_ c, . , J. . :. __ . PROPOSED AGENDA CPC SOFTWARE CHANGES MAY 19, 1980 I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE CHANGE II. DEFINITION OF CHANGES , A. CEAC PF CHANGES B. CPC/CEAC DIAGNOSTICS C. ASGT MODIFICATION i D. HEAT FLUX FILTER E. OTHER CHANGES III. QUALIFICATION PROGRAM IV. TEST RESULTS A. PHASE I RESULTS | B. PHASE II RESULTS C. NOISE TESTING | V. SAFETY EVALUATION | VI. SUMMARY l | $ ! o , 8 0 0 7 010 SY33 ; ~ _.

I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

_

c, .

,

J. . :. __

.

PROPOSED AGENDA

CPC SOFTWARE CHANGES

MAY 19, 1980

I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE CHANGE

II. DEFINITION OF CHANGES,

A. CEAC PF CHANGES

B. CPC/CEAC DIAGNOSTICS

C. ASGT MODIFICATION

i

D. HEAT FLUX FILTER

E. OTHER CHANGES

III. QUALIFICATION PROGRAM

IV. TEST RESULTS

A. PHASE I RESULTS

|B. PHASE II RESULTS

C. NOISE TESTING

|V. SAFETY EVALUATION |

VI. SUMMARYl|

$

!

o,

8 0 0 7 010 SY33 ;

~

_.

Page 2: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

_. ..

*.

,- .

1

I.. CPC/EAC fMR/3 SCFNAE CPANGE - REASCNS/CIUECTIVES

A. rFCCRIPTION

EASONS: (1) TE AND-2 OPEPATING HISTORY HAS INDICATED UitESIPABLE

SUSECPTIBILITY TO SPURIOUS EA R)SITION SIC #LS.

(2) OPEPATOR PEDEACK FAS INDICATED ESIPABLE CFANGES

' TO IFPROVE TE HIFAN INTEPFAE. (IMPROVED DISPt.AY

ANDDIAGNOSTICCAPABILITY)

(3) ON-GOING FEVIB10F TE CPC/EAC SYSTEM BY C-E AND

AP8L FAS IDENTIFIED EEDED EONCEIEiTS.

OBJECTIVES: (1) TO EDUE TE PROBABILITY OF SPURIOUS PLANT TRIPS.

(2) TO PROVIDE TE OPEPATOR WITH ADDITIONAL DIACESTIC

INPOWATION AND IFPRONED INTERFAES,

(3) TO IFPROVE ALGORITFl4 ACCURACY WHILE PAlhTAINING

TE ESIGN BASIS PROTECTICN CRITERIA INCLUDING

E0JIED UNCERTAINTIES AND DYNAMIC ALLcWANCES.

(O ENFANE OVEPALL SYSTEM PERPOPMNCE.

IN JANUARY,1979 APSL CONTPACTED WITH C-E TO EEGIN WORK ON SCFiWAE

MODIFICATIONS TO ACCG'PLISH TE ABOVE OBJECTIVES.ITWASDECIDEDTO'

CCBIE THIS MODIFICATION WITH A PPE/ICUSLY PLANNED MDDIFICATICN

EGARDING ASSWETRIC STEAM GENEPATOR TPANSIENTS TO AVOID TE ADDITICNAL

EXPENSE OF SCFTWARE QUALIFICATICN TESTING TWIE PER C64-39(A).

.

Page 3: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

.

-

.

. .

2

:TE ASSYitTRIC STEM GEBATOR TP#1SIENT PORTICN OF RE GRES PAD

PFE/IOUSLY EEEi EFEFFED TO AS f03, AND TE OTER GREES AS MOD 2.

CCNSEQUEiTLY TE CGSIED GMES EECME MOD 2/3. DUE TO CEPATIONAL

DIFFICULTIES ElCOUNTEED DURING EAC POWER FAIL ESTARTS AND FOLLCWING

ESTARTS AFTER ECUIED SURVEIU.AfIE TESTS, A PORTICN OF TE FDD 2 -

GiAtE (PDD 2A) WAS IiftBEllED IN JUE,1979. -THIS 0%NGE WAS ESCRIBED

TO TE NRC GC TASK FORCE DURING TEIR SEFIESER,1979 AllDIT. TE

REdAINING FDD 2 CP#EES EEC#E MOD 2B AND TE COSIED CP#EE EEC#E

MOD 2B/3.

- A TOTAL OF AFFFOXIPATELY 12CCO PAN-fiCURS FAVE EEEN EXPEiDED TO DATE

BY CCFEUSTIGi ENGINEERING IN PEPARING AND TESTING TE P0D2B/3 CP#EES.

IhhEi TE MOD 2B/3 SOFTWARE IS IffLEFEITED #0-2 AVAILABILITY IS EXPECTED l

TO IffROVE PAFEDLY. TE MOD 2 EEEITS WILL EE EALIZED IFTEIATELY,

hHILE RE EEEITS CF TE P0D 3 PORTION WILL ECUIE AN ASSOCIATED

TE0iNICAL SECIFICATION CPANGE PRIOR TO EDUCING TE LOW STEM GENERATOR |-

WATER LE/EL SETPOINT.

1

. -

,

e

Page 4: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

,- .

4

3

B, OPERATING HIST 0fu

IDEROUS PL41T TRIPS FAVE BEEN EXPERIENCED ON #0-2 kHICH APPEAR|

TO EE UNNECCESARY (SpuRicuS), F## OF THESE CCUG HAVE EEEN PIEENTED

BY TE ICD 2B/3 SOFPdAE CHANES AND THE CHANE IN LCW STEE GENERATOR

WATER LEEL.

TE CAUSES FOR TESE UNIECESSARY TRIPS CAN EE CATEC{RIZED AS FOLLOWS:

(1) SPURICUS CEA RSPT SIG4ALS

(2) CEADRCPSATLCWPOWERL⪕

(3) CEAC INTET1ITTENT FAILUES (PRCCESSCR AND/CR DATA LINKS)

(14) DIFFICULTY CF STEM GEEPATOR LEVEL CCfffROL a LCW PGERS

IN PNUAL

TE POLLOWING SLIDES EETAIL THE PAST #D-2 TRIPS hHICH CAN EE

ATTRIBUTED TO TFESE TYPES OF &E1TS,

.

o

.

1

.

Page 5: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

..

e *

#0-2. TRIPS W1101 WOULD/mY (?) IIAVE IEEN IRVBIIB) BY CPC/CEAC MOD 2B/3 OWrf , 'l -

PAGE1,

DME Rx IGER (%) TRIP CNJSE MOD 2B -M003

12-17-78 5 S/G LEVEL YES

32-17-78 5 S/GLEVEL ?

12-18-78 5 S/G LEVEL ?

12-18-78 11 S/GlEVEL ?

12-20-78 10 S/GLEVEL YES

12-29-78 19 S/GLEVEL YES.

12-30-78 20 DNBR (CEAC) ?

1-0G-79 20 DNBR(RSPT) YES

1-07-79 5 DNBR(RSFI) YES

1-11-79 5 DNBR(CEAC) ?

1-19-79 20 S/GLEVEL ?

1-31-79 18 S/G LEVEL YES

1-31-79 <1 DNBR(RSPI) YES

- 6-06-79 <1 DNBR (CEAC) ?

.

Page 6: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

.

.

#0-2 TRIPS Wil01 W0llD/l%Y (?) IIAVE BEDI PRB/ENlEI) BY CfUCEAC MDD 2B/3 OWLE 5 -

PAGE2

IMIE Rx IUUt (%) TRIP CMJSE M002B MDD3 ,

~ 6-07-79 11 RE (CEA mw) ?

6-08-79 1 S/GLEVEL YES

6-09-79 10 S/GLEVEL YES

6-10-79 2. RE (CEA moe) ?

6-13-79 10 S/G[fVEL YESg

6-20-79 37 S/GLEVEL 7 -

6-20-79 1 DNBR (CEA moe) ?

6-21-79 1 DNBR (CEA mm) ?

6-21-79 2 S/G LEVEL YES

6-21-79 15 N E (CEAD ?

8-07-79 53 RlBR (CEA mw) ?

8-lli-79 <1 RM (RSPD YES'

l

8-18-79 29 DNBR (RSFD YES

8-18-79 <1 DNBR (RSPD YES

.

O

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _

Page 7: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

.

.

.

IND-2 TRIPS 1411011RA1)/mY (?) IlWE PEEN PIDENIED BY CPC/&E MOD 2B/3 OIANGE 6

Pace 3

,

IWE Rx IMR (%) TRIPCAUSE M002B M003

8-19-79 16 INE (RSPD YES

9-23-79 7 DIER (RSPD YES

12-02-79 6 S/GLEVEL YES

3-18-80 <1 fiNBR (CEA DRT) ?

3-19-80 9 S/GLEvct YES-

3-20-80 till INE (CEK) ?

3-20-80 6 S/G 11YEL YES

li-19-80 10 S/G IIVEL YES

11-211- 8 0 80 DNBR (RSPD YES

11-25-80 80 IN3R (RSPD YES

.

_ _ - _ _ _ - - - _ _ _ _ _ _ _ - _ _ - - - _ - - _

Page 8: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

_ - _ .

-

.,

7

#D-2 TRIFS hHIG IICLD/MIGhT(?) PAVE EEEN

PEENTED BY TE itD2B/3 SOFil@E CFAIE.S

TOTAL to.- TRIPS hHIG MOD 2B WUJLD PAVE PPE/ENTED = 10

TOTAL fo. TRIPS kHIG MOD 2B MIGHT PAVE PFE/ENTED = 11 :

TOTAL fo. TRIPS hHIG MOD 3 hCULD FAVE PFE/ENTED = 12

TOTAL N0. TRIPS hHIG MOD 3 MIGHT FAVE PPE/ENTED = _5i

TOTAL = 38

.

6

9

4

W ,

Page 9: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

-

.,

8

Mil FRTCES

1. F0D2B/3WOFKINITIATEDJN11ARY15,1979

2. DESCRIPTICN CF CFM5.S (FItkD TP#64Ilito TO AP&L

NOMER 29,1979

3. AP&L CafLETED INITIAL SAFETY EVAUJATION

J#ll!ARY 20,1980

4. EESCRIPTION CF CPANGES TPAG1ITTED TO NRC FOR FE/IB4

JN1!ARY 31,1980''

5. AP&L EETE41IED TPAT CP#iGES DID NOT CCNSTITUTE AN

lf1FE/IB1ED SAFETY QUESTION PAY 6,1980

6. SArtTY E/ALUATION TPR&1ltid TO NRC PAY 6,1980'

|'

7. INITIAL PLANNED DATE FOR IFFLEEITATICN PAY 17,1980

8. PESENT PLRED DATE FOR IPPLEENTATION PAY 24,1980

.

9

Page 10: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

*

.,

SLM9R/ OF GMR

1. CEAC PF CHANGES (ITEMS 1,2A,10,13,13)

2. CPC/CEAC DIAGNOSTICS (ITEMS 8,9,14)

3. ASGT MODIFICATION (ITEM 12)

4. HEAT FLUX FILTER (ITEM 11)

5. OTHER MISCELLANEOUS CHANGES (ITEMS 3,5,6,7)

1

.

*

i

9

. - _ _ _ . .

Page 11: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

.

.

CEAC PF CHANGES

OBJECTIVE:

REDUCE THE NUMBER OF UNNECESSARY CPC TRIPS AS A RESULT OFCEA DEVIATION LOGIC,

PREVIOUS DESIGNr

1. THE CEAC CALCULATED ONE " WORST CASE" PENALTY FACTORWHICH WAS APPLIED TO DNBR AND LPD,

2. THE PF WAS APPLIED TO THE ONE PIN RADIAL PEAK.3. THE CEAC/RSPT INOPERABLE MODE LOGIC LEAVES BOTH CEACS

IN-SERVICE OR TAKES BOTH CEACS OUT-OF-SERVICE.|

CHANGES: I

1. SEPARATE DNBR AND LPD PENALTY FACTORS.2. PENALTY FACTORS DEPENDENT ON:

A. MAGNITUDE OF DEVIATION

B. DIRECTION OF DEVIATIONC. SUBGROUP WITH DEVIATION

D. CEA CONFIGURATION

E. TIME

3' DATA TRANSMITTED TO CPC EROM CEAC.

A. FAIL FLAG

B. BIG PENALTY FACTOR FLAG

C. DNBR AND LPD PENALTY FACTOR

4. APPLY PF TO HEAT FLUX IN STATIC DNBR LOGIC.

5. MODIFY THE CEAC/RSPT IN0PERABLE MODE LOGIC SUCH THAT ONE

CEAC CAN BE LEFT IN-SERVICE.

6. MODIFY CEAC CRT DISPLAY.

.

Page 12: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

---, -- -- , _ - - - -- -- - - - , - - -- --- ---- --- -- - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - -

4

9 *

e

I

e

.

O

C 2 8 88RS SS aR2* '

C gg- - - - - -

-.

_ . .eso 9 ,

. S .Ne .== e .* * m.

9** 9 .- e .=. O e .

I1 - 9 .,

- # 1

* * m j* " # E.1- * 3

5 o, *- * ..

\ O| - e*,- .

|,

- * -9 <

'- * . , 3.

- G 4 gd a.- e . *

L =-. e. J.

v

3- De _

*'t- * $

.= e p y| ,

= e . k* * . 1;

J ~. | .,a*e l G.

[j- e

m- - _ .,. - - ._ -

i.= se

G. : | 9 o 1=

, , - ,

[ ']a- * _

O. giU ,

'-- * o la |: : - -

,A p', *, ,

" - i.O m ,a: -

o 1-i . _i ak"

-T m..

y-- ..

- an.g

1

[,f'W $4 o* - *

- e" * . ~m- * .

o " 'I| ** O ,*=

9 g**

m. S g, "

G5 -

4-6i, m. -

_. .- ..

_ . " N- S -me 3

* * _.o 9 ** ~

I * O * =. g -

I a. e -e q

**|*= G ,

, " ,' T*=== e * **

tm e -) *

- e .** S'

w e *--1 O **1F a. e ** -

i g

o o o o o,= C C C C C C C C C C Ce e n N c m co N G W3 v r3 N c'*e= r= - T= - *=

9

"s

| 4.. *( ( 1

%| Q + ."

i

Page 13: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

|.

.

. )

-.

t

.

25 t2 C3 E! 23 23 23 E3 13*W Wr tu C3 m A r tu

g + + + + + + + + + + + + + + + o

r -mrm :fft m m m

E E3 ru 3 r : -

mmmm :.

m mr .e :tu :

Orramm :- - ru - CD :

-'

- ru m m r G :~

*. .

WE3 NW-m * -

fu I"" t 53 I"" ||"

m a m e .s C4 -

g-rerr z E,r-mtm A : :m W W W1- - 1

u -.

m ci ru A r -

- mmmm 1 "

>-

bP Jerm -

ru ru ru ru :- -c_

O. a.. C/)* 19 m W|

- e.-N N fu fu : C"3

.

UQ fu J I"" r c2 " <

2* 2" r |||" W. U *

* * * m m e - es : .

' m u14 4 ::- *.

,

1

.T m .EI - m fu : |

:i

.

- m m e r- e :4 .a .s .3 --

b O da m r m .s== J J .a .3 C :'|

.

Nr - r t: I"" -

N - F" !"* C3 f"" || 3

|ru a r e m A : -

~

Q. l.

J !

- r-mm u. :- m=r :d b. 1

.c3 m es r ru :)~

= m 2' =* 2" .

+ + + + + + + + + + + + + + + +t|2 C3 E3 C3 C3 C3 22 C3 t|3.M. 3.'

tu C3 CEE .3 r tu.

1

l

.

.

1

Page 14: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

. - _ _ _ - _ - _ . ________ - - _ _ _ _ _ _ _ _ _ _

-.

.

. *

.e . .. ... .. ..

$

.

me a a m m a a mH mr N E2 m .a r N

+ + +++ + + +<> + + + + <>- <><>

r- em :M mm :

m C2 N .n r :mmmm :

:m W W r - r.H .N :@rramm :

--N- @ :

mmmr H :-:e

h bJ IF1 - m || !a

t- M F

m e m e .s C4 .

n- - rrrr =:, i-

Me h e

r=mem Q - ."

- W W U1 mU.

~

>-m u m .a r :-mmmm 1 <: a |O-

. tn

10PTm(* mNm G" .-- a-

L .a Nmme U-

NNNN : c::"LLJU

QN JFrm"rrrr 1-

1

m m r ** m ---m W .3 .2==

M m. m N -

rmmer + =- :

N .a.a .a .s .m Ym r m .m :

== .5 .D .2 .3 H :e

Nr rEmF- =

u r- li im .a r r m A :

:gJ

-

r-mm u :--merr :g g.

anurm :"

- M 2"|r" 2* -

4 4 + e t 4 + + + + + + + + + ep:2 m c3 c2 c2 c2 A T3 C2 |

'

r N.C.2

23 .2 r NW1. .

*1

Page 15: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

. _ _

*.

CPC/CEAC DIAGNOSTICS

ORIFCTIVF.,

PROVIDE ADDITIONAL CPC AND CEAC DIAGNOSTICS TO IDENTIFY

THE CAUSE OF SPURIOUS CPC TRIPS.

PREVIOUS DESIGN:'

SENSOR STATUS WORDS PROVIDED INFORMATION THAT A CPC SENSOR

HAD FAILED.

CHANGES:

1. FAILED SENSOR STACKS IN CPCS AND CEACS

A. STORES UP TO 6 ENTRIESB. CONTAINS SENSOR ID, STATUS, AND TIME OF ENTRY

C. ACCESSED FROM:.

t. OPERATOR'S MODULE

It. TELETYPE WHEN CALCULATOR IN-TEST

2. SNAPSHOT OF DATA l|'

A. CONTAINS INPUTS, ADDRESSABLE CONSTANTS, INTERMEDIATE

VARIABLES AND OUTPUTS.

B. BUFFER FILLED: I,

I. IN CEAC, FOR AN OFF-NORAML PF OUTPUT !II. IN CPC, FOR A CHANNEL TRIP. |

C. ACCESSED FROM TELETYPE WHEN CALCULATOR IS IN-TEST. |

3. LOGIC ADDED TO PREVENT SPURIOUS PENALTIES AS A RESULT OF

RSPT ASSOCIATED INSTRUMENTATION ANOMALIES.|

'|1

|

Page 16: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

_

,

|

ASGT MODIFICATION

OBJECTIVE:

PERMIT REDUCTION (AFTER NRC APPROVAL) 0F THE LOW STEAM

GENERATOR LEVEL TRIP SETPOINT BY PROVIDING PROTECTION FOR

SELECTED ASGTS IN THE CPCS.

PREVIOUS DESIGN:

NONE

CHANGER

APPLY A PENALTY FACTOR TO DNBR BASED ON A COMPENSATED DIFFERENCE

IN THE COLD LEG TEMPERATURES.

.

Page 17: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

. .- . - - - . -

_

o,

,

Coto Les /cmerwene OrrreeroceCornerasnzoa ro< ASG7s^

COAPFMSMEDc

AcruALgo .

MCo LOLErr4T

C'O,, --- Te e. E ww.9_G2.*n - - --

i !3 |

|85- 8

1

1

I

I

I

I

I

I

Il10 ~

iI |

1

i CPC| GEAISE O

| eriI

5 1-

i'

iii

ilIn

! |I

, , .

j 2 3 Y 8 |

-tine (SEC.)1

e

|

.. |

I

, . . _

Page 18: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

_

.

.

~ HEAT FLUX FILTER MODIFICATIONS

OBJECTIVEr

TO ' REDUCE THE SENSITIVITY TO NOISE OF THE THERMAL POWER TOHEAT-FLUX COMPENSATION TO NOISE EFFECTS.

PREVIOUS DESIGNr

1. TWO FILTERS

A. OPTIMIZED FOR INCREASING POWER;

|

a. OPTIMIZED FOR DECREASING POWER

|

2. INPUT TO FILTERS IS MAXIMUM 0F CPC THERMAL POWER |A.1D CPC FLUX F0WER. !

CHANGES:

1. PROVIDE A SEPARATE HEAT FLUX FILTER OPTIMIZED FOR INCREASING

POWER WHICH USES THERMAL POWER AS INPUT.

2. USE THE CURRENT FILTER OPTIMIZED FOR INCREASING POWER FOR

NEUTRON FLUX POWER ONLY.

3. FILTER FOR DECREASING POWER TRANSIENTS USES THERMAL POWER

AS INPUT.,

4. CPC HEAT FLUX IS THE MAXIMUM-0F THE OUTPUTS FROM THESE

THREE FILTERS.

.

Page 19: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

__

.

.

,_

y

REASON FOR HEAT FLUX CHANGE

FOR PREVIOUS SOFTWARE

1. THE CPC POWER INPUT TO THE HEAT FLUX FILTER MUST BE A

CONSERVATIVE ESTIMATE DE POWER. THE CPC POWER IS THE

MAXIMUM 0F THE TOTAL THERMAL POWER AND THE NEUTRONFLUX POWER,

2. THE HEAT FLUX LAGS THE CORE POWER.

13. THE CPC THERMAL POWER LAGS THE HEAT FLUX,

i

4. FOR INCREASING POWER TRANSIENTS, WITH THE CPC NEUTRON

FLUX POWER NON-CONSERVATIVE, THE CPC THERMAL POWER MUST

BE c0MPENSATED WITH A DYNAUIC TERM AND A STATIC 0FFSET.

TO ASSURE THAT THE CPC TOTAL THERMAL POWER IS GREATER

THAN THE ACTUAL POWER. THIS TOTAL THERMAL POWER IS |

THEN LAGGED TO PROVIDE THE CPC HEAT FLUX. ||1

i

|

.

Page 20: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

- _ _ . . - - .

'

,.

.

CEA 8ANK WI RA '"^ L..

FRon)- ,

fa. LL f0 u)ER(*lo AO ?-

O.5 xIO'Y ^ (sec

.fo R. 0 -

-k - Acraat Au x Poweg

107.0 - . - Acraat Mes, fiax

)( - C PC STATIC 7~4cnmAt Powgg.f 0 6.0 -

.

105.0 -

10V. O -

.t o 3. 0 -

10.z.0 -

102.0 -

X

f00.0 - n-

' ' ' ' '07?meO 10 20 30 VO SO cscQ

.

-- - ---______

Page 21: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

, . - ._ _ - - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

.

FOR MOD 2B/3 SOFTWARE:

1. THERMAL POWER IS COMPENSATED BY THE DYNAf11C THERMAL-

POWER TERM AND THE HEAT FLUX FILTER S0 THAT THE

RESULTING HEAT FLUX IS CONSERVATIVE WITH RESPECT

TO THE ACTUAL HEAT FLUX.

.

Page 22: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

.- --._ __

*. . . . .

.

CEA 8ANK WIMRA U' AL/~Ron]

'

fa. LL f0 u) ER(*AD '07 *

(o.sxio'Yh$.).

SEc

.108.0 -

-$c - Acra.st fxux Powag'

. - Acraat. Hes, Max 'i 07.o -

)( - CPC STATIC 7~4cnn?AL Pawgg10G * ~ .

a - cec corneensceo went f2a x

105.0 -

.101.0 '-

,

1 o 3. 0 -

i

1 02.0 -

\

.fod . O -

/ 1

100.0 W-

-

, i , i '91.0

, .

TIMEO 10- "20 0 ' #8'")

.

___

Page 23: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

-

'

,

MISCELLANEOUS' MODIFICATIONS

1. CONSTANTS, ADDRESSABLE CONSTANTS, AND POINT ID'S FOR

THE MODIFICATIONS LISTED ABOVE.

2. MODIFICATIONS TO THE CALCULATIONAL SEQUENCE TO INCREASE

EFFICIENCY AND ACCURACY.

3. ADDED A DEADBAND TO THE LOW END OF THE EXCORE SIGNAL

RANGE TO AVOID SPURIOUS OUT-0F-RANGE ALARMS.-

4. MODIFICATION TO THE LOW LIMIT CHECK LOGIC FOR EXCORE

SIGNALS CORRECTED FOR SHAPE ANNEALING.

5. MODIFICATION TO THE SATURATION TRIP LOGIC.

6. MINOR MODIFICATION TO THE PERIODIC TEST OUTPUT LOGIC.

7. IMPLEMENT MEASURED VALUES OF CERTAIN POWER DISTRIBUTION

CONSTANTS.

l

!!

Page 24: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

_____. .__ _-_

*.

QUALIFICATION PROGRAM

ALL CHANGES WERE MADE AND TESTED IN ACCORDANCE WITH

A. CEN-39(A)-P, REVISION 02, THE CPC PROTECTION ALGORITHMSOFTWARE CHANGE PROCEDURE, DECEMBER 21, 1978.

B. CEN-39(A)-P, SUPPLEMENT 1-P, REVISION 01, JANUARY 5, 1979.

.

T

Page 25: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

-.

THE FOLLOWING WAS PERFORMED:

PHASE I

TESTS ALL MODULES MODIFIED

TESTS ALL MODULES WHICH ACCESS COMSTANTS THAT WERE MODIFIED'

PHASE II

INPUT SWEEP TEST

2000 CASES FOR CPC

1200 CASES FOR CEAC

DYNAMIC SOFTWARE VERIFICATION TEST

LIVE INPUT SINGLE-PARAMETER TEST:

_

-|

Page 26: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

*.

1

THE FOLLOWING DESIGN DOCl'MENTS WERE MODIFIED AND QA'D:

1. Functional Description for a CPC, 00000-ICE-3208, Rev. 03, February 18, 1980.'

2. Functional Description for a CEAC, 00000-ICE-3234, Rev. 02, March 20,1980.3. ANO-2 Cycle 1 CPC and CEAC Data Base Document, 6370-ICE-3212 Rev. 03,

April 18,1980.

4 General Specification for Software Design of CPCs, 00000-ICE-3010 Rev. 04, iMay 15, 1980. |

iS. General Specification for Software Design of CEACs, 00000-ICE-3026, Rev. 03,May 15, 1980.

6. General Specification for Software Design for CPC/CEAC Executive System.00000-ICE-3031, Rev. 01, May 15,1980.

7. CPCS Phase I Design Qualification Test Report, 6370-ICE-3717, Rev. 03, May16, 1980.

8. CPC/CEAC System Phase II Software Verification Test Report, 6370-ICE-3726, Rev.02, May 14, 1980.-

9. Program Listings for CPC, 00000-ICE-3910, Rev. 03, May 15,1980.10. Program Listings for CEAC, 00000-ICE-3926, Rev. 03, May 15,1980.11. Program Listings for CPC/CEAC Executive System, 00000-ICE-3931, Rev. 02,

May 15, 1980.

12. Test and Certification Analysis of CPC System Software for Channels Cand D 6370-ICE-3631, Rev. 04, May 16,1980.

13. Test and Certification Ar alysis of CPC System Software for Channels A andB, 6370-ICE-3629. Rev. 04, May 16,1980.

i

.

i

Page 27: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

..,

-,

SOFTWARE VERIFICATION TESTS

1. PHASE I MODULE TESTING

II. PHASE 11 TESTING

A. INPUT SWEEP.

B. DYNAMIC SOFTWARE VERIFICATION

C. LIVE INPUT SINGLE PARAMETER !

|III. NOISE TESTING

.

I

O

Page 28: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

'

.

PHASE I MODULE-TESTING

I. TEST REQUIREMENTS (PER CEN-39(A)-P)

A. TEST ALL MODIFIED MODULES

B. TEST MODULES ACCESSING UPDATED CONSTANTS

II. TESTS WERE PERFORMED ON ALL MODULES

III. TEST RESULTS

A. CPC - NO ERRORS

B. CEAC - NO ERRORS

C. EXECUTIVE - 2 DISCREPANCIES BETWEEN SPECIFICATION

AND IMPLEMENTATION

1. IN A SEGMENT OF CODE USED FOR PERIODIC TEST.

A. FIRST DISCOVERED IN ORIGINAL PHASE I TEST

B. DOES NOT IMPACT NORMAL OPERATION OR

PERIODIC TESTING.,

I

9

Page 29: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

-.

.

2. IN THE CEAC AUT0-RESTART CODING:

A. IMMEDIATELY AFTER AN AUT0-RESTART, WITH THE

FAIL BIT SET, THE PENALTY FACTOR VALUE IN THE

PF OUTPUT WORD TRANSMITTED TO THE CPC'S IS NOT

AS SPECIFIED.

B. ERROR NOT CORRECTED - DOES NOT IMPACT CPC

OR CEAC OPERATION

1. CPC IGNORES VALUE OF CEAC PF WORD IF FAILBIT SET.

2. PENALTY FACTORS IN PF WORD ARE CORRECT

AFTER 0.1 SECONDS.

3. FAIL BIT IS NOT RESET FOR APPROXIMATELY.12 SECONDS.

.

O

Page 30: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

.-,

PHASE II TESTING

I. INPUT SWEEP TESTING

A. OBJECTIVES

1. DETERMINE PROCESSING UNCERTAINTIES'

2. VERIFY INITIALIZATION3. IDENTIFY ABNORMALITIES

B. MINIMUM 0F 500 TEST CASES REQUIRED

C. CPC TEST

1, 2000 TEST CASES |

2. OBJECTIVES OF TEST MET

A. PROCESSING UNCERTAINTIES LESS THAN REV. 02 SOFTWARE !s. NO ABNORMALITIES UNCOVEREDc. ALL TEST CASES INITIALIZED I

D. CEAC TEST

1, 1200 TEST CASES

2. OBJECTIVES OF TEST MET

|

A. PROCESSING UNCERTAINTIES DETERMINED is. ALL TEST CASES INITIALIZED |c. NO ABNORMALITIES UNCOVERED

1. INTERMEDIATE VALUES IN 24 TEST CASES

DIFFERENT DUE TO AN IMPLEMENTATION

DIFFERENCE. DOES NOT IMPACT CEACPENALTY FACTOR OUTPUTS,

2. ONE CASE DID NOT MEET ACCEPTANCE CRITERIA

DUE TO DIFFERENCES IN MACHINE PRECISION-ABOUT- A BREAKPOINT.

.

,- -- - - -

Page 31: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

._ _ _ _ _ _ _ _ _ _ _ _ _ _

'

,

.

PHASE II TESTS (CONTINUED)

II. DYNAMIC SOFTWARE VERIFICATION TEST (DSVT)

A. OBJECTIVES

1. VERIFY DYNAMIC RESPONSE

2. HELP ASSURE CORRECT SOFTWARE IMPLEMENTATION

B. TEST CASES

1. FIVE. REQUIRED BY CEN-39(A)-P

'

2. NINE CASES RUN

A. FIVE REQUIRED CASES

a. THREE ADDITIONAL CEA DROP CASES

c. ASGT CASE

C. RESULTS - DSVT OBJECTIVES MET

.

Page 32: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

__

'

.

.

PHASE II TEST (CONTINUED)

III. LIVE INPUT SINGLE PARAMETER (LISP) TEST

A. OBJECTIVES

1. VERIFY DYNAMIC RESPONSE

2. HELP ASSURE CORRECT IMPLEMENTATION OF SOFTWARE

3. EVALUATE HARDWARE / SOFTWARE SYSTEM

B. TEST CASES

1. FIVE REQUIRED BY CEN-39(A)-P

2. SIX CASES RUN

A. FIVE REQUIRED CASES .

i'

B. ONE PART-LENGTH CEA DROP CASE

C. RESULTS - LISP 6BJECTIVES MET

||

2

e

Page 33: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

._ . _

.

a

i

NOISE TESTING

A. OBJECTIVE.,

1. EVALUATE SOFTWARE RESPONSE TO PROCESS NOISE.,

:

B. RESULTS4

. 1. THE REV. 03 RESPONSE IS VERY SIMILAR TO THE'

REV. 02 RESPONSE.

:

i

i

,

.

I

.,

: |

.

O

9

m . _ __ - .. ,_,. -

Page 34: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

_

e

.

e

- _ = . . .

L30

Ov

*= e

*C3

iO.s2e

it =

| *

| 3 ou O~

r4x e.4 ..

C30

|'

C81

'

te_

,

J C3C

\! .'

6i i r c4

3 i-

-

%hI A a. 0:o. s. -O! . > c --

P I Cd wM| m r . 0 ==$ & .~

t. t(3 Li.

43.E| -

.e3

(D.*= .

7, - * . ; -

h .- |

*6 f :

S. H.'l 8

'

.

-N

fw s .o .

-

1 e-I h 43

| C e= =e f$'

| o e.e .-

w

O

"""'" 'd -J,

-

| e s e.,. ' V% #h

J: - - ,"t

e 7i | | | Ul = = *

ofIIC "a o a o1

P.m *G3

C. & Q. * r. eag tgt m .

_= o3 r; '

#. . r. *r. g g *e.l

- . . .

e-a3-

,

;

i ._.

i . .4 +== me, awX.I',

ae.m,# 'd< .

CJ:-%-= c.m=

I e .a gvv

,

!l .

.

.

Page 35: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

,.

.

.

.

o9o

|, .

_

o-

an

g -.

U, o

" . . *"

N*

_

il o

: 90 t *\'O.g. J

-oo

'

I

o --,

E~oO 9 =;*

n =e

D *--

.CL o u

9 Z E !l . _ . - e - ;

'

~

N| d oJ

% C 2 *

_

f 2< o

Om =.

o euJ -

O>, e

'

w gOz ( 4 ,

Z -.,

| 2 1 d' f I t oIC "o o o o a o!% * * * * N'p a , , , ,

| ** *'* me me ao&CO O b

gN,i u gaj v]U E 'si"3ca;

8 UUi;

l. __ i!

*.

Page 36: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

'W

8

e

O'

g . . . . . _

.

O**i *gk. O. ..: -- -

se

W. . -s._

- N--

r. .,- e~ nr --..

[. %."4J p. **.. - -

O*

* .6' O... a g**# .... 'J

$*<'> O, .**

6-

3.a.%. a...- ts

.- d e, e

*fe

$. *5 .m q'ss

#g e<

$.

Q d '. U"2*. .

7 a.1- 4. *.

} g- .-,

. - ,-:.. e4

%s *! .- s -- ).T I '* O=%,

0 #-* ** 5' i^.-.m O a,'v , f~. -

w.co-

oh.*j*,& f4 x

o .-1

, .g,.s - - -g 1

'.+ .-P- - b| * O a. - - o c

3*=* e.- - -v3 -

e.e >=.=. }, . i

Q Y' '. 1'

s -*s .

of** *A . ..*b c.*=** s m,-a. - , ._,

L.- y . .. e. s.- .

.f. Ta ~

**--,

. -k,,.h U

gy, . . ,- 8a.

* O . e**+-.:. .-. , ,

g%

i - d' ,cj - } 3I P * ra *, .- .. py -

. , . .- .

- g . ..w* *..OW

"w . I i i t.ti - ,, - _ -

_

' >-- u a a a a unI r * O O e C O O

"*= (** P3 0 Or -=.L.. w4 - * !

* ,

, e4 e4 e4 3 e4 ea io;4^*'. . 20 |- as i

t~e us |rs

t.e.

.I

;*.:,s, : .c x- .,. hunc...h. m .

O %4 ed % #

j .u .. _.

.

!6 .

!4

1

_ _

Page 37: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

- - ~ - - - - - - - - - - - - - . , . - _ _ ,

m

h*

e

.

e

=

$ y*.**). d,#

..k - .

. .** ,, ps. .

o

. . i=:t* ie . . ~ .~

M . ,Q *' an*t ., =j g~ -

S *. .- N. *

['-

* . * ..* p:f.c3

o.. * . . .-, , . , . * co. + .eg*, 3** N*

-; T . +,+. . * * *| 6 o 'o .t ;4 .v. *

| ** *

s * f+.*% - ;

I .* N |(

I < . --

'

4. ,. n ==* +* A.* o c3. o 2*@ %~ ca?'E * *

-+ . umH * * * N wx) /*, ** W3 ==* -

6 . * *p

N A'*' ** a w ,

o .n.>- .. *** % ,

>- e @ M.

N . J.*.* % -+

t,fp . * .: *Jg a ,.t** . -

C s . g.+ t* N~ .

M.. - -.> ...$_,"

1- t a.ON LC. 8

O eY. * . .' .*w --

v)> }...s .

* Q**m

5' m

OZ * .j **D*'*+ - ,

.|y '.s --z

:* :s ~.

z f ; t i e* .1C a oo o

k h * og

o o-

I--- - .

E~" " " N

Z ily ..

8gDOt a

wUJU t . ctx

HGNQC1UU

.

GUlIHW gW

.

t

e

t

,, *

Page 38: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

c.

,

.

.

.

i

. THEMARGINOFSAFETYISNOTDECREASEDIF: I

.~

A) THE CONSEQUENCES (I.E. RADIOLOGICAL EXPOSURE TO THE

PUBLIC) 0F THE LIMITING DESIGN BASES EVENTS ARE NO

MORE SEVERE, AND

a) THE CONFIDENCE LEVEL IN THE CAPABILITY OF THE SYSTEM

TO PERFORM ITS SAFETY FUNCTION IS MAINTAINED

,

)

9

w

Page 39: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

.. . . .,

.

WITHRESPECTTOITEMi)

THE CPC I5 REQUIRED TO INITIATE A REACTOR TRIP TO ASSURE

THAT THE SAFDL (s.a. DNBR AND LPD ) ARE NOT VIOLAIED FOR

SPECIFIED DBEs.

MEASUREMENT, CALCULATION AND PROCESSING UNCERTAINTIES AND |DYNAMIC ALLOWANCES MUST BE CONSIDERED IN THE TRIP LOGIC

.

e

4

J

t

t

9

0

Page 40: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

:e 4.

s

ge

J.3"a ij .

{ Ij'

k I'

s =<8.

'

2

$iu 62 yT cT ~3 1

h 'l .

3c4 +N d

-

2 oO Z

.

de d- ss - -d E, e a :a'd j1 m

$U l' l V!) e c > ssT |

'w x )v 1

..

3I

i

0 l. ;e ~

2 .

O

_ .

Page 41: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

43- 4,

da

1

Y d, 3_ woe ,

T-

! } $ 13-

a5ase+3.

'

3oe

5'i4.4

h*3

*

19 &

b 5y n

ch &'

y }fo a, 2 --

5g3

~<

g i< a-,

2 i

. --

f 0 N I,a'

-

$. % 5 1-

{l -9i

3.s.- > c ck Xi \

.

.

1. -

3,

.

i'

.

'

2O .

. .

Page 42: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

kt I,

e

f

. .

j-

l*

.

@-,

m . **%

Y.2 )o aH 2 s :

- i

I- 3,

%g s :

Fa)

$ Ee ~1

4

_-

n 2..

H o g !.o -

4 2G. t w o2 +0 -~

,4-

Si af ,3 E3 -

,

E + z--

-

5 ~

i 0 *. ( !e-

f11

-

'

V,)~

4

$D-

8' o

ob

Cf*|

i

Page 43: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

E$p,

e 6

OS

O 9

0

4

%

+2. .-

00.e ' ,'

7 %e3,

'

43~

% -- o-

2 -

_ _ _ _ _ _-

-4_

o _wq1,. -P

.

25 |@

9A~- -3 -

|2______~- '

U 'n

g o OL 2

*

H ~

O t_ m o ,

* _. eG. ! ____

1_

___ '

2 y '

o i

+1I. ~.

a 2 o s1

E -

~

-

O i?9e a= N91 ~

.

._

.

_.

-o~

.

:.0'

3oob .

*

Cs

. _ , . _.. . - - _ -.ev.---

Page 44: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

'

., ee

|

THE MOD 2B/3 SOFPdARE IS MORE ACCURATE AND THE PR0 ABILITY

BAND 'dIDTH IS REDUCED .

.

.

O

I

o

e

.

Page 45: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

- , - - - - - - - - - - - , - - - . - - - , . - - , - - - - - - - - - , . - - - , - - - - - - - - -,

O

h%

0

.

em

4. ' . . Di EN -

.

.

@0-

f$

N,

|

eso<a

a h4 *

'

8L

\s

/2 |.

i

!+

~.

-

-

s > oEe '1 ~

'

Ia fo 3;

> ssO_,

(c /* x 0e-

a

$

'.

e3

1

0.

2 .

Page 46: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

B05-9

/

.e

i

|*

.

|

,.''

)

N !.

4 !

Q a \o >o i

sc *t is !

-

H o0e -g 9&G 4

p q--

H j eo '.

2q

@. o 9Oq -

~O A

i b 3.-

Ee -

{ ! ( +2-

'g a 4o _ f.

-

1 ,a.

T1> g~

t.j.

.

K-

-*-

7oSa04

Q/ .

_ . _ _ _ __ - _. . . - _ _

Page 47: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

- - - - - - -- --- -- - - - - - - - - , , - , - - - -

O t4J% E o

%%0 pr $'h* 9 W m

e oe. 9

.-A o oew g.

o g w wg[' >* W%f

.

by $ A.\g

'

. ,

E & O* d% 5NC % % n -

ihoy J O' 4' I 6 D$ MN

239dk & *+

-

z ,3r h npwge m m x.w u om N~ 4 4 Ny 4 h tob. E to u %-

O W%* g o gv" LH m w . -

. -otry.

o m a fm m w,

.k.

.

M hQ $ N l

NuO $utw W u W Rv m g 1

i

s6 0 N W 6 6 ep cyy Oto .

m yNW N OOT k3 ..sut a g g2

TE $*# D Q M V M N) ^ g.o M h w bW cy a m

F5h 9 o n gt6j'sm*- .

o w 6 gw a b.

w y s .

W' x? w =

h 2 $ O $ D Y(

3 $ N.'

$_ , 6, e e e. _. m. .= ,$ $ j O q0 " w 3

Mw * M*-

< w CO N N ymM H |U

. .

*

. . . . - . _ _ _ _ _

Page 48: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

_ _ _ _ - _ _ - - _ ____-_-__-___ _ ______

':' .

CONCULSION .

THE MOD 2B/3 SOFTWARE IS A MORE ACCURATE VERSION AND REDUCES

THE SPREAD ON THE MINIMUM DNBR VALUES FOR DBEs

THE LIMITING TRANSIENT WILL HAVE CONSEQUENCES NO MORE'

'

ADVERSE THAN THE PREVIOUS SOFTWARE

OTHER EVENTS WHICH HAVE RESULTED IN UNNECESSARY TRIPS

ARE AVOIDED .;

i

.

O

9

4

, - - .

Page 49: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

, . -

.

.

WITH RESPECT TO ITEM a)

THE PURPOSE OF CEN-39(A) IS TO ASSURE'THAT THE CONFIDENCE IN

THE SYSTEM IS NOT DEGRADED DUE TO SOFTWARE CHANGES .

SINCE THE MOD 2B/3 SOFTWARE CHANGES WERE SUCCESSFULLY

PERFORMED IN ACCORDANCE WITH CEN-39(A), THE CONFIDENCE

LEVEL IN THE SYSTEM IS MAINTAINED

.

4

I

l

.

Page 50: I. ANO-2 OPERATION EXPERIENCE AND NEED FOR SOFTWARE …

.. .

.. .

.

WITH RESPECT TO ITEM s)

THE PURPOSE OF CEN-39(A) IS TO ASSURE'THAT THE CONFIDENCE IN

THE SYSTEM IS NOT DEGRADED DUE TO SOFTWARE CHANGES

SINCE THE MOD 2B/3 SOFTWARE CHANGES WERE SUCCESSFULLY

PERFORMED IN ACCORDANCE WITH CEN-39(A), THE CONFIDENCE

LEVEL IN THE SYSTEM IS MAINTAINED

.

G

9 8

.

.