17
2019 DEEP FOUNDATIONS INSTITUTE 44 th ANNUAL CONFERENCE Future Forward Hilton Chicago | Illinois | October 15-18, 2019 CHICAGO PROGRAM & SCHEDULE Program Advertisers

Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

2019

D E E P F O U N D AT I O N S I N S T I T U T E

44th ANNUAL CONFERENCE

Future Forward

Hilton Chicago | Illinois | October 15-18, 2019

C H I C A G O

P R O G R A M & S C H E D U L EP r o g r a m A d v e r t i s e r s

Page 2: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

Want to Order ICE® Parts Online?ICE and Comacchio Parts -

electronically look up and add to your order*need a company verified ICE customer email address & credit application

WWW.ICEUSA.COM

As the original USA manufacturer, ICE® is your one stop foundation shop with new offerings including

Double Dampening Solutions to Tougher, Lighter Vibratory Hammers, Drill Rigs and Tooling to fit your every application

Hydraulic Vibratory Drivers/Extractors Vibration Double Dampening Solution Power Units featuring CAT enginesEx-mounted Vibratory Drivers/ExtractorsHeavy Duty Piling & Drilling MastDiesel Impact HammersICE Pilemer Hydraulic HammersLeads, Spotters, and Accessories

In compliment to our outstanding driven pile line, ICE® offersNew ICE® Kelly BarsDistribution of EMDE, Kennametal & TecniwellICE® Top Drive Rotary Heads and AugersExcavator-mounted ICE® Rotary HeadsDistributor & Rental Fleet of Comacchio Drilling Rigs

INTERNATIONAL CONSTRUCTION EQUIPMENT, INC301 Warehouse Drive

MattheWs, NC 28104 usa704-821-8200 | WWW.iCeusa.CoM

42

Page 3: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

Untitled-1 1 8/28/2019 2:09:01 PM

43

Page 4: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

44

MANUFACTURED IN AMERICA | DISTRIBUTED WORLDWIDE | WWW.TEIROCKDRILLS.COM

DUST SUPPRESSION SYSTEMComplies with Local and Federal Safety RegulationsReduces dust by up to 97% Two models: 25 gallon | 100 gallon Provides dust suppression for 4-8 hours

BEFORE

SILICA OR DUST? WE HAVE A SOLUTION!

leica-geosystems.com

Page 5: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

45

NO CONCRETE & NO EXCAVATION

YEAR-ROUND INSTALLATION

COST EFFECTIVE

IMMEDIATELY LOADABLE

ENVIRONMENTALLY FRIENDLY

PERMANENT & REUSABLE

SIMPLE • SOL ID • SUSTAINABLE

A M E R I C A N G R O U N D S C R E W. C O M

THE FUTURE IS SIMPLE.

SoilmecNA.com follow us

18320 Imperial Valley Drive, Houston, TX 77060

Dealers Networks

SR-95HIT l ine

AMERICAN EQUIPMENT & FABRICATING CORP.Eastern & Central

CHAMPION EQUIPMENT SALES, LLCPacific + NV, AZ, & AK

SELIX EQUIPMENT INC.Eastern Canada

WESTERN EQUIPMENT SOLUTIONS, LLCRockies + Western Canada

Page 6: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

46

TYPHOON HURRICANE

THE PERFECT STORM

CYCLONE2-8 m3 (0.5 - 35 gpm) 8-30 m3 (35 - 132 gpm) 25-110 m3 (110 - 480+ gpm)

Complete Custom Solutions for Maximum Results. Grout Mixing, Pumping Systems, Bulk Storage, Feed Systems, Control Systems, Dust Collection.

[email protected] 1-604-746-0555

100% EMPLOYEE OWNED | An ESOP Company

BerkelandCompany.com

DEEP FOUNDATIONS | SHORING | GROUND IMPROVEMENT

SINCE1959

[email protected]

DESIGN/BUILD: DEEP FOUNDATIONSSHORING - GROUND IMPROVEMENT

AUGER PRESSURE GROUTED PILESDISPLACEMENT PILES

DRIVEN PILES • H BEAMS & LAGGINGSECANT WALLS • SHEET PILES • HELICAL PILES

PRESSURE GROUTING • SOIL NAILS GROUND IMPROVEMENT ELEMENTS

UNDERPINNING • TIEBACKS • MICRO PILES60 years

Page 7: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

47

TOTAL TURNKEY SOLUTIONS• Project Safety Implementation• Initial Environmental Planning• Fluid Management• Solids Control and Waste Mitigation• Disposal Coordination• Social and Economical Impact Benefits

Our team has the experience and equipment necessary to provide a solution to improve fluid properties and performance that enable beneficial reuse of construction fluid.

SOLVE FLUID PROBLEMS

BOS provides more than just the dewatering system. With flexible equipment and operational expertise, BOS is the industry leader for onsite waste reduction and construction fluid management. We will work with our clients to reduce or eliminate disposal requirements and cost.

REDUCE DISPOSAL COSTS

[email protected]

STOP BY BOOTH #916

BOS Solutions has built a reliable reputation on our highly-trained employees and our innovative solutions in waste slurry separation technology. This includes our patented dewatering system. Our technicians utilize the BOS equipment to separate a waste slurry into dry, stackable solids and clean water. The solids are classified as a solid waste and can be disposed of onsite or hauled away in a standard end dump truck. The water is typically reused in operations but it can be disposed of onsite or in a drainage system to reduce the environmental impact.

In every industry that we operate, BOS Solutions strives to be a leader. We recognize the challenges and costs associated with waste management and disposal in deep foundation projects and the construction industry. These types of projects have the potential to generate large volumes of liquid or waste slurry, which requires costly transportation and disposal methods. Through our flexible and scalable approach, we focus on providing environmentally friendly solutions for waste management that can reduce costs associated with waste transportation and disposal. BOS has partnered with clients in the construction industry on various large scale building and tunneling projects.

Environmentally Friendly Solutions for Waste Management

SOLIDS AND LIQUIDS SEPARATION, BENEFITING THE ENVIRONMENT

>

ENVIRONMENTALSOLUTIONS

THE US LEADER IN SILENT PILING

OFFICE LOCATIONS N. California ~ S. California ~ Nevada ~ Louisiana ~ Florida ~ Washington

www.blueironllc.com

Page 8: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

48

Page 9: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

49

Revit-Modelle für

3D-Schalungsplanung

Mikropfähle online bemessen

digitale Lösungen von Ischebeck

Baurechtlicher Nachweis komplexer

Schalaufgaben

Alu-Schalungsgerüst: Baurechtlicher

Nachweis komplexer Schalaufgaben

smart

smart

smart

smart

smart

Designing micropiles onlinesmart

Dimensionamento dei

micropali online

smart• Foundations / Underpinning• Anchorages for retaining structures• Slope stabilization and soil nailing• Tunneling

ISCHEBECK USA Inc.Phone: +1 239 403 8522E-Mail: [email protected]

One system – many applicationsTITAN Hollow Bar – the original

from ISCHEBECKBuy American

lsa

o

woN

Now also

re ic

m

a

A

n

yu

B

Page 10: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

50

geotechnical construction | specialty civil construction | environmental remediation

odinconstruction.com

Page 11: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

51

Design Engineers - Shoring - Support of Excavation - Slope Stability - Construction Engineering

Phone: (415) 526 - 3031 Email: [email protected] Website: PBANDAINC.COM

SAFER. SMARTER. SUSTAINABLE.

Visit Sterling and Lion Lumber at Booth #308 to learn about smarter ground protection and customizable lumber products that make your job sites safer and more efficient. See more at SterlingSolutions.com.

Page 12: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

52

WE BRING MORE “YES” TO YOUR PROJECT

All excavation jobs come with some uncertainty. Sunbelt Rentals can eliminate the uncertainty surrounding equipment and expertise. From trench boxes and road plates to slide rail and engineered excavation solutions, Sunbelt Rentals has everything you need to safely and successfully complete your trench and excavation work. Availability, Reliability, and Ease. That’s The Sunbelt Promise.

Visit us at booth #400 or sunbeltrentals.com.

© 2019 Sunbelt Rentals. All Rights Reserved.

SBR19621A_DFI_ShoringPrintAd_3D-7.5x4.625_HalfPage.indd 1 8/19/19 9:54 AM

Page 13: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

53

Page 14: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

54

Innovation That Builds TrustDeep Foundations | Underground Construction | Heavy Civil Construction |

Advanced Modeling | Information Management | Data Analytics | Virtual RealityLEARN MORE AT BV.COM/DFI

Pittsburgh Pipe • www.pittsburghpipe.com • 800-325-2653 The Right Pipe • Right on Time

WE’RE “AMERICAN PROUD” TO PARTNER WITH THE LEADING UTILITY CONTRACTORS IN THE USA.

S T E E L C A S I N G • P I P E P I L I N G • V E R T I C A L S H A F T S • T E L E C O M D U C T , B O X E S & A C C E S S O R I E S

ONE NATION, UNDERGROUND, WITH QUALITY ASSURANCE FOR ALL

Page 15: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

55

Thank you to our Cooperating Organizations

Media Partners

The International Association of Foundation Drilling

ILLINOIS SECTION

Page 16: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

44th ANNUAL CONFERENCE ON DEEP FOUNDATIONS | 2019DFI

56

The International Association of Foundation Drilling

in partnership with

Piling Design & Construction Conference

Saint Louis, Missouri

June 3-5, 2020 | Hilton St. Louis at the Ballpark

This three-day event will include presentations*

on the latest developments in: n Augered Cast-in-Place and

Drilled Displacement Pilesn Drilled Shaftsn Driven Pilesn Helical Piles and Tiebacksn Marine Foundationsn Micropilesn Seismic and Lateral Loadsn Testing and Evaluationn Working Platforms

n Designing for resiliency under extreme or unexpected loading conditions (inclement weather, flooding, scour, seismic, liquefaction, lateral spreading)

n Alternative procurement methods and early contractor involvement

n Re-use of foundations and other sustainable design approaches

n Foundation optimization through risk management (geotechnical, contractual, communication risks)

Conference Highlights*

n DFI Technical Committee Meetingsn WiDF Networking Receptionn Exhibit Hall with over 75 Manufacturers,

Suppliers and Service Providers

www.dfi.org/SuperPile20*Program subject to change.

n Innovations and advancements in pile design and installation

n Designing and constructing safely and effectively in urban environments

n Deep foundations in expansive and frost-susceptible soils

n Foundations in karst and erodible sedimentary bedrock

n Corrosion of buried structuresn Instrumentation, load testing,

monitoring

n Osterberg Memorial Lecture n Presentation of the Ben C. Gerwick Award for

Innovation in the Design and Construction of Marine Foundations

Call For Abstracts has been

extended through Oct. 25!

Submit yours at:

wwww.dfi.org/SuperPIle20

Page 17: Hilton Chicago Illinois 2019 Advertisers.pdf · 2019. 11. 4. · leica-geosystems.com. 45 NO CONCRETE & NO EXCAVATION YEAR-ROUND INSTALLATION COST ... 18320 Imperial Valley Drive,

CALL FOR ABSTRACTSFOR TECHNICAL PAPERS AND PANEL SESSIONS

Submit here: www.dfi.org/annual2020ABSTRACT PORTAL OPENS: October 16, 2019

ABSTRACT DEADLINE: December 13, 2019

Please submit abstracts for original technical papers and panel sessions for the DFI 45th Annual Conference on Deep Foundations to be held October 13-16, 2020 in National Harbor, Maryland. The theme is People. Purpose. Passion. #DFI45. This conference will showcase a profession at the top of its game, highlighting the hard work, passion, connections, technologies and professionalism that drive the deep foundations industry worldwide.

All accepted papers will be published in the Conference Proceedings and select papers will be presented orally by the author during the technical sessions. Proposals for panel sessions are welcomed and encouraged. Please describe the panel topic and list the proposed speakers in the abstract. Paper format guidelines are available at www.dfi.org/annual2020. Abstracts are accepted on the following topics:

n Mega and local projects (history and retrofitting,current projects)

n Adapting deep foundation techniques forinnovative urban and waterfront constructionsolutions (ground improvement, excavationsupport, drilled and driven piling, dewatering,tunneling)

n Political influence on contract delivery(collaboration, logistics, financing, legal, teaming,contract vehicles, changed conditions)

n High value subsurface characterizationprocesses (investigation in complicatedgeology, program optimization, interpretation/recommendations)

n Development and use of national and state codesand standards

n Designing for complex geology, loadingconditions and project constraints (geotechnicaland geological challenges, existing structures,access, schedule, code requirements)

n QA/QC/monitoring during/after construction –relationships, qualifications, responsibilities

n Local and national/international case historieswith lessons learned

n Other professional topics (ethics, safety, projectmanagement, deep foundations education)

n Other deep foundations topics

Conference Chair: Sebastian Lobo-Guerrero, Ph.D., P.E.,American Geotechnical and Environmental Services, Inc., [email protected]

Program Co-Chairs: Jennifer Nicks, Ph.D., P.E., Federal Highway Administration, [email protected] and Gregg Piazza, P.E., GeoStructures, Inc., [email protected]

For technical questions, contact: Mary Ellen Bruce Large, P.E., D.GE, DFI Director of Technical Activities, [email protected]

IMPORTANT DATESAbstracts Due: Dec. 13, 2019

Decision on Abstracts: Jan. 17, 2020Draft Papers Due: April 3, 2020

Decisions on Draft papers: July 1, 2020Revised Papers Due: July 24, 2020

Final Decision: Aug. 12, 2020Final PowerPoint Due: Sept. 11, 2020