11

H - 1507 Bhaklana To Petwar 5.7227) km.

Work Completed on 15.08.15. Road is in good condition.111239 29-Oct-15

Constructed- 2008 ,Path 5 Karam, Crust 225 mm. Work completed.110292 18-Sep-15

PC pending only. Action under clause-3 taken against the agency vide this office memo No. 11615 dt 28.10.2014.

91832 06-Jan-15

Friday, February 05, 2016 Page 8 of 21Narnaund N

Page 9: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

R/A/A amounting to Rs. 68.65 lac on dated 10.07.2014.78881 11-Jul-14

Work alloted to Sh. Raj Kumar Malik Contractor, on 16.12.13. Time limit 4 months.

66212 12-Mar-14

A/A/D/E of Rs.6073600/- accorded and rates also approved on 09.12.2013.

59485 09-Dec-13

Stone metal patches 23.96cum, PC patches 1876.99 expenditure on A/R year 2012-13 is Rs.2.91lacs.

44407 08-Apr-13

PC with WBM patches in entire length. Estimated Cost: Rs 64 lacs.91339 01-Apr-13

Constructed- 2008 ,Path 5 Karam, Crust 225 mm, 11 Nos, 450 mm H.P. Culver.

6551 27-Sep-11

H - 1508 Majra To Janta Nagar 1.6028) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110416 18-Sep-15

Good condition.95715 09-Mar-15

Constructed- 2009 ,Path 4 Karam, Crust 225 mm, 3 Nos, 450 mm H.P. Culvert, Work Plan:- AR (Rs. 16000/-Per km) Est. Cost:- 0.26Lacs.

6552 27-Sep-11

H - 1510 Sisai Lohari To Dhani Kumaharia 3.6029) km.

Work of Annual Repair alloted to M/s Salasar Enterprises, Hisar on dt: 23.06.15.

110418 18-Sep-15

Good condition.95717 09-Mar-15

E.E. reported that minor patches required ( Area 700 sqm estimated cost 1.40 lacs) (Exp. During 2012-13 in A/R 0.36 lacs)

78115 09-Jul-14

181 sqm PC Patches done by 28.06.2013 (Exp. 36k)55158 18-Sep-13

Constructed- 2009 ,Path 3 Karam, Crust 225 mm, 9 Nos. 450 mm H.P. Culvert.

29638 20-Aug-12

AR 424.99 sqm, patches done on 22/03/12 ( Exp. 75K), no patch now.

21608 30-Mar-12

H - 1512 Madan Heri To Puthi 6.1630) km.

Work completed on 30.11.2015. Road is in good condition. 114458 29-Dec-15

Work in progres. Schedule date of competion is 07.12.2015.112673 24-Nov-15

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110419 18-Sep-15

Constructed- 2009 ,Path 5 Karam, Crust 225 mm. Work alloted under Work Plan 2015-16 to M/s Salasar Enterprises, H No 525 Sector -13 Hisar on dated 12.08.15 with the A/A amounting to Rs. 5.25 lacs & schedule date of completion is 11.10.15.

110281 18-Sep-15

A/A accorded for Rs. 5.25 lac on 03.08.2015 (Under work plan 2015-16).

106902 03-Aug-15

Work plan 2015-16: PIP block 150m (RD 6040 - 6160m) in 18' width village Puthi PC 4.45

102454 12-May-15

Constructed- 2009 ,Path 5 Karam, Crust 225 mm, 12 Nos, 450 mm H.P. Culvert.

6556 27-Sep-11

Friday, February 05, 2016 Page 9 of 21Narnaund N

Page 10: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

H - 1513 Jind Hansi Road To Bhaini Amirpur. 1.0831) km.

Work of Annual Repair alloted to Sh. Mukesh Kumar, VPO Modakhera Distt. Hisar on dt: 23.06.2015.

110420 18-Sep-15

Good condition.95720 09-Mar-15

Constructed- 2009 ,Path 4 Karam, Crust 225 mm, 5 Nos, 450 mm H.P. Culvert

29639 20-Aug-12

H - 1514 Koth Kalan To Kapro 5.3132) km.

Work of Annual Repair alloted to M/s Salasar Enterprises, Hisar on dt: 23.06.15.

110421 18-Sep-15

Good condition.95721 09-Mar-15

WBM 36 cum, PC 882 sqm done on 26.11.2013 (Exp. 234k)59659 10-Dec-13

EE reported road transferred back from PWD (B&R) on 06.08.2013.52606 08-Aug-13

Transferred to PWD. PWD RoadID: __________.21200 16-Mar-12

Constructed 2009, Path 6 karam, Crust 225mm12326 21-Oct-11

H - 1515 Badala To Petwar 5.2233) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110422 18-Sep-15

Good condition.95722 09-Mar-15

WBM 2.83 cum, PC patches 576 sqm done on __________(Exp.-----k), now road is in good condition.

55163 18-Sep-13

Constructed- 2010 ,Path 5 Karam, Crust 225 mm, 12 Nos, 450 mm H.P. Culvert, Work Plan:- AR (Rs. 16000/-Per km) Est. Cost:- 0.84 Lacs.

6559 27-Sep-11

H - 1516 Approach Road Sports Stadium At Sulchani 0.0334) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110423 18-Sep-15

Good condition.95723 09-Mar-15

Constructed- 2008 ,Path 6 Karam, Crust 150 mm, Work Plan:- Good Condition

6560 27-Sep-11

H - 1517 Approach Road Sports Stadium At Sisai Kali Rawan 0.0335) km.

Good condition.95724 09-Mar-15

(135 Sqm) Patches done on 27.06.2013 (Exp. 27k), Now road is in good condition.

55165 18-Sep-13

Constructed- 2008 ,Path 6 Karam, Crust 150 mm.6561 27-Sep-11

H - 4914 Petwar To Jind Bhiwani Road 5.1036) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110494 18-Sep-15

Good condition.95793 09-Mar-15

A/A on 21/01/11 for Rs. 148.40lacs. Path 5 karam. Crust 400mm. 12 no. 600mm HP culvert. Tender approved on 2/01/12 (The

18022 14-Feb-12

Friday, February 05, 2016 Page 10 of 21Narnaund N

Page 11: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Ramayan Adarash Co-Op L& C Society Ltd.)

H - 4917 Mohala To Khera Rangran 4.1337) km.

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110497 18-Sep-15

Good condition.95796 09-Mar-15

SE reported work completed on 22.9.2013 except 100m portion under dispute of demarcation issue and only PC left in this 100m portion.

56576 23-Oct-13

R/A/A on 18.04.2012 for Rs. 1.07 crore. Tender allotted on 21/4/2012 (M/s Sandhu Construction Co.)

22503 24-Apr-12

A/A granted on 14.10.10 for 84.83 lacs. Path-5k . Crust-225 mm.4309 07-Sep-11

H - 6241 Approach road from Main road to Sport Stadium Khanda Kheri 0.1538) km.

Work Completed on 20.10.2015. .Road is in good condition.111275 29-Oct-15

A/A amounting to Rs. 7.18 lacs has been granted. Work alloted on 01.09.2015 to M/s Sinhmar Construction Company, 40 Azad Nagar Hisar. 4989/01.09.15. 9813796670

110293 18-Sep-15

Good condition.95810 09-Mar-15

A/A Rs. 4.35 lacs vide CRR No. 4360 dated 21/07/11. R/A/A on 25/01/12 Rs. 5.34 lacs, Work completed on 28/02/12(Sh. Suresh Kumar)

29611 20-Aug-12

141.38 km. Sub Total:

SR Awarded

H - 1360 Madha To Janta Nagar 2.631) km.

Work in progress. Likely date of competion is 31.03.2016.114450 29-Dec-15

Constructed- 1997 ,Path 5 Karam, Crust 150 mm, 5 Nos, 450 mm, H.P. Culvert, SR 2007, 20 mm PC. Work alloted under Work Plan 2015-16 to M/s Rajender Singh Contractor, H No 817 Sector-15-A, Hisar. 9416010504 on dated 12.08.15 with A/A amount Rs. 17.90 with the schedule date 11.11.15.

110271 18-Sep-15

A/A accorded for Rs. 17.90 lac on 03.08.2015 (Under work plan 2015-16). Tender approved on dated 04.08.2015 (Sh. Rajender Singh Contractor).

106900 04-Aug-15

Work plan 2015-16: WBM patches 10% with PC in entire length, EC 17.64 lacs

102449 12-May-15

Constructed - 1997, Path 5 karam, curst 150mm, 5 nos, 450mm H.P. Culvert. SR 2007: 20mm PC entire length Exp. 9.26 lacs

101778 27-Sep-11

H - 1471 Mirchpur To Milkpur 5.422) km.

Stone matel Patches in progress and PC pending . Work in progress. Exp. upto date is Rs. 0.32 lacs. Likely date of competion is 31.03.2016.

114451 29-Dec-15

Constructed- 1992 ,Path 5 Karam, Crust 150 mm. Work alloted under Work Plan 2015-16 to M/s Salasar Enterprises, H No 525

110279 18-Sep-15

Friday, February 05, 2016 Page 11 of 21Narnaund N

Page 12: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Sector -13 Hisar on dated 11.08.15 with the A/A amounting to Rs. 27.87 lacs with the schedule date 10.12.15.

A/A accorded for Rs. 27.87 lacs on 04.08.2015. Tender approved on dated 04.08.2015 (M/s Salasar Enterprises) & D/E Tech. Sanction for Rs. 27.87 lacs.

106919 04-Aug-15

Pavers over 250 GSB and drains on both sides in 920m (RD 0 to 920m) in Mirchpur. DOC 15.11.2014, Exp 66.51 lacs

101790 15-Nov-14

Constructed - 1992, Path 5 karam, crust 150mm, 2 nos, 450mm H.P. Culvert, SR 2007, 20mm PC & CC in 900m (RD 4300 to 5200m) Phirni portion of village Mirchpur

101789 27-Sep-11

H - 1481 Sisar To Jind Bhiwani Road 4.803) km.

stone matel patches in progress PC pending . Exp. upto date is Rs. 0.31 lacs. Schedule date of competion is 07.01.2016.

114452 29-Dec-15

Constructed- 2001 ,Path 5 Karam, Crust 150 mm, 3 No. 450 mm H.P .Culvert, SR 2009, 20 mm PC . Work alloted under Work Plan 2015-16 to M/s Rampal Singh Contractor, Hisar. On dated 08.09.15. with the A/A Rs. 46.84 lacs & schedule date is 07.01.2016.

110283 18-Sep-15

A/A for Rs. 46.84 lac on 24/8/2015. Tender approvd to M/s Rampal Singh on 24/8/2015. D/E Tech. Sanctioned for Rs. 46,84,000/- on dated 27.08.2015.

108239 27-Aug-15

Work plan 2015-16: WBM layer with PC in 3900m length (Except 900m existing CC), EC 43.00 lacs

102448 12-May-15

Constructed - 2001, Path 5 karam, crust 150mm, 3 no. 450 mm H.P. Culvert, SR 2009, 20mm PC, CC 1:2:4 with one layer WBM 900m, WBM + PC 3900m Exp. 34.76 lacs

101776 27-Nov-11

H - 1486 Buwana To Dharam Kheri 6.814) km.

Paver block and PC pending .Work in progress. Exp. upto date is Rs. 0.04 lacs. Schedule date of competion is 07.01.2016.

114453 29-Dec-15

Work in progres. Schedule date of competion is 07.01.2016.111269 29-Oct-15

Constructed 2002, Path 6 karam,Crust 150mm & 325mm in Phirni, only PC in 2010. Work alloted under Work Plan 2015-16 to M/s Rampal Singh Contractor, Hisar. On dated 08.09.15. with the A/A Rs. 44.52 lacs & schedule date is 07.01.2016.

110284 18-Sep-15

A/A for Rs. 44.52 lacs on 24/8/2015. Tender approved on 24/8/2015 to Sh. M/s Rampal Singh Contractor. D/E Tech. Sanctioned for Rs. 44,52,000/- on dated 27.08.2015.

108246 27-Aug-15

Work plan 2015-16: PC in entire length with earth work on berms, EC 39.76 lacs

102453 12-May-15

Transferred to PWD. PWD RoadID: __________.21194 16-Mar-12

Constructed 2002, Path 6 karam, crust 150mm & 325mm in Phirni, SR done 2010: Patch + OC 6340m & CC 1:1 1/2 : 3 in 47m Exp. 25.57 lacs.

101786 21-Oct-11

H - 1504 Samain To Madanheri (Sahid Jasvir Singh Marg) 1.905) km.

Work in progres. Exp upto date is Rs. 0.11 lacs. Schedule date of competion is 31.03.2016.

114455 29-Dec-15

Constructed- 2006 ,Path 5 Karam, Crust 150 mm, 8 Nos, 450 mm H.P. Culvert, Work Plan:- AR (Rs. 16000/-Per km) Est. Cost:- 0.3

110285 18-Sep-15

Friday, February 05, 2016 Page 12 of 21Narnaund N

Page 13: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Lacs. Work alloted under Work Plan 2015-16 to Sh. Harpal Singh Contractor, 5115/04.09.15. with a/a Rs. 24.41 lacs with schedule date 31.12.2015.

A/A for Rs. 24.41 lacs on 24/8/2015. Tender approved on 25/8/2015 to Sh. Harpal Singh Contractor.

108237 25-Aug-15

Work plan 2015-16: WBM layer 75mm + PC in entire length with retaining wall 30m (RD 1450 - 1480m), EC 23.04 lacs

102450 12-May-15

Constructed - 2006, Pth 5 karam, crust 150mm, 8 nos, 450mm H.P. Culvert

101780 27-Sep-11

H - 1509 Majra To Petwar 3.206) km.

R/Wall complete in 100 m. Further work is in progress. Exp., upto date is Rs. 0.03 lacs. Likely date of competion is 31.03.2016.

114456 29-Dec-15

Work of Annual Repair alloted to M/s B.G. Construction Company, Azad Nagar, Hisar on dt: 23.06.15.

110417 18-Sep-15

Constructed- 2009 ,Path 5 Karam, Crust 225 mm, 5 Nos, 450 mm H.P. Culvert, Work Plan:- AR (Rs. 16000/-Per km) Est. Cost:- 0.51 Lacs. Work alloted under Work Plan 2015-16 to Sh. Suresh Kumar Chugh, 5117/04.09.15. with a/a Rs. 20.34 lacs with schedule date 31.12.2015.

110286 18-Sep-15

A/A for Rs. 20.34 lacs on 24/8/2015. Tender approved to Sh. Suresh Kumar Chugh on 25/8/2015.

108238 25-Aug-15

Work plan 2015-16: WBM patches 5% with PC 140m (RD 0 - 140m) and retaining wall 0 to 140m left side and RD 24 to 140m right side, EC 18.69 lacs

102452 12-May-15

Constructed - 2009, Path 5 karam, crust 225m, 5 nos, 450mm H.P. Culvert

101784

H - 1511 Mundhal To Singhwa Khass 4.147) km.

Work in progres. Exp upto date is Rs. 0.01 lacs. Likely date of competion is 31.03.2016.

114457 29-Dec-15

Constructed - 2009, path 5 karam, crust 225m, 6 nos, 450mm H.P. Culvert. Work alloted under Work Plan 2015-16 to Sh. Vinod Kumar Contractor, Mela Kothi Hisar. 5165-69/ 08.09.15 with a/a Rs. 32.00 lacs with schedule date 07.12.2015.

110287 18-Sep-15

A/A accorded for Rs. 32.00 lac on dated 22.08.2015. Tender approved on dated 27.08.2015 (Sh. Vinod Saharan Contractor) & D/E Tech. Sanctioned for Rs. 32,00,000/-

108254 27-Aug-15

Work plan 2015-16: WBM patches 10% with PC 3.94 km (RD 0 - 3940m and raising 200m (3940 - 4140m) EC 29.82 lacs

102451 12-May-15

Constructed - 2009, path 5 karam, crust 225m, 6 nos, 450mm H.P. Culvert

101782 27-Sep-11

28.90 km. Sub Total:

Friday, February 05, 2016 Page 13 of 21Narnaund N

Page 14: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

New Construction going on

New Construction - Awarded

H - 6913 Sisai to Data 9.091) km.

WBM completed PC left .Exp. upto date is Rs. 80.00 lacs. Likely date of completion is 31.03.2016.

114428 29-Dec-15

Work alloted on 20.02.2014. GSB Laid in 6 Km. 1st layer of stone metal laid in 4 Km. Exp. upto date is Rs. 18.97 lacs & Likely completion date of work is 31.10.2015.

110240 18-Sep-15

W/ E.I. C has order that S.E Hisar to ensure compliance report of inspection made of this work.

102574 15-May-15

SE Hisar to ensure compliance report of inspection made.99144 30-Mar-15

A/A accorded for Rs. 2,13,35,800/- on 11.02.14. Work alloted to Sh. Raj Kumar Malik Contractor, on 20.02.14. Time limit 12 months.

66201 12-Mar-14

On 20.12.2013, Hon'ble CM has approved the construction of road to availability of path as per required norms and found to be beneficial in marketing operations although no distance to mandi is shortened.

60354 30-Dec-13

Path= RD 0 to 2850m=32'3", 2850 to 4176m=33', 4176 to 4511m=existing PWD road, 4511 to 5598m=33', 5598 to 7280m=33'4", 7280 to 7521m=33', 7221 to 8716m=31'5", 8716 to 9092m=31' wide st., no distance shortened.

53247 01-Aug-13

9.09 km. Sub Total:

New Construction - Unawarded

H - 5700 Khanda Kheri to Kagsar. 4.271) km.

A/A accorded for Rs. 1.21 crore on dated 21.01.2016.115606 21-Jan-16

On dated 06.01.2016, Hon'ble CM has approved the construction of this road.

115062 12-Jan-16

PR sent to Hon'ble CM vide AM office no. 660 dated 28.12.2015.114638 06-Jan-16

P/R with AM on 22.12.2015114085 22-Dec-15

PR sent to ACS (Agri.) vide CA No. 543 dated 01.12.2015, further sent to AM vide ACS (A) No. 3438 dated 4.12.2015.

113467 10-Dec-15

Proposal does not fall in the policy of the board due to insufficient revenue path. Case may be filed.

93281 24-Feb-15

PR sent to CA on 16.02.2015.93199 16-Feb-15

Road does not fall in the policy of the board due to insufficient revenue path. CA order case may be filed.

93195 16-Feb-15

Road demanded by Captain Abhimanyu. RD 0 to 880= 3karam, RD 880 to 2960= 5karam, RD 2960 to 3420= 7karam, RD 3420 to 4270= 5karam. Road not feasible due to less consolidation path. Distance shortened, length 2.71km.

92787 09-Jan-15

Hon'ble CM not approved the proposal on 17.09.12 due to non availbility of consolidation path prescribed in the norms of HSAMB.

34336 09-Oct-12

Friday, February 05, 2016 Page 14 of 21Narnaund N

Page 15: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

CM ordered on 17/09/2011 to put up after modal code conduct is over. Road not fall In the policy due to less path in RD 3745 to 4625 i.e 3k.

13107 08-Jun-12

H - 7941 Harbal park main gate to Khanda kheri-Igrah road 0.272) km.

A/A accorded for Rs. 12.79 lacs on dated 20.01.2016.115597 21-Jan-16

On dated 16.12.2015, Hon'ble CM has approved the construction of this road.

114380 24-Dec-15

P/R after approval sent to ACS (A) vide AM office no. 525 dated 18.12.2015

114092 22-Dec-15

P/R sent to Hon'ble AM vide ACS (A) office no. 2409 on dated 07.08.2015

107178 11-Aug-15

PR sent to ACS (A) vide CA memo no. 370 dated 7/8/2015107040 07-Aug-15

Path: RD 0 to 270m= 7karam. No distance shortened.115601 05-Aug-15

PR sent to CA on dated 05.08.2015.106950 05-Aug-15

Recommendation of Hon'ble Finance Minister (Captain Abhimanyu). Path 7k.

106945 05-Aug-15

H - 8003 Bhaini Amirpur to Budana 2.133) km.

A/A accorded for Rs. 71.55 lacs on dated 21.01.2016.115607 21-Jan-16

On dated 06.01.2016, Hon'ble CM has approved the construction of this road.

115063 12-Jan-16

PR sent to Hon'ble CM vide AM office no. 662 dated 28.12.2015.114640 06-Jan-16

P/R with AM on 22.12.2015114093 22-Dec-15

PR sent to ACS (Agri.) vide CA No. 542 dated 01.12.2015, further sent to AM vide ACS (A) No. 3434 dated 04.12.2015.

113465 10-Dec-15

RD 0 to 2130m= 3karam. Distance shortened 325m to reach the Narnaund Mandi. Road demanded by the Hon'ble Finance Minister, Haryana.

112643 24-Nov-15

6.67 km. Sub Total:

Friday, February 05, 2016 Page 15 of 21Narnaund N

Page 16: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Planned - New Construction

Planned

H - 4935 Sisar To Badala 3.751) km.

PR sent to CA on 16.02.2015.93241 19-Feb-15

Road demanded by Captain Abhimanyu. RD 0 to 3750= 5karam. Road feasible, direct link road, No distance shortened.

92788 09-Jan-15

Hon'ble AM ordered to file the proposal on 06.09.11 because no fresh demand has come up. Path- 5k, Distt. Hisar

5628 08-Jun-12

18 Nos. 600 mm H.P. Culvert, Est. Cost:- 153.34 lacs.6662 27-Sep-11

3.75 km. Sub Total:

PR with ACS(A) Office

H - 4937 Mohalla To Puthi 5.161) km.

PR sent to ACS (A) vide AM Office memo No. 638 dated 01.02.2016115701 01-Feb-16

PR sent to AM office vide CM office No. 48321 dated 06.01.2015.115445 19-Jan-16

P/R with CM office vide AM office No. 638 dated 19.10.2015114083 22-Dec-15

PR sent to ACS (Agri.) Vide CA No. 541 dated 01.12.2015, further sent to AM vide ACS (A) No. 3430 dated 09.12.2015.

113466 11-Dec-15

RD 0 to 5160m= 5&6kara, and feasible. No distance shortened to reach the Mandi. Direct Link to Road. Road demanded by the Hon'ble Finance Minister, Haryana.

112641 24-Nov-15

On 04.03.2014, Hon'ble CM has not approved the construction of roda due to non-availability of consolidation path prescribed in the norms of HSAMB.

66536 14-Mar-14

Path=RD o to 240m=33', RD 240 to 693m=37'2", RD 693 to 785=34'10.5", RD 785 to 1040m=31'6", RD 1040 to 3130m=27'6", RD 3130 to 4400m=24'11", RD 4400 to 5180m=27'6", no distance shortend, existing bridge at RD 693m is ok.

51750 19-Jul-13

On 19.06.2013, Hon'ble CM has desired to put up the case for construction of the roads immediately.

49490 19-Jun-13

Construction demanded by MP Rohtak on 22/3/2013.43917 26-Mar-13

The case has been considered and filed by the Govt. vide EIC memo no. 14893 dated 21.09.11.

29819 20-Aug-12

Hon'ble AM ordered on 12.09.11 that due to paucity of funds, the estimate may be putup in the next financial year

26031 26-Jun-12

New construction. Path 5 karam. Crust 225mm, 6 Nos, 11 nos., 600mm HP culvert.

18026 14-Feb-12

H - 6718 Habatpur to Gamra 2.022) km.

PR sent to ACS (A) vide CA office memo No. 48 dated 29.01.2016 115724 01-Feb-16

PR again re-submitted to CA on dated 20.01.2016115600 21-Jan-16

Path: RD 0 to 1015m= 4karam, RD 1015 to 1257m= No path 115599 21-Jan-16

Friday, February 05, 2016 Page 16 of 21Narnaund N

Page 17: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

available, RD 1257 to 2022m= 6Karam. Distance shortened.

PR sent to AM office vide CM office No. 49694 dated 06.01.2015.115447 19-Jan-16

PR sent to Hon'ble CM vide AM office no. 659 dated 28.12.2015.114639 06-Jan-16

P/R with AM on 22.12.2015114086 22-Dec-15

PR sent to ACS (Agri.) Vide CA No. 540 dated 01.12.2015, further sent to AM vide ACS (A) No. 3435 dated 04.12.2015.

113464 10-Dec-15

RD 0 to 1015m=4karam, RD 1015 to 1257m= No path is available, RD 1257 to 2022m= 6karam. No distance shortened. Road demanded by the Hon'ble Finance Minister, Haryana.

112642 24-Nov-15

Road unapproved by Govt. due to non availability of consolidation path.

49724 21-Jun-13

The proposal for const. of road taken up by PWD(B&R) intimated by EE Hisar vide no. 4528 dated 14.09.12

34252 05-Oct-12

Recommended by Hon'ble CM.Proposal has been taken up by XEN provincial division PWD (B&R) Hansi vide his memo no 3731 dated 11.09.2012.

33847 04-Oct-12

H - 7695 Datta to Barwala- Hansi road via Khanpur 9.153) km.

PR returned to CA by ACS (A) No. 3439 dated 8/12/2015113474 11-Dec-15

PR sent to ACS (Agri.) Vide CA No. 544 dated 01.12.2015.113468 10-Dec-15

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85716 24-Sep-14

RD 0 to 2950= 5 karam, RD 2950 to 9150= 6 Karam. Road is feasible (direct link road, no distance shortened).

82463 13-Aug-14

16.33 km. Sub Total:

Friday, February 05, 2016 Page 17 of 21Narnaund N

Page 18: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Transferred

Transferred to PWD (938 roads)

H - 1469 Masudpur To Sisai Lohari Ragho 4.601) km.

PWD has allotted works worth 28 lacs.43435 20-Mar-13

Constructed 12/1993, Path 6 karam, Crust 150 mm & 325mm in Phirni, only PC in 2006

12364 21-Oct-11

Transferred to PWD. PWD RoadID : 91607841 03-Oct-11

H - 1476 Datta To Lohari Ragho 6.202) km.

PWD has allotted works worth 40 lacs.43434 20-Mar-13

Constructed 6/1994, Path 6 karam,Crust 150 mm & 325 mm in Phirni, only PC in 2000

12366 21-Oct-11

Transferred to PWD. PWD RoadID : 91617842 03-Oct-11

H - 1478 Ugalan To Jind Bhiwani Road 3.183) km.

PWD has allotted works worth 18 lacs.43437 20-Mar-13

Constructed 10/1999, Path 6 karam, Crust 150mm, 12367 21-Oct-11

Transferred to PWD. PWD RoadID : 91627840 03-Oct-11

H - 1502 Madanheri To Bass 7.654) km.

PWD has allotted works worth 107 lacs.43433 20-Mar-13

Constructed 10/2003, Path 6 karam, Crust 150mm12369 21-Oct-11

21.63 km. Sub Total:

Friday, February 05, 2016 Page 18 of 21Narnaund N

Page 19: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Other

Dropped

H - 4934 Gurana To Khanpur 5.501) km.

The road does not fall in the policy of the board bucause already parallel link to existing PWD road.

93240 19-Feb-15

PR sent to CA on 16.02.2015.93198 16-Feb-15

Road demanded by Captain Abhimanyu. RD 0 to 1800= 7karam, RD 1800 to 5570= 6karam, RD 2960 to 3420= 7karam, RD 3420 to 4270= 5karam. Road feasible.Direct link road. No distance shortened.

92789 09-Jan-15

Hon'ble AM ordered to file the proposal on 06.09.11 because no fresh demand has come up. Path- 6 k, Distt. Hisar

5629 08-Jun-12

Path 5 Karam, Crust 225 mm, 24 Nos, 600 mm H.P. Culvert, Est. Cost:- 213.67

6661 27-Sep-11

H - 4936 Mirchpur To Koth Khurd 5.902) km.

Due to General Assembly Election a Code of Conduct is imposed. Hon’ble Agriculture Minister has desired that this file may be put up in the next Financial year.

85808 29-Sep-14

Path 5 Karam, Crust 225 mm, 13 Nos, 600 mm H.P. Culvert. Hon'ble AM ordered to file the proposal on 06.09.11 because no fresh demand. It is CM announcement. R/C/E sent to Govt. vide CA no. 490 dated 07.09.12. Hon'ble AM has ordered on 12.05.2013 that Hon'ble CM has already filed the proposal on 12.01.2010. Path 33' wide, 2km distance shortened. On 25.3.2014, Hon'ble CM has asked to put up after the Lok Sabha Elections Model Code of conduct is over.

21129 31-Mar-14

H - 6862 Puthi to Ugalan 4.723) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85736 24-Sep-14

PR sent to AM vide ACS (A) memo no.2578 on 11.10.13.66618 19-Mar-14

PR sent to PSA vide CA memo no. 564 on dated 03.10.2013.55949 03-Oct-13

Construction demanded by MP Rohtak on 22/3/2013.43873 26-Mar-13

H - 7380 Gamra to Gariajima 5.464) km.

Due to General Assembly Elections a Code of Conduct is imposed.Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85203 19-Sep-14

P/R sent to PSA vide CA memo no. 853 dated 17.12.13. PR sent to AM vide ACS (A) memo no. 3928 dated 23.12.13.

66702 19-Mar-14

Hon'ble CM desired to examined and take sutable action all dated 16.06.2013 path is 3 and 4 karam

59295 05-Dec-13

H - 7381 Bass to Kharbala khera 5.865) km.

Friday, February 05, 2016 Page 19 of 21Narnaund N

Page 20: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Due to General Assembly Elections a Code of Conduct is imposed Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85996 29-Sep-14

P/R sent to PSA vide CA memo no. 865 dated 18.12.13. PR sent to AM vide ACS (A) memo no. 3949 dated 20.12.13.

66703 19-Mar-14

Request of Gram panchyat to DC Hisar. Path is 5 and 7 karam.59296 05-Dec-13

H - 7605 Madanheri to Baas road via Dehar wala rasta. 6.626) km.

Due to General Assembly Elections a Code of Conduct is imposed Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85964 29-Sep-14

P/R sent to ACS (Agri.) vide CA memo no. 370 dt. 02.07.1480186 24-Jul-14

PR sent to CA on 1.7.2014.76749 01-Jul-14

Demanded by Hon'ble MP Sh. Deepender Hooda in meeting on dated: 07/06/2014.

76488 25-Jun-14

34.05 km. Sub Total:

Rejected by Government

H - 4938 Data To Rajli Bridge Via Khanpur 8.261) km.

Earth work completed in 3 km under MGNREGA scheme37150 08-Nov-12

Hon'ble AM ordered to file the proposal on 06.09.11 because no fresh demand has come up. Length 8.26 km, path- 6 k, Distt. Hisar

5627 08-Jun-12

Path-5k . Crust-225 mm. R/C/E sent to Govt. on 04.07.114320 07-Sep-11

H - 6065 Petwar to Ugalan. 5.252) km.

Not approved on 25.10.10.14841 08-Jun-12

H - 6334 Puthi Smain to Bhaklana 4.723) km.

Hon'ble CM has not approved the const.of road on 01.03.13. due to non availablity of consolidation path as per norms.

43060 18-Mar-13

CP RD 0-3026=27'6", 3026-3320=27' 3", 3320-3610=26' 8", 3610-3927=27' 3", 3927-4209=26'8", 4209-4259=25", 4259-4326=26' 8", 4326-4470=27' 3", 4470-4722=26' 8", no distance shortened. Existing bridge at 3100m is unsafe 40' span bridge is required with an estimated cost 25lacs.

34520 11-Oct-12

On the request of gram Panchyat Puthi CM ordered for necessary action on 04.08.2011. path 5 karam angled no distance shortened.

21285 21-Mar-12

H - 6677 Petwar to Sulchani 3.904) km.

Hon'ble CM has not approved the proposal on 28.12.12.due to non availability of path with prescribed norms,

39883 09-Jan-13

CP RD 875-1148, 1268 -1902,2023-2476=21'2" wide. RD 3321-3442=25'10" wide, in rest 27' 6" wide. No distance shortened. Upward of EIC on 26.09.2012.

33328 26-Sep-12

Friday, February 05, 2016 Page 20 of 21Narnaund N

Page 21: Haryana State Agricultural Marketing Board - … wise reports/Narnaund - Captain...Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Narnaund

Hon'ble Cm, Haryana has recommended for taking appropriate decision on the request of Gram Panchyat, Petwar dated 26.04.2012. CP 5karam Diagonally.

32614 13-Sep-12

22.13 km. Sub Total:

Friday, February 05, 2016 Page 21 of 21Narnaund N