SPECI ALI ST P O L Y U R E A S O L UTI O NS INFORMATION SHEET BALL / SAG MILLS Industry Gold Processing Client Major Gold Producers Asset Ball and SAG Mills Descripon: Nukote’s high performance polyurea coangs provide a unique soluon in the maintenance of Ball and SAG mills in the gold processing industry. Aſter removal of wear plates in the mill, the exisng rubber lining is removed. The internal surface of the mill is then abrasive blasted to SA 2.5 and tested for surface contaminates. Applicaon of 6mm of Nukote ST is then immediately applied on the internal steel surfaces. Nukote ST system is 95% cured within 5 minutes of applicaon. The fast curing characteriscs of the Nukote system allows re-installing the wear liners of the mill to commence almost immediately aſter the coang has been applied. Nukote’s seamless liner system also prevents “racing” that occurs in the joints of tradional rubber liners. The system can be parally or fully installed to a mill and repairs to the liner can be undertaken quickly and efficiently during planned shutdowns. Nukote Australia Pty Ltd P: +61 (8) 9419 0600 A: 7/6 Richardson Street, Kwinana Beach WA 6167 E: [email protected] www.nukoteaustralia.net.au SPECIALIST POLYUREA SOLUTIONS SPECIAL POINTS OF INTEREST Nukote applicaon teams are capable of installing 400m 2 of liner in 28 hours, significantly reducing down me. Significant cost savings are realised with reduced down me and long-term performance benefits. Clients report that mills lined with Nukote experience less bolt breakages. Images 1. Rubber lining removed, abrasive blasted and ready for coang. 2. 6mm of Nukote ST has been applied. 3. External of a ball mill. 1 2 3 Locaon Goldfields WA

INFORMATION SHEET BALL / SAG MILLS - Nukote Australia

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INFORMATION SHEET BALL / SAG MILLS - Nukote Australia

SPECIALIST POLYUREA SOLUTIONS

INFORMATION SHEET

BALL / SAG MILLS

IndustryGold Processing

ClientMajor Gold Producers

AssetBall and SAG Mills

Description:

Nukote’s high performance polyurea coatings provide a unique solution in the maintenance of Ball and SAG mills in the gold processing industry.

After removal of wear plates in the mill, the existing rubber lining is removed. The internal surface of the mill is then abrasive blasted to SA 2.5 and tested for surface contaminates. Application of 6mm of Nukote ST is then immediately applied on the internal steel surfaces.

Nukote ST system is 95% cured within 5 minutes of application. The fast curing characteristics of the Nukote system allows re-installing the wear liners of the mill to commence almost immediately after the coating has been applied.

Nukote’s seamless liner system also prevents “racing” that occurs in the joints of traditional rubber liners. The system can be partially or fully installed to a mill and repairs to the liner can be undertaken quickly and efficiently during planned shutdowns.

Nukote Australia Pty Ltd P: +61 (8) 9419 0600A: 7/6 Richardson Street, Kwinana Beach WA 6167E: [email protected]

www.nukoteaustralia.net.auSPECIALIST POLYUREA SOLUTIONS

SPECIAL POINTS OF INTEREST

◊ Nukote application teams are capable of installing 400m2 of liner in 28 hours, significantly reducing down time.

◊ Significant cost savings are realised with reduced down time and long-term performance benefits.

◊ Clients report that mills lined with Nukote experience less bolt breakages.

Images1. Rubber lining removed, abrasive blasted and ready for coating.

2. 6mm of Nukote ST has been applied.3. External of a ball mill.

1

2

3

LocationGoldfields WA