© 2015 Boise State University 21 IMPLEMENTATION + PHASING

IMPLEMENTATION + PHASING · Microsoft PowerPoint - SBOE June 2015 - Master Plan Presentation with Hidden Slides Author: christyjordan Created Date: 8/21/2015 5:12:40 PM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IMPLEMENTATION + PHASING · Microsoft PowerPoint - SBOE June 2015 - Master Plan Presentation with Hidden Slides Author: christyjordan Created Date: 8/21/2015 5:12:40 PM

© 2015 Boise State University 21

IMPLEMENTATION + PHASING

Page 2: IMPLEMENTATION + PHASING · Microsoft PowerPoint - SBOE June 2015 - Master Plan Presentation with Hidden Slides Author: christyjordan Created Date: 8/21/2015 5:12:40 PM

© 2015 Boise State University 22

Phase 1 – High Priority Projects + Improvements (1‐10+ Yrs.)

EXISTING CAMPUS GARAGES

OFF CAMPUS BUILDINGS

PROPOSED CAMPUS BUILDINGS

EXISTING CAMPUS BUILDINGS

PROPOSED CAMPUS GARAGES

1. Royal Street Intersection2. Fine Arts Building3. Arts Green, Relocate 

Greenhouses4. Academic Building5. Academic Building – Replace 

Campus School6. Administration Visitor Parking7. Remove Riverfront Hall –

Expand Main Quad to River8. Albertson’s Library Expansion9. Administration Plaza10. Library Mall Pedestrian Path11. SUB Green and Central 

Pedestrian Path/Bikeway12. Live‐Learn Residential Honors 

College13. Student Recreation Field14. University Drive Pedestrian 

Improvements15. Academic STEM Building16. Academic Student Resources 

Building17. Athletics Practice Field18. Academic Building19. Dining Hall Satellite20. Broadway Bridge 

Replacement21. Bronco Plaza22. Improved Stadium Entrance 

Plaza and Round‐about23. Alumni Center24. Academic Stem Building25. Beacon Crossing – Pedestrians 

and Bicycles26. Health Sciences Building and 

Quad

1

2

3

4

5

6

7 8

9 10 11

12

13

14

15

1617

18

1920

2122

23

24

25

26

Page 3: IMPLEMENTATION + PHASING · Microsoft PowerPoint - SBOE June 2015 - Master Plan Presentation with Hidden Slides Author: christyjordan Created Date: 8/21/2015 5:12:40 PM

© 2015 Boise State University 23

EXISTING CAMPUS GARAGES

OFF CAMPUS BUILDINGS

PROPOSED CAMPUS BUILDINGS

EXISTING CAMPUS BUILDINGS

PROPOSED CAMPUS GARAGES

Phase 2 – Medium Range Improvements 

1. Music – Theater Performing Arts Center

2. Gateway Academic Building3. Academic – Research Building4. West Parking Garage / 

Facilities Services5. Student Housing Village / 

Campus Ministries Option6. Administration Building7. Center Parking Garage 8. Faculty, Staff or Graduate 

Townhomes9. Campus Ministries Option10. Live – Learn Community 11. University Mall12. Central Plant Expansion13. Improved Connection to the 

Greenbelt14. New Pedestrian and Bicycle 

Bridge15. Academic or Athletics Building16. Taco Bell Arena Entrance 

Improvements17. Pedestrian Plaza and Crossings 

to the Stadium18. STEM Academic Building19. Stadium East Entrance 

Improvements20. Kinesiology Building and Quad 

Improvements21. Broadway Parking Garage –

Phase 122. Olympic Sports Center23. Natatorium24. Recreation Center Expansion25. New Center Street26. Boise Avenue /Capitol 

Boulevard Intersection Improvements

1

2

3

4

5

6

7

8

910

11

12

13

14

15

1617

18

19

20 21

2223

24

25

26

Page 4: IMPLEMENTATION + PHASING · Microsoft PowerPoint - SBOE June 2015 - Master Plan Presentation with Hidden Slides Author: christyjordan Created Date: 8/21/2015 5:12:40 PM

© 2015 Boise State University 24

EXISTING CAMPUS GARAGES

OFF CAMPUS BUILDINGS

PROPOSED CAMPUS BUILDINGS

EXISTING CAMPUS BUILDINGS

PROPOSED CAMPUS GARAGES

Full Build‐out

1. Improvements to the Morrison Center,  Relocating and Expanding the Box Office

2. Drop‐off and pedestrian improvements

3. Student Housing and/or Campus Ministries Option

4. Recreation Field and Pavilion5. Student Housing Village 

Expansion6. Academic and Research 

Buildings7. Student Housing (Freshman 

Communities)8. Health Sciences – STEM 

Academic Building9. Engineering Resources 

Building10. Broadway Parking Garage –

Phase 211. Gateway Buildings12. North Stadium Expansion13. Center Street Continuation

1

2

34

5

6

7

8

9

10

11

1213

Page 5: IMPLEMENTATION + PHASING · Microsoft PowerPoint - SBOE June 2015 - Master Plan Presentation with Hidden Slides Author: christyjordan Created Date: 8/21/2015 5:12:40 PM

© 2015 Boise State University 25

EXISTING CAMPUS GARAGES

OFF CAMPUS BUILDINGS

PROPOSED CAMPUS BUILDINGS

EXISTING CAMPUS BUILDINGS

PROPOSED CAMPUS GARAGES

Final Campus Plan