23
1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly July Oct. 2012 Vol. X : No. 4 & 5 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-5 - Addition of Books - 6-7 - Reports - 8-23 Prepared by : Neeru Saini Librarian

ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

Embed Size (px)

Citation preview

Page 1: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

1

Internal Circulation Only

ICT LIBRARY UPDATE

Bi-monthly July – Oct. 2012 Vol. X : No. 4 & 5

Contents

- Articles - Pages

(Subject wise alphabetically indexed) - 2-5

- Addition of Books - 6-7

- Reports - 8-23

Prepared by : Neeru Saini

Librarian

Page 2: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

2

Articles

Architecture

1 Eco friendly lighting technology make the green switch (Insite )

2 Energy conscious interiors (Architecture + Design : July 2012)

Building

1 Metal Buildings – Pre Engineered metal buildings (The master builder – August 2012)

2 Tall Buildings : Sustainability Tall buildings and sustainability myth or reality (The master builder – August 2012)

3 High Rise : Building technology (The master builder – August 2012)

4

Bridge

1 Elastic - plastic response of bridge piers due to vehicle collision a static approach (Journal of structural engineering : June –July

2012)

2 Study of thermal stresses in skewed integral abutment steel girder bridges : (Structural Engineering International : August 2012)

3 Calibration of a congestion Load Model for Highway bridges using traffic micro simulation (Structural Engineering International :

August 2012)

Business Development

1 Parada’s CEO on staying Independent in a consolidating industry (Harvard Business Review : Sept. 2012).

Concrete

Page 3: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

3

1 Studies on correlation between flexural strength and compressive strength of concrete (The Indian Concrete Journal Sept. 2012).

2 Structural healing : development of self –healing concrete ( Bridge Design & Engineering : Third Quarter 2012)

3 Experimental study on waste type rubber reinforced concrete: (Journal of Structural Engineering L August-Sept. 2012)

4 Free vibration studies of box type laterite masonry structures: (Journal of Structural Engineering L August-Sept. 2012)

Energy

1 Energy saving thermostats : (Innovative ACR : June 2012).

2 Making rural kitchens smoke free : (Energy Next : Renewable Energy : July 2012).

3 Energy efficient initiative from the supreme industries( The master builder : July 2012)

4 Gandhi Nagar solar rooftop program (Energy Next : August : 2012)

Environmental

1 Status of indoor air pollution in India (Environmental Pollution Control Journal : July-August 2012).

2 Measurement of radioactive air pollutants in indoor environment (Environmental Pollution Control Journal : July-August 2012).

Earthquake

1 Earthquake Management : Rocking Systems (The master builder – August 2012).

2 Strengthening of structures using brick inserts to reduce the captive column effect during earthquake (Journal of structural

engineering : June –July 2012)

General

1 Scientists map microbes (Down to Earth : July 1-12 , 2012).

2 Global perspective what’s my health worth (The Human Factor : July 2012)

Page 4: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

4

Human Resource

1. Role of Management Education in Leadership Development in India (Consultancy Ahead : July 2012).

2. What makes a Leader : (Harvard Business Review : August –December 2012).

3. Significance of pre-training factors in determining the effectiveness of training programmes (Indian Journal of Training & Development :

April –June ,2012).

4. Training managers in applying intuition to decision making (Indian journal of training & Development : April-June, 2012)

Highways

1 Project under PPP & Value for Money (Consulting Ahead , July 2012)

2 Public-Private Partnership : Progress and Prospects (Consulting Ahead, July 2012)

Project Briefs

1 Infra. Developments (NBM&CW : July 2012)

2 Roads & Highways projects (NBM&CW : July 2012)

3 Metro projects (NBM&CW : July 2012)

4 Power projects (NBM&CW : July 2012)

5 Railways Projects (NBM&CW : July 2012)

6 Port Projects (NBM&CW : July 2012)

7 Airport projects (NBM&CW : July 2012)

Power

1 Role of power exchanges (Power today : July 2012).

2 Indian power sector in transition mode : (NBM&CW: August 2012)

Road

Page 5: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

5

1 New technology aids in monitoring roads (Infrastructure Today : August 2012).

Steel

1 Cross- Sectional Stability of structural steel : (Steel structure and metal building : July 2012)

Structures

1 Effect on structural design due to loss of sign in response spectrum analysis (The Indian concrete journal: Indian concrete Journal :

August 2012)

2 Steel fibre reinforced concrete : ( The master builder : July 2012)

3 Hydro structures : Application of high performance concrete in hydropower structures : (NBM&CW : August 2012)

Water

1 Pressure technique to locate water pipe leaks, with precision (Down to Earth : Sept. 1-15, 2012).

2 The discharge of domestic sewage is a serious problem in urban areas (Water Today : August 2012)

3 Water Management (Indian Plumbing: July 2012)

4 Water efficiency (Indian Plumbing : July 2012)

5

Page 6: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

6

ADDITIONAL OF BOOKS

1. 15507 : Direct taxes ready reckoner Asst. year 2012-13.

2. 15508 : Basic schedule of rate for road works Bhilwara : Years2011

3. 15509 : IRC : 67 -2012 : Code of practice for road sings

4. 15541 : Map Odisa Road guide.

5. 15565 : Environmental Impact Assessment guidance manual for highways.

6. 15566 : ADB Safeguard policy statement 2009.

7. 15567 : Involuntary resettlement source book planning and implementation in ….

8. 15568 : IRC : 53 – 2012: Road accident recording forms …

9. 15569 : Special Report No. 21 State of Art use of jute geotextiles in road construction….

10. 15570 : Basic schedule of rates rural road district Pali.

11. 15571 : Basic schedule of rates National highways Bikaner

12. 15572 : Basic schedule of rates Road works Jodhpur district.

13. 15573 : Basic schedule of rates Nagpur district.

14. 15586 : Guide specifications for polymer concrete bridge deck overlays : Oct. 1995.

15. 15587 : Guide specification for concrete overlays of pavements and bridges

16. 15588 : Map of Uganda

17. 15589 : Map of Tanzania Rwanda

18. 15590 : Map of Tanzania.

19. 15643 : Standard specification for road works 2000 Tanzania.

20. 15685 : CPWD Work manual 2012

21. 15686 : IRC SP 96 : 2012- Guidelines for selection operation and maintenance.

22. 15687 : Route map of Kenya

23. 15688 : Map of Ghana

24. 15696 : Map of Rajasthan

25. 15697 : Geotechnical engineering

26. 15698 : PPP Non metro airports MCA.

27. 15699 : PPP Greenfield airport MCA.

Page 7: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

7

28. 15700 : PPP Transmission systems MCA.

29. 15701 : Container train operation MCA.

30. 15742 : IS/ISO : 10002 ; 2004 Customer satisfaction

31. 15743 : Indian railways permanent ways.

32. 15744 : CSIR CRRI Diamond Jubilee July 16- 2012.

33. 15745 : Soil mechanics principles of geotechnical engineering

34. 15746 : Soil mechanics principles of geotechnical engineering

35. 15755 : CPWD Delhi schedule of rates (Electrical) 2012

36. 15756 : FIDIC capacity building : a Major role for FIDIC in the consulting engineering industry.

37. 15757 : FIDIC world consulting engine. Conference Seoul 10-12, Sept. 2012.

38. 15758 : FIDIC world consulting engine. Conference Seoul 10-12, Sept. 2012

39. 15873 : Cable stayed bridges 40 years of experience worldwide

40. 15874 : Steel structures design using FEM

41. 15875 : The world of foot bridges from the utilitarian to the spectacular

Page 8: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

8

Reports

Sl. No. Projects Name Acc. No. Title of the Report (Hard CopRe Soft

Copy

Year

1 NH-15 (PA) : Independent engineer for 4 laning of

Pathankot - Amritsar

15620 MPR No. 23 : July 2012

15497 MPR No. 21 : May 2012

15526 QPR No. 7 : June 2012

15527 MPR No. 22 : June 2012

15662 Concession Agreement

15731 Monthly Inspection Report No. 15 :

August 2012

15732 MPR : No. 24 : August 2012

15829 MPR No. 25 : Sept. 2012

15844 Monthly Inspection Report No. 16 : Sept.

2012

15759 FDPR : Package (I) : Vol. I : Main Report

: Sept. 2012

15760 FDPR : Vol. I (A) : appendix to main

report : Sept. 2012

15761 FDPR : Vol. II : Design Report : Sept.

2012

15762 FDPR : Vol. II (A) : Bridge Calculation

(Part 1 to 13) : Sept. 2012

15763 FDPR : Vol. II (A) : Bridge Calculation

(Part 2 to 13) : Sept. 2012

15764 FDPR : Vol. II (A) : Bridge Calculation

(Part 3 to 13) : Sept. 2012

15765 FDPR : Vol. II (A) : Bridge Calculation

(Part 4 to 13) : Sept. 2012

Page 9: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

9

15766 FDPR : Vol. II (A) : Bridge Calculation

(Part 5 to 13) : Sept. 2012

15767 FDPR : Vol. II (A) : Bridge Calculation

(Part 6 to 13) : Sept. 2012

15768 FDPR : Vol. II (A) : Bridge Calculation

(Part 7 to 13) : Sept. 2012

15769 FDPR : Vol. II (A) : Bridge Calculation

(Part 8 to 13) : Sept. 2012

15770 FDPR : Vol. II (A) : Bridge Calculation

(Part 9 to 13) : Sept. 2012

15771 FDPR : Vol. II (A) : Bridge Calculation

(Part 10 to 13) : Sept. 2012

15772 FDPR : Vol. II (A) : Bridge Calculation

(Part 11 to 13) : Sept. 2012

15773 FDPR : Vol. II (A) : Bridge Calculation

(Part 12 to 13) : Sept. 2012

15774 FDPR : Vol. II (A) : Bridge Calculation

(Part 13 to 13) : Sept. 2012

15775 FDPR : Vol. III : Traffic study and

analysis ; Sept. 2012

15776 FDPR : Vol. II (B) Geotechnical

investigation report (Part -1 of 3) : Sept.

2012

15777 FDPR : Vol. II (B) Geotechnical

investigation report (Part -2 of 3) : Sept.

2012

15778 FDPR : Vol. II (B) Geotechnical

investigation report (Part -3 of 3) : Sept.

2012

15779 FDPR : Vol. IV : Soil and material

investigation report : Sept. 2012

15780 FDPR : Vol. V (A) : Environmental

assessment report including

environmental management plan : Sept.

2012

15781 FDPR : Vol. V (B) : Resettlement action

plan : Sept. 2012

15782 FDPR : Vol. VI : Technical specification

Page 10: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

10

Sept. 2012

15783 FDPR : Vol. VII : Rate analysis : Sept.

2012

15784 FDPR : Vol. VIII : Cost Estimates : Sept.

2012

15785 FDPR : Vol. IX: Bill of quantities : Sept.

2012

15786 FDPR : Vol. XI : Model concession

agreement : Sept. 2012

15787 FDPR : Package (II) Vol. I :Main Report

: Sept. 2012

15788 FDPR : Vol. 1 (A) : Appendix to main

report : Sept. 2012

15789 FDPR : Vol. Vol. II : Design Report :

Sept. 2012

15790 FDPR : Vol. II (B) : Bridge Calculation

(Part 1 of 4) : Sept. 2012

15791 FDPR : Vol. II (B) : Bridge Calculation

(Part 2 of 4) : Sept. 2012

15792 FDPR : Vol. II (B) : Bridge Calculation

(Part 3 of 4) : Sept. 2012

15793 FDPR : Vol. II (B) : Bridge Calculation

(Part 4 of 4) : Sept. 2012

15794 FDPR : Vol. III : Traffic study and

analysis : Sept. 2012

15795 FDPR : Vol. IV : Soil and material

investigation report : Sept. 2012

15796 FDPR : Vol. V (A) : Environmental

assessment report including

environmental management plan : Sept.

2012

15797 FDPR : Vol. V (B) : Resettlement action

plan : Sept. 2012

15798 FDPR : Vol. VI : Technical specification

: Sept. 2012

15799 FDPR : Vol. VII : Rate Analysis : Sept.

2012

Page 11: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

11

15800 FDPR : Vol. VIII : Cost estimates : Sept.

2012

15801 FDPR : Vol. IX : Bill of quantities : Sept.

2012

15802 FDPR : Vol. XI : Civil work contract

agreement : Sept. 2012

2

NH-22 (Punjab) : Independent consultancy services for 4/6

laning of Zirakpur Parwanoo section of NH-22 including

Pinjore Kalka-Bypass on BOT basis ……

15501 MPR No. 49 : April 2012

15518 MPR No. 50 : May 2012

15574 MPR No. 51 : June 2012

15575 QPR No. 17 : June 2012

15693 MPR No. 52 : July 2012

15712 MPR No. 10 : August 2012`

3 NH-47 (KL-3) : Independent engineering services for design

construction, development finance operation and maintenance

of …..

15551 Monthly Inspection Report : June 2012

15695 Monthly Inspection Report : July 2012

15615 Quarterly Inspection Report : June 2012

4 NH-8 (D) : Independent engineering services for the four

laning of jetpur Somnath section…..

15476 QPR : May 2012

15494 Pavement evaluation report : April 2012

15531 Inspection Report : May 2012

15532 MPR No. 7 : May 2012

15540 MPR : June 2012

15564 QPR No.2 : March 2012

15617 MPR : May 2012

15618 Inspection Report : June 2012

15619 MPR No. 8 :June 2012

15620 MPR : July 2012

15748 MPR No. 10 : August 2012

Page 12: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

12

5 MP (2154) : Consulting services for construction supervision

of package no. 2 …..

15473 MPR No. 67 : May 2012

15542 MPR No. 68 : June 2012

15591 QPR : June 2012

15661 MPR No. 69 : July 2012

6 NH-2 (UP): Construction supervision for four laning and

strengthening of the existing two ….

15480 Engineering Report No. 118 : May 2012

15515 QPR : June 2012

15516 MPR : June 2012

15517 Engineering Report No. 119 : June 2012

15659 Engineering Report No. 120 : July 2012

15660 MPR : No. 125 : July 2012

15725 Engineering Report No. 121 : August

2012

15726 MPR No. 126 :August 2012

15841 MPR No. 127: Sept. 2012

7

NH-9 (HV): Independent consultancy services for design,

engineering, construction, development, finance, operation

and maintenance of 4/6 laning of Hyderabad- Vijayawada

section from km…….

15474 Quarterly Report No. 7 : May 2012

15490 Monthly Report : April 2012

15492 MPR : April l 2012

16493 Compliance Report for NCR’s

15523 MPR : May 2012

15524 Monthly Report : May 2012

15631 Monthly Report : July 2012

15632 MPR : June 2012

15689 MPR : July 2012

15690 Maintenance Manual : June 2012

15691 Monthly Report : June 2012

15733 Quarterly Report No. 9 : August 2012

8 NH-5 (CN) :Independent engineer services for design,

engineering, construction, development, finance, operation

15489 MPR : April 2012

15649 MPR : March 2012

Page 13: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

13

and 15650 MPR : Feb. 2012

15651 MPR : May: 2012

15652 MPR : June : 2012

15753 MPR : July 2012

9

NH-13 : (Bijapur) : Four laning of Bijapur – Hungund section

of NH-13 from km 102.000 to km. 202.000 in the state of

……

15471 Project completion report : June 2012

15400 MPR : May 2012

15528 Operation and maintenance Manual

15613 MPR : April : 2012

15741 Monthly status report : August 2012

10 NH-54 (MN) : Four laning from km. 126/450 to km. 140/700

and km.164/080 to km.165/400 section of …..

15472 MPR : May 2012

15546 MPR : June 2012

15657 MPR : July 2012

15834 MPR : August 2012

11

NH-21 : (Punjab) : Independence consultancy services for 4

laning of Kurali - Kiratpur section of NH-21 on Bot basis

under NHDP …..

15475 MPR No. 56 : May 2012

15519 MPR No. 57 : June 2012

15520 QPR No. 19 : June 2012

15604 MPR No. 58 :July 2012

15843 Monthly Report No. 59 : August 2012

12 NH-77 (HM) : Four laning of Hajipur-Muzaffarpur section

of …….

15482 QPR No. 6 : April 2012

15483 MPR No. 18 : April 2012

15578 Inspection Report : July 2012

15717 MPR No. 20 : June 2012

15718 Inspection Report : August 2012

15485 MPR : April 2012

15486 Monthly Inspection Report No. 8 : April

2012

15559 Monthly Inspection Report : May 2012

15560 Monthly Progress Report : May 2012

Page 14: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

14

15561 Monthly Progress Report : June 2012

15562 Inspection report No. 10 : June 2012

15563 Quarterly Inspection Report No. 3

15821 Inspection Report : Sept.

15822 MPR 22 : August 2012

13 NH-77 (MS) : Independent engineer services for two laning

of Muzaffarpur - Sonbarsa ….

15585 MPR : July 2012

15825 MPR : August 2012

12826 Monthly inspection report no. 12 : August

2012

12827 Quarterly inspection report No. 12 :

August 2012

14

NH-9 (PS) : Independent engineer series for design

engineering construction development finance operation and

maintenance of …..

15491 MPR No. 18 : April 2012

15653 QPR No. 6 : April 2012

15654 MPR No. 17 : March 2012

15655 MPR No. 19 : May 2012

15656 MPR No. 20 : June 2012

15 J&K (2151) : Multi sector project for infrastructure

rehabilitation in …..

15496 MPR : May 2012

15576 MPR : June 2012

15634 MPR : July 2012

15723 MPR : August 2012

16 MP (2736) : Construction of ADB Assistant nine highway

corridors under ADB…..

15498 MPR No. 10 : May 2012

15525 QPR No. 2 : June 2012

15592 MPR No. 12 : July 2012

15735 MPR No. 13 : August 2012

17 NH-50 : (Bijapur) : Four laning of Bijapur – Hungund section

of …..

15499 Inspection Report 18 : May 2012

15529 QPR : June 2012

15530 Inspection Report No. 19

15612 Operation and maintenance report No. 1 :

July 2012

Page 15: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

15

15716 Operation and maintenance report :

August 2012

15750 Consolidated additional changes of scope

of work as preside requirements

15858 Operation and maintenance report No. 3 :

Sept. 2012

18 NH-25/26 (J.L.) : Jhansi to lalitpur in the state of U.P. …..

15502 MPR : April 2012

15538 MPR : May 2012

15539 QPR : June 2012

15633 MPR : June 2012

15692 MPR : July 2012

15742 Operation and maintenance manual

19 NH-4 (TC) : Six laning of Tumkur- Chitradurga section of

NH-4 from Km. 75+000 to km. 189….

15503 MPR No. 43 Package. 4 : May 2012

15504 MRP No. 43 Package. 5 : May 2012

15555 MPR No. 44 Pack. 4 : June 2012

15556 MPR No. 44 Pack . 4: June 2012

15622 MPR : April 2012

15623 MPR : May 2012

15624 MPR : June 2012

15625 QPR : June 2012

15739 MPR No. 46 : August 2012 Package 4

15740 MPR No. 46 : August 2012 Package 5

15854 Monthly Inspection Report : June 2012

15855 Monthly Progress Report : July 2012

15856 MPR : Sept. 2012

20 NH-8 (Gomti) : Independent engineering service for

development and operation of Beawar ….

15505 Quarterly Inspection 10 : April 2012

15599 O & M Inspection Report 32 : June 2012

15600 Quarterly Inspection/Progress Report :

July 2012

Page 16: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

16

15601 O & M Inspection Report 33 : July 2012

15872 Q&M Report No. 34 : August 2012

21 NH-11 (Jaipur – Mahua) : Independent consultant for laning

of Jaipur – Mahua …..

15511 Project completion report : August 2012

22 NH-10 (Hary.) : Independent engineering services for 4/6

laning of Delhi/ Haryana…….

15512 QPR : June 2012

15513 MPR : May 2012

15514 MPR : June2012

15614 MPR : July 2012

15729 MPR : August 2012

15842 MPR : Sept. 2012

23

NH-58/72 : Independent engineering services for 4 – laning

of Haridwar….

15534 MPR : May 2012

15535 MPR : April 2012

15577 MPR : June 2012

15715 MPR : July 2012

24 NH-24 (BS): Four laning of Bareilly Sitapur section of

15537 Report on site visit : July 2012

15603 Road safety audit during construction

stage report No. 2 : June 2012

25 NH-47 (KL-1 ) : Design construction development finance

…….

15616 MPR : June 2012

15835 MPR : July 2012

26

Ghana (FS) : Consultancy services for construction

supervision of road works and design and supervision of

ancillary works for ….

15579 Socio-Economic survey. :July 2012

27

VME : Preparation od detailed engineering design report for

Vadodara Mumbai expressway to be executed as BOT (Toll)

Project on DBFO Pattern under

15580 Detailed design for main balance ……

15581 Technical specification for extra closed

segmental type…

15582 Detailed drawings for balanced across ..

15583 Detailed D for main extra close

15584 Detailed drawings for main extra closes

spans …

28 NH-59 (Gujarat) : Independent engineer services for 4 laning 15593 QPR No. 6 : April 2012

Page 17: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

17

of Godhra to Gujarat/Madhya Pradesh Border section of ….. 15594 MPR No. 18 : April 2012

15595 MPR No. 19 : May 2012

15596 MPR No. 20 : June 2012

15597 Inspection Report No. 18 : June 2012

15598 Inspection Report No. 19 : July 2012

29

NAM (AP) : Independent engineering services for design,

construction, development finance operation and maintenance

…..

15602 MPR No. 16 : June 2012

15823 MPR No. 17 : July 2012

15830 MPR No. 15 : May 2012

15849 MPR No. 18 : August 2012

15850 QPR No. 6 : June 2012

30 NH-8 (SD) :Six laning of Surat - Dahisar section of NH-8

from km. 236.000 to km. 502.000….

15605 MPR : July 2012

15724 MPR : August 2012

15846 QPR : July 2012

15847 MPR : Sept. 2012

15824 Site inspection report : Sept. 2012

31 EW -3 B : North-South & East-West Corridors Section

33km. 58.600 to km 75.500 of Lucknow-Kanpur section of

15606 MPR : Jan. 2012

15607 MRP : Feb. 2012

15608 MPR : March 2012

15609 MPR : April 2012

15610 MPR : May 2012

15611 MPR : June 2012

32 5 (TK) : Independent Engineer services for two laning with

paved shoulder of Dindigul - …

15626 MPR : March 2012

15627 Inspection Report No. 5 : May 2012

Page 18: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

18

15629 QPR : June 2012

15630 MPR : June 2012

33 Bihar (BSRDC) : Civil works contracts for Bihar state

highway project Ph- II ….

15628 QPR : June 2012

34 NH-4 (TH) : NHAI Western transport corridor NH-4

Harrihar to Haveri …..

15644 MPR No. 45 : July 2012 Pack. 4

15645 MPR No. 45 : July 2012 Pack. 5

35 NH-60 (A) : Consultancy services for preparation of detailed

project report for rehabilitation and upgrading to

15647 MPR : June 2012

15648 MPR : July 2012

15730 MPR : August 2012

15817 MPR : Sept. 2012

36 NH-54 (MN) : Four laning from km126/450 to km 140./700

and km. 164/080 to km. 165/400 ……

15657 MPR : July 2012

37 NH-54 (AS-1) : 4 laning of Silchar to Balachera Section of

NH-54 from ……

15658 MPR : July 2012

15747 MPR : August 2012

38 NH-1 (Panipat) : Preparation of detailed project report for

safe greener highways on

15487 MPR : May 2012

15533 MPR : June 2012

15714 MPR : August 2012

15865 MPR : Sept. 2012

39

NH-54 (Assam) :NH-54 (AS 1); PREPARATION OF DPR

FOR SILCHAR TO UDARBAND TO HARANGAJO, NH - 54, Km. 309.00 to Km. 275.00 to Km. 244.00 (Pack. No. C-III/30), 4-Laning OF SILCHAR to BALACHERA SEC. from Km. 306.54 to Km. 275.00 of NH-54 in ASSAM {Pack. - EW - II (AS-1).

15477 MPR : May 2012

15521 QPR : June 2012

15522 MPR : June 2012

40

NH-15 (BSG) : Consultancy services for preparation of Detailed Project Report for Upgrading of Barmer- Sanchor-Gujrat Border Section of NH-15 in the State of Rajasthan

15478 Inception report : June 2012

15479 Quality Assurance report : June 2012

15544 MPR : June 2012

15694 MPR : July 2012

15728 MPR : August 2012

Page 19: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

19

41

NH-6 : (Orissa) : Consultancy services for preparation of

DPR for rehabilitation and Upgradation of Bharagora to

Sambalpur

15488 Progress Report : May 2012

15864 Progress report : Sept. 2012

15543 Progress Report : June 2012

15713 Progress Report : August 2012

42

Govt. of Nepal : Ministry of physical planning and works :

Dept. of Railways Rail and Metro Development Project

15536 Bidding procedure : July 2012

43 Bihar (SH)Consultancy services for preparation of detailed

project report for ….

15545 QPR : June 2012 Package 1

44 NH-47 (KL-1) : 4/6 laning NH from Thrissur to Edapally

section of NH-47 Kerala on north south corridor…

15547 MPR : March 2012

15548 MPR : May 2012

15549 MPR : May 2012

45 MP( 2330) :Construction of ADB assisted thirteen highway

corridors under ADB…

15552 MPR : June 2012

46 NH-5 (VGM) : Design consultancy for six laninning of

Vijayawada Gundugolanu section of …….

15553 Inception Report

47

NH-21 (HP) : Consultancy services for the preparation of

detailed project report for rehabilitation and up gradation of

NH stretches under NHDP IV – V : Group a ….

15663 FDPR : Vol. I : Appendices to main

report : August 2012

15664 FDPR Vol. I(A) : appendices to main

report : August 2012

15665 FDPR : Vol. II : Traffic surveys and

analysis report : August 2012

15666 FDPR : Vol. III : Design Report : August

2012

15667 FDPR : Vol. III : (B) Geotechnical

investigation Report (Part – 1 of 2 ) :

August 2012

15668 FDPR : Vol. III : (B) Geotechnical

investigation Report (Part – 2 of 2 ) :

August 2012

15669 FDPR : Vol. III : (A) : Bridge design

calculation report (Part 1 of 7) : August

2012

15670 FDPR : Vol. III : (A) : Bridge design

Page 20: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

20

calculation report (Part 2 of 7) : August

2012

15671 FDPR : Vol. III : (A) : Bridge design

calculation report (Part 3 of 7) : August

2012

15672 FDPR : Vol. III : (A) : Bridge design

calculation report (Part 4 of 7) : August

2012

15673 FDPR : Vol. III : (A) : Bridge design

calculation report (Part 5 of 7) : August

2012

15674 FDPR : Vol. III : (A) : Bridge design

calculation report (Part 6 of 7) : August

2012

15675 FDPR : Vol. III : (A) : Bridge design

calculation report (Part 7 of 7) : August

2012

15676 FDPR : Vol. IV : (A) : Soil and materials

report : August 2012

15677 FDPR : Vol. V (A) : Environmental

impact assessment study and environment

management plan : August 2012

15678 FDPR : Vol. V (B) : Social impact

assessment status and resettlement action

plan : August 2012

15679 FDPR : Vol. VI : Technical specifications

: August 2012

15680 FDPR : Vol. VII : Rate analysis : August

2012

15681 FDPR : Vol. VIII : Cost estimate : August

2012

15682 FDPR : Vol. IX : Bill of quantities :

August 2012

15683 FDPR Vol. XI : Model Concession

Agreement : August 2012

48 Nippo : Corporation MSIL Proving ground project Rohtak 15719 MPR : May 2012

15720 MPR : June 2012

Page 21: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

21

15721 MPR : July 2012

15722 MPR : August 2012

49 NH-54 (EW-II B) (SC-1) : 2 laning of National highway

from Maibang –Bharangajao section of NH-54 ….

15727 MPR : July 2012

15833 MPR : August 2012

50 NH-33: Design consultancy for four laning of Mahulia

Bahragora section of NH-33 and Bahragora

15736 Check list of abstract of cost and

annexures

15737 Bidding documents PPPAC Documents

15738 Strip plan: Sept. 2012

51 NH-2 (VA) : Independent engineering services for the work

of 6 laning of Varanasi

15749 Contract for consultants and NHAI …

52

SH-18 (TL) : MP State of Road Development corporation

intermediate/two laning with /without pavaed shoulders of

Thandla …..

15751 MP Lender’s engineer report on EPC cost

of project review and assessment

15752 Lender Engineer services MPR No. 1

15753 MPR No. 1 : August 2012

53 NH-83 : (Patna) : Patna Gaya Dhobi section of NH-83 from

km. 0.000 ti km 125.000

15816 Traffic survey and analysis : August 2012

54 NH-6 (Dhankuni-B) : Dhankuni to Baleshwar section of NH-

6 & 60 …..

15818 Final feasibility study report : Vol. I :

Main Report : July 2012

55 NH-6(Dankuni –Kharagpur) : Bid advisory services for six

laning of Dabkuni to Kharagpur …..

15819 Interim report : Jan. 2011

56 SH : 39 (JJK) : Intermediate/two laning with without paved

Shoulders of Jhabua Jhobat

15828 MPR No. 1 : July 2012

57

NH-15 (P. Jaisalmer): Consultancy services for preparation of

detailed project report for Phalodi Jaisalmer section of NH-

15

15845 MPR : Sept. 2012

15860 Inception Report : Sept. 2012

15861 Quality assurance plan : Sept. 2012

58 NH-44 (Meghalaya) : Consultancy services for feasibility study and detailed project report for four laning of …

15803 NH-44 : FDPR (2 lane option) : Vol. I : Main Report . Sept. 2012

CD

15804 FDPR : Vol. I (A) : appendices to main report : Sept. 2012

15805 FDPR : Vol. II : Design report : Sept. 2012

15806 FDPR : Vol. II(A) : Bridges design Calculation : Sept. 2012

Page 22: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

22

15807 FDPR : Vol. III : Material report : Sept. 2012

15808 FDPR : Vol. IV (A) : Environmental Impact assessment report : Sept. 2012

15809 FDPR : IV (B) : Resettlement action plan : Sept. 202

15810 FDPR : V : Technical specification : Sept. 2012

15811 FDPR : VI : Rate Analysis ; Sept. 2012

15812 FDPR : VII : Cost estimates : Sept. 2012

15813 FDPR : VIII : BOQ : Sept. 2012

15814 FDPR : X : Civil work Contract Agreement : Sept. 2012

15815 FDPR : XI : Project clearance : Sept. 2012

59 NH-59 (MP) : Independent engineer services for 4 laning of Godhra to Gujarat

15831 QPR No. 7 : July 2012

15832 MPR No. 21 : July 2012

15859 Inspection Report No. 20 : August 2012

60 NH-45 (TK) : Independent engineer services for two laning with paved shoulder of Dindigul Theni section

15836 MPR : April 2012

15837 MPR : May 2012

15838 Inspection Report No. 7 : July 2012

61 NH-25 (EW-3:B) : Lucknow –Kanpur 15840 MPR : July 2012

62 NH-45 : Independent Engineer services for two laning with paved shoulder of ….

15848 MPR : July 2012

63 NH-9 (PS) : Independent engineer services for design 15851 QPR No. 7 : July 2012

15852 MPR No. 21 : July 2012

64 NH-4 : (Harihar Haveri) : km. 284 to km 340 in the Karnataka state

15862 MPR Package 4 : No. 47 : Sept. 2012

15863 MPR Package 5 : No. 47 : Sept. 2012

65 NH-5 (IA) : Bid pre tender consultancy services for six laning of NH-5 …..

15857 Interim Report : June 2012

Page 23: ICT LIBRARY UPDATE - ICT Online · ICT LIBRARY UPDATE ... 3 Calibration of a congestion Load Model for Highway bridges ... Cable stayed bridges 40 years of experience worldwide 40

23

66

SH-45-50 (C - Anjar) : Design consultancy for four lanning of existing two lane Chirai-Anjar Road incluidng Anjar Bypass (SH-50) and Spur Road (SH-45) in the State of Gujarat on BOT Basis

15866 Geotechnical investigation : Sept. 2012

15867 Geotechnical investigation Vol. I : Sept. 2012

15868 Geotechnical investigation Vo. II : Sept. 2012

15869 FDPR : Vol. I : Main Report Sept. 2012

15870 FDPR : Vol. II BOQ : Sept. 2012

15871 FDPR Vol. III : Drawing : Sept. 2012