Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
1
Internal Circulation Only
ICT LIBRARY UPDATE
Bi-monthly May – June 2013 Vol. X1 : No. 3
Contents
- Articles - Pages
(Subject wise alphabetically indexed) - 2-4
- Addition of Books - 5
- Reports - 6-12
Prepared by : Neeru Saini
Librarian
2
Articles
Building
1 Building Failures : What causes building to fall ? (Master Builder : May 2013)
2 Precast Concrete : Buildings : Precast manufacturing facility (Master builder : April 2013)
3 Steel in Vogue for high rise building : (Master builder : April 2013)
Business Development
1 Dysfunction in the Boardroom : A New survey of corporate directors reveals that despite their desire for diversity, board are less
than welcoming to women. (Harvard Business Review : June 2013).
2 The EX- CEO Contemplate a coup should a family business replace its outside leader : (Harvard Business Review : June 2013)
Concrete 1 Using waste glass in concrete : (Indian Concrete Journal : June 2013)
2 Application of affine theorem to orthotropic rectangular reinforced concrete slab with short side opening symmetric about
horizontal axis (Indian concrete Journal : May 2013).
3 Supplementary cementations materials : Glass power as a pozzolan in concrete (Indian concrete Journal : May 2013)
4
Energy
1 Working for a cleaner future : (Energy Next : May 2013)
2 Time to Soar : with more effective policy decisions and programs on the cards, the wind sector seems all set to surge (Energy Next :
June 2013)
3 Greening of Garbage : As India struggles with its mounting piles of garbage, anaerobic digestion can not only help better waste
management, but also produce clean energy : (Energy Next : June 2013)
3
General
1 Immunity-suppressing drug to cut flu deaths ( Down to Earth : June 16-30, 2013)
2 Milk Bank : A bank in Udaipur collects mothers (Down to Earth : June 16-30, 2013)
3 A Panel that cools house in direct sunlight : (Down to Earth : May 1-15, 2013)
4 How to reduce energy wastage which using internet : (Down to Earth : May 1-15, 2013)
Human Resource
1 When leaders engage (Human Capital : June 2013).
2 Creating the best workplace on earth : (Harvard Business Review : May 2013)
Project Briefs
1 Infrastructure Development : (NBM & CW : June 2013)
2 Road & Highways Projects : (NBM & CW : June 2013)
3 Metro Project : (NBM & CW : June 2013)
4 Power Projects : (NBM & CW : June 2013)
5 Airport Projects : (NBM & CW : June 2013)
6 Port Projects : (NBM & CW : June 2013)
Road and Highways
1 Public Private Partnership (PPP) in Highway Sector and the way forward by Mr. K.K. Kapila (Consulting Ahead : June : 2013).
2 12th
plan for top priority to Infra Development : (Urban Railways : April –June , 2013).
3 Road construction : Automation and robotics based technologies for road construction maintenance and operations : (Master Builder
: April 2013)
5 Railways : Improving the techniques for road under bridge construction (Indian concrete Journal : May 2013)
4 Power of self-reflection : (Human Capital : May 2013)
4
5 Working around a tight budget : (Human Capital : May 2013)
Traffic
1 Bearings, joints & seismic protection : User friendly expansion joints designed to be replaced under traffic : (Bridge design and
engineering 2nd
quarter 2013).
2 Urban Traffic Control : 48 intelligent intersection control systems have a growing role to play in making urban traffic more efficient
(ITS International : March –April 2013).
3 Parking and Access Control : (ITS International : March –April 2013).
4 A Review on traffic noise studies and need for development of traffic noise standards for different types of urban roads. (EPCJ :
March-April , 2013).
5 Traffic control : A smart corridor concept in California is delivering efficient traffic management : ( World Highways : May 2013)
6 Traffic Management : Analytical models in toll forecasting : (Traffic Infra Tech. April – May 2013)
Tunnel
1 Tunneling & Hydropower : Tunneling and underground work for Hydropower project : (NBM & CW : June 2013).
2 Tunneling : Bauma saw several important equipment launched for the tunneling sector, which is seeing large and ambitious projects
get underway ( International construction : May 2013)
Water
1 Geo electrical investigations and their correlation with groundwater depth and quality : (EPCJ : March- April 2013).
2 Hydroelectric Waterfall Prison Proposal : (Steel Structure and Metal Building : June 2013)
5
ADDITIONAL OF BOOKS
1. 16641 : Journal of state of the art : Building technology : April 26-28, 2013 : Patna.
2. 16642 : Urban bus specification II
3. 16643 : Road Safety in Urban and rural roads 1-2, Nov. 2012
4. 16644 : ASTM D -3551-08: Standard practice for laboratory preparation of soil lime mixtures using.
5. 16645 : Pavements Analysis and design
6. 16646 : Guidelines for electronic and mechanical works in buildings.
7. 16647 : Manual on water proofing of building.
8. 16648 : IS 3025 (Part 41): 1992 Methods of sampling and test for water and waste ware
9. 16649 : IS 3025 (Part 42): 1992 Methods of sampling and test for water and waste ware
10. 16650 : IS 3025 (Part 44): 1992 Methods of sampling and test for water and waste ware
11. 16651 : IS 3025 (Part 47): 1994 Methods of sampling and test for water and waste ware
12. 16652 : IS 3025 (Part 48): 1994 Methods of sampling and test for water and waste ware
13. 16653 : IS 3025 (Part 58): 2006 Methods of sampling and test for water and waste ware
14. 16673 : Specification for road and bridges works 5th
revision
6
Project Report Sl. No.
Projects Name Acc. No.
Title of the Report (Hard Copy) Soft Copy
Year
1. 1 NH-77 (HM) : Four laning of Hajipur - Muzaffarpur section of …….
16731 MPR :No. 29 : March. 2013
16732 Inspection Report : April 2013
16796 MPR : No. 30 : April. 2013
2. 2 NH-10 (Hary.) : Independent engineering services for 4/6 laning of Delhi/Haryana…….
16727 MPR : April 2013
16774 MPR : May 2013
3. 3 NH-15 (PA) : Independent engineer for 4 laning of Pathanko t- Amritsar section from …..
16721 MPR No. 32 : April 2013
16722 Monthly Inspection Report No. 23 : April 2013
16723 Monthly Inspection Report No. 24 : May 2013
4. 4 NH-8 (SD) : Six laning of Surat –Dahisar section of NH-8 from km 263.000 to km. 502.000…..
16728 Operation & Maintenance report No. : April 2013
16729 Site inspection Report : April 2013
5. 5 NH-77 (MS) : Independent engineer services for two laning of Muzaffarpur –Sonbarsa section of NH-77 ……
16625 Various MPR : March 2013
16733 MPR : March 2013
16734 MIR No. 19 : March 2013
16735 MPR : April 2013
16736 MIR No. 20 : April 2013
6. 6 NH-2 (UP) : Consultancy Package GTRIP/SC/1 for the construction supervision for four laning and strengthening of the existing two ….
16730 MPR No. 134 : April 2013
7. 8 NH-21 (Punjab) :Independent consultancy services for 4 laning of Kurali) kiratpur section ……
16715 Monthly Report No. 67 : April 2013
7
8. 9 NH-6 (BS) : Consultancy services for preparation of DPR for rehabilitation and upgradation of Baharagora to Sambalpur ……
16680 Progress Report : April 2013
16781 Progress Report : May 2013
9. 10 NH-1 A (2151) : Multi sector project for infrastructures rehabilitation in Jummu ….
16725 MPR : April 2013
16784 MPR : May 2013
10. 11 NH-9 (HV) : Independent consultancy services for design, engineering, construction, development ….
16636 Monthly Progress Report : March 2013
16693 MPR : April . 2013
16694 Monthly Report : April 2013
11. 12 NH-47 (KL-1) : 4/6 laning of NH from Thrissur to Edapally section of NH-47 …..
16632 Operation and maintenance inspection report : March. 2013
16750 Operation & Maintenance Inspection : April 2013
16695 Operation and maintenance inspection report : March 2013
12. 14 NH-50 (BH) : Four laning of Bijapur ……
16631 QPR : March 2013
16783 Operation & Maintenance report No. 11 : May 2013
16700 MPR : April 2013
13. 15 MP : (2736) : Construction of ADB Assisted Nine highway corridors under ADB Loan No. 2736
16706 MPR No. 21 : April 2013
16772 MPR No.22 : May 2013
14. 19 NH-8 (D) : Independent engineering services for the four langin of Jetpur Somnath section from …..
16627 MPR No. 17 : March 2013
16702 MPR No. 18 : April 2013
16629 QPR No. 5 : March 2013
15. 24
NH-43 : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 laning ….
16705 MPR : April 2013
16778 MPR : May 2013
16. NH-30 : (Mohania) : Independent engineering services for the work of four laning of Mohania Ara Section of NH-30 ….
16696 MPR : April 2013
16773 MPR : May 2013
17. 26 NH-15 (PJ) : Consultancy services for preparation of detailed project report for phalodi-jaisalmer section of …..
16720 MPR : April . 2012
16779 MPR : May 2013
18. 28 NH-54 (MN) : Four laning from km. 126/450 to km. 140/700 and km. 164 /080 to km. 165/400 Section of
16701 MPR : April . 2013
8
19. 30 NH-58/72 (Haridwar) Independent engineering services for 4 laning of Haridwar Dehradun section….
16698 QPR : March 2013
16699 MPR : March 2013
20. 31 NH-1 (Panipat) : Preparation of detailed project report of for safer greener highway on …..
16656 FDPR : Vol. I : Main Report May 2013
16657 FDPR : Vol. I (A) : Appendices to main report
16658 FDPR :Vol. II : Design Report
16659 FDPR :Vol. II(A) : Bridge design calculation Report (Part 1 of 5)
16660 FDPR : Vol. II(A) : Bridge design calculation Report (Part 2 of 5)
16661 FDPR : Vol. II(A) : Bridge design calculation Report (Part 3 of 5)
16662 FDPR : Vol. II(A) : Bridge design calculation Report (Part 4 of 5)
16663 FDPR : Vol. II(A) : Bridge design calculation Report (Part 5 of 5)
16664 FDPR : Vol. II(B) : Geotechnical investigation Report (Part I of 2)
16665 FDPR : Vol. II(B) : Geotechnical investigation Report (Part 2 of 2)
16666 FDPR : Vol. III : Technical specification
16667 FDPR :Vol. IV : Calculation of quantities
16668 FDPR :Vol. V : Tate analysis
16669 FDPR :Vol. VI : Cost Estimate
16670 FDPR :Vol. VIII : Civil work bidding documents (MCA (Draft)
16671 FDPR :Vol. IX : Project clearance
16672 FDPR :Vol. X : Project plan
16681 MPR : April 2013
16780 MPR : May 2013
21. 3NH-8 (Gomti): Independent engineering services for 16626 O & M Inspection Report No. 41: March
9
5 development and operation of beawar- gomti section of …..
2013
19713 MIR No. 42 : April 2013
16714 QR No. 14 : April 2013
22. 43 SH-10 (Deh-ISH) : Intermediate/two laning with without paved shoudlers of
16623 Lender’s engineer report : Jan.2013
16628 Lender’s engineer report : March 2013
23. 44 SH-18 (MP) : Intermediate/two lanign with/without paved shoulders for Thandla Limdi …..
16738 MPR : May 2013
24. 45 SH-39 (Jhabua Jobat) : Two laning with/without paved shoudlers of Jhabua-Jobat Kukshi road ….
16739 MPR : May 2013
25 Bihar (BSRDC) : Civil works contracts for Bihar State highways …….
16689 QPR : March 2013
16690 MPR : April : 2013
26 NH-22 (Punjab)Independent consultancy services for 4/6 lanning of Zirakpur parwanoo section of ….
16624 Site visit to Mallah Road Junction. April 2013
16630 Q & M Inspection Report : March 2013
16716 MPR No. 13 April 2013
16717 QPR No. 20 : March 2013
27 NH-54 (AS-1) : 4 laning of Silchar to Balachera section … 16633 QPR : March 2013
28
NH-47 (KL-3) : Independent engineering services for design construction, development, finance, operation and maintenance of 6 laning of Vadakanchery thrissur section of ….
16637 Quarterly inspection report : March 2013
16697 MIR : April 2013
16638 Inspection Report : March 2013
29 NH-4 (TC) : Six laning of Tumkur – chitradurga section of NH-4 from …..
16674 MPR : Dec. 2012
16675 MPR : Jan. 2013
16676 MIR : Feb. 2013
16677 MPR : Feb. 2013
16678 MIR : March 2013
30 NH-60 (A) Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 ……
16679 MPR : April 2013
16778 MPR : May 2013
31 NH-59 (MP) : Independent engineering services for 4 16682 Inspection Report No. 27 : March 2013
10
laning of Godhra to Gujarat/Madhya Pradesh Border section of NH- 59 , from….
16793 MPR No. 29 : March 2013
16794 MPR No. 30 : April 2013
16795 Inspection Report No. 29 : May 2013
16683 Inspection Report No. 28 : April 2013
16684 QPR No. 10 : March 2013
16685 MPR No. 28 : Feb. 2013
32 NAM (AP) : Design construction finance operation and maintenance of four laning of Narketapally ….
16686 MPR No. 23 : Jan. 2013
16687 MPR No. 24 : Feb. 2013
16688 MPR No. 25 : March 2013
16776 Annual Report No. 2 : Dec. 2012
33 NH-5 (CN) :
16691 MPR : Feb. 2013
16788 MPR : March 2013
16789 MPR : April 2013
34
NH-9 (PS):Independent engineer services for design, engineering construction development, finance, operation and maintenance of 4 laning of Pune Solapur section of NH- 9 …
16692 MPR No. 27 : Jan. 2013
16785 QPR No. 9 : Dec. 2013
16786 MPR No. 28 : Feb. 2013
16787 MPR No. 29 : March 2013
35 NH-45 (E) (TK) independent engineer services for two laning with paved shoulder of Digul Theni section
16703 QPR : March 2013
16790 MPR : March 2013
16791 Inspection Report No. 16 : April 2013
16792 MPR : April 2013
16707 MPR : Feb. 2013
36 NH-54 (Assam) : Four laning from km. 126/450 to km.140/700 and 164/080…
16704 MPR : April 2013
37 MP (2154) : Consulting services for construction supervision of package no. 2 …..
16708 MPR No. 78 : April 2013
16709 QPR :March 2013
16718 MPR No. 77 : March 2013
38 NH-31/28 (KT) : Independent engineering services for the 16710 MPR : Feb. 2013
11
project of development of greenfield bridge across river ganga and its approaches connecting …
16719 MPR : April 2013
39 NH-45 (E) (DT) 16711 Inspection Report No. 14 : Feb. 2013
16712 Inspection Report No. 15 : March 2013
40 NH-26 (JL)In the state of Uttar Pradesh NSI/BOT/UP-2…. 16726 MPR : April 2013
16782 MPR : May 2013
41
Tanzania (NML) : Consultancy services for environmental and social impact assessment detailed engineering design and preparation of tender documents for upgrading of ….
16751 Bidding Documents : Vol. 3 A : Material Report : May 2013
16752 Bidding Documents : Vol. 3 B : Hydrology Report : May 2013
16753 Bidding Documents : Package (I) : Vol. I : May 2013
16754 Bidding Documents : Package (I) : Vol. II : May 2013
16755 Bidding Documents : Package (II) : ol. I : May 2013
16756 Bidding Documents : Package (II) : Vol. II : May 2013
16757 Bidding Documents : Package (III) : Vol. I : May 2013
16758 Bidding Documents : Package (III) : Vol. II : May 2013
16759 Final Engineering Design Report : Vol. I : Main report : May 2013
16760 Final Engineering Design Report : Vol. 2 : Topographical survey Report : May 2013
16761 Final Engineering Design Report : Vol. 3 (B) : Geotechnical report : May 2013
16762 Final Engineering Design Report : Vol. 4: Traffic Report : May 2013
16763 Final Engineering Design Report : Vol. 5 (A) Plan and profile and miscellaneous drawings : May 2013
16764 Final Engineering Design Report : Vol. 5 (B) : Setting out data : May 2013
12
16765 Final Engineering Design Report : Vol.6 : Drawings plan and structural drawing : May 2013
16766 Final Engineering Design Report : Vol. Drawing Data : May 2013
16767 Final Engineering Design Report : Vol. 8 : Structure Design calculations (Bridges and box culverts) : May 2013
16768 Final Engineering Design Report : Vol. 9 : Bill of quantities (appendix 16.1,16.2,16.3) : May 2013
16769 Final Engineering Design Report : Vol.10 (B) Resettlement action plan: May 2013
16770 Final Engineering Design Report : Vol.10 (B) : (Annexure1.4) : May 2013
16771 Final Engineering Design Report : Vol. Confidential cost estimate : May 2013
42 IRSDC (Bhopal Habibganj) 16654 Traffic planning Report
43 IRSDC (Chandigar Habibganj) 16655 Traffic planning Report