Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Inception Report
Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the
FPCs/EDCs covering areas of execution
WEST BENGAL FOREST AND BIODIVERSITY CONSERVATION PROJECT (WBFBCP) SOCIETY
West Bengal Forest Department & JICA
PREPARED BY:
NABARD CONSULTANCY SERVICES PVT. LTD.
Corporate Office : 24, Rajendra Place, 1st Floor, NABARD Building, New Delhi – 110125
Reg. Office : Plot No. C24, G Block, 3rd Floor, NABARD Building, Bandra Kurla Complex,
Bandra East, Mumbai – 400051
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Table of Contents LIST OF ABBREVIATIONS ..................................................................................................................... 4
1.0 Approach & Methodology ............................................................................................................... 5
1.1.1 Objective of WBFBCP ................................................................................................................. 5
1.1.2 Progress of institutional development at the field level under WBFBCP ............................. 6
1.1.2.1 The state’s scenario .............................................................................................................. 6
1.2 The Project Scenario ....................................................................................................................... 7
2.1 Objective of the assignment ........................................................................................................... 8
The Objectives derived from broad Objective .............................................................................. 8
2.2 Sample size of FPC/EDC for the Baseline Survey ............................................................ 9
3.0 Detailing the Methodology & Approach .................................................................................. 9
3.1 Approach ......................................................................................................................................... 9
3.2 Methodology: ................................................................................................................................ 10
Desk review: .................................................................................................................................... 10
Structured questionnaire for baseline Survey: .......................................................................... 11
Primary research ............................................................................................................................ 11
I. Direct interview (DI) using structure questionnaires: ....................................................... 11
II. Focused Group Discussion (FGD): ....................................................................................... 11
III. Ranking and Scoring Techniques (RST): ........................................................................... 11
Broad Indicators identified for the collection of information at the Household levels ... 12
3.2.1 Information to be collected at Community (or FPC/EDC) level .................................... 12
Testing and finalizing the questionnaires ............................................................................... 13
3.3 Sampling Plan .............................................................................................................................. 13
Selection of FPC/EDC: .................................................................................................................. 13
Sample Overview of Phase-I & Phase-II ................................................................................... 13
3.4 Random selection of Sample Project FPC across Zone/Division/Range/Beat .............................. 14
3.5 List of Final FPCs for Baseline study based on random sampling: .................................................. 18
3.6 Final Sample EDC to be covered in Project areas (Random selection) ........................................... 31
The selection of the Households FPC/EDC would follow the proportional method as
per the SC/ST composition. ........................................................................................................ 32
Selection of Households: ............................................................................................................. 32
3.7 Analysis framework .................................................................................................................... 32
3.8 FPC/EDC level Indicators ...................................................................................................... 32
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
3.9 FPC/EDC Members’ Level Household survey Indicators ........................................... 33
4.0 Data Analysis ................................................................................................................................ 34
5.0 Field survey Arrangement: ....................................................................................................... 34
6.0 Monitoring and Quality Control ............................................................................................... 35
7.0 Work Plan .................................................................................................................................. 35
8.0 Deliverables .................................................................................................................................. 36
9.0 Report Template .......................................................................................................................... 36
10.0 Staff Deployment and Roles & Responsibility of Key Professional ............................ 38
11. Supports Required and provided from/by WBFBCP ......................................................... 38
Annexure-I ............................................................................................................................................ 40
FPC/EDC level Questionnaire ......................................................................................................... 40
Annexure-II........................................................................................................................................... 52
FPC/EDC MMBER HOUSEHOLD SURVEY SCHEDULE .......................................................................... 52
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
LIST OF ABBREVIATIONS DMU Division Management Unit
DFO Divisional Forest Officer
EDC Eco Development committee
EI Evaluation Indicator
FGD Focus Group Discussion
FMU Field Management Unit
FPC Forest Protection committee
GB Governing Body
GoWB Government of west Bengal
HH Household
HPC High Powered Commitee
IGA Income Generation Activities
II Impact Indicator
JFM Joint Forest Management
JICA Japan International Cooperation Agency
M&E Monitoring & Evaluation
MI Monitoring Indicator
NABCONS NABARD Consultancy Services Pvt. Ltd.
NGO Non-Government Organization
PA Protected Area
PCR Project completion Report
PLA Participatory Learning and action
PMU Project Management Unit
QPR Quarterly Project Report
RO Range Officer
SC Scheduled Caste
SHG SHG Self Help Group
SHG Self-help Groups
ST Scheduled Tribe
WBFBCP West Bengal Forest and biodiversity Conservation Project
WBFBCS West Bengal Forest and Biodiversity Conservation Society
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
1.0 Approach & Methodology 1.1 Scope & Objective
1.1.1 Objective of WBFBCP The West Bengal Forest and Biodiversity Conservation Project (WBFBCP) aims “To improve
forest ecosystem and conserve biodiversity by undertaking afforestation, regeneration and wildlife
management activities through JFM (Joint Forest Management approach, including institutional
capacity development, thereby contributing to environmental conservation and harmonized socio-
economic development in West Bengal”.
The Main components of the Project are (i) Afforestation (ii) Biodiversity conservation (iii)
Community Development (iv) Institutional Capacity Development.
Adoption of JFM approach to implement the WBFBC project is derived from existence of symbiotic
relationships of the community and Forest including biodiversity requires. Community
participation in environmental conservation and harmonized socio-economic development has
been institutionalized with the formation of local level institutions such as Forest Protection
Committees (FPC) and Eco-Development Committees (EDC). The community development as
the major component of participatory forest and biodiversity management is being implemented
in 23 Divisions.
• Afforestation of Degraded Forest Land in Recorded Forest Area
•Tree Planting Outside Forest (Social Forestry)•Soil & Moisture Conservation in Forestry Treatment Areas
•Production of Quality Planting Material
Afforestation
•Improvement of Wildlife Habitat in Protected Areas
•Mitigation of Man-Animal Conflict
•Research on Wildlife and Biodiversity
Biodiversity Conservation
•Community Mobilization
•Micro Planning
•Income Generation Activity
•Comunnity Development infrastructure
Community Development
Institutional Capcity Development
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
The following section briefly elaborate about people bodies involved in project activities:
The community development activities formed as per the extant resolutions/regulations issued by
GoWB shall implement the Community Development Activities. Income Generation Activities shall
be undertaken through Self-Help Groups (SHGs) within the members of FPCs/EDCs.
I. Forest Protection Committees (FPCs): People’s body formed, in order to ensure adequate
and quality community participation for forest protection and management. The beneficiaries of
FPC are economically backward people living in the vicinity of forest. There is a joint membership
(If, husband is a member, wife automatically becomes a member and vice versa) from each
household.
ii. Eco Development Committees (EDCs): Eco Development Committee (EDC) is people’s body
formed for the protection and development of wildlife protected areas (Sanctuaries and National
Parks). EDC functions to ensure adequate and quality community participation for protection and
management of Protected Area including wildlife. The members of EDC are from economically
backward people living in the vicinity of wildlife protected areas.
iii. Self-Help Groups (SHGs): SHGs are formed within a FPC/EDC to improve the livelihoods of
the people through Income Generation Activities.
iv. Beneficiary Groups (BGs) outside Forest Areas are formed under state’s social forestry
programme for the plantation of trees in the areas outside forest areas. Plantation sites are
managed by the BGs. Generally, the beneficiaries comprise economically backward people, SCs
and STs.
1.1.2 Progress of institutional development at the field level under WBFBCP
1.1.2.1 The state’s scenario As on 31st Match 2015, there were 4312 FPC consisting of 498171 Members in the state. The
social composition of FPC members constitutes 29.59 % (SC), 25.21 % (ST) and 45.20%
(Others). In the state, 107 EDC comprising 22625 Members were formed as on 31st March 2015.
Percentages of Male & Female EDC members constitutes 73.39 % and 26.60 % respectively.
The distribution of EDC members across different social categories is as follows: 27.19% (SC),
32.92% (ST) and 39.89% (Others
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
1.2 The Project Scenario In the Project areas as per the information available from WBFBCP PMU, there are around 576
FPCs and 24 EDCs. The details of the FPCs/EDCs adopted under WBFBCP are mentioned in
the following table.
Sl.
No.
Name of Circle Name of DMU As approved in
7th GB
Revision as
proposed after
MTR
1 Western Midnapur 56 62
2 Western Kharagpur 21 24
3 Western Rupnarayan 45 50
4 Western Jhargram 35 37
Total Circle 157 173
5 Central Bankura (N) 55 59
6 Central Bankura (S) 45 51
7 Central Panchet 45 50
Total Circle 145 160
8 South-West Kangsabati (N) 31 33
9 South-West Kangsabati (S) 34 36
10 South-West Purulia 35 37
Total Circle 100 106
11 South-East Birbhum 12 12
12 South-East Burdwan 31 31
13 South-East Durgapur 10 10
Total Circle 53 53
14 North-West Malda 3 0
Total Circle 3 0
15 Northern Baikunthapur 18 23
16 Northern Coochbehar 3 3
17 Northern Jalpaiguri 20 25
Total Circle 41 51
18 Hill Darjeeling 3 3
19 Hill Kurseong 16 16
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Total Circle 19 19
20 Wildlife (N) Wildlife III 14 14
Total Circle 14 14
Grand Total 532 576
EDC
Sl. No. Name of Circle Name of DMU As approved in
7th GB
Revision as
proposed after
MTR
1 Wildlife (N) Wildlife I 11 6
2 Wildlife (N) Wildlife II 7 7
3 Wildlife (N) Wildlife III 11 11
Total Circle 29 24
Grand Total 29 24
Source: WBFPC, PMU
2.1 Objective of the assignment To conduct Baseline Survey to ascertain socio-economic status of communities involved in the
FPCs / EDC in West Bengal to produce baseline study indicators to serve as reference point for
the project monitoring & Evaluation system and to facilitate the comparison of project
achievements, results and impact across different point of time.
The Objectives derived from broad Objective To Identify benchmarks and indicators, which can be used as a point of reference for future
Evaluations
To Provide information which can be used to monitor the project in the course of
implementation
To provide information for planning the project
As per the mandated ToR, the baseline study would be conducted in two phases as
mentioned below:
Phase Batch 1 Batch 2
Financial Year 2015-16 to 2016-17* 2015-16 to 2016-17*
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Socio-economic Baseline study
in two batches
Baseline Batch-1: March -
August 2016
Baseline Batch-2: June 2016 –
September 2016
* The timeline for the submission of baseline reports is revised as state assembly election in West Bengal has been scheduled during 4th April to 19th May 2016.
2.2 Sample size of FPC/EDC for the Baseline Survey
Total numbers of FPC and EDC in the project area are 265 and 12 respectively spread
across 09 Districts of the state
Total numbers of FPC and EDC in the non-project area are 25 and 03 respectively.
Around 50% project FPC in each district and minimum No. of FPC to be covered in a
district is 03 and non-project FPCs will constitute 10% of sample Project FPCs in each
district subject to minimum 01 FPC in each district.
Around 50% of Project EDC subject to minimum 01 EDC in project area of each district
and non-project EDCs will constitute 10% of sample Project EDCs in each district subject
to minimum 01 EDC in each district
In total 09 districts are proposed to be covered to collect baseline information
The sample design section describes in-details of the selection of FPC/EDC and
Households.
FPC/EDC strength of Membership wise sample determination
FPC/EDC Membership size No, of HH of Members to be covered
Actual no. of HH to be sampled will depend on the final list of FPC/EDC selected as per sampling method
Up to 50 10
>50-100 15
>100-200 30
>200-350 55
3.0 Detailing the Methodology & Approach
3.1 Approach The approach and methodology for conducting baseline survey describes the broad objective of
the WBFBC project, project activities undertaken by the CBOs (FPC, EDC and SHGs) and
outcomes of formation of such people bodies.
The approach of a Socio-economic baseline study is more comprehensive than conventional
baselines, as it will focus roles of FPC and EDC in the implementation of project activities. The
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
baseline survey would focus on indicators implying project outputs and their impact on socio-
economic conditions of the Members of FPC & EDC.
Baseline Study Main focus Local institutions and
members of local
institutions
Forest/biodiversity
Resources and resource
management
Specific Focus Present Socio-economic
Conditions
Dependence and relationship
with Forest and bio-diversity
resources
Design Indicative indicators in the
ToR, Participation from
WBFD, West Bengal Forest
and Biodiversity Conservation
Project (WBFBCP) society:
(PMU, DMUs & FMUs), Bon –
O- Bhumi Sanskar Sthayee
Samiti, FPC, EDC and SHGs,
NGOs, extension workers
Quantitative and qualitative
indicators (Problems and
opportunities- Livelihood
development, Forest
development and
conservation of biodiversity,
etc.)
Techniques Structured close/open-ended
questionnaire, Semi
structured Questionnaire,
FGD and other Participatory
Learning and Action (PLA)
tools for triangulation and
validation of data/information.
Quantitative and qualitative
indicators and data validation
through PLA Tools,
secondary research (Census
data & NSSO Survey data)
and using advance software.
The baseline study will attempt to compile and analyses information on two types of indicators:
(i) Benchmark indicators: Related to socio-economic conditions of Members of FPC/EDC
(ii) M & E indicators: Related to broad objectives of the Project and activities to be undertaken/
already undertaken under the project components.
3.2 Methodology:
Desk review:
Study and review the research papers, project documents, Minutes of meetings,
evaluations, and special study reports pertaining to FPC & EDC and JFM in West Bengal
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Study of Resolutions/Acts/schemes and policies regarding community participation in
JFM, FPC, EDC and other linked Ministries/departments schemes/programmes
Meeting/Workshop with various stakeholders and adopt a participatory approach for
baseline benchmarks/indicators development
Structured questionnaire for baseline Survey: Apart from above key stakeholders’ interaction, the questionnaire development would involve
Client level Discussions
Conducting pilot 02 FGDs (01 each with members of FPC & EDC) to identify socio-
economic indicators/benchmarks and M & E indicators in a participatory manner
Combining of reference indicators provided in the ToR with the socio-economic indicators
revealed through stakeholders’ consultation meetings
Primary research Primary survey will be done by approaching FPC, EDC and the members of FPC & EDC and
conducting field survey through direct interview (DI) method with help of structured closed/open
ended schedules and focused group discussions (FGD) for the collection of socio-economic
indicators related information. The methodology to be followed for primary research will be as
under:
I. Direct interview (DI) using structure questionnaires: It will be conducted through structured/ semi-structured questionnaires or interview
guidelines with households of FPC/EDC, Members of FPC/EDC in the project areas
and members of control group (FPC/EDC in non-project areas)
Sample FPC and EDC interviews will be conducted to refine the structured baseline
survey questionnaire.
II. Focused Group Discussion (FGD): FGD will be conducted, involving a group of 5 to 10 FPC/EDC members and it complements the
DI method by eliminating any biased opinion in the responses of the individuals, largely to validate
the data collected at the household level. In each of the 09 sample districts, 01 FGD would be
conducted to supplement the HH level data.
III. Ranking and Scoring Techniques (RST): RST, PLA tool will be used to rank the problems and issues of FPC/EDC and Forest conservation
Bio-diversity related issues.
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Wealth-ranking method will be used to rank the household level wealth status across the social
groups.
Broad Indicators identified for the collection of information at the Household
levels • General information about the household: (identification of the household, basic information
on its composition and main characteristics including family composition, proximity to roads
and markets, education, member of what kind of group or cooperative etc.), Basic amenities
at the HH level, Access to basic services
• Poverty status
• Income (per household) and consumption pattern
• Employment structure and dependence on Forest related activities/forest resources
• Structure of Income (Agriculture, Off-farm income, income from Forest Products and NTFP,
Labour income, and debt etc.)
• Household assets
• Income distribution of house hold
• Indebtedness and access to credit
• Social security & food security
• Extend of dependence on forest based resources
• Perception of the status of forest by comparing past and present
• Perception on benefits emerging as member of FPC/EDC
• Social and economic group association & Institutional relationship
• Awareness of forest institutions and forest management
• Awareness of roles and responsibilities as member of FPC/EDC
3.2.1 Information to be collected at Community (or FPC/EDC) level a. General information about the FPC/ EDC
i. Identification of the project FPC/ EDC (District, Block, Revenue Village, Habitation; Division,
Range etc.)
b. Roles and functions of FPC
b. Access to Services in FPC/ EDC
i. Proximity to roads and markets, medical facilities, electricity, panchayat office, Block office
etc.
c. Profile of FPC/ EDC
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
i. Infrastructure and amenities situations, migration pattern ,fuel and fodder collection
practices, existence of CBOs, SHGs (which are active and their status of activities, total
transaction of last one year, actual deposit amount etc.)
d. Forest resources, roles and responsibility of FPC/EDC
i. Roles and responsibility of FPC/EDC
ii. Access to Forest resources
iii. Impact of project activities under WBFBC project
The detailed indicators and benchmarks can be scanned from the Schedules attached at the
annexures.
Testing and finalizing the questionnaires The questionnaires developed through the desk review, stakeholders’ consultation was validated
through conducting field visits to Seuligaria FPC under Chhatna beat/range in North-Bankura
division and FPCs in Hizli under Kharagpur division of West Medinapur during 19-20 April 2016.
The FPC schedule was pre-tested in the presence of investigators and discussions were held
with Range and Beat Officers. Accordingly, the final household schedule is prepared and placed
at annexure-II. One important lesson learnt from the pre-test was that as the FPCs were formed
earlier, there had been a change in the memberships depending upon the status of earlier
members. The original members of FPC had nominated other members from their families to
continue as members for continuance of family representation in the FPC. Further, as the FPC
are formed years back, hence it would be difficult to provide information on socio-economic status
in pre-FPC formation stage by the respondents. Keeping several such factors in view the
household schedules were finalized. The FPC/EDC schedule is also modified as per discussions
with relevant stakeholders. Both the FPC member HH schedule and FPC/EDC schedule are
placed at annexure-II & I.
3.3 Sampling Plan
Selection of FPC/EDC: As per the ToR around 50% of Project area FPC/EDC to be covered under the baseline study. In
total 277 FPC /EDC are proposed to be covered under primary survey from the project areas and
in the non-project areas 28 FPC/EDC will be covered to represent the control group. The break-
up of proposed sample size for FPC and EDC is proposed as follows:
Sample Overview of Phase-I & Phase-II
Sample Size FPC/EDC
No. of Districts 9
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
No. of Districts in S.W.B. 5
No. of Districts in N.W.B. 4
FPC/EDC Sample Size
Broad Category FPC EDC Total
Grand Sample Size 290 15 305
Project areas 265 12 277
Non-Project Area 25 3 28
3.4 Random selection of Sample Project FPC across Zone/Division/Range/Beat Zone: South Bengal: Phase-I
Division
Range
Beat
Sample FPC
Bankura North Bankura North Belbani 1
Salboni 1
Barjora Barjora 2
Shitla 1
Beliatore Beliatore 2
Brindabanpur 3
Kundalia 2
Chhatna Jhantipahari 1
G. Ghati Amarkanan 1
Ukhradihi 1
Patrasayer Kushwadeep 1
Radhanagar Balarampur 1
Bhora 3
Radhanagar 1
Sonamukhi Hamirhati 1
Indkata 2
Sonamukhi 1
Bankura South Bankura Bankura 1
Ratanpur 2
Hirbundh Hirbundh-I 1
Indpur Hatagram 2
Jhilimili Muchikata 2
Motgoda Pirrah 1
Pirrargari Parsola 1
Ranibandh Ambikanagar 1
Punshya 1
Ranibandh 2
Simlapal Simlapal 2
Panchet Bankadaha Amdahara 1
Amdangra 3
Bankadaha 2
Peardoba 2
Uporsole 1
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Bishnupur Basudevpur 1
Bishnupur - I 1
Bishnupur - II 3
Hereparbat 1
Joypur Adhkata 3
Joypur 2
Kuchiakole 1
Machantala 1
Onda Chingani 2
Krishnagar 1
Kharagpur Belda Kashipur 1
Keshiary 1
Chandabila Chandabila 1
Hijli Hijli 1
Khajra 2
Kalaikunda Sankrail 2
Medinipur Arabari Arabari 2
Dakshinsole 1
Gopalbundh 1
Bhadutala Bhadutala 1
Moupal 9
Chandra Gurguripal 1
Chandrakona Andharnayan 4
Godapeasal Anandapur 1
Karamsole 2
Lalgarh Kantapahari 1
Lalgarh 2
Midnapore Baghasole 1
Nayabasat Akchara 1
Kiamacha 1
Rupnarayan Amlagora Chandabila 2
Pathrisole 1
Raskundu 4
Garhbeta Dhadika 2
Nohari 1
Goaltore Barapatasole 2
Ramgarh 1
Mahalisai Adalia 1
Mahalisai-I 1
Mahalisai-II 1
Ruaparghagra 4
Jhargram Belpahari Belpahari 2
Talpukuria 1
Lodhasuli Chandri-I 3
Chandri-II 4
Lodhasuli 3
Manikpara Balivasa 2
Ramrama 1
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Phase-I Total 138
Zone: South Bengal: Phase-II
Division
Range
Beat
Sample FPC
Birbhum Dubrajpur Hetampur 2
Khairasole 1
Md. Bazar Rashpur 2
Rajnagar Rajnagar 1
Burdwan Durgapur Arrah 1
Basudha 1
Gopalpur 1
Molandighi 1
Shibpur 1
Guskara Pratappur 1
Panagarh Aduria 7
Kanksa 1
Khandari 1
Durgapur Asansol Gourandi 2
Ukhra Fuljhore 2
Kantaberia 2
Kangsabati North Hura Bishpuria 2
Hura 1
Keshargarh 4
Rakab 1
Puncha Gopalpur 1
Jambad 3
Panipathar 1
Puncha 3
Raghunathpur Neturia 3
Raghunathpur-I 1
Santuri 1
Kangsabati South Barabazar Barabazar 3
Sindri 2
Manbazar-I Kenda 4
Manbazar 10
Sindurpur 4
Manbazar-II Kumari 1
Purulia Ajodhya Ajodhya 1
Bagmundi Bagmundi 4
Burda 1
Balarampur Balarampur 1
Bersa 1
Jhalda Kalma 2
Khamar 1
Joypur Bangidiri 1
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Talmu 2
Kotshila Khatanga 1
Nowahatu 1
South -Bengal Phase-II FPC 88
Zone: North Bengal: Phase-II
Division Range Beat Sample FPC
Baikunthapur Ambari Kundardighi 2
Belacoba Batasivita 2
Gourikone 6
Shikarpur 1
Coochbehar Coochbehar-I Nagurhat 1
Darjeeling Rimbick S. Rimbick 1
Jalpaiguri Chalsa Nagrakata 1
Dalgaon Bandapani 1
Dalgaon 1
Moraghat Sonakhali 1
Totapara 1
Nathua Gadhiarkuthi 1
Kurseong Bagora Bagora 1
Majua 1
Bamanpokhari Singbulli 1
Panighatta Kharibani 1
Lohagarh 1
Sevoke Berrick 1
Kalijhora 2
Latpancher 1
Malda Malda Rajadighi 1
Wildlife-III Chilapata Chilapata 1
Kodalbasti Kodalbasti 2
Mantharam 2
Madarihat Dhumchi 2
North Khairbari 1
South Khairbari 2
North Bengal Total FPC (Phase-II) 39
3.4.1 Selection of Non-Project FPC
Circle/DMUCircle/DMU No. of Non-Project Sample FPC
Bankura North 2
Bankura South 2
Panchet 2
Central Total 6
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Kurseong 1
Hill Total 1
Baikunthapur 1
Jalpaiguri 1
Northern Total 2
Burdwan 2
Durgapur 1
South-East Total 3
Kangsabati North 2
Kangsabati South 1
Purulia 2
South-West Total 5
Jhargram 1
Kharagpur 1
Medinipur 3
Rupnarayan 2
Western Total 7
Wildlife-III 1
Wildlife (N) Total 1
Total Sample Non-Project FPC 25
Non-Project Sample EDC
Circle Division Range Non—Project EDC
Wildlife (N) Wildlife-II Gorumara South Range 1
Wildlife (N) Wildlife-III Jaldapara East 1
Wildlife (N) Wildlife-I Senchal East Range 1
Total Sample Non-Project EDC 03
3.5 List of Final FPCs for Baseline study based on random sampling: On the basis of information collected from WBFPC, PMU random sampling method has been
followed to identify 265 FPC out of total project FPCs 576. Random sampling technique using
MS- Excel has been applied to 576 project FPCs to select the sample FPCs. The sample FPCs
to be covered under the baseline survey is as follows:
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
5 South Bengal
Bankura North
G. Ghati Ukhradihi Suabasa 87 15
8 South Bengal
Bankura North
Beliatore Brindabanpur
Kodma 69 15
9 South Bengal
Bankura North
Beliatore Brindabanpur
Shri Rampur Bhairabdanga 50 15
12 South Bengal
Bankura North
Radhanagar Bhora Dapanjuri 89 15
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
13 South Bengal
Bankura North
Radhanagar Radhanagar Bankati 37 10
14 South Bengal
Bankura North
Radhanagar Bhora Hurhura 24 10
15 South Bengal
Bankura North
Barjora Barjora Monohar 87 15
18 South Bengal
Bankura North
Radhanagar Bhora Mayapur 116 30
28 South Bengal
Bankura North
Sonamukhi Sonamukhi Ganganidanga 53 15
30 South Bengal
Bankura North
Beliatore Beliatore Madhabpur 90 15
36 South Bengal
Bankura North
G. Ghati Amarkanan Borjuri 268 55
37 South Bengal
Bankura North
Beliatore Kundalia Amlatore 99 15
38 South Bengal
Bankura North
Barjora Barjora Saharjora 370 65
40 South Bengal
Bankura North
Sonamukhi Indkata Junsura 242 55
41 South Bengal
Bankura North
Chhatna Jhantipahari Kalipahari 88 15
42 South Bengal
Bankura North
Patrasayer Kushwadeep Alkhasa - Sankarpur - Bhairavpur
97 15
44 South Bengal
Bankura North
Bankura North
Belbani Dhadka 74 15
45 South Bengal
Bankura North
Bankura North
Salboni Radharamanpur 150 30
48 South Bengal
Bankura North
Sonamukhi Indkata Dhansimla Station 121 30
49 South Bengal
Bankura North
Barjora Shitla Majmurha 202 55
50 South Bengal
Bankura North
Beliatore Beliatore Mukutigram 50 15
51 South Bengal
Bankura North
Beliatore Brindabanpur
Shri Krishnapur 169 30
53 South Bengal
Bankura North
Radhanagar Balarampur Bijpur, Salbagan, Dharambandh
36 10
54 South Bengal
Bankura North
Beliatore Kundalia Amlabaid Banmadhabpur 144 30
55 South Bengal
Bankura North
Sonamukhi Hamirhati Bhula 95 15
60 South Bengal
Bankura South
Jhilimili Muchikata Gobindasole 52 15
62 South Bengal
Bankura South
Ranibandh Ranibandh Burium, Daluibasa 88 15
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
65 South Bengal
Bankura South
Ranibandh Punshya Punshya 86 15
67 South Bengal
Bankura South
Pirrargari Parsola Lakhiatapal 22 10
71 South Bengal
Bankura South
Ranibandh Ranibandh Mitham 147 30
72 South Bengal
Bankura South
Ranibandh Ambikanagar
Kulam 167 30
74 South Bengal
Bankura South
Bankura Ratanpur Ramkrishnapur 467 65
77 South Bengal
Bankura South
Simlapal Simlapal Susunia Sidhagara 54 15
78 South Bengal
Bankura South
Indpur Hatagram Sayedi 104 30
81 South Bengal
Bankura South
Bankura Ratanpur Motherboni Kolargram 229 55
83 South Bengal
Bankura South
Hirbundh Hirbundh-I Manasjore 149 30
86 South Bengal
Bankura South
Jhilimili Muchikata Muchikata 75 15
91 South Bengal
Bankura South
Motgoda Pirrah Jaher Era Marang Buru 39 10
92 South Bengal
Bankura South
Simlapal Simlapal Krishnapur 68 15
95 South Bengal
Bankura South
Bankura Bankura Taribeterdihi, Basulitora, Searbada
88 15
96 South Bengal
Bankura South
Indpur Hatagram Dhagara 99 15
102 South Bengal
Panchet
Bishnupur Bishnupur - II
Jhantibani 248 55
103 South Bengal
Panchet
Joypur Adhkata Jagannathpur,Shyampur 142 30
104 South Bengal
Panchet
Bankadaha Peardoba Methana 263 55
106 South Bengal
Panchet
Bishnupur Bishnupur - II
Kantabari,Bauridanga 311 55
109 South Bengal
Panchet
Joypur Adhkata Bangsipur,Arubil 154 30
111 South Bengal
Panchet
Bankadaha Bankadaha Rajpur-2No 205 55
112 South Bengal
Panchet
Joypur Adhkata Saltora 138 30
116 South Bengal
Panchet
Bishnupur Basudevpur Basudevpur 87 15
118 South Bengal
Panchet
Bishnupur Hereparbat Kamarpukur,Digmardanga 81 15
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
119 South Bengal
Panchet
Joypur Joypur Kodalbandi 82 15
121 South Bengal
Panchet
Joypur Machantala Madhabpur,Gosaipur 194 30
122 South Bengal
Panchet
Bankadaha Amdangra Mahulbaria 160 30
123 South Bengal
Panchet
Bankadaha Bankadaha Dundure 84 15
124 South Bengal
Panchet
Bankadaha Peardoba Satmouli 346 55
125 South Bengal
Panchet
Bishnupur Bishnupur - II
Jadavnagar,Banjamuna 259 55
128 South Bengal
Panchet
Joypur Joypur Padampur 56 15
129 South Bengal
Panchet
Onda Chingani Amarpur,Chaulabandh,Ambari
201 55
131 South Bengal
Panchet
Bankadaha Amdangra Murkati 164 30
132 South Bengal
Panchet
Bankadaha Amdahara Amdahara 132 30
134 South Bengal
Panchet
Bankadaha Uporsole Jamsuli 206 55
135 South Bengal
Panchet
Onda Krishnagar Madhabpur,Kamarkata,Jambeda
158 30
139 South Bengal
Panchet
Bishnupur Bishnupur - I Bankati 88 15
141 South Bengal
Panchet
Onda Chingani Andharia Dhaboni Topsi 157 30
143 South Bengal
Panchet
Joypur Kuchiakole Benechapra (S) 88 15
145 South Bengal
Panchet
Bankadaha Amdangra Dhemnamara 91 15
146 South Bengal
Birbhum
Dubrajpur Hetampur Belbuni 60 15
151 South Bengal
Birbhum
Md. Bazar Rashpur Charicha-Bathandanga 83 15
152 South Bengal
Birbhum
Md. Bazar Rashpur Fulgaria, Dhamukdanga, Bodmati & Dobandi
109 30
153 South Bengal
Birbhum
Rajnagar Rajnagar Abadnagar 43 10
154 South Bengal
Birbhum
Dubrajpur Hetampur Metela 60 15
155 South Bengal
Birbhum
Dubrajpur Khairasole Bhardi 50 15
158 South Bengal
Burdwan
Panagarh Aduria Aduria Amarpur 513 65
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
160 South Bengal
Burdwan
Durgapur Gopalpur Gopalpur 202 55
161 South Bengal
Burdwan
Panagarh Aduria Chora,Dangapara Patharkuchi
208 55
162 South Bengal
Burdwan
Panagarh Khandari Khandari 164 30
164 South Bengal
Burdwan
Panagarh Aduria Kalikapur 76 15
166 South Bengal
Burdwan
Durgapur Arrah Rupganj 51 15
172 South Bengal
Burdwan
Panagarh Aduria Hedogoria 164 30
173 South Bengal
Burdwan
Panagarh Kanksa Dhabaru 105 30
176 South Bengal
Burdwan
Panagarh Aduria Gerai,Goalara 225 55
178 South Bengal
Burdwan
Durgapur Basudha Telipara 732 80
179 South Bengal
Burdwan
Durgapur Shibpur Shibpur 373 65
183 South Bengal
Burdwan
Panagarh Aduria Chack-Tilong, Rangakhula 102 30
186 South Bengal
Burdwan
Durgapur Molandighi Rakshitpur/Bistupur 397 65
187 South Bengal
Burdwan
Panagarh Aduria Dhantor 111 30
188 South Bengal
Burdwan
Guskara Pratappur Babuisole 211 55
189 South Bengal
Durgapur
Ukhra Kantaberia Madhaiganj 52 15
192 South Bengal
Durgapur
Asansol Gourandi Panuria (Lalbandh) 29 10
194 South Bengal
Durgapur
Ukhra Kantaberia Kantaberia Dhabani 111 30
195 South Bengal
Durgapur
Ukhra Fuljhore Haribazar Pardai 62 15
196 South Bengal
Durgapur
Asansol Gourandi Roshna 165 30
197 South Bengal
Durgapur
Ukhra Fuljhore Jemua 48 10
199 South Bengal
Kangsabati North
Hura Bishpuria Chirugora 99 15
202 South Bengal
Kangsabati North
Puncha Puncha Baraghutu 55 15
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
203 South Bengal
Kangsabati North
Puncha Jambad Jambaid 606 80
204 South Bengal
Kangsabati North
Hura Keshargarh Keshargarh 123 30
205 South Bengal
Kangsabati North
Hura Rakab Rahamda 88 15
206 South Bengal
Kangsabati North
Puncha Puncha Rangametya 123 30
207 South Bengal
Kangsabati North
Raghunathpur
Raghunathpur-I
Paharpur-Jorka 33 10
208 South Bengal
Kangsabati North
Puncha Jambad Pirra 188 30
209 South Bengal
Kangsabati North
Raghunathpur
Neturia Pahargora-Rampur 102 30
211 South Bengal
Kangsabati North
Hura Bishpuria Samukgaria 172 30
212 South Bengal
Kangsabati North
Hura Hura Dariakata 80 15
214 South Bengal
Kangsabati North
Hura Keshargarh Aralkocha 36 10
216 South Bengal
Kangsabati North
Hura Keshargarh Chargali, Kaitardi 47 10
218 South Bengal
Kangsabati North
Hura Keshargarh Korkota 25 10
220 South Bengal
Kangsabati North
Puncha Gopalpur Dewli 164 30
222 South Bengal
Kangsabati North
Puncha Jambad Dharampur 264 55
223 South Bengal
Kangsabati North
Puncha Panipathar Deorang 122 30
224 South Bengal
Kangsabati North
Puncha Puncha Shyamakata 26 10
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
227 South Bengal
Kangsabati North
Raghunathpur
Neturia Kochbel-Kalabali 85 15
228 South Bengal
Kangsabati North
Raghunathpur
Neturia Nutandi-Patharberia 75 15
229 South Bengal
Kangsabati North
Raghunathpur
Santuri Patharbandh 76 15
230 South Bengal
Kangsabati South
Manbazar-I Manbazar Hariharpur 44 10
231 South Bengal
Kangsabati South
Manbazar-I Kenda Kuda 265 55
232 South Bengal
Kangsabati South
Manbazar-I Sindurpur Bhalubasa 284 55
234 South Bengal
Kangsabati South
Barabazar Barabazar Bhikharicheliama 218 55
236 South Bengal
Kangsabati South
Barabazar Sindri Kheriadi 48 10
237 South Bengal
Kangsabati South
Manbazar-I Manbazar Bhurasol 78 15
238 South Bengal
Kangsabati South
Manbazar-I Manbazar Poradi 73 15
239 South Bengal
Kangsabati South
Barabazar Sindri Jilling 165 30
241 South Bengal
Kangsabati South
Manbazar-I Manbazar Menidibangram 119 30
242 South Bengal
Kangsabati South
Manbazar-I Sindurpur Janara 155 30
243 South Bengal
Kangsabati South
Manbazar-I Sindurpur Kashidi 284 55
244 South Bengal
Kangsabati South
Manbazar-I Sindurpur Kumardih 118 30
246 South Bengal
Kangsabati South
Manbazar-II Kumari Nekra 218 55
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
248 South Bengal
Kangsabati South
Manbazar-I Manbazar Dhadika 54 15
250 South Bengal
Kangsabati South
Manbazar-I Manbazar Bhelagora 43 10
251 South Bengal
Kangsabati South
Manbazar-I Manbazar Gokulnagar 42 10
252 South Bengal
Kangsabati South
Manbazar-I Manbazar Pealsole 110 30
253 South Bengal
Kangsabati South
Manbazar-I Manbazar Susni-Porasigora 52 15
255 South Bengal
Kangsabati South
Manbazar-I Kenda Jangidiri 136 30
257 South Bengal
Kangsabati South
Manbazar-I Manbazar Jalhari 40 10
258 South Bengal
Kangsabati South
Barabazar Barabazar Gohamikocha 77 15
259 South Bengal
Kangsabati South
Barabazar Barabazar Purihansa 82 15
262 South Bengal
Kangsabati South
Manbazar-I Kenda Bijoydih 130 30
263 South Bengal
Kangsabati South
Manbazar-I Kenda Keshia 87 15
265 South Bengal
Purulia Bagmundi Bagmundi Barnajora-Dulgubera 90 15
266 South Bengal
Purulia Bagmundi Bagmundi Tarpenia 76 15
269 South Bengal
Purulia Jhalda Khamar Pandri 53 15
270 South Bengal
Purulia Joypur Talmu Chirkarmu-Arargeria 123 30
272 South Bengal
Purulia Joypur Bangidiri Udaypur-Pattamjuri 62 15
280 South Bengal
Purulia Joypur Talmu Piri 89 15
282 South Bengal
Purulia Jhalda Kalma Kalma 248 55
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
287 South Bengal
Purulia Bagmundi Bagmundi Nischintapur 91 15
288 South Bengal
Purulia Bagmundi Bagmundi Charida 128 30
289 South Bengal
Purulia Bagmundi Burda Ichakota 33 10
291 South Bengal
Purulia Ajodhya Ajodhya Ajodhya 85 15
293 South Bengal
Purulia Jhalda Kalma Kiribera 120 30
294 South Bengal
Purulia Kotshila Khatanga Jarahatu 79 15
295 South Bengal
Purulia Balarampur Balarampur Kairadih 96 15
296 South Bengal
Purulia Balarampur Bersa Kana 264 55
297 South Bengal
Purulia Kotshila Nowahatu Khatanga 194 30
300 South Bengal
Jhargram
Lodhasuli Lodhasuli Bhowda 25 10
301 South Bengal
Jhargram
Lodhasuli Chandri-II Simli 91 15
307 South Bengal
Jhargram
Lodhasuli Lodhasuli Naharia 163 30
311 South Bengal
Jhargram
Lodhasuli Chandri-I Patasimul 208 55
313 South Bengal
Jhargram
Lodhasuli Chandri-II Ghatidoba 63 15
315 South Bengal
Jhargram
Belpahari Belpahari Sarisabasa 103 30
317 South Bengal
Jhargram
Lodhasuli Chandri-I Purnapani 60 15
318 South Bengal
Jhargram
Lodhasuli Lodhasuli Gritakham 159 30
322 South Bengal
Jhargram
Manikpara Balivasa Guptamani 181 30
323 South Bengal
Jhargram
Manikpara Balivasa Pachapara 111 30
325 South Bengal
Jhargram
Manikpara Ramrama Nuniakundri 106 30
327 South Bengal
Jhargram
Belpahari Belpahari Barighati 38 10
330 South Bengal
Jhargram
Belpahari Talpukuria Pukuria 68 15
331 South Bengal
Jhargram
Lodhasuli Chandri-I Narda 44 10
332 South Bengal
Jhargram
Lodhasuli Chandri-II Bagjhanpa 111 30
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
333 South Bengal
Jhargram
Lodhasuli Chandri-II Baro Didiha 54 15
334 South Bengal
Kharagpur
Belda Keshiary Jhantageria 251 55
339 South Bengal
Kharagpur
Hijli Hijli Ajodhyagarh (Keshuria) 120 30
340 South Bengal
Kharagpur
Hijli Khajra Lengamara 312 55
341 South Bengal
Kharagpur
Chandabila Chandabila Dulki 63 15
345 South Bengal
Kharagpur
Kalaikunda Sankrail Sushnigeria 583 80
347 South Bengal
Kharagpur
Kalaikunda Sankrail Sankrail Durgahari 910 80
349 South Bengal
Kharagpur
Hijli Khajra Jamsole 414 65
353 South Bengal
Kharagpur
Belda Kashipur Jamuna 218 55
356 South Bengal
Medinipur
Bhadutala Moupal Nonasole 123 30
357 South Bengal
Medinipur
Chandrakona
Andharnayan
Pataisole 468 65
359 South Bengal
Medinipur
Bhadutala Moupal Daha 114 30
360 South Bengal
Medinipur
Bhadutala Bhadutala Gobru 139 30
361 South Bengal
Medinipur
Bhadutala Moupal Bagmari,Bethkundri, Jorakushma
228 55
362 South Bengal
Medinipur
Bhadutala Moupal Sushnibari 27 10
364 South Bengal
Medinipur
Godapeasal Anandapur Lepsa, Kanchgeria 22 10
365 South Bengal
Medinipur
Lalgarh Lalgarh Birkar- Barapelia Jamsole Khayrasuli
133 30
366 South Bengal
Medinipur
Arabari Arabari Buramara 120 30
370 South Bengal
Medinipur
Arabari Gopalbundh Solidiha-Jarakendi 1047 80
373 South Bengal
Medinipur
Bhadutala Moupal Kalibasha 40 10
374 South Bengal
Medinipur
Bhadutala Moupal Pathar Kumkumi, Gohaldihi 291 55
380 South Bengal
Medinipur
Bhadutala Moupal Garmal 253 55
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
381 South Bengal
Medinipur
Bhadutala Moupal Jaggnathpur 32 10
382 South Bengal
Medinipur
Chandra Gurguripal Muchiberia 131 30
384 South Bengal
Medinipur
Godapeasal Karamsole Kotalkuli 148 30
385 South Bengal
Medinipur
Godapeasal Karamsole Pirrakuli 20 10
387 South Bengal
Medinipur
Lalgarh Kantapahari Bansber 59 15
390 South Bengal
Medinipur
Lalgarh Lalgarh Jhitka Bhumija-Dhansola 144 30
393 South Bengal
Medinipur
Nayabasat Akchara Ukhla 158 30
394 South Bengal
Medinipur
Nayabasat Kiamacha Bankumari 68 15
398 South Bengal
Medinipur
Arabari Arabari Nepura-Kuarkhal 978 80
399 South Bengal
Medinipur
Bhadutala Moupal Sawra 82 15
400 South Bengal
Medinipur
Chandrakona
Andharnayan
Chhototara 659 80
401 South Bengal
Medinipur
Chandrakona
Andharnayan
Keudi 416 65
403 South Bengal
Medinipur
Midnapore Baghasole Tasarara, Jamboni, Chakighata
221 55
406 South Bengal
Medinipur
Arabari Dakshinsole Goborda 83 15
407 South Bengal
Medinipur
Chandrakona
Andharnayan
Manikbandh, Marchi, Neurasau
173 30
412 South Bengal
Rupnarayan
Garhbeta Dhadika Gilaboni 183 30
413 South Bengal
Rupnarayan
Garhbeta Nohari Ekariya &Fulmanipur 317 55
414 South Bengal
Rupnarayan
Amlagora Chandabila Dhannyadiha- Garki 64 15
415 South Bengal
Rupnarayan
Amlagora Raskundu Hurhuria 65 15
416 South Bengal
Rupnarayan
Amlagora Raskundu Jadavnagar 176 30
419 South Bengal
Rupnarayan
Amlagora Pathrisole Kastogura 193 30
423 South Bengal
Rupnarayan
Garhbeta Dhadika Kharikasuli 157 30
425 South Bengal
Rupnarayan
Amlagora Chandabila Dhobaberia-Jemuasole 194 30
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
428 South Bengal
Rupnarayan
Amlagora Raskundu Kamarkhali 77 15
431 South Bengal
Rupnarayan
Goaltore Barapatasole Andharia 248 55
434 South Bengal
Rupnarayan
Goaltore Barapatasole Nadaria 316 55
437 South Bengal
Rupnarayan
Goaltore Ramgarh Mohanpur 69 15
440 South Bengal
Rupnarayan
Mahalisai Mahalisai-I Porakanali 116 30
441 South Bengal
Rupnarayan
Mahalisai Mahalisai-II Dhamcha 281 55
444 South Bengal
Rupnarayan
Mahalisai Ruaparghagra
Kesia 162 30
445 South Bengal
Rupnarayan
Mahalisai Ruaparghagra
Rengtia 63 15
446 South Bengal
Rupnarayan
Mahalisai Ruaparghagra
Ruparghagra 311 55
447 South Bengal
Rupnarayan
Mahalisai Ruaparghagra
Bhalukbasa 99 15
453 South Bengal
Rupnarayan
Amlagora Raskundu Rampur 53 15
455 South Bengal
Rupnarayan
Mahalisai Adalia Adalia 248 55
458 North Bengal
Darjeeling
Rimbick S. Rimbick Maneydara 70 15
459 North Bengal
Coochbehar
Coochbehar-I
Nagurhat Rasikbeel Forest Village 20 10
468 North Bengal
Jalpaiguri
Dalgaon Dalgaon Lera FV 24 10
469 North Bengal
Jalpaiguri
Moraghat Sonakhali Sonakhali FV 30 10
473 North Bengal
Jalpaiguri
Nathua Gadhiarkuthi Gadhiarkuthi 195 30
475 North Bengal
Jalpaiguri
Chalsa Nagrakata Sukhanibusty 250 55
476 North Bengal
Jalpaiguri
Moraghat Totapara Mogalkata FV 106 30
479 North Bengal
Jalpaiguri
Dalgaon Bandapani Garuchira 56 15
482 North Bengal
Baikunthapur
Belacoba Batasivita Maringajhora 119 30
485 North Bengal
Baikunthapur
Belacoba Gourikone Pradhanpara /Bhullapra 123 30
486 North Bengal
Baikunthapur
Belacoba Gourikone Sepaipara-Sahebpara 74 15
487 North Bengal
Baikunthapur
Belacoba Gourikone Basuniapara 78 15
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
488 North Bengal
Baikunthapur
Belacoba Gourikone Nayanpara 130 30
490 North Bengal
Baikunthapur
Belacoba Gourikone Dewniapara-1 47 10
494 North Bengal
Baikunthapur
Belacoba Batasivita Solaidanga 43 10
496 North Bengal
Baikunthapur
Belacoba Shikarpur Rangerbari 56 15
497 North Bengal
Baikunthapur
Belacoba Gourikone Talipara 82 15
498 North Bengal
Baikunthapur
Ambari Kundardighi Talma 110 30
499 North Bengal
Baikunthapur
Ambari Kundardighi Ghughujhora 95 15
500 North Bengal
Wildlife-III
Madarihat North Khairbari
North Khairbari 3 No. 341 55
501 North Bengal
Wildlife-III
Kodalbasti Mantharam Mantharam 35 10
502 North Bengal
Wildlife-III
Kodalbasti Mantharam Dakshin Satali 56 15
504 North Bengal
Wildlife-III
Madarihat Dhumchi Dhumchi FV 51 15
506 North Bengal
Wildlife-III
Madarihat Dhumchi Chapaguri 279 55
507 North Bengal
Wildlife-III
Madarihat South Khairbari
South Khairbari FV 58 15
509 North Bengal
Wildlife-III
Chilapata Chilapata Deodanga 204 55
510 North Bengal
Wildlife-III
Kodalbasti Kodalbasti Kodalbasti 161 30
511 North Bengal
Wildlife-III
Kodalbasti Kodalbasti Paschim Satali 66 15
512 North Bengal
Wildlife-III
Madarihat South Khairbari
Dakshin Deogaon 253 55
515 North Bengal
Kurseong
Bagora Bagora M-1 F.V. 31 10
517 North Bengal
Kurseong
Sevoke Berrick Upper Kandung F.V. 56 15
518 North Bengal
Kurseong
Sevoke Kalijhora 6th Mile F.V. 34 10
519 North Bengal
Kurseong
Sevoke Latpancher Sittong F.V. 29 10
520 North Bengal
Kurseong
Bagora Majua L. babukhola-I F.V. 20 10
523 North Bengal
Kurseong
Sevoke Kalijhora Karmat F.V. 71 15
526 North Bengal
Kurseong
Bamanpokhari
Singbulli Singbulli F.V. 26 10
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Random ID
Zone Division
Range Beat JFMC Member
Total
Sample HH
528 North Bengal
Kurseong
Panighatta Kharibani Katria F.V. 63 15
529 North Bengal
Kurseong
Panighatta Lohagarh Rangmohan F.P.C. 20 10
532 North Bengal
Malda Malda Rajadighi Kharnuna Malancha 49 10
3.6 Final Sample EDC to be covered in Project areas (Random selection) Sl. No. EDC
Range PA JFMC Regd. Total Member
Sample HH
20 North Range Mahananda Wildlife Sanctuary
Jholi 9/94/EDC/99
373 65
26 Sukna Range Mahananda Wildlife Sanctuary
Chamta 73/EDC/1-3/9
330 55
9 Jaldapara East Jaldapara Wildlife Sanctuary
Sidhabari No12-B/EDC/cob
383 65
25 Senchal East Range
Senchal Wildlife Sanctuary
3rd Mile Simkona 21/EDC/5-6/9
177 30
28 Senchal West Range
Senchal Wildlife Sanctuary
Jorebunglow Dhoteria
23/EDC/15-1/9
171 30
12 Jaldapara West
Jaldapara Wildlife Sanctuary
Mandalpara-Kalabari
1/EDC/COB
354 55
11 Jaldapara North
Jaldapara Wildlife Sanctuary
Uttar Madarihat,(NWC-2)
18/EDC 222 55
24 North Range Mahananda Wildlife Sanctuary
10th mile 15/EDC/3-2/9
253 55
7 Upper Neora Range
Neora Valley NP Mulkharga 16/EDC 349 55
6 Gorumara South Range
Gorumara NP Kalipur - Budhram - Chatua
2/EDC 109 30
26 Sukna Range Mahananda Wildlife Sanctuary
Chamta 73/EDC/1-3/9
330 55
21 North Range Mahananda Wildlife Sanctuary
Sevoke 16/EDC/3-1/9
721 80
Selection of Non Project FPC/EDC
Under this study control group baseline data will be developed by covering 25 FPC and
03 EDC from non-Project areas. The selection of Non-project FPC/EDC will be done from
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
the adjacent area of the Project FPC. Accordingly, the FPC of the non-project area
nearest to the Project FPC will be selected for the study.
The selection of the Households FPC/EDC would follow the proportional method
as per the SC/ST composition.
Selection of Households: The household selection will be done randomly and will depend upon the availability of FPC
members in the villages during the survey period.
3.7 Analysis framework
The proposed base-line study analytically will focus on generating an extensive data base
and compiling parameters/indicators in a systematic manner. Apart from providing tables
of indicators related to socio-economic paradigms of FPC/EDC, the report will include the
analysis of current socio-economic status of Households of members of FPC/EDC.
Two stage method would be followed to build up the monitoring and evaluation indicators:
From an analytical perspective, cross-tabulation method involving two or more indicators
would be used to interlink various variables and provide analytical findings as far as
current situations are prevailing. Further, FGD reports for a defined number of FPC/EDC
would be produced.
3.8 FPC/EDC level Indicators
Sl. No. Category/Description of Tables Indicator Types
1. Profiling FPC/EDC: Location BI
2. Month & Year wise formation, Membership strength, Social & Economic Category wise distribution of members
BI
Forest Category & Average Forest Area, forest Area allocated for Management
BI/MI/EI
Forest Profile of the FPC/EDC area BI/MI/EI
Stage-IFocusing on Monitoring
Stage-II
Focusing on Evaluation
Benchmarks
Input Indicators
Output Indicators
Outcome indicators
Impact Indicators
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Sl. No. Category/Description of Tables Indicator Types
Tentative proportion of species/plants (High, Average, Low, etc.)
BI/MI/EI
3. Awareness level of FPCs: Project, responsibility and functions of FPCs
BI
4. Distance matrix from Infra and other Facilities BI/MI/EI
5 Basic Services/Facilities Access BI/EI
6 Socio-Economic Profile of FPC/EDC Members’ HHs BPL, Landlessness, Livestock, Livelihood sources, Income and income sources, Landholding status, Irrigation and crop status,
BI/EI
7 Project Activities carried out BI/MI/EI
8 Benefits to FPC from Forest resources BI/MI/EI
9 IGA status across FPCs BI/MI/EI
10 Functions PFCs performed/Activities FPCs has performed
MI
11 Extend of involvement of FPC members MI
12 Financial Status of FPCs: Revenue/Grant & Expen. BI/MI/EI
13 Governance & Management indicators of FPC BI/MI
14 Forest status in the FPC area: type, Density and degradation status
MI/EI
15 Interventions for Development of FPC/.EDC MI/EI
16 Capacity building of FPCs BI/EI
17 FPC wise Collection of NTFP MI/EI
18 FPC wise forest related IGA MI/EI
19 Status of SHGs under FPC/EDC MI/EI
20 Rank based Qualitative statement analysis of key functionaries of FPCs
EI
21 Rank based Qualitative statement analysis of FPC EI
22 Quality index of FPC based on certain weight based indicators
MI/EI
* BI: Benchmarks, MI: Monitoring Indicator, EI: Evaluation Indicator
3.9 FPC/EDC Members’ Level Household survey Indicators
Sl. No. Category/Description of Tables Indicator Types
1 General Information BI
2 Village wise % Distribution of sample FPC/EDC Members (For each Forest Division/District) vis a vis total FPC/EDC Members
BI/MI
4 Reasons of joining FPC/EDC and Awareness level of Roles and functions of FPC/EDC
BI
5 Gender and caste status of HHs BI
6 Family size and dependency ratio BI
7 Housing status and Basic Amenities available with HHs BI
8 Access to social and Economic Infrastructure BI/EI/MI
9 Education status of Family Members BI
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
10 Education status of children, dropout & Malnutrition among Child under 5 Years
BI
11 Migration status of HH Members BI
12 Vulnerable Members of HH BI
13 Health Status of HHs Major diseases in the family /Access to Health services
BI
14 IMR/MMR BI
15 Malnutrition: Children under 05 BI
16 Principal Occupational Status of Members of HH BI/MI/EI
17 Annual Family Income/Sources of Income/Expenditure and Savings
BI/MI/EI
18 Income of FPC/EDC Member MI/EI
19 BPL Status BI/EI
20 Asset Holding Pattern including Agri-implements BI/EI
21 Landholding status BI/EI
22 Agriculture productions/Slaes and cost of cultivation BI/EI
23 Constraints of Agriculture production BI/EI
24 Marketing of produce: Agri., Livestock and Forest BI/EI/MI
25 Livestock of HHs BI/EI
26 Food Security and procurements under PDS BI/EI
27 HH Status of access to Forest Produce (Pre-post) MI/EI
28 as Benefits Member of FPC/EDC MI/EI
29 Project Activities and impact on FPC Members HH MI/EI
30 Membership Status of SHG MI/EI
30 Sources of livelihood BI/EI/MI
32 Income from different sources BI/EI/MI
33 Assistances under Govt. Schemes BI/MI/EI
34 Impact of WBFBCP at HH Level MI/EI
35 Perceptions of FPC Members on status of Forest under FPC management
MI/EI
4.0 Data Analysis Data analysis will be done using the relevant statistical software. The following tools will be used
for extracting information: tables, graphs and charts, frequencies, percentages, ratio, and
averages, and standard deviations, minimum and maximum ranges. Further, ranking information
will be analyzed by using mean and standard deviation statistical tools. Data validity, generation
of random table, significant test, correlation, etc. will be done by using software.
5.0 Field survey Arrangement: Field testing and discussions with 1-2 FPC/EDC functionaries/FMU to improve the draft
questionnaire prepared on the basis of desk review (Completed)
list FPCs/EDCs and Final questionnaires Sample are duly approved by the client
(completed)
Collection of contact details of Officials (DMU/FMU) and sample FPC/EDC from the
client
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Issue of cooperation letter to concern Officials/Functionaries from the client
Identification and FPC/EDC allocation to investigators/field monitors
Field Testing and bench-marking information for Master schedule and time taken to
canvass 01 schedule (Completed)
Workshop/training for field Team (Completed)
Commencement of field survey and completion of field survey
Re-survey of 01 Schedules from Each of FPC/EDC
Focus Group Discussions (FGDs)
RST PLA tool will be used to identify problems, plantations, etc.
6.0 Monitoring and Quality Control Field Survey team members of each of the District/Village will take utmost care to collect accurate
information. The FPC/EDC functionaries will certify the data quality collected at the members’
level. At least 20% of schedules of each of the field investigators need to be vetted by the
FPC/EDC functionary/local Forest Officials. 1-2 members from each of the FPC/EDC will be
resurveyed. On spot verification of field investigators data collection process by Field team
coordinators will be done. Further, information gathered through FGD and other PLA tools like
RST will be used to validate the accuracy of data collected through DIs. Secondary data accessed
from census 2011 and NSSO will also be used to validate the primary data.
7.0 Work Plan The Baseline study mandated to be completed in two batches
Each of the draft baseline reports of Batch I & II to be submitted in 03 Months from the
date of signing of contract (13th January 2016)
The state assembly election was declared in the month of March 2016. The field situations
were not conducive for conducting field survey during March-May 2016 due to assembly
election in the state. Hence the revised timeline for the completion of the assignment is
proposed as follows for endorsement:
Activity Est. Start Est. Finish Est. Duration in Days
Draft Inception Report 13-01-16 10-02-16 27
Validation of HH schedules for final HH survey schedule
18-04-16 19-04-16 02
Submission of Final Inception Report
25-5-16 25-5-16 02
Final Inception Report (05 Hard copies & Soft copy)
17-05-16 26-5-16 01
Phase –I Submission of Draft Report:
Field Survey [Phase-I] Bankura & West Medinapur
20-05- 16 05-07-16 45
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
FGD/RST at Field (Phase-I) 25-06-16 30-06-16 05
Data Entry 15-06-16 10-07-16 15
Data Analysis & Report Writing (Phase I)
15-07-16 30-07-16 15
Draft Report Phase-I - 30-07-16
Phase-II: Submission of Draft Report
Field Survey [Phase-II] Bankura & West Medinapur
31-05- 16 10-07-16 40
FGD/RST at Field (Phase-I) 01-07-16 07-03-16 03
Data Entry 25-06-16 15-07-16 20
Data Analysis & Report Writing (Batch 2)
25-07-16 10-08-16 15
Draft Report Batch 2 14-8-16
Final Report Phase –I & Phase II
20-08-16 Project Completion
8.0 Deliverables I. Inception Report 05 copies of hard copy and soft copy
II. Draft Inception Report (Batch 1 and Batch -2)
06 hard copies and soft copy
III. Final Baseline reports (Batch 1 & Batch 2) 30 Hard copies and soft copy
9.0 Report Template Acronyms & Abbreviations
Executive summary
1. Background
Macro perspectives on JFM and FPC/EDC in West Bengal
About WBFBCP
Short Description of Project area
Short History of previous Development Interventions
2. Objectives of Baseline Study, Approach and Methodology
Approach
Information used as Benchmarks and Indicators for M & E
Socio-Economic Information and Forest sector specific information
Information useful for planning: Needs, problems in the area, resources and opportunities
Constraints and Solutions
Methodology
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Tools and techniques used for information collection, statistical techniques used and Data
software used to scope for MIS
Categories of people interviewed and other stakeholders
Sample design
3. Profile of FPC/EDC
General information of FPC/EDC
Social and Economic features of FPC/EDC
Resource status of FPC/EDC Area
Capacity Building of FPC/EDC
Status of Micro-Plans
Impact Analysis
Problems and opportunities of FPC/EDC: FGD reports and RST analysis
4. Categorizing: Monitoring, Evaluation, Impact and Planning Indicators
5. Household level Socioeconomic Analysis
Basic information
Social and economic Infrastructure, Access to basic amenities including housing status
Social Development: Culture, Caste, Gender, children, Health and Education, Food
security and Malnutrition, vulnerability
Asset ownership, Consumption-saving, indebtedness and financial inclusion
Sector wise Livelihood Analysis: Agriculture, Livestock, HH industries, Services, Wage
labour Poverty, Income, occupational structure, migration & employment status
Livelihood, Income, Employment and dependency on local resources/Forest resources
Household perception on WBFPC and impact of joining FPC/EDC
Impact Analysis of WBFPC at HH level
Other Scheme benefits and convergence with WBFBCP
Benchmarking indicators at HH level for Monitoring and Evaluation
6. Conclusions
7. Appendices
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
10.0 Staff Deployment and Roles & Responsibility of Key Professional
Sl. No. Professional along with Designation Key Role and Responsibility
1. Shri Vivek K. Sinha, Vice President, NABCONS, Zonal Office Mumbai Contact No. 022-26539396 e-mail: [email protected]
Project Head, Overall guidance for the execution of the assignment and technical supports for Report writing and vetting
2. Shri V. Pathak, Vice President , NABCONS Corporate Office, New Delhi Contact No. 011-25745105 e-mail: [email protected]
Co-Project Head and Supervision of Progress of Assignment
3. Shri Samrat Mukherjee, Sr. Consultant NABCONS, Zonal Office Mumbai 022-26539320 e-mail: [email protected]
JFM Expert, Client level technical discussions, Key inputs for report preparation, FGDs in selected locations, on-spot verification of field survey and training to investigators
4. Shri Loken Das, Sr. Consultant, NABCONS, Regional Office, NABARD, Kolkata Contact No. 033-22552228 e-mail: [email protected]
Key Project Facilitator, Client-management, Engagement of Investigators and Field survey arrangements, Data Entry facilitation, Training to Field investigators
5. Shri Chandan K. Sinha, Consultant, NABCONS, Regional Office, NABARD, Kolkata, e-mail: [email protected]
Project Facilitator, Client-management, supports for the Engagement of Investigators and Field survey arrangements, Data Entry facilitation, Training to Field investigators
6. Dr. Subhransu Tripathy Consultant Economist, NABCONS, Zonal Office Mumbai Contact No. 022-26539412 e-mail: [email protected]
Project Coordinator Canvassing Questionnaires, Data analysis, FGDs in selected location, Report preparation, Training to investigators and client level technical discussions.
11. Supports Required and provided from/by WBFBCP
1. The O/o WBFBCP/PMU has shared, information on FPCs/EDCs in project and non-project
areas and requested to provide the contact details of Key Officials from PMU/DMU/FMU, Forest
Department Officials of the DMU to be covered under the Baseline study.
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
2. The O/o WBFBCP/PMU is requested to issue letter of cooperation to DMU/Divisional Forest
Officer, Department of Forest Govt. of West Bengal and other relevant Officials/Functionaries to
cooperate with NABOCNS (Agency) to conduct the field survey and to collect information as per
the assignment’s requirements.
3. The O/o WBFBCP/PMU is requested to provide Identity cards (Temporary) to the selected
Field investigators/Professionals to conduct the field survey/FGD in case of survey in reserve
forest areas.
4. It is expected that the PMU office will facilitate the process of establishing contacts and
informing the concerned Officials prior to the arrival of the field investigators/Professionals.
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Annexure-I
FPC/EDC level Questionnaire
NABARD CONSULTANCY SERVICES PVT. LTD. Corporate Office : 24, Rajendra Place, 1st Floor,
NABARD Building, New Delhi – 110125 Reg. Office : Plot No. C24, G Block, 3rd Floor,
NABARD Building, Bandra Kurla Complex, Bandra East, Mumbai – 400051
Contact: NABCONS, NABARD Regional Office, Kolkata, West Bengal
Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the
FPCs/EDCs covering areas of execution
WEST BENGAL FOREST AND BIODIVERSITY CONSERVATION
PROJECT (WBFBCP)
WEST BENGAL FOREST DEPARTMENT & JICA
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Investigator: This questionnaire should be carefully filled with the help of one or (preferably) several knowledgeable members of the FPC/EDC/Beat Officer. Please try to collect information from actual records of FPC/EDC.
Name of the Investigator(s): Date of Data Collection: DAY: MONTH: YEAR: Investigator: Briefly describe the main respondents (eg. FPC/EDC Secretary, Chairman/President/Nominated from Panchayat/Nominated from Forest Dept.)
PART A: GENERAL INFORMATION 1. LOCATION OF FPC/EDC
Division/District/FMU or Range
Block/ Taluka
Panchayat
Village/Villages
Forest area under the FPC/EDC in Ha.
Dominant type of Forest Area (Reserved/Village/Community/Self-owned)
Forest Category under FPC/EDC
Total Area in Ha.
Ownership in Ha.
State Community private others
1. Natural Forest
2. Managed Forest
3. Plantation Source: FMU/FPC/EDC
a) Identification of FPC/EDC including contact details of Secretary of FPC/EDC
b) Regd. No, & Month & Year of formation of FPC/EDC
c) Forest area allotted for management and protection (2012 & Current Year)
2. FPC Profile
Profile of Executive Committee Members of FPC/EDC
Sl. No.
Name of the Executive Committee Member & Mobile No.
Age Sex Elected/Nominated Position
1)
2)
3)
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
4)
5)
6)
7)
3. Forest resource Profile of the FPC/EDC area Reserve Forest Area in ha. problems in management
High forest
Harvestable plantation
Other plantation
Degraded forest
Open/blank
Protected Forest
High/coppice forest
Other plantation
Degraded forest
Open/blank
Degraded forest area fit for coppicing
Plantation on the community land
Any other plantation outside forest area
Grass land
Source: FMU/FPC/EDC
Plant Local name Main uses Relative Abundance in %
1.
2.
3.
4.
5.
6.
Source: FMU/FPC/EDC
PART B: BASIC INFRASTRUCTURE AND FACILITIES 4. Proximity of FPC
FPC Location Distance from In Km./access to (Yes/No)
Forest area
Block HQ.
District HQ.
Connected Road
Transport Facilities
Nearest Market
Nearest Post Office
PHC
Nearest Bank Branch
Distance from Divisional Forest Office
Distance from Forest Ranger’s Office
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Nearest Nursery (Forest dept.)
Nearest Forest produce Sales centre
Nearest training centre
Nearest sales outlet (FPC/Forest Dept.)
Electricity Connection and availability
Telephone connectivity
Internet Connectivity
5. Access to Basic Services:
Basic Facilities Yes/No within FPC locality (If, not, mention distance & location)/ Percentage
% of HH access to safe Drinking Water
% of HH Electricity connection
% of HH having Sanitation (Toilet) facilities
Primary School
High School
PHC
Health services for Veterinary
PDS
Anganwadi centre
PART C: SOCIO-ECONOMIC PROFILE 6. Brief Socio-economic Profile of Members of FPC
Principal Characteristics Response
FPC Members spread across --- No. of villages (Mention the names/name of villages/village)
Total No. of FPC Members
No. of Households in the FPC
% of Male members in the FPC
% of SC Members
% of ST Members
% of OBC Members
% Other caste Category Members
% of BPL Members
% of Landless FPC Households
Livestock population of FPC Cows: Buffaloes: Bullocks: Goats: Sheep: Poultry: Others:
% of Members actively participating in the FPC activities
% of FPC Members attending annual general meeting
% of FPC Member undergone training programme
% of FPC Members are organized into SHGs
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
No. of SHGs formed
7. Livelihood Sources:
Source of livelihood No. of Households Problems/Opportunity
Agriculture
Forestry
Livestock
Wage labour
Small Business
Household Industries
Services/Jobs
Vulnerable HHs
8. Income Status:
Annual Income Level % of Households
Sources of Income (Agriculture including agri-labor-1, Forest resources including wage engagement in forestry activity-2, livestock -3, Household industry-4, Other casual labour-5, others like migration-6)
BPL
HH income < 0.5 lakh
HH Income 0.5- 1.0 Lakh per annum
HH Income Rs. 1.0-3.0 Lakh per annum
HH Income Rs. 3.0-5.0 Lakh per annum
HH Income more than Rs. 5.0 Lakh per annum
9. Land Holdings status of HHs under FPC/EDC
Land Ow Status (Exclude Homestead land) No. of HHs
Farmer HHs <= 0.5 acre.
Farmer HHs 1-2 ha.
Farmer HHs 2-4 ha.
Farmer HHs 4-10 ha
Farmer HHs >= 10ha.
10. Irrigation and crop Status of FPC/EDC Area
Total Agriculture land in the FPC Area in Ha.
Irrigated land in the FPC area in Ha.
Major Rabi crops
Major Kharif crops
Major Summer crops
Area in ha. under Rabi crops
Area in ha. under Kharif crops
Area under summer crops
Yield rate of major crops: Crop name Yield rate in Kg/Acre
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Fallow land in the FPC Area in ha.
Waste land in the FPC area in ha.
Water Bodies in the FPC Area (irrigation projects, Ponds, Watersheds, Wells and other ground water harvesting structures)
PART D: FPC/EDC RELATED INFORMATION
11. Who are eligible for the FPC membership? (i) Forest users in the village (ii) Anyone in the village (iii) Forest users within a given forest (iv) Other, please specify 12I. Are there any cash payments /contribution that one has to make to a FPC? If so, how much? 13. Maintenance of Records
Sl. No. Record Type/Governance issues Yes/No
i. Register showing the Members details
ii. Minutes of Meeting
iii. Annual General Meetings held regularly
iv. Bank A/C or A/C with Post Office
vii. Plantation Register and journal
viii. Work calendar register
14. Functions of FPC What are responsibilities of the FPC as per operational status? Prepare micro plans and annual plans
Are the FPC members aware about Micro plan (Yes/No)
Has the FPC prepared any Micro plan (Yes/No)
Is the annual action plan is prepared (Yes/No)
Sl No. Highlighted Assigned Duties Yes/No & Describe briefly nature of involvement
1. Information to Forest Officials about any person or persons attempting trespass and wilfully or maliciously damaging the side forest(s) and/or wildlife therein
2. Preventing trespass, encroachment, grazing, fire, poaching, theft of damage jointly with Forest Dept. Staff
Comment: shorten the sentences
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
3. Assisting Forest Dept. Staff in smooth and timely execution of all Forestry works taken up in protected area
4. Involve members in the duties assigned to FPC
5. Support Forest Officials for the Execution of forestry and fringe area development work
6. To assist the Forest Officials for identification and selection of laborers required for forestry work
7. Support to Forest department for harvesting of forest produce
8. Support to distribute the earmarked portion of net sales proceeds to the members of FPC
9. To assist Forest department to take action against the person/committee member damaging the forest/wildlife/plantation
15. Activities carried out/to be carried out for Forest and biodiversity Conservation under the Project in the year 2014-15 & 2015-16 1. Degraded forest land area
in the year 2012-13 in Ha. in the FPC covered area
2. Degraded forest land area during survey period in the FPC Area
Indicators Information/data Impact
3. Treatment of degraded forest land in the FPC domain in Ha.
1: Employment generation in man-days 2: No. of FPC Members engaged 3: 4: Average Wage Income in Rs.
Percentage increase in availability of forest resources/produce (from 2012 to present)
Small timber/Fuel wood
Grass & fodder
Medicinal produce & honey
Food items
4. Planting with High Yielding Eucalyptus Clone in the FPC area in ha. under the project & No. of trees planted
1: Employment generation in man-days 2: No. of FPC Members engaged 3: Increase in availability of forest resources/produce
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
4: Average wage income in Rs.
5. Plantation of Sal and Associate Species in ha. & no. of trees planted
1: Employment generation in man-days 2: No. of FPC Members engaged 3: Increase in availability of forest resources/produce 4: Average wage income in Rs.
6. Plantation of Quick growing and small Timber Species in ha. & in Nos.
in man-days 2: No. of FPC Members engaged 3: Increase in availability of forest resources/produce 4: Average wage income in Rs.
7. Enrichment of degraded forests in FPC managed Forest area in ha.
1: Employment generation in man-days 2: No. of FPC Members engaged 3: Increase in availability of forest resources/produce 4: Average wage income in Rs.
8. Area and No. of tree planted under social forestry up to the survey period in the FPC Area
1: Employment generation in man-days 2: No. of FPC Members engaged 3: Increase in availability of forest resources/produce 4: Average wage income in Rs.
9. Setting up Hi-tech Central Nursery (If, located in the FPC Area or nearby FPC Area), Total Production of plants/ saplings in No. (Incase located in nearby areas, mention the distance in km.)
1: Employment generation in man-days 2: No. of FPC Members engaged 3: Increase in availability of saplings 4: Average wage income in Rs.
10. Grassland restoration & fodder tree planting in ha. in the FPC/EDC area
1: Employment generation in man-days 2: No. of FPC Members engaged 3: Increase in availability of Fodder 4: Average wage income in Rs.
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
5: Other Benefits:
16. Activities carried out/to be carried out for overall development of FPC in the year 2014-15 & 2015-16
Type of Activity
Physical Target
Physical Achievement
Financial Target
Financial Achievement
Impact
Basic services
Community Infrastructure Development
Livelihood Enhancement
Resource Development
Capacity Building
17. Do the FPC has to obtain permits to (1) Harvest, transport and sale fuel wood, fodder, forest foods, medicinal plants, timber, NTFPs
18. Does FPC have obligations in the management plan? (1) How to manage fuel wood, fodder, forest foods, medicinal plants, timber, NTFPs (# of extraction, protection etc.)
19. Do the FPC has to pay fees for such permits? 20. Do the FPC has to sell products to particular places?- Fuel wood, fodder, forest foods,
medicinal plants, timber, NTFPs, etc.
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
21. Benefits to FPC in last year
Sl. No.
Forest Produce Product description
Quantity in Kg./Quantity in No.
Sales in Rs.
Sales proceed share of FPC
Problems
1. NTFP
2. NTFP Product-1 Honey
3. NTFP product-2 Fire-wood
4. NTFP product -3 Sal Leaf
5. NTFP product -5 Tendu leaf
6. NTFP product -6 Broom Grass
7. NTFP product -7 Fodder
8. NTFP product -8 Medicinal plants
9. NTFP product -9 Wild Vegetables
10. NTFP product -10 Others
11. Timber wood
12. Processed products
13. Manufactured products like Furniture and others
14. Others
22. Collection Time in Month and Distance Travel/Man-days engaged during the survey period
Sl. No.
Forest Produce Months (Name) Distance Traveled
Man-days engaged per unit* collection
1. NTFP
2. NTFP Product-1 Honey
3. NTFP product-2 Fire-wood
4. NTFP product -3 Sal Leaf
5. NTFP product -5 Tendu leaf
6. NTFP product -6 Broom Grass
7. NTFP product -7 Fodder
8. NTFP product -8 Medicinal plants
9. NTFP product -9 Wild Vegetables
10. NTFP product -10 Others
11. Timber wood
12. Processed products
13. Manufactured products like Furniture and others
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Sl. No.
Forest Produce Months (Name) Distance Traveled
Man-days engaged per unit* collection
14. Others
* Mention the unit as discussed with FPC Functionaries
23. FPC Financial Status during last 01 year
Sl. No. Income including grant/loan/share from
sales proceeds
Expenditure
24. Mention details of sources of Income and major expenditure heads of the FPC/EDC (Collect 01 year Balance sheets)?
25. How are revenue shared between the forest department and FPC?
26. How revenues are distributed among FPC members? 27. Status of SHGs under FPC
Sl. No. Indicators Response
1. No. of Active SHGs
2. Year of formation of max. number of SHGs
3. Total No. of SHG Members in active SHGs
4. No. of SHGs into IGA & list out major activities
5. No. of SHGs involved in Forest related IGA
6. No. of SHGs engaged in afforestation activity
7. No. of FPC members yet to be mobilized for SHG formation
28. How does the FPC decide on and distribute works among members? (a) Area treated (coppicing and singling), (b) Wage per day (c) No. of persons (d) No. of days’ work (e) No. of plants planted (f) Expenditure (Tabular form)
29. Implementation of a micro plan: How is each work implemented? (i) Plant nursery: (ii) Planting trees: (iii) Coppicing: (iv) Singling: (v) Thinning: (vi) Soil conservation (e.g. stabilize slope): (vii) Fire management (e.g. remove combustible materials): (viii) Forest patrolling to capture forest offence:
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
(ix) Others:
30. Trainings programmes conducted for the FPC Members/FPC Staffs
Sl. No. Training programme No. of Members attended
1. JFM
2. IGA
3. Technical training on harvesting forest produce
4. Technical training on plantation
5. Technical training on forest protection
6. On forest Act
7. Others (Specify)
31. 10 Major problems of the area as per the FPC key functionaries’ perception and Views and opinions of Key FPC/EDC functionaries on WBFCBP (List of Problems)
Problems Rank (10 marks for most important problem)
Suggestive Solutions
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Annexure-II
FPC/EDC REGD. NO:
DIVISION CODE:
RANGE CODE:
HH CODE:
WEST BENGAL FOREST AND BIODIVERSITY CONSERVATION PROJECT (WBFBCP)
WEST BENGAL FOREST DEPARTMENT & JICA
SOCIO-ECONOMIC BASELINE SURVEY TO ASCERTAIN SOCIO-ECONOMIC STATUS OF COMMUNITIES INVOLVED IN THE
FPCS/EDCS COVERING AREAS OF EXECUTION
NABARD CONSULTANCY SERVICES PVT. LTD. Corporate Office : 24, Rajendra Place, 1st Floor,
NABARD Building, New Delhi – 110125 Reg. Office : Plot No. C24, G Block, 3rd Floor,
NABARD Building, Bandra Kurla Complex, Bandra East, Mumbai – 400051
Contact: NABCONS, NABARD Regional Office, Kolkata, West Bengal
FPC/EDC MMBER HOUSEHOLD SURVEY SCHEDULE
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
FPC/EDC MEMBER’S HOUSEHOLD SURVEY
Date of Interview:
Name of Interviewer: _______________
1. GENERAL INFORMATION
Division: District: Range: Village:
Regd. No. of
FPC/EDC:
Month & Year formation: Functional: Yes/No
Name of FPC/EDC
Member*:
Male Female
Identification of
FPC/EDC Member
(Any one, Preferably
Aadhaar card)
Voter ID Card
No.
Ration Card
No.
Aadhaar Card
No.
Any other ID
Card
(DL/PAN/Bank
Pass book)
Others
(Specify)
HH Poverty Status: APL BPL AAY
Social category: GC SC ST OBC
Why you have joined
the FPC (Apart from
the reason that all the
HHs are Member of
FPC)
Increased access
to forest products
Regenerate forests
for the future
generation
Wage employment opportunities
Social aspect
Motivated by
Forest Department
Motivated by NGO Not aware that I am a FPC/EDC Member
Others Specify?
Are you aware of responsibilities and duties of a FPC/EDC Member? (Yes/No)
* Strikeout the irrelevant one
2. Apart from FPC/EDC Membership, do you or your family members are Member of any other group 1-Farmer’s group 2-SHGs 3- Cooperative Society 4-Producer Group 5-Watershed Group 6-
Any other (Specify)
3. Basic Household Facts
Sl. No Particulars Responses
a. Family size
b. No. of Family Members (Male)
c. No. of Family Members (Female)
d. No. of Earning Family Members
e. Male Family Members in the age group of 15-60 year
f. Female Family Members in the age group of 15-60 year
g. No. of Children below 15 Year
h. No. of Family Members above 60 Year
i. Children below 5 Years
j. No. of literate Family Members
k. No. of School going Children
l. No. Children above 6 years not enrolled in the school
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
# Child is defined as in the age range of less than 15 years
4. Household Basic Amenities
Type of House1
Details of homestead land2
Is house electrified? (Yes-1, No.2)
Source of light in the house3
Source of drinking water4
Availability of drinking water (Code 1: Yes, 2: No, Partially: 3)
Availability of toilet (Yes/No) & Place of defecation5
Main source of fuel used for cooking in the household6
Water available for Bathing (Yes/No)
Mobile/Land line (Yes-1, No.2)
Radio Television (Yes-1, No.2)
Bi-cycle (Yes-1, No.2)
Scooter/Motor cycle/Moped (Yes-1, No.2)
Ceiling Fan (Yes-1, No.2)
Availing Banking Services (Yes-1, No.2)
1 Straw thatched Katcha-1; pucca-2; Semi-Pucca-3 2 inherited own land-1; purchased land-2; govt. land with purcha-3; govt. land without purcha-4; landlord’s land-5; others(specify)-6 3 Dhubri-1; K. oil lantern/lamp-2, K. oil petromax-3, electric bulb/tube-4, solar lantern-5, others-6 4 Own hand pump/tubewell-1; public hand pump/ tubewell-2; tap in dwelling-3; public tap-4, own dugwell-5, public dugwell-6; pond/river/stream-7; tanker/truck supplied-8; others (specify)-9 5 Modern latrine (with or without flush)-1; pit latrine-2, service latrine-3, open field-4, others (specify)-5 6 Fuel Wood-1, coal-2, k.oil-3, hay/leaves-4, cow dung cake-5; agricultural waste 6; gobar gas-7; liquid petroleum gas-8, others-9
m. No. of Children dropped education (Below 15 years)
n. No. of migrants from the Family < 03 Months)
o. No. of migrants from the Family (>= 03 Months)
p. Describe on Destination of Migration and purpose
q. Others, please mention specific to demographic features of HH like Widow, Divorcee, child labour, etc______________________________________________________________________________ _
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
5. Details of Family Members’ Information use code
Family Member’s Sl. No.
Relation7 with the FPC /EDC Member
Age Sex (M/F)
Educational status of Family Member8
Occupation of Family Member
No. of family Migrated
Main9
Ist 2nd
1.
2.
3.
4.
5.
6. Monthly average Household income and expenditure
INCOME EXPENTITURE
Item
Average
Monthly
(Rs./Month)
Item
Average
Monthly
Expenditure
(Rs. /Month)
a. Agriculture 1. Foods
b. Livestock/Dairy 2. Fuel
c. Fishing/Aquaculture 3. Water
d. Forest Produces 4. Electricity
e. Employment in Forestry activity 5. Transportation
f. Cottage industry/HH Industry 6. Communication
g. Business/Trading 7. Agriculture
Inputs
h. Wage Labourer (casual work) – private 8. Education
7 Self-1, husband/with-2, son/daughter-3, wife/husband of son/ daughter-4, grandson/daughter-5,
father/mother-6, brother/sister-7, mother/father in-law-8, sister-in-law-9, nephew/niece-10, uncle/aunty-11, other relatives-12, servant/employee/other-13.
8 Illiterate-1, below primary or informal education-2, primary-3, middle-4, matric/high school/secondary-5, higher secondary/ pre-university/ intermediate-6, pre-graduation diploma or certificate below degree 7. Degree /equivalent to degree(graduation level), 8, Post Graduate degee diploma certificate-9. Technical degee (medical, engineering etc.)-10
9 Self – cultivator-1; tenant-2; casual labour in agricuture-3; attached agricultural labour-4; casual labour in
rural non –farm-5; industrial casual labour (engaged in manufacturing; construction, mining etc )-
6; industrial regular labour-7;self- employed mechanic-8; engaged in traditional
occupations/artisan-9; engaged in self-business based on agriculture & allied activities (animal
husbandary, poultry, aqua-culture etc.) –10 ; politics-11; small business/trade/shop/contract work-
12; big business/trade/shop/contract work-13 collection of fodder/cutting wood from jungle and
selling-14 begging/dependent on doles-15 unemployed-16 student-17: only domestic work-18
retired/very old-19 disable handicapped/sick-20 domestic servant-21:(white collar jobs) -22 class
none-26, others (spccify)-27
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
INCOME EXPENTITURE
i. Agricultural Labourer 9. Health
(medicine)
j. Employment generation under Govt.
schemes
10. Clothing
k. Employment generation work by Forest
Dept.
11. Social
Functions
Loan 12. Loan
repayment
l.
j.
Remittances
Others (specify)
13. Saving
14. Others
(Specify)
Total Annual Income Total Annual
Expenditure
7. Income of FPC/EDC Member or Nominated Member-I
Occupational Activity No. of Days in a Year Annual Income from Activity in Rs.
Agriculture- self cultivation
Agriculture labourer
Wage Labourers under MGNREGA*
Livestock/Dairy
Forest Produce collection & selling
NTFP
Govt. Servant
Formal Employment in Private
Business
HH Industry
Remittances
Traditional Skill service
Employment under activity by Forest dept. or under WBFBCP
Self-Employment activity IGA promoted under WBFPC
Others (mention details)
8. HH Members Wage earnings
Wage Labour type No. of HH members
engaged as wage
earners
Wage rate Peak Months
of
employment
No. of Days
Engaged in a
Year (2014-15)
Agricultural Labourers
Daily Wage labourers in
Non-Agricultural Activity
Industrial Labourers
Skilled labourer
MGNREGS
Forest Activities
Others (Specify)
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
9. Land Holdings/access of the HH by type, size, and holding type.
Land Holdings by the HH Land Area (acre)
(1) Total cultivated land (Including land leasing)
(2) Total irrigated cultivated land
(3) Residential land
(5) Agriculture land owned by the HH
(6) Land leased in (Tenancy)
(7) Land leased out
(8) Cultivable waste land
(9) Waste land
(8) Land Mortgaged in
(9) Land Mortgaged out
(10) Community land (Not Permanent)
(11) Land with Permanent Pass (User Rights)
(12) Forest Land (Not permanent)
(14) Others (Specify)
(16) Land owned by the FPC/EDC Member
10. AGRICULTURE PRODUCTION (Please give information on production and sales of the
following crops for last one year)
Crop Name
Production System [Multiple answers allowed]
Cultivating Season Cultivated
Area (acre)
Production quantity
(kg/season)
Sale quantity
(kg/season) Rainfed
Cultivation
Irrigated Cultivatio
n
From (Month)
To (Month)
11. Information on cost of cultivation per acre for last one year in Rs.
Crop name Total Cost of cultivation per Bihga in Rs. (Include imputed cost of HH labour and others used by HH own sources)
12. What are major constraints in agriculture production? [Please choose three most
serious constrains]
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
01 = Lack of irrigation facilities. 02 = Lack of irrigation water. 03 = Erratic precipitation. 04 = Lack of suitable land for cultivation. 05 = Soil degradation. 06 = Difficult to obtain appropriate seeds/seedlings (e.g. high-yielding, disease resistance, etc.). 07 = Difficult to apply fertilizer appropriately. 08 = Difficult to control insects and diseases. 09 = Lack of labour forces. 10 = Lack of agriculture machineries/equipment. 11 = Lack of skills and knowledge on cultivation. 12 = Transportation of farm inputs/outputs 13 = Others
(specify):_______________________________________________________________________ 14 = Others
(specify):______________________________________________________________________________
13. Do you owe any loan at present [Y/N] [if yes, give the following details]
Amount of loan – purpose and source wise
Sl.No. Amount Year of borrowing
Rate of interest
Source* Purpose** Amount repaid
When was last Installment paid
[* Money lender = 1, Govt PAPs = 2, PRY = 3, PACS = 4, Bank = 5, Post Office = 5, Family relatives &
friends = 7, Other = 8, If more than one source, mention all.
** Enterprise (including poultry, fishery, agriculture) = 1, Cropping = 2, Children’s Education = 3, Out
migration =4, Treatment of illness = 5, repayment of another loan =6, Social functions (marriage, birth,
death) =7, Festivals = 8, House construction = 9, Purchase of agricultureal implements = 10, Purchase of
cattle = 11, Food = 12, Other = 13]
14. Access to Market (Please give information on regarding marketing for last one year, Produce includes both raw materials and processed ones).
(A) (B) (C) (D) (E) (F)
Produce
(Agro/Livestock/forest)
Where do
you sell your
produce*?
[USE
CODE]
To whom
do you sell
your
produce*?
[USE
CODE]
How do you
transport your
produce*?
[USE CODE]
Package of
produce for
transportation*
[USE CODE]
Constraints
on marketing.
[USE CODE]
1st 2nd 3rd
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Codes for
(B)
01 = Farm gate; 02 = Village market; 03 = Roadside market ; 04 = Town/City market; 05 = Outside
State; 06 = Others (specify)
Codes for
(C)
01 = Consumer; 02 = Retailer; 03 = Collector/Broker/Agent/Wholesaler; 04 = Processing factory; 05
= Others (specify)
For 03, please describe the town / city name of final destination market.
Codes for
(D)
01 = On foot; 02 = Collected by collector/middleman; 03 = Cart; 04 = Truck; 05 =LMV; 06 = Three
wheeler;
; 07 = Motorcycle; 08 = Bicycle; 09 = Others (specify)
Codes for
(E)
01 = No arrangement; 02 = Bag; 03 = Bamboo basket; 04 = Wooden box; 05 = Others (specify)
Codes for
(F)
Please choose three most serious constrains at maximum and rank them (1st= most serious, 2nd=
secondary serious, 3rd= third serious).
01 = Low price; 02 = Fluctuation of price; 03 = Lack of market information (price, demand, etc.); 04 =
Limited buyer; 05 = Difficulty of market access; 06 = Lack of transportation facilities; 07 = Lack of
knowledge on marketing way; 08 = Lack of labour forces; 09 = Others (specify)
15. Livestock Details
Particulars Cattle Poultry Sheep Goat Pig
Milch Cows
Buffaloes
Number of animals
Products from livestock
Quantity Sold in market
Price per litre or per kg in Rs.
16. Assistances under government schemes (1) Have you received benefits under any Government Development schemes for the past 3 years? (
Yes No) (2) If Yes, please give details of assistances received under those government scheme and extension
service
Scheme
Kind of assistances
Grant Loan Subsidy Employ
ment Training
MGNREGA
National Rural Livelihood Mission (NRLM)/SGSY
National Rural Health Mission (NRHM)
IAY (Indira Awas Yojana)
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Education Scheme (SSA)
NOAP
PMJDY
JSY (Jan Suraksha Yojana)
PDS (Ration Shop)
Integrated Watershed Management Programme
(IWMP)
Accelerated irrigation Benefit Programme (AIBP)
National Horticulture Mission (NHM)
Rashtriya Krishi Vikash Yojana (RKVY)
Extension Service by Government Department
Specify Department: Forest Department
JFM/Social Forestry Programme
Others (specify):________________
17. Food Security Status
Do your family failed to afford food requirements during any month in the last Year? ( Yes No)
If Yes, how many months a year have you failed to afford food? (________________months/year
17. A. Public Distribution System Number of family members entered in the card ( )
Sl.No. Items Quantity purchased last month (kg.)
Issue price per kg. Price at which purchased per kg.
Part B
18. As per your knowledge what are the major plant species available in the forest area:
1. 4.
2. 5.
3. 6.
19. As per your knowledge what are the more suitable species for plantation in the
FPC/EDC area (Use local names)
1. 4.
2. 5.
3. 6.
20. what are the forestry activities, FPC/EDC family members are engaged by the Forest
department
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Forestry Activity No. of Days employed in last year (2015-16) from
your family
i. Plantation (e.g.)
ii.
iii.
iv.
v.
vi
21. Status of Access to Forest Produce as a FPC/EDC Member at present (Please give information on collection of forest products for year: 2015-16)
Type of Forest Produce
How much forest
product do you obtain?
(kg)
Sources of forest produce Sale of forest
products for last one year
Self-use
Reserved Forest
Protected
Forest
Unclassified Forest
Others (Specify)
Quantity (kg)
Amount (Rs.)
Quantity (kg)
1. Timber wood 2. Firewood 3. Bamboo 4. Bark 5. Honey 6. Tendu leaf 7. Sal leaf 8. Broom grass 9. Fodder 10. Mahua Seeds 11. Wild
vegetables
12. Fruits/oth. 13. Others
(specify):
20. What kinds of benefit you have received as a member of FPC/EDC? [Multiple answers
allowed, put √ mark]
01 Better Access to Forest produce
02 Employment in Forest development activity including plantation, nursery, etc.
03 Employment in works undertaken for rural infra development
04 IGA developed under SHGs formed within FPC/EDC
05 Shares of sales proceeds from auction/sales of forest produce
06 receive technical guidance and training
07 No benefits
08 Others (specify)
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
21. Activities carried out/to be carried out under WBFBCP in the year 2014-15 & 2015-16
and Benefits to FPC Member (Refer to Micro plan and others)
Type of Activity Month & Year
Rating of the interventions (Excellent-1, Very Good-2, Average-3, Below Average-4, Not good-5)
Impact/Benefits
Basic services
Community Infrastructure Development
Livelihood Enhancement
Resource Development
Capacity Building
22. Have you ever participated/engaged in plantation activity by the Forest department
(Yes/No)
23. If, yes, mention details of involvement in plantation activity like employment, name of
the trees/species planted and benefits accrued from the plantation activity
24. Have you undergone any training programme conducted by Forest
department/WBFBCP (Yes/No)
If, Yes, mention the details
Sl. No. Training programme Month & Year attended
1. JFM
2. Income Generating (Vocational)
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
3. Technical training on harvesting forest produce
4. Technical training on plantation
5. Technical training on forest protection
6. On forest Act
7. Others (Specify)
25. Have you/family member ever reported any illegal activity by anyone in the forest area
to the Forest Officials/FPC/EDC (Yes/No)
Mention the kind of illegal activity?
26. Have you/your family members ever reported and supported forest department in
case forest fire (Yes/No)
27. Have you supported forest department to preserve the forest resources by any
means? (Yes/No)
If, Yes, do mention the kind of supports extended to forest department?
28. Impact of WBFBC Project Activities at Household level
Indicator In the year 2014-15 Information During Field Survey (2015-16)
Annual Family Income in Rs.
No. of man-days Employment (All Family Members)
Annual income from Forest resources
Annual FPC/EDC Member’s Income in Rs.
No. of man-days Employment in Forestry Activity
HH access to community Infrastructure (Mention the Infra. Road, transport facility, PHS/Sub-PHC/ICDS/Schools/Community hall, and others) (Access to facility within 0.5 – 1 km.)
Infra Yes/Np
All weather road
Drainage
Electricity
Primary School
ICDS
PHC
All weather road
Yes/Np
Drainage
Electricity
Primary School
ICDS
PHC
Sub-PHC
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Indicator In the year 2014-15 Information During Field Survey (2015-16)
Sub-PHC
Public Drinking water source
Transport facility
Bank
Post office
Community Toilet
Community Hall
Training centre
Market
Storage facility for agri and oth products
PDS
CSC (Common Service centre)
Forest department office
Others specify
Public Drinking water source
Transport facility
Bank
Post office
Community Toilet
Community Hall
Training centre
Market
Storage facility for agri and oth products
PDS
CSC (Common Service centre)
Forest Department office
Others specify
Basic Household Amenities (Mention the Amenities: Drinking water, Sanitation, Electricity, Fuel type use, and others)
Basic facility at HH
Yes/No
Drinking water
Electricity supply/connection
Toilet
Fuel
Storage facility
Others specify
Basic facility at HH
Yes/No
Drinking water
Electricity supply/connection
Toilet
Fuel
Storage facility
Others specify
Average Distance travelled per Day to Collect Forest Produce in Km.
Quantity of forest produce collected per Day in kg./No. with specific products
Benefits under Govt. Programme (Mention Programme/scheme names)
Other Development programme (mention names)
29. Perception on status of Forest
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
Increase in Forest and tree cover in the area linked with FDC/EDC has increased in last 03 Years
1: Large extent 2. Moderate extent 3. Little extent 4. Remained same 5. Decreased
Diversion of forest area for non-Forestry purpose in last 03 Years
1: Large extent 2. Moderate extent 3. Little extent 4. Remained same 5. Decreased
Forest area under encroachment in last 03 Years
1: Large extent 2. Moderate extent 3. Little extent 4. Remained same 5. Decreased
Increase in tree plantation in last 03 Years by forest department
1: Large extent 2. Moderate extent 3. Little extent 4. Remained same 5. Decreased
Increased collection of NTFP produces in last 03 Years
1: Large extent 2. Moderate extent 3. Little extent 4. Remained same 5. Decreased
Increased access to Timber collection for private uses in recent past
1: Large extent 2. Moderate extent 3. Little extent 4. Remained same 5. Decreased
Decline in Distance travel to collect forest produce in recent past
1: Large extent 2. Moderate extent 3. Little extent 4. Remained same 5. Decreased
Increase in volume of Forest produce collection in recent past
1: Large extent 2. Moderate extent 3. Little extent 4. Remained same 5. Decreased
Overall ranking of implementation of WBFBCP
1: Excellent 2. Very Good 3: Good 4: Not Good
Mention 05 important likely impact of WBFBCP in coming 05 Years: 1: 2: 3: 4: 5:
Inception Report Socio-Economic Baseline Survey to ascertain socio-economic status of communities involved in the FPCs/EDCs covering areas of execution
Final Inception Report
30. Any suggestion for improvement of the program (WBFBCP)?
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________