Upload
diane-kelly
View
244
Download
5
Tags:
Embed Size (px)
Citation preview
Infrastructure initiatives
Infrastructure initiatives
by
Government of Karnataka
by
Government of Karnataka
BangaloreBangalore
INDIAINDIAINDIAINDIA
Bangalore – The Capital of Karnataka
Knowledge Capital
Technology Hub
A Brand
Bangalore – The Capital of Karnataka
Knowledge Capital
Technology Hub
A Brand
Basic Facts
Area : 192,000 Sq. Kms
Population : 52.73 Million(2001 census)
State GSDP 2004-05 : US $ 34.41 Billion
GSDP Growth Rate % - 2005-068.7 %
Basic Facts
Area : 192,000 Sq. Kms
Population : 52.73 Million(2001 census)
State GSDP 2004-05 : US $ 34.41 Billion
GSDP Growth Rate % - 2005-068.7 %
Karnataka – Your Partner in Progress
Karnataka – Your Partner in Progress
AirportsAirports
InfrastructureInfrastructure
Bangalore International AirportBangalore International Airport
Pioneering PPP initiative
Project Cost – USD 430m
Brisk progress
To be operational by April 08
Pioneering PPP initiative
Project Cost – USD 430m
Brisk progress
To be operational by April 08 www.bialairport.comwww.bialairport.com
New International AirportNew International Airport
Existing Airport – OperationalExisting Airport – Operational
Minor Airports – Development ProposalsMinor Airports – Development Proposals
Existing Airport – Non–OperationalExisting Airport – Non–Operational
Minor AirportsMinor
Airports
Upgraded to International AirportUpgraded to International Airport
DetailsDetails
BIJAPURBIJAPUR
GULBARGAGULBARGA
HASSANHASSAN
BANGALOREBANGALORE
BELGAUMBELGAUM
HUBLIHUBLIBELLARYBELLARY
MANGALOREMANGALORE
MYSOREMYSORE
SHIMOGASHIMOGA
Bangalore Metro
Bangalore Metro
Bangalore Mass Rapid Transit Ltd. (BMRTL), is the implementing agency.
Project envisages a 33km elevated and underground rail network with 32 stations for Phase 1.
Budgeted at more than 54.5 billion rupees ( about US$1.2 billion ). Soil testing started. Project to be completed by 2011.
Bangalore Mass Rapid Transit Ltd. (BMRTL), is the implementing agency.
Project envisages a 33km elevated and underground rail network with 32 stations for Phase 1.
Budgeted at more than 54.5 billion rupees ( about US$1.2 billion ). Soil testing started. Project to be completed by 2011.
www.bmrc.co.inwww.bmrc.co.inProposed Route MapProposed Route Map
RailwaysRailways
Setting up a separate project development company (K–RIDE) for rail projects in Karnataka.
Hassan – Mangalore Gauge Conversion project through a Special Purpose Vehicle with equity participation by strategic investors, NMPT and MEL.
Hassan – Mangalore rail line is operational and handling freight traffic. To be opened for passenger traffic shortly.
Setting up a separate project development company (K–RIDE) for rail projects in Karnataka.
Hassan – Mangalore Gauge Conversion project through a Special Purpose Vehicle with equity participation by strategic investors, NMPT and MEL.
Hassan – Mangalore rail line is operational and handling freight traffic. To be opened for passenger traffic shortly.
Proposed to be located on 104 acres in Electronic City Phase III, Hosur Road, Bangalore.
Private developer responsible for providing core, commercial and support infrastructure, marketing and realty management services.
Project development activities under progress.
Process for selection of private developer to commence shortly.
Proposed to be located on 104 acres in Electronic City Phase III, Hosur Road, Bangalore.
Private developer responsible for providing core, commercial and support infrastructure, marketing and realty management services.
Project development activities under progress.
Process for selection of private developer to commence shortly.
Development of Biotech Park in Bangalore
Development of Biotech Park in Bangalore
Other Infrastructure ProjectsOther Infrastructure Projects
1. Elevated Corridor for IT City – Bangalore.1. Elevated Corridor for IT City – Bangalore.
2. Truck Terminals.2. Truck Terminals.
3. Sandur Project Overview.3. Sandur Project Overview.
4. BOT Road Projects.4. BOT Road Projects.
5. Urban Infrastructure.5. Urban Infrastructure.
6. Tourism Projects.6. Tourism Projects.
Bangalore Metropolitan Region Development Authority (BMRDA) Projects
Bangalore Metropolitan Region Development Authority (BMRDA) Projects
Development of Trunk Road Network & Five Townships :Development of Trunk Road Network & Five Townships :
Satellite Town Ring Roads :Connecting Towns located around Bangalore City.
Intermediate Ring Roads :
Connecting Industrial & Residential Developments.
Radial Roads :
Radiating from Bangalore City Connecting BMR – Satellite Town Ring Roads & BMR – Intermediate Ring Roads.
Townships :Five Townships proposed around Bangalore.
Satellite Town Ring Roads :Connecting Towns located around Bangalore City.
Intermediate Ring Roads :
Connecting Industrial & Residential Developments.
Radial Roads :
Radiating from Bangalore City Connecting BMR – Satellite Town Ring Roads & BMR – Intermediate Ring Roads.
Townships :Five Townships proposed around Bangalore.
www.bmrda.orgwww.bmrda.org
Approach Approach
1. First project at Bidadi through bid route & other projects through SPV [Public Private Partnership] mode. Last date for bidding 30th Nov 2006.
2. Aim : Development of integrated work & live infrastructure and not merely creating plots.
3. Master Plan to be prepared by Private Partner / SPV.
1. First project at Bidadi through bid route & other projects through SPV [Public Private Partnership] mode. Last date for bidding 30th Nov 2006.
2. Aim : Development of integrated work & live infrastructure and not merely creating plots.
3. Master Plan to be prepared by Private Partner / SPV.
Mangalore is a major sea port with a Refinery of ONGC (US$ 20 billion Oil & Gas major) & a Fertilizer Plant.
Mangalore is poised to be the major hub of Petroleum, Chemical & Petrochemical Industries of Southern India.
A new Coastal Special Economic Zone (SEZ) is planned as a part of the PCPIR. SPV incorporated for SEZ (with ONGC, GoK, IL&FS & others).
13000 acres identified & under acquisition. Government committed to acquire additional land required for the PCPIR.
Mangalore is a major sea port with a Refinery of ONGC (US$ 20 billion Oil & Gas major) & a Fertilizer Plant.
Mangalore is poised to be the major hub of Petroleum, Chemical & Petrochemical Industries of Southern India.
A new Coastal Special Economic Zone (SEZ) is planned as a part of the PCPIR. SPV incorporated for SEZ (with ONGC, GoK, IL&FS & others).
13000 acres identified & under acquisition. Government committed to acquire additional land required for the PCPIR.
Plans for Petroleum, Chemicals, Petrochemical Investment Region ( PCPICR )
at Mangalore
Plans for Petroleum, Chemicals, Petrochemical Investment Region ( PCPICR )
at Mangalore
Location MapLocation Map
ONGC – Anchor Tenant. ONGC – Anchor Tenant.
ONGC’s Plan at Mangalore. ONGC’s Plan at Mangalore.
Mangalore – Ideal Destination. Mangalore – Ideal Destination.
Connectivity & Linkages to Mangalore. Connectivity & Linkages to Mangalore.
Facilities at New Mangalore Port Trust
Facilities at New Mangalore Port Trust
Deepest Inner harbor with 15.4 m depth at the entrance channel.
Deep draft Berths for handling POL and other liquid cargo ( VLCCs & LNG Carriers ).
State-of-the-art vessel traffic management system.
Special facilities to handle hazardous cargo.
Back-up area available for future expansion.
Deepest Inner harbor with 15.4 m depth at the entrance channel.
Deep draft Berths for handling POL and other liquid cargo ( VLCCs & LNG Carriers ).
State-of-the-art vessel traffic management system.
Special facilities to handle hazardous cargo.
Back-up area available for future expansion.
PowerPower
Total Installed Capacity : 7,858.5 MW. Total Installed Capacity : 7,858.5 MW.
Capacity Addition :
Taken-up generation of an additional 1,500 MW at a cost of Rs. 5,000 Crores in the next 2 years.
8th Unit of RTPS : 230 MWs (commissioned)
7 Major projects to generate another 4,000 MW at a cost of Rs. 17,000 Crores over the next 5 years at Bijapur, Mysore, Hassan & Gulbarga.
Capacity Addition :
Taken-up generation of an additional 1,500 MW at a cost of Rs. 5,000 Crores in the next 2 years.
8th Unit of RTPS : 230 MWs (commissioned)
7 Major projects to generate another 4,000 MW at a cost of Rs. 17,000 Crores over the next 5 years at Bijapur, Mysore, Hassan & Gulbarga.
o Unrestricted Demand : 7,353 MW.
o Actual Availability : 6,495 MW.
o % of Shortage : 12 %.
o Unrestricted Demand : 7,353 MW.
o Actual Availability : 6,495 MW.
o % of Shortage : 12 %.
Peak Demand projected for 2006 – 2007 :Peak Demand projected for 2006 – 2007 :
www.kptcl.comwww.kptcl.com
Special Economic Zone ( SEZ )Special Economic Zone ( SEZ )
What is a Special Economic Zone?
A specifically delineated duty free enclave and shall be deemed to be foreign territory for the purposes of trade operations and duties and tariffs.
Any private / public / joint sector or State Government or its agencies can set up an SEZ.
Can Foreign Companies set up SEZs?
Yes.
What is a Special Economic Zone?
A specifically delineated duty free enclave and shall be deemed to be foreign territory for the purposes of trade operations and duties and tariffs.
Any private / public / joint sector or State Government or its agencies can set up an SEZ.
Can Foreign Companies set up SEZs?
Yes.
Special Economic ZoneSpecial Economic Zone
1. Are there any terms & conditions for setting up of SEZ ?1. Are there any terms & conditions for setting up of SEZ ?
2. What is role of State Governments ?2. What is role of State Governments ?
3. What are the Incentives / Facilities for an SEZ Developer ?3. What are the Incentives / Facilities for an SEZ Developer ?
4. What are the Incentives / Facilities available for SEZ units ?4. What are the Incentives / Facilities available for SEZ units ?
5. Foreign Direct Investment ?5. Foreign Direct Investment ?
SEZs by Government of Karnataka :
SEZ for Auto at Shimoga. SEZ for Textile at Hassan. SEZ for IT at Mangalore. Mangalore SEZ - JV. SEZ for Pharma & Biotechnology at Hassan. SEZ for Food Processing and Agrobased industries at Hassan.
Other SEZs :
By Infosys, Wipro, Biocon, Suzlon, etc… in sectors such as IT, BT, Apparel, Petrochemical, Wind energy harnessing equipments and parts, Hardware, Contract R&D and multi-products.
SEZs by Government of Karnataka :
SEZ for Auto at Shimoga. SEZ for Textile at Hassan. SEZ for IT at Mangalore. Mangalore SEZ - JV. SEZ for Pharma & Biotechnology at Hassan. SEZ for Food Processing and Agrobased industries at Hassan.
Other SEZs :
By Infosys, Wipro, Biocon, Suzlon, etc… in sectors such as IT, BT, Apparel, Petrochemical, Wind energy harnessing equipments and parts, Hardware, Contract R&D and multi-products.
Special Economic ZoneSpecial Economic Zone
Projects in PipelineProjects in Pipeline
International Convention Center Near Bangalore Airport
International Convention Center Near Bangalore Airport
Bangalore has been identified as one of the locations in the country, for setting up a world-class mega convention center.
Proposed to be located near the new international airport at Devanahalli.
Estimated cost of over Rs. 500 crores.
Project being developed under a PPP structure.
Project is eligible for financial assistance under VGF.
Project related studies are underway.
Qualification process commenced.
Bangalore has been identified as one of the locations in the country, for setting up a world-class mega convention center.
Proposed to be located near the new international airport at Devanahalli.
Estimated cost of over Rs. 500 crores.
Project being developed under a PPP structure.
Project is eligible for financial assistance under VGF.
Project related studies are underway.
Qualification process commenced.www.karnatakatourism.orgwww.karnatakatourism.org
International Convention Center Near Bangalore Airport
International Convention Center Near Bangalore Airport
Express Rail Link to Bangalore Airport
Express Rail Link to Bangalore Airport
Estimated Project Cost : Rs. 800 crores
25-30 year concession
Estimated Project Cost – Rs. 800 crores ( including cost of land and rolling stock ).
Preliminary studies by IDeCK indicate that project could be implemented as a PPP ( MoR + GoK + private investor / developer ).
Route length – approx. 30 kms :
Byappanahalli – New International Airport.
Estimated travel time of 30 minutes.
Estimated fare for one-way trip – Rs. 350 (2008-09).
Check-in facility at city-end terminal.
Detailed Project Studies to be undertaken after approval by Cabinet.
Estimated Project Cost – Rs. 800 crores ( including cost of land and rolling stock ).
Preliminary studies by IDeCK indicate that project could be implemented as a PPP ( MoR + GoK + private investor / developer ).
Route length – approx. 30 kms :
Byappanahalli – New International Airport.
Estimated travel time of 30 minutes.
Estimated fare for one-way trip – Rs. 350 (2008-09).
Check-in facility at city-end terminal.
Detailed Project Studies to be undertaken after approval by Cabinet.
Express Rail Link to Bangalore Airport
Express Rail Link to Bangalore Airport
JLR proposes to develop about 10 new eco–tourism destinations with themes like water sports, trekking, fishing, hang – gliding etc.
The proposal envisages development of these projects either as a management arrangements or on long-term BOT concessions.
JLR has identified about 4 locations ( Almatti, Bonal tank, Jog Falls, Desur ) for development.
Estimated redevelopment costs of Rs. 12-14 crores ( for 4 locations ).
Few of the projects would be on offer to interested parties by October – November 2006.
JLR proposes to develop about 10 new eco–tourism destinations with themes like water sports, trekking, fishing, hang – gliding etc.
The proposal envisages development of these projects either as a management arrangements or on long-term BOT concessions.
JLR has identified about 4 locations ( Almatti, Bonal tank, Jog Falls, Desur ) for development.
Estimated redevelopment costs of Rs. 12-14 crores ( for 4 locations ).
Few of the projects would be on offer to interested parties by October – November 2006.
Eco – Tourism Projects in Karnataka
Eco – Tourism Projects in Karnataka
Jungle Lodges & Resorts, a GoK undertaking, is currently managing 12 eco-tourism based theme resorts in places like Kabini, Dandeli, Karwar etc
Jungle Lodges & Resorts, a GoK undertaking, is currently managing 12 eco-tourism based theme resorts in places like Kabini, Dandeli, Karwar etc
BangaloreBangalore
HospetHospet
HassanHassan
MysoreMysore
Dandeli Dandeli
GoaGoa
Estimated Project Cost : Rs 32 crore
Train to be developed/operated by KSTDC and IRCTC/MoR
Fabrication of coaches for the programmed at ICF, Chennai
To be tendered in September 2006
Estimated Project Cost : Rs 32 crore
Train to be developed/operated by KSTDC and IRCTC/MoR
Fabrication of coaches for the programmed at ICF, Chennai
To be tendered in September 2006
Management Agreement with private operator for Coach interiors & Maintenance, Marketing, Hospitality Services.Management Agreement with private operator for Coach interiors & Maintenance, Marketing, Hospitality Services.
Luxury Tourist TrainLuxury Tourist Train
HubliHubli
Government Flying Training School, Jakkur, Bangalore
Offers courses and training facilities for obtaining Commercial Pilot and Private Pilot Licenses.
GoK proposes to hand over the school to competent private operator on a short-term concession
Intention to redevelop, manage and operate the school at international standards
Government Flying Training School, Jakkur, Bangalore
Offers courses and training facilities for obtaining Commercial Pilot and Private Pilot Licenses.
GoK proposes to hand over the school to competent private operator on a short-term concession
Intention to redevelop, manage and operate the school at international standards
Project development process underway
Tenders likely to be called in October 2006
Project development process underway
Tenders likely to be called in October 2006
Private Operator for GFTSPrivate Operator for GFTS
Objectives– “Welcome gate” which will become the
new focus for the city.
– State of the art / modern terminal infrastructure facilities, amenities, services and conveniences.
– integration of the terminals with the proposed mass transit system and City Railway Station.
– Commercial development.
Objectives– “Welcome gate” which will become the
new focus for the city.
– State of the art / modern terminal infrastructure facilities, amenities, services and conveniences.
– integration of the terminals with the proposed mass transit system and City Railway Station.
– Commercial development.
Tenders likely in October 2006Tenders likely in October 2006
Inter – modal Transit Center at Bangalore
Inter – modal Transit Center at Bangalore
Site Area- 31 Acres ; Estimated project cost- Rs 700 Crores
KSRTC and BMTC propose to jointly develop the existing Kempegowda Bus Terminal at Subhashnagar into an Intermodal Transit Center through Private Sector Participation on BOT basis.
KSRTC and BMTC propose to jointly develop the existing Kempegowda Bus Terminal at Subhashnagar into an Intermodal Transit Center through Private Sector Participation on BOT basis.
Aviation Academy in Bangalore / Mysore.
Private Bus Terminal at Channapatna.
Biotech Park.
Aviation Academy in Bangalore / Mysore.
Private Bus Terminal at Channapatna.
Biotech Park.
Other ProjectsOther Projects
Development of Tornagallu – Kudligi State Highway. Development of Tornagallu – Kudligi State Highway.
Transfer Stations at Bangalore – SWM.
Solid Waste Treatment & Disposal facilities at 7 ULBs.
Ultra Mega Power Project ( 4000 MW ) at Tadri on BOO basis – CEA initiative ( EOIs called in April this year ).
Transfer Stations at Bangalore – SWM.
Solid Waste Treatment & Disposal facilities at 7 ULBs.
Ultra Mega Power Project ( 4000 MW ) at Tadri on BOO basis – CEA initiative ( EOIs called in April this year ).
Other Transport Terminal Projects. Other Transport Terminal Projects.
Sl No.
District Proposed forLand
in acres
1. Between Dharwad & Hubli IT SEZ 1000
2. Mysore Fab city 1500
3. Belgaum a) Textile Park / SEZb) Food Processing park near Kittur
10001000
4. Sathnur, Bangalore Rural District Auto components, Tourism project like Disneyland etc. 1000
5.i) Shimogaii) Sidlipura, Shimoga
*SEZ for Auto componentsTextile Park
4401000
6. Hassana)* SEZ for Pharma and Biotechnologyb)* SEZ for Food Processing & Agro-based industriesc)* SEZ for Textiles
703395618
7. Kurnad, Mangalore LCV / Automobile manufacturing 1000
8.BangaloreMysore, Dharwad, Belgaum
Life Sciences Park104
As needed
9. Karwar & surrounding area Toursim Project like Tourism village As needed
Contd…Contd…
GOK is encouraging investments in Tier – II cities viz., Hubli – Dharwad, Mangalore, Mysore, Belgaum, Bellary.GOK is encouraging investments in Tier – II cities viz., Hubli – Dharwad, Mangalore, Mysore, Belgaum, Bellary.
Suggested Projects for Investments in Karnataka
Suggested Projects for Investments in Karnataka
Sl No.
District Proposed forLand
in acres
10. Kolar – Mulbagal – Bangarpet Warehousing and Reverse logistics 1000
11. BijapurAn SEZ / Park can be developed alongwith Air cargo facility & township
5,000 – 10,000
12. Bagepalli, Kolar SEZ 1,000 – 2,500
13. Bidar SEZ for Chemical industries 500
14. Raichur * Growth Centre 2,000
15. Jewargi, Gulbarga * Food Park 105
16.Bellary ( Between Kudathini & Bellary / Toranagallu & Kudathini
Apparel Park (Water can be provided from Almatti dam)
1,000
17 Bagalkot SEZ for food processing 250
18 Mandya, Tubinakere Industrial park 2,000
19 Tumkur Industrial park 1,000
* Areas already developed by KIADB, ready to occupy.* Areas already developed by KIADB, ready to occupy.
Suggested Projects for Investments in Karnataka
Suggested Projects for Investments in Karnataka
New Industrial PolicyNew Industrial Policy
Statement of Intent
Valid for 5 years
Statement of Intent
Valid for 5 years
Industrial Policy 2006 – 2011 : ObjectiveIndustrial Policy 2006 – 2011 : Objective
GSDP Growth over 9%
Industrial Sector Growth over 12%
Exports:15-20%
Employment Generation: Min. 1million
GSDP Growth over 9%
Industrial Sector Growth over 12%
Exports:15-20%
Employment Generation: Min. 1million
Industrial Policy 2006 – 2011 : StrategyIndustrial Policy 2006 – 2011 : Strategy
Infrastructure
Dispersal of industries – special incentives
Skill Development
Infrastructure
Dispersal of industries – special incentives
Skill Development
⇒Infrastructure upgradation fund-INR 500 Crores (USD 110 Million)
⇒Development and Maintenance of Industrial Estates in Public Private Partnership (PPP)
⇒Infrastructure upgradation fund-INR 500 Crores (USD 110 Million)
⇒Development and Maintenance of Industrial Estates in Public Private Partnership (PPP)
InfrastructureInfrastructure
⇒Three Zones (Zone-1, 2 & 3)
⇒Incentives
Capital Investment Subsidy
Stamp Duty
Conversion Fine
Subsidy for EFT (Effluent Treatment Plant)
Entry Tax Concession
⇒Three Zones (Zone-1, 2 & 3)
⇒Incentives
Capital Investment Subsidy
Stamp Duty
Conversion Fine
Subsidy for EFT (Effluent Treatment Plant)
Entry Tax Concession
Dispersal of IndustriesDispersal of Industries
⇒Training Centers (Apparel, Building Construction)
⇒Scheme for on the Job Training & Employment
⇒Training Centers (Apparel, Building Construction)
⇒Scheme for on the Job Training & Employment
Skill DevelopmentSkill Development
Rural Digital Services – Bridging the Urban-Rural Divide
Kaveri – Registration of Property Transactions
CET – Centralized Seat allotment
Khajane – Treasury Transaction Tracking
Bhoomi – Computerised Land Records
Therige – Tax Administration
Sachivalaya Vahini – Secretariat LAN
Saarige – Transport Administration
Krishi Marata Vahini – Agriculture Commodity Market Information
Bangalore One – Single window citizen services
Rural Digital Services – Bridging the Urban-Rural Divide
Kaveri – Registration of Property Transactions
CET – Centralized Seat allotment
Khajane – Treasury Transaction Tracking
Bhoomi – Computerised Land Records
Therige – Tax Administration
Sachivalaya Vahini – Secretariat LAN
Saarige – Transport Administration
Krishi Marata Vahini – Agriculture Commodity Market Information
Bangalore One – Single window citizen services
Initiatives in E-GovernanceInitiatives in E-Governance
Fair Bidding ProcessFair Bidding Process
Implementation through PPP Mode
Selection of Partners by Transparent Procedures
Advertisement, Pre-bid, Bidding, Evaluation & Selection
Evaluation (Technical and Cost Bid)
Implementation through PPP Mode
Selection of Partners by Transparent Procedures
Advertisement, Pre-bid, Bidding, Evaluation & Selection
Evaluation (Technical and Cost Bid)
YourInvestmentNavigator
YourInvestmentNavigator
Year of Establishment1992
Year of Establishment1992
KarnatakaUdyogMitra
KarnatakaUdyogMitra
Single Window SystemSingle Window System
District Level Single Window Clearance Committee (DLSWCC) - For Investments upto Rs. 3 Crores.
District Level Single Window Clearance Committee (DLSWCC) - For Investments upto Rs. 3 Crores.
State Level Single Window Clearance Committee (SLSWCC) For Investments between Rs. 3 Crores to Rs. 50 Crores.
State Level Single Window Clearance Committee (SLSWCC) For Investments between Rs. 3 Crores to Rs. 50 Crores.
State High Level Clearance Committee (SHLCC) chaired by the Chief Minister – For Investments above Rs. 50 Crores.
State High Level Clearance Committee (SHLCC) chaired by the Chief Minister – For Investments above Rs. 50 Crores.
1. Year Wise Approvals of Projects by SLSWCC.1. Year Wise Approvals of Projects by SLSWCC.
2. Year Wise Approvals of Projects by HLCC.2. Year Wise Approvals of Projects by HLCC.
Karnataka Diaspora CellKarnataka Diaspora Cell
This Cell will connect Karnataka
Diaspora, residing in various parts of
the world to Karnataka.
This Cell will connect Karnataka
Diaspora, residing in various parts of
the world to Karnataka.
Free Memberships to all NRIs / People of Karnataka Origin (PKOs).
Interactive website.
Publication of Newsletter / circulars.
Creation of data base.
Event Management.
Cell will be run by a private agency identified by GOK.
Free Memberships to all NRIs / People of Karnataka Origin (PKOs).
Interactive website.
Publication of Newsletter / circulars.
Creation of data base.
Event Management.
Cell will be run by a private agency identified by GOK.
Karnataka Diaspora CellKarnataka Diaspora Cell
Mr. K. M. Shivakumar, IAS
Principal Secretary to Government of Karnataka
Commerce & Industries Department
# 106, 1st Floor, Vikasa Soudha, Dr. Ambedkar Veedhi,
Bangalore-560 001, India.
e-mail : [email protected]
Mr. K. M. Shivakumar, IAS
Principal Secretary to Government of Karnataka
Commerce & Industries Department
# 106, 1st Floor, Vikasa Soudha, Dr. Ambedkar Veedhi,
Bangalore-560 001, India.
e-mail : [email protected]
For Further Details, Contact :
For Further Details, Contact :
Dr. Raj Kumar Khatri, IAS
Director of Industries & Commerce and Commissioner for Industrial Development, Chairman KUM
DIRECTORATE OF INDUSTRIES & COMMERCE
Government of Karnataka
2nd Floor, South Block, Khanija Bhavan, Race Course Road,
Bangalore-560 001, India.
Website : www.karnatakaindustry.gov.in
Dr. Raj Kumar Khatri, IAS
Director of Industries & Commerce and Commissioner for Industrial Development, Chairman KUM
DIRECTORATE OF INDUSTRIES & COMMERCE
Government of Karnataka
2nd Floor, South Block, Khanija Bhavan, Race Course Road,
Bangalore-560 001, India.
Website : www.karnatakaindustry.gov.in
Mr. H.L Shivananda
Managing Director,
KARNATAKA UDYOG MITRA
(A Govt. Of Karnataka Organisation)
3rd Floor, South Block, Khanija Bhavan,
Race Course Road, Bangalore-560 001, India.
Ph : 91 – 80 – 2228 2392, 2228 5659, 2238 1232, 2228 6632
Fax : 91 – 80 – 2226 6063
e-mail: [email protected]
Visit us at : ww.kumbangalore.com
Mr. H.L Shivananda
Managing Director,
KARNATAKA UDYOG MITRA
(A Govt. Of Karnataka Organisation)
3rd Floor, South Block, Khanija Bhavan,
Race Course Road, Bangalore-560 001, India.
Ph : 91 – 80 – 2228 2392, 2228 5659, 2238 1232, 2228 6632
Fax : 91 – 80 – 2226 6063
e-mail: [email protected]
Visit us at : ww.kumbangalore.com
For Further Details, Contact :
For Further Details, Contact :