Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System* by Holte''InteMational Holtec Center 555 Lincolh D'rive West Marlton, NJ, 0,8053 (holtecinternational.com) USNRC Docket No.: Holtec Report No.: Quality Designation: 72-1014 HI-2002444 Safety Significant This document is a copyrighted intellectual property of Holtec International. All rights reserved. Excerpting any part of this document, except for public domain citations included herein, by any person or entity except for the USNRC, without written consent of Holtec International is unlawful. HI-STORM 100 FSAR Revision 8 January 18, 2010

Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

Holtec InternationalFinal Safety Analysis Report for the

HI-STORM 100 Cask System*

by

Holte''InteMationalHoltec Center

555 Lincolh D'rive WestMarlton, NJ, 0,8053

(holtecinternational.com)

USNRC Docket No.:Holtec Report No.:Quality Designation:

72-1014HI-2002444Safety Significant

This document is a copyrighted intellectual property of Holtec International. All rights reserved.Excerpting any part of this document, except for public domain citations included herein, by any personor entity except for the USNRC, without written consent of Holtec International is unlawful.

HI-STORM 100 FSARRevision 8January 18, 2010

Page 2: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

HOLTEC INTERNATIONAL,-DOCUMENT NUMBER: HI-2002444 PROJECT NUMBER: 5014

DOCUMENT ISSUANCE AND REVISION STATUS

DOCUMENT NAME: HI-STORM FSAR DOCUMENT CATEGORY: Z GENERIC L] PROJECT SPECIFIC

Document REVISION No. 7 REVISION No. 8 REVISION No.Portion(Chapter orSection Author's Date Author's Date Author's DateNumber) Iniial ApprovedIR

No. Initials Approved Initials Approved Initials Approved

1. 1 TSM 8/8/08 628639 TSM 1/18/10 261682

2. 2 TSM 8/8/08 352556 TSM 1/18/10 430085

3. 3 CWB 8/8/08 223114 CWB 1/18/10 606298

4. 4 IR 8/8/08 808688 IR 1/18/10 792928

5. 5 SPA 8/8/08 410785 SPA 1/18/10 798514

6. 6 SPA 8/7/08 372258 SPA 1/18/10 809344

7. 7 KC 8/7/08 951285 TSM 1/18/10 156383

8. 8 TSM 8/8/08 85811 TSM 1/18/10 604039

9. 9 TSM 8/6/08 782515 TSM 1/18/10 711656

10. 10 SPA 8/8/08 218691 TSM 1/18/10 547146

11. 11 ER 7/10/08 955026 TSM 1/18/10 205144

12. 12 TSM 8/6/08 841345 TSM 1/18/10 262082

13. 13 TSM 8/7/08 791174 TSM 1/18/10 664314

Page 1 of 4 HI-STORM 100 FSARRevision 8January 18, 2010

Page 3: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

HOLTEC INTERNATIONALDOCUMENT NUMBER: HI-2002444 PROJECT NUMBER: 5014

DOCUMENT ISSUANCE AND REVISION STATUS

DOCUMENT NAME: HI-STORM FSAR DOCUMENT CATEGORY: 0 GENERIC El PROJECT SPECIFIC

Document REVISION No. 4 REVISION No. 5 REVISION No. 6Portion(Chapter orSection Author's Date Author's Date Author's Date

No. Number) Initials Approved VIR # Initials Approved VIR # Initials Approved VIR #

1. 1 LEH 4/10/06 679018 TSM 6/19/07 254841 TSM 2/7/08 251576

2. 2 LEH 4/10/06 352962 TSM 6/19/07 815387 TSM 2/7/08 808432

3. 3 CWB 4/10/06 926484 CWB 6/19/07 405257 CWB 2/7/08 370539

4. 4 DMM 4/10/06 53264 DMM 6/20/07 839967 DMM 2/7/08 846793

5. 5 ERD 4/10/06 91451 SPA 6/20/07 654660 SPA 2/7/08 906070

6. 6 SPA 4/10/06 142478 SPA 6/20/07 658909 SPA 2/7/08 794294

7. 7 KC 4/10/06 930273 KC 6/20/07 69449 KC 2/7/08 334538

8. 8 JG 4/10/06 728141 JDG 6/19/07 540392 JDG 2/7/08 121986

9. 9 LEH 4/10/06 590912 KC 6/20/07 965280 TSM 2/7/08 835761

10. 10 ERD 4/10/06 604641 SPA 6/20/07 565174 SPA 2/7/08 928175

11. 11 DMM 4/10/06 870251 ER 6/20/07 582705 ER 2/7/08 31423

12. 12 SPA 4/10/06 911918 ER 6/20/07 438028 TSM 2/7/08 101336

13. 13 SPA 4/10/06 515528 TSM 6/19/07 837745 TSM 2/7/08 367403

Page 2 of 4 HI-STORM 100 FSARRevision 8January 18, 2010

Page 4: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

HOLTEC INTERNATIONAL:!DOCUMENT NUMBER: HI-2002444 PROJECT NUMBER: 5014

DOCUMENT ISSUANCE AND REVISION STATUS

DOCUMENT NAME: HI-STORM FSAR DOCUMENT CATEGORY: 0 GENERIC El PROJECT SPECIFIC::

Document REVISION No. 1 REVISION No. 2 REVISION No. 3Portion(Chapter orSection Author's Date Author's Date Author's Date

No. Number) Initials Approved VIR # Initials Approved VIR # Initials Approved VIR #

1. 1 BGU 8/22/02 330888 BGU 1/19/04 147902 SPA 5/26/05 921348

2. 2 BGU 9/17/02 181394 BGU 1/12/04 635397 SPA 5/26/05 306544

3. 3 CWB 9/13/02 553330 CWB 2/17/04 322728 CWB 5/26/05 118516

4. 4 IR 8/22/02 829317 IR 1/30/04 42783 ER 5/26/05 619640

5. 5 ERD 9/13/02 136063 ERD 2/17/04 27030 ERD 5/26/05 531811

6. 6 SPA 8/22/02 751052 SPA 3/3/04 235143 SPA 5/26/05 804742

7. 7 KC 8/22/02 181406 KC 3/3/04 538268 KC 5/26/05 618709

8. 8 JG 8/22/02 786745 JG 3/5/04 705490 JG 5/26/05 672421 q

9. 9 BGU 8/22/02 118193 BGU 1/12/04 305051 LEH 5/26/05 896141

10. 10 JG 8/22/02 504833 JG 2/17/04 384984 JG 5/26/05 511173

11. 11 ER 8/22/02 687910 ER 1/30/04 189574 ER 5/26/05 268920

12. 12 BGU 8/22/02 415966 BGU 2/2/04 988602 SPA 5/26/05 822043

13. 13 BGU 7/26/02 678908 BGU N/A N/A SPA 5/26/05 31611

Page 3 of 4 HI-STORM 100 FSARRevision 8January 18, 2010

Page 5: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

HOLTEC INTERNATIONALDOCUMENT NUMBER: HI-2002444 PROJECT NUMBER: 5014

DOCUMENT CATEGORIZATION

In accordance with the Holtec Quality Assurance Manual and associated Holtec Quality Procedures (HQPs), this document is categorized as a:

F-1 Calculation Package 3 (Per HQP 3.2)

F-1 Design Criterion Document (Per HQP 3.4) I

Technical Report (Per HQP 3.2)(Such as a Licensing Report)

Design Specification (Per HQP 3.4)

E] Other (Specify):

DOCUMENT FORMATTINGThe formatting of the contents of this document is in accordance with the instructions of HQP 3.2 or 3.4 except as noted below:

DECLARATION OF PROPRIETARY STATUS

[ Nonproprietary - Holtec Proprietary -- Privileged Intellectual Property (PIP)

Documents labeled Privileged Intellectual Property contain extremely valuable intellectual/commercial property of Holtec International. They cannot be released to externalorganizations or entities without explicit approval of a company corporate officer. The recipient of Holtec's proprietary or Top Secret document bears full and undividedresponsibility to safeguard it against loss or duplication.

Notes:

1. This document has been subjected to review, verification and approval process set forth in the Holtec Quality Assurance Procedures Manual. Password controlledsignatures of Holtec personnel who participated in the preparation, review, and QA validation of this document are saved in the N-drive of the company'snetwork. The Validation Identifier Record (VIR) number is a random number that is generated by the computer after the specific revision of this document hasundergone the required review and approval process, and the appropriate Holtec personnel have recorded their password-controlled electronic concurrence to thedocument.

2.

3.

A revision to this document will be ordered by the Project Manager and carried out if any of its contents is materially affected during evolution of this project. Thedetermination as to the need for revision will be made by the Project Manager with input from others, as deemed necessary by him.

Revisions to this document may be made by adding supplements to the document and replacing the "Table of Contents", this page and the "Revision Log".

Page 4 of 4 HI-STORM 100 FSARRevision 8January 18, 2010

Page 6: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

Certificate of Compliance (1014) and Final Safety Analysis Report Matrix

HI-STORM 100 Cask Storage System Final NRC Certificate of Compliance (CoC) 1014Safety Analysis Report (FSAR) Revision Amendment No.

0 01 1

2* 13 2

4* 25 36 47 58 6

* - These Revisions incorporated changes made via ECO/72.48 process only.

Rev. 8

...... . ..............................I-.sTO RMI00'FSAR.Revision 8January 18, 2010

Page 7: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

LIST OF EFFECTIVE PAGES FOR HI-STORM 100 FSAR -Revision- 8:- January 18,2010- -.. ,-,

Paaegss Revision

ithrough xi 8

PAGE 1 of 14HI'-STORM 100FsýARRevision 8January 18, 2010

Page 8: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

-.1....... .,,,LIST OF EFFECTIVE PAGESFOR HI-STORM. 100 FSAR,-Revision 8-.January-18,12010....... - ........-: ,-,

Page(s) Revision

1.0-1 through 1.0-31 81.1-1 through 1.1-4 6Fig. 1.1.1 0Fig. 1.1.1A 1Fig. 1.1.1B 2Fig. 1.1.2 0Fig. 1.1.3 through 1.1.3A 1Fig. 1.1.3B 2Fig 1.1.4 through 1.1.5 11.2-1 through 1.2-40 7Fig. 1.2.1 1Fig. 1.2.1A 2Fig. 1.2.2 4Fig. 1.2.3 3Fig. 1.2.4 4Fig. 1.2.5 through 1.2.6 0Fig. 1.2.7 1Fig. 1.2.8 through 1.2.8A 1Fig. 1.2.9 through 1.2.9A 1Fig. 1.2.10 through 1.2.12 0Fig. 1.2.13 through 1.2.15 DeletedFig. 1.2.16a through 1.2.16f 0Fig. 1.2.17a through 1.2.17d 5Fig. 1.2.18 11.3-1 51.4-1 through 1.4-3 1Fig. 1.4.1 through 1.4.2 01.5-1 through 1.5-2 8Drawings See Section 1.5Bills-of-Material See Section 1.51.6-1 through 1.6-2 71.A-1 through 1.A-7 4Fig. 1.A.1 through 1.A.5 01.B-1 through 1.B-3 31.C-1 71.C-2 through 1.C-5 Deleted1.D-1 through 1.D-8 71.1-1 61.11-1 7

PAGE 2 of 14HI-STORM"100 FSAR.Revision 8January 18, 2010

Page 9: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

,..LIST OFEFFECTIVE PAGES FOR HI-STORM.100 FSAR-Revision S- January 18,2010 . .,

PageUs) Revision

2.0-1 through 2.0-35 82.1-1 through 2.1-66 8Fig. 2.1.1 3Fig. 2.1.2 through 2.1.2C 1Fig. 2.1.2D 3Fig. 2.1.3 through 2.1.5 0Fig. 2.1.6 through 2.1.8 DeletedFig. 2.1.9 32.2-1 through 2.2-58 72.3-1 through 2.3-22 8Fig. 2.3.1 through 2.3.4 02.4-1 through 2.4-3 72.5-1 02.6-1 through 2.6-3 72A-1 through 2.A-5 7Fig. 2.A.1 12.B-1 through 2.1-4 3Fig. 2.8.1 32.C-1 through 2.C-2 7Fig. 2.C.1 32.1-1 62.11-1 7Fig. 2.11.1 Deleted

PAGE 3 of 14HI-STORM 100 FSAR ý4Revision 8January 18, 2010

Page 10: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

.LIST, OFEFFECTI VE PAGES 4FORHI-STORM 00lFSAR-Revision 8 -'January. 18,'201W .

Page(s) Revision

3.0-1 through 3.0-10 73.1-1 through 3.1-47 8Fig. 3.1.1 through 3.1.3 13.2-1 through 3.2-14 73.3-1 through 3.3-11 73.4-1 through 3.4-135 7Fig. 3.4.1 0Fig. 3.4.2 1Fig. 3.4.3 through 3.4.4 0Fig. 3.4.5 1Fig. 3.4.6 through 3.4.9 0Fig. 3.4.10 1Fig. 3.4.11 through 3.4.29 0Fig. 3.4.30 through 3.4.49 13.5-1 through 3.5-2 8Fig. 3.5.1 through 3.5.9 Deleted3.6-1 through 3.6-9 73.7-1 through 3.7-8 73.8-1 through 3.8-2 83.A-1 through 3.A-15 7Fig. 3.A.1 through 3.A.18 0Fig. 3.A. 19 through 3.A.30 Deleted3.1-1 63.11-1 7Fig. 3.11.1 Deleted

PAGE 4 of 14

HI'STORM 100 FSARRevision 8January 18, 2010

Page 11: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

ý..;!.ý,,,.....LIST.OFEFFECTIVE PAGESFORHI-STORMVE 10E0FSAR-RSORev0isSA ion-evsio.!8-!Janar~.ý8ýý20,08 - January18, 2010,',!-";1ýj,

PaceUs) Revision

4.0-1 through 4.0-2 74.1-1 through 4.1-5 7Fig. 4.1.1 7Fig. 4.1.2 74.2-1 through 4.2-10 7Fig. 4.2.1 through 4.2.2 DeletedFig. 4.2.3 Deleted4.3-1 through 4.3-2 74.4-1 through 4.4-65 7Fig. 4.4.1 7Fig. 4.4.2 DeletedFig. 4.4.3 through 4.4.7 7Fig. 4.4.8 DeletedFig. 4.4.9 DeletedFig. 4.4.10 DeletedFig. 4.4.11 DeletedFig. 4.4.12 through 4.4.13 DeletedFig. 4.4.14 through 4.4.15 DeletedFig. 4.4.16 through 4.4.17 DeletedFig. 4.4.18 DeletedFig. 4.4.19 through 4.4.20 DeletedFig. 4.4.21 through 4.4.23 DeletedFig. 4.4.24 DeletedFig. 4.4.25 through 4.4.26 DeletedFig. 4.4.27 Deleted4.5-1 through 4.5-24 8Fig. 4.5.1 0Fig. 4.5.2 14.6-1 through 4.6-2 74.7-1 through 4.7-3 Deleted4.A-1 Deleted4.B-1 through 4.B-9 DeletedFig. 4.B.1 through 4.B.8 Deleted4.1-1 64.11-1 7

PAGE 5 of 14HI-STORM-100 FSARRevision 8January 18, 2010

Page 12: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

........... ,- ........ ,LISTOFEFFECTIVE.PAGES.,FORHI-STORMO,100FSAR.,-Revision*8 -4anuary,.1'8;•2010:,-•,.

PageUs) Revision5.0-1 through 5.0-4 85.1-1 through 5.1-26 7Fig. 5.1.1 1Fig. 5.1.2 0Fig. 5.1.3 3Fig. 5.1.4 0Fig. 5.1.5 0Fig. 5.1.6 0Fig. 5.1.7 0Fig. 5.1.8 0Fig. 5.1.9 0Fig. 5.1.10 0Fig. 5.1.11 0Fig. 5.1.12 1Fig. 5.1.13 25.2-1 through 5.2-58 75.3-1 through 5.3-15 7Fig. 5.3.1 1Fig. 5.3.2 through Fig. 5.3.3 0Fig. 5.3.4 2Fig. 5.3.5 0Fig. 5.3.6 0Fig. 5.3.7 1Fig. 5.3.8 through Fig. 5.3.9 0Fig. 5.3.10 3Fig. 5.3.11 1Fig. 5.3.12 4Fig. 5.3.13 4Fig. 5.3.14 4Fig. 5.3.15 1Fig. 5.3.16 1Fig. 5.3.17 1Fig. 5.3.18 1Fig. 5.3.19 2Fig. 5.3.20 1Fig. 5.3.21 1Fig. 5.3.22 2Fig. 5.3.23 45.4-1 through 5.4-35 85.5-1 05.6-1 through 5.6-3 35.A-1 through 5.A-4 05.B-1 through 5.B-7 05.C-lthrough 5.C-61 05.D-1 through 5.D-6 15.E-1 through 5.E-4 75.F-1 through 5.F-4 3Fig. 5.F.1 through 5.F.7 35.1-1 65.11-1 7

PAGE 6 of 14HI-STORM`100 FSAR'Revision 8January 18, 2010

Page 13: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

. . , LIST-;ýOF -EFFECTIVzE E-PAGESFOR HI-STORM 1,00 -;FSAR -Revision 8 - January 18;.2010 •,•,,:•.i...... ,--

Paae(s) Revision

6.1-1 through 6.1-19 76.2-1 through 6.2-64 76.3-1 through 6.3-19 7Fig. 6.3.1 1Fig. 6.3.1A 1Fig. 6.3.2 1Fig. 6.3.3 0Fig. 6.3.4 1Fig. 6.3.5 1Fig. 6.3.6 0Fig. 6.3.7 16.4-1 through 6.4-34 8Fig. 6.4.1 DeletedFig. 6.4.2 through 6.4.15 1Fig. 6.4.16 3Fig. 6.4.17 36.5-1 06.6-1 06.7-1 and 6.7-2 16.A-1 through 6.A-20 2Fig. 6.A.1 through 6.A.5 0Fig. 6.A.6 26.B-1 and 6.B-2 06.C-1 through 6.C-16 76.D-1 through 6.D-35 16.1-1 66.11-1 7Fig. 6.11.1 Deleted

PAGE 7 of 14HI-STORMI100 FSAR...Revision 8January 18, 2010

Page 14: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

.... ••:.,.,•, ....................LIT•O:EFFECTIVE :PAGES.FOR•HI-ST.ORM.AO0 FSA, R-R.evision•8 - January 18•, 201,0,:.,- ......-•.-,•.. ...

PaaeUs' Revision

7.0-1 67.1-1 through 7.1-8 8Fig. 7.1.1 07.2-1 37.3-1 37.4-1 through 7.4-2 57.A-1 Deleted7.1-1 67.11-1 7

PAGE 8 of 14HI-STORM 100 FSARRevision 8January 18, 2010

Page 15: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

....LISOF EFFECTVE.PAGESFORHI-STORM 1FOOSAR-Revision 8.-,-January,418,:20109v.•=o••. .-.........

Paqe(s) Revision

8.0-1 through 8.0-6 78.1-1 through 8.1-42 8Fig. 8.1.1 7Fig. 8.1.2a and 8.1.2b 0Fig. 8.1.2c 4Fig. 8.1.2d 1Fig. 8.1.2e and 8.1.2f 0Fig. 8.1.3 0Fig. 8.1.4 4Fig. 8.1.5 and 8.1.6 0Fig. 8.1.7 1Fig. 8.1.8 through 8.1.11 0Fig. 8.1.12 and 8.1.13 1Fig. 8.1.14 through 8.1.17 0Fig. 8.1.18 and 8.1.19 1Fig. 8.1.20 4Fig. 8.1.21 1Fig. 8.1.22a and 8.1.22b 1Fig. 8.1.23 1Fig. 8.1.24 0Fig. 8.1.25 1Fig. 8.1.26 4Fig. 8.1.27 through 8.1.28 1Fig. 8.1.29a and 8.1.29b 8Fig. 8.1.30 1Fig. 8.1.31 4Fig. 8.1.32 0Fig. 8.1.33 7Fig. 8.1.34a 1Fig. 8.1.34b DeletedFig. 8.1.35 and 8.1.36 0Fig. 8.1.37 48.2-1 48.3-1 through 8.3-11 7Fig. 8.3.1 5Fig. 8.3.2a 4Fig. 8.3.2b 5Fig. 8.3.2c through 8.3.2d 0Fig. 8.3.3 0Fig. 8.3.4 Deleted8.4-1 through 8.4-3 4Fig. 8.4.1a 0Fig. 8.4.1b 48.5-1 through 8.5-5 7Fig. 8.5.1 08.6-1 18.1-1 68.11-1 7

PAGE 9 of 14HI-STORM 100 FSARRevision 8January 18, 2010

Page 16: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

-- .. .. . LIST, OF.EFFECTIVE•PAGESFORIIHI-STORM 1900,FSAR,-Revision 8 -January 8: 2010 -

PageUs) Revision

9.0-1 49.1-1 through 9.1-30 89.2-1 through 9.2-4 69.3-1 19.4-1 09.1-1 69.11-1 7

PAGE 10 of 14HI-STORM 100FSARRevision 8January 18, 2010

Page 17: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

..... ALIST OEFFECTIVER PAGES FOR HI-STORM 00 M TSAR-Revision 8- January 18,20190,,, ,

Eaaes Revision

10.1-1 through 10.1-8 5Fig. 10.1.1 410.2-1 310.3-1 through 10.3-43 7Fig. 10.3.1a 4Fig. 10.3.1b 4Fig. 10.3.1c 4Fig. 10.3.1d 4Fig. 10.3.1e 410.4-1 through 10.4-5 710.5-1 010.1-1 610.11-1 7

PAGE 11 of 14HI-STORM-100 FSARRevision 8January 18, 2010

Page 18: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

. .3,",,..LIST, O.FEFFECTIVE-PAGES-FOR HI-STORM 100 FSARt-Revision-8.-,=January ,18,T.2010;;. .. ,,ý.;,,,:,,I:,....

Page(sU Revision

11.1-1 through 11.1-13 711.2-1 through 11.2-30 7Fig. 11.2.1 DeletedFig. 11.2.2 through 11.2.5 DeletedFig. 11.2.6 Deleted11.3-1 711.1-1 611.11-1 through 11.11-14 7

PAGE 12 of 14HI-STORM 100' FSARRevision 8January 18, 2010

Page 19: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

...........LISTOF EFFEC,.TIV E PAGES FOR-HI-STORM--100,FSAR,-Revision• 8,- Januar-y 189-,2010 .....

Faqe s Revision

12.0-1 012.1-1 through 12.1-3 712.2-1 through 12.2-8 712.3-1 012.4-1 012.5-1 0Appendix 12.A Cover 3TS Bases TOC 5B 3.0-1 through B 3.0-9 0B 3.1.1-1 through B 3.1.1-7 7B 3.1.2-1 through B 3.1.2-7 7B 3.1.3-1 through B 3.1.3-3 5B 3.1.4-1 through B 3.1.4-3 7B 3.2.1-1 7B 3.2.2-1 through B 3.2.2-3 1B 3.2.3-1 3B 3.3.1-1 through B 3.3.1-5 7Appendix 12.B Deleted12.1-1 612.11-1 7

PAGE 13 of 14HI-STORM'100 FSARRevision 8January 18, 2010

Page 20: Holtec International Final Safety Analysis Report for the ...8 jg 4/10/06 728141 jdg 6/19/07 540392 jdg 2/7/08 121986 9. 9 leh 4/10/06 590912 kc 6/20/07 965280 tsm 2/7/08 835761 10

. LIST OF FEECTIVE, PAGESFOR HI-STORM.40.0fFSAR-Revision,8:-.January4 8;,2010,

aae~s Revision

13.0-1 through 13.0-2 413.1-1 Deleted13.2-1 Deleted13.3-1 Deleted13.4-1 Deleted13.5-1 Deleted13.6-1 413.1-1 613.11-1 7

PAGE 14 of 14HI-STORM 100 FSAR-'Revision 8January 18, 2010