Upload
hoangnguyet
View
250
Download
0
Embed Size (px)
Citation preview
1
Internal Circulation Only
ICT LIBRARY UPDATE
Bi-monthly July – Oct. 2012 Vol. X : No. 4 & 5
Contents
- Articles - Pages
(Subject wise alphabetically indexed) - 2-5
- Addition of Books - 6-7
- Reports - 8-23
Prepared by : Neeru Saini
Librarian
2
Articles
Architecture
1 Eco friendly lighting technology make the green switch (Insite )
2 Energy conscious interiors (Architecture + Design : July 2012)
Building
1 Metal Buildings – Pre Engineered metal buildings (The master builder – August 2012)
2 Tall Buildings : Sustainability Tall buildings and sustainability myth or reality (The master builder – August 2012)
3 High Rise : Building technology (The master builder – August 2012)
4
Bridge
1 Elastic - plastic response of bridge piers due to vehicle collision a static approach (Journal of structural engineering : June –July
2012)
2 Study of thermal stresses in skewed integral abutment steel girder bridges : (Structural Engineering International : August 2012)
3 Calibration of a congestion Load Model for Highway bridges using traffic micro simulation (Structural Engineering International :
August 2012)
Business Development
1 Parada’s CEO on staying Independent in a consolidating industry (Harvard Business Review : Sept. 2012).
Concrete
3
1 Studies on correlation between flexural strength and compressive strength of concrete (The Indian Concrete Journal Sept. 2012).
2 Structural healing : development of self –healing concrete ( Bridge Design & Engineering : Third Quarter 2012)
3 Experimental study on waste type rubber reinforced concrete: (Journal of Structural Engineering L August-Sept. 2012)
4 Free vibration studies of box type laterite masonry structures: (Journal of Structural Engineering L August-Sept. 2012)
Energy
1 Energy saving thermostats : (Innovative ACR : June 2012).
2 Making rural kitchens smoke free : (Energy Next : Renewable Energy : July 2012).
3 Energy efficient initiative from the supreme industries( The master builder : July 2012)
4 Gandhi Nagar solar rooftop program (Energy Next : August : 2012)
Environmental
1 Status of indoor air pollution in India (Environmental Pollution Control Journal : July-August 2012).
2 Measurement of radioactive air pollutants in indoor environment (Environmental Pollution Control Journal : July-August 2012).
Earthquake
1 Earthquake Management : Rocking Systems (The master builder – August 2012).
2 Strengthening of structures using brick inserts to reduce the captive column effect during earthquake (Journal of structural
engineering : June –July 2012)
General
1 Scientists map microbes (Down to Earth : July 1-12 , 2012).
2 Global perspective what’s my health worth (The Human Factor : July 2012)
4
Human Resource
1. Role of Management Education in Leadership Development in India (Consultancy Ahead : July 2012).
2. What makes a Leader : (Harvard Business Review : August –December 2012).
3. Significance of pre-training factors in determining the effectiveness of training programmes (Indian Journal of Training & Development :
April –June ,2012).
4. Training managers in applying intuition to decision making (Indian journal of training & Development : April-June, 2012)
Highways
1 Project under PPP & Value for Money (Consulting Ahead , July 2012)
2 Public-Private Partnership : Progress and Prospects (Consulting Ahead, July 2012)
Project Briefs
1 Infra. Developments (NBM&CW : July 2012)
2 Roads & Highways projects (NBM&CW : July 2012)
3 Metro projects (NBM&CW : July 2012)
4 Power projects (NBM&CW : July 2012)
5 Railways Projects (NBM&CW : July 2012)
6 Port Projects (NBM&CW : July 2012)
7 Airport projects (NBM&CW : July 2012)
Power
1 Role of power exchanges (Power today : July 2012).
2 Indian power sector in transition mode : (NBM&CW: August 2012)
Road
5
1 New technology aids in monitoring roads (Infrastructure Today : August 2012).
Steel
1 Cross- Sectional Stability of structural steel : (Steel structure and metal building : July 2012)
Structures
1 Effect on structural design due to loss of sign in response spectrum analysis (The Indian concrete journal: Indian concrete Journal :
August 2012)
2 Steel fibre reinforced concrete : ( The master builder : July 2012)
3 Hydro structures : Application of high performance concrete in hydropower structures : (NBM&CW : August 2012)
Water
1 Pressure technique to locate water pipe leaks, with precision (Down to Earth : Sept. 1-15, 2012).
2 The discharge of domestic sewage is a serious problem in urban areas (Water Today : August 2012)
3 Water Management (Indian Plumbing: July 2012)
4 Water efficiency (Indian Plumbing : July 2012)
5
6
ADDITIONAL OF BOOKS
1. 15507 : Direct taxes ready reckoner Asst. year 2012-13.
2. 15508 : Basic schedule of rate for road works Bhilwara : Years2011
3. 15509 : IRC : 67 -2012 : Code of practice for road sings
4. 15541 : Map Odisa Road guide.
5. 15565 : Environmental Impact Assessment guidance manual for highways.
6. 15566 : ADB Safeguard policy statement 2009.
7. 15567 : Involuntary resettlement source book planning and implementation in ….
8. 15568 : IRC : 53 – 2012: Road accident recording forms …
9. 15569 : Special Report No. 21 State of Art use of jute geotextiles in road construction….
10. 15570 : Basic schedule of rates rural road district Pali.
11. 15571 : Basic schedule of rates National highways Bikaner
12. 15572 : Basic schedule of rates Road works Jodhpur district.
13. 15573 : Basic schedule of rates Nagpur district.
14. 15586 : Guide specifications for polymer concrete bridge deck overlays : Oct. 1995.
15. 15587 : Guide specification for concrete overlays of pavements and bridges
16. 15588 : Map of Uganda
17. 15589 : Map of Tanzania Rwanda
18. 15590 : Map of Tanzania.
19. 15643 : Standard specification for road works 2000 Tanzania.
20. 15685 : CPWD Work manual 2012
21. 15686 : IRC SP 96 : 2012- Guidelines for selection operation and maintenance.
22. 15687 : Route map of Kenya
23. 15688 : Map of Ghana
24. 15696 : Map of Rajasthan
25. 15697 : Geotechnical engineering
26. 15698 : PPP Non metro airports MCA.
27. 15699 : PPP Greenfield airport MCA.
7
28. 15700 : PPP Transmission systems MCA.
29. 15701 : Container train operation MCA.
30. 15742 : IS/ISO : 10002 ; 2004 Customer satisfaction
31. 15743 : Indian railways permanent ways.
32. 15744 : CSIR CRRI Diamond Jubilee July 16- 2012.
33. 15745 : Soil mechanics principles of geotechnical engineering
34. 15746 : Soil mechanics principles of geotechnical engineering
35. 15755 : CPWD Delhi schedule of rates (Electrical) 2012
36. 15756 : FIDIC capacity building : a Major role for FIDIC in the consulting engineering industry.
37. 15757 : FIDIC world consulting engine. Conference Seoul 10-12, Sept. 2012.
38. 15758 : FIDIC world consulting engine. Conference Seoul 10-12, Sept. 2012
39. 15873 : Cable stayed bridges 40 years of experience worldwide
40. 15874 : Steel structures design using FEM
41. 15875 : The world of foot bridges from the utilitarian to the spectacular
8
Reports
Sl. No. Projects Name Acc. No. Title of the Report (Hard CopRe Soft
Copy
Year
1 NH-15 (PA) : Independent engineer for 4 laning of
Pathankot - Amritsar
15620 MPR No. 23 : July 2012
15497 MPR No. 21 : May 2012
15526 QPR No. 7 : June 2012
15527 MPR No. 22 : June 2012
15662 Concession Agreement
15731 Monthly Inspection Report No. 15 :
August 2012
15732 MPR : No. 24 : August 2012
15829 MPR No. 25 : Sept. 2012
15844 Monthly Inspection Report No. 16 : Sept.
2012
15759 FDPR : Package (I) : Vol. I : Main Report
: Sept. 2012
15760 FDPR : Vol. I (A) : appendix to main
report : Sept. 2012
15761 FDPR : Vol. II : Design Report : Sept.
2012
15762 FDPR : Vol. II (A) : Bridge Calculation
(Part 1 to 13) : Sept. 2012
15763 FDPR : Vol. II (A) : Bridge Calculation
(Part 2 to 13) : Sept. 2012
15764 FDPR : Vol. II (A) : Bridge Calculation
(Part 3 to 13) : Sept. 2012
15765 FDPR : Vol. II (A) : Bridge Calculation
(Part 4 to 13) : Sept. 2012
9
15766 FDPR : Vol. II (A) : Bridge Calculation
(Part 5 to 13) : Sept. 2012
15767 FDPR : Vol. II (A) : Bridge Calculation
(Part 6 to 13) : Sept. 2012
15768 FDPR : Vol. II (A) : Bridge Calculation
(Part 7 to 13) : Sept. 2012
15769 FDPR : Vol. II (A) : Bridge Calculation
(Part 8 to 13) : Sept. 2012
15770 FDPR : Vol. II (A) : Bridge Calculation
(Part 9 to 13) : Sept. 2012
15771 FDPR : Vol. II (A) : Bridge Calculation
(Part 10 to 13) : Sept. 2012
15772 FDPR : Vol. II (A) : Bridge Calculation
(Part 11 to 13) : Sept. 2012
15773 FDPR : Vol. II (A) : Bridge Calculation
(Part 12 to 13) : Sept. 2012
15774 FDPR : Vol. II (A) : Bridge Calculation
(Part 13 to 13) : Sept. 2012
15775 FDPR : Vol. III : Traffic study and
analysis ; Sept. 2012
15776 FDPR : Vol. II (B) Geotechnical
investigation report (Part -1 of 3) : Sept.
2012
15777 FDPR : Vol. II (B) Geotechnical
investigation report (Part -2 of 3) : Sept.
2012
15778 FDPR : Vol. II (B) Geotechnical
investigation report (Part -3 of 3) : Sept.
2012
15779 FDPR : Vol. IV : Soil and material
investigation report : Sept. 2012
15780 FDPR : Vol. V (A) : Environmental
assessment report including
environmental management plan : Sept.
2012
15781 FDPR : Vol. V (B) : Resettlement action
plan : Sept. 2012
15782 FDPR : Vol. VI : Technical specification
10
Sept. 2012
15783 FDPR : Vol. VII : Rate analysis : Sept.
2012
15784 FDPR : Vol. VIII : Cost Estimates : Sept.
2012
15785 FDPR : Vol. IX: Bill of quantities : Sept.
2012
15786 FDPR : Vol. XI : Model concession
agreement : Sept. 2012
15787 FDPR : Package (II) Vol. I :Main Report
: Sept. 2012
15788 FDPR : Vol. 1 (A) : Appendix to main
report : Sept. 2012
15789 FDPR : Vol. Vol. II : Design Report :
Sept. 2012
15790 FDPR : Vol. II (B) : Bridge Calculation
(Part 1 of 4) : Sept. 2012
15791 FDPR : Vol. II (B) : Bridge Calculation
(Part 2 of 4) : Sept. 2012
15792 FDPR : Vol. II (B) : Bridge Calculation
(Part 3 of 4) : Sept. 2012
15793 FDPR : Vol. II (B) : Bridge Calculation
(Part 4 of 4) : Sept. 2012
15794 FDPR : Vol. III : Traffic study and
analysis : Sept. 2012
15795 FDPR : Vol. IV : Soil and material
investigation report : Sept. 2012
15796 FDPR : Vol. V (A) : Environmental
assessment report including
environmental management plan : Sept.
2012
15797 FDPR : Vol. V (B) : Resettlement action
plan : Sept. 2012
15798 FDPR : Vol. VI : Technical specification
: Sept. 2012
15799 FDPR : Vol. VII : Rate Analysis : Sept.
2012
11
15800 FDPR : Vol. VIII : Cost estimates : Sept.
2012
15801 FDPR : Vol. IX : Bill of quantities : Sept.
2012
15802 FDPR : Vol. XI : Civil work contract
agreement : Sept. 2012
2
NH-22 (Punjab) : Independent consultancy services for 4/6
laning of Zirakpur Parwanoo section of NH-22 including
Pinjore Kalka-Bypass on BOT basis ……
15501 MPR No. 49 : April 2012
15518 MPR No. 50 : May 2012
15574 MPR No. 51 : June 2012
15575 QPR No. 17 : June 2012
15693 MPR No. 52 : July 2012
15712 MPR No. 10 : August 2012`
3 NH-47 (KL-3) : Independent engineering services for design
construction, development finance operation and maintenance
of …..
15551 Monthly Inspection Report : June 2012
15695 Monthly Inspection Report : July 2012
15615 Quarterly Inspection Report : June 2012
4 NH-8 (D) : Independent engineering services for the four
laning of jetpur Somnath section…..
15476 QPR : May 2012
15494 Pavement evaluation report : April 2012
15531 Inspection Report : May 2012
15532 MPR No. 7 : May 2012
15540 MPR : June 2012
15564 QPR No.2 : March 2012
15617 MPR : May 2012
15618 Inspection Report : June 2012
15619 MPR No. 8 :June 2012
15620 MPR : July 2012
15748 MPR No. 10 : August 2012
12
5 MP (2154) : Consulting services for construction supervision
of package no. 2 …..
15473 MPR No. 67 : May 2012
15542 MPR No. 68 : June 2012
15591 QPR : June 2012
15661 MPR No. 69 : July 2012
6 NH-2 (UP): Construction supervision for four laning and
strengthening of the existing two ….
15480 Engineering Report No. 118 : May 2012
15515 QPR : June 2012
15516 MPR : June 2012
15517 Engineering Report No. 119 : June 2012
15659 Engineering Report No. 120 : July 2012
15660 MPR : No. 125 : July 2012
15725 Engineering Report No. 121 : August
2012
15726 MPR No. 126 :August 2012
15841 MPR No. 127: Sept. 2012
7
NH-9 (HV): Independent consultancy services for design,
engineering, construction, development, finance, operation
and maintenance of 4/6 laning of Hyderabad- Vijayawada
section from km…….
15474 Quarterly Report No. 7 : May 2012
15490 Monthly Report : April 2012
15492 MPR : April l 2012
16493 Compliance Report for NCR’s
15523 MPR : May 2012
15524 Monthly Report : May 2012
15631 Monthly Report : July 2012
15632 MPR : June 2012
15689 MPR : July 2012
15690 Maintenance Manual : June 2012
15691 Monthly Report : June 2012
15733 Quarterly Report No. 9 : August 2012
8 NH-5 (CN) :Independent engineer services for design,
engineering, construction, development, finance, operation
15489 MPR : April 2012
15649 MPR : March 2012
13
and 15650 MPR : Feb. 2012
15651 MPR : May: 2012
15652 MPR : June : 2012
15753 MPR : July 2012
9
NH-13 : (Bijapur) : Four laning of Bijapur – Hungund section
of NH-13 from km 102.000 to km. 202.000 in the state of
……
15471 Project completion report : June 2012
15400 MPR : May 2012
15528 Operation and maintenance Manual
15613 MPR : April : 2012
15741 Monthly status report : August 2012
10 NH-54 (MN) : Four laning from km. 126/450 to km. 140/700
and km.164/080 to km.165/400 section of …..
15472 MPR : May 2012
15546 MPR : June 2012
15657 MPR : July 2012
15834 MPR : August 2012
11
NH-21 : (Punjab) : Independence consultancy services for 4
laning of Kurali - Kiratpur section of NH-21 on Bot basis
under NHDP …..
15475 MPR No. 56 : May 2012
15519 MPR No. 57 : June 2012
15520 QPR No. 19 : June 2012
15604 MPR No. 58 :July 2012
15843 Monthly Report No. 59 : August 2012
12 NH-77 (HM) : Four laning of Hajipur-Muzaffarpur section
of …….
15482 QPR No. 6 : April 2012
15483 MPR No. 18 : April 2012
15578 Inspection Report : July 2012
15717 MPR No. 20 : June 2012
15718 Inspection Report : August 2012
15485 MPR : April 2012
15486 Monthly Inspection Report No. 8 : April
2012
15559 Monthly Inspection Report : May 2012
15560 Monthly Progress Report : May 2012
14
15561 Monthly Progress Report : June 2012
15562 Inspection report No. 10 : June 2012
15563 Quarterly Inspection Report No. 3
15821 Inspection Report : Sept.
15822 MPR 22 : August 2012
13 NH-77 (MS) : Independent engineer services for two laning
of Muzaffarpur - Sonbarsa ….
15585 MPR : July 2012
15825 MPR : August 2012
12826 Monthly inspection report no. 12 : August
2012
12827 Quarterly inspection report No. 12 :
August 2012
14
NH-9 (PS) : Independent engineer series for design
engineering construction development finance operation and
maintenance of …..
15491 MPR No. 18 : April 2012
15653 QPR No. 6 : April 2012
15654 MPR No. 17 : March 2012
15655 MPR No. 19 : May 2012
15656 MPR No. 20 : June 2012
15 J&K (2151) : Multi sector project for infrastructure
rehabilitation in …..
15496 MPR : May 2012
15576 MPR : June 2012
15634 MPR : July 2012
15723 MPR : August 2012
16 MP (2736) : Construction of ADB Assistant nine highway
corridors under ADB…..
15498 MPR No. 10 : May 2012
15525 QPR No. 2 : June 2012
15592 MPR No. 12 : July 2012
15735 MPR No. 13 : August 2012
17 NH-50 : (Bijapur) : Four laning of Bijapur – Hungund section
of …..
15499 Inspection Report 18 : May 2012
15529 QPR : June 2012
15530 Inspection Report No. 19
15612 Operation and maintenance report No. 1 :
July 2012
15
15716 Operation and maintenance report :
August 2012
15750 Consolidated additional changes of scope
of work as preside requirements
15858 Operation and maintenance report No. 3 :
Sept. 2012
18 NH-25/26 (J.L.) : Jhansi to lalitpur in the state of U.P. …..
15502 MPR : April 2012
15538 MPR : May 2012
15539 QPR : June 2012
15633 MPR : June 2012
15692 MPR : July 2012
15742 Operation and maintenance manual
19 NH-4 (TC) : Six laning of Tumkur- Chitradurga section of
NH-4 from Km. 75+000 to km. 189….
15503 MPR No. 43 Package. 4 : May 2012
15504 MRP No. 43 Package. 5 : May 2012
15555 MPR No. 44 Pack. 4 : June 2012
15556 MPR No. 44 Pack . 4: June 2012
15622 MPR : April 2012
15623 MPR : May 2012
15624 MPR : June 2012
15625 QPR : June 2012
15739 MPR No. 46 : August 2012 Package 4
15740 MPR No. 46 : August 2012 Package 5
15854 Monthly Inspection Report : June 2012
15855 Monthly Progress Report : July 2012
15856 MPR : Sept. 2012
20 NH-8 (Gomti) : Independent engineering service for
development and operation of Beawar ….
15505 Quarterly Inspection 10 : April 2012
15599 O & M Inspection Report 32 : June 2012
15600 Quarterly Inspection/Progress Report :
July 2012
16
15601 O & M Inspection Report 33 : July 2012
15872 Q&M Report No. 34 : August 2012
21 NH-11 (Jaipur – Mahua) : Independent consultant for laning
of Jaipur – Mahua …..
15511 Project completion report : August 2012
22 NH-10 (Hary.) : Independent engineering services for 4/6
laning of Delhi/ Haryana…….
15512 QPR : June 2012
15513 MPR : May 2012
15514 MPR : June2012
15614 MPR : July 2012
15729 MPR : August 2012
15842 MPR : Sept. 2012
23
NH-58/72 : Independent engineering services for 4 – laning
of Haridwar….
15534 MPR : May 2012
15535 MPR : April 2012
15577 MPR : June 2012
15715 MPR : July 2012
24 NH-24 (BS): Four laning of Bareilly Sitapur section of
15537 Report on site visit : July 2012
15603 Road safety audit during construction
stage report No. 2 : June 2012
25 NH-47 (KL-1 ) : Design construction development finance
…….
15616 MPR : June 2012
15835 MPR : July 2012
26
Ghana (FS) : Consultancy services for construction
supervision of road works and design and supervision of
ancillary works for ….
15579 Socio-Economic survey. :July 2012
27
VME : Preparation od detailed engineering design report for
Vadodara Mumbai expressway to be executed as BOT (Toll)
Project on DBFO Pattern under
15580 Detailed design for main balance ……
15581 Technical specification for extra closed
segmental type…
15582 Detailed drawings for balanced across ..
15583 Detailed D for main extra close
15584 Detailed drawings for main extra closes
spans …
28 NH-59 (Gujarat) : Independent engineer services for 4 laning 15593 QPR No. 6 : April 2012
17
of Godhra to Gujarat/Madhya Pradesh Border section of ….. 15594 MPR No. 18 : April 2012
15595 MPR No. 19 : May 2012
15596 MPR No. 20 : June 2012
15597 Inspection Report No. 18 : June 2012
15598 Inspection Report No. 19 : July 2012
29
NAM (AP) : Independent engineering services for design,
construction, development finance operation and maintenance
…..
15602 MPR No. 16 : June 2012
15823 MPR No. 17 : July 2012
15830 MPR No. 15 : May 2012
15849 MPR No. 18 : August 2012
15850 QPR No. 6 : June 2012
30 NH-8 (SD) :Six laning of Surat - Dahisar section of NH-8
from km. 236.000 to km. 502.000….
15605 MPR : July 2012
15724 MPR : August 2012
15846 QPR : July 2012
15847 MPR : Sept. 2012
15824 Site inspection report : Sept. 2012
31 EW -3 B : North-South & East-West Corridors Section
33km. 58.600 to km 75.500 of Lucknow-Kanpur section of
15606 MPR : Jan. 2012
15607 MRP : Feb. 2012
15608 MPR : March 2012
15609 MPR : April 2012
15610 MPR : May 2012
15611 MPR : June 2012
32 5 (TK) : Independent Engineer services for two laning with
paved shoulder of Dindigul - …
15626 MPR : March 2012
15627 Inspection Report No. 5 : May 2012
18
15629 QPR : June 2012
15630 MPR : June 2012
33 Bihar (BSRDC) : Civil works contracts for Bihar state
highway project Ph- II ….
15628 QPR : June 2012
34 NH-4 (TH) : NHAI Western transport corridor NH-4
Harrihar to Haveri …..
15644 MPR No. 45 : July 2012 Pack. 4
15645 MPR No. 45 : July 2012 Pack. 5
35 NH-60 (A) : Consultancy services for preparation of detailed
project report for rehabilitation and upgrading to
15647 MPR : June 2012
15648 MPR : July 2012
15730 MPR : August 2012
15817 MPR : Sept. 2012
36 NH-54 (MN) : Four laning from km126/450 to km 140./700
and km. 164/080 to km. 165/400 ……
15657 MPR : July 2012
37 NH-54 (AS-1) : 4 laning of Silchar to Balachera Section of
NH-54 from ……
15658 MPR : July 2012
15747 MPR : August 2012
38 NH-1 (Panipat) : Preparation of detailed project report for
safe greener highways on
15487 MPR : May 2012
15533 MPR : June 2012
15714 MPR : August 2012
15865 MPR : Sept. 2012
39
NH-54 (Assam) :NH-54 (AS 1); PREPARATION OF DPR
FOR SILCHAR TO UDARBAND TO HARANGAJO, NH - 54, Km. 309.00 to Km. 275.00 to Km. 244.00 (Pack. No. C-III/30), 4-Laning OF SILCHAR to BALACHERA SEC. from Km. 306.54 to Km. 275.00 of NH-54 in ASSAM {Pack. - EW - II (AS-1).
15477 MPR : May 2012
15521 QPR : June 2012
15522 MPR : June 2012
40
NH-15 (BSG) : Consultancy services for preparation of Detailed Project Report for Upgrading of Barmer- Sanchor-Gujrat Border Section of NH-15 in the State of Rajasthan
15478 Inception report : June 2012
15479 Quality Assurance report : June 2012
15544 MPR : June 2012
15694 MPR : July 2012
15728 MPR : August 2012
19
41
NH-6 : (Orissa) : Consultancy services for preparation of
DPR for rehabilitation and Upgradation of Bharagora to
Sambalpur
15488 Progress Report : May 2012
15864 Progress report : Sept. 2012
15543 Progress Report : June 2012
15713 Progress Report : August 2012
42
Govt. of Nepal : Ministry of physical planning and works :
Dept. of Railways Rail and Metro Development Project
15536 Bidding procedure : July 2012
43 Bihar (SH)Consultancy services for preparation of detailed
project report for ….
15545 QPR : June 2012 Package 1
44 NH-47 (KL-1) : 4/6 laning NH from Thrissur to Edapally
section of NH-47 Kerala on north south corridor…
15547 MPR : March 2012
15548 MPR : May 2012
15549 MPR : May 2012
45 MP( 2330) :Construction of ADB assisted thirteen highway
corridors under ADB…
15552 MPR : June 2012
46 NH-5 (VGM) : Design consultancy for six laninning of
Vijayawada Gundugolanu section of …….
15553 Inception Report
47
NH-21 (HP) : Consultancy services for the preparation of
detailed project report for rehabilitation and up gradation of
NH stretches under NHDP IV – V : Group a ….
15663 FDPR : Vol. I : Appendices to main
report : August 2012
15664 FDPR Vol. I(A) : appendices to main
report : August 2012
15665 FDPR : Vol. II : Traffic surveys and
analysis report : August 2012
15666 FDPR : Vol. III : Design Report : August
2012
15667 FDPR : Vol. III : (B) Geotechnical
investigation Report (Part – 1 of 2 ) :
August 2012
15668 FDPR : Vol. III : (B) Geotechnical
investigation Report (Part – 2 of 2 ) :
August 2012
15669 FDPR : Vol. III : (A) : Bridge design
calculation report (Part 1 of 7) : August
2012
15670 FDPR : Vol. III : (A) : Bridge design
20
calculation report (Part 2 of 7) : August
2012
15671 FDPR : Vol. III : (A) : Bridge design
calculation report (Part 3 of 7) : August
2012
15672 FDPR : Vol. III : (A) : Bridge design
calculation report (Part 4 of 7) : August
2012
15673 FDPR : Vol. III : (A) : Bridge design
calculation report (Part 5 of 7) : August
2012
15674 FDPR : Vol. III : (A) : Bridge design
calculation report (Part 6 of 7) : August
2012
15675 FDPR : Vol. III : (A) : Bridge design
calculation report (Part 7 of 7) : August
2012
15676 FDPR : Vol. IV : (A) : Soil and materials
report : August 2012
15677 FDPR : Vol. V (A) : Environmental
impact assessment study and environment
management plan : August 2012
15678 FDPR : Vol. V (B) : Social impact
assessment status and resettlement action
plan : August 2012
15679 FDPR : Vol. VI : Technical specifications
: August 2012
15680 FDPR : Vol. VII : Rate analysis : August
2012
15681 FDPR : Vol. VIII : Cost estimate : August
2012
15682 FDPR : Vol. IX : Bill of quantities :
August 2012
15683 FDPR Vol. XI : Model Concession
Agreement : August 2012
48 Nippo : Corporation MSIL Proving ground project Rohtak 15719 MPR : May 2012
15720 MPR : June 2012
21
15721 MPR : July 2012
15722 MPR : August 2012
49 NH-54 (EW-II B) (SC-1) : 2 laning of National highway
from Maibang –Bharangajao section of NH-54 ….
15727 MPR : July 2012
15833 MPR : August 2012
50 NH-33: Design consultancy for four laning of Mahulia
Bahragora section of NH-33 and Bahragora
15736 Check list of abstract of cost and
annexures
15737 Bidding documents PPPAC Documents
15738 Strip plan: Sept. 2012
51 NH-2 (VA) : Independent engineering services for the work
of 6 laning of Varanasi
15749 Contract for consultants and NHAI …
52
SH-18 (TL) : MP State of Road Development corporation
intermediate/two laning with /without pavaed shoulders of
Thandla …..
15751 MP Lender’s engineer report on EPC cost
of project review and assessment
15752 Lender Engineer services MPR No. 1
15753 MPR No. 1 : August 2012
53 NH-83 : (Patna) : Patna Gaya Dhobi section of NH-83 from
km. 0.000 ti km 125.000
15816 Traffic survey and analysis : August 2012
54 NH-6 (Dhankuni-B) : Dhankuni to Baleshwar section of NH-
6 & 60 …..
15818 Final feasibility study report : Vol. I :
Main Report : July 2012
55 NH-6(Dankuni –Kharagpur) : Bid advisory services for six
laning of Dabkuni to Kharagpur …..
15819 Interim report : Jan. 2011
56 SH : 39 (JJK) : Intermediate/two laning with without paved
Shoulders of Jhabua Jhobat
15828 MPR No. 1 : July 2012
57
NH-15 (P. Jaisalmer): Consultancy services for preparation of
detailed project report for Phalodi Jaisalmer section of NH-
15
15845 MPR : Sept. 2012
15860 Inception Report : Sept. 2012
15861 Quality assurance plan : Sept. 2012
58 NH-44 (Meghalaya) : Consultancy services for feasibility study and detailed project report for four laning of …
15803 NH-44 : FDPR (2 lane option) : Vol. I : Main Report . Sept. 2012
CD
15804 FDPR : Vol. I (A) : appendices to main report : Sept. 2012
15805 FDPR : Vol. II : Design report : Sept. 2012
15806 FDPR : Vol. II(A) : Bridges design Calculation : Sept. 2012
22
15807 FDPR : Vol. III : Material report : Sept. 2012
15808 FDPR : Vol. IV (A) : Environmental Impact assessment report : Sept. 2012
15809 FDPR : IV (B) : Resettlement action plan : Sept. 202
15810 FDPR : V : Technical specification : Sept. 2012
15811 FDPR : VI : Rate Analysis ; Sept. 2012
15812 FDPR : VII : Cost estimates : Sept. 2012
15813 FDPR : VIII : BOQ : Sept. 2012
15814 FDPR : X : Civil work Contract Agreement : Sept. 2012
15815 FDPR : XI : Project clearance : Sept. 2012
59 NH-59 (MP) : Independent engineer services for 4 laning of Godhra to Gujarat
15831 QPR No. 7 : July 2012
15832 MPR No. 21 : July 2012
15859 Inspection Report No. 20 : August 2012
60 NH-45 (TK) : Independent engineer services for two laning with paved shoulder of Dindigul Theni section
15836 MPR : April 2012
15837 MPR : May 2012
15838 Inspection Report No. 7 : July 2012
61 NH-25 (EW-3:B) : Lucknow –Kanpur 15840 MPR : July 2012
62 NH-45 : Independent Engineer services for two laning with paved shoulder of ….
15848 MPR : July 2012
63 NH-9 (PS) : Independent engineer services for design 15851 QPR No. 7 : July 2012
15852 MPR No. 21 : July 2012
64 NH-4 : (Harihar Haveri) : km. 284 to km 340 in the Karnataka state
15862 MPR Package 4 : No. 47 : Sept. 2012
15863 MPR Package 5 : No. 47 : Sept. 2012
65 NH-5 (IA) : Bid pre tender consultancy services for six laning of NH-5 …..
15857 Interim Report : June 2012
23
66
SH-45-50 (C - Anjar) : Design consultancy for four lanning of existing two lane Chirai-Anjar Road incluidng Anjar Bypass (SH-50) and Spur Road (SH-45) in the State of Gujarat on BOT Basis
15866 Geotechnical investigation : Sept. 2012
15867 Geotechnical investigation Vol. I : Sept. 2012
15868 Geotechnical investigation Vo. II : Sept. 2012
15869 FDPR : Vol. I : Main Report Sept. 2012
15870 FDPR : Vol. II BOQ : Sept. 2012
15871 FDPR Vol. III : Drawing : Sept. 2012