KARBI LANGPI POWER PROJECT
1
Built on river Langpi which originates from Meghalaya.
Project was sanctioned by the Planning Commission in1979.
Contracts for the major works like Dam, Tunnel etc were awarded in year 1981.
I Unit of 50MW was commissioned on 30.1.2007 and the second unit was commissioned on 20.3. 2007.
2
Location Karbi Anglong district of Assam.
Latitude 25.047'12"
Longitude 92030'08" Annual energy 390 MKWH Project cost Rs 373.09 Cr
KARBI LANGPI POWER PROJECT
Type Concrete gravity
Length 221m
Deepest foundation level 265.00m
Top elevation 319.50m
Crest level 300.00m
Spillway capacity 9950.00cumecs
DAM
LOW PRESSURE TUNNEL
Type Horse Shoe Shaped
Length 4430 m
Diameter 4.20 m
Capacity 57.00cumec
HIGH PRESSURE TUNNEL
Tunnel 2 numbers
Type Circular steel lined
Diameter 2.60m
Tunnel1 151.20m
Tunnel 2 166.20m
PENSTOCK TUNNEL
Tunnel 2 numbers
Diameter 2.60m
Tunnel 1 101.20m
Tunnel 2 89.50m
PENSTOCK
Penstock 2 numbers
Diameter 2.60m
Penstock 1 526.70m
Penstock 2 514.20m
POWER HOUSE
Type Over ground indoor type.
Maximum Head 240.00m
Average Head 235.00m
Maximum Utilizable discharge 57.00cumecs
Annual available energy 390 MKWH
Installation 2 Units of 50 MW each.
Type of turbine Francis , vertical Shaft
KOPILI POWER PROJECT
1
Built on river Kopili in the North Cachar Hills of Assam.
Was the first venture of NEEPCO in 1976.
Beneficiary states are Assam , Meghalaya ,Mizoram,Nagaland, Arunachal Pradesh, Tripura.
Head available is 326.50m.
Total Generation Capacity is 275 MW.
2
Dam and dyke systems are used.
One reservoir is on Kopili and one on Umrong(tributary). Khandong station uses Kopili water to generate 50 MW(2X25 MW) power.
Kopili station uses the tail water to generate 100 MW(2x50) power. Extended by setting up Unit III & Unit IV of 50 MW capacity each in 1997. Total installed capacity rose to 250 MW.
Khandong Unit I 8-03-1984 Khandong Unit II 3-05-1988 Kopili Unit I 4-07-1988 Kopili Unit II 21-07-1988 Kopili Unit III 5-03-1988 Kopili Unit IV 17-06-1988 KHEP Stage II 26 -07-2004
DATE OF COMISSIONING
Kopili Hydro Electric Stage II Power Station
PENSTOCK
Penstock 2 numbers
Diameter 2m
Length 890m
DAM
Type Concrete Gravity
Height 30m
Length 143m
HIGH PRESSURE TUNNEL
Diameter 4.6m
Length 825m
Lining Concrete
Diameter 4.0m
Length 300m
Lining Steel
LOW PRESSURE TUNNEL
Diameter 4.6m
Length 5.5km
Lining Concrete
STATUS OF GENERATION
Generation during September 2009 was 132 MU.
Generation in 2008-09 was 1171 MU.
Involves a 481m long conductor system.
Conductor system brings water from Khandong reservoir.
Power generated in the powerhouse is 25 MW.
Tail water goes to Umrong power station for utilisation in
Kopili hydro power station.
Kopili Hydro Electric Stage II Power Station
1
HEAD & POWER
Head 99m
Generated Power 25 MW
PENSTOCK
Penstock 2 numbers
Diameter 2.5m
Length 192m
TUNNEL
Diameter 4.5m
Length 2852m
Type Concrete lined
Diameter 4.5m Length 38m Type Steel lined
DAM
Type Concrete Gravity
Height 66m
Length 243m
SUBANSIRI HYDRO POWER PLANT
1
Built on river Subansiri at Gerumukh on Assam-Arunchal Pradesh border.
Is a run-off river project.
Biggest hydroelectric project undertaken in India so far.
Largest and longest tunnel in India constructed under the project.
1
Survey work and investigation commenced in the year 2001.
Estimated energy generation is 7241 MU. Total Capacity is 2000 MW ( 8x250 MW). Still under construction, expected to be completed by 2012. Project cost is about Rs. 6285.33 crores.
HEAD RACE TUNNEL
Tunnels 8 numbers Diameter 9.5m Shape Horse shoe Length 608m-1168m
DAM
Type Concrete Gravity
Height 116m
SURGE TUNNELS
Tunnels 8 numbers Diameter 9.5m Shape Horse shoe Length 400m-485m
PRESSURE SHAFT
Shafts 8 number
Shape Horse shoe
Diameter 9.5m-7m
TAIL RACE CHANNEL
Width 206m Length 35m
POWER HOUSE
Turbines 8 number
Capacity 8X 250 MW
Diameter 9.5m-7m