I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR 167 Program Karl Westby, PhD Traffic Manager WSDOT I-405/SR 167 Program 1

I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

I-405 Peak-Use Shoulder LaneProject Overview

NOCoE WebinarSept. 28, 2017

Barrett Hanson, P.E.Design Manager

WSDOT I-405/SR 167 Program

Karl Westby, PhDTraffic Manager

WSDOT I-405/SR 167 Program

1

Page 2: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

I-405/SR 167 Corridor• 40-mile freight and commuter corridor• North-south alternative to I-5• One of the most congested routes in

Washington State• Home to fastest-growing population and

job centers in greater Seattle area

I-405 express toll lanes• Opened between Bellevue and Lynnwood

in Sept. 2015• Two-lane system between Bellevue

and Bothell• Single-lane system between Bothell

and Lynnwood• Extension of system funded between

Bellevue and Renton to connect with SR 167 high occupancy toll lanes

Project Setting

2

Page 3: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Challenge: High Demand, Limited Capacity

Bottleneck moved north after new capacity opened • Higher volumes moving

faster in five-lane section (Bellevue/Kirkland area)

• Resulted in increased congestion in three-lane section (Bothell area)

High volumes entering I-405 at SR 527 during afternoon peak periods• ~1,000 vehicles/hour were forced to merge into full

general purpose lanes• The result: general purpose lane back-ups, less

reliable express toll lane trips (and higher toll rates)

3

Page 4: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Traffic Conditions Before Shoulder Conversion

• Heavy traffic during the afternoon commute throughout the corridor

• Congestion builds south of SR 527 during peak periods

• Desire for quick congestion relief

February-April 2017

4

Page 5: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Project Scope and Outreach

Converted existing right shoulder to 1.8 mile long, dynamically controlled general purpose peak-use shoulder lane

First dynamically controlled peak-use shoulder lane in Washington State

Extensive stakeholder coordination & outreach• Washington State Patrol• WSDOT traffic/tolling divisions• FHWA• Local cities• Freight industry• Traveling public• Elected officials

Total project cost: $11.5 million funded by toll revenue• $7.29 million construction contract

5

Page 6: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

• Four overhead electronic lane control signs with side-mounted message signs• 0.5 mile spacing • 5-foot by 5-foot lane control sign• Supplemental messages and

queue warnings• Four paved emergency pull-out areas• New quarter-mile long noise wall• Striping and delineators• Paving• Guardrail

Project Construction Elements

Typical northbound roadway cross-section

6

Page 7: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

$1.5M

$1M

Project Costs Design-build contract $7.29M

$2.75M

$1.75M

$1.5M

$3M

Design-builderdesign and administration

Preliminaryengineering

WSDOT ConstructionCosts: CE, sales tax,design review and contingency

Peak-use shoulder laneelements

Noise wall

Other projectelements

7

Page 8: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Rapid Project Timeline

2016 2017April 24

Opened to traffic

JanuaryConstruction

start

MarchProject

identified

SeptemberDesign-build RFP

issued

DecemberContractawarded

14 months from project identification to open to traffic

120 days from NTP to opening

8

Page 9: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Early performance: Congestion contours for general purpose lanes

BEFOREFebruary-April 2017

AFTERFirst 3 months

9

Page 10: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Early performance: Congestion contours for express toll lanes

BEFOREFebruary-April 2017

AFTERFirst 3 months

10

Page 11: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Early performance: Travel times

0

5

10

15

20

25

3012

:00

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

19:0

0

20:0

0

21:0

0

Trav

el T

imes

(min

)I-405 NB GP Travel Times from SR 522 to I-5

(SRMP: 21.83-28.98)

95th%-5th% Jan-Apr Avg 4/24/16-7/17/16 (M-F) 4/24/17-7/17/17 (M-F)Avg Jan-Apr (M-F)

11

Page 12: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Early performance data: Volumes

Five-hour Peak-Use Shoulder Lane Volumes (2 to 7 p.m.)Range of peak-use shoulder lane volumes by week

Highest Volume Day

Lowest Volume Day

Average Day

12

Page 13: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Incidents

11 incidents in first five months of operation• Four collisions• Six disabled vehicles• One unclassified incident• Too early for trend identification

Disabled motor home blocked peak-use shoulder lane, resulting in temporary closure

Box truck in emergency pullout partially blocked shoulder lane, triggering warning signs

13

Page 14: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Positive feedback from the public

14

Page 15: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Future peak-use shoulder lane projects planned in Seattle region

• I-5, Everett to Marysville(northbound only)Construction start: 2019

• I-405, Renton area(northbound only)Construction start: 2019

WSDOT is implementing peak-use shoulder lanes at strategic locations to add more space for travelers in a quick, cost-effective manner. WSDOT is also partnering with local transit agencies to open bus-only shoulders.

15

Page 16: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

Lessons learned

Design• Added delineation• Early stakeholder coordination

Implementation and Outreach• Robust public outreach for educating

the traveling public• Supplemental incident response

teams and enforcement• Managing public expectations of

implementing additional peak-use shoulder lanes

16

Page 17: I-405 Peak-Use Shoulder Lane › uploaded_files › WsDOT...I-405 Peak-Use Shoulder Lane Project Overview NOCoE Webinar Sept. 28, 2017 Barrett Hanson, P.E. Design Manager WSDOT I-405/SR

CONTACT

Barrett HansonDesign manager, I-405/SR 167 program

[email protected]

Karl WestbyTraffic manager, I-405/SR 167 program

[email protected]

17