ILD Magnet & calorimeters integration meeting Questions to be addressed. 01-02 /02/2012 @LLR-LAL. 1St session : Experimental Hall & Japanese site. Experimental Hall design status New considerations induced by Japanese site specifications : - PowerPoint PPT Presentation
Citation preview
ILD Magnet & calorimeters integration meeting
Questions to be addressed
01-02 /02/2012@LLR-LAL
Experimental Hall design status
New considerations induced by Japanese site specifications :• Incidence on the design of the hall, on the assembly of the
detector, on its design.• Influence of seismic considerations : predominant effects of
vibrations over mechanical deformations.
1St session : Experimental Hall & Japanese site
2nd session : Coil and Magnet SystemVacuum tank :
Thickness of the vacuum tank skin ( 60 mm continuously?) Fixation to return yoke (suspension and tie rods) Hcal rail support : welded on vacuum tank? FEA calculations Construction
2nd session : Coil and Magnet SystemVacuum tank :
Thickness of the vacuum tank skin ( 60 mm continuously?) Fixation to return yoke (suspension and tie rods) Hcal rail support : welded on vacuum tank? FEA calculations Construction
Coil : conductor, winding, Internal instrumentation
Return Yoke design( shape, thickness, Muons chambers…)
Update of stray field calculations ( FSP aera, no compensating coil)
FEA : Self load and in load deformations.Definition of attachment points in the coil (azimuth and sizing)TPC support
3rd session : Calorimeters assembly and integration studies
emax = 1.69 mm
g
FEA : Self load and in load deformation.Definition of attachment points in the coil (azimuth and sizing)
SDHcal = room for these rails. ( also place for services)
3rd session : Calorimeters assembly and integration studies
FEA : Self load and in load deformation.Definition of attachment points in the coil (azimuth and sizing)TPC support :
• Azimuth,• fixation to Ecal/Hcal/Vaccum tank ?• Needed space ( on the face of TPC and on the other fixation
point)
if time :• Not to forgot that 700 cables coming from the inners : way
out in each case ( AHCAL/DHCAL/TPC endplate), connecting boxes
3rd session : Calorimeters assembly and integration studies
4th session : endcaps studies
Tilt of the Ahcal ( 22.5 °)(because of self load deformation)
Segmentation of the Ecal endcap
5th session : Hadronic calorimeters , design report
Update of the design of the Calos
Tooling
SDHcal : dimensioning of the gap Calo/coil ( overlap of service, rails…)