Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
!!
!!!!
!
! !
!
!
!
!!
!
!! !
!!
!!
!
!
!
!
!
!
!
!
!
!
!!!!!!
!!
!!
!
!
!
!
!
!!
!! !!!
!!!
!
!!
!!!!
!
!
!
!!!
!!!
!
!!!
!!
!!
!
!
!
!
!
!
!
!
!!
!
!! !
!
!!
! !
!
!
!!!
!
!
!!
!!
!! ! !
!! !
!
!
!
!!
!!
!
!
!!
!!
!
!
!
!
!
!
!!
!
!
!!!
!!
!!
CentrePond
Glim Lake
J Lake
ProposedPit
Proposed Dyke
Dry StackTailings Facility
Option
ConventionalTailings Facility
Option
EC15-145 (20.73 m)EC15-146 (23.77 m) EC15-148 (36.27 m)
EC15-147 (21.03 m)
EC15-144 (142.64 m)
EC15-149 (56.91 m)
EC15-150 (41.00 m) EC15-151 (11.00 m)EC15-152 (5.30 m)
EC15-153 (41.00 m)EC15-154 (5.00 m)
EC15-156 (4.65 m)EC15-155 (41.00 m)
EC15-140 (8.19 m)
EC15-142 (59.80 m)
EC15-141 (10.85 m)
EC15-143 (203.00 m)
Proposed Process Plant
250
300
200
350
300
300250
300
300
250
300
250
250
250
250
250250
300
300
300
250
250
250
300
300
250
300
250
250
300
250
300
300
250
300
300
535000
535000
6315
000
6315
000
#I
Lac LeMoyne
520000 525000 530000 535000 540000 545000 550000 555000
6295
000
6300
000
6305
000
6310
000
6315
000
6320
000
6325
000
6330
000
6335
000
Index Map#I Camp Valcourt
Eldor Property
SYMBOLS! Drill Hole (Planned)! Drill Hole (2015 Summer)! Drill Hole (2015 Winter/Spring)! Drill Hole (Pre-2105)
Proposed PitProposed Process PlantConventional Tailings Facility OptionDry Stack Tailings Facility OptionProposed DykeElevation Contour (5 m)Elevation Contour (50 m)Eldor Property (Commerce Resources)
COMMERCE RESOURCES CORP.
0 200 400 600 800Metres
¯
1:7,500UTM Nad 83, Zone 19N
Eldor Property, Quebec
Ashram ProjectProposed Infrastructure
Results of the Preliminary Economic Assessment (PEA) representforward-looking information. This economic assessment is bydefinition preliminary in nature and it includes inferred mineralresources that are considered too speculative to have the economicconsiderations applied to them that would enable them to becategorized as mineral reserves. There is no certainty that the PEAwill be realized. Mineral resources are not mineral reserves as theydo not have demonstrated economic viability.The Pre-feasibility Study (PFS) is ongoing with the results of theprograms described in this news release and associated map(s) tobe incorporated, along with other necessary technical data includinggeological and engineering studies, into the PFS with costs andbenefits to be described in more detail therein.