Focus on... 50-60 Station RoadCambridge
Imtech Engineering Services
Succeed by delivering a better experience
Imtech.co.uk
4 Engineering Services
50-60 Station Road is part of the CB1 regeneration
scheme currently being undertaken by development
company Brookgate whom specialise in mixed-use
regeneration projects and focus on 'transforming run-
down areas into vibrant and sustainable communities
that cities can be proud of'.
As the flagship scheme of Cambridge, CB1 is said to
be a new urban community that has been developed
to complement the elegance and charm of the City.
It will create a world-class arrival point for visitors to
this historic place offering a new public plaza, retail,
eateries and residential space in addition to high
quality commercial space.
50-60 Station Road will offer state of the art office
accommodation just 150m from the railway station and
amongst the offices of some of the world’s best known
business names including Microsoft, Amazon and
Apple. It will be amongst the largest and most modern
offices in the historic city and will offer astounding
views over Cambridge’s City Centre.
These bright, elegant offices are ‘world-class’ in their
design and the building itself is planned to exceed
energy efficiency standards with beautifully presented
façade designed to complement the buildings
surroundings.
50-60 Station Road50-60 Station Road is a brand new 8-storey, open plan office development located in south central Cambridge.
Focus on... 50-60 Station Road 2
Our teams are adept at finding solutions, efficiencies
and savings. With a can-do attitude and extensive
experience you can be assured that they are able to
deliver cost effective projects that continue to deliver
savings.
Scope of WorksWorking alongside main contractor, Galliford Try,
Imtech Engineering Services Central are delivering the
mechanical, electrical and plumbing services installation,
within the landlord and tenant areas, at this prestigious
new development in the centre of Cambridge.
During the tender period our in-house designers and
estimators worked to develop the mechanical and
electrical design enabling us to produce a robust tender
offer. Following our appointment to the project, we
worked closely with Galliford Try on the development of
the design through to construction stage. Our input at
this stage took into account the services co-ordination,
feedback from our supply chain, as well as consultation
with the end-user to ensure compliance with project
performance requirements.
Throughout the pre-construction phase of this project
we ensured our team gained a full understanding of
the design and its commissionability, along with the
management of interfaces, whilst ensuring that the
team were conscious of budget.
‘This project adds to our growing commercial portfolio in the East Anglia Region of our UK-wide business and we are proud and delighted to be a part of helping Cambridge continue to attract large multinational firms and retain its position as a major business and technology hub. We have worked closely with our partner, Galliford Try, on this exciting development and have enjoyed collaborating and enhancing our strong working relationship.'
Damian Harrison, Regional Director East Anglia Region
Delivery by Exceptional People
Focus on... 50-60 Station Road 4
Early involvement in a project affords our Engineers the
opportunity to add value during the pre-construction
phase. By understanding the individual building from
the outset, we offer value engineered solutions that
can lead to time efficiencies and a more cost effective
installation.
We take a holistic view of each project to ensure we
provide the best solutions, we look at how we can
deliver cost savings that will also provide year-on-
year energy efficiencies. Whether that is proposing
improvements to heat or cool buildings efficiently or
utilising LED lighting to save energy.
Project ChallengesThe nature of 50-60 Station Road and the location
of the new building presented some challenging
requirements in terms of the delivery. The logistical
challenge of being on a constricted site, next to the busy
city centre train station, required close collaboration
with our key supply chain partners. We ensure materials
are delivered to site in a timely, managed and controlled
manner in order to avoid disruption to the surrounding
buildings and the general public.
A further challenge was within the design of the
building, which originally incorporated a traditional
design of screwed steel mechanical pipework. Our
experienced engineers identified that this type of
installation required extensive labour to install and may
potentially have impacted the timely delivery of the
scheduled programme of work. The team introduced
an off-site pre-fabrication strategy, this resulted in a
significant reduction in labour required and lowered
associated health and safety risks.
Engineering Excellence
Focus on... 50-60 Station Road 6
Focus on... 50-60 Station Road 8
Our team of expert engineers have the technical
expertise, along with a proven track record across a
varied portfolio, to introduce tangible solutions and
deliver added value to your project. We recognise the
need for excellent communication across the project
team and also with staff, visitors and supporters alike.
Pre-fabrication & Modularisation In the early stages of the 50-60 Station Road project,
Imtech’s team worked with Galliford Try to develop
a fully integrated programme and alignment prior
to the construction phase of the project. Maximising
opportunities for off-site manufacture were identified
early in the process, along with ensuring pre-fabricated
packages were incorporated into the construction
programme.
As part of our strategy the pre-fabricated riser modules
were manoeuvred into place via the tower crane. This
eliminated traditional labour intensive riser works and
the associated health and safety risks with this type of
installation.
A pre-fabricated plant room was also positioned
onto the roof by crane, in four separate sections. This
approach also greatly reduced on-site works, health
and safety risks and ultimately, provided a better
quality finish.
By utilising an off-site pre-fabrication and
modularisation strategy, along with innovative
installation methods on the 50-60 Station Road project,
we have estimated that this will lead to an approximate
reduction of 33% labour on site. It will also ensure the
project remains on programme and achieves a high
quality finish that may not have been attained through
traditional installation methods.
Unique Thinking
Imtech’s installation is progressing well, we are on track
to achieve completion and be ready for the first stages
of commissioning to begin in summer 2018. Works
officially commenced in December 2017 and we are
scheduled to complete the project by December 2018.
50-60 Station Road is expected to be fully let by early
2019 and the building is on target to receive a BREEAM
rating of ‘excellent’
Our approach is to deliver local projects by local people
and the majority of our Station Road team are based
in and around the Cambridge area which has led to a
team that are very proud to be a part of this prestigious
development. We are focussed on ensuring that the
intrinsic role we play within the wider project team, will
help achieve the successful delivery of this project and
create a new landmark for the City of Cambridge.
Safety FirstWe have a Safety First approach and the processes that
are embedded in our culture ensure that our people,
and those that are directly and indirectly affected by
our work, remain safe. We have an enviable health
and safety record, our Accident Frequency Rate is
consistently below the industry average.
‘The Imtech team worked very closely alongside the GTC team through the tender and pre-construction stages
of 50-60 Station Road. This early involvement enabled both teams to interface very effectively and work as one to deliver the project.
Imtech has been able to maximise the programme benefits and improve quality control associated with the use of extensive elements of off-site fabrication and modularisation.
From a site safety viewpoint Imtech has been working very closely with GTC in delivering a complimentary behavioural safety programme.’
Tony Harding BSc (Hons) MCIOB, Operations Director
Galliford Try Building - Southern
Project Progress
Focus on... 50-60 Station Road 10
Commercial Sector Coverage
Project Green, EON HQ,
Nottingham
Saladworks, Leicester
Butterfield Business Park, Luton
Project Horizon, Norwich
207-211 Old Street, London
Focus on... 50-60 Station Road 12
Imtech in East AngliaImtech Engineering Services Central has extensive experience in delivering M&E services within Cambridge and its surrounding areas, along with over 100 years of expertise within the industry. In addition to our local expertise, we have access to the numerous capabilities of our Imtech colleagues across the Central region and the UK.
Our local office is situated on the outskirts of
Cambridge City Centre and is home to almost 100
Imtech employees who have a vested interest in the
successful delivery of our projects and the expansion of
our region. We have been a part of the local economy
for over 40 years which has led to us gaining significant
experience, and developing the key resources to deliver
many high profile, complex projects. Our local, directly
engaged workforce and supply chain, provides us
with flexibility and the ability to respond quickly and
efficiently to the needs of our customers and the local
economy.
All Imtech businesses share a common culture and
trading principles and we have a collaborative approach
that is extended throughout the entire Central region,
the wider Imtech Group and with our parent company,
EDF Energy. This leads to the added benefits of sharing
knowledge, expertise and resources, adding value
to customer and supply chain relationships. It also
supports our ongoing business strategy and growth
objectives within East Anglia. We are proud to be a
part of the future of the region and its exciting plans
for development and growth.
11 Focus on... 50-60 Station Road
Constantine House, Ipswich
Capital Park, Cambridge
Main Office - Stone
Systems Integration
Main Office - Waterford
Suir Engineering
an Imtech company
Main Office - Birmingham
Technical Facilities
Management
Main Office - Falkirk
Imtech Engineering Services
Scotland
Main Office - Nottingham
Imtech Engineering Services
Central
Main Office -
Staines upon Thames
Imtech HQ /
Imtech Engineering Services
London & South
Main Office - Kirkham
Imtech Engineering Services
North
National Coverage
13 Focus on... 50-60 Station Road
With an annual turnover of circa £330m and more than
20 years of market experience, we have the financial
strength, scale and technical expertise to meet all our
clients’ needs. We undertake projects from consultancy
and design of mechanical and electrical systems through
to the installation and whole-life maintenance and
management of these assets.
We have four complementary business streams:
n Engineering Services
n Technical Facilities Management
n Systems Integration
n Suir Engineering in Ireland
Our network of offices enables us to build strong
relationships with clients and deliver successful projects
both locally and nationally.
Who we areAs one of the largest technical services providers in the UK and Ireland, we operate in various sectors including commercial, retail and residential within the areas of buildings, infrastructure and industry.
Focus on... 50-60 Station Road 14
NorthCalder HouseSt George’s ParkKirkhamLancashire PR4 2DZT +44 (0) 1772 471 111
London & SouthTWENTY20 Kingston RoadStaines-upon-ThamesMiddlesexTW18 4LG T +44 (0)1784 411 600
CentralHooton Street Carlton RoadNottingham NG3 5GLT +44 (0) 1159 505 100
Suir Engineeringan Imtech companyUnit 9a Cleaboy Business ParkOld Kilmeaden RoadWaterfordIrelandT +353 (0) 51 359 500
Imtech Engineering Services
Imtech.co.uk
ScotlandEast Gateway Business HubBeancross RoadGrangemouthFK3 8WHT +44 (0) 1324 469 075