2016 plan/budget result A fairly detailed plan/budget for 2016 is available For some workpackages, it is a major revision of the planning. The most common problem is the low availability of stakeholder requirements meaning uncertain scope The plans for 2017 and onwards are (with few exceptions) untouched since 2013/2014 timeframe. This means that visibility for activities after 2017 are obscure Plans for 2016 show that we must produce about twice the value that will be done in 2015 For 2017 another value doubling is planned The ICS budget envelope for the construction phase shows the monumental challenge of fast rise and fall in capacity over just a few years time 3
Citation preview
ICS re-planning, outsourcing/inhouse development strategy and staffing
TAC 12 presentation
Henrik Carling
ESS/ICSDate: 2015-09-30
2
Re-planning, outsourcing/inhouse development strategy and staffing• Agenda
– Current situation• Planning -> Effort estimate -> Competence/capacity roadmap• The challenge of in-kinding labor• Management of commercial suppliers
– Issues
– Way forward
3
2016 plan/budget result
• A fairly detailed plan/budget for 2016 is available
• For some workpackages, it is a major revision of the planning. The most common problem is the low availability of stakeholder requirements meaning uncertain scope
• The plans for 2017 and onwards are (with few exceptions) untouched since 2013/2014 timeframe. This means that visibility for activities after 2017 are obscure
• Plans for 2016 show that we must produce about twice the value that will be done in 2015
• For 2017 another value doubling is planned
• The ICS budget envelope for the construction phase shows the monumental challenge of fast rise and fall in capacity over just a few years time
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
Total
0
5000000
10000000
15000000
20000000
25000000
2015 2016 2017 2018 2019
Physics
Integration - Target
Integration - Conventional facilities
Test Stands
Integration - Instruments
Personal safety system
Control system infrastructure
Software Applications
Machine protection system
Management and administration
Integration - Accelerator
Hardware core
Software core
Equipment
4
Employee/consultant ratio
• Since it is not currently possible to establish a credible competence / capacity roadmap, some other models can be used to establish the relationship between employees and consultants
• One important factor is the size of the ICS team at steady state operations (somewhere in the phase 2019 - 2026)
• Based on experience from other facilities and adjusting for ESS Size and complexity, the following model has been used as an estimate for the steady state operations phase
0
10
20
30
40
50
60
70
2015 2016 2017 2018 2019
ICS staffing models (constant budget)
Consultants
Employees
Group EmployeesInfrastructure 4Integration 7Management 3Safety and protection 7Software 9
5
The challenge of in-kinding labor
• The in-kind budget model is particularly difficult for ICS since 80 - 90% of the cost is labor driven• This means that approximately a value of 25 M€ shall be generated from In-kind activities• This corresponds to approximately 231 MY with the ESS Cost-book labor rate• Meaning that approximately 58 in-kind FTE:s shall be fully loaded by ICS activities during 2016-2019• This is very, very difficult
• We expect the ”value efficiency” to be quite low for in-kind activities
Organization Title Estimate Agreed Project status Contractual statusBilbao MEBT controls 570Bilbao MEBT controls 130Estonia TUT Electronics collaboration Early discussions to identify opportunities in testingFrance CNRS Integration Support WP.10 600Huddersfield Control Boxes 2000 Activities postponed to 2H 2016IFE Control Room design 1100 Pre-study made and delivered. Pending contracts Technical annex being drafted. HOA being discussed assisted by Marie-LouiseLegnaro DTL controls 500PSI Electronics collaboration 700 Collaboration is ongoing - investigation started how to In-kind this workSaclay LEBT controls 260 260 Technical annex signedSaclay Proton Source 390 390 Technical annex signedSaclay Proton Source and LEBT 150 150 Technical annex signedSaclay RFQ ontrols 600UK STFC Procurement for PSS 1850 Activities postponed to 2H 2016Uppsala Control System 175 Activities postponed to 2016 - coordinate with AcceleratorUppsala Control System 150 Activities postponed to 2016 - coordinate with AcceleratorUppsala Control System 100 Activities postponed to 2016 - coordinate with AcceleratorZHAW MPS interlock Collaboration is ongoing - investigation started how to In-kind this work
6
Management of commercial suppliers
• Competence is one of several important factors for line managers to consider
• Social skills and overall team and motivation level are sometimes more important (since skills often can be learned more quickly than behavioural changes)
• When extending the line organization, one of the first decision points is if the position is permanent or transient
• Permanent positions should be filled with employees considering– Long term (5 - 10 years) assignment, competence and capacity profile of the team– Social/teamwork skills– Competence and experience– Remuneration and other contractual status
• Transient positions can be filled with temporary employees or consultants– New framework agreements are being created
• Software development services• Hardware development services• PLC programming services • Integration services
• The new framework agreements are intended to replace the current ”Epics integration” agreement– Increase supplier selection– Provide local support for smaller assignments– Increase supplier competitiveness– Lower cost, increase quality
7
Technology scope for ICS
• The span of technical scope and the competencies needed in ICS is enormous• From analog signals to Java-based high-end, big-data GUI:s in high performance, high availability• PLC systems• Mechanics and Safety/protection systems• Systems integration, Installation• Project management and administration
Electronics hardware Software
PLC
Mechanics
Anal
og e
lect
roni
cs
Digi
tal e
lect
roni
cs
FPGA
firm
war
e
Digi
tal c
omm
unica
tion
PCB,
pac
kagi
ng
Test
and
val
idati
on
Indu
stria
lizati
on, m
aint
enan
ce
Kern
el d
river
s
Ope
ratin
g sy
stem
s (RT
)
Deve
lopm
ent e
nviro
nmen
ts
EPIC
S
CSS/
Eclip
se
Appl
icat
oins
(GU
I, W
eb, S
ervi
ces)
Data
base
s
Avai
labi
lity,
perfo
rman
ce
Test
and
val
idati
on
Safety and protection
8
Competence map for ICS
• Electronics (Test, general)• Digital systems (FPGA, Firmware)• Automation and control (PLC)• Computer communications (Networking, cabling)• Hardware/software interaction (Low level software)• Core software development (Linux kernel)• Software development (Java)• Database, High availability (Postgres)• Systems integration• Safety and protection systems (IEC61508 etc)
9
Software development services framework
RequirementsThe European Spallation Source ESS AB is an accelerator-driven neutron spallation source. The Integrated Controls Systems (ICS) is responsible for providing control and monitoring for all parts of the machine (accelerator, target, neutron scattering systems and conventional facilities).
A large part of the construction scope for ICS is to design, develop, test, deploy and maintain software systems. The software for the control system of ESS is distributed over many different products and technologies with a very wide scope. Some examples are:
• Control system core functions; the ESS software control system will be based on the open-source standard EPICS [Link] family of projects
• Hardware drivers; specialized hardware built specifically for ESS need software drivers, most often drivers in the Linux kernelspace
• Database oriented systems for configuration management; most user level ESS projects are built on database technology, common examples use PostgreSQL or similar open database products
• Operator environments; Providing ESS operators with a user interface environment for the control system is essential for ICS. We will use the Control System Studio [Link] family of open-source, Eclipse-based products for this purpose
• Development environments; in order for ESS stakeholders to be able to integrate efficiently into the EPICS-based control system, ICS will provide ready-made development environments to facilitate integration work
• Data acquisition, archiving and analysis; ICS needs be able to register and store signal flow in the control system to be able to debug and analyze/optimize problems in the very complex facility
10
Software development services framework
This “OCT” has been issued by ESS AB in order to enter into a Framework Agreement with one supplier, and for a maximum period of 4 years from contract signature, for the following products:• Software development services including the following
– Design• Requirement breakdown and analysis• Estimations• Software architecture, data structure
– Implementation• Analysis• Documentation• Programming
– Java, C, C++– Linux environments, Embedded environments– Test driven development
• Database implementation– Test, validation, verification and integration
• Several different levels (module, system, integration, …)
• Build systems, automated testing• Continuous integration• Delivery
– Deployment, maintenance and support
• Software methodology services including the following– Software project management support
• Many methodologies from agile to waterfall• Planning and structuring software projects• Coordination of production/deliveries from several
sites• Software architecture• Coaching and training
– Useability and design support• User interface design analyses• User experience design support
The following products are excluded:• Automation software development (PLC)
11
Issues
• Very difficult to achieve the in-kind goals as labor
• Long lead time for framework agreements to come into play
• Uncertainties around the steady-state operations staffing situation
12