How to Consider Risk and Life Cycle Costs in Transportation Asset Management Decisions For the 2014 IHEEP Conference Presented by: Katie Zimmerman, P.E.

How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

How to Consider Risk and Life Cycle Costs in Transportation Asset Management Decisions

For the 2014 IHEEP Conference

Presented by:Katie Zimmerman, P.E.

Page 2: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Background

• MAP-21 requires state highway agencies to develop a risk-based TAMP that includes a life cycle analysis of its assets– Risk can be used to help set agency

priorities– Life-cycle cost results help evaluate the

cost-effectiveness of various investment strategies

– Both provide an effective way of communicating with decision makers

Page 3: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Management

Page 4: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Incorporating Risk Into a TAMP

• Risk is “the effect of uncertainty on objectives” (ISO)

• Risk management is “a systematic process to identify risks that may impact agency objectives, to analyze their consequences, and to develop ongoing measures to address them” (Adapted from New South Wales Government Asset Management Committee)

Page 5: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

ISO Risk Management Framework

Page 6: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Levels of Risk Management

Source: FHWA (2012). Risk Based Asset Management

Page 7: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Areas

Source: FHWA (2012). Risk Based Asset Management

Page 8: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Types of Risk

Source: FHWA/AASHTO Webinar on Approaches to Integrating Risk into TAM Programs and Plans

Risk Type Considerations

Financial Risk

• Is future funding adequate to achieve our targets?• What is the impact of inflation on our purchasing power?

Information Risk

• Do we have tools to predict and manage asset conditions for the next 10 years?

Asset Risk • Are key assets such as poor-performing pavements or bridges a continuing risk to asset management targets?

• Are specific functional classes particularly vulnerable?

Operational Risk

• Is our project delivery mechanism reliable enough to meet our assetcondition performance targets?

• Do we have a sound preventive maintenance program?• Do we have sound contracting mechanisms to ensure material and

construction quality?

Decision Risk

• Does our project selection process identify appropriate candidates and treatments?

Climate Risk • Will increased climate-related events have a noticeable impact on asset conditions or level of service?

Page 9: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Identify Risk Statements

• Consists of a defined event and its impact• Represents one risk event• Helps analyze likelihood and impact

• Example: “If (RISK EVENT) happens then (CONSEQUENCE) will happen to (WHAT OR WHOM), causing (RESULT).”

Page 10: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Establish Risk Likelihood Ratings

Ranking Likelihood Frequency Score

Very High or Almost Certain Near Certainty (90%) Likely to occur within the year 5

High or Likely Highly Likely (70%) Likely to occur within 2 years 4

Moderate Likely (50%) Likely to occur within 3 to 5 years 3

Low or Unlikely Unlikely (20-30%) Likely to occur within 6 to 10 years 2

Very Low or Rare Remote (10%) Not likely to occur for 10 or more years 1

Page 11: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Establish Risk Consequence Ratings

Consequence Score

Catastrophic Impact on System Performance 5

High/Large Impact on System Performance 4

Moderate/Noticeable Impacts on System Performance 3

Low/Some Noticeable Impacts on System Performance 2

Insignificant/Little Noticeable Impacts on System Performance 1

Page 12: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Consequence: Asset Value/Economic Impact

Factors/Considerations Score

Greater than 50% of the budget controlled at the decision level 5

30% to 50% of the budget controlled at the decision level 4

15% to 30% of the budget controlled at the decision level 3

5% to 15% of the budget controlled at the decision level 2

Less than 5% of the budget controlled at the decision level 1

Page 13: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Consequence: Legal Compliance

Factors/Considerations Score

Agency liable for missing mandates. No viable plan to comply. 5

Agency sued or fined for missing mandates. Expects to comply in 6 months to 1 year 4

Agency warned of compliance issues and adopts corrective action 3

Agency agrees to compliance schedule, and avoids lawsuits and fines 2

Agency fully complies and is on course with regulators to anticipate mandates 1

Page 14: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Consequence: Public Expectations

Factors/Considerations Score

Unplanned disruption to essential service, e.g., lifeline route (long term, over 30 days) 5

Unplanned disruption to large number of households (5 days to 29 days) 4

Simultaneous unplanned disruption to multiple households, firms, or community services/structures (1 day to 4 days) 3

Unplanned disruption to multiple households, firms or community services / structures (<1 day) 2

Community Complaints 1

Page 15: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Consequence: Safety

Factors/Considerations Score

Single fatality, multiple serious injuries and/or primary routes affected 5

Multiple serious injuries and/or a primary route affected 4

Serious injuries and/or multiple secondary routes affected 3

Minor injuries and/or a secondary route affected 2

No injuries or primary/secondary routes affected 1

Page 16: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Consequence: Reputation

Factors/Considerations Score

System largely impacted, national media attention 5

System impacted and large parts performing poorly, public concerned, media attention for 2 days 4

System impacted and parts of performance are poor, complaints widespread, media attention for more than 2 days 3

Some impacts on performance, media coverage for 1 week, public becoming aware 2

No adverse media, system works 1

Page 17: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Consequence: Environment

Factors/Considerations Score

Permanent, widespread ecological damage 5

Heavy ecological damage, costly restoration 4

Major but recoverable ecological damage 3

Limited but medium-term negative effect 2

Short-term damage 1

Page 18: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Analyze Risks Using a Risk Rating

Page 19: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Identify Mitigation Strategies

Page 20: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Example – Colorado DOT

Page 21: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Mitigation Strategies

Terminate • Eliminate threat posed by the riskTransfer • Shift risk to third partyTreat • Take steps to reduce probability and/or impact of risk

Tolerate • Deal with the risk, monitor it, lack of options due to cost/low risk

TakeAdvantage • Opportunity – External funding or partnership

Page 22: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Types of Mitigation Strategies

Source: FHWA/AASHTO Webinar on Approaches to Integrating Risk into TAM Programs and Plans

Risk Type Treatment Options

Financial Risk

• Demonstrate funding shortfalls• Communicate uncertainty in achieving targets due to funding fluctuations• Emphasize trade-offs such as lower levels of service to be accepted• Justify and seek additional funding

Information Risk

• Fill data gaps• Improve tools and management systems

Asset Risk • Prioritize assets for funding, treatment, monitoring through using an objective, data-driven approach

Operational Risk

• Improve internal processes

Decision Risk

• Improve project selection approach and adopt a whole-life approach to preserve, maintain and manage assets

Climate Risk • Conduct climate vulnerability and impact studies• Emphasize robustness, resilience, redundancy

Page 23: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Example – NY State DOT

Page 24: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Life Cycle Cost (LCC) Analysis

Initial Costs

Future Costs

Page 25: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

What is Life-Cycle Cost Analysis?

• Analytical technique used to assess total cost of asset ownership associated with construction, inspection, maintenance, and disposal

Page 26: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Concept –Transport Scotland

Page 27: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Concept –Transport Scotland

Page 28: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Concept –Transport Scotland

Page 29: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Life-Cycle Modeling StrategiesAsset Typical Strategy Worst-First Strategy Desired Strategy

Pavements

(70-yr Analysis Period)

• Delay need for reconstruction by applying a combination of maintenance and preservation treatments, mill and overlays

• Reconstruct a pavement as it deteriorates to a Poor condition without routine preservation activities

• Apply a major rehabilitation activityat year 50 once the pavement has gone through a few preservation cycles and minor rehabilitation activities

Bridges

(200-yr Analysis Period)

• Repair and preventivemaintenance on 2% of bridges and wash 75% bridges annually• Limited repair actions based on available funding and engineering judgment.

• Replace entire bridge structure as it deteriorates to a Poor condition without any preventive maintenance or repairs.

Page 30: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Pavement LCCA: Results

• Agency’s current policy saves approximately $17 Billion when compared to the worst-first strategy (over entire inventory).• The desired strategy will result in savings of approximately $600 million over the current strategy (over entire inventory).

Page 31: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Bridge LCCA: Treatment Strategies

• Bridges inspected typically at 2-year intervals

• Most bridges washed annually to remove corrosive salts, repairs and preventive maintenance actions performed based on conditions noted during inspections

Badcondition

Newcondition $ $ $

Deterioration

Routine maintenancee.g. washing, sealing

Mid-life preservatione.g. painting, patching, protective system repairs

Rehabilitation and replacementwhen the bridge is too old or deteriorated to repair

Balanced investment

plan

Page 32: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Bridge LCCA: Results

• Agency’s current policy saves approximately $600 Million when compared to the worst-first strategy (over entire inventory).

Page 33: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Using Results to Improve Decisions

Page 34: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Risk Can Be Used To:

• Set priorities• Assign resources• Improve communication with stakeholders• Increase the likelihood of organizational

success• Reduce agency liability

Page 35: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Utah DOT - Risk in Investment Decisions

• Budget: $185M/yr– Interstate (935 mi) -

$70M– Level 1 Roads

(2,960 mi) (> 1,000 cars/day) - $105M

– Level 2 Roads (1,970 mi) (< 1,000 cars/day) - $10M

Page 36: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Role of Life-Cycle Costs in the TAMP

• Convey strategies for managing an asset effectively using preservation activities

• Quantify future maintenance requirements associated with capital improvements and expansion projects

• Determine whether replacement decisions are being made in a timely manner and whether the agency is capitalizing on preventive maintenance opportunities

Page 37: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Resources Available

• 2015 Performance Measures Conference & 1-day

Asset Management Meeting

• FHWA Website

– http://www.fhwa.dot.gov/asset/

• FHWA/AASHTO Asset Management Webinar Series

– http://tam.transportation.org/pages/webinars.aspx

• NCHRP 08-93, Managing Risk Across the Enterprise: A

Guidebook for State Departments of Transportation

Page 38: How to Consider Risk and Life Cycle Costs in ... · • Risk is “the effect of uncertainty on objectives” (ISO) • Risk management is “a systematic process to identify risks

Thank You!

Contact Information:Katie Zimmerman, P.E.

(217) [email protected]