1. 8 Expenditure Management Commission The Government will constitute an Expenditure Management Commission, which will look into various aspects of expenditure reforms to be undertaken by the Government. The Commission will give its interim report within this financial year. I also propose to overhaul the subsidy regime, including food and petroleum subsidies, and make it more targeted while providing full protection to the marginalized, poor and SC/STs. A new urea policy would also be formulated. [Nodal Ministries/Departments: Department of Expenditure, Department of Food & Public Distribution, Ministry of Petroleum & Natural Gas, Department of Fertilizers] 2. 9 GST The debate whether to introduce a Goods and Services Tax (GST) must now come to an end. We have discussed the issue for the past many years. Some States have been apprehensive about surrendering their taxation jurisdiction; others want to be adequately compensated. I have discussed the matter with the States both individually and collectively. I do hope we are able to find a solution in the course of this year and approve the legislative scheme which enables the introduction of GST. This will streamline the tax administration, avoid harassment of the business and result in higher revenue collection both for the Centre and the States. I assure all States that government will be more than fair in dealing with them. [Nodal Ministry/Department: Department of Revenue ] 3. 10 Tax Administration The sovereign right of the Government to undertake retrospective legislation is unquestionable. However, this power has to be exercised with extreme caution and judiciousness keeping in mind the impact of each such measure on the economy and the overall investment climate. (i) This Government will not ordinarily bring about any change retrospectively which creates a fresh liability. Hon'ble Members are aware that consequent upon certain retrospective amendments to the Income Tax Act 1961 undertaken through the Finance Act 2012, a few cases have come up in various courts and other legal fora. These cases are at different stages of pendency and will naturally reach their Expenditure Management Commission was constituted on 4th September 2014. It has submitted its Interim Report on 17.1.2015. Modified Direct Benefit Transfer to LPG consumers called Pahal was launched in 54 districts on 15.11.2014. It has been launched in the remaining districts of the country from 1.1.2015. Formulation of New Urea Policy is in progress. Action partially completed The Cabinet approved the proposal for introduction of a Bill in the Parliament for amending the Constitution of India to facilitate the introduction of GST in the country on 17.12.2014. The Bill was introduced in the Lok Sabha on 19.12.2014. Work in progress Budget Speech 2014-2015 (10th July 2014) S.No. Para Budget Announcement Status of Implementation No. (Position reported on 30 th January, 2015)

Implementation of Budget Announcements 2014-2015

  • Upload
    buidien

  • View
    215

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Implementation of Budget Announcements 2014-2015

1. 8 Expenditure Management CommissionThe Government will constitute an ExpenditureManagement Commission, which will look intovarious aspects of expenditure reforms to beundertaken by the Government. TheCommission will give its interim report withinthis financial year. I also propose to overhaulthe subsidy regime, including food andpetroleum subsidies, and make it more targetedwhile providing full protection to themarginalized, poor and SC/STs. A new ureapolicy would also be formulated.

[Nodal Ministries/Departments:Department of Expenditure,Department of Food & Public Distribution,Ministry of Petroleum & Natural Gas,Department of Fertilizers]

2. 9 GSTThe debate whether to introduce a Goods andServices Tax (GST) must now come to an end.We have discussed the issue for the past manyyears. Some States have been apprehensiveabout surrendering their taxation jurisdiction;others want to be adequately compensated. Ihave discussed the matter with the States bothindividually and collectively. I do hope we areable to find a solution in the course of this yearand approve the legislative scheme whichenables the introduction of GST. This willstreamline the tax administration, avoidharassment of the business and result in higherrevenue collection both for the Centre and theStates. I assure all States that government willbe more than fair in dealing with them.

[Nodal Ministry/Department:Department of Revenue ]

3. 10 Tax AdministrationThe sovereign right of the Government toundertake retrospective legislation isunquestionable. However, this power has to beexercised with extreme caution andjudiciousness keeping in mind the impact ofeach such measure on the economy and theoverall investment climate.

(i) This Government will not ordinarily bringabout any change retrospectively whichcreates a fresh liability. Hon'ble Membersare aware that consequent upon certainretrospective amendments to the IncomeTax Act 1961 undertaken through theFinance Act 2012, a few cases have comeup in various courts and other legal fora.These cases are at different stages ofpendency and will naturally reach their

Expenditure Management Commission was constituted on4th September 2014. It has submitted its Interim Report on17.1.2015.

Modified Direct Benefit Transfer to LPG consumers calledPahal was launched in 54 districts on 15.11.2014. It hasbeen launched in the remaining districts of the country from1.1.2015.

Formulation of New Urea Policy is in progress.

Action partially completed

The Cabinet approved the proposal for introduction of a Billin the Parliament for amending the Constitution of India tofacilitate the introduction of GST in the country on17.12.2014. The Bill was introduced in the Lok Sabha on19.12.2014.

Work in progress

Budget Speech 2014-2015(10th July 2014)

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

Page 2: Implementation of Budget Announcements 2014-2015

2

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

The High Level Committee has been constituted underSection 119 of the Income Tax Act on 28.8.2014 by theCentral Board of Direct Taxes.

Action completed

Sections 245-O and 245-N of the Income-tax Act have beenamended vide Finance (No.2) Act, 2014 to provide that the"advance ruling" shall also include a determination by theAuthority in relation to the tax liability of a notified residentapplicant in respect of a transaction undertaken or proposedto be undertaken by him.

Action completed

Provision has been made for more than one bench of theAuthority in view of the enlarged scope of AAR. The Authorityshall have a Chairman and such number of Vice-Chairmen,revenue member and law member as the CentralGovernment may appoint. Action is being taken to constitutetwo additional Benches.

Section 245C of the Income-tax Act relating to SettlementCommission has been amended to enhance the scope ofthe Settlement Commission.

Action partially completed

A High level Committee has been constituted videDepartment of Revenue's O.M. F.No. A.50050/84/2014-Ad.Idated 26th November, 2014.

logical conclusion. At this juncture I wouldlike to convey to this August House andalso the investors community at large thatwe are committed to provide a stable andpredictable taxation regime that would beinvestor friendly and spur growth. Keepingthis in mind,

(ii) We have decided that henceforth, all freshcases arising out of the retrospectiveamendments of 2012 in respect of indirecttransfers and coming to the notice of theAssessing Officers will be scrutinized by aHigh Level Committee to be constituted bythe CBDT before any action is initiated insuch cases. I hope the investor communityboth within India and abroad would reposeconfidence on our stated position andparticipate in the Indian growth story withrenewed vigour.

[Nodal Ministry/Department:Department of Revenue]

4. 11 Advance Ruling and Other Tax RelatedMeasuresTax demand of more than ̀ 4 lakh crore is underdispute and litigation before various Courts andAppellate authorities. This is one of the seriousconcerns of all taxpayers in this country. Inorder to reduce litigation in direct taxes, Ipropose to make certain legislative andadministrative changes.

[Nodal Ministry/Department:Department of Revenue]

5. 12 Currently, an advance ruling can be obtainedabout the tax liability of a non-resident from theAuthority for Advance Rulings. This facility isnot available to resident taxpayers exceptPublic Sector Undertakings. I propose to enableresident taxpayers to obtain an advance rulingin respect of their income tax liability above adefined threshold. I also propose to strengthenthe Authority for Advance Rulings byconstituting additional benches. I furtherpropose to enlarge the scope of the Income-tax Settlement Commission so that taxpayersmay approach the Commission for settlementof disputes. This would continue to be once ina lifetime opportunity for any taxpayer.

[Nodal Ministry/Department:Department of Revenue]

6. 13 As an administrative measure, I propose to setup a High Level Committee to interact with tradeand industry on a regular basis and ascertain

Page 3: Implementation of Budget Announcements 2014-2015

3

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

areas where clarity in tax laws is required.Based on the recommendations of theCommittee, the Central Board of Direct Taxesand the Central Board of Excise and Customsshall issue appropriate clarifications, whereverconsidered necessary, on the tax issues withina period of two months.

[Nodal Ministry/Department:Department of Revenue ]

7. 14 Transfer Pricing is a major area of litigation forboth resident and non-resident taxpayers. Ihave proposed certain changes in the TransferPricing regulations, which I would spell out inPart-B of my speech.

[Nodal Ministry/Department:Department of Revenue ]

8. 17 India today is the largest buyer of Defenceequipment in the world. Our domesticmanufacturing capacities are still at a nascentstage. We are buying substantial part of ourDefence requirements directly from foreign players.Companies controlled by foreign governments andforeign private sector are supplying our Defencerequirements to us at a considerable outflow offoreign exchange. Currently we permit 26 per centFDI in Defence manufacturing. The composite capof foreign exchange is being raised to 49 per centwith full Indian management and control throughthe FIPB route.

[Nodal Ministry/Department: Department of Industrial Policy & Promotion]

9. 18 The Insurance sector is investment starved.Several segments of the Insurance sector needan expansion. The composite cap in theInsurance sector is proposed to be increasedup to 49 per cent from the current level of 26per cent, with full Indian management andcontrol, through the FIPB route.

[Nodal Ministry/Department:Department of Financial Services ]

10. 19 To encourage development of Smart Cities,which will also provide habitation for the neo-middle class, requirement of the built up areaand capital conditions for FDI is being reducedfrom 50,000 square metres to 20,000 squaremetres and from USD 10 million to USD 5million respectively with a three year postcompletion lock in.

[Nodal Ministry/Department:Department of Industrial Policy & Promotion]

Action completed

Section 92C of the Income-tax Act has been amended videFinance (No.2) Act, 2014 to provide that in respect ofinternational transaction or specified domestic transactionundertaken on or after 01.04.2014, where more than oneprice is determined by the most appropriate method, theALP shall be computed in the manner as may be prescribed.

Action completed

The press note no.7 amending the FDI policy regardingDefence Sector was issued on 26.8.2014.

Action completed

Government has promulgated an Ordinance namely - theInsurance Laws (Amendment) Ordinance, 2014 on 26thDecember, 2014 to make amendments to the InsuranceAct, 1938, the General Insurance Business (Nationalization)Act, 1972 and the Insurance Regulatory and DevelopmentAuthority Act, 1999 in accordance with the Insurance Laws(Amendment) Bill 2008 as reported by the Select Committeeof the Rajya Sabha and for suitably introducing it in theParliament in the next session.

Work in progress

Press Note No.10 amending the FDI policy regardingConstruction Development Sector was issued on 3rdDecember, 2014.

Action completed

Page 4: Implementation of Budget Announcements 2014-2015

4

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

11. 20 To further encourage this, projects whichcommit at least 30 per cent of the total projectcost for low cost affordable housing will beexempted from minimum built up area andcapitalisation requirements, with the conditionof three year lock-in.

[Nodal Ministry/Department:Department of Industrial Policy & Promotion]

12. 22 Bank CapitalizationFinancial stability is the foundation of a rapidrecovery. Our banking system needs to befurther strengthened. To be in line with Basel-IIInorms there is a requirement to infuse ̀ 2,40,000crore as equity by 2018 in our banks. To meetthis huge capital requirement we need to raiseadditional resources to fulfill this obligation. Whilepreserving the public ownership, the capital ofthese banks will be raised by increasing theshareholding of the people in a phased mannerthrough the sale of shares largely through retailto common citizens of this country. Thus, whilethe government will continue to have majorityshareholding, the citizens of India will also getdirect shareholding in these banks, whichcurrently they hold indirectly. We will alsoexamine the proposal to give greater autonomyto the banks while making them accountable.

[Nodal Ministry/Department:Department of Financial Services ]

13. 24 Smart CitiesAs the fruits of development reach anincreasingly large number of people, the paceof migration from the rural areas to the cities isincreasing. A neo middle class is emergingwhich has the aspiration of better livingstandards. Unless, new cities are developedto accommodate the burgeoning number ofpeople, the existing cities would soon becomeunlivable. The Prime Minister has a vision ofdeveloping 'one hundred Smart Cities', assatellite towns of larger cities and bymodernizing the existing mid-sized cities. Toprovide the necessary focus to this criticalactivity, I have provided a sum of `7,060 crorein the current fiscal.

[Nodal Ministry/Department:Ministry of Urban Development ]

14. 25 e-VisaTourism is one of the larger job creatorsglobally. Many economies world over aresupported by tourism. In order to give a majorboost to tourism in India, the facility of ElectronicTravel Authorization (e-Visa) would be

Press Note No.10 amending the FDI policy regardingConstruction Development Sector was issued on 3rdDecember, 2014

Action completed

On 10.12.2014 the Cabinet has approved allowing PSBs toraise capital from public markets through FPO or QIP bydiluting Government of India holding upto 52% in phasedmanner based on their capital requirement, their stockperformance, liquidity, market appetite and subject of suchother conditions that may be prescribed for efficient use ofcapital and resources, on case to case basis with specificapproval of Finance Minister to each bank.

Action completed

The Concept Note on Contours of Smart City Scheme afterconsultations with all the stakeholders was revised on03.12.2014. The document was uploaded on the website(www.indiansmartcities.in) for inviting further commentsbefore it is finalized.

Work in progress

Tourist Visa on Arrival enabled with Electronic TravelAuthorization has been extended to citizens of 43 countriesin the first phase on 9 designated airports viz, Delhi, Mumbai,Kolkata, Chennai, Hyderabad, Bangalore,Thiruvananthapuram, Cochin and Goa from 27.11.2014.

Page 5: Implementation of Budget Announcements 2014-2015

5

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

introduced in a phased manner at nine airportsin India where necessary infrastructure wouldbe put in place within the next six months. Thecountries to which the Electronic Travelauthorisation facility would be extended wouldbe identified in a phased manner. This wouldfurther facilitate the visa on arrival facility.

[Nodal Ministry/Department:Ministry of Home Affairs;Ministry of External Affairs]

15. 26 REITs & InvITsReal Estate Investment Trusts (REITS) havebeen successfully used as instruments forpooling of investment in several countries. Iintend to provide necessary incentives forREITS which will have pass through for thepurpose of taxation. As an innovation, amodified REITS type structure for infrastructureprojects is also being announced asInfrastructure Investment Trusts (InvITs), whichwould have a similar tax efficient pass throughstatus, for PPP and other infrastructureprojects. These structures would reduce thepressure on the banking system while alsomaking available fresh equity. I am confidentthese two instruments would attract long termfinance from foreign and domestic sourcesincluding the NRIs.

[Nodal Ministry/Department:Ministry of Urban Development,Department of Revenue ]

16. 27 Kisan Vikas PatraKisan Vikas Patra (KVP) was a very popularinstrument among small savers. I plan toreintroduce the instrument to encouragepeople, who may have banked and unbankedsavings to invest in this instrument.

[Nodal Ministry/Department: Department of Economic Affairs]

17. 28 Skill IndiaA national multi-skill programme called Skill Indiais proposed to be launched. It would skill the youthwith an emphasis on employability andentrepreneur skills. It will also provide training andsupport for traditional professions like welders,carpenters, cobblers, masons, blacksmiths,weavers etc. Convergence of various schemesto attain this objective is also proposed.

[Nodal Ministry/Department:Ministry of Labour & EmploymentMinistry of Skill Development,Entrepreneurship Youth Affairs & Sports]

Action completed

Sections 2, 10, 47, 49, 111A, 115A of the Income-tax Actand Chapter VII of the Finance (No.2) Act, 2004 have beenamended vide Finance (No.2) Act, 2014. Sections 115UAand 194LBA have been inserted in the Income-tax Act videFinance (No.2) Act, 2014 to give effect to theseannouncements.

Action completed

The necessary notification has been issued on 23.9.2014.

Action completed

To steer this programme, a new Ministry i.e. Ministry of SkillDevelopment & Entrepreneurship has been created whichis now fully functional.

A multi skill development programme on mission mode forjob creation and entrepreneurship for all socio-economicclasses is being worked out.

A sub-scheme has been prepared to undertake modulartraining courses for the unorganized sector workers in urbanITI's as a separate component in existing Skill DevelopmentInitiative Scheme. Guidelines of the sub-scheme have beenissued.

Page 6: Implementation of Budget Announcements 2014-2015

6

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

18. 29 Pradhan Mantri Krishi Sinchayee YojanaBulk of our farm lands are rain fed anddependent on monsoons. Therefore, there is aneed to provide assured irrigation to mitigaterisk. To improve access to irrigation we proposeto initiate the scheme "Pradhan Mantri KrishiSinchayee Yojana". I propose to set aside asum of `1,000 crore for this purpose.

[Nodal Ministry/Department:Department of Agriculture & Cooperation]

19. 30 Swatchh Bharat AbhiyanThe need for sanitation is of utmost importance.Although the Central Government is providingresources within its means, the task of totalsanitation cannot be achieved without the supportof all. The Government intends to cover everyhousehold by total sanitation by the year 2019,the 150th year of the Birth anniversary of MahatmaGandhi through Swatchh Bharat Abhiyan.

[Nodal Ministry/Department:Ministry of Urban Development ]

20. 31 Shyama Prasad Mukherji Rurban MissionGujarat has demonstrated successfully theRurban development model of urbanization ofthe rural areas, through which people living inthe rural areas can get efficient civicinfrastructure and associate services. ShyamaPrasad Mukherji Rurban Mission will belaunched to deliver integrated project basedinfrastructure in the rural areas, which will alsoinclude development of economic activities andskill development. The preferred mode ofdelivery would be through PPPs while usingvarious scheme funds for financing.

[Nodal Ministry/Department:Department of Rural Development]

21. 32 Deen Dayal Upadhyaya Gram Jyoti YojanaPower is a vital input for economic growth andthe Government is committed to providing 24x7uninterrupted power supply to all homes. "DeenDayal Upadhyaya Gram Jyoti Yojana" forfeeder separation will be launched to augmentpower supply to the rural areas and forstrengthening sub-transmission and distributionsystems. I propose to set aside a sum of `500crore for this purpose.

[Nodal Ministry/Department:Ministry of Power]

Special Training courses in the area of modern constructiontechnology were approved by NCVT Sub-Committee on30.10.2014.

Work in progress

Concept Note, Expenditure Finance Committee (EFC) Noteand draft Guidelines of PMKSY have been circulated to allconcerned Ministries/Departments.

Work in progress

The Scheme has been launched on 2.10.2014. Guidelineshave been issued on 28.12.2014.

Work in progress

A national consultation workshop was held on 8.8.2014 toelicit suggestions on the proposed scheme. Thereafter, anExpert Committee has been constituted. The matter will betaken up for EFC and Cabinet approval.

Work in progress

The Scheme has been approved by Cabinet Committee onEconomic Affairs (CCEA) on 20.11.2014.

Action completed

Page 7: Implementation of Budget Announcements 2014-2015

7

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

22. 33 Statue of UnityGovernment of Gujarat has embarked upon themission to build the largest statue of SardarVallabh Bhai Patel. Sardar Patel stands as thesymbol of the unity of the country. To supportthe Gujarat Government in this initiative to erectthe Statue of Unity, I propose to set aside asum of `200 crore.

[Nodal Ministry/Department:Ministry of Culture]

23. 36 To provide credit enhancement facility for youngstart up entrepreneurs from Scheduled Castes,who aspire to be part of the neo-middle class, Ipropose to set aside a sum of ̀ 200 crore whichwill be operationalised through a scheme byIFCI.

[Nodal Ministry/Department:Department of Financial Services,Ministry of Social Justice & Empowerment]

24. 37 For the welfare of the tribals "Van BandhuKalyan Yojana" is being launched with an initialallocation of `100 crore.

[Nodal Ministry/Department:Ministry of Tribal Affairs]

25. 38 Welfare of Senior CitizensVarishtha Pension Bima YojanaNDA Government during its last term in officehad introduced the Varishtha Pension BimaYojana (VPBY) as a pension scheme for seniorcitizens. Under the scheme a total no. of 3.16lakh annuitants are being benefitted and thecorpus amounts to `6,095 crore. I propose torevive the scheme for a limited period from 15August, 2014 to 14 August, 2015 for the benefitof citizens aged 60 years and above.

[Nodal Ministry/Department:Department of Financial Services ]

26. 39 A large amount of money is estimated to belying as unclaimed amounts with PPF, PostOffice, saving schemes etc. These are mostlyout of investments belonging to the seniorcitizens and on their demise, remain unclaimedfor want of relevant payment instructions. Ipropose to set up a committee to examine andrecommend how this amount can be used toprotect and further financial interests of thesenior citizens. The committee will give itsreport not later than December this year.

[Nodal Ministry/Department:Department of Economic Affairs]

A sum of ` 200 crore has been released on 30.9.2014 toSardar Vallabh Bhai Patel Rashtriya Ekta Trust,Gandhinagar.

Action completed

Guidelines for financial assistance to Scheduled Castesentrepreneurs were issued on 22.12.2014. A fund of ` 200crore has been allocated under the Scheme inSupplementary Demands for Grants 2014-15.

Action completed

The Scheme "Van Bandhu Kalyan Yojana (VKY)" waslaunched on 28th October, 2014. So far ` 75 crore havebeen released to ten States having Schedule V areas.

Action completed

Varishtha Pension Bima Yojana was launched on 14.8.2014.

Action completed

The Committee has been constituted. It has held twomeetings on 26.9.2014 and 29.12.2014.

Work in progress

Page 8: Implementation of Budget Announcements 2014-2015

8

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

27. 40 Government is fully committed to the socialsecurity and welfare of employees serving inthe organized sector. The Government isnotifying minimum pension of ̀ 1,000 per monthto all subscriber members of EP Scheme andhas made an initial provision of `250 crore inthe current financial year to meet theexpenditure. Further, increase in mandatorywage ceiling of subscription to EPS from ̀ 6,500to `15,000 has been made and a provision of`250 crore has been provided in the currentbudget. For the convenience of the subscribers,EPFO will launch the "Uniform AccountNumber" Service for contributing members tofacilitate portability of Provident Fund accounts.

[Nodal Ministry/Department:Ministry of Labour & Employment ]

28. 41 Empowerment of the Differently AbledPersonsGovernment will make all out efforts to createa more inclusive society for Persons withDisabilities to enable them to enjoy equalopportunities to lead an empowered life withdignity. I propose to extend the scheme forAssistance to Disabled Persons for purchase/fitting of Aids and Appliances (ADIP) to includecontemporary aids and assistive devices. It isalso proposed to establish National levelinstitutes for Universal Inclusive Design andMental Health Rehabilitation and also a Centrefor Disability Sports.

[Nodal Ministry/Department:Department of Empowerment of Persons withDisabilities]

29. 42 Incentives for the Visually ChallengedThe Braille Presses in the Government andprivate sector are not able to meet the demandof Braille Text books for the visually impairedstudents. It is proposed to provide assistanceto the State Governments to establish fifteennew Braille Presses and modernize ten existingBraille Presses in the current financial year.Government will also print currency notes withBraille like signs to assist the visibly challengedpersons.

[Nodal Ministry/Department:Department of Disability Affairs,Department of Economic Affairs]

30. 43 Women & Child DevelopmentWomen's safety is a concern shared by all thehonourable members of this House. We needto test out different approaches that can bevalidated and scaled up quickly. An outlay of

Notifications have been issued on 19.08.2014 and22.08.2014 respectively.

Seeding of Uniform Account Number (UAN) with Bankaccount and Aadhaar has been taken up for 4.25croresubscribers. Bank account seeding has been done inrespect of 53% of UAN.

Action partially completed

Action to include High-end mobility devices, prostheticdevices & other P&O Devices is under process.

CCEA Note has been finalized and sent to PMO and CabinetSecretariat on 29.01.2015.

For preparing a site specific Detailed Project Report (DPR)of a Centre for Disability Sports, Expression of Interest (EoI)has been invited.

"In principle" approval of the engagement of HSCC (India)Ltd for comprehensive consultancy of the project has beensought. The technical Committee has been constituted tofinalize the TOR of the contracts.

Work in progress

Central Sector Scheme of "Support of establishment/modernization/capacity augmentation of Braille Presses"has been approved with the objectives to establish fifteenBraille Presses in States and one Braille Printing unit inUT, to modernize ten Braille Presses and to augment oneBraille Press during the 2014-15.

The draft design for Currency notes with Braille like signshas been sent to Reserve Bank of India for finalization andnecessary approval of Central Board.

Action partially completed

Scheme for Safety for Women in Public Road Transport inthe country has been approved by CCEA on 02.01.2014.This Scheme envisages setting up a National Level VehicleSecurity & Tracking System and City Command & Control

Page 9: Implementation of Budget Announcements 2014-2015

9

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

`50 crores will be spent by Ministry of RoadTransport & Highways on pilot testing a schemeon "Safety for Women on Public RoadTransport". A sum of `150 crores will also bespent by Ministry of Home Affairs on a schemeto increase the safety of women in large cities.It is also proposed to set up "Crisis ManagementCentres" in all the districts of NCT of Delhi thisyear in all government and private hospitals. Thefunding will be provided from the Nirbhaya Fund.

[Nodal Ministry/Department:Ministry of Road Transport and Highways,Ministry of Home Affairs,Department of Health & Family Welfare,Department of Economic Affairs,Delhi Government]

31. 44 Beti Bachao, Beti Padhao YojanaIt is a shame that while the country has emergedas a major player amongst the emerging marketeconomies, the apathy towards girl child is stillquite rampant in many parts of the country.Therefore I propose to launch Beti Bachao, BetiPadhao Yojana which will be a focused schemewhich would help in generating awareness andalso help in improving the efficiency of deliveryof welfare services meant for women. I proposeto set aside a sum of `100 crore for this.

[Nodal Ministry/Department:Ministry of Women & Child Development ]

32. 46 Rural DevelopmentPradhan Mantri Gram Sadak YojanaPradhan Mantri Gram Sadak Yojana initiatedduring the NDA-I under the stewardship ofPrime Minister Atal Behari Vajpayee has hada massive impact in improvement of accessfor Rural population. It is time to reaffirm ourcommitment to a better and more energeticPMGSY under the dynamic leadership of PrimeMinister Shri Narendra Modi. I propose toprovide a sum of `14,389 crore.

[Nodal Ministry/Department:Department of Rural Development]

33. 47 MGNREGAThe Government is committed to providingwage and self-employment opportunities inrural areas. However, wage employment wouldbe provided under MGNREGA through worksthat are more productive, asset creating andsubstantially linked to agriculture and alliedactivities.

[Nodal Ministry/Department:Department of Rural Development]

Centre with installation of GPS/CCTV/panic buttons in publicroad transport in the Country.

A contract has been signed between MoRTH and DelhiIntegrated Multi-Modal Transit Systems Ltd (DIMTS) toprovide Project Management Consultancy for smoothimplementation of the project.

Crises Management Centres have been set up in 11 Govt.Hospitals for rapes survivals in all districts of NCT of Delhi.Advisory has been issued to all the private hospitals/nursinghomes for setting up Crisis Management Centres.

Consultations have been started with the beneficiary States/UTs in a phased manner for informing them the details ofthe Scheme and action required on their part for timelyimplementation of the Scheme.

Action partially completed

The Scheme was launched on 22.1.2015.

Action completed

Joint detailed Plan/Guidelines were formulated and issuedto all State Governments on 31.7.2014

Action completed

The notification for amendment of the Schedule -I to theMGNREGA Act, 2005 was issued on 21/7/2014.

To facilitate States in engaging technical assistants for bettertechnical planning and supervision of works underMGNREGA, guidelines have been issued on 21.8.2014 toallow their establishment cost as a part of material cost ofworks instead of administrative cost.

Work in progress

Page 10: Implementation of Budget Announcements 2014-2015

10

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

34. 48 National Livelihood MissionAjeevika, the National Rural Livelihood Mission(NRLM), aims to eliminate rural poverty throughsustainable livelihood options. Under thismission, Women SHGs are provided bankloans at 4% on prompt repayment in 150districts and at 7% in all other districts. I proposeto extend the provision of bank loan for womenSHGs at 4% in another 100 districts. I alsopropose to set up a "Start Up VillageEntrepreneurship Programme" for encouragingrural youth to take up local entrepreneurshipprograms. I am providing an initial sum of ̀ 100crore for this.

[Nodal Ministry/Department:Department of Rural Development]

35. 49 The Rural Housing Scheme has benefited alarge percentage of rural population who haveavailed credit through Rural Housing Fund(RHF). Accordingly, I propose to increase theallocations for the year 2014-15 to ̀ 8,000 crorefor National Housing Bank (NHB) with a viewto expand and continue to support RuralHousing in the country.

[Nodal Ministry/Department:Department of Financial Services]

36. 50 Watershed DevelopmentTo give an added impetus to watersheddevelopment in the country, I propose to starta new programme called "Neeranchal" with aninitial outlay of `2,142 crores in the currentfinancial year.

[Nodal Ministry/Department:Department of Land Resources]

37. 51 Panchayati RajBackward Region Grant Fund (BRGF) is beingimplemented in 272 backward districts in 27States, to fi l l up the crit ical gaps indevelopment of basic infrastructure facilitiesand for capacity building of Panchayats/ GramSabhas in backward areas. It is proposed torestructure the BRGF to address intra-districtinequalities to ensure that backward sub-districts units within States receive adequatesupport.

[Nodal Ministry/Department:Ministry of Panchayati Raj]

38. 52 Safe Drinking WaterMany of our drinking water sources haveexcess impurities like flouride, arsenic andmanmade contaminations due to untreated

Extension of provision of bank loan for women SHGsat 4% in 100 districts: The EFC memo has been prepared.EFC meeting is awaited.

Startup Village Entrepreneurship Programme: Aworkshop has been conducted with all the stakeholders atHyderabad on 26-27 September, 2014. A note is underpreparation.

Work in progress

RBI has issued orders on 26th August, 2014.

Action completed.

A Cabinet Note seeking approval of Cabinet has beensubmitted on 29.10.2014.

Work in progress

Draft EFC Memorandum on the restructuring of districtcomponent of BRGF programme is being finalized.

Work in progress

As on 01.04.2014, there are approximately 20,000 waterquality affected habitations affected with excess arsenic,fluoride, heavy metals, toxic elements, pesticides and

Page 11: Implementation of Budget Announcements 2014-2015

11

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

sewage, industrial effluents and leaching ofpesticides and fertilizers. It is proposed toearmark `3,600 crore under National RuralDrinking Water Programme for providing safedrinking water in approximately 20,000habitations affected with arsenic, fluoride,heavy/ toxic elements, pesticides/ fertilizersthrough community water purification plants innext 3 years.

[Nodal Ministry/Department:Department of Drinking Water & Sanitation]

39. 53 Health and Family WelfareTo move towards "Health for All", the two keyinitiatives i.e. the Free Drug Service and FreeDiagnosis Service would be taken up onpriority.

[Nodal Ministry/Department:Ministry of Health & Family Welfare]

40. 54 In order to achieve universal access to earlyquality diagnosis and treatment to TB patients,two National Institutes of Ageing will be set upat AIIMS, New Delhi and Madras MedicalCollege, Chennai. A national level research andreferral Institute for higher dental studies wouldbe set up in one of the existing Dentalinstitutions.

[Nodal Ministry/Department:Department of Health & Family Welfare,Department of Health Research

41. 55 It is a matter of great satisfaction that all the sixnew AIIMS at Jodhpur, Bhopal, Patna,Rishikesh, Bhubaneswar and Raipur, which arepart of Pradhan Mantri Swasthya SurakshaYojana, have become functional. A plan to setup four more AIIMS like institutions at AndhraPradesh, West Bengal, Vidarbha inMaharashtra and Poorvanchal in UP is underconsideration. I propose to set aside a sum of`500 crore for this. Presently 58 governmentmedical colleges have been approved. It is alsoproposed to add 12 more government medicalcolleges. In addition, dental facilities would alsobe provided in all the hospitals.

[Nodal Ministry/Department:Department of Health & Family Welfare]

42. 56 For the first time, the Central Government willprovide central assistance to strengthen the

fertilizer in the country which are yet to be provided withsafe drinking water. It has been decided to provide 8-10LPCD of safe drinking water in all such habitations in aphased manner before March, 2017. OperationalGuidelines on implementation of Community Drinking Waterpurification Plants for providing safe drinking water in RuralIndia have been prepared. For providing such purificationplants, funds released to the States under NRDWP 20%Quality Fund and NRDWP 5% earmarked Quality Fundsare to be utilized as per NRDWP guidelines.

All the State Governments have been asked to cover morehabitations preferably even beyond the target fixed for theyear 2014-15. During the year, 1386 habitations have beencompleted and by March, 2015, 4000 habitations would becompleted.

Action partially completed

An EFC Memo of National Health Assurance Mission hasbeen circulated on 08.12.2014. The proposed componentsinter-alia include 'free essential drugs' and 'free essentialdiagnosis'.

Work in progress

ICT based pilot has been initiated to include private sector,in two districts. viz., Patna (Bihar) and Mehsana (Gujarat)and the ICT system has been tested.

The proposal for setting up of two National Centres forAgeing at AIIMS, New Delhi and Madras Medical College,Chennai is under consideration.

A Central Task Force for Up-gradation of Dental Servicesin India has been set up on 4th September, 2014.

Action partially completed

Draft EFC Note has been circulated on 17.10.2014.

Under the National Oral Health Programme, support toHealth Facilities [District and below] on the followingcomponents of a Dental Unit is provided. The budgetaryallocation is ` 81 crore :

(i) Manpower support (Dentist, Dental Hygienist, DentalAssistant)

(ii) Equipments including Dental Chair.

(iii) Consumables for dental procedures.

Work in progress

Views of public/stake holders were elicited on the proposedstructure for (i) Strengthening of Central Drugs Standard

Page 12: Implementation of Budget Announcements 2014-2015

12

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

States' Drug Regulatory and Food RegulatorySystems by creating new drug testinglaboratories and strengthening the 31 existingState laboratories.

[Nodal Ministry/Department:Department of Health & Family Welfare]

43. 57 In keeping with the Government's focus onimproving affordable healthcare and toaugment the transfer of technology for betterhealth care facilities in rural India, fifteen ModelRural Health Research shall be set up in thestates, which shall take up research on localhealth issues concerning rural population.

[Nodal Ministry/Department:Department of Health Research]

44. 58 EducationSchool EducationElementary education is one of the majorpriorities of the Government. There is a residualgap in providing minimal school infrastructurefacilities. Government would strive to providetoilets and drinking water in all the girls schoolin first phase. An amount of ` 28,635 crore isbeing funded for Sarva Shiksha Abhiyan and`4,966 crore for Rashtriya Madhyamik ShikshaAbhiyan. A School Assessment Programme isbeing initiated at a cost of `30 crore. To infusenew training tools and motivate teachers, "PanditMadan Mohan Malviya New Teachers TrainingProgramme" is being launched. I am settingaside an initial sum of `500 crore for this.

[Nodal Ministry/Department:Department of School Education and Literacy]

45. 59 To take advantage of the reach of the IT, Ipropose to allocate a sum of `100 crore forsetting up virtual classrooms asCommunication Linked Interface forCultivating Knowledge (CLICK) and onlinecourses.

[Nodal Ministry/Department:Department of School Education and Literacy]

46. 60 Higher EducationThe country needs a large number of Centresof higher learning which are world class. Ipropose to set up Jai Prakash NarayanNational Centre for Excellence in Humanitiesin Madhya Pradesh. I also intend to set upfive more IITs in the Jammu, Chattisgarh,Goa, Andhra Pradesh and Kerala. Five IIMswould be set up in the States of HimachalPradesh, Punjab, Bihar, Odisha and

Control Organisations (CDSCO) (ii) Strengthening of StatesDrug Regulatory System and (iii) Strengthening of the FoodSafety and Standards Authority of India (iv) Strengtheningof States' Food Regulatory System. The draft Cabinet Note,is being finalized.

Work in progress

12 Model Rural Health Research Units (MRHRUs) havealready been sanctioned in Assam, Himachal Pradesh,Rajasthan, Tamil Nadu, Tripura, Karnataka, Punjab,Maharashtra, Andhra Pradesh, Odisha, Madhya Pradeshand Chhattisgarh. Remaining 3 are expected to be approvedby the end of 2014-15.

The individual projects sanctioned under the scheme are atvarious stages of implementation.

Work in progress

Construction of toilets with separate girls' toilets in all schoolswhich do not have toilets has been taken up. 1.02 lakh newgirls' toilets and 1.54 lakh new boys' toilets are underconstruction. Public Sector Corporations have comeforward in a big way to construct school toilets in responseto Hon'ble Prime Minister's call.

School Assessment Programme has been approved and isbeing rolled out.

Pandit Madan Mohan Malviya National Mission on Teachersand Teaching has been launched on 25.12.2014.

Action partially completed

SFC process for ` 94 crore for capacity building is underway.

Work in progress

Mentor IITs/IIMs have been selected for all the institutions.Proposals for site have been received for 10 out of 11institutions. Two sites have been finalized and another fiveState Site Selection visits have been completed. Theremaining four Site Selection visits are underway.

The EFC is under circulation for starting the academicsession 2015-16 in the temporary campus.

Work in progress

Page 13: Implementation of Budget Announcements 2014-2015

13

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

Maharashtra. I propose to set aside a sum of`500 crore for this.

[Nodal Ministry/Department:Department of Higher Education]

47. 61 Government also proposes to ease and simplifynorms to facilitate education loans for higherstudies.

[Nodal Ministry/Department:Department of Financial Services,Ministry of Human Resource Development]

48. 62 Digital IndiaThere is an imminent need to further bridgethe divide between digital "haves" and "have-nots". For this it is proposed to launch a panIndia programme "Digital India". This wouldensure Broad band connectivity at villagelevel, improved access to services through ITenabled platforms, greater transparency inGovernment processes and increasedindigenous production of IT hardware andsoftware for exports and improved domesticavailability. Special focus would be onsupporting software product startups. ANational Rural Internet and TechnologyMission for services in villages and schools,training in IT skills and E-Kranti for governmentservice delivery and governance scheme isalso proposed. I have provided a sum of ̀ 500crore for this purpose.

[Nodal Ministry/Department:Department of Information & Technology,Department of School Education & Literacy]

49. 63 A programme for promoting "GoodGovernance" would be launched and I proposeto set aside a sum of `100 crore for this.

[Nodal Ministry/Department:Department of Information & Technology]

50. 64 Information and BroadcastingSo far around 400 permissions for setting upof a Community Radio Stations have beenissued. To encourage the growth in this sector,a new plan scheme is being taken up with anallocation of `100 crore. This scheme wouldsupport about 600 new and existing CommunityRadio Stations.

[Nodal Ministry/Department:Ministry of Information & Broadcasting]

Based on the consultations between Ministry of HumanResource Development and Department of FinancialServices, Indian Bankers Association (IBA) is revising themodel education loan scheme and NCGTC is revising thecredit guarantee scheme for education loans.

Work in progress

Digital India Programme has been approved. Follow upaction is being taken with respect to each component.

A draft Cabinet Note on e-Kranti (NeGP 2.0) has beenfinalized.

EFC Note on National Information Infrastructure (NII) hasbeen circulated.

EFC Note on Common Services Centre 2.0 (CSC 2.0) isunder finalization.

1st meeting of the Apex Committee on Digital IndiaProgramme has been held on 26th November, 2014.

Action partially completed

All concerned Ministries/Departments and States/UTs havebeen requested to formulate suitable project proposals fordevelopment of new applications and for replication ofsuccessful e-Governance applications in various domains.Various proposals have been already received. TwoWorking Group meetings have been held and 8 projectshave already been recommended for approval withappropriate revisions.

Action partially completed

A new scheme namely "Supporting Community RadioMovement in India" has been introduced for providingfinancial support to existing and new Community RadioStations. The size of the Scheme is ` 100 core.

Action completed

Page 14: Implementation of Budget Announcements 2014-2015

14

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

51. 65 Film & Television Institute, Pune and SatyajitRay Film & Television Institute, Kolkata areproposed to be accorded status of Institutes ofnational importance and a "National Centre forExcellence in Animation, Gaming and SpecialEffects will be set up.

[Nodal Ministry/Department:Ministry of Information & Broadcasting]

52. 66 Urban DevelopmentUrban RenewalIt is time that our cities and towns undergourban renewal and become better places to livein. While developing housing and otherinfrastructure, both physical and economic,which can have local variations, fourfundamental activities must underpin suchdevelopment. These are provision of safedrinking water and sewerage management, useof recycled water for growing organic fruits andvegetable, solid waste management and digitalconnectivity. It is the vision of this Governmentthat at least five hundred (500) such habitationsmust be provided support, while harnessingprivate capital and expertise through PPPs, torenew their infrastructure and services in thenext ten years.

[Nodal Ministry/Department:Ministry of Urban Development]

53. 67 Pooled Municipal Debt Obligation FacilityPooled Municipal Debt Obligation Facility: Thisfacility was set up in 2006 with participation ofseveral Banks to promote and financeinfrastructure projects in Urban Area on sharedrisk basis. Present corpus of this facility is`5,000 crores. This Government has a majorfocus of providing good infrastructure, includingpublic transport, solid waste disposal,sewerage treatment and drinking water in theurban areas. In keeping with the Hon'ble PrimeMinister's vision for urban areas it is proposedto enlarge it to `50,000 crores with extensionof the facility by five years to March 31, 2019.

[Nodal Ministry/Department:Ministry of Urban Development,Department of Financial Services ]

54. 68 Urban TransportationUrban Metro Projects have proven to be veryuseful in decongesting large cities. For twomillion plus cities, planning of metro projectsmust begin now. Government will encouragedevelopment of metro rail systems, includinglight rail systems, in the PPP mode, which willbe supported by the Central Government

A proposal for introduction of National Institute of Film,Television and Allied Studies Bill, 2014 has been submittedfor consideration of the Cabinet.

A proposal to seek in-principle approval of NITI AYOG forsetting up of "National Centre for Excellence in Animation,Gaming and Special Effects" is being prepared.

Work in progress

EFC Note is being finalized for obtaining comments of theconcerned Ministries/Departments.

Work in progress

Pooled Municipal Debt Obligation Facility has beenenhanced to ` 50,000 crore as against the present corpusof ` 5,000 crore with extension of the facility by five yearsto March, 31, 2019, to promote and finance infrastructureprojects in urban area on shared risk basis.

Action completed

The proposal for Lucknow Metro Rail Project Phase-IA wasdiscussed in the PIB Meeting held on 25.8.2014. ` 50 croreallocation has been made in the BE for 2014-15.

Cabinet Note for Ahmedabad Metro Rail Project is underconsideration. ` 50 crore allocation has been made in theBE for 2014-15.

Page 15: Implementation of Budget Announcements 2014-2015

15

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

through VGF. In the current financial year, Ipropose to set aside a sum of `100 crore forMetro Projects in Lucknow and Ahemdabad.

[Nodal Ministry/Department:Ministry of Urban Development]

55. 69 Housing for AllOur government is committed to endeavour tohave housing for all by 2022. For this purpose,I intend to extend additional tax incentive onhome loans to encourage people, especiallythe young, to own houses.

[Nodal Ministry/Department:Department of Revenue]

56. 70 I propose setting up a Mission on Low CostAffordable Housing which will be anchored inthe National Housing Bank. Schemes will beevolved to incentivize the development of lowcost affordable housing. I propose to allocatethis year also a sum of `4,000 crores for NHBwith a view to increase the flow of cheapercredit for affordable housing to the urban poor/EWS/LIG segment. I have already outlinedsome other incentives such as easier flow ofFDI in this sector. Government is willing toexamine other suggestions that would spurgrowth in this sector.

[Nodal Ministry/Department:Department of Financial Services]

57. 71 I also propose to add inclusion of slumdevelopment in the list of Corporate SocialResponsibility (CSR) activities to encourage theprivate sector to contribute more towards thisactivity.

[Nodal Ministry/Department:Ministry of Corporate Affairs]

58. 72 MalnutritionA national programme in Mission Mode isurgently required to halt the deterioratingmalnutrition situation in India, as presentinterventions are not adequate. Acomprehensive strategy including detailedmethodology, costing, time lines andmonitorable targets will be put in place withinsix months.

[Nodal Ministry/Department: Ministry of Women & Child Development]

59. 73 MinoritiesA programme for the up gradation of skills andtraining in ancestral arts for development for

An advisory has been issued to all the State Governmentson 25.8.2014 with a request to explore the possibility ofhaving PPP model for the proposals of Metro Rail Project.

Work in progress

Section 24 of the Income-Tax Act has been amended videFinance (No.2) Act, 2014 to increase the deduction limit onaccount of interest on loan in respect of self occupied houseproperty from ` 1.5 lakh to 2 lakh.

Action completed

RBI has allocated the funds on 26.8.2014. NHB has beenasked to setup a Mission on low cost housing.

Serial 11 above may also be seen in this regard.

Action completed

"Slum Development" has been added in Schedule VII ofthe Companies Act, 2013.

Action completed

The Draft Strategy Note for discussion on National NutritionMission has been submitted. State consultations are inprogress.

Work in progress

A Scheme for "Up-gradation of Skills and Training inTraditional Arts/Crafts for Development (USTTAD)" has

Page 16: Implementation of Budget Announcements 2014-2015

16

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

the minorities called "Up gradation of TraditionalSkills in Arts, Resources and Goods" would belaunched to preserve the traditional arts andcrafts which are rich heritage.

[Nodal Ministry/Department: Ministry of Minority Affairs;Ministry of Small & Medium Enterprises]

60. 74 An additional amount of `100 crores forModernization of Madarsas has been providedto the Department of School Education.

[Nodal Ministry/Department: Department of School Education & Literacy]

61. 75 III. AGRICULTUREFarming as an activity contributes nearly 1/6thto our National GDP and a major portion of ourpopulation is dependent on it for livelihood. Ithas risen to the challenge of making Indialargely self-sufficient in providing food for agrowing population. To make farmingcompetitive and profitable, there is an urgentneed to step up investment, both public andprivate, in agro-technology development andcreation and modernization of existingagri-business infrastructure. Indian AgriculturalResearch Institute, Pusa has been at theforefront of research in this area. However,since independence only one such centre hasbeen established. Government will establishtwo more such institutions of excellence onsimilar pattern in Assam and Jharkhand withan initial sum of `100 crore in the currentfinancial year. In addition, an amount of `100crores is being set aside for setting up an"Agri-Tech Infrastructure Fund".

[Nodal Ministry/Department:Department of Agricultural Research &Education,Department of Agriculture]

62. 76 It is also proposed to establish AgricultureUniversities in Andhra Pradesh and Rajasthanand Horticulture Universities in Telangana andHaryana. An initial sum of ̀ 200 crores has beenallocated for this purpose.

[Nodal Ministry/Department:Department of Agricultural Research &Education]

been finalized. It will be rolled out soon.

Work in progress

EFC Note stands submitted.

Work in progress

400 hectare land in Hazaribag district of Jharkhand has beenidentified to establish an IARI like institution. Response inregard to identification of land from Government of Assamis awaited.

A Central Sector Scheme on Promotion of NationalAgricultural Market through Agri-Tech Infrastructure Fund(ATIF) for ` 200 crore has been approved.

Action partially completed

State Agricultural University i.e. ANGRAU will be establishedat Lam Village in Guntur district. Necessary steps are beinginitiated to release funds.

Government of Rajasthan has identified lands forestablishing State Agricultural University in Baran andJhalawad Districts respectively.

Government of Telangana has prepared Plan of action andidentified land in Medak district for Horticulture University.

Govt. of Haryana has prepared DPR and Work Plan toestablish Horticulture University. A High Level Committeehas been constituted to finalize the details.

Work in progress

Page 17: Implementation of Budget Announcements 2014-2015

17

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

63. 77 Deteriorating soil health has been a cause ofconcern and leads to sub optimal utilizationof farming resources. Government will initiatea scheme to provide to every farmer a soilhealth card in a Mission mode. I propose toset aside a sum of ̀ 100 crore for this purposeand an additional `56 crores to set up 100Mobile Soil Testing Laboratories across thecountry. There have also been growingconcerns about the imbalance in the utilizationof different types of fertilizers resulting indeterioration of the soil.

[Nodal Ministry/Department:Department of Agriculture & Cooperation]

64. 78 Climate change is a reality which all of us haveto face together. Agriculture as an activity ismost prone to the vagaries of climate change.To meet this challenge, I propose to establisha "National Adaptation Fund" for climatechange. As an initial sum an amount of `100crore will be transferred to the Fund.

[Nodal Ministry/Department:Ministry of Environment & Forests & ClimateChange,Department of Agricultural Research &Education]

65. 79 We are committed to sustaining a growth of4% in Agriculture and for this we will bringtechnology driven second green revolution withfocus on higher productivity and include"Protein revolution" as an area of major focus.

[Nodal Ministry/Department:Department of Agriculture & Cooperation]

66. 80 As a very large number of landless farmers areunable to provide land title as guarantee,institutional finance is denied to them and theybecome vulnerable to money lenders' usuriouslending. I propose to provide finance to 5 lakhjoint farming groups of "Bhoomi Heen Kisan"through NABARD in the current financial year.

[Nodal Ministry/Department:Department of Financial Services ]

The Scheme "Soil Health Card" will be rolled out shortly.

Funds have been released to 12 States for setting up of 47Mobile Soil Testing Laboratories.

Work in progress

Draft EFC Memo for "National Adaption Fund" has beencirculated.

SFC proposal for NAF for Climate Risk in Agricultureamounting to ` 100 crore has been formulated and is inadvanced stage of processing.

Work in progress

Pulses are a major source of protein in India. Increasingproduction and productivity of pulses is being carried outthrough NFSM-Pulses. It is implemented in 615 districts of27 States for increasing the production & productivity ofpulses.

Additional area coverage for increasing pulses productionduring Rabi/Summer 2014-15 is also being implementedfor ` 224.42 crore.

Adaptive research projects are being implemented to reducethe gaps of potential yield and yield realized at farmers'field.

Efforts are being made to promote area expansion in ricefallows and cultivation of pulses as inter-crop with oilseeds/commercial crops/coarse cereals etc.

Work in progress

A State wise target for financing 5 lakh Joint Farming Groupsthrough Joint Liability Group mode financing has beencommunicated. The SLBCs have been advised by NABARDto communicate bank wise targets in each State and monitorthe progress.

RBI has issued a circular on 13.11.2014 to all banks forfinancing of Joint farming group of "Bhoomi Heen Kisan".

Action completed

Page 18: Implementation of Budget Announcements 2014-2015

18

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

67. 81 Price volatility in the agriculture produce createsuncertainties and hardship for the farmers. Tomitigate this I am providing a sum of ̀ 500 crorefor establishing a Price Stabilization Fund.

[Nodal Ministry/Department:Department of Agriculture & Cooperation]

68. 82 The farmers and consumers' interest will befurther served by increasing competition andintegrating markets across the country. Toaccelerate setting up of a National Market, theCentral Government will work closely with theState Governments to re-orient theirrespective APMC Acts., to provide forestablishment of private market yards/ privatemarkets. The state governments will also beencouraged to develop Farmers' Markets intown areas to enable the farmers to sell theirproduce directly.

[Nodal Ministry/Department:Department of Agriculture & Cooperation]

69. 83 I also propose to set aside a sum of `50 croresfor the development of indigenous cattle breedsand an equal amount for starting a bluerevolution in inland fisheries.

[Nodal Ministry/Department:Department of Animal Husbandry, Dairying &Fisheries]

70. 84 Agriculture CreditBanks are providing strong credit support tothe agriculture sector. A target of ̀ 8 lakh crorehas been set for agriculture credit during2014-15 which, I am confident, the banks willsurpass this.

[Nodal Ministry/Department:Department of Financial Services ]

71. 85 Interest Subvention Scheme for Short TermCrop LoansUnder the Interest Subvention Scheme for shortterm crop loans, the banks are extending loansto farmers at a concessional rate of 7%. Thefarmers get a further incentive of 3% for timelyrepayment. I propose to continue the Schemein 2014-15.

[Nodal Ministry/Department:Department of Financial Services]

The draft Guidelines of Price Stabilization Fund have beenposted on website inviting comments from all stakeholdersby 02.02.2015. Guidelines will be finalized thereafter.

Work in progress

16 States have reformed their APMC Acts in respect ofpermitting direct marketing, contract farming and setting upof private markets and 9 of them have implemented Rulesin this regard.

States are being urged periodically to adopt reforms on thelines of the Model Act and beyond.

A central sector scheme on Promotion of NationalAgricultural Market through Agri-Tech Infrastructure Fund(ATIF) has been launched to facilitate to integrate themarkets across the country to move towards a NationalMarket through adoption of reforms and creating appropriatee-market platforms in States.

States are being constantly advised to adopt the model andservices of SFAC to develop the Farmers' Markets.

Work in progress

Administrative approval of and guidelines for implementationof the scheme for 'National Kamdhenu Breeding Centre'have been issued on 22.12.2014.States have beenrequested to submit proposals under the scheme.

It has been decided to implement the "Blue revolution"through National Fisheries Development Board, with aprovision of `50 crores.

Action partially completed

Agency wise targets have been allotted.

Action completed

Cabinet has approved the proposal on 10.12.2014.Guidelines have been issued on 18.12.2014.

Action completed

Page 19: Implementation of Budget Announcements 2014-2015

19

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

72. 86 Rural Infrastructure Development FundNABARD operates the Rural InfrastructureDevelopment Fund (RIDF), out of the prioritysector lending shortfall of the banks, whichhelps in creation of infrastructure in agricultureand rural sectors across the country. I proposeto raise the corpus of RIDF by an additional`5,000 crores from the target given in theInterim Budget to ̀ 25,000 crores in the currentfinancial year.

[Nodal Ministry/Department:Department of Financial Services]

73. 87 Warehouse Infrastructure FundIncreasing warehousing capacity for increasingthe shelf life of agriculture produces and therebythe earning capacity of the farmers is of utmostimportance. Keeping in view the urgent needfor availability of scientific warehousinginfrastructure in the country, I propose anallocation of `5,000 crore for the fund for theyear 2014-15.

[Nodal Ministry/Department:Department of Financial Services]

74. 88 Creation of Long Term Rural Credit FundThe share of long term investment credit inagriculture is going down as compared to shortterm crop loan. This is severely hampering theasset creation in agriculture and allied activities.In order to give a boost to long term investmentcredit in agriculture, I propose to set up "LongTerm Rural Credit Fund" in NABARD for thepurpose of providing refinance support toCooperative Banks and Regional Rural Bankswith an initial corpus of `5,000 crore.

[Nodal Ministry/Department:Department of Financial Services]

75. 89 Allocation of STCRC (Refinance) FundThe Short Term Cooperative Rural Credit(STCRC) - Refinance Fund was announced inUnion Budget 2008-09 with initial corpus of`5,000 crore. In order to ensure increased anduninterrupted credit flow to farmers and to avoidhigh cost market borrowings by NABARD, Ipropose to allocate an amount of ̀ 50,000 crorefor STCRC Fund during 2014-15.

[Nodal Ministry/Department:Department of Financial Services]

76. 90 Producers Development and UpliftmentCorpus (PRODUCE)The issue of profitability of small holding basedagriculture has assumed importance in view of

RBI has allocated ` 25,000 crore on 20.8.2014.

Action completed

RBI has allocated ` 5,000 crore on 20.8.2014.Guidelinesof the NABARD warehousing scheme have since beenissued by NABARD.

Action completed

RBI has allocated ` 5,000 crore on 20.8.2014.

Action completed

RBI has allocated ` 50,000 crore on 20.8.2014.

Action completed

Appraisal note seeking approval of Committee on Non PlanExpenditure (CNE) on PRODUCE has been considered in

Page 20: Implementation of Budget Announcements 2014-2015

20

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

increasing proportion of small and marginalfarmers in the country. I propose to supplementNABARD's Producers' organizationdevelopment fund for Producer's developmentand upliftment called PRODUCE with a sum of`200 crore which will be utilized for building2,000 producers organizations across thecountry over the next two years.

[Nodal Ministry/Department:Department of Financial Services]

77. 91 Food SecurityGovernment is committed to reforms in the foodsector. Restructuring FCI, reducingtransportation and distribution losses andefficacy of PDS would be taken up on priority.

[Nodal Ministry/Department:Department of Food & Public Distribution]

78. 92 Government is also committed to providewheat and rice at reasonable prices to theweaker sections of the society. Even if due toinadequate rainfall there is a marginal declinein agriculture production, stocks in the Centralpool are adequate to meet any exigency.Government shall, when required, undertakeopen market sales to keep prices undercontrol.

[Nodal Ministry/Department:Department of Food & Public Distribution]

79. 93 Kisan TVKisan TV, dedicated to the interests of theagriculture and allied sector will be launchedin the current financial year. This willdisseminate real time information to the farmersinformation regarding new farming techniques,water conservation, organic farming etc. I

its meeting held on 27.1.2015.

Work in progress

A High Level Expert Committee was constituted on01.09.2014 to make recommendations on unbundling/restructuring of FCI.

Many steps have been taken by FCI to reduce theTransportation and Distribution losses.

With a view to modernize the system, the Government isimplementing a Plan Scheme on 'End-to-endComputerisation of TPDS Operations' on cost sharing basiswherein technical and financial assistance is being given toStates/UTs.Best practices implemented by States and UTs in TPDSare being shared through advisories, guidelines,conferences etc. from time to time.

Work in progress

Foodgrains are being provided to the States/UTs fordistribution to the people at highly subsidized prices of Re.1/2/3 per Kg for coarse grains/wheat/rice respectively as perthe National Food Security Act.

So far 11 States/UTs have implemented NFSA.

Additional quantities of foodgrains have been allocated fordistribution to Below Poverty Line and Above Poverty Linefamilies from August, 2014 in the States/UTs where NFSAhas not been implemented.

Foodgrains have also been allocated to the States forfestival, calamities etc. and 50 lakh tons of foodgrains havebeen allocated under Other Welfare Schemes.

The Government has started sale of 100 lakh MT wheatunder Open Market Sale Scheme (Domestic) during theyear 2014-15. A quantity of 23.08 lakh MT of wheat hasbeen sold under the scheme upto first week ofJanuary, 2015.

Work in progress

SFC Meeting held on 5.11.2014 gave 'in-principle' approvalto launch Kisan Channel scheme. Soft launch of the channelis proposed from 23.3.2015 and firm launch is expected on13/14th April 2015.

Work in progress

Page 21: Implementation of Budget Announcements 2014-2015

21

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

propose to set aside a sum of `100 crore forthis purpose.

[Nodal Ministry/Department:Ministry of Information & Broadcasting ]

80. 94 IV. INDUSTRYThe eBiz platform aims to create a businessand investor friendly ecosystem in India bymaking all business and investment relatedclearances and compliances available on a24x7 single portal, with an integrated paymentgateway. All Central Government Departmentsand Ministries will integrate their services withthe eBiz platform on priority by 31 Decemberthis year.

[Nodal Ministry/Department: Department of Industrial Policy & Promotion]

81. 95 A National Industrial Corridor Authority, with itsheadquarters in Pune, is being set up tocoordinate the development of the industrialcorridors, with smart cities linked to transportconnectivity, which will be the cornerstone ofthe strategy to drive India's growth inmanufacturing and urbanization. I haveprovided an initial corpus of ̀ 100 crore for thispurpose.

[Nodal Ministry/Department:Department of Industrial Policy & Promotion]

82. 96 The Amritsar Kolkata Industrial masterplanning will be completed expeditiously forthe establishment of industrial smart cities inseven States of India. The master planning ofthree new smart cities in the Chennai-Bengaluru Industrial Corridor region, viz.,Ponneri in Tamil Nadu, Krishnapatnam inAndhra Pradesh and Tumkur in Karnataka willalso be completed.

[Nodal Ministry/Department: Department of Industrial Policy & Promotion]

83. 97 The perspective plan for the Bengaluru MumbaiEconomic corridor (BMEC) and Vizag-Chennaicorridor would be completed with the provisionfor 20 new industrial clusters.

[Nodal Ministry/Department:Department of Industrial Policy & Promotion]

Integration of the 13 priority Central services with e-Biz isat an advanced stage. Those which will be shortly readyfor public launch include 3 MCA services, 2 CBDT services,2 RBI services and EPFO services. The ESIC service waslaunched on 12.12.2014.

Work relating to integration of other Services is at anadvanced stage.

Work in progress

A Memorandum for EFC on formation of the NationalIndustrial Corridor Development Authority has beensubmitted.

Work in progress

DMICDC is in process of appointing consultant forundertaking feasibility study of Amritsar Kolkata IndustrialCorridor.

Master Planning for three industrial nodes in the ChennaiBengaluru Industrial Corridor region is likely to be completedby March 2015.

Work in progress

The perspective planning of BMEC project has been initiatedby the DMICDC and is in advanced stage. The draftperspective planning of BMEC has been submitted byDMICDC.

Feasibility study has been entrusted to Asian DevelopmentBank. ADB has submitted the Report of ConceptualDevelopment Plan of VCIC region. Out of four nodes namelyVishakhapatnam, Kakinada, Gannavaram and Kankipaduand Srikalahasti-Yerpedu. ADB would prioritize two nodesnamely Vishakhapatnam and Srikalahasti-Yerpedu formaster planning.

Work in progress

Page 22: Implementation of Budget Announcements 2014-2015

22

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

84. 98 Kakinada, its adjoining area and the port will bedeveloped as the key drivers of economic growthin the region with a special focus on hardwaremanufacturing.

[Nodal Ministry/Department:Department of Industrial Policy & Promotion]

85. 99 Exports cannot be exponentially increasedunless the states play a very active role inexport promotion by providing goodinfrastructure and full facilitation. It will be ourendeavor to engage with the states to takeIndia's exports to a higher growth trajectory. Itis proposed to establish an Export promotionMission to bring all stakeholders under oneumbrella.

[Nodal Ministry/Department:Department of Commerce]

86. 100 Special Economic ZonesThe Government is committed to revive theSpecial Economic Zones (SEZs) and makethem effective instruments of industrialproduction, economic growth, export promotionand employment generation. For achieving this,effective steps would be undertaken tooperationalize the Special Economic Zones, torevive the investors' interest to develop betterinfrastructure and to effectively and efficientlyuse the available unutilized land.

[Nodal Ministry/Department: Department of Commerce]

87. 101 ApprenticeshipComparing the size of the Indian economy, theperformance of the Apprenticeship TrainingScheme is not satisfactory and a large numberof training facilities in the industry are unutilized.Apprenticeship Act will be suitably amendedto make it more responsive to industry andyouth. We will also encourage MSMEs to availof the benefits of this scheme.

[Nodal Ministry/Department:Ministry of Labour & Employment; MSME]

As per the Report of Conceptual Development Plan ofVCIC region out of four nodes namely Vishakhapatnam,Kakinada, Gannavaram and Kankipadu and Srikalahasti-Yerpedu identified by ADB in their CDP-VCIC region, ADBwould prioritize two nodes namely Vishakhapatnam andSrikalahasti-Yerpedu for master planning.

Work in progress

A workshop of the Principal Secretaries of 14 States ofIndustries and Commerce Departments was held on25.7.2014 for mainstreaming of States to boost exports.Commerce Secretary has written to Chief Secretaries of15 States to mainstream States to expand exports. TheState Governments have been advised to appoint anExport Commissioner for coordination of all export relatedactivities.

Nodal Officers in DoC have been tasked to emphasizedevelopment of an Export Strategy by the State Governmentduring their SLEPC meetings chaired by Chief Secretariesof the respective State Governments.

The issue regarding establishment of an export promotionMission to bring all stakeholders under on umbrella is beingtaken care of in the Foreign Trade Policy through a proposedstructure by the DGFT.

Work in progress

Following measures have been undertaken:

♦ Mapping of activities related to SEZ Developers andUnits has been completed and timelines forcompletion of the said activities have also beenfinalized and implemented in all the Zones. Activitieswhich are being taken up for Digitization and Onlineprocessing of works relating to SEZ Developers andUnits has been finalized. A module is being preparedby NSDL for Online processing activities for adoptionand implementation in all SEZs. A pilot module ondigitization and online processing of works related toSEZ developers and units was launched in SEEPASEZ, Mumbai in 12.9.2014. On the basis of feedbackon the performance of the module, it will be replicatedin all the Zones.

♦ All DCs have been directed to constantly interact withDevelopers for speedy operationalisation of all non-functional SEZs.

Work in progress

In order to make the Apprentices Act, 1961 more responsiveto industry and youth, the Apprentices (Amendment) Bill,2014 has been further amended and brought into effectw.e.f. 22.10.2014.

In addition, action has been taken on the scheme of sharingof 50% of prescribed stipend by the Central Governmentfor 1,00,000 apprentices to be engaged by manufacturingand other Enterprises.

Action completed

Page 23: Implementation of Budget Announcements 2014-2015

23

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

88. 102 Micro, Small and Medium Enterprises sectorSMEs form the backbone of our Economy.They account for a large portion of ourindustrial output and employment. The bulkof service sector enterprises are also SMEs.Most of these SMEs are Own AccountEnterprises. Most importantly a majority ofthese enterprises are owned or run by SCs,STs and OBCs. Financing to this sector is ofcritical importance, particularly as it benefitsthe weakest sections. There is need toexamine the financial architecture for thissector. I propose to appoint a committee withrepresentatives from the Finance Ministry,Ministry of MSME, RBI to give concretesuggestions in three months.

[Nodal Ministry/Department:Ministry of Micro, Small & Medium Enterprises,Department of Financial Services]

89. 103 Promotion of entrepreneurship and start-upCompanies remains a challenge. While therehave been some efforts to encourage, oneprincipal limitation has been availability ofstart-up capital by way of equity to be brought inby the promoters. In order to create a conduciveeco-system for the venture capital in the MSMEsector it is proposed to establish a ̀ 10,000 crorefund to act as a catalyst to attract private Capitalby way of providing equity, quasi equity, soft loansand other risk capital for start-up companies.

[Nodal Ministry/Department: Ministry of Micro, Small & Medium Enterprises]

90. 104 To establish technology centre network topromote innovation, entrepreneurship andagro-industry, I propose to set up a fund with acorpus of `200 crore.

[Nodal Ministry/Department: Ministry of Micro, Small & Medium Enterprises]

91. 105 The definition of MSME will be reviewed toprovide for a higher capital ceil ing. Aprogramme to facilitate forward and backwardlinkages with multiple value chain ofmanufacturing and service delivery will alsobe put in place.

[Nodal Ministry/Department: Ministry of Micro, Small & Medium Enterprises]

The Committee has been constituted. It held a meeting on5.11.2014. The report of the Committee is awaited.

Work in progress

A fund with corpus of ` 10,000 crore has been establishedwith SIDBI from contributions of priority sector shortfall ofbanks. The tenure of the deposits will be for a period ofthree years or as decided by the RBI from time to time.

The scheme has been formulated. RBI's comments havebeen received.

The matter with regard to the source of investment is underconsideration.

Action partially completed

Fund for Promoting Innovation, Entrepreneurship andAgro-Industry has been formulated.

The MSMEs had detailed consultations with differentMinistries and Departments to operationalize the Fund. Thedraft scheme has been uploaded on to the website foreliciting comments from various stakeholders. In parallel,the SFC Memorandum has been circulated to variousMinistries for inter-Ministerial consultations. A contest forName, Logo and Tagline for the proposed scheme has beenset up on MyGov Platform.

Work in progress

The draft Amendment Bill to change the definition of MSMEhas been circulated to all the concerned Ministries/Departments, State Governments and other stakeholdersfor comments.

Work in progress

Page 24: Implementation of Budget Announcements 2014-2015

24

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

92. 106 Entrepreneur friendly legal bankruptcy frameworkwill also be developed for SMEs to enable easyexit. A nationwide "District level Incubation andAccelerator Programme" would be taken up forincubation of new ideas and providing necessarysupport for accelerating entrepreneurship.

[Nodal Ministry/Department: Ministry of Micro, Small & Medium Enterprises,Department of Economic Affairs]

93. 107 TextilesI propose to set up a Trade Facilitation Centreand a Crafts Museum with an outlay of `50crore to develop and promote handloomproducts and carry forward the rich tradition ofhandlooms of Varanasi, where I also intend tosupport a Textile mega-cluster. I also proposeto set up six more Textile mega-clusters atBareily, Lucknow, Surat, Kuttch, Bhagalpur,Mysore and one in Tamil Nadu. I am allocatinga sum of `200 crore for this purpose.

[Nodal Ministry/Department:Ministry of Textiles]

94. 108 I also propose to set up a Hastkala Academy

The draft Amendment Bill, along with a background note,has been circulated to all the concerned Ministries forcomments.

Work in progress

The SFC in its meeting held on 05.01.2015 has appraisedthe scheme, "setting up at Trade Facilitation Centres & CraftMuseum" at Badalpur, Varanasi at a total cost of` 200 crore.

Textile Mega Cluster, Varanasi- Projects are at differentstages of implementation. Total amount released ` 33.10crore, 51,936 handloom parts distributed, 2308 BatteryLinked Inverter Lighting Units distributed, yarn suppliedworth ` 171 crore etc. 2458 weavers provided credit. EoIshave been invited through advertisement published on02.01.2015 for engaging designers in the Varanasi megaHandloom Cluster. Also 6 common Facility Centres arebeing set up.

Textile Mega Cluster Lucknow, Bareily and Kutch:Preliminarily survey work has been completed. Projectimplementation through SPV in collaboration with StateGovernment is under progress. Diagnostic study and DPRis being prepared by National Centre for Design andProduct Development (NCDPD), New Delhi.Implementation shall commence thereafter. The formationof the SPV for the implementation and execution of theMega Cluster has been initiated and the memorandum ofAssociation and rules and regulations are under formation/submission for the formation of SPV.

Textile Mega Cluster in Bhagalpur: Agreement with NIFT,Patna has been signed for engaging them as ClusterManagement & Technical Agency (CMTA). Baseline surveyof cluster is in progress. CMTA is likely to submit the DPRby 15.01.2015.

Textile Mega-cluster in Tamil Nadu: Agreement with M/sTamil Nadu Handloom development Corporation as CMTAhas been signed. Revised DPR submitted to the ProjectApproval and Monitoring Committee for approval.

Textile Mega Cluster of Surat (Gujarat): The bid for CMTAis under process.

Textile Mega Cluster, Mysore: Karnataka State TextilesInfrastructure Development Corporation Limited (KSTIDC)has been finalized as CMTA. Work is underway for preparingdetailed Project Report.

Work in progress

Page 25: Implementation of Budget Announcements 2014-2015

25

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

for the preservation, revival, and documentationof the handloom/handicraft sector in PPP modein Delhi. I have set aside a sum of ̀ 30 crore forthis purpose.

[Nodal Ministry/Department:Ministry of Textiles]

95. 109 I propose to start a Pashmina PromotionProgramme (P-3) and a programme for thedevelopment of other crafts of Jammu &Kashmir. I am setting aside a sum of `50 crorefor this purpose.

[Nodal Ministry/Department:Ministry of Textiles]

96. 110 V. INFRASTRUCTUREIndia has emerged as the largest PPPmarket in the world with over 900 projects invarious stages of development. PPPs havedelivered some of the iconic infrastructure likeairports, ports and highways which are seenas models for development globally. But wehave also seen the weaknesses of the PPPframework, the rigidities in contractualarrangements, the need to develop morenuanced and sophist icated models ofcontracting and develop quick disputeredressal mechanism. An institution toprovide support to mainstreaming PPPscalled 3P India will be set up with a corpus of`500 crores.

[Nodal Ministry/Department:Department of Economic Affairs]

97. 111 ShippingA policy for encouraging the growth of Indiancontrolled tonnage will be formulated to ensureincrease in employment of the Indian seafarers.Development of ports is also critical for boostingtrade. Sixteen new port projects are proposedto be awarded this year with a focus on portconnectivity. ̀ 11,635 crore will be allocated forthe development of Outer Harbour Project inTuticorin for phase I. SEZs will also bedeveloped in Kandla and JNPT. Acomprehensive policy will also be announcedto promote Indian ship building industry in thecurrent financial year.

[Nodal Ministry/Department:Ministry of Shipping,Department of Commerce]

The EFC Memorandum stands submitted.

Work in process

Pashmina Promotion Programme(P-3) has been launchedon 8.10.2014. Guidelines approved by the Hon'ble Ministerof State for Textiles.

National Centre for Design and Product Development asnodal Agency is to be appointed for undertaking baselinesurvey/Diagnostic study for J&K craft projects and supportthe formation of SPV and preparation of DPR. An amountof ` 25.50 lakh has been released.

Action partially completed

The Cabinet Note on Setting up of the 3P India Institution isready. The Cabinet Note shall be sent to the CabinetSecretariat in February, 2015.

Work in progress

(i) Allowing Indian Shipping companies to flag theirtonnage abroad- Policy decision has been taken andnotification has been issued by the DG (Shipping) on23.07.2014.

(ii) Development of Ports: 11port projects have beenawarded.

(iii) Development of Outer Harbour Projects inTuticorin for Phase I: This project has been posedto Government of Japan for JICA OfficialDevelopment Assistance loan for ` 5686 crore onNovember 5, 2014.

(iv) The SEZ at JNPT was launched on 16.8.2014.

“In principle” approval of Ministry of Commerce has beenextended upto July, 2015 for Kandla Port Trust.

Page 26: Implementation of Budget Announcements 2014-2015

26

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

98. 112 Inland NavigationDevelopment of inland waterways can improvevastly the capacity for the transportation ofgoods. A project on the river Ganga called'JalMargVikas' (National Waterways-I) will bedeveloped between Allahabad and Haldia tocover a distance of 1620 kms, which will enablecommercial navigation of at least 1500 tonnevessels. The project will be completed over aperiod of six years at an estimated cost of`4,200 crore.

[Nodal Ministry/Department:Ministry of Shipping]

99. 113 New AirportsDespite increase in air connectivity air travel isstill out of reach of a large number ofaspirational Indians. Scheme for developmentof new airports in Tier I and Tier II will belaunched for implementation through AirportAuthority of India or PPPs.

[Nodal Ministry/Department:Ministry of Civil Aviation]

100. 114 Roads sectorRoads sector constitutes a very import arteryof communication in the country. The sectorhad taken shape from 1998-2004 under NDA-I. The sector again needs huge amount ofinvestment along with debottlenecking frommaze of clearances. I propose investment inNational Highways Authority of India and StateRoads of an amount of `37,880 crores, whichincludes `3,000 crores for the North East.During CFY a target of NH construction of 8500km will be achieved.

[Nodal Ministry/Department:Ministry of Road Transport & Highways]

101. 116 PowerTo promote cleaner and more efficient thermalpower, I propose to allocate an initial sum of`100 crore for preparatory work for a newscheme "Ultra-Modern Super Critical CoalBased Thermal Power Technology."

(i) Draft Cabinet note on "New Ship buildingdevelopment scheme" has been circulated forinter-ministerial consultations.

Action partially completed

Process of establishment of Project Monitoring has beencompleted. EOI for Environmental Impact Assessment(EIA)/Environmental Management Plan was issued in thesecond week of September 2014. The response to EOI hasbeen received. IWAI has listed the consultants forpreparation of DPR and EIA/EMP study.

Work in progress

It has been decided to develop 'No frills' airports in Tier IIand Tier III cities across the country keeping the criteria ofpopulation, distance and the potential for tourism andindustry. So far 50 locations have been identified.

Five airports viz., namely Hubli and Belgaum inKarnataka; Kishangarh in Rajasthan; Jharsuguda inOdisha and Tezu in Arunachal Pradesh have beenidenti f ied for construct ion of small airports forcommencement of work during 2014-15 and the work hasalready been started by Airports Authority of India. Theremaining 45 locations will be reviewed based on thebroad criteria of minimum population of 10 lacs, tourismpotential, viability of airport operations, details of flightmovement in the past etc.

Action Completed

Till December, 2014, 2475 km. highway has beenconstructed.

Work in progress

EFC has approved the proposal of R&D project fordevelopment of Advanced Ultra Super-Critical Technologyfor Thermal Power Plants on a Mission Mode.

Page 27: Implementation of Budget Announcements 2014-2015

27

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

[Nodal Ministry/Department:Department of Heavy Industries]

102. 117 CoalComprehensive measures for enhancingdomestic coal production are being put in placealong with stringent mechanism for qualitycontrol and environmental protection, whichincludes supply of crushed coal and setting upof washeries. The existing impasse in the coalsector will be resolved and adequate quantityof coal will be provided to power plants whichare already commissioned or would becommissioned by March 2015, to unlock deadinvestments. An exercise to rationalize coallinkages which will optimize transport of coaland reduce cost of power is underway.

[Nodal Ministry/Department: Ministry of Coal]

103. 118 New & Renewable EnergyNew and Renewable energy deserves a veryhigh priority. It is proposed to take up UltraMega Solar Power Projects in Rajasthan,Gujarat, Tamil Nadu, and Laddakh in J&K. Ihave set aside a sum of `500 crores for this.We are launching a scheme for solar powerdriven agricultural pump sets and waterpumping stations for energizing one lakhpumps. I propose to allocate a sum of `400crores for this purpose. An additional ̀ 100 croreis set aside for the development of 1 MW SolarParks on the banks of canals. Implementationof the Green Energy Corridor Project will beaccelerated in this financial year to facilitateevacuation of renewable energy across thecountry.

[Nodal Ministry/Department:Ministry of New & Renewable Energy ]

104. 119 Petroleum & Natural Gas

BHEL has been requested to start the important projectactivities related to the R&D project. After approval of CCEA,` 100 crore, will be released to BHEL.

A draft CCEA note has been submitted.

Work in progress

Action for timely implementation of various projects as perproduction plan for reaching 1 billion tonnes by 2019-20will be taken after approval by CIL Board.

To bring about improvement in the quality of coal supply,the system of Third Party Sampling was introduced w.e.f.01.10.2013. Power utilities like NTPC and others are in theprocess of selecting the third party agencies thoroughtendering process.

The Coal Mines (Special provisions) Ordinance, 2014 hasbeen promulgated.

E-auction of the coal blocks has been initiated. The powerplants which are already commissioned or would becommissioned by March, 2015 can participate in competitivebidding.

Work in progress

The Scheme for Development of Solar Parks and Ultra MegaSolar Power Projects was approved by the Cabinet in itsmeeting held on 10.12.2014 . The guidelines of the Schemewere issued on 12.12.2014

The scheme of Ministry of New & Renewable Energy(MNRE) for providing subsidy for solar pumps has beenintegrated with the Ministry of Agriculture and Ministry ofDrinking Water Supply so that drip irrigation, waterharvesting etc. are combined with solar pumps to give acomplete solution to the farmer.

A sanction was issued on 5.12.2014 for the implementationof a "Pilot-cum-Demonstration Project for Development ofGrid Connected Solar PV Power Plants on Canal Banksand Canal Tops" in the country during the 12th Plan Periodat an estimated cost of ` 975 crores and with CentralFinancial Assistance of ` 228 crores.

Tendering for inter-state transmission schemes has beendone by Power Grid Corporation of India Limited inJuly, 2014.

CCEA in its meeting held on 10.12.14 has approved theNCEF support of ` 637.2 crore to Tamil Nadu. Tamil Naduhas started the tendering process.

Action for the current year is completed

Action completed

Page 28: Implementation of Budget Announcements 2014-2015

28

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

It is my Government's intention to accelerateproduction and exploitation of Coal BedMethane reserves. The possibility of usingmodern technology to revive old or closed wellswill also be explored to maximize productionfrom such fields.

[Nodal Ministry/Department: Ministry of Petroleum & Natural Gas]

105. 120 The usage of PNG will be rapidly scaled up ina Mission mode as it is "clean" and efficient todeliver.

[Nodal Ministry/Department:Ministry of Petroleum & Natural Gas]

106. 121 We have at present about 15,000 km of gaspipeline systems in the country. In order tocomplete the gas grid across the country, anadditional 15,000 km of pipelines are required.

A comprehensive note for CCEA to seek amendment ofthe CBM policy is under preparation, which will also addressthe following issues:

(i) Allow exploration and exploitation of CBM from areasunder coal mining lease allotted to differentcompanies, both in the public and private section.

(ii) In order to incentivize investment for production ofCBM the contractor would be allowed to sell gasbased on price bidding without following any allocationpriority.

(iii) Simplification of the existing CBM contracts toeliminate micro management of operations.

(iv) To put in place a workable mechanism for resolvingthe issue of overlap of CBM and coal/oil and gasblocks

Work in progress

Policy guidelines have been framed in August 2014 tosupply domestic gas through GAIL (India) Ltd. to City GasDistribution (CGD) entities. The domestic gas is suppliedto meet 100% requirement of CNG (transport) anddomestic PNG segments based on last six monthlyconsumption data by the respective CGD networks. GAILhas been allowed to meet 10% additional demand of CGDsector (CNG & domestic PNG) by supply of domestic gas.1.9 lakh PNG households are being added in the ninemonths of FY 2014-15. Around 27.37 lakh household in11 states are using PNG supplies. CGD networks arealso supplying CNG to 22 lakh vehicles through 969 fillingstations in the country. CGD network is also catering tothe gas demand of 28000 industrial and commercial gascustomers.

Road Map for expansion of PNG coverage

i. Cities which are in the vicinity of existing andproposed trunk pipelines have been identified.

ii. Since there is clarity that domestic gas would bemade available for this sector, PNGRB has beenadvised to schedule the bidding process in a mannerso as to first cover the cities in the vicinity of existingpipelines.

iii. In cities that would fall in the vicinity of proposedpipelines, PNGRB has been requested to synchronizethe bidding process with the development of thepipeline.

Work in progress

The following pipelines have been identified for developinga Gas Grid:

Page 29: Implementation of Budget Announcements 2014-2015

29

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

It is proposed to develop these pipelines usingappropriate PPP models. This will help increasethe usage of gas, domestic as well as imported,which, in the long-term will be beneficial inreducing dependence on any one energysources.

[Nodal Ministry/Department: Ministry of Petroleum & Natural Gas]

107. 122 MiningIt is my Government's intention to encourageinvestment in mining sector and promotesustainable mining practices to adequatelymeet the requirements of industry withoutsacrificing environmental concerns. The currentimpasse in mining sector, including, iron oremining, will be resolved expeditiously.Changes, if necessary, in the MMDR Act, 1957would be introduced to facilitate this.

[Nodal Ministry/Department:Ministry of Mines]

108. 123 Revision of Royalty RateThere have been requests from several StateGovernments to revise rate of Royalty onminerals. Hon'ble Members are aware that rateof Royalty can be revised after a period of threeyears. Last revision took place in August, 2009.Therefore, another revision, which is due, willbe undertaken to ensure greater revenue to theState Governments.

[Nodal Ministry/Department:Ministry of Mines]

109. 124 VI. FINANCIAL SECTORCapital MarketFinancial sector is at the heart of the growthengine. Globalization helps channelize externalsavings to India to bridge the resource gap butalso renders the financial sector vulnerable tothe vagaries of the global economy. We haveseen this in the recent past in ample measure.It is essential to strengthen and modernize thelegislative regulatory framework. There aresome important recommendations of theFinancial Sector Legislative ReformsCommission like the enactment of the IndianFinancial Code which is considered necessary

Pipeline Systems Length (in KM)Kakinada- Haldia 1100Kakinada- Chennai 600Chennai-Tuticorin 670Jagdishpur-Haldia 2050Barauni-Guwahati 800Surat-Paradip 2050Mallavaram-Bhilwara 1584Mehsana-Bathinda 1670Bahtinda-Srinagar 740Kochi-Bengaluru-Managluru 1348Spurlines (phase-I) 2500TOTAL 15112

GAIL has been identified as the "sponsoring authority" forimplementing Ranchi-Talcher-Paradip pipeline section ona pilot basis through PPP mode with VGF.

Work in progress

The Mines and Mineral (Development and Regulation) Act,1957 has been amended and the Mines and Minerals(Development and Regulation) Amendment Ordinance,2015 has been promulgated on 12.1.2015.

Action completed

The Second Schedule and Third Schedule to the Minesand Minerals (Development and Regulation) Act, 1957 havebeen amended. Notification was issued on 1.9.2014.

Action completed

Task Forces for laying down the roadmap for upgradingthe existing Securities Appellate Tribunal to the FinancialSector Appellate Tribunal and establishing new agencieslike, the Resolution Corporation, the Public DebtManagement Agency and Financial Data ManagementCentre have been set up on 30th September 2014. TheTask Forces are likely to submit their reports by 30September 2015.

The draft Indian Financial Code is being fine-tuned on thebasis of comments from all stakeholders. Timelines have

Page 30: Implementation of Budget Announcements 2014-2015

30

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

for better governance and accountability. It willbe my endeavor to complete the ongoingprocess of consultations with all thestakeholders expeditiously on this. It is alsoessential to have a modern monetary policyframework to meet the challenge of anincreasingly complex economy. Governmentwill, in close consultation with the RBI, put inplace such a framework.

[Nodal Ministry/Department:Department of Economic Affairs]

110. 125 While the impact of the above measures willbe felt in the medium term, towards the sameobjective, I propose to:

i. Advise financial sector regulators to takeearly steps for a vibrant, deep and liquidcorporate bond market and deepen thecurrency derivatives market by eliminatingunnecessary restrictions.

ii. Extend a liberalized facility of 5%withholding tax to all bonds issued by Indiancorporate abroad for all sectors and extendthe validity of the scheme to 30.06.2017.

iii. Liberalize the ADR/GDR regime to allowissuance of depository receipts on allpermissible securities.

iv. Allow international settlement of Indian debtsecurities.

v. Completely revamp the Indian DepositoryReceipt (IDR) and introduce a much moreliberal and ambitious Bharat DepositoryReceipt (BhDR).

vi. Clarify the tax treatment on income of foreignfund whose fund managers are located inIndia to resolve a long-standing problem.Details will be presented in Part B.

[Nodal Ministry/Department:Department of Economic Affairs,Department of Revenue]

111. 126 The Indian capital markets have been a sourceof risk capital for a growing India. I propose totake a number of measures to further energizethese markets including:

i. Introduction of uniform KYC norms and inter-

been decided for various steps involved in legislating theIndian Financial Code.

Agreement on Monetary Policy between Government andRBI is being finalized.

Work in progress

Sub-Committee of Standing Council of Experts on IndianFinancial Sector is expected to shortly submit reportcomprising policy proposals on revamping the currencyderivatives market by eliminating unnecessary restrictions.The matter was also discussed by the FSDC and RBI/SEBIare being advised to take necessary action.

Standing Councils meeting to be held soon to discuss thereport of the Sub--committee

Section 194LC of the Income-tax Act has been amendedvide Finance (No.2) Act, 2014 to give effect to theseannouncements.

Revised ADR/GDR scheme has been accepted and will benotified shortly after the enabling amendments are madeby RBI and SEBI.

Deliberations are going on with RBI and SEBI to finalizeand implement Euroclearability of Indian Debt Securities.

Sahoo Committee (Phase II, part I) Report on IDR has beenreceived and uploaded on Ministry of Finance's website forseeking public views and comments.

Section 2(14) of the Income-tax Act has been amended videFinance (No.2) Act, 2014 to give effect to thisannouncement.

Action partially completed

RBI is in the process of finalizing the common KYC templatefor pilot run and final implementation through CERSAI.

The FSDC Sub-Committee, in its meeting held on 9.8.2014decided the project would be limited to viewing financial

Page 31: Implementation of Budget Announcements 2014-2015

31

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

usability of the KYC records across the entirefinancial sector.

ii. Introduce one single operating demataccount so that Indian financial sectorconsumers can access and transact allfinancial assets through this one account.

[Nodal Ministry/Department: Department of Economic Affairs]

112. 127 As part of strengthening the regulatoryframework for commodity markets, theWarehouse Development and RegulatoryAuthority (WD&RA) has begun a transformationplan to invigorate the warehousing sector andsignificantly improve post-harvest lending tofarmers against negotiable warehouse receipts.This plan will be implemented with vigour.

[Nodal Ministry/Department:Ministry of Food & Public Distribution]

113. 128 There is an urgent need to converge the currentIndian accounting standards with theInternational Financial Reporting Standards(IFRS). I propose for adoption of the new IndianAccounting Standards (Ind AS) by the Indiancompanies from the financial year 2015-16voluntarily and from the financial year 2016-17on a mandatory basis. Based on theinternational consensus, the regulators willseparately notify the date of implementation ofAS Ind for the Banks, Insurance companies etc.Standards for the computation of tax would benotified separately.

[Nodal Ministry/Department:Ministry of Corporate Affairs;Department of Revenue ]

114. 129 BankingThere have been some suggestions forconsolidation of Public Sector Banks.Government, in principle, agrees to considerthese suggestions.

[Nodal Ministry/Department:Department of Financial Services]

115. 130 To provide all households in the country with

assets only. However, the technology for accountaggregation would but be restrictive so that it can be scaledup to facilitate transactions subsequently. It was alsosuggested that the efforts made by other regulators like SEBIin this area could also be leveraged upon. RBI has alsoagreed that IRTG should move forward in setting up anenabling framework for implementing the system for accountaggregation.

Work in progress

National Institute of Public Finance & Policy (NIPFP) haveheld consultations with the warehouse service providers,collateral managers, banks, lawyers and commodityexchanges to study the market practices and issues in thewarehousing sector with a view to frame rules andregulations that address concerns of the warehousingmarket.

The tender documents have been finalized for selection ofan agency to conduct a quantitative sample survey ofwarehousing sector in the country has also been finalized.Action has also been initiated to conduct qualitative surveyof warehousing. The NIPFP will be undertaking this surveywithout any financial implication for the WDRA.

Tender documents for hiring of a Project Consultant arebeing drafted.

Work in progress

All 39 Indian Accounting Standards (Ind AS) have beenfinalized in consultation with NACAS. Roadmap forimplementation of Ind AS has been announced on 2.1.2015.

Companies (Accounting Standards) Rules 2015 alongwithall Ind AS are in the process of notification.

The Finance (No.2) Act, 2014 amended the provisions ofsection 145 of the Income-tax Act, 1961 for notification ofIncome Computation and Disclosure Standards (ICDS).These standards would be applicable for computation ofincome for financial year 2015-16 and subsequent years.Draft ICDS have been placed in public domain on 8.1.2015for inviting comments for a period of 30 days. Efforts arebeing made to notify ICDS by 15th March, 2015.

Work in Progress

SBI Caps has been asked to do a feasibility study. Matter isunder consideration.

Work in progress

Page 32: Implementation of Budget Announcements 2014-2015

32

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

banking services, a time bound programmewould be launched as Financial InclusionMission on 15 August this year. It wouldparticularly focus to empower the weakersections of the society, including women, smalland marginal farmers and labourers. Two bankaccounts in each household are proposed tobe opened which will also be eligible for credit.

[Nodal Ministry/Department:Department of Financial Services ]

116. 131 Long term financing for infrastructure has beena major constraint in encouraging larger privatesector participation in this sector. On the assetside, banks will be encouraged to extend longterm loans to infrastructure sector with flexiblestructuring to absorb potential adversecontingencies, sometimes known as the 5/25structure. On the liability side, banks will bepermitted to raise long term funds for lendingto infrastructure sector with minimum regulatorypre-emption such as CRR, SLR and PrioritySector Lending (PSL).

[Nodal Ministry/Department:Department of Financial Services]

117. 132 After making suitable changes to currentframework, a structure will be put in place forcontinuous authorization of universal banks in theprivate sector in the current financial year. RBIwill create a framework for licensing small banksand other differentiated banks. Differentiatedbanks serving niche interests, local area banks,payment banks etc. are contemplated to meetcredit and remittance needs of smallbusinesses, unorganized sector, low incomehouseholds, farmers and migrant work force.

[Nodal Ministry/Department:Department of Financial Services]

118. 133 The rising Non Performing Assets of PublicSector Banks is a matter of concern for theGovernment. Six new Debt Recovery Tribunalswould be set up at Chandigarh, Bengaluru,Ernakulum, Dehradun, Siliguri and Hyderabad.Government will work out effective means forrevival of other stressed assets.

[Nodal Ministry/Department:Department of Financial Services]

119. 134 Insurance SectorBenefits of insurance in India have not reacheda large section of the people and insurancepenetration and density are very low. The

"Pradhan Mantri Jan-DhanYojana was launched on28.08.2014. Under the Yojana 12.31 crore accountshave been opened till 28.01.2015 out of which 4.94crore are in urban areas and 7.37 crore in rural areas.There are 8.30 crore accounts with zero balance andin remaining 4.01 crore accounts deposit of`10217.43crore has been mobilized. The averagebalance per account is ` 830.00. 99.98% Survey workhas been completed. As per Survey result, out of 2105.93lakh households, 2105.52 lakh households have beencovered.

Action completed

RBI has issued two circulars to Banks on 15th July, 2014permitting them to raise long term funds throughinfrastructure bonds and providing flexibility in structuringloans to infrastructure projects.

Action completed

The final guidelines on licensing of Small Finance Banks inthe private sector and Payments Banks have been placedby RBI on its website on 27th November, 2014.

Applications for setting up such banks were invited by 16thJanuary, 2015.

Action completed

Cabinet note was approved by the Cabinet on 10.12.2014.

Action is being taken for location of premises, fixing ofjurisdiction & creation of posts.

Work in progress

Action plan for fulfillment of this announcement has beenfinalised by IRDA, LIC and GIPSA companies and the matrix

Page 33: Implementation of Budget Announcements 2014-2015

33

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

for monitoring their performance has been sent to LIC andGIPSA companies.

Instructions have been issued to LIC, PSGICs, AICIL andSLBC coordinators to mainstream insurance services inPMJDY

A monthly review of performance of the Public sectorinsurance companies is being done.

Action partially completed

Draft Cabinet Note and the Bill are under finalisation. Repliesfrom Ministries/ Departments have been received. TheCabinet Note and the Bill are being finalised.

Work in progress

Action to re-vitalize small savings has been taken.

Action completed

Scheme has been notified on 2nd December, 2014.

Sukanya Samridhi Scheme was launched on 22.01.2015.

Action completed

Ceiling of PPF Scheme enhanced to `1.5 lakh p.a. from`1 lakh.

Action completed

Already provided in the demands of MoD.

Action completed

Government would work towards addressing thissituation in multi-pronged manner with thesupport of all stake holders concerned. Thiswould include suitable incentives, usingbanking correspondents, strengthening micro-offices opened by public sector insurance. It isalso proposed to take up the pending insurancelaws (amendment) Bill for consideration of theParliament.

[Nodal Ministry/Department:Department of Financial Services]

120. 135 As part of the legislative initiatives underfinancial sector reforms, it is proposed to bridgethe regulatory gap under the Prize Chits andMoney Circulation Scheme (Banning) Act,1978. This step is expected to facilitate effectiveregulation of companies and entities whichhave duped a large number of poor andvulnerable people in this country.

[Nodal Ministry/Department:Department of Financial Services]

121. 136 Small SavingsTo address the concerns of decline in savingsrate and improving returns for small savers, Ipropose to revitalize small savings.

[Nodal Ministry/Department: Department of Economic Affairs]

122. 137 My Government attaches utmost importanceto the welfare of Girl Child. A special smallsavings instrument to cater to the requirementsof educating and marriage of the Girl Child willbe introduced. A National Savings Certificatewith insurance cover will also be launched toprovide additional benefits for the small saver.

[Nodal Ministry/Department:Department of Economic Affairs]

123. 138 In the PPF Scheme, annual ceiling will beenhanced to ̀ 1.5 lakh p.a. from ̀ 1 lakh at present.

[Nodal Ministry/Department: Department of Economic Affairs]

124. 139 VII. DEFENCE & INTERNAL SECURITYThere can be no compromise with the defenceof our country. I therefore propose to allocatean amount of ` 2,29,000 crore for the currentfinancial year for Defence.

[Nodal Ministry/Department:Ministry of Defence]

125. 140 One Rank One Pension

Page 34: Implementation of Budget Announcements 2014-2015

34

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

We reaffirm our commitment to our bravesoldiers. A policy of "One Rank One Pension"has been adopted by the Government toaddress the pension disparities. We proposeto set aside a further sum of `1,000 crore tomeet this year's requirement.

[Nodal Ministry/Department:Ministry of Defence]

126. 141 ModernizationModernization of the armed forces is critical toenable them to play their role effectively in theDefence of India's strategic interests. I,therefore, propose to increase the capital outlayfor Defence by `5,000 crore over the amountprovided for in the interim Budget. This includesa sum of `1,000 crore for accelerating thedevelopment of the Railway system in theborder areas. Urgent steps would also be takento streamline the procurement process to makeit speedy and more efficient.

[Nodal Ministry/Department:Ministry of DefenceMinistry of Railways]

127. 142 War MemorialThe country is deeply indebted to the officersand the jawans of the armed forces for havingmade huge sacrifices to defend its honour.In doing so a very large number of them gaveup their lives. It is a privilege for the nation toerect a befitting memorial in their memory. Iam happy to announce that a War Memorialwill be constructed in the Princes Park. It willbe supplemented by a War Museum. I amallocating a sum of `100 crore for thispurpose.

[Nodal Ministry/Department:Ministry of Defence]

128. 143 The Defence ProductionIn the year 2011 a separate fund was announcedto provide necessary resources to public andprivate sector companies, including SMEs, aswell as academic and scientific institutions tosupport research and development of Defencesystems that enhance cutting-edge technologycapability in the country. However, beyond theannouncement, no action was taken. Therefore,I propose to set aside an initial sum of ̀ 100 croreto set up a Technology Development Fund tosupport this objective.

[Nodal Ministry/Department:Ministry of Defence]

129. 144 Internal Security

A working Group was constituted under the Chairmanshipof CGDA for examining the proposal. The Working Groupafter deliberation suggested some possible options forimplementation of One Rank One Pension (OROP).Meetings were held on 26.8.2014 under the Chairmanshipof Defence Minister with Defence Secretary, Secretary(ESW), FA (DS) and CGDA on the implementation of OROP.The modalities are under consideration.

Work in progress

It has been decided with the approval of Defence Ministerto request Ministry of Finance for reversion of the allotmentof ` 1000 crore which has been provided for Defence RailNetwork in the Capital segment of Army Grant and to makededicated non-lapsable funds available to the Railway Boardfor development of Strategic Railway lines.

Work in progress

The Draft Cabinet Note for the construction of National WarMuseum is under preparation.

Work in progress

Consultation with stakeholders have been completed anddraft Cabinet Note is being prepared.

Work in progress

Page 35: Implementation of Budget Announcements 2014-2015

35

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

A Committee was constituted on 8th September, 2014,under the chairmanship of Additional Director General,BPR&D to make the MPF Scheme more efficient andeffective. Its report has been submitted on 03.12.2014.

Matter in regard to enhance the allocation from a sum of` 1847 crore to ` 3000 was taken up with the Ministry ofFinance for providing additional funds at RE 2014-15 stage.

Work in progress

Against the three allocation, sum of ̀ 914.30, ̀ 744.56 croreand ` 12.88 core respectively have been spent till25.01.2015.

Work in progress

IB is raising its proposal for renovation of National PoliceMemorial at Chanakyapuri, New Delhi at a cost of ` 53.94crore through NBCC so that the existing structures areutilized and the design conform to the DUAC norms.

Work in progress

The Scheme was appraised by the SFC in its meeting heldon 18th December, 2014.

Guidelines have been approved.

First Meeting of National Steering Committee held on14.01.2015.

Mission Directorate has been set up for implementing thescheme.

Action partially completed

Guidelines have been approved.

First Meeting of National Steering Committee (NSC) heldon 14.01.2015.

Mission Directorate has been set up for implementing thescheme.

Action partially completed

The scheme for modernization of state policeforces would be reviewed. I propose toenhance the allocation from a sum of `1,847crore in the BE of 2013-14 to `3,000 crore inthe current financial year. I am also allocatingadequate funds for carrying out small but muchneeded developmental activities as AdditionalCentral Assistance for Left Wing ExtremistAffected districts.

[Nodal Ministry/Department:Ministry of Home Affairs]

130. 145 In order to strengthen and modernize borderinfrastructure, a sum of ̀ 2,250 crore has beenset aside. In addition, a sum of `990 crore hasbeen allocated for the socio economicdevelopment of the villages along the borders.A sum of ̀ 150 crore has also been ear-markedfor the construction of Marine Police Station,Jetties, for the purchase of boats etc.

[Nodal Ministry/Department:Ministry of Home Affairs]

131. 146 National Police MemorialThe nation is equally indebted to the officersand the jawans of the Police forces, includingthe central armed police forces, who areconstantly engaging with the enemy within andin the process sacrificing their lives in the lineof duty. I announce the construction of abefitting National Police Memorial. I proposeto set aside a sum of ̀ 50 crores for this purposein the current financial year.

[Nodal Ministry/Department:Ministry of Home Affairs]

132. 147 VIII. CULTURE & TOURISMIndia's rich cultural, historical, religious andnatural heritage provides a huge potential forthe development of tourism and job creationas an Industry. I propose to create 5 touristcircuits around specific themes and set asidea sum of `500 crore for this purpose.

[Nodal Ministry/Department:Ministry of Tourism]

133. 148 National Mission on Pilgrimage Rejuvenationand Spiritual Augmentation Drive (PRASAD)shall be launched in this financial year. A sumof ̀ 100 crore is being set aside for this purpose.

[Nodal Ministry/Department:Ministry of Tourism]

134. 149 National Heritage City Development and

Page 36: Implementation of Budget Announcements 2014-2015

36

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

National Heritage City Development and AugmentationYojana (HRIDAY) has been approved. The scheme waslaunched on 21.1.2015.

12 cities namely Varanasi, Amritsar, Ajmer, Mathura, Gaya,Kanchipuram, Vellankani, Badami, Amaravati, Warangal,Puri and Dwarka have been identified for development underthe scheme.

Action partially completed

A sum of ̀ 100 crore has been allocated in BE. Monumentshave been identified for initiating action.

Action partially completed

5 Circuits including Buddhist circuit have been approved.

Action partially completed

MoU declaring Goa as permanent venue has been signedwith the Govt. of Goa.

Action partially completed

A special committee has been constituted vide notificationdated 23.9.2014 to take the programme forward.

16 Feasibility Reports have been completed of which 14are under peninsular component and 2 under HimalayanComponent (Indian side). 5 DPR's have also beencompleted under peninsular component till date.

` 60 crore has been allocated in the current financial year2014-15 for the work of preparation of the DPR for interlinking of river under IWRSD Component of the Plan schemenamely River basin Management.

The Special Committee on Inter Linking of Rivers has

Augmentation Yojana (HRIDAY) will also belaunched for conserving and preserving theheritage characters of these cities. To beginwith I propose to launch this programme in thecities such as Mathura, Amritsar, Gaya,Kanchipuram, Vellankani and Ajmer. I proposeto set aside a sum of `200 crore for thispurpose. The Project will work through apartnership of Government, academicinstitutions and local community combiningaffordable technologies.

[Nodal Ministry/Department:Ministry of Urban Development]

135. 150 Archeological sites preservation requiresurgent attention lest our ancient heritage is lostto all future generations. For this purpose, Iintend to set aside a sum of `100 crore.

[Nodal Ministry/Department:Ministry of Culture]

136. 151 Sarnath-Gaya-Varanasi Buddhist circuit wouldalso be developed with world class touristamenities to attract tourists from all over the world.

[Nodal Ministry/Department:Ministry of Culture,Ministry of Tourism]

137. 152 Goa has emerged as a major internationalconvention centre. It has also been declaredas the permanent venue for International FilmFestival of India. There is an urgent need todevelop world class convention facilities. Thiscan best be done in close collaboration withthe private sector. Government of India will fullysupport this initiative to develop the facilities inPPP mode through the VGF scheme.

[Nodal Ministry/Department:Ministry of Information & Broadcasting]

138. 153 Water Resources and cleaning of GangaLinking of RiversRivers form the lifeline of our country. Theyprovide water not only for producing food forthe multitudes but also drinking water.Unfortunately the country is not uniformlyblessed with perennial rivers. Therefore, aneffort to link the rivers can give rich dividendsto the country. It is time that we made a seriouseffort to move in this direction. To expedite thepreparation of the Detailed Project Reports, Ipropose to set aside a sum of `100 crore.

[Nodal Ministry/Department:Ministry of Water Resources, RiverDevelopment & Ganga Rejuvenation]

Page 37: Implementation of Budget Announcements 2014-2015

37

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

constituted sub-committees to meet the objectives set underinter-linking of river programme. So far the DPRs for theILR projects were being prepared by National WaterDevelopment Agency. SFC is being held for release of fundsto the States for preparation of DPRs for intra-state projectsby the States themselves.

Work in progress

` 2037 crore has been allocated for this subject.

The scheme has been appraised by EFC in its meeting heldon 30th December, 2014. Cabinet note is being finalised.

Work in progress

The scheme has been appraised by the EFC in its meetingheld on 30th December, 2014. Cabinet note is underpreparation.

Work in progress

Cabinet has approved the scheme on 24th September,2014.

Action completed

Each of the five Technical Research Centre proposals tobe reviewed by expert committees/Task Forces/PACs. Theexercise has been completed for 3 of the 5 proposals andis in progress for the remaining 2 proposals.

Work in progress

139. 154 Sacred RiversSubstantial amount of money has been spentin the conservation and improvement of theGanga, which has a very special sacred placein the collective consciousness of this country.However, the efforts have not yielded desiredresults because of the lack of concerted effortby all the stakeholders. I propose to set upIntegrated Ganga Conservation Mission called"Namami Gange" and set aside a sum of ̀ 2,037crores for this purpose.

[Nodal Ministry/Department:Ministry of Water Resources, RiverDevelopment & Ganga Rejuvenation]

140. 155 Development of Ghats and beautification ofRiverfrontOur Riverfronts and Ghats are not only placesof rich historical heritage but many of these arealso sacred. To start this process in the country,I propose to set aside a sum of `100 crore forGhat development and beautification of riverfront at Kedarnath, Haridwar, Kanpur, Varanasi,Allahabad, Patna and Delhi in the currentfinancial year.

[Nodal Ministry/Department:Ministry of Water Resources, RiverDevelopment & Ganga Rejuvenation]

141. 156 NRI Ganga FundNRIs have been a very important contributor tothe development process in India, in areas suchas education, health and preservation of culture.In this context, to harness their enthusiasm tocontribute towards the conservation of the riverGanga, NRI Fund for Ganga will be set up whichwill finance special projects.

[Nodal Ministry/Department:Ministry of Water Resources, RiverDevelopment & Ganga Rejuvenation]

142. 157 Science and TechnologyTechnology Research CentresThe Department of Science & Technology hassome of country's leading research centres inthe areas such as nanotechnology, materialsscience and bio-medical device technology.The government will strengthen at least fivesuch institutions as Technical ResearchCentres to make them more effective in the

Page 38: Implementation of Budget Announcements 2014-2015

38

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

For Bioscience Cluster (B-Life), necessary funds werereleased in first week of January, 2015.

For NCR Biotech Science Cluster at Faridabad, financialapprovals are in the final stage.

Work in progress

Proposals for scaling up of Agri-biotech cluster in Mohaliand establishment of two new clusters in Pune and Kolkatahave been sent for financial approval.

Work in progress

Cabinet Note on ICGEB has been submitted forconsideration. Necessary funds to continue activities ofICGEB have been released.

Work in progress

Two solid boosters (S-200) have been realized andassembled on mobile launch pedestal at Solid StageAssembly Building.

Electrical Checks and functional test with avionics assemblycompleted on Core liquid stage (L-110).

Passive Cryogenic Stage (C25) is undergoing functionalchecks at Technical Complex.

PSLV-C23 successfully launched French Earth Observationsatellite SPOT-7 and 4 co-passenger satellites viz. NLS7.1 & NLS 7.2 from Canada, AISAT from Germany andVELOX-1 from Singapore on June 30, 2014 fromSriharikota.

Action partially completed

innovation space through Public PrivatePartnerships.

[Nodal Ministry/Department: Ministry of Science & Technology]

143. 158 Stimulating Investment In BiotechnologyThe development of biotech clusters inFaridabad and Bengaluru will be scaled upand taken to the highest international quality.This effort will include global partnerships inaccessing model- organism resources fordisease biology, stem cell biology and forhigh-end electron microscopy.

[Nodal Ministry/Department:Department of Bio-Technology]

144. 159 The nascent agri-biotech cluster in Mohali willbe scaled up to include plant-genetic andphenotype platforms. Secondary agriculture willbe a major thrust in Mohali throughcollaborations in the public and private sector.In addition, two new clusters, in Pune andKolkata will be established.

[Nodal Ministry/Department:Department of Bio-Technology]

145. 160 Global partnerships will be developed underIndia's leadership to transform the Delhicomponent of the International Centre forGenetic Engineering and Biotechnology(ICGEB) into a world-leader in life sciences andbiotechnology.

[Nodal Ministry/Department:Department of Bio-Technology]

146. 161 Indian Space ProgrammeSeveral major space missions are planned for2014-15 which include the experimental flightof India's future heavy capacity launcher GSLVMk-III, one commercial launch of PSLV and twomore navigational satellites.

[Nodal Ministry/Department:Department of Space]

147. 162 Our Mars Orbiter spacecraft is in its 300 days

Page 39: Implementation of Budget Announcements 2014-2015

39

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

Action completed

Process for setting up Junior Sports Academies and Nationallevel Sports Academies is under progress. EFC note is likelyto be finalized soon.

Work in progress

Proposal has been prepared. After its approval, NIT will beissued in consultation with the J&K State Government forselection of PSU for PMC works.

Work in progress

Location of the proposed University has been identified at44-Yaithibi in Thoubal Sub-Division, Manipur. After thenecessary infrastructure is created along with engagementof Faculty, the National Sports University would be fullyfunctional.

Department of Expenditure has agreed to sanction up to` 50 crore for pre-investment activities.

A separate agency, Hindustan Prefab Limited has beenengaged to submit a Detailed Project Report (DPR)expeditiously.

Work in progress

Concept note has been approved. The SFC has appraisedthe proposal. Draft scheme for holding the competitions hasbeen prepared. Modalities for holding of the festival werediscussed with the Secretary (Sports), Governments ofAssam and Manipur on 19.1.2015. It was decided that thecompetitions may be held annually sometime in the month

long voyage to Planet Mars along the designatedhelio-centric trajectory. Mars Orbiter Spacecraftis expected to be orbiting around Mars onSeptember 24, 2014.

[Nodal Ministry/Department:Department of Space]

148. 163 Sports and Youth AffairsSportsSports are an integral part of growing up andpersonality development. Unfortunately, in ourcountry, sports have not been main-streamedto date. Government will set up national levelSports Academies for major games in differentparts of the country to mainstream sports.Academies with international level facilities fortraining of accomplished athletes and fornurturing best talent in the country at junior andsub-junior level will also be set up for Shooting,Archery, Boxing, Wrestling, Weightlifting andvarious Track and field events.

[Nodal Ministry/Department:Ministry of Youth Affairs & Sports]

149. 164 Jammu & Kashmir has a lot of sporting talentwhich is not finding expression due toinadequate sports facilities. I propose toprovide a sum of ̀ 200 crore for upgrading theindoor and outdoor sports stadiums tointernational standards in Jammu and inKashmir Valley.

[Nodal Ministry/Department:Ministry of Youth Affairs & Sports]

150. 165 I also propose to set up a sports university inManipur. For this I am providing a sum of ̀ 100crore in the current financial year.

[Nodal Ministry/Department:Ministry of Youth Affairs & Sports]

151. 166 Unique sports traditions have developed in theHimalayan region in the countries and thestates that are a part of it. To promote these,India will start an annual event to promote thesegames and would invite countries such asNepal and Bhutan also to participate in additionto the Indian states such as J&K, Uttarakhand,

Page 40: Implementation of Budget Announcements 2014-2015

40

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

of October in Guwahati, Assam. For this purpose, a budgetprovision of ` 5 crore is being made. Scheme documenthas been approved.

Work in progress

Allocation of `100 crore has been made.

Action completed

SFC for career centers has been approved as a distinctcomponent of National Career Service Project. Guidelinesfor Model Career Centers have been issued. Proposals havebeen received and are being finalized.

Work in progress

A new Central Sector Scheme namely, 'National YouthLeaders Programme (NYLP)' was launched inDecember 2014.

Action completed

(a) Allocation of `500 crore has been made.

(b) A proposal with financial implications of ̀ 5820 crorehas been received from the Government of J&K forrevision in the existing PM's Package-2008, whichenvisages upward revision of the scale of most ofthe items of existing package.

(c) In view of the past experience, it has been felt thatthe new Package for rehabilitation of KashmiriMigrants should be careful ly f inal ized inconsultat ion with the State Govt. and therepresentatives of the migrants. Consultations havetaken place with State Government officials andrepresentatives of the migrants and the scheme isnow being finalized. The amount earmarked in theBudget 2014-15 will be utilized accordingly.

(d) The Ministry of Home Affairs has accorded approvalfor enhancement of cash relief to the Kashmirimigrants from the present level of ̀ 1650/- per personper month to ` 2500/- per person per month.

Action partially completed

Himachal Pradesh, Sikkim and the NorthEastern States.

[Nodal Ministry/Department:Ministry of Youth Affairs & Sports]

152. 167 I also propose to set aside a sum of ̀ 100 crore forthe training of our sports women and men for theforthcoming Asian and Commonwealth games.

[Nodal Ministry/Department:Ministry of Youth Affairs & Sports]

153. 168 YouthEmployment exchanges will be transformedinto career centres and in addition for providinginformation about job availability. These centerswill also extend counseling facilities to the youthfor selecting the jobs best suited to their abilityand aptitude. I have set aside a sum of `100crore for this purpose.

[Nodal Ministry/Department:Ministry of Labour& Employment]

154. 169 Youth of India are pragmatic and forwardlooking and wish to be leaders in all fields. Inorder to promote leadership skills, I propose toset up "A Young Leaders Programme" with aninitial allocation of `100 crore.

[Nodal Ministry/Department:Ministry of Youth Affairs & Sports]

155. 170 IX. OTHER PROPOSALSDisplaced Kashmiri MigrantsDisplaced Kashmiri Migrants require ourspecial support for rehabilitation. For this, Iintend to provide a sum of `500 crore in thecurrent financial year.

[Nodal Ministry/Department:Ministry of Home Affairs]

156. 171 Conservation of Himalayas

Page 41: Implementation of Budget Announcements 2014-2015

41

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

The SFC meeting is awaited.Work in progress

The Government of Andhra Pradesh has allotted 500 acresof land for establishment of the Academy in PalasamudramVillage, Anantpur District. Further action is being taken.

Work in progress

An amount of ` 100 crore has been made available toDONER in Budget 2014-15 for promotion of organic food innorth eastern region.

Draft EFC/SFC Memo along with Concept Note forimplementation of the scheme is being finalized.

Work in progress

There are 19 railway projects underway in the North Eastregion, of which 9 are national projects. With higher andassured allocation and by closed monitoring of works in thisregion, two new lines projects have been completed i.e.Harmuti to Naharlagun (Itanagar) and (ii) Dudhnoi-Mendipather (first time BG rail link in Meghalaya in 2014-15.One gauge conversion project i.e. Rangia-Mukongselek(510km) has also been completed and full section will getcommissioned during the current financial year. Lumding-Badarpur-Silchar leg of a very ambitious gauge conversionproject having importance to connect the Barak Valley i.e.southern region of Assam with BG rail link to National Capital.

Action partially completed

SFC proposal has been received on 29.8.2014. Theobservation of the Ministry has been conveyed to PrasarBharati on 24.9.2014. Matter is under consideration in PrasarBharti.

Work in progress

There is a great need to increase the capacityin the country for Himalayan Studies. I proposeto set up a National Centre for HimalayanStudies in Uttarakhand with an initial outlay of`100 crore.

[Nodal Ministry/Department:Ministry of Environment, Forests & Climate Change]

157. 172 Academy for CustomsIt is proposed to set up the National Academyfor Customs & Excise at Hindupur in AndhraPradesh.

[Nodal Ministry/Department:Department of Revenue]

158. 173 North Eastern StatesOrganic FoodNorth Eastern Region of India has tremendouspotential for development of organic farming.With a growing global demand for organic food,people living in the NE states can reap richharvest from development of commercialorganic farming. To facilitate this, I propose toprovide a sum of ̀ 100 crore for this purpose inthe current financial year.

[Nodal Ministry/Department:Ministry of Development of North Eastern Region]

159. 174 North East Railway ConnectivityNorth Eastern Region has suffered from underdevelopment and a sense of isolation due tolack of proper connectivity. Development of railsystem is urgently required to bridge this gap. Iintend to expedite the development of railconnectivity in the region and for this purpose Ipropose to set aside an additional sum of`1,000 crore over and above the amountprovided for in the interim Budget.

[Nodal Ministry/Department:Ministry of Railways]

160. 175 24x7 Channel for the North EastTV is a very powerful tool for the expression ofcultural identities and for creating greaterawareness of the richness of the diversity of ourcountry. To provide a strong platform to rich culturaland linguistic identity of the North-East, a new 24x7channel called "ArunPrabha" will be launched.

[Nodal Ministry/Department:Ministry of Information & Broadcasting]

161. 176 Andhra Pradesh and Telangana

Page 42: Implementation of Budget Announcements 2014-2015

42

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

My Government is committed to addressing theissues relating to development of AndhraPradesh and Telangana in the AP Re-organization Act, 2014. Provision has beenmade by various Ministries/Departments tofulfill the obligation of Union Government forboth the States.

[Nodal Ministry/Department:Ministry of Home Affairs]

162. 177 National Capital Territory of DelhiNCT of Delhi faces large in-migration everyyear. Delhi is plagued by frequent transmissionrelated problems and issues of waterdistribution and supply. In order to overcomethis and make Delhi a world class city, I proposeto provide `200 crore for power reforms and`500 crore for water reforms.

[Nodal Ministry/Department:Delhi Government,Ministry of Water Resources, RD & GR]

163. 178 In addition, to solve the long term water supply

Following activities for development of Andhra Pradeshand Telangana as per the AP Re-organization Act, 2014are being undertaken:

Ministry of Home Affairs: Special Infrastructure Schemein the Left Wing Extremism (LWE) affected States, Settingup of Greyhounds Training Centre at Vizag, Establishmentof National Institute of Disaster Management (NIDM).

Ministry of Urban Development: Feasibility of Metro Railin Visakhapatnam and Guntur-Vijayawada-Tenali.

Ministry of Railways: Establishment of a new RailwayZone, Feasibility of Rail Coach Factory in Telangana.

Ministry of Coal: Establishment of a 4000 MW power plantin Telangana by NTPC.

Ministry Civil Aviation: Examine feasibility of expandingVisakhapatnam, Vijayawada & Tirupathi to internationalstandards

Ministry of Road Transport & Highway: National HighwayAuthority of India will improve connectivity to backwardregions of Telangana. 4207 kms. Length is Involved.Establishment of road connectivity from new Capital toHyderabad and other important cities of Telangana.

Ministry of Petroleum & Natural Gas: Establishment of aPetroleum University. Feasibility of a Greenfield Refineryin AP.

Ministry of Shipping: Establishment of DugguragpatnamPort.

Ministry of Human Resource Development :Establishment of institutions namely IIT, IIM, IISER, TribalUniversity, NIT, Central University.

Department of Agricultural Research and Education:Establishment of Horticulture University in Telangana.

Ministry of Power: Establishment of a 4000 MW powerplant in Telengana.

Department of Industrial Policy & Promotion: Feasibilityof Vizag-Chennai Industrial Corridor.

Work in progress

Power reforms: Scheme approved. ` 200 crore releasedto Govt. of NCT of Delhi.

Water reforms: The SFC in its meeting held on 16.12.2014,approved for ` 450 crore and ` 50 crore for Renuka dam.Payment of ̀ 270 crore was released to Govt. of NCT Delhion 22.12.2014.

Action completed

Page 43: Implementation of Budget Announcements 2014-2015

43

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

issues to the capital region, construction of longpending Renuka Dam would be taken up onpriority. I have provided an initial sum of `50crore for this.

[Nodal Ministry/Department:Ministry of Water Resources, RD & GR]

164. 179 Andaman and Nicobar Island andPuducherryAndaman and Nicobar Island are part of ourrich cultural heritage. In order to tide overcommunication related problems of the Island,I propose to allot a sum of ` 150 crore.

[Nodal Ministry/Department:Ministry of Home Affairs]

165. 180 Similarly, I propose to provide `188 crore toPuducherry for meeting commitments forDisaster preparedness.

[Nodal Ministry/Department:Ministry of Home Affairs]

166. 249 Faster clearance of import and export cargoreduces transaction costs and improvesbusiness competitiveness. To help achievethese objectives, measures are being initiatedto extend the existing 24x7 customs clearancefacility to 13 more airports in respect of all exportgoods and to 14 more sea ports in respect ofspecified import and export goods.

The sum of ` 50 crore for Renuka dam has been releasedto Govt of NCT Delhi on 22nd Dec 2014.

Action completed

Additional 150 crore allocated to A&N Islands UT's budgetby MHA.

BSNL has come up with a proposal as under:

♦ BSNL, will increase the bandwidth by additional 50Mbps by end of October, 2014 by making internaladjustments in c-Band transponders of in INSAT-3C

♦ The bandwidth will be increased by another 300 mbpsby end of January, 2015 by hiring additionaltransponders from THAICOM-6 which is expected tobe launched shortly.

♦ The bandwidth capacity will be augmented by another300 Mbps by May, 2015 by utilizing 6-8 transpondersfrom GSAT-16 of ISRO.

A Detailed Project Report (DPR) and Memorandum forExpenditure Finance Committee (EFC) received from theUT Administration in R/o Grant to BSNL for hiring ofadditional Satellite Transponder for improving Telecomconnectivity between A&N Islands with mainland and interIslands has been sent to DOT on 09.10.2014, with a requestto examine the proposal of the UT Administration and obtainapproval of EFC on the Financial implication involved inthe proposal. Financial concurrence given by on19.01.2015.

Action completed

Allocation of `188 crore was made. As requested byGovernment of Puducherry vide their letter dated 4thSeptember, 2014 an amount of ̀ 88,98,62,132 on accountof implementation of Coastal Disaster Risk ReductionProject was released to UT of Puducherry on 17.10.2014.

Another proposal for release of ̀ 99.01 crore received fromUT of Puducherry is under consideration.

Action completed

With effect from 31.12.2014, the facility of 24x7 Customsclearance for specified imports viz. goods covered by'facilitated' Bill of Entry and specified exports of factorystuffed containers and goods exported under free ShippingBills has been made operational at 18 sea ports. Similarly,w.e.f. 31.12.2014, the facility of 24x7 Customs clearancefor specified imports viz. goods covered by facilitated Bills

Page 44: Implementation of Budget Announcements 2014-2015

44

S.No. Para Budget Announcement Status of ImplementationNo.

(Position reported on 30th January, 2015)

[Nodal Ministry/Department:Department of Revenue]

167. 250 It is also proposed to implement an 'IndianCustoms Single Window Project' to facilitatetrade. Under this, importers and exporterswould lodge their clearance documents at asingle point only. Required permissions, if any,from other regulatory agencies would beobtained online without the trader having toapproach these agencies. This would reduceinterface with Governmental agencies, dwelltime and the cost of doing business.

[Nodal Ministry/Department:Department of Revenue]

168. * Setting up of a special fund of ` 2,000 crore inNABARD for providing affordable credit to agro-processing units being designated as foodparks

[Nodal Ministry/Department:Department of Financial Services,Ministry of Food Processing Industries]

169. * Restoration of the accelerated depreciationbenefit for wind energy through amendmentsin the Finance Bill.

[Nodal Ministry/Department:Department of Revenue]

170. * Establishment of drug de-addiction centres inPunjab and other parts of the country with aninitial contribution ` 50 crore.

[Nodal Ministry/Department:Ministry of Health & Family Welfare]

of Entry and all exports of goods covered by Shipping Billshas been made operational at 17 air cargo complexes.

Action completed

A Customs Single Window Clearance Project for fasterCustoms clearance has been initiated. Further, a decisionhas also been taken to establish an online messageexchange facility between Customs and Food SafetyStandards Authority of India (FSSAI)/ Plant Quarantine by31/03/2015.

Work in progress

RBI has allocated ̀ 2,000 crore to NABARD on 26.08.2014.

Guidelines have been issued by NABARD.

Action completed

The notification for restoring accelerated depreciation@80% for wing power projects installed on or after 1st April,2014 has been issued on 16th September, 2014

Action completed

A meeting was held in the Ministry of Health & FamilyWelfare, Government of India with representatives ofMinistry of Social Justice and Empowerment andGovernment of Punjab on 07.11.2014. It was suggestedthat the matter may be processed through PIP-NationalHealth Mission. The NHM team has stated that the proposalmay be forwarded to AS&MD (NHM) through PrincipalSecretary (Health & F.W.) Government of Punjab in theirPIP. Principal Secretary (Health & F.W.) Govt. of Punjabhas accordingly been requested on 19th November, 2014.

Work in progress

* These announcements were made during the discussion on the Budget Speech in the Parliament on 18.07.2014.