Confidential. Not to be copied, distributed, or reproduced without prior approval. IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES OF PIPE MANUFACTURERS May 24, 2017 Paper By : Jeffrey Stetson GE Oil & Gas Inspection Technologies, USA Presented By: Kah Cheon (KC) Lye GE Oil & Gas - Inspection Technologies, Singapore

IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior approval.

IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES OF PIPE MANUFACTURERS May 24, 2017

Paper By : Jeffrey Stetson

GE Oil & Gas – Inspection Technologies, USA

Presented By: Kah Cheon (KC) Lye

GE Oil & Gas - Inspection Technologies, Singapore

Page 2: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

GE Oil & Gas - Inspection Technologies

May 24, 2017 2 SEAISI2017

Manufacturing Fabrication Field Install & Construction

Operations & Maintenance

Decommission

Help assess the health of customer assets throughout the lifecycle with NDT technology and solutions

• Testing machines for verifying the quality of pipe, plate, and castings

• Improve fabrication productivity with ultrasound and digital x-ray

• Validate the integrity of field construction with portables

• Assist with verifying repairs

• Help monitor and view equipment condition

• Help assess condition

Ultrasonic

Testing

Machines

Page 3: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

GE Ultrasonic Testing Machines (UT TM)

May 24, 2017 Presentation Title 3

Applications

• Tubes and Pipes used in Oil & Gas

- Seamless Pipe and Tube

- ERW Pipe and Tube Inspection

- SAW Pipe and Tube (longitudinal and spiral welded)

• Raw materials used in critical applications

- Bar and Billet

- Heavy Plate

- Strip Tester

Page 4: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Failure Examples

May 24, 2017 4 SEAISI2017

Page 5: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

Annual Cost of Failure of US Midstream Pipelines

May 24, 2017 SEAISI2017 5

Source: Pipeline and Hazardous Materials Safety Administration, US Department of Transportation

$0

$200,000,000

$400,000,000

$600,000,000

$800,000,000

$1,000,000,000

$1,200,000,000

$1,400,000,000

$1,600,000,000

$1,800,000,000

$2,000,000,000

0

50

100

150

200

250

300

350

400

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Number Total Cost Current Year Dollars

Average annual cost of $389M per year from 1997 through 2016

Page 6: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

US Line Pipe Failure Causes – 2006-2010

May 24, 2017 6

Source: US Department of Transportation, The State of the National Pipeline Infrastructure

Material and/or Weld 36%

Corrosion 24%

Excavation Damage 14%

Incorrect Operation 10%

Other 7%

Natural Forces 6%

Other Outside Forces 3%

Defects that should have

been caught during the pipe

manufacturing process

SEAISI2017

Page 7: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

Duke University Study on Water Contamination

May 24, 2017 7

Source: EurekAlert.org

PUBLIC RELEASE: 15-SEP-2014

Contaminated water in 2 states linked to faulty

shale gas wells

Flawed well casings and cement blamed for

drinking water contamination in Pennsylvania

and Texas

DUKE UNIVERSITY

SEAISI2017

Page 8: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Tightening of Inspection Standards >> It’s not just about API

May 24, 2017 8 SEAISI2017

Page 9: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

LSAW Line Pipe Example

May 24, 2017 9

Source: API 5L and Shell DEP 31.40.20.37

API 5L Shell DEP

25mm Thick LSAW Pipe

Longitudinal Flaw

Transverse Cap

HAZ Laminations

Longitudinal Weld Cap Longitudinal Weld Root

Longitudinal Midwall

Longitudinal Midwall

Longitudinal Midwall

Transverse Root

Transverse Cap

Longitudinal Weld Cap

Longitudinal Weld Root

Transverse Root

SEAISI2017

Page 10: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

Seamless Casing Example

May 24, 2017 10

Source: API 5CT and Exxon Mobil EMQSP 6.9

SEAISI2017

API 5CT EMQSP 6.9

Wall Reduction

45 Degree Right Hand 67 Degree Right Hand

22 Degree Left Hand

45 Degree Left Hand

Transverse OD

Longitudinal ID

Longitudinal OD

Transverse ID

Carbon Steel CRA

Mid-wall (TDH)

Transverse OD

Longitudinal ID

Longitudinal OD

Transverse ID

Inclusions (FBH)

67 Degree Left Hand

22 Degree Right Hand

Page 11: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior approval.

The Future is Now

May 24, 2017 11 SEAISI2017

Page 12: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

Future Proof

May 24, 2017 12

Inspect to a Higher Quality Standard – Seamless Pipes

Conventional probes discrete angles

1D Array probes discrete angles

1D Array probes

with Paintbrush gapless up to ±45°

2D Matrix Array probes

with ShapeUT gapless 360°

SEAISI2017

Page 13: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

May 24, 2017 SEAISI2017 13

Future Proof

Inspection Flexibility Needs – Clad and Carbon Steel SAW Pipe

• Phased Array Ultrasonic Inspection

• Sectorial Scanning

For quick and easy setup

• Motorized Probe Adjustment

For quick and repeatable setup

• Wheel Probe – provides ability to

improve evaluation of transverse weld

defects

• B, C Scan and 3D imaging capability

to eliminate prove up steps

• Stable mechanical structure to ensure

proper probe alignment and

inspection stability

Page 14: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

May 24, 2017 SEAISI2017 14

Case Study - Kashagan Project Source: https://qz.com/196057/kazakhstan-kashagan-largest-oilfield-will-be-shut-down-for-at-least-two-years/

Page 15: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior approval.

How to Compete?

May 24, 2017 15 SEAISI2017

Page 16: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

May 24, 2017 SEAISI2017 16

Examples by Supplier and Pipe Type

Carbon Steel Seamless Relative Price Comparison (USD/Ton)

SIZE NB SIZE" MSL ISMT JSL NSSMC USL BAO ARCELLOR TNRS V&M

15 1/2 1,350.00 1,350.00 1,360.00 1,485.00 - 1,050.00 1,470.59 1,420.00 1,450.00

20 3/4 1,125.00 1,125.00 1,150.00 1,265.00 - 970.00 1,250.00 1,200.00 1,225.00

25 1 970.00 970.00 980.00 1,125.00 - 900.00 1,102.94 1,050.00 1,070.00

32 1.25 925.00 925.00 940.00 1,070.00 - 875.00 1,058.82 1,000.00 1,025.00

40 1.5 825.00 801.47 820.00 980.00 - 825.00 955.88 900.00 930.00

50 2 820.00 820.00 820.00 965.00 - 630.00 941.18 880.00 920.00

65 2.5 820.00 820.00 820.00 965.00 - 630.00 941.18 880.00 920.00

80 3 820.00 820.00 820.00 965.00 - 630.00 941.18 880.00 920.00

90 3.5 820.00 820.00 820.00 965.00 - 630.00 941.18 880.00 920.00

100 4 820.00 820.00 820.00 965.00 790.00 630.00 941.18 880.00 920.00

125 5 820.00 820.00 820.00 965.00 790.00 630.00 941.18 880.00 920.00

150 6 820.00 820.00 820.00 965.00 790.00 630.00 941.18 880.00 920.00

200 8 820.00 820.00 820.00 965.00 790.00 665.00 941.18 880.00 920.00

250 10 820.00 820.00 - 965.00 790.00 665.00 941.18 880.00 920.00

300 12 875.00 - - 1,020.00 790.00 665.00 1,000.00 950.00 975.00

350 14 875.00 - - 1,020.00 790.00 665.00 1,000.00 950.00 975.00

400 16 875.00 - - 1,050.00 - 665.00 1,029.41 975.00 1,000.00

450 18 875.00 - - 1,050.00 - 720.00 1,029.41 975.00 1,000.00

500 20 875.00 - - 1,050.00 - 720.00 1,029.41 975.00 1,000.00

550 22 - - - 1,200.00 - 720.00 1,176.47 1,050.00 1,150.00

600 24 - - - 1,200.00 - 720.00 1,176.47 1,050.00 1,150.00

Page 17: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

Competitive Strategies

May 24, 2017 SEAISI2017 17

• Low Cost Producer?

High Volumes

Generic Product

• Product Excellence?

Highest Quality

• Service Excellence?

Batch Production

Specialty Products

Secondary Operations

Ma

rgin

s

Product Integrity

Page 18: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction

Confidential. Not to be copied, distributed, or reproduced without prior

approval.

May 24, 2017 SEAISI2017 18

Thank You

Please feel free to contact the following if you have any

questions or want more information:-

• KC Lye ([email protected])

• Jeff Stetson ([email protected])

Page 19: IMPORTANCE OF QUALITY VALIDATION TO COMPETITIVE STRATEGIES ...seaisi.org/seaisi2017/file/file/presentation-file/9A-4.pdf · Manufacturing Fabrication Field Install & Construction